By constructing an industrial energy impact network, analyzing the cascading propagation process of leakage events, and calculating multidimensional impact indicators and governance value indices, the problem of lack of systematic assessment in existing technologies is solved, and intelligent governance decision support for industrial energy systems is realized.
Patent Information
- Application Number
- CN202611164040.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-03
- Publication Date
- 2026-11-20
AI Technical Summary
Existing technologies lack a systematic assessment of the impact of leaks in industrial energy systems, making it difficult to accurately identify the scope of impact, propagation process, and economic losses, and failing to provide a reliable basis for decision-making in setting governance priorities.
Construct an Industrial Energy Impact Network (IEIN), combine sensor data to analyze the cascading propagation process of leakage events along the energy supply, equipment dependence and production organization chain, calculate multi-dimensional impact indicators and generate a leakage impact index, combine governance costs and benefits to calculate a governance value index, and output governance priorities and strategies.
It enables systematic analysis of the impact of leaks, improves the intelligence and refinement of governance decisions, provides a scientific basis for decision-making, and enhances the efficiency and accuracy of assessments.
Smart Images

Figure CN123140699A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of intelligent industrial energy management technology, and in particular to a method and system for assessing the leakage impact of industrial energy systems. Background Technology
[0002] Industrial enterprises typically rely on various energy sources such as compressed air, steam, natural gas, circulating water, and chilled water for production operations. This energy is transported to each production unit via pipeline systems. Due to the wide coverage of industrial energy pipelines, complex operating conditions, and the aging of equipment and pipelines over long-term service, leaks are prevalent in industrial energy systems, causing direct losses of energy sources and consequently increasing overall operating costs for enterprises. In recent years, with the development of industrial Internet of Things (IoT) sensing technology and intelligent diagnostic algorithms, leak detection, identification, and location have been achieved based on multi-source sensor signals such as pressure, flow, ultrasound, acoustics, and vibration, combined with artificial intelligence algorithms, providing corresponding technical support for on-site operation and maintenance.
[0003] However, from the perspective of enterprise energy management business needs, leak detection and location are only the starting point of governance work. The core issues of enterprise energy management are: the scale of energy loss caused by a leak, the equipment and production process affected, the degree of economic loss derived from the leak, and how to establish governance priorities to maximize benefits under the condition of limited maintenance resources. Existing technologies mostly focus on the detection and location of the leak itself, and lack systematic research on the diffusion mechanism and comprehensive assessment of the leak impact. Further analysis reveals that existing technologies mainly have the following shortcomings: (1) lack a unified correlation mechanism between leak events and energy networks, equipment networks and production networks, making it difficult to accurately identify the business objects such as equipment, processes, production lines and products covered by the leak impact; (2) lack a leak impact propagation analysis mechanism, making it difficult to analyze the propagation range and evolution process of the leak impact in the industrial system; (3) lack a comprehensive quantitative assessment mechanism for energy loss, production impact, economic costs and governance benefits, and cannot provide a reliable decision-making basis for the formulation of maintenance priorities and the optimal allocation of governance resources.
[0004] Based on the above situation, there is an urgent need to propose a leakage impact assessment scheme for industrial energy systems. Summary of the Invention
[0005] The purpose of this invention is to provide a method and system for assessing the impact of leaks in industrial energy systems. This method and system conducts systematic impact analysis on industrial energy leak events, enabling the identification of leak-affected objects, analysis of impact propagation, quantification of comprehensive impact, and support for governance decisions. It provides scientific and quantitative decision-making basis for the governance of energy leaks in industrial enterprises, and improves the level of intelligent and refined management of industrial energy governance.
[0006] The technical solution adopted in this invention is:
[0007] A leakage impact assessment method for industrial energy systems includes:
[0008] Acquire information on leakage events in industrial energy systems and related industrial operating data to construct leakage event analysis objects; among which, industrial operating data includes energy operating data, equipment operating data, process operating data, and production organization data obtained from sensors deployed in industrial energy systems;
[0009] Based on the leakage event analysis object, an industrial energy impact network is constructed by combining the topology of the industrial energy system, equipment connection relationships, and production organization relationships.
[0010] An impact analysis model is constructed based on the industrial energy impact network. According to the preset impact propagation rules, propagation weights and industrial operation constraints, the cross-level cascade propagation process of leakage impact along the energy supply chain, equipment dependence chain and production organization chain is analyzed to obtain the leakage impact propagation results.
[0011] Based on the propagation results of the leakage impact, multi-dimensional impact indicators of energy impact, production impact, economic impact and operational risk are calculated respectively, and the leakage impact index is obtained by normalizing and weighting the indicators of each dimension.
[0012] The governance value index is calculated by combining the leakage impact index with the governance cost and expected governance benefits. Multiple leakage events are then ranked according to their governance value index to generate leakage governance priorities and governance strategies.
[0013] Furthermore, in some technical solutions, energy operation data includes pressure, flow rate, temperature, energy consumption, and power supply status; equipment operation data includes equipment operating status, equipment load rate, and operating efficiency; process operation data includes process parameters, process constraints, and process cycle time; and production organization data includes process, production line, workshop, and product information.
[0014] Specifically, the leak event is represented as: Where L represents the leak location, T represents the leak occurrence time, M represents the energy medium type, and S represents the set of leak event attributes. Further, by combining this with the industrial operation data set D, a leak event analysis object is constructed: The object of the leakage event analysis As input for subsequent impact analysis.
[0015] Furthermore, in some technical solutions, the realization of constructing an industrial energy impact network includes:
[0016] Based on the leakage event analysis object, and combining the topology of the industrial energy system, equipment connection relationships, and production organization relationships, the initial set of affected objects is identified; whereby the initial set of affected objects is... Each impact analysis object should include at least three categories: energy objects, equipment objects, and production objects.
[0017] The initial set of affected objects was filtered based on the leak location, energy supply path, and real-time operating status of the equipment to obtain the target set of affected objects; the target set of affected objects is as follows: The target affected subset contains m objects, that is .
[0018] Establish the influence relationships among the various objects in the target influence object set, and introduce influence propagation weights and industrial operation constraints to construct an industrial energy influence network. Specifically, the calculation formula is as follows:
[0019] ;
[0020] in, For industrial energy impact networks; R represents the set of objects affected by the target, including energy objects, equipment objects, and production objects; R represents the set of relationships between objects, including energy supply relationships, equipment dependence relationships, and production organization relationships; W represents the set of influence propagation weights, which are determined based on pipeline diameter, gas supply distance, and the proportion of gas used by equipment; C represents the set of industrial operation constraints, including at least one of energy supply constraints, process constraints, equipment capacity constraints, and production organization constraints.
