Nuclear power risk assessment method based on equipment degradation information and computer device

By constructing dynamic event trees and fault trees and dynamically updating them, the problem of insufficient correlation between equipment degradation information and accident evolution process is solved, and the accuracy and comprehensiveness of nuclear power plant system risk assessment are achieved.

CN123140685APending Publication Date: 2026-11-20SHENZHEN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611649735.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-23
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In nuclear power plants, the correlation between equipment degradation information and accident evolution processes and system risks is insufficient, making it difficult for risk assessments to fully reflect the impact of equipment degradation on the operating status of nuclear power plant systems and accident evolution.

Method used

By constructing a dynamic event tree, combining system simulation models and equipment degradation prediction information, the fault tree probability is dynamically updated, the probability of accident evolution path is recursively determined, and the risk assessment results of the nuclear power plant system are generated.

Benefits of technology

It enables the effective correlation between equipment degradation information and the nuclear power plant accident evolution process and system status, allowing for a more accurate assessment of the impact of equipment degradation on the accident path and outcome, and providing a comprehensive and precise risk assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140685A_ABST
    Figure CN123140685A_ABST
Patent Text Reader

Abstract

The application relates to a nuclear power risk assessment method based on equipment degradation information and computer equipment, and relates to the technical field of nuclear power plant safety analysis. The method comprises the following steps: performing system simulation based on a system simulation model and an initiating event; in the simulation process, a dynamic event tree is created according to a dynamic event tree construction rule; for each functional event branch node in the dynamic event tree, conditional probability updating is performed on a fault tree based on equipment degradation prediction information, the probabilities of branch paths under the functional event branch node are determined, and the path probabilities of all termination paths of the dynamic event tree are recursively determined; and according to the path probabilities of all termination paths and corresponding simulation results, a risk assessment result of a nuclear power plant system to be evaluated is generated. The application can realize closed-loop conversion from an equipment degradation state to a risk model parameter, the risk assessment result is updated in real time according to the actual health state of the equipment, and the timeliness, accuracy and mechanism consistency of risk assessment under a nuclear power accident scenario are significantly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application belongs to the field of nuclear power plant safety analysis technology, and in particular relates to a nuclear power risk assessment method and computer equipment based on equipment degradation information. Background Technology

[0002] Equipment in nuclear power plants may be affected by factors such as operating conditions, environmental conditions, and operating time during long-term operation, and its operating status and performance may change. Changes in equipment status can further affect the operating status of the nuclear power plant system and the evolution of accidents. Therefore, in the process of risk assessment of nuclear power plants, it is necessary to comprehensively consider the operating status of equipment and its changes.

[0003] Nuclear power plant risk assessment involves various types of information, including equipment status, system operating status, and accident evolution outcomes. These different types of information vary in data format, time scale, and description method. During the accident evolution process, both equipment status and system status may change over time, leading to dynamic correlations between risk information at different stages. Furthermore, there are correspondences between equipment degradation information and the probabilistic information, system status information, and accident outcome information involved in the risk assessment process, making the unified correlation and comprehensive utilization of relevant information quite complex.

[0004] Therefore, given the degradation of nuclear power plant equipment, how to comprehensively consider the degradation status of the equipment and its impact on the operating status of the nuclear power plant system and the outcome of accidents, in order to achieve a more comprehensive risk assessment of the nuclear power plant system, has become a technical issue that needs attention. Summary of the Invention

[0005] In view of this, embodiments of this application provide a nuclear power risk assessment method and computer equipment based on equipment degradation information to address the problem that insufficient correlation between nuclear power plant equipment degradation information and accident evolution process and system risk leads to the risk assessment failing to fully reflect the impact of equipment degradation on the nuclear power plant system operating status, accident evolution, and risk outcome. This method achieves an effective correlation between equipment degradation information and nuclear power plant accident evolution process, system status, and risk outcome, and on this basis comprehensively reflects the impact of equipment degradation on accident occurrence paths and corresponding accident outcomes, thereby realizing nuclear power plant system risk assessment based on equipment degradation information.

[0006] A first aspect of this application provides a nuclear power risk assessment method based on equipment degradation information, the method comprising: Identify the nuclear power plant system, target equipment, and initiating event to be evaluated, and obtain the dynamic event tree construction rules, which are used to configure the creation conditions of branch nodes in the dynamic event tree; The system simulation is performed based on the system simulation model of the nuclear power plant system to be evaluated and the initiating event. During the simulation, branch nodes of the dynamic event tree are created according to the dynamic event tree construction rules to complete the construction of the dynamic event tree. For each functional event branch node in the dynamic event tree, based on the branch time data corresponding to the functional event branch node and the device degradation prediction information of the target device, the fault tree corresponding to the functional event branch node is conditionally probabilistically updated, and the probability of each branch path under the functional event branch node is determined according to the updated fault tree; wherein, the branch time data includes the simulation system state data and the target device degradation state data at the branch time, and the functional event branch node is a branch node created based on the judgment of success or failure of safety function event; Based on the branch probabilities corresponding to the functional event branch nodes, the path probabilities of each termination path from the root node of the dynamic event tree to the node corresponding to the simulation termination condition are recursively determined. Based on the path probabilities of each termination path in the dynamic event tree and the corresponding simulation results, the risk assessment results of the nuclear power plant system to be evaluated are generated.

[0007] In one implementation of the first aspect, the system simulation is performed based on the system simulation model of the nuclear power plant system to be evaluated and the initiating event. During the simulation, branch nodes of the dynamic event tree are created according to the dynamic event tree construction rules to complete the construction of the dynamic event tree, including: Construct a system simulation model of the nuclear power plant system to be evaluated; The system simulation is performed based on the system simulation model and the initiating event, and the root node of the dynamic event tree is created according to the initiating event; During the simulation, if the simulation data triggers the dynamic event tree construction rule, a branch node of the dynamic event tree is created in the current simulation path, and the branch time data corresponding to the branch node is recorded. The branch time data includes the simulation system state data and the target device degradation state data at the branch time. Based on the simulation system state data at the branch moment and the target device degradation state data, each branch path under the branch node is simulated independently; Returning to the steps described above, if the simulation data triggers the dynamic event tree construction rule during the simulation process, a branch node of the dynamic event tree is created in the current simulation path, and the branch time data corresponding to the branch node is recorded, until the simulation termination condition is triggered to complete the construction of the dynamic event tree.

[0008] In one implementation of the first aspect, the step of performing conditional probability updates on the fault tree corresponding to each functional event branch node in the dynamic event tree, based on the branch time data corresponding to the functional event branch node and the device degradation prediction information of the target device, and determining the probability of each branch path under the functional event branch node according to the updated fault tree, includes: For each functional event branch node in the dynamic event tree, determine the fault tree corresponding to the functional event branch node; Based on the device degradation prediction information of the target device, the dynamic failure probability of the corresponding failure mode of the target device is determined, and the fault tree is conditionally updated based on the dynamic failure probability and the branch time data corresponding to the functional event branch node. The branch probability of the functional event branch node is determined based on the updated fault tree, and the probability of each branch path under the functional event branch node is determined based on the branch probability.

[0009] In one implementation of the first aspect, determining the dynamic failure probability of the failure mode corresponding to the target device based on the device degradation prediction information of the target device, and performing conditional probability updates on the fault tree based on the dynamic failure probability and the branch time data corresponding to the functional event branch node, includes: Acquire multi-source monitoring data of the target device, and construct health indicators of the target device based on the multi-source monitoring data; A degradation process model of the target device is established based on the health indicators, and the probability density function of the remaining useful life of the target device is determined based on the degradation process model. Based on the remaining useful life probability density function and the task time window corresponding to the functional event branch node, the dynamic failure probability of the failure mode corresponding to the target device is determined, and the dynamic failure probability is used as the probability parameter of the basic event corresponding to the failure mode in the fault tree.

[0010] In one implementation of the first aspect, acquiring multi-source monitoring data of the target device and constructing health indicators of the target device based on the multi-source monitoring data includes: Obtain multi-source monitoring data of the target device at the current evaluation time; The multi-source monitoring data is preprocessed and time window aligned to obtain time-aligned and continuous multi-source monitoring data. The time-aligned and continuous multi-source monitoring data is segmented using a sliding window method; Features are extracted from each segment of multi-source monitoring data, and filtered based on the features to obtain target features characterizing the degradation trend of the target device. The features include time-domain features, frequency-domain features, and time-frequency-domain features. Based on the target features, the health indicators of the target device at the current evaluation time are obtained by fusing them. The health indicators are expressed as follows: ; in, Indicates the target device At the assessment time Health indicators Indicates the target device At the evaluation time Multi-source monitoring data within the corresponding time window, Indicates that it is aimed at the target device. The process involves extracting, filtering, and fusing features from multi-source monitoring data to obtain the health indicators.

