A method and system for evaluating source-load matching capability of a ground-air integrated charging and discharging system

By constructing a source-load matching evaluation model for an integrated ground-air charging and discharging system, the problem of the lack of reflection of the charging time limit and equipment boundaries in the existing technology has been solved, and the accurate assessment and guarantee of the charging needs of electric vehicles and drones have been achieved.

CN123140709APending Publication Date: 2026-11-20STATE GRID FUYANG POWER SUPPLY COMPANY
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611387324.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-08
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies fail to effectively reflect the recharge time and equipment operating boundaries in integrated ground-to-air charging and discharging systems, leading to an overestimation of recharge capacity and an inability to meet the diverse charging needs of electric vehicles and drones.

Method used

By collecting multi-source assessment data, a time-series assessment dataset is established, the energy replenishment demand is calculated and the allowable energy replenishment period is determined, a source-load matching constraint set is constructed, a source-load matching assessment model is constructed and solved, the maximum effective matching power is assessed, and the actual equipment operating boundary is reflected.

Benefits of technology

The energy replenishment capability of the integrated ground-air charging and discharging system was accurately assessed, avoiding overestimation of the matching capability due to differences in total power or instantaneous power, and thus meeting the actual energy replenishment needs of electric vehicles and drones.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140709A_ABST
    Figure CN123140709A_ABST
Patent Text Reader

Abstract

The application discloses a kind of ground-air integrated charging and discharging system source-load matching capability evaluation method and system, and relates to the technical field of power system source-load collaborative analysis.The method comprises: obtaining time series evaluation dataset;Respectively calculate ground-air vehicle energy supplement demand, and determine the allowed energy supplement period of each energy supplement demand, obtain energy supplement demand analysis result;Establish the source-load matching constraint set of ground-air integrated charging and discharging system;Build source-load matching evaluation model, and solve, obtain the maximum effective matching power in the allowed energy supplement period;The maximum effective matching power is compared with the energy supplement demand analysis result, and the source-load matching capability of ground-air integrated charging and discharging system is evaluated according to the comparison result, and the source-load matching capability evaluation result is obtained.The application is used to solve the problem that source-load matching capability evaluation method cannot fully reflect ground-air vehicle energy supplement time limit and equipment operation boundary, leading to the actual energy supplement support capability of ground-air integrated charging and discharging system being overestimated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power system source-load coordination analysis technology, and more specifically, to a method and system for evaluating the source-load matching capability of an integrated ground-air charging and discharging system. Background Technology

[0002] With the development of distributed new energy, electric transportation, and the low-altitude economy, electric vehicles, logistics drones, inspection drones, and emergency drones are gradually generating diverse energy replenishment needs across ground transportation and low-altitude operating spaces. Integrating distributed photovoltaics, fixed energy storage, power grid interconnection devices, electric vehicle charging and discharging facilities, and drone charging facilities into a single system can provide shared energy support for different types of electric vehicles and create conditions for local consumption of new energy and friendly grid connection.

[0003] For example, the invention patent announcement CN121813506A discloses a method, system, electronic device, and medium for assessing the openable capacity of distributed generation. This method acquires basic technical data of the distribution network system; constructs a source-load matching characteristic model and corresponding constraints based on the basic technical data; inputs real-time operating data of each voltage level of the distribution network into the source-load matching characteristic model; uses a solver to solve the source-load matching characteristic model to obtain the distributed generation carrying capacity value at each voltage level; and calculates the openable capacity of distributed generation that the distribution network can accommodate based on the distributed generation carrying capacity value.

[0004] The above-disclosed technical solutions have at least the following technical problems: The time-limited delivery requirements of the energy replenishment load are not coupled with various constraints. Due to the diverse charging needs of the integrated ground-air charging and discharging system, electric vehicles must complete the target energy replenishment before the planned departure, while drones must reach the minimum take-off charge state before the start of the next flight mission. Even if the system has sufficient total available energy during the evaluation period, it may still be unable to complete all energy replenishment needs within the allowed energy replenishment period due to limitations in energy storage status, power boundaries of distribution nodes, power of energy replenishment interfaces, or the number of concurrent interfaces. Summary of the Invention

[0005] To overcome the above-mentioned defects of the prior art, embodiments of the present invention provide a method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system, in order to solve the problem that existing source-load matching evaluation methods cannot fully reflect the refueling time limit and equipment operation boundary of ground-to-air vehicles, resulting in an overestimation of the actual refueling guarantee capability of the integrated ground-to-air charging and discharging system.