[0021] Furthermore, in some technical solutions, energy objects are used to describe industrial energy supply paths, transmission network structures, and energy medium attributes; equipment objects are used to describe the attributes, operating status, and energy dependencies of energy-consuming equipment; and production objects are used to describe production lines, processes, and product manufacturing processes.
[0022] By establishing heterogeneous relationships among energy objects, equipment objects, and production objects, the industrial energy system is expanded from a single energy topology network into a multi-level industrial energy impact network oriented towards impact propagation, enabling the cascading propagation analysis of leakage impacts from the energy layer to the equipment layer and production layer.
[0023] Furthermore, in some technical solutions, the propagation parameters and operational constraints are adaptively adjusted based on the physical properties, transmission mechanisms, and industrial application constraints of the different leaked industrial energy media.
[0024] Furthermore, in some technical solutions, achieving the propagation of the effects of leakage includes:
[0025] The energy node corresponding to the leakage event is taken as the initial impact source, and the initial impact value is calculated based on the leakage amount, leakage duration, and energy medium type. : ;in: This refers to the amount of leakage. Duration of the leak; Energy medium type;
[0026] Based on the industrial energy impact network, starting from the initial impact value, the cascading impact propagates layer by layer along the impact correlation;
[0027] During the propagation process, the impact value of each target object is calculated as the result of the leakage impact propagation based on the real-time operating status coefficient of the source object, the distance attenuation coefficient of the propagation path, and the constraint correction coefficient determined based on industrial operating constraints.
[0028] The formula for calculating the impact value of the target object is as follows:
[0029] ;
[0030] in, For the j-th target object The impact value; upstream related objects Impact value; Representation Object With object The influence propagation weight between them; This represents the propagation distance attenuation coefficient, and its value is related to the object. To object Transmission distance between Correlation is related; the greater the distance, the greater the attenuation. Indicates upstream related objects The real-time operating status coefficient is used to characterize the amplification or attenuation effect of the current load level on the leakage. According to the object The real-time load rate is determined when the object is down or offline. =0, when the object is running at full capacity. ; Indicates the target affected object constraint correction coefficients, constraint correction coefficients Determined based on the industrial operation constraint set C, it is used to correct the impact of process constraints, equipment capacity constraints, and production organization constraints on the influence propagation process; m is the total number of objects in the target influence object set.
[0031] The set of influence values for all affected objects is .
[0032] Furthermore, the multi-dimensional impact indicators include at least four categories: energy impact, production impact, economic impact, and operational risk. Energy impact is calculated based on energy loss and energy prices; production impact is calculated based on equipment efficiency decline, changes in production cycle time, and capacity loss; economic impact is calculated based on a comprehensive assessment of energy loss, production loss, and maintenance costs; and operational risk is calculated based on a comprehensive assessment of the scope, level, and safety risks of the leakage event. In some technical solutions, the multi-dimensional impact indicators for energy impact, production impact, economic impact, and operational risk are calculated separately based on the propagation results of the leakage impact, and the leakage impact index is obtained by normalizing and weighting each indicator. This includes:
[0033] Energy impact indicators are obtained by calculating energy losses based on the impact values of each target object and in conjunction with energy prices.
[0034] Calculate production impact indicators based on equipment efficiency decline, changes in production cycle time, and capacity loss;
[0035] Economic impact indicators are calculated by combining energy losses, production losses, and maintenance costs.
[0036] Calculate operational risk indicators based on the scope of the leak's impact, its level of impact, and safety risks;
[0037] To eliminate the dimensional differences among different influencing indicators, the indicators of each dimension are normalized. As a feasible implementation, the min-max standardization method is used to normalize the multidimensional influencing indicators. The normalized value of the k-th dimension indicator is expressed as:
[0038] ;
[0039] in, This represents the original value of the k-th dimension index. and These are the minimum and maximum values of the indicator for this dimension, respectively.
[0040] The leakage impact index was calculated using a multidimensional linear weighted fusion model. ; ;in, The number of indicator dimensions is p=4 in some implementations, corresponding to the four dimensions of energy impact, production impact, economic impact and operational risk respectively; For the k-th dimension normalized influence index, The weight coefficients for the corresponding dimensions and satisfying .
[0041] Furthermore, in some technical solutions, a governance value index is calculated based on the leakage impact index combined with governance costs and expected governance benefits. The implementation of prioritizing and formulating governance strategies for multiple leakage events according to their governance value indices includes:
[0042] The expected benefits of remediation are determined based on the recoverable energy losses, production losses, and risk reduction after remediation.
[0043] The cost of remediation is determined based on the labor cost, material cost, and downtime losses.
[0044] Calculate the governance value index: ; The benefits of governance include labor costs, spare parts costs, and downtime losses; The expected remediation benefits are used to characterize the degree of leakage impact reduction expected after the implementation of remediation measures, comprehensively covering energy recovery benefits, production recovery benefits, and operational recovery benefits; Leakage impact index;
[0045] Multiple leakage events are sorted in descending order based on the governance value index (Rank=Sort(GVI)). The leakage governance priority is output, and corresponding governance suggestions, maintenance plans, and expected governance benefits are generated to realize leakage governance decisions in industrial energy systems.
[0046] Furthermore, in some technical solutions, the implementation of generating leakage mitigation priorities and mitigation strategies includes:
[0047] Based on the leakage impact index and the governance value index, and combined with preset thresholds, the governance level is divided, and the corresponding maintenance priority, maintenance plan and expected governance benefits are output.
[0048] Furthermore, in some technical solutions, the method also includes governance closed-loop verification and model update steps: after completing the leakage remediation, industrial operation data is re-collected; the object status, propagation weight and constraint parameters in the industrial energy impact network are updated; the leakage impact index is recalculated, and the governance effect is verified by the changes in indicators before and after the remediation; historical leakage events, governance strategies and governance results are stored in a case library for optimizing the impact propagation model.
[0049] Furthermore, this invention also discloses a leakage impact assessment system for industrial energy systems, which applies the aforementioned leakage impact assessment method for industrial energy systems. The system includes:
[0050] The data acquisition module is used to acquire information on leakage events in industrial energy systems and related industrial operation data to construct leakage event analysis objects. Among them, the industrial operation data includes energy operation data, equipment operation data, process operation data and production organization data obtained from sensors deployed in industrial energy systems.