[0011] In one implementation of the first aspect, the step of establishing a degradation process model of the target device based on the health indicators, and determining the probability density function of the remaining useful life of the target device based on the degradation process model, includes: A nonlinear stochastic degradation process model for the target device is established based on the aforementioned health indicators. This degradation process model is expressed as follows: ; in, Indicates the target device At any moment The corresponding health indicator stochastic process, Indicates the target device The stochastic process value of the health indicator corresponding to the initial moment of the degradation process. Indicates the target device At any moment The corresponding drift coefficient, which characterizes the degradation rate of the target device, Indicates the target device At any moment The corresponding diffusion coefficient, which characterizes the volatility of the degradation process of the target equipment. Represents standard Brownian motion; Based on the random process of the health indicators and the health indicator failure threshold of the corresponding failure mode of the target device, determine the failure time when the target device reaches the health indicator failure threshold: ; in, Indicates the target device Corresponding failure mode Failure time, Indicates the target device The current assessment time corresponding to the equipment degradation prediction. Indicates the target device Corresponding failure mode The health indicator failure threshold, This indicates the earliest time when the random process of the health indicator reaches or exceeds the failure threshold of the health indicator; The remaining useful life random variable of the target device, starting from the current evaluation time, is determined based on the failure time, and the remaining useful life random variable satisfies... ;in, Indicates the target device At the current assessment moment Corresponding failure mode The remaining useful life is a random variable; Based on the remaining useful life random variable, determine the conditional probability density function of the remaining useful life random variable: And the conditional cumulative distribution function corresponding to the conditional probability density function: ; in, This indicates the relative time of the remaining useful life. Indicates the target device From the initial time to the current evaluation time The acquired monitoring data, This indicates the target device determined based on the monitoring data. Corresponding failure mode The conditional probability density function of the remaining useful life.

[0012] In one implementation of the first aspect, determining the dynamic failure probability of the target device corresponding to the failure mode based on the remaining useful life probability density function and the task time window corresponding to the branch node includes: Based on the branching time of the functional event branch node Task duration and the current assessment time Determine the relative time interval of the task time window with respect to the current evaluation time. ],in, ; ; The target device is calculated based on the conditional cumulative distribution function corresponding to the conditional probability density function. Corresponding failure mode In the functional event branch node The probability of condition failure within the corresponding task time window:

[0013] in, Indicates the functional event branch node The start time of the corresponding task time window relative to the current evaluation time Relative time, Indicates the functional event branch node The corresponding task time window end time relative to the current evaluation time Relative time, Indicates the target device Corresponding failure mode In the functional event branch node The probability of condition failure within the corresponding task time window. Indicates the target device Corresponding failure mode The remaining useful life conditional cumulative distribution function.

[0014] In one implementation of the first aspect, determining the branch probability of the functional event branch node based on the updated fault tree, and determining the probability of each branch path under the functional event branch node based on the branch probability, includes: Based on the probability parameters of each basic event in the updated fault tree, determine the probability of the top event of the fault tree:

[0015] in, This indicates that the fault tree is at the functional event branch node. The probability of the top event at a given location. This represents the total number of minimum cut sets corresponding to the fault tree. Indicates the first Minimal cut set This represents the basic events in the fault tree. Represents the basic event In the functional event branch node The probability parameter at that location; The probability of the top event is determined as the probability of the failed branch corresponding to the functional event branch node, and the probability of the successful branch is determined based on the complement probability of the top event probability. ; ; in, Indicates the functional event branch node The corresponding probability of a security function failure branch. Indicates the functional event branch node The probability of a successful branch for the corresponding security function; Based on the branch probability corresponding to the functional event branch node, the first in the dynamic event tree is recursively determined. The dynamic event path passes through the functional event branch node. The probability of the subsequent path: ; in, Indicates the first A dynamic event path leads to the functional event branch node. Previous path probabilities, Indicates the functional event branch node The corresponding branch conditional probability, Indicates the first The dynamic event path passes through the functional event branch node. The probability of the subsequent path.

[0016] In one implementation of the first aspect, the method further includes: Based on the device degradation prediction information of the target device, multiple degradation states of the target device are determined, and based on the device degradation prediction information, the conditional probability of the target device being in each degradation state is determined; The performance multipliers corresponding to each degradation state are determined, and the equivalent performance multipliers of the target device at the current evaluation moment are determined based on the conditional probabilities of each degradation state and the corresponding performance multipliers.

[0017] in, Indicates the target device At the assessment time The corresponding equivalent performance multiplier, This indicates the upper limit of the state number corresponding to the number of degradation states of the target device. Indicates the target device At the assessment time In the first The conditional probability of a degenerate state. Indicates the first The performance multiplier corresponding to each degenerate state; Based on the equivalent performance multiplier and the rated physical parameters of the target device, determine the device's physical parameters in the degradation state corresponding to the current evaluation time: ; in, Indicates the target device At the assessment time Corresponding physical parameters of the equipment in a degraded state. Indicates that it is aimed at the target device. The established performance mapping function, Indicates the target device At the assessment time The corresponding equivalent performance multiplier, Indicates the target device The rated physical parameters corresponding to a healthy state; The device physical parameters are input into the system simulation model through the device performance parameter interface set in the system simulation model, so that the system simulation model can perform system simulation based on the device physical parameters to obtain system simulation results.

[0018] A second aspect of this application provides a computer device including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the steps of the nuclear power risk assessment method based on equipment degradation information as described in any of the first aspects.

[0019] Compared with the prior art, the technical effects of this application are as follows: By identifying the nuclear power plant system, target equipment, and initiating event to be evaluated, and conducting system simulation based on the system simulation model and the initiating event, branch nodes of the dynamic event tree are created according to the dynamic event tree construction rules during the simulation process. This allows the branch nodes of the dynamic event tree to correspond to the system state at the corresponding stage during the system simulation process, thereby enabling a dynamic description of the accident evolution process based on the system simulation process. This provides branch information corresponding to the accident evolution process for subsequent risk probability analysis.

[0020] By targeting functional event branch nodes in a dynamic event tree, and based on the branch time data corresponding to the functional event branch node and the device degradation prediction information of the target device, conditional probability updates are performed on the fault tree corresponding to the functional event branch node. The probability of each branch path under the functional event branch node is determined according to the updated fault tree. This allows the device degradation information of the target device to be combined with the system state and device degradation state at the corresponding moment during the accident evolution process to affect the functional event branch probability, thereby enabling the functional event branch probability to reflect the impact of the target device degradation state on safety functional events.

[0021] By recursively determining the path probability of each termination path from the root node of the dynamic event tree to the node corresponding to the simulation termination condition based on the branch probability corresponding to each functional event branch node, the branch probability corresponding to each functional event branch node can be transmitted along the accident evolution path, thereby obtaining the path probability corresponding to each termination path and quantifying the probability of occurrence of different accident evolution paths.

[0022] By using the path probabilities of each termination path in the dynamic event tree and the corresponding simulation results, a risk assessment result for the nuclear power plant system to be evaluated is generated. This combines the occurrence probabilities of different accident evolution paths with the corresponding system simulation results, thereby comprehensively reflecting the impact of equipment degradation on the nuclear power plant accident evolution process and its outcome, and forming a risk assessment result for the nuclear power plant system to be evaluated.

[0023] In summary, this application correlates equipment degradation information with the nuclear power plant accident evolution process, dynamically updates the branch probabilities of functional events based on the corresponding system state and equipment degradation state during the accident evolution process, and then obtains the path probability of each termination path through recursion of the branch probabilities. Combined with the simulation results corresponding to each termination path, risk assessment is carried out. This allows the path probabilities used in the risk assessment process to change with the equipment degradation state and the accident evolution state, enabling a more accurate and precise characterization of the impact of equipment degradation on the probability of different accident evolution paths and the consequences of the accident. As a result, a more comprehensive and accurate assessment of the risk level of the nuclear power plant system is achieved, obtaining risk assessment results corresponding to the equipment degradation state and the accident evolution results. Attached Figure Description

[0024] To more clearly illustrate the technical solutions in the embodiments of this application, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0025] Figure 1 This is a schematic diagram illustrating the implementation process of the nuclear power risk assessment method based on equipment degradation information provided in this application embodiment; Figure 2 This is a schematic diagram of a nuclear power risk assessment system based on equipment degradation information provided in an embodiment of this application; Figure 3 This is a schematic diagram of the computer device provided in an embodiment of this application; Figure 4 This is a schematic diagram of a computer program product provided in an embodiment of this application. Detailed Implementation

[0026] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application may also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.

[0027] It should be understood that, when used in this application specification and the appended claims, the term "comprising" indicates the presence of the described features, integrals, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components and / or a collection thereof.

[0028] It should also be understood that the term “and / or” as used in this application specification and the appended claims means any combination of one or more of the associated listed items and all possible combinations, and includes such combinations.

[0029] As used in this application specification and the appended claims, the term "if" may be interpreted, depending on the context, as "when," "once," "in response to determination," or "in response to detection." Similarly, the phrase "if determined" or "if detected [the described condition or event]" may be interpreted, depending on the context, as meaning "once determined," "in response to determination," "once detected [the described condition or event]," or "in response to detection [the described condition or event]."

[0030] Furthermore, in the description of this application and the appended claims, the terms "first," "second," "third," etc., are used only to distinguish descriptions and should not be construed as indicating or implying relative importance.