[0051] The impact network construction module is used to identify an initial set of impact objects based on the leakage event analysis objects, combined with the topology of the industrial energy system, equipment connection relationships, and production organization relationships; to filter the target set of impact objects based on the leakage location, energy supply path, and real-time operating status of equipment; and to establish impact correlation relationships, introduce impact propagation weights and industrial operation constraints to construct an industrial energy impact network.
[0052] The impact analysis module is used to construct an impact analysis model based on the industrial energy impact network. According to the preset impact propagation rules, propagation weights and industrial operation constraints, it analyzes the cross-level cascading propagation process of leakage impact along the energy supply chain, equipment dependence chain and production organization chain to obtain the leakage impact propagation results.
[0053] The impact assessment module is used to calculate multi-dimensional impact indicators of energy impact, production impact, economic impact and operational risk based on the set of impact values, and to normalize and weight the indicators of each dimension to obtain the leakage impact index.
[0054] The governance decision module is used to calculate the governance value index based on the leakage impact index combined with governance costs and expected governance benefits, and to sort multiple leakage events according to the governance value index to generate leakage governance priorities and governance strategies.
[0055] The closed-loop update module is used for verifying the governance effect and optimizing model parameters.
[0056] The present invention adopts the above technical solution and has the following beneficial effects compared with the prior art:
[0057] (1) It breaks through the technical limitations of existing technologies that only target leakage detection, location and leakage estimation, and establishes a leakage cascade impact analysis system for industrial energy systems, realizing the technical extension of leakage management from event detection to impact assessment and management decision-making, and expanding the technical boundaries of industrial energy leakage management.
[0058] (2) This invention proposes an Industrial Energy Impact Network (IEIN) and a cascading impact analysis mechanism. By introducing an industrial operation constraint set, an impact analysis data model with domain-specific characteristics is constructed. Based on this model, the transmission process of leakage impact along the energy supply chain, equipment dependence chain and production organization chain is deduced layer by layer. This can accurately reflect the cascading amplification effect of leakage impact in the industrial energy system and improve the consistency between the analysis results and the actual industrial working conditions.
[0059] (3) In the cascading impact calculation, the present invention introduces the real-time operating status coefficient and distance attenuation coefficient of the object, and combines the object screening mechanism to make the leakage impact dynamic with the equipment load level and transmission distance. At the same time, the cascading analysis is carried out only within the target object set, which improves the accuracy of the analysis and effectively reduces the computational complexity, thereby improving the evaluation efficiency of large-scale industrial energy systems.
[0060] (4) The present invention constructs a LII-GVI dual-index decision system, which realizes a unified quantitative description of the comprehensive impact of leakage through normalization and multi-dimensional weighted fusion, and realizes a quantitative evaluation of governance value by combining the degree of impact reduction and governance cost. It can automatically generate leakage governance priorities and governance strategies, providing a standardized decision basis for horizontal comparison of different leakage events and optimization of maintenance resource allocation, and improving the intelligent level of leakage governance in industrial energy systems. Attached Figure Description
[0061] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments;
[0062] Figure 1 This is a flowchart illustrating a leakage impact assessment method for industrial energy systems according to the present invention.
[0063] Figure 2 This is a schematic diagram of the industrial energy impact network of the present invention;
[0064] Figure 3 This is a schematic diagram illustrating the process of constructing the Impact Analysis Model (IAM) of this invention;
[0065] Figure 4 This is a schematic diagram of the leakage control decision-making process of the present invention. Detailed Implementation
[0066] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings.
[0067] This invention does not rely on specific leak detection methods, but instead uses identified leak events as the starting point for analysis. It constructs an Industrial Energy Impact Network (IEIN) as a unified data model, establishes an Impact Analysis Model (IAM) based on IEIN, and conducts cascade impact analysis. It comprehensively and quantitatively analyzes the energy loss, production impact, economic loss, and operational risks caused by leak events, forming a Leakage Impact Index (LII). Furthermore, it generates a Governance Value Index (GVI) and governance priorities, realizing intelligent support for the entire process of leak governance in industrial energy systems, from event detection to cascade impact analysis and governance decision-making.
[0068] This embodiment uses an industrial manufacturing enterprise energy system as an application scenario. The industrial energy system encompasses one or more energy media such as compressed air, steam, natural gas, circulating water, and chilled water, and consists of energy stations, main pipelines, branch pipelines, and end-user energy equipment, forming a complete energy supply system. Each energy system is equipped with field sensing devices such as pressure sensors, flow sensors, temperature sensors, level sensors, and electricity metering devices, and achieves data interconnection with business systems such as equipment control systems, manufacturing execution systems (MES), energy management systems (EMS), production management systems, and enterprise resource planning systems (ERP), forming an industrial operation data foundation covering information on energy operation, equipment operation, process operation, and production organization.
[0069] like Figures 1 to 4 As shown, this invention discloses a leakage impact assessment method for industrial energy systems, which does not limit the detection method of leakage events. Leakage events can be identified in industrial settings through pressure monitoring, flow balance analysis, negative pressure wave detection, ultrasonic detection, acoustic detection, vibration analysis, manual inspection, or other methods. All identified leakage events can be used as input objects for this invention to conduct subsequent leakage impact assessments and remediation decision analysis.
[0070] The key technical focus of this invention is to systematically analyze the scope, degree, and remediation value of identified leakage events. Specifically, the process begins by acquiring leakage events and corresponding industrial operation data to construct the leakage event analysis object. Then, based on the industrial energy system topology, equipment connection relationships, and production organization relationships, an Industrial Energy Impact Network (IEIN) is constructed. Based on this network, an Impact Analysis Model (IAM) is established to conduct cascading propagation analysis of leakage impacts along the energy supply chain, equipment dependency chain, and production organization chain. Further calculations are made of multi-dimensional impact indicators, including energy impact, production impact, economic impact, and operational risk, which are then integrated to form the Leakage Impact Index (LII). Finally, considering remediation costs, expected remediation benefits, maintenance resources, and operational constraints, a Governance Value Index (GVI) is calculated, outputting leakage remediation priorities and strategies. This achieves intelligent analysis of the entire process of industrial energy system leakage remediation, from event detection to impact assessment and remediation decision-making.
[0071] like Figure 1 As shown, a leakage impact assessment method for industrial energy systems mainly includes the following steps:
[0072] S1 acquires leakage events and industrial operation data to construct leakage event analysis objects;
[0073] S2 constructs the Industrial Energy Impact Network (IEIN) to establish the correlation between leakage events and energy objects, equipment objects, and production objects;
[0074] S3 constructs an impact analysis model (IAM) based on the industrial energy impact network, conducts cascade impact analysis of leakage events, and obtains the impact propagation results of each affected object.