[0031] References to "one embodiment" or "some embodiments" as described in this specification mean that one or more embodiments of this application include a specific feature, structure, or characteristic described in connection with that embodiment. Therefore, the phrases "in one embodiment," "in some embodiments," "in other embodiments," "in still other embodiments," etc., appearing in different parts of this specification do not necessarily refer to the same embodiment, but rather mean "one or more, but not all, embodiments," unless otherwise specifically emphasized. The terms "comprising," "including," "having," and variations thereof mean "including but not limited to," unless otherwise specifically emphasized.

[0032] The nuclear power risk assessment method based on equipment degradation information provided in this application can be applied to computer devices such as mobile phones, tablets, wearable devices, in-vehicle devices, augmented reality (AR) / virtual reality (VR) devices, laptops, ultra-mobile personal computers (UMPCs), netbooks, and personal digital assistants (PDAs). This application does not impose any restrictions on the specific type of computer device.

[0033] like Figure 1 The diagram shown is a flowchart of a nuclear power risk assessment method based on equipment degradation information provided in this application embodiment. The method includes: Step S101: Determine the nuclear power plant system, target equipment, and initiating event to be evaluated, and obtain the dynamic event tree construction rules. The dynamic event tree construction rules are used to configure the creation conditions of branch nodes in the dynamic event tree.

[0034] First, the boundary objects and logical framework of the risk assessment are clearly defined. The nuclear power plant system to be assessed is selected as the analysis object, and target equipment corresponding to key safety functions is identified. These target devices must have available operational monitoring data, and their performance degradation will directly affect the system's safety functions. Specific initiating events are also defined as the initial trigger points for risk evolution. Based on this, pre-configured dynamic event tree construction rules are obtained. These rules define the specific triggering conditions for the dynamic event tree to automatically generate branch nodes during simulation, such as exceeding process variable thresholds, changes in equipment status, or operator responses. Through these settings, it is ensured that the subsequent risk assessment model is built upon clear physical boundaries and logical rules, providing a standardized modeling foundation for dynamic probabilistic risk assessment.

[0035] Step S102: Perform system simulation based on the system simulation model and initiating events of the nuclear power plant system to be evaluated, and create branch nodes of the dynamic event tree according to the dynamic event tree construction rules during the simulation process to complete the construction of the dynamic event tree.

[0036] Using a system simulation model, the changes in the system's physical parameters under disturbance are deduced starting from a predetermined initiating event. System state data is continuously monitored during real-time simulation. Once the simulation data meets the triggering conditions defined by the aforementioned dynamic event tree construction rules, a branch node of the dynamic event tree is automatically created on the current simulation path. Each newly created branch node records the current system and device states, thus forming a dynamic event tree structure with a time dimension. This process overcomes the limitation of traditional static event trees in reflecting the continuous evolution of system states under complex operating conditions, achieving a realistic reconstruction of the accident process.

[0037] Step S103: For each functional event branch node in the dynamic event tree, based on the branch time data corresponding to the functional event branch node and the device degradation prediction information of the target device, perform conditional probability updates on the fault tree corresponding to the functional event branch node, and determine the probability of each branch path under the functional event branch node according to the updated fault tree; wherein, the branch time data includes the simulation system state data and the target device degradation state data at the branch time, and the functional event branch node is a branch node created based on the judgment of success or failure of safety functional events.

[0038] For each functional event branch node in the dynamic event tree created based on the success or failure judgment of a safety function event, the system state data and the degradation state data of the target device at that node's moment are extracted as branch moment data. Combined with device degradation prediction information, i.e., the remaining service life probability distribution obtained based on fault prediction and health management technologies, the fault tree corresponding to that functional event is conditionally updated with probabilities. Specifically, the dynamic failure probability of the device within the task time window is written into the basic event corresponding to the fault tree, replacing the traditional static empirical probability, and the probability of the top event of the fault tree is recalculated. This top event probability is used as the success or failure branch probability of the functional event branch node, thereby determining the probability of each branch path under that node. This processing method realizes the transformation from the dynamic probability of the basic event of the fault tree to the branch probability of the dynamic event tree, enabling the risk assessment results to change dynamically with the actual health status of the equipment.

[0039] Step S104: Based on the branch probabilities corresponding to the functional event branch nodes, recursively determine the path probabilities of each termination path from the root node of the dynamic event tree to the node corresponding to the simulation termination condition.

[0040] After obtaining the branch probabilities of each functional event branch node, the dynamic event tree is used to recursively deduce the event evolution path layer by layer, starting from the root node corresponding to the initiating event and proceeding down each possible path. By multiplying the historical probability of the current path by the branch probabilities of each functional event branch node, the final path probability of each termination path reaching the node corresponding to the simulation termination condition is calculated. This quantifies the overall probability of different accident sequences occurring, providing an accurate probability weighting basis for subsequent risk indicator calculations.

[0041] Step S105: Generate the risk assessment results of the nuclear power plant system to be evaluated based on the path probabilities of each termination path in the dynamic event tree and the corresponding simulation results.

[0042] By combining the path probabilities of each identified termination path with the physical consequences data output by the system simulation model at the end of each path, core risk indicators such as cumulative core damage frequency and equipment importance are statistically calculated. Finally, a complete risk assessment result is generated, including risk level assessment and the correlation between equipment degradation and safety margin. This result visually demonstrates the impact of equipment aging or performance degradation on safety margin, providing dynamic probabilistic evidence for risk guidance, online risk monitoring, and accident mitigation strategy evaluation in nuclear power plants.

[0043] Specifically, for each termination path in the dynamic event tree, the path probability of the termination path is associated with the system simulation result corresponding to the termination path, and the corresponding system simulation result is weighted according to the path probability of each termination path to obtain the risk assessment result of the nuclear power plant system to be evaluated.

[0044] In another optional embodiment, system simulation is performed based on the system simulation model of the nuclear power plant system to be evaluated and the initiating event. During the simulation, branch nodes of the dynamic event tree are created according to the dynamic event tree construction rules to complete the construction of the dynamic event tree, including: Step S201: Construct a system simulation model of the nuclear power plant system to be evaluated.

[0045] Before starting specific accident evolution simulations, a deterministic model that can realistically reflect the physical evolution of the target nuclear power plant system under accident conditions should be established. The system simulation model is the basic carrier for realizing dynamic probabilistic risk assessment. Its core role is to provide continuously changing system state data for subsequent accident process simulations, and to serve as the engine for receiving equipment performance parameter updates and driving dynamic event tree branch triggering.

[0046] In a preferred embodiment, the system simulation model can be built using a thermal-hydraulic program such as RELAP5. This model includes not only the main thermal loops such as the reactor coolant system, steam generator and its secondary side, main feedwater and auxiliary feedwater systems, but also related pump and valve components, protection and control logic, and waste heat removal paths. By setting initiating events and related control logic in the model, including equipment start-up signals, valve opening and closing conditions, and protection system action conditions, the system simulation can reflect the evolution of equipment actions, control states, and system process variables over time after an accident. Furthermore, for target degraded equipment connected to the fault prediction and health management system, the system simulation model needs to pre-set interfaces for externally updated equipment performance parameters, such as the pump's maximum flow rate and head, and the valve's effective flow area and action time, so that physical parameters calculated based on the equipment's health status can be injected in real time during subsequent simulation cycles.

[0047] Step S202: Perform system simulation based on the system simulation model and the initiating event, and create the root node of the dynamic event tree based on the initiating event.

[0048] Once the system simulation model is built, the initial simulation process is initiated. The system simulation model is run starting from a defined initiating event, such as a partial loss of feedwater accident. The initiating event is a disturbance or fault that causes the nuclear power plant to deviate from its normal operating state and is also the starting point for the evolution of the entire accident sequence.

[0049] Meanwhile, within the logical framework of the dynamic event tree, an initial event sequence framework is established around the initiating event as the root node, revolving around functional events required for accident mitigation, such as reactor shutdown, high-pressure injection, auxiliary feedwater, and cooling depressurization. The creation of the root node marks the formal start of the dynamic event tree construction process; it records the initial moment of the accident and the corresponding initial system state, providing a logical starting point and data benchmark for the generation of branch nodes in subsequent simulations.

[0050] Step S203: During the simulation, if the simulation data triggers the dynamic event tree construction rule, a branch node of the dynamic event tree is created in the current simulation path, and the branch time data corresponding to the branch node is recorded. The branch time data includes the simulation system state data and the target device degradation state data at the branch time.

[0051] As the system simulation continues to run, the system state variables are monitored in real time and compared with the preset dynamic event tree construction rules. The dynamic event tree construction rules are used to configure the creation conditions of branch nodes in the dynamic event tree. These conditions may include, but are not limited to: a safety function needs to be determined as successful or unsuccessful; the results of actions such as starting, stopping, opening, or closing the equipment; the health status of the equipment crossing a preset threshold; the operator's response time falling into different ranges; and process variables such as system pressure, water level, or temperature reaching preset limits.

[0052] When the simulation data meets any of the above triggering conditions, it indicates that the current accident evolution path may have branched at that moment. At this time, a branch node of a dynamic event tree is automatically created on the current simulation path. This branch node represents a key decision point or state transition point in the accident sequence. To ensure the accuracy of subsequent risk assessment, the branch moment data corresponding to this branch node is immediately recorded. The branch moment data is a multi-dimensional state snapshot, including not only system simulation state data at the branch moment, such as physical quantities like pressure, temperature, flow rate, and water level in each loop, but also degradation state data of the target equipment, such as the health index HI(t) or remaining service life (RUL) distribution calculated based on fault prediction and health management monitoring data. This method of synchronously recording the system physical state and equipment health state ensures the integrity and consistency of the information carried by the branch node, avoiding the information fragmentation problem in traditional static probabilistic risk assessment.

[0053] Step S204: Perform independent simulations of each branch path under the branch node based on the simulation system state data and target device degradation state data at the branch moment.

[0054] After creating a new branch node and recording the branch time data, the process enters the sub-path parallel evolution stage. Since a branch node may correspond to multiple possible outcomes, such as successful or failed auxiliary water supply, or different consequences due to different levels of equipment degradation, it is necessary to generate a corresponding sub-path for each possible outcome.

[0055] For each generated sub-path, independent simulation is performed using the recorded branch-time data, starting from the state of its parent path at the branch moment. This means that the system simulation model on each sub-path will continue to extrapolate based on the specific equipment actions, operator responses, or physical parameters of that path. For example, if the equipment corresponding to a sub-path fails, the relevant equipment performance parameters in the system simulation model will be set to the performance multiplier after the failure state or degradation; if the corresponding equipment remains healthy, the rated parameters will be maintained. Through this independent simulation mechanism based on branch-time data, the continuous evolution of the system state under different accident scenarios can be meticulously depicted, thus providing diverse physical evolutionary basis for subsequent probability calculations and risk assessments.

[0056] Step S205: During the simulation process, if the simulation data triggers the dynamic event tree construction rule, a branch node of the dynamic event tree is created in the current simulation path, and the steps of the branch time data corresponding to the branch node are recorded until the simulation end condition is triggered to complete the construction of the dynamic event tree.

[0057] After completing the independent simulation of each sub-path under the current branch node, the system enters the iterative loop phase. The system will check whether the predetermined simulation termination conditions have been met. These conditions may include reaching the end of the risk assessment time range, all active paths having terminated, or meeting other set convergence criteria.

[0058] If the simulation termination condition is not triggered, a return operation is performed, and the simulation continues on the already generated sub-path, repeating steps S203 to S204. That is, during the simulation, new triggering conditions are continuously detected. If the dynamic event tree construction rule is triggered again, new branch nodes are generated and new branch time data is recorded. Then, each new branch path is independently simulated based on the new data. This closed-loop iterative modeling mechanism ensures that the dynamic event tree can be fully embedded in the system simulation process, driven by the simulation data flow and judged by the triggering conditions, forming an automated tree structure growth process. Branch node generation stops only when the simulation termination condition is finally triggered, thus completing the entire dynamic event tree construction process.

[0059] In another optional embodiment, for each functional event branch node in the dynamic event tree, based on the branch time data corresponding to the functional event branch node and the device degradation prediction information of the target device, the fault tree corresponding to the functional event branch node is conditionally probabilistically updated, and the probability of each branch path under the functional event branch node is determined according to the updated fault tree, including: Step S301: For each functional event branch node in the dynamic event tree, determine the fault tree corresponding to the functional event branch node.

[0060] During the operation of the dynamic event tree, when a parent accident path evolves to the point where a certain safety function needs to be determined, a corresponding functional event branch node is formed. At this time, through a pre-established dynamic event tree node-fault tree mapping table, the specific physical equipment and its failure mode on which the functional event depends are located, thereby establishing a structured mapping relationship between the determination of a specific functional event and the failure logic of the underlying equipment during the accident evolution process. Taking the functional event branch node for determining the success or failure of the auxiliary water supply system as an example, its corresponding top event in the fault tree is defined as the failure of the auxiliary water supply function, while the basic events include specific equipment failure modes such as the pump not starting and the isolation valve not opening. This fault tree serves as the carrier for subsequent dynamic probability updates. Its structure consists of equipment components, supports system associations, and common cause failure logic, and is used to transform high-level system functional requirements into quantifiable combinations of underlying equipment states.

[0061] Step S302: Based on the equipment degradation prediction information of the target equipment, determine the dynamic failure probability of the corresponding failure mode of the target equipment, and update the fault tree conditionally based on the dynamic failure probability and the branch time data corresponding to the functional event branch node.

[0062] Step S303: Determine the branch probability of the functional event branch node based on the updated fault tree, and determine the probability of each branch path under the functional event branch node based on the branch probability.

[0063] In one possible implementation, based on the device degradation prediction information of the target device, the dynamic failure probability of the corresponding failure mode of the target device is determined, and based on the dynamic failure probability and the branch time data corresponding to the functional event branch nodes, the fault tree is conditionally updated with probability, including: Step S401: Obtain multi-source monitoring data of the target device and construct health indicators of the target device based on the multi-source monitoring data.

[0064] A multi-source sensor network deployed at key nodes in nuclear power plants collects real-time operational status signals of target equipment. This multi-source monitoring data includes, but is not limited to, vibration signals, temperature readings, pressure values, and flow parameters, collectively forming a raw set of information characterizing the physical state of the equipment. To transform this high-dimensional, heterogeneous, and potentially noisy raw data into a single scalar value that intuitively reflects the degree of equipment performance degradation, a health index needs to be constructed. The construction process first involves time alignment and preprocessing of the raw data to eliminate temporal biases caused by different sampling frequencies, followed by denoising and outlier removal. Subsequently, a feature extraction algorithm is used to extract feature vectors that stably characterize degradation trends from the preprocessed data. Based on this, kernel principal component analysis (KPCA) is used to perform nonlinear dimensionality reduction and fusion of the extracted feature vectors, resulting in a continuous health index sequence. This health index is not a simple statistical average, but a structured scalar specifically designed for state assessment and remaining service life prediction, formed by deeply fusing multi-dimensional degradation features. Its value range is normalized to 0 to 1, where 0 indicates that the device is in a fully healthy initial state, 1 indicates that the device has reached the functional failure threshold, and values ​​between 0 and 1 accurately represent the different performance degradation stages of the device.

[0065] Step S402: Establish a degradation process model for the target equipment based on health indicators, and determine the probability density function of the remaining service life of the target equipment based on the degradation process model.

[0066] After obtaining health indicators characterizing the current degradation state of the equipment, a degradation process model describing the evolution of equipment performance over time is further established. Since the performance degradation of equipment under actual operating conditions is often influenced by both random environmental factors and internal aging mechanisms, exhibiting significant uncertainty, a nonlinear Wiener process is adopted as the basic architecture of the degradation process model. This model can not only fit the overall trend of equipment degradation but also capture the random fluctuations in the degradation process through the diffusion coefficient.

[0067] Step S403: Based on the remaining useful life probability density function and the task time window corresponding to the functional event branch node, determine the dynamic failure probability of the failure mode corresponding to the target device, and use the dynamic failure probability as the probability parameter of the basic event corresponding to the failure mode in the fault tree.

[0068] Within the dynamic probabilistic risk assessment framework, risk assessment is progressively advanced during the simulation process of a dynamic event tree. When the system simulation reaches a certain branch node of the dynamic event tree... At this point, the node corresponds to a specific incident evolution path and a specific time context. To accurately assess the reliability of the target device at this node, the concept of a task time window is introduced. A task time window can refer to the time interval from the triggering time of a branch node in the dynamic event tree to the time interval until the safety function needs to be completed or the next assessment point arrives.

[0069] In another embodiment, acquiring multi-source monitoring data of the target device and constructing health indicators for the target device based on the multi-source monitoring data includes: Step S501: Obtain multi-source monitoring data of the target device at the current evaluation time.

[0070] A network of sensors deployed at key nodes in nuclear power plants, such as pumps and valves, collects real-time operational status information of the target equipment. These sensors include, but are not limited to, vibration accelerometers, temperature thermocouples, pressure transmitters, and flow sensors, used to capture raw signals reflecting the physical state of the equipment. For the target equipment e to be evaluated, at the current evaluation moment... The system reads the corresponding multi-source monitoring data set from the underlying data acquisition system. This multi-source monitoring data is typically heterogeneous, covering signals with different physical dimensions and sampling frequencies, providing basic data support for subsequent feature extraction and fusion.

[0071] Step S502: Perform data preprocessing and time window alignment on the multi-source monitoring data to obtain time-aligned and continuous multi-source monitoring data.

[0072] Raw monitoring data collected from actual industrial sites often suffers from noise interference, missing values, or asynchronous sampling clocks, which can lead to model distortion if used directly for feature extraction. Therefore, the raw data is first cleaned and standardized. Denoising is performed to eliminate random noise introduced by high-frequency electromagnetic interference, missing data points are marked and imputed, and the data from each channel is normalized to unify the units of measurement. Subsequently, to address the issue of inconsistent sampling frequencies among multi-source data, a resampling algorithm is used to map data sequences of different frequencies onto a unified time axis, achieving time window alignment and thus obtaining a time-aligned and continuous multi-source monitoring data sequence. This process ensures that subsequent segmentation and feature extraction operations can be performed on a consistent time reference.

[0073] Step S503: Use a sliding window method to segment the time-aligned and continuous multi-source monitoring data.