[0075] S4 calculates multi-dimensional impact indicators such as energy impact, production impact, economic impact and operational risk based on the cascade impact analysis results, and integrates them to form the Leakage Impact Index (LII);
[0076] S5. Based on the Leakage Impact Index (LII), combined with the remediation benefits, remediation costs, and maintenance resource constraints, calculate the Governance Value Index (GVI), prioritize the remediation of multiple leakage events, and output remediation strategies and maintenance recommendations.
[0077] The Industrial Energy Impact Network (IEIN) serves as the unified data organization model of this invention, describing the various impact objects and their relationships within the industrial energy system. The Impact Analysis Model (IAM) is the core analysis model, simulating the cascading propagation of leakage impacts within the industrial energy system. The Leakage Impact Index (LII) is a comprehensive impact assessment index, used to uniformly quantify the overall impact of different leakage events. The Governance Value Index (GVI) is a governance decision evaluation index, used to comprehensively evaluate the governance value of different leakage events and guide the optimal allocation of maintenance resources. These four parts work synergistically to constitute the leakage impact assessment and governance decision-making methodology system for industrial energy systems outlined in this invention.
[0078] To further illustrate the technical solution and scope of application of the present invention, the following detailed description is provided in conjunction with two specific embodiments. First, taking an industrial compressed air system as an application scenario, the specific implementation process of each step of the present invention is explained in detail. Next, taking an industrial circulating water system as an application scenario, the adaptation method of the present invention under different energy media is described to verify that the present invention has good cross-energy media applicability, and is not only applicable to compressed air systems, but can also be extended to the leakage impact assessment of other industrial energy systems such as steam, natural gas, circulating water, and chilled water.
[0079] Example 1:
[0080] This embodiment takes the compressed air system of the welding workshop of an industrial manufacturing enterprise as the application scenario. The leakage event is set as the leakage of the main pipeline flange in area A of the welding workshop. All analysis processes revolve around this leakage event.
[0081] The industrial compressed air system consists of an air compressor station, main pipeline network, branch pipeline network, and terminal air-using equipment. The air compressor station is equipped with multiple screw air compressors, dryers, and air tanks; the terminal air-using equipment includes welding robots, spraying equipment, assembly pneumatic tools, and pneumatic actuators. The system is equipped with pressure sensors, flow sensors, energy metering devices, and equipment operation status monitoring devices, and is interconnected with the Energy Management System (EMS), Manufacturing Execution System (MES), and Enterprise Resource Planning (ERP) system.
[0082] The specific implementation steps of this embodiment will be described in detail below.
[0083] S1 Acquires Leakage Events and Industrial Operation Data: This step corresponds to... Figure 1 The input stage of the process is shown. This invention does not limit the source of leak detection. In this embodiment, the leak event at the flange of the main pipeline in Area A of the welding workshop is identified by a flow balance analysis model deployed in the pipeline network, and simultaneously confirmed by on-site inspection personnel.
[0084] The leakage event can be formally represented as:
[0085] ;
[0086] Where: L represents the location of the leak, corresponding to the pipeline node number EN-PIPE-023; T represents the time of the leak; M represents the type of energy medium, which is compressed air in this embodiment; S represents the set of leak event attributes, including the leak level, estimated leak volume, leak duration and current operating conditions.
[0087] Using the time T at which the leak occurred as the time reference, industrial operation data is collected synchronously within a set time period before and after the leak event to form an industrial operation data set:
[0088] ;
[0089] Among them: energy operation data This includes main pipeline pressure, branch line flow rates, air compressor outlet temperature, total power consumption of the station, and air supply status for each area; equipment operation data. This includes the operating status of each air compressor, the operating rate of the dryer, the pressure of the air receiver tank, and the operating status and load rate of the end-user air equipment; process operation data. This includes the process pressure requirements, production cycle time, and process constraints for each process step; production organization data. This includes information on production lines, processes, shift teams, products in production, and order progress.
[0090] Forming the analysis object: Timestamp alignment, outlier removal, and missing value interpolation are performed on the collected data to establish an analysis dataset with a unified time window.
[0091] By combining leakage event E with industrial operation data set D, a leakage event analysis object is constructed:
[0092] ;
[0093] The object of leakage event analysis As input for the subsequent construction of industrial energy impact networks.
[0094] S2 constructs the Industrial Energy Impact Network (IEIN): This step corresponds to... Figure 2 The diagram illustrates the process of building a network that influences industrial energy.
[0095] Identify affected objects and analyze objects based on leakage events. By combining the compressed air system topology, equipment ledger, and production organizational structure, potential impact targets are identified, forming an initial set of impact targets:
[0096] ;
[0097] In this embodiment, all affected objects adopt a unified coding rule: Energy objects (EN series): including air compressor stations, air storage tanks, main pipeline sections, branch pipeline sections, valve groups, etc., such as EN-001 (air compressor station) and EN-023 (main pipeline in area A); Equipment objects (EQ series): including various air-consuming equipment such as air compressors, dryers, welding robots, and pneumatic tools, such as EQ-101 (welding robot No. 1); Production objects (PR series): including production lines, processes, and products, such as PR-001 (welding assembly line 1) and PR-011 (welding process).
[0098] The initial set of affected objects is screened based on the leak location, the topology of the compressed air supply path, and the real-time operating status of the equipment. Objects that are not connected to the leak point by the air path, equipment that has been shut down and is offline, and non-production objects are excluded.
[0099] After filtering, a set of target impact objects is formed:
[0100] ;
[0101] In this embodiment, the target impact object set after screening contains m objects, including several energy objects, equipment objects, and production objects. Irrelevant objects such as non-related regional pipelines and equipment, and equipment under maintenance are excluded.
[0102] Establish relationships and target the set of objects affected. Establish three types of influence relationships to form a set of relationships R: Energy supply relationship: describes the gas path connection relationship between energy objects, such as the hierarchical gas supply relationship of main network → branch line → terminal equipment; Equipment dependency relationship: describes the dependency relationship of equipment objects on energy objects, such as welding robots relying on the gas supply of branch line A; Production organization relationship: describes the organization relationship of production objects on equipment objects, such as welding assembly line relying on several welding robots.
[0103] Construct an industrial energy influence network and further assign propagation weights to each relationship. And introduce industrial operation constraint set Ultimately, this will lead to the construction of an industrial energy impact network.