[0074] To capture local dynamic trends in device performance degradation and avoid masking short-term anomalies with global data, a sliding window mechanism is used to segment the continuous data stream. A fixed window length is set. and a sliding step Data segments are sequentially extracted along the time axis. For each window position, a subset of multi-source monitoring data within the corresponding time period is extracted. This segmentation strategy not only effectively reduces the data size of a single calculation and improves the computational efficiency of feature extraction, but also enables the extracted feature vectors to more accurately reflect the instantaneous state evolution of the equipment within a specific time interval.

[0075] Step S504: Extract the features of each segment of multi-source monitoring data, and filter them based on the features to obtain target features that characterize the degradation trend of the target equipment. The features include time domain features, frequency domain features, and time-frequency domain features.

[0076] After data segmentation, multi-dimensional feature engineering is performed on each segment of multi-source monitoring data to extract key information highly sensitive to equipment degradation from massive amounts of raw signals. The time-domain statistical characteristics of each data segment are calculated, such as absolute mean, root mean square, peak value, skewness, and kurtosis; the frequency-domain transformation characteristics are calculated, such as spectral energy distribution and dominant frequency amplitude; and the time-frequency joint characteristics are calculated, such as wavelet packet decomposition energy entropy. Considering that the extracted initial features may contain redundancy or excessive correlation, thus affecting subsequent fusion results, the feature set is further dimensionality-reduced and filtered based on feature importance scoring or correlation analysis algorithms. Noisy features with weak correlation to equipment degradation trends are removed, ultimately retaining the core feature set that can stably characterize the degradation trend of the target equipment, i.e., the target features.

[0077] Step S505: Perform fusion based on target features to obtain the health index of the target device at the current evaluation moment; the health index is represented as: ,in, Indicates the target device e at the evaluation time Health indicators Indicates the target device e at the evaluation time Multi-source monitoring data within the corresponding time window, This refers to the process of extracting, filtering, and fusing features from multi-source monitoring data of target device e to obtain health indicators.

[0078] The high-dimensional, heterogeneous feature space is compressed into a low-dimensional, monotonic scalar value with definite physical meaning for subsequent prediction of remaining lifetime. Using a pre-defined feature fusion algorithm, such as kernel principal component analysis (KPCA), weighted summation, or a neural network-based fusion module, the obtained target features are nonlinearly mapped and aggregated. This fusion process is formalized as a function. Its input is multi-source monitoring data within a specific time window. The output is the health index at the current assessment moment. Health indicators The numerical range can be set to [0,1], where 0 represents that the device is in a fully healthy state, 1 represents that the device has reached the failure threshold, and the values ​​in between linearly or non-linearly represent the current degree of performance degradation of the device. Through this structured data pipeline processing, noise and asynchronous interference in the original data are effectively eliminated, significantly improving the ability and robustness of health indicators to represent the actual degradation state of the device, and providing a high-quality input foundation for subsequent degradation process modeling.

[0079] In other embodiments, the feature fusion method may also employ principal component analysis, independent component analysis, or other feature fusion methods capable of obtaining health indicators based on the target features; the health indicators may also be directly provided by the equipment monitoring system.

[0080] One possible implementation involves establishing a degradation process model for the target device based on health indicators, and determining the probability density function of the target device's remaining useful life based on the degradation process model, including: Step S601: Establish a nonlinear stochastic degradation process model for the target equipment based on health indicators. The degradation process model is expressed as: .

[0081] in, This represents the stochastic process of the health index of target device e at time t. This represents the stochastic process value of the health index of the target device e at the initial moment of the degradation process. This represents the drift coefficient of the target device e at time τ. The drift coefficient is used to characterize the degradation rate of the target device. This represents the diffusion coefficient of the target device e at time τ. The diffusion coefficient is used to characterize the volatility of the degradation process of the target device. This represents standard Brownian motion.

[0082] By constructing a high-fidelity nonlinear stochastic degradation process model, a precise mathematical characterization of equipment performance degradation is achieved. Unlike traditional assessments that only focus on the binary assumption of equipment being intact or failing, this application employs a continuously evolving stochastic process to describe the equipment's state changes throughout its entire lifecycle, from healthy to failed. Using multi-source monitoring data features extracted by algorithms such as Kernel Principal Component Analysis (KPCA), a health index characterizing the current health status of the target equipment e is constructed. Based on this, to overcome the uncertainties brought about by stochastic factors such as environmental disturbances, material inhomogeneities, and measurement errors, which deterministic models cannot reflect, a nonlinear Wiener process is introduced as the underlying architecture. This model decomposes the evolution of the health index into two parts: a deterministic degradation trend term determined by the drift coefficient, reflecting the average performance degradation rate accumulated over operating time; and a stochastic fluctuation term determined by the diffusion coefficient and the differential of standard Brownian motion, simulating the impact of external operating condition fluctuations and internal microscopic damage randomness on the degradation path. By employing this mechanism that combines drift and diffusion, the abstract physical aging process of equipment is transformed into a computable high-dimensional random sequence, thus laying a solid physical foundation for subsequent probabilistic predictions. For example, for pumps operating in high-temperature and high-pressure environments, their impeller wear rate may be affected by both fluid corrosion and mechanical fatigue. This stochastic process model can adaptively capture the nonlinear degradation trajectory under these complex coupled effects.

[0083] Step S602: Based on the random process of health indicators and the health indicator failure threshold of the corresponding failure mode of the target equipment, determine the failure time when the target equipment reaches the health indicator failure threshold: .

[0084] in, This indicates the failure time of the target device e corresponding to failure mode m. This represents the current assessment time corresponding to the prediction of equipment degradation for target device e. denoted as the health indicator failure threshold for the failure mode m corresponding to the target device e, and inf represents the earliest time when the random process of the health indicator reaches or exceeds the health indicator failure threshold.

[0085] The time boundary for equipment malfunction loss is defined as the first time-through. In practical engineering applications, different safety functions, such as pump flow maintenance and valve sealing, correspond to different failure criteria. Therefore, for each potential failure mode m of the target equipment e, a corresponding health indicator failure threshold is pre-set. This threshold is not a single fixed value, but a judgment threshold determined comprehensively based on the equipment's design specifications, historical failure statistics, and industry safety standards. For example, for a centrifugal pump, when health indicators such as vibration amplitude or efficiency decay rate deteriorate to a certain critical level, it means that it can no longer meet the minimum head requirement of the system. At this point, the critical value can be defined as the health indicator failure threshold. Subsequently, by solving the boundary problem of the aforementioned nonlinear stochastic degradation process model, the exact time point at which the stochastic process first touches or crosses the threshold from the current evaluation time is found. Due to the introduction of stochastic differential equations, this failure time itself is no longer a fixed constant, but a random variable with statistical distribution characteristics. By capturing this dynamically changing time-through, the uncertainty of the equipment's remaining service life is quantified, making risk assessment no longer limited to static yes / no judgments, but able to cover all possibilities of equipment failure within a specific time period.

[0086] Step S603: Determine the remaining useful life random variable of the target equipment from the current evaluation time based on the failure time. The remaining useful life random variable satisfies the following conditions: in, Indicates the target device At the current assessment moment The remaining useful life random variable corresponding to failure mode m.

[0087] Step S604: Determine the conditional probability density function of the remaining useful life random variable based on the remaining useful life random variable: And the conditional cumulative distribution function corresponding to the conditional probability density function: .

[0088] Where r represents the relative time of the remaining useful life. This represents the monitoring data acquired by target device e from the initial time to the current evaluation time ti. Let f(x) represent the conditional probability density function of the remaining useful life of the target device e corresponding to the failure mode m, determined based on monitoring data.

[0089] The process transforms the data from the physical time domain to the probability distribution domain, outputting a key parameter directly serving subsequent dynamic risk assessment: the remaining useful life probability density function. First, through algebraic operations, the absolute failure time is subtracted from the current assessment time, yielding a random variable representing the relative remaining useful life starting from the current time. This step unifies the assessment benchmark to the current state, eliminating biases caused by differences in commissioning times among different devices. Next, based on the established stochastic process model and the historical monitoring data sequence up to the current time (containing time-series observations from multiple sensors), the conditional probability density function of the remaining useful life is derived using state estimation algorithms such as Bayesian update theory or Kalman filtering. This function describes the probability of the device experiencing a failure mode within any given relative time interval. Furthermore, to facilitate interval probability calculations in the subsequent dynamic event tree, a conditional cumulative distribution function is defined, representing the total probability of device failure within a relative time period. This rigorous mathematical derivation not only provides a point estimate of when the device may fail, but also gives a complete probability distribution pattern, which can accurately match the task time window requirements of each node in the dynamic event tree, providing direct and high-confidence data support for calculating the conditional failure probability of the device within that time window.

[0090] In other embodiments, the degradation process model is not limited to a nonlinear stochastic degradation process model, but may also employ other degradation process models that can determine the probability distribution of the remaining useful life, the failure time distribution, or the probability of conditional failure of the target equipment based on the health indicators.

[0091] In one optional implementation, the dynamic failure probability of the target device corresponding to the failure mode is determined based on the remaining useful life probability density function and the task time window corresponding to the branch node, including: Step S701: Based on the branching time of the function event branch node Task duration and the current assessment time Determine the relative time interval of the task time window with respect to the current evaluation time. ],in, ; .

[0092] Step S702: Calculate the target device based on the conditional cumulative distribution function corresponding to the conditional probability density function. Corresponding failure mode In the function event branch node The probability of condition failure within the corresponding task time window:

[0093] in, Represents a functional event branch node The start time of the corresponding task time window relative to the current evaluation time Relative time, Represents a functional event branch node The corresponding task time window end time relative to the current evaluation time Relative time, Indicates the target device Corresponding failure mode In the function event branch node The probability of condition failure within the corresponding task time window. Indicates the target device Corresponding failure mode The remaining useful life conditional cumulative distribution function.

[0094] After completing the aforementioned time mapping, the probability of equipment failure within the current dynamic event tree node's task window is calculated using the probabilistic statistical characteristics of remaining useful life. A conditional probability mechanism is introduced to take into account the prior fact that the equipment has not failed at the current evaluation time. Based on the aforementioned relative time interval, the conditional cumulative distribution function value of the corresponding failure mode of the target equipment is queried. The numerator of the formula represents the absolute probability that the remaining useful life falls within this relative time interval; the denominator represents the conditional probability that the equipment can successfully survive until the start of the task window. By dividing the two, the probability density is renormalized, and the conditional failure probability is finally output. This parameter not only contains information about the current degradation state of the equipment but also precisely quantifies the possibility of failure within a specific incident mitigation period. The calculated conditional failure probability is then directly written into the corresponding basic event in the fault tree, replacing the traditional static failure probability, so that the probability recursion of each branch path of the dynamic event tree can truly reflect the risk evolution brought about by equipment aging.

[0095] In one optional implementation, the branch probability of a functional event branch node is determined based on the updated fault tree, and the probability of each branch path under the functional event branch node is determined based on the branch probability, including: Step S801: Determine the probability of the top event in the fault tree based on the probability parameters of each basic event in the updated fault tree.

[0096] After obtaining the fault tree containing dynamic failure probability parameters of the corresponding failure modes of the target device, the fault tree is quantitatively analyzed using the minimum cut set method to determine the total probability of occurrence of the top event. Specifically, based on the system configuration and logical structure corresponding to the current branch node, all minimum cut sets constituting the top event are extracted, and the sum of the occurrence probabilities of each minimum cut set is calculated. This process can be formally represented as the following decision function:

[0097] in, This indicates the fault tree at the functional event branch node. The probability of the top event at point C is given by C, where C represents the total number of minimum cut sets corresponding to the fault tree. Let c represent the c-th minimal cut set, and e represent the basic events in the fault tree. This indicates that the basic event e is in the function event branch node. The probability parameter at that location.

[0098] The calculation using the above formula can accurately reflect the overall probability level of related safety function failure due to the performance degradation of the target device at the current branch moment.

[0099] Step S802: Determine the probability of the top event as the probability of the failed branch corresponding to the functional event branch node, and determine the probability of the successful branch based on the complement probability of the top event probability.

[0100] After determining the top event probability, a bi-state decision logic is established for the functional event branch node, that is, to clarify the specific probability weight of the accident path leading to failure or success at this node. Specifically, the previously determined top event probability is directly mapped to the failure branch probability of the functional event branch node, while utilizing the complementarity of the probability space, the success branch probability is obtained by subtracting the top event probability. This mapping relationship can be formally expressed as:

[0101]

[0102] in, Represents a functional event branch node The corresponding probability of a security function failure branch. Represents a functional event branch node The probability of a successful branch for the corresponding security function.

[0103] This approach ensures that the quantification results of the fault tree can be seamlessly integrated into the branch logic of the dynamic event tree, so that the real-time degradation state at the device level directly determines the evolution direction and probability of the accident sequence at that node.

[0104] Step S803: Based on the branch probabilities corresponding to the functional event branch nodes, recursively determine the path of the l-th dynamic event in the dynamic event tree that passes through the functional event branch nodes. The probability of the subsequent path.

[0105] This step enables the dynamic cumulative calculation of risk propagation along the accident sequence. After assigning branch probabilities to a single node, the cumulative probability of the preceding path is multiplied by the branch conditional probability of the current node using the multiplication rule of conditional probability, thus obtaining the updated complete path probability. This recursive process can be formally represented as:

[0106] in, This indicates that the l-th dynamic event path enters the functional event branch node. Previous path probabilities, Represents a functional event branch node The corresponding branch conditional probability, This indicates that the l-th dynamic event path passes through the function event branch node. The probability of the subsequent path.

[0107] During this process, if the l-th path selects a failed branch, then Values If the l-th path successfully selects a branch, then Values Through this layer-by-layer recursive mechanism, the dynamic risk weights generated by equipment degradation at each dynamic event tree node can be effectively superimposed, ultimately forming a complete accident sequence probability distribution.

[0108] In summary, this application's embodiments address the problem that traditional static risk assessments cannot reflect the impact of real-time equipment health status by constructing a rigorous mathematical transformation chain from the probability of the top event in the fault tree to the probability of branches in the dynamic event tree and then to the probability of paths in the dynamic event tree. Specifically, firstly, the fault tree containing dynamic failure probability parameters is precisely quantified using the minimum cut set method to obtain the probability of the top event; then, this probability is strictly mapped to the failure and success branch probabilities of functional event branch nodes, establishing deterministic rules for single-step evolution; finally, a path probability recursive formula is introduced to achieve automatic propagation of risk weights under multi-node, multi-path coupling. This step-by-step transmission mechanism from local to global, from micro-equipment status to macro-system risk, not only breaks down the data barriers between fault prediction and health management prediction data and the dynamic probability risk assessment risk model, but also ensures that the risk assessment results can truly and continuously reflect the dynamic evolution characteristics of the nuclear power plant system under the dual effects of complex operating conditions and equipment aging, providing a high-fidelity mathematical foundation for subsequent core damage frequency calculations and operation and maintenance decisions.

[0109] In one possible implementation, the nuclear power risk assessment method based on equipment degradation information provided in this application embodiment further includes: Step S901: Determine multiple degradation states of the target device based on the device degradation prediction information, and determine the conditional probability of the target device being in each degradation state based on the device degradation prediction information.

[0110] This embodiment first executes a multi-state degradation modeling process to overcome the limitation of traditional risk assessments that simplify equipment into a binary state of intact / failed. Multiple degradation states can be divided according to the value range of health indicators, the degree of equipment performance degradation, or a preset degradation threshold. For example, the target equipment can be classified into healthy, mildly degraded, moderately degraded, and severely degraded states, and the conditional probability of the target equipment being in each degradation state at the current assessment time can be determined based on equipment degradation prediction information. The specific number of states and the corresponding division ranges for each state can be set according to the operating characteristics of the target equipment. During system initialization or offline training, based on historical monitoring data and physical mechanism analysis, discrete division rules for healthy states are pre-established. Specifically, the performance degradation process of the equipment from complete health to functional failure is divided into... A discrete level of degradation state, denoted as .in, Represents health status. This indicates a functional failure state, the middle one. to These represent different levels of performance degradation, such as mild and moderate. Let the state classification threshold be: When the health indicator is a fixed value, if the following conditions are met: Then the device is determined to be in a certain state. .

[0111] When health indicators or condition degradation are uncertain, the device is in a state of... The probability is: For every healthy state Define the corresponding performance multiplier ,satisfy: ,in, This indicates that the equipment is in good condition and maintains its inherent rated performance. This indicates that the equipment has completely failed. This indicates that the device is in a state of partial performance degradation.

[0112] When the health indicators of the target device are uncertain at the current assessment moment, the confidence level of the device in each discrete state is calculated through statistical inference. This conditional probability reflects the likelihood that the device is actually in a specific degradation level under the current monitoring data. Through this multi-state partitioning mechanism, the intermediate states of the device, where it has not completely failed but its performance has deteriorated, can be described in detail, providing a finer state granularity for subsequent risk assessment.

[0113] Step S902: Determine the performance multiplier corresponding to each degradation state, and determine the equivalent performance multiplier of the target device at the current evaluation moment based on the conditional probability of each degradation state and the corresponding performance multiplier. in, Indicates the target device At the assessment time The corresponding equivalent performance multiplier, This indicates the upper limit of the state number corresponding to the number of degradation states of the target device. Indicates the target device At the assessment time In the first The conditional probability of a degenerate state. Indicates the first The performance multiplier corresponding to each degenerate state.

[0114] For each discrete degenerate state A parameter is predefined to characterize the device's ability to maintain performance in this state, i.e., the performance multiplier. The value range of this performance multiplier is [0,1], where This indicates that the equipment maintains its inherent rated performance, such as a healthy state, under this condition. This indicates that the device is completely unusable in this state, and This indicates that the device is in a partially degraded performance state. To eliminate the uncertainty of a single state determination, an expected value fusion strategy is adopted. The conditional probability of each degraded state is weighted and summed with its corresponding performance multiplier to calculate the comprehensive equivalent performance multiplier of the target device at the current evaluation moment. This equivalent performance multiplier not only includes the device's current average performance level but also incorporates the uncertainty information of the distribution of each degraded state, achieving a smooth transition from the discrete state space to the continuous performance space.