[0104] ;
[0105] Where: Propagation weight set The set of operational constraints is determined comprehensively based on factors such as pipeline diameter, gas supply distance, and the proportion of gas consumption by equipment. These include minimum air supply pressure constraints, maximum equipment load constraints, production cycle constraints, and upper limit constraints on air compressor energy supply.
[0106] It is important to note that traditional industrial energy leakage analysis is typically based on energy pipeline topology, which can only describe the propagation process of energy loss and cannot further correlate with equipment operating status and production organization relationships. The Industrial Energy Impact Network (IEIN) constructed in this invention maps energy objects, equipment objects, and production objects to the same impact space. It establishes cross-level associations through energy supply relationships, equipment dependencies, and production organization relationships, enabling the cascading transmission of leakage impacts from the energy layer to the equipment and production layers, laying the foundation for subsequent multi-dimensional impact assessments.
[0107] The Industrial Energy Impact Network (IEIN) provides a unified data foundation for subsequent cascading impact analysis.
[0108] S3 establishes an IAM and conducts cascading impact analysis: Based on the Industrial Energy Impact Network (IEIN), and combining impact propagation rules, propagation weight calculation methods, and industrial operation constraints, an impact analysis model (IAM) is constructed. The IAM uses IEIN as the network data foundation, cascading propagation rules as the calculation core, and industrial operation constraints as correction conditions to simulate the layer-by-layer transmission process of leakage impacts along the energy supply chain, equipment dependency chain, and production organization chain.
[0109] Initialize the impact source: The energy node (EN-PIPE-023) where the leak point is located is designated as the initial source node for the cascading impact. Based on the leakage amount, leakage duration, and energy medium characteristics, calculate the initial impact value:
[0110] ;
[0111] in, For leakage amount, For the duration of the leak, This indicates the energy medium type. The initial impact value represents the initial impact of the leak at the source point.
[0112] Cascade effects propagate, starting from the initial impact value. Starting from the object, the cascading effect propagates downstream along the relationships within IEIN. To object The transfer formula is:
[0113] ;
[0114] Where: m is the total number of objects in the target-affected object set; For object and The influence propagation weight between them; This is the distance attenuation coefficient, related to the pipeline transmission distance. They are negatively correlated; in this embodiment, an exponential decay model is used. For source object The real-time operating status coefficient; it takes the maximum value when the object is running at full load, assigns a value based on the real-time load rate when the object is running at partial load, and determines the value when the object is stopped or offline. ; The industrial constraint correction coefficient for the target object is calculated from the industrial operation constraint set C and is used to characterize the corrective effect of process constraints, equipment capacity constraints, and production organization constraints on the propagation of influence results.
[0115] The constraint correction coefficient The rule for determining the value is: when the object's operating parameters do not reach the process threshold, <1, the impact is constrained and buffered; when the object's operating parameters reach or exceed the process risk threshold... >1, the degree of impact is amplified by constraints. Through the constraint correction mechanism, the cascading impact results are not only affected by network connectivity, but also dynamically modulated by process constraints, equipment capacity constraints, and production organization constraints.
[0116] In this embodiment, a typical cascading propagation path includes: leakage source node → main network → branch line in area A → welding robot → welding process → welding assembly line production, that is, the impact is transmitted from the energy layer to the equipment layer, and finally to the production layer.
[0117] The propagation process uses a breadth-first traversal approach, calculating the impact value of each downstream object layer by layer starting from the source node.
[0118] Propagation Termination Condition: The cascading propagation process terminates when any of the following conditions are met:
[0119] 1. If the impact value of the object is lower than the preset threshold, the impact is considered negligible;
[0120] 2. The current object has no downstream associated nodes and has been propagated to the terminal;
[0121] 3. Triggering industrial operation constraint boundaries, such as when the pressure has dropped below the lower limit of the process, the degree of impact no longer changes.
[0122] After propagation is complete, an impact propagation tree is formed with the leak source node as the root.
[0123] Output the impact analysis results. After the propagation calculation is completed, obtain the set of impact values for all affected objects:
[0124] ;
[0125] The set of impact values serves as the input for subsequent multidimensional impact quantification assessment, corresponding to Figure 3 The output result.
[0126] S4 Multidimensional Impact Quantitative Assessment: This step is based on the results of cascade impact analysis, and conducts quantitative assessment from multiple dimensions and integrates them to form a leakage impact index.
[0127] Generate an impact matrix. Based on the cascading impact analysis results and the business attributes of each object, calculate the degree of influence of each affected object in different dimensions, and generate the impact matrix:
[0128] ;
[0129] The rows correspond to m affected objects, and the columns correspond to four dimensions: energy impact, production impact, economic impact, and operational risk. This represents the degree of influence of the i-th object in the k-th dimension.
[0130] The impact matrix expands upon the traditional object-level comprehensive impact value to a two-dimensional impact distribution based on objects and dimensions. According to the type of affected object and its business attributes, the dimensions corresponding to different objects in the impact matrix are weighted and aggregated to obtain energy impact indicators, production impact indicators, economic impact indicators, and operational risk indicators, providing a structured data foundation for subsequent multi-dimensional assessments.
[0131] The energy impact is calculated by combining the impact values of each energy node with pipeline flow data and energy prices to determine energy losses. The direct compressed air loss caused by leakage is converted into additional power consumption of the air compressor. Based on operating time and electricity prices, the economic energy loss can be calculated, ultimately forming a quantified value of the energy impact. .
[0132] The production impact is calculated based on the impact values of the equipment and the production objects, combined with production cycle time and capacity data, to determine production losses. A decrease in gas supply pressure leads to a reduction in the operating speed of gas-consuming equipment and a lengthening of the production cycle time, resulting in capacity loss. The production impact is quantified by calculating the output value per unit time. .
[0133] The economic impact is calculated by taking into account energy losses, production losses, and estimated maintenance costs, resulting in a quantified economic impact value. .
[0134] Calculate operational risks, and assess operational risks by comprehensively considering the scope of impact, safety risks, and continuous operation risks. The extent of the impact is determined by the range of pipelines affected by the leak, the number of equipment, and the number of production lines; potential fluctuations in product quality and abnormal equipment operation due to pressure drops constitute safety and reliability risks. A comprehensive quantitative value for operational risk is then generated. .
[0135] Indicator normalization: To eliminate the dimensional differences among the indicators, the min-max standardization method is used to normalize the above indicators.