[0115] Step S903: Based on the equivalent performance multiplier and the rated physical parameters of the target equipment, determine the physical parameters of the target equipment in the degradation state corresponding to the current evaluation time: ; in, Indicates the target device At the assessment time Corresponding physical parameters of the equipment in a degraded state. Indicates that it is aimed at the target device. The established performance mapping function, Indicates the target device At the assessment time The corresponding equivalent performance multiplier, Indicates the target device The rated physical parameters corresponding to a healthy state.

[0116] For example, pump equipment can be defined as follows: , ; For valve-type equipment, the following definition can be made: , ; in, for Maximum available bandwidth at any given time The maximum flow rate that can be provided is the rated flow rate. for Always ready to set off, For the rated head, For valves Effective circulation area at all times The rated effective flow area of ​​the valve, for The time required for the valve to open. The rated time required for the valve to open. This represents the amount of motion delay caused by degradation.

[0117] Step S904: Input the physical parameters of the equipment into the system simulation model through the equipment performance parameter interface set in the system simulation model, so that the system simulation model can perform system simulation based on the physical parameters of the equipment and obtain the system simulation results.

[0118] Performance mapping functions describe the correspondence between equipment performance multipliers and equipment physical parameters. Their specific form can be determined based on the target equipment type and physical characteristics. Different performance mapping functions can be used for different equipment or different physical parameters of the same equipment to convert equivalent performance multipliers into equipment physical parameters that the system simulation model can access.

[0119] Using a pre-defined performance mapping function, abstract equivalent performance multipliers are transformed into specific physical parameters that can be directly identified by the system simulation model. This performance mapping function establishes a non-linear or linear transformation relationship between the equivalent performance multipliers and the rated physical parameters under healthy conditions. For example, for pumps, key physical parameters such as maximum flow rate and head can be scaled according to the equivalent performance multiplier; for valves, the effective flow area decreases as the performance multiplier decreases, while the operating time may increase. The generated equipment physical parameters are then written into the pre-defined equipment performance parameter interface in the system simulation model, such as the RELAP5 program. After receiving the updated physical parameters, the system simulation model can re-determine the accident process based on the actual equipment aging characteristics. This means that equipment degradation not only affects the probability of the accident path occurring but also directly affects the physical evolution of the accident consequences, achieving a dual-track coupling of risk probability and accident consequences.

[0120] It should be noted that the degradation state of the target device does not completely correspond to the success or failure of a functional event. When the target device is in a degradation state that has not yet reached the functional failure threshold, the target device can still meet the basic operational requirements of the corresponding safety function and enter the success branch of the functional event. However, the actual performance parameters of the target device have changed relative to the rated physical parameters in the healthy state. In this case, the device physical parameters determined according to the degradation state are input into the system simulation model, so that the device degradation affects the evolution of subsequent system states and accident consequences, without repeatedly including this performance degradation in the functional failure probability of the current functional event.

[0121] It should be understood that the sequence number of each step in the above embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this application.

[0122] This application also provides a nuclear power risk assessment system based on equipment degradation information, used to perform the steps in the above-described embodiments of the nuclear power risk assessment method based on equipment degradation information.

[0123] like Figure 2 As shown in the figure, this application provides a nuclear power risk assessment system 200 based on equipment degradation information, including: The condition configuration module 201 is used to determine the nuclear power plant system, target equipment and initiating event to be evaluated, and to obtain the dynamic event tree construction rules, which are used to configure the creation conditions of branch nodes in the dynamic event tree. The dynamic event tree construction module 202 is used to perform system simulation based on the system simulation model of the nuclear power plant system to be evaluated and the initiating event, and during the simulation process, to create branch nodes of the dynamic event tree according to the dynamic event tree construction rules to complete the construction of the dynamic event tree. The probability update module 203 is used to perform conditional probability updates on the fault tree corresponding to each functional event branch node in the dynamic event tree, based on the branch time data corresponding to the functional event branch node and the equipment degradation prediction information of the target device, and to determine the probability of each branch path under the functional event branch node according to the updated fault tree; wherein, the branch time data includes the simulation system state data and the target device degradation state data at the branch time, and the functional event branch node is a branch node created based on the success or failure judgment of the safety function event; The probability recursion module 204 is used to recursively determine the path probability of each termination path from the root node of the dynamic event tree to the node corresponding to the simulation termination condition based on the branch probability corresponding to the functional event branch node. The evaluation result generation module 205 is used to generate the risk assessment result of the nuclear power plant system to be evaluated based on the path probability of each termination path in the dynamic event tree and the corresponding simulation results.

[0124] Figure 3 This is a schematic diagram of the structure of a computer device provided in an embodiment of this application. Figure 3 As shown, the computer device 3 of this embodiment includes: at least one processor 30 ( Figure 3 Only one is shown in the diagram), memory 31, and computer program 32 stored in said memory 31 and executable on said at least one processor 30, wherein said processor 30, when executing said computer program 32, implements any of the above-described components. Steps in the method embodiments.

[0125] The computer device may include, but is not limited to, a processor 30 and a memory 31. Those skilled in the art will understand that... Figure 3 The computer device 3 is merely an example and does not constitute a limitation on the computer device 3. It may include more or fewer components than shown in the figure, or combine certain components, or different components, such as input / output devices, network access devices, etc.

[0126] The processor 30 can be a central processing unit (CPU), or it can be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor can be a microprocessor or any conventional processor.

[0127] In some embodiments, the memory 31 may be an internal storage unit of the computer device 3, such as a hard disk or memory of the computer device 3. In other embodiments, the memory 31 may be an external storage device of the computer device 3, such as a plug-in hard disk, smart media card (SMC), secure digital (SD) card, flash card, etc., equipped on the computer device 3. Furthermore, the memory 31 may include both internal and external storage units of the computer device 3. The memory 31 is used to store the operating system, applications, bootloader, data, and other programs, such as the program code of the computer program. The memory 31 can also be used to temporarily store data that has been output or will be output.

[0128] It should be noted that the information interaction and execution process between the above-mentioned devices / units are based on the same concept as the method embodiments of this application. For details on their specific functions and technical effects, please refer to the method embodiments section, and they will not be repeated here.

[0129] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the above-described division of functional units and modules is merely an example. In practical applications, the above functions can be allocated to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit. Furthermore, the specific names of the functional units and modules are only for easy differentiation and are not intended to limit the scope of protection of this application. The specific working process of the units and modules in the above system can be referred to the corresponding process in the foregoing method embodiments, and will not be repeated here.

[0130] This application also provides a computer-readable storage medium storing a computer program that, when executed by a processor, can implement the steps in the above-described method embodiments.

[0131] like Figure 4 As shown, this application embodiment provides a computer program product 4, including a computer program 32, which, when run, causes the steps in the above-described method embodiments to be executed.

[0132] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, all or part of the processes in the methods of the above embodiments of this application can be implemented by a computer program instructing related hardware. The computer program can be stored in a computer-readable storage medium, and when executed by a processor, it can implement the steps of the various method embodiments described above. The computer program includes computer program code, which can be in the form of source code, object code, executable files, or certain intermediate forms. The computer-readable medium can include at least: any entity or device capable of carrying computer program code to a device / computer equipment, a recording medium, a computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media. Examples include USB flash drives, portable hard drives, magnetic disks, or optical disks. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electrical carrier signals or telecommunication signals.

[0133] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail or recorded in a certain embodiment, please refer to the relevant descriptions of other embodiments.

[0134] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0135] In the embodiments provided in this application, it should be understood that the disclosed computer devices and methods can be implemented in other ways. For example, the computer device embodiments described above are merely illustrative. For instance, the division of modules or units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interfaces, devices, or units, and may be electrical, mechanical, or other forms.

[0136] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0137] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.

Claims

1. A nuclear power risk assessment method based on equipment degradation information, characterized in that, The method includes: Identify the nuclear power plant system, target equipment, and initiating event to be evaluated, and obtain the dynamic event tree construction rules, which are used to configure the creation conditions of branch nodes in the dynamic event tree; The system simulation is performed based on the system simulation model of the nuclear power plant system to be evaluated and the initiating event. During the simulation, branch nodes of the dynamic event tree are created according to the dynamic event tree construction rules to complete the construction of the dynamic event tree. For each functional event branch node in the dynamic event tree, based on the branch time data corresponding to the functional event branch node and the device degradation prediction information of the target device, the fault tree corresponding to the functional event branch node is conditionally updated with probability, and the probability of each branch path under the functional event branch node is determined according to the updated fault tree. The branch time data includes the simulation system state data and the target device degradation state data at the branch time, and the functional event branch node is a branch node created based on the success or failure judgment of the safety functional event. Based on the branch probabilities corresponding to the functional event branch nodes, the path probabilities of each termination path from the root node of the dynamic event tree to the node corresponding to the simulation termination condition are recursively determined. Based on the path probabilities of each termination path in the dynamic event tree and the corresponding simulation results, the risk assessment results of the nuclear power plant system to be evaluated are generated.