[0136] ;
[0137] in, and These are the minimum and maximum values of the k-th dimension indicator in the company's historical case database, respectively. After normalization, the values of each dimension are all in the range of [0,1].
[0138] The Leakage Impact Index (LII) is calculated using a multidimensional linear weighted fusion model.
[0139] ;
[0140] In this embodiment, the number of dimensions is p=4, corresponding to energy impact, production impact, economic impact, and operational risk, respectively. The weighting coefficients satisfy... It can be adjusted according to the company's management focus.
[0141] The Leakage Impact Index (LII) is used to uniformly characterize the comprehensive impact of leakage events on industrial energy systems, enabling horizontal quantitative comparisons between different leakage events.
[0142] S5. Leakage Mitigation Decision: Calculate mitigation benefits and expected mitigation benefits. It is used to characterize the expected reduction in the impact of leakage after the implementation of remediation measures, and comprehensively covers three aspects: energy recovery benefits: additional energy losses that can be eliminated after remediation; production recovery benefits: capacity losses that can be recovered after remediation; and operational recovery benefits: product quality risks and equipment operation risks that can be eliminated after remediation.
[0143] Calculate the cost of remediation, the cost of leak remediation. This includes: labor costs: the cost of maintenance personnel's working hours; material costs: the cost of spare parts and consumables; and downtime losses: the loss of production capacity caused by planned gas outages for maintenance.
[0144] The governance value index is calculated by normalizing the governance benefits and costs.
[0145] ;
[0146] in, and These represent the normalized governance benefits and governance costs, respectively. A higher GVI value indicates a greater impact reduction benefit per unit of governance cost and a higher governance priority.
[0147] Prioritize governance by calculating the GVI value of each leak when multiple leak events exist in the system at the same time and sorting them in descending order: Rank=Sort(GVI);
[0148] Generate a governance strategy and dynamic closed loop. Based on the Leakage Impact Index (LII) and the Governance Value Index (GVI), and combined with preset governance rules, generate a tiered governance strategy: When LII ≥ 0.8 and GVI ≥ 2.0, it is determined to be a Level 1 governance target, and it is recommended to arrange maintenance immediately; when 0.5 ≤ LII < 0.8 and 1.0 ≤ GVI < 2.0, it is determined to be a Level 2 governance target, and it is recommended to include it in the weekly maintenance plan; when 0.3 ≤ LII < 0.5 and 0.5 ≤ GVI < 1.0, it is determined to be a Level 3 governance target, and it is recommended to continuously monitor and treat it as appropriate; when LII < 0.3, it is determined to be a general leak, and it is recommended to include it in routine inspection and maintenance.
[0149] The system outputs governance decision results, including information such as maintenance targets, maintenance priorities, suggested maintenance windows, expected governance benefits, and expected recovery time, providing a basis for decision-making in maintenance plan formulation.
[0150] For leaks that have been remediated, the system automatically re-executes the assessment process, calculates the impact value of the corresponding nodes, updates the node status and propagation weight in IEIN, and realizes the comparison of the impact status before and after remediation and dynamic network updates, forming a complete closed loop of leak discovery → impact assessment → remediation decision → effect verification → network update.
[0151] This embodiment addresses a leak incident involving the main pipeline flange in a welding workshop, completing a full-process analysis from data input to governance decision output. The system constructs an Industrial Energy Impact Network (IEIN) to identify several affected entities, covering the main pipeline, multiple branch lines, multiple terminal devices, and corresponding production lines. Through cascaded impact analysis and multidimensional assessment, the Leakage Impact Index (LII) is calculated to be approximately 0.83 (high impact level) and the corresponding Governance Value Index (GVI). This leak incident is classified as a Level 1 governance target.
[0152] After maintenance, the system re-executed the entire S1 to S5 process for review: re-collecting pipeline operation data, updating the IEIN network node status and weights, and re-performing cascade impact analysis and multi-dimensional assessment. The review results showed that the Leakage Impact Index (LII) dropped below 0.05, from a high-impact level to a negligible level, the number of affected objects decreased significantly, and gas supply pressure, equipment operation, and production cycle time all returned to normal. The system automatically closed the leak event and stored this remediation case in the historical case library for subsequent weight calibration and model optimization.
[0153] The above closed-loop verification process demonstrates that the present invention can accurately assess the comprehensive impact of leakage events in industrial compressed air systems and provide scientific and quantitative decision support for leakage control, while also possessing the ability to verify the control effect and continuously optimize it.
[0154] Example 2: This example uses the circulating water system of a painting workshop in an industrial manufacturing enterprise as an application scenario to illustrate the applicability of the leakage impact assessment method described in this invention under different industrial energy media conditions.
[0155] Unlike the compressed air system in Example 1, the industrial circulating water system is a liquid energy medium. Its leakage not only results in direct loss of the energy medium but may also lead to reduced equipment cooling capacity, fluctuations in process parameters, and product quality risks. This example focuses on illustrating how the present invention adapts its methods for modeling affected objects, constructing influence relationships, and performing cascading influence analysis under different energy medium conditions through the Industrial Energy Influence Network (IEIN) and the Influence Analysis Model (IAM).
[0156] The circulating water system consists of a circulating water pump station, a main water supply pipe, a main water return pipe, heat exchange equipment, and terminal cooling equipment. It mainly serves the cooling needs of the air conditioning units, process cooling units, and production equipment in the painting workshop. The system is equipped with pressure sensors, flow sensors, temperature sensors, power metering devices, and equipment operation status monitoring devices, and is interconnected with the Energy Management System (EMS), Manufacturing Execution System (MES), and Equipment Management System.
[0157] In this embodiment, the leakage event is set as a leak at the valve connection of the circulating water main pipeline in Area B of the painting workshop.
[0158] First, leakage events are identified using a flow balance analysis model to obtain information on leakage location, occurrence time, energy medium type, and leakage attributes. Simultaneously, circulating water pressure, flow rate, temperature, equipment operating status, process temperature requirements, and production organization information are collected to construct a leakage event analysis object. The specific implementation method for this step is the same as in Example 1 S1, and will not be elaborated here.
[0159] Subsequently, an Industrial Energy Impact Network (IEIN) was constructed based on the circulating water system topology, equipment connection relationships, and production organization relationships.
[0160] Considering the characteristics of the medium in the circulating water system, the affected objects in this embodiment include:
[0161] (1) Energy objects, including circulating water pumping stations, main water supply pipes, main return water pipes, branch pipe networks and heat exchange units;
[0162] (2) Equipment objects, including terminal energy-consuming equipment such as air conditioning cooling units, process cooling equipment and heat exchange equipment;
[0163] (3) Production objects, including coating production lines, spraying processes and related product production processes.
[0164] Compared to compressed air systems, this embodiment adjusts the influencing relationships based on the characteristics of the circulating water medium. These mainly include: circulating water supply relationship, which describes the supply process of circulating water from the pump station through main pipes and branch lines to the terminal cooling equipment; cooling capacity dependence relationship, which describes the dependence of the terminal equipment on the heat exchange capacity of the circulating water; and process temperature influence relationship, which describes the influence of changes in circulating water temperature and decreases in cooling capacity on production process parameters and product quality.
[0165] Based on the aforementioned affected entities and their relationships, an industrial energy impact network is constructed:
[0166] ;
[0167] Among them, the propagation weight set Determined based on factors such as pipe diameter, flow rate, heat exchange capacity, and equipment cooling load; operational constraint set. These include minimum water supply pressure constraints, allowable temperature rise constraints for equipment, process temperature range constraints, and product quality control constraints.
[0168] In this embodiment, the same industrial energy influence network model is still used to map energy objects, equipment objects, and production objects to the same influence space. Only the object attributes and relationships are adjusted according to the energy medium type to achieve unified modeling of different energy systems.
[0169] Furthermore, an impact analysis model IAM was constructed based on the Industrial Energy Impact Network (IEIN), and cascade impact analysis was conducted.
[0170] In response to the characteristics of the circulating water system, the propagation path of leakage impact is adjusted from the pressure change in the compressed air system - equipment energy consumption change mode to the flow loss - cooling capacity reduction - process temperature change - increased production risk mode.
[0171] The typical cascading effect path in this embodiment is:
[0172] Leakage point → circulating water main → branch cooling equipment → decreased heat exchange capacity → process temperature change → coating quality risk.
[0173] Meanwhile, in the process of influence propagation calculation, temperature change coefficient, equipment cooling load coefficient and process sensitivity coefficient are introduced to dynamically correct the degree of influence on different objects.
[0174] The calculation process for cascading effects is the same as in Example 1 S3, except that the propagation parameters and constraints are adjusted according to the characteristics of the circulating water system, which will not be elaborated here.
[0175] After obtaining the set of impact values for each affected object through IAM calculation, the energy impact, production impact, economic impact and operational risk are quantitatively analyzed according to the method described in Example 1 S4, and then integrated to form the Leakage Impact Index LII.
[0176] During the governance decision-making stage, based on the Leakage Impact Index (LII), combined with maintenance costs, expected recovery benefits, and production constraints, the Governance Value Index (GVI) is calculated, and maintenance priorities and governance strategies are output. The specific process is the same as in Example 1, S5.
[0177] In this embodiment, the system evaluation results show that the circulating water leakage event not only caused the loss of circulating water medium, but also led to a decrease in the heat exchange capacity of some cooling equipment, and further affected the temperature stability of the coating process. The method of this invention can identify the affected equipment and production processes, quantify the overall impact of the leakage event, and generate corresponding mitigation strategies.
[0178] In summary, as can be seen from Examples 1 and 2, the Industrial Energy Impact Network (IEIN) proposed in this invention does not rely on a single energy medium. Instead, it achieves impact modeling of different industrial energy systems by uniformly describing the relationships between energy objects, equipment objects, and production objects. At the same time, the Impact Analysis Model (IAM) can adjust the propagation parameters and constraints according to the characteristics of different energy media, thus making it applicable to leakage impact assessment and mitigation decisions for compressed air, circulating water, and other industrial energy systems.
[0179] The present invention adopts the above technical solution and has the following beneficial effects compared with the prior art:
[0180] (1) It breaks through the technical limitations of existing technologies that only target leakage detection, location and leakage estimation, and establishes a leakage cascade impact analysis system for industrial energy systems, realizing the technical extension of leakage management from event detection to impact assessment and management decision-making, and expanding the technical boundaries of industrial energy leakage management.
[0181] (2) This invention proposes an Industrial Energy Impact Network (IEIN) and a cascading impact analysis mechanism. By introducing an industrial operation constraint set, an impact analysis data model with domain-specific characteristics is constructed. Based on this model, the transmission process of leakage impact along the energy supply chain, equipment dependence chain and production organization chain is deduced layer by layer. This can accurately reflect the cascading amplification effect of leakage impact in the industrial energy system and improve the consistency between the analysis results and the actual industrial working conditions.
[0182] (3) In the cascading impact calculation, the present invention introduces the real-time operating status coefficient and distance attenuation coefficient of the object, and combines the object screening mechanism to make the leakage impact dynamic with the equipment load level and transmission distance. At the same time, the cascading analysis is carried out only within the target object set, which improves the accuracy of the analysis and effectively reduces the computational complexity, thereby improving the evaluation efficiency of large-scale industrial energy systems.
[0183] (4) The present invention constructs a LII-GVI dual-index decision system, which realizes a unified quantitative description of the comprehensive impact of leakage through normalization and multi-dimensional weighted fusion, and realizes a quantitative evaluation of governance value by combining the degree of impact reduction and governance cost. It can automatically generate leakage governance priorities and governance strategies, providing a standardized decision basis for horizontal comparison of different leakage events and optimization of maintenance resource allocation, and improving the intelligent level of leakage governance in industrial energy systems.
[0184] Obviously, the described embodiments are only a part of the embodiments of this application, not all of them. Without conflict, the embodiments and features in the embodiments of this application can be combined with each other. The components of the embodiments of this application described and illustrated herein can generally be arranged and designed in various different configurations. Therefore, the detailed description of the embodiments of this application is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
Claims
1. A method for assessing the leakage impact of industrial energy systems, characterized in that, include: Acquire information on leakage events in industrial energy systems and related industrial operating data to construct leakage event analysis objects; among which, industrial operating data includes energy operating data, equipment operating data, process operating data, and production organization data obtained from sensors deployed in industrial energy systems; Based on the leakage event analysis object, an industrial energy impact network is constructed by combining the topology of the industrial energy system, equipment connection relationships, and production organization relationships. An impact analysis model is constructed based on the industrial energy impact network. According to the preset impact propagation rules, propagation weights and industrial operation constraints, the cross-level cascade propagation process of leakage impact along the energy supply chain, equipment dependence chain and production organization chain is analyzed to obtain the leakage impact propagation results. Based on the propagation results of the leakage impact, multi-dimensional impact indicators of energy impact, production impact, economic impact and operational risk are calculated respectively, and the leakage impact index is obtained by normalizing and weighting the indicators of each dimension. The governance value index is calculated by combining the leakage impact index with the governance cost and expected governance benefits. Multiple leakage events are then ranked according to their governance value index to generate leakage governance priorities and governance strategies.