2. The nuclear power risk assessment method based on equipment degradation information as described in claim 1, characterized in that, The system simulation is performed based on the system simulation model of the nuclear power plant system to be evaluated and the initiating event. During the simulation, branch nodes of the dynamic event tree are created according to the dynamic event tree construction rules to complete the construction of the dynamic event tree, including: Construct a system simulation model of the nuclear power plant system to be evaluated; The system simulation is performed based on the system simulation model and the initiating event, and the root node of the dynamic event tree is created according to the initiating event; During the simulation, if the simulation data triggers the dynamic event tree construction rule, a branch node of the dynamic event tree is created in the current simulation path, and the branch time data corresponding to the branch node is recorded. The branch time data includes the simulation system state data and the target device degradation state data at the branch time. Based on the simulation system state data at the branch moment and the target device degradation state data, each branch path under the branch node is simulated independently; Returning to the steps described above, if the simulation data triggers the dynamic event tree construction rule during the simulation process, a branch node of the dynamic event tree is created in the current simulation path, and the branch time data corresponding to the branch node is recorded, until the simulation termination condition is triggered to complete the construction of the dynamic event tree.

3. The nuclear power risk assessment method based on equipment degradation information as described in claim 1, characterized in that, For each functional event branch node in the dynamic event tree, based on the branch time data corresponding to the functional event branch node and the device degradation prediction information of the target device, a conditional probability update is performed on the fault tree corresponding to the functional event branch node, and the probability of each branch path under the functional event branch node is determined according to the updated fault tree, including: For each functional event branch node in the dynamic event tree, determine the fault tree corresponding to the functional event branch node; Based on the device degradation prediction information of the target device, the dynamic failure probability of the corresponding failure mode of the target device is determined, and the fault tree is conditionally updated based on the dynamic failure probability and the branch time data corresponding to the functional event branch node. The branch probability of the functional event branch node is determined based on the updated fault tree, and the probability of each branch path under the functional event branch node is determined based on the branch probability.

4. The nuclear power risk assessment method based on equipment degradation information as described in claim 3, characterized in that, The step of determining the dynamic failure probability of the corresponding failure mode of the target device based on the device degradation prediction information of the target device, and performing conditional probability updates on the fault tree based on the dynamic failure probability and the branch time data corresponding to the functional event branch node, includes: Acquire multi-source monitoring data of the target device, and construct health indicators of the target device based on the multi-source monitoring data; A degradation process model of the target device is established based on the health indicators, and the probability density function of the remaining useful life of the target device is determined based on the degradation process model. Based on the remaining useful life probability density function and the task time window corresponding to the functional event branch node, the dynamic failure probability of the failure mode corresponding to the target device is determined, and the dynamic failure probability is used as the probability parameter of the basic event corresponding to the failure mode in the fault tree.

5. The nuclear power risk assessment method based on equipment degradation information as described in claim 4, characterized in that, The step of acquiring multi-source monitoring data of the target device and constructing health indicators of the target device based on the multi-source monitoring data includes: Obtain multi-source monitoring data of the target device at the current evaluation time; The multi-source monitoring data is preprocessed and time window aligned to obtain time-aligned and continuous multi-source monitoring data. The time-aligned and continuous multi-source monitoring data is segmented using a sliding window method; Features are extracted from each segment of multi-source monitoring data, and filtered based on the features to obtain target features characterizing the degradation trend of the target device. The features include time-domain features, frequency-domain features, and time-frequency-domain features. Based on the target features, the health indicators of the target device at the current evaluation time are obtained by fusing them. The health indicators are expressed as follows: ; in, Indicates the target device At the assessment time Health indicators Indicates the target device At the evaluation time Multi-source monitoring data within the corresponding time window, Indicates that it is aimed at the target device. The process involves extracting, filtering, and fusing features from multi-source monitoring data to obtain the health indicators.

6. The nuclear power risk assessment method based on equipment degradation information as described in claim 5, characterized in that, The step of establishing a degradation process model for the target device based on the health indicators, and determining the probability density function of the remaining useful life of the target device based on the degradation process model, includes: A nonlinear stochastic degradation process model for the target device is established based on the aforementioned health indicators. This degradation process model is expressed as follows: ; in, Indicates the target device At any moment The corresponding health indicator stochastic process, Indicates the target device The stochastic process value of the health indicator corresponding to the initial moment of the degradation process. Indicates the target device At any moment The corresponding drift coefficient, which characterizes the degradation rate of the target device, Indicates the target device At any moment The corresponding diffusion coefficient, which characterizes the volatility of the degradation process of the target equipment. Represents standard Brownian motion; Based on the random process of the health indicators and the health indicator failure threshold of the corresponding failure mode of the target device, determine the failure time when the target device reaches the health indicator failure threshold: ; in, Indicates the target device Corresponding failure mode Failure time, Indicates the target device The current assessment time corresponding to the equipment degradation prediction. Indicates the target device Corresponding failure mode The health indicator failure threshold, This indicates the earliest time when the random process of the health indicator reaches or exceeds the failure threshold of the health indicator; The remaining useful life random variable of the target device, starting from the current evaluation time, is determined based on the failure time, and the remaining useful life random variable satisfies... ;in, Indicates the target device At the current assessment moment Corresponding failure mode The remaining useful life is a random variable; Based on the remaining useful life random variable, determine the conditional probability density function of the remaining useful life random variable: And the conditional cumulative distribution function corresponding to the conditional probability density function: ; in, This indicates the relative time of the remaining useful life. Indicates the target device From the initial time to the current evaluation time The acquired monitoring data, This indicates the target device determined based on the monitoring data. Corresponding failure mode The conditional probability density function of the remaining useful life.

7. The nuclear power risk assessment method based on equipment degradation information as described in claim 6, characterized in that, The step of determining the dynamic failure probability of the target device corresponding to the failure mode based on the remaining useful life probability density function and the task time window corresponding to the branch node includes: Based on the branching time of the functional event branch node Task duration and the current assessment time Determine the relative time interval of the task time window with respect to the current evaluation time. ],in, ; ; The target device is calculated based on the conditional cumulative distribution function corresponding to the conditional probability density function. Corresponding failure mode In the functional event branch node The probability of condition failure within the corresponding task time window: in, Indicates the functional event branch node The start time of the corresponding task time window relative to the current evaluation time Relative time, Indicates the functional event branch node The corresponding task time window end time relative to the current evaluation time Relative time, Indicates the target device Corresponding failure mode In the functional event branch node The probability of condition failure within the corresponding task time window. Indicates the target device Corresponding failure mode The remaining useful life conditional cumulative distribution function.

8. The nuclear power risk assessment method based on equipment degradation information as described in claim 3, characterized in that, The step of determining the branch probability of the functional event branch node based on the updated fault tree, and determining the probability of each branch path under the functional event branch node based on the branch probability, includes: Based on the probability parameters of each basic event in the updated fault tree, determine the probability of the top event of the fault tree: in, This indicates that the fault tree is at the functional event branch node. The probability of the top event at a given location. This represents the total number of minimum cut sets corresponding to the fault tree. Indicates the first Minimal cut set This represents the basic events in the fault tree. Represents the basic event In the functional event branch node The probability parameter at that location; The probability of the top event is determined as the probability of the failed branch corresponding to the functional event branch node, and the probability of the successful branch is determined based on the complement probability of the top event probability. ; ; in, Indicates the functional event branch node The corresponding probability of a security function failure branch. Indicates the functional event branch node The probability of a successful branch for the corresponding security function; Based on the branch probability corresponding to the functional event branch node, the first in the dynamic event tree is recursively determined. The dynamic event path passes through the functional event branch node. The probability of the subsequent path: ; in, Indicates the first A dynamic event path leads to the functional event branch node. Previous path probabilities, Indicates the functional event branch node The corresponding branch conditional probability, Indicates the first The dynamic event path passes through the functional event branch node. The probability of the subsequent path.

9. The nuclear power risk assessment method based on equipment degradation information as described in any one of claims 1 to 8, characterized in that, The method further includes: Based on the device degradation prediction information of the target device, multiple degradation states of the target device are determined, and based on the device degradation prediction information, the conditional probability of the target device being in each degradation state is determined; The performance multipliers corresponding to each degradation state are determined, and the equivalent performance multipliers of the target device at the current evaluation moment are determined based on the conditional probabilities of each degradation state and the corresponding performance multipliers. in, Indicates the target device At the assessment time The corresponding equivalent performance multiplier, This indicates the upper limit of the state number corresponding to the number of degradation states of the target device. Indicates the target device At the assessment time In the first The conditional probability of a degenerate state. Indicates the first The performance multiplier corresponding to each degenerate state; Based on the equivalent performance multiplier and the rated physical parameters of the target device, determine the device's physical parameters in the degradation state corresponding to the current evaluation time: ; in, Indicates the target device At the assessment time Corresponding physical parameters of the equipment in a degraded state. Indicates that it is aimed at the target device. The established performance mapping function, Indicates the target device At the assessment time The corresponding equivalent performance multiplier, Indicates the target device The rated physical parameters corresponding to a healthy state; The device physical parameters are input into the system simulation model through the device performance parameter interface set in the system simulation model, so that the system simulation model can perform system simulation based on the device physical parameters to obtain system simulation results.

10. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the steps of the nuclear power risk assessment method based on equipment degradation information as described in any one of claims 1 to 9.