2. The leakage impact assessment method for industrial energy systems according to claim 1, characterized in that, The realization of building an industrial energy impact network includes: Based on the objects analyzed in the leakage event, the initial set of affected objects is identified by combining the topology of the industrial energy system, equipment connection relationships, and production organization relationships. The initial set of affected objects is filtered based on the leak location, energy supply path, and real-time operating status of the equipment to obtain the target set of affected objects; Establish the influence relationships among the various influence objects in the target influence object set, and introduce influence propagation weights and industrial operation constraints to construct an industrial energy influence network.
3. The leakage impact assessment method for industrial energy systems according to claim 2, characterized in that, Energy objects are used to describe industrial energy supply paths, transmission network structures, and energy medium attributes; equipment objects are used to describe the attributes, operating status, and energy dependencies of energy-consuming equipment; and production objects are used to describe production lines, processes, and product manufacturing processes.
4. The leakage impact assessment method for industrial energy systems according to claim 2, characterized in that, The parameters for influencing propagation and the operating constraints are adaptively adjusted based on the physical properties, transmission mechanisms, and industrial application constraints of the different industrial energy media involved in the leak.
5. The leakage impact assessment method for industrial energy systems according to claim 1, characterized in that, The realization of the propagation of the effects of the leak includes: The energy node corresponding to the leakage event is taken as the initial impact source, and the initial impact value is calculated based on the leakage amount, leakage duration, and energy medium type. : ;in: This refers to the amount of leakage. Duration of the leak; Energy medium type; Based on the industrial energy impact network, starting from the initial impact value, the cascading impact propagates layer by layer along the impact correlation; During the propagation process, the impact value of each target object is calculated as the result of the leakage impact propagation based on the real-time operating status coefficient of the source object, the distance attenuation coefficient of the propagation path, and the constraint correction coefficient determined based on industrial operating constraints. The formula for calculating the impact value of the target object is as follows: ; in, For the j-th target object The impact value; upstream related objects Impact value; Representation Object With object The influence propagation weight between them; Indicates the propagation distance attenuation coefficient; Indicates upstream related objects Real-time operating status coefficients According to the object The real-time load rate is determined when the object is down or offline. =0; Indicates the target affected object constraint correction coefficients, constraint correction coefficients Determined based on the set of industrial operation constraints; m is the total number of objects in the target-affected object set.
6. The leakage impact assessment method for industrial energy systems according to claim 1, characterized in that, Based on the propagation results of the leakage impact, multi-dimensional impact indicators of energy impact, production impact, economic impact, and operational risk are calculated. The leakage impact index is then obtained by normalizing and weighting each indicator. Energy impact indicators are obtained by calculating energy losses based on the impact values of each target object and in conjunction with energy prices. Calculate production impact indicators based on equipment efficiency decline, changes in production cycle time, and capacity loss; Economic impact indicators are calculated by combining energy losses, production losses, and maintenance costs. Calculate operational risk indicators based on the scope of the leak's impact, its level of impact, and safety risks; The multidimensional impact indicators were normalized using the min-max standardization method, and the leakage impact index was calculated using a multidimensional linear weighted fusion model. ; ;in, The number of indicator dimensions. For the k-th dimension normalized influence index, The weight coefficients for the corresponding dimensions and satisfying .
7. A leakage impact assessment method for industrial energy systems according to claim 1 or 6, characterized in that, The governance value index is calculated based on the leakage impact index, combined with governance costs and expected governance benefits. Multiple leakage events are then ranked according to their governance value index to generate leakage governance priorities. The implementation of governance strategies includes: The expected benefits of remediation are determined based on the recoverable energy losses, production losses, and risk reduction after remediation. The cost of remediation is determined based on the labor cost, material cost, and downtime losses. Calculate the governance value index: ; For governance benefits; For expected governance benefits; Leakage impact index; Multiple leakage events are sorted in descending order based on their governance value index, and corresponding governance strategies are generated.
8. The leakage impact assessment method for industrial energy systems according to claim 7, characterized in that, The implementation of generating leak mitigation priorities and mitigation strategies includes: Based on the leakage impact index and the governance value index, and combined with preset thresholds, the governance level is divided, and the corresponding maintenance priority, maintenance plan and expected governance benefits are output.
9. The leakage impact assessment method for industrial energy systems according to claim 1, characterized in that, It also includes governance closed-loop verification and model update steps: after completing the leakage remediation, re-collect industrial operation data; update the object status, propagation weight and constraint parameters in the industrial energy impact network; recalculate the leakage impact index and verify the governance effect by the changes in indicators before and after the remediation; store historical leakage events, governance strategies and governance results in the case library for optimizing the impact propagation model.
10. A leakage impact assessment system for industrial energy systems, employing the leakage impact assessment method for industrial energy systems as described in any one of claims 1 to 9, characterized in that the system... include: The data acquisition module is used to acquire information on leakage events in industrial energy systems and related industrial operation data to construct leakage event analysis objects. Among them, the industrial operation data includes energy operation data, equipment operation data, process operation data and production organization data obtained from sensors deployed in industrial energy systems. The impact network construction module is used to identify an initial set of impact objects based on the leakage event analysis objects, combined with the topology of the industrial energy system, equipment connection relationships, and production organization relationships; to filter the target set of impact objects based on the leakage location, energy supply path, and real-time operating status of equipment; and to establish impact correlation relationships, introduce impact propagation weights and industrial operation constraints to construct an industrial energy impact network. The impact analysis module is used to construct an impact analysis model based on the industrial energy impact network. According to the preset impact propagation rules, propagation weights and industrial operation constraints, it analyzes the cross-level cascading propagation process of leakage impact along the energy supply chain, equipment dependence chain and production organization chain to obtain the leakage impact propagation results. The impact assessment module is used to calculate multi-dimensional impact indicators of energy impact, production impact, economic impact and operational risk based on the set of impact values, and to normalize and weight the indicators of each dimension to obtain the leakage impact index. The governance decision module is used to calculate the governance value index based on the leakage impact index combined with governance costs and expected governance benefits, and to sort multiple leakage events according to the governance value index to generate leakage governance priorities and governance strategies. The closed-loop update module is used for verifying the governance effect and optimizing model parameters.