[0006] To achieve the above objectives, the present invention provides the following technical solution: A method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system includes the following steps: Collect multi-source evaluation data of the integrated ground-air charging and discharging system, and process the multi-source evaluation data to obtain a time-series evaluation dataset. Based on the time-series assessment dataset, the refueling demand of ground-to-air vehicles is calculated, and the allowable refueling time period for each refueling demand is determined to obtain the refueling demand analysis results. A source-load matching constraint set for an integrated ground-air charging and discharging system is established based on a time-series evaluation dataset. Based on the energy replenishment demand analysis results and the source-load matching constraint set, a source-load matching evaluation model is constructed and solved to obtain the maximum effective matching power during the allowed energy replenishment period. The maximum effective matching power is compared with the energy replenishment demand analysis results. Based on the comparison results, the source-load matching capability and limiting factors of the integrated ground-air charging and discharging system are evaluated to obtain the source-load matching capability evaluation results.

[0007] In a preferred embodiment, the step of obtaining the energy replenishment demand analysis results includes: Based on the electric vehicle travel parameters in the time-series evaluation dataset, the effective refueling periods for each electric vehicle are determined. The target state of charge of each electric vehicle is analyzed based on the time-series evaluation dataset, and the energy demand for recharging of each electric vehicle is calculated based on the analysis results. Based on the flight mission parameters of the UAVs in the time series evaluation dataset, calculate the power required for the next flight mission of each UAV, determine the minimum takeoff charge state, judge the mission feasibility based on the minimum takeoff charge state, and calculate the power required for recharging the UAVs after returning to base based on the judgment result. The energy replenishment requirements of various electric vehicles and drones were unified to obtain the energy replenishment demand analysis results.

[0008] In a preferred embodiment, the effective refueling period for each electric vehicle is from the arrival time to the planned departure time; the effective refueling period for each UAV is from the return time to the start time of the next mission.

[0009] In a preferred embodiment, the step of analyzing the target state of charge of each electric vehicle includes: If the target state of charge is less than or equal to the arrival state of charge, then the required energy replenishment is set to 0. If the target state of charge is higher than the arrival state of charge, then the recharge demand of each electric vehicle is calculated.

[0010] In a preferred embodiment, the step of unifying the refueling requirements of each electric vehicle and each drone includes: Set up a state variable for the energy replenishment period to describe the energy replenishment availability status of different vehicles under a unified time scale; Set an interface occupancy status variable to describe whether each power replenishment requirement occupies the matching power replenishment interface at time t. The power required for each energy replenishment demand is constrained based on the energy replenishment period state variables and the interface occupancy state variables, thus obtaining the energy replenishment demand analysis results.

[0011] In a preferred embodiment, the source-load matching constraint set includes distributed photovoltaic unit output constraints, fixed energy storage unit constraints, distribution network interaction power constraints, distribution node power balance constraints, and energy replenishment interface constraints.

[0012] In a preferred embodiment, the calculation process for the maximum effective matching power during the allowed replenishment period is as follows: Obtain the effective matching power for each energy replenishment demand, and establish an objective function with the goal of maximizing the sum of the effective matching power for each energy replenishment demand; A source-load matching evaluation model is constructed by combining the aforementioned source-load matching constraint set; The source-load matching evaluation model is solved to obtain the maximum effective matching power during the allowable energy replenishment period.

[0013] In a preferred embodiment, the step of obtaining the source-load matching capability assessment result includes: Obtain the total energy demand from the energy demand analysis results, and calculate the source-load matching capability of the air-ground integrated charging and discharging system based on the ratio of the maximum effective matching power to the total energy demand. The source-load matching capability is analyzed by the total replenishment power demand, and the source-load matching capability assessment result is obtained.

[0014] In a preferred embodiment, the step of analyzing the source-load matching capability includes: When the total energy demand is greater than 0, the source-load matching capability ranges from 0 to 1. When the source-load matching capability is equal to 1, it means that the energy demand of all ground and air vehicles can be met. When the total energy demand is 0, the source-load matching capability is not calculated in the current assessment period. When the source-load matching capability is less than 1, the unmatched replenishment power is calculated. The unmatched replenishment power is used to quantify the effective demand power that cannot be met within the allowed replenishment period under the current evaluation conditions.

[0015] This invention provides a source-load matching capability evaluation system for an integrated ground-to-air charging and discharging system, comprising: The data acquisition module collects multi-source evaluation data from the integrated ground-air charging and discharging system, processes the multi-source evaluation data, and obtains a time-series evaluation dataset. The energy replenishment demand calculation module calculates the energy replenishment demand of ground-to-air vehicles based on the time-series assessment dataset, determines the allowable energy replenishment period for each energy replenishment demand, and obtains the energy replenishment demand analysis results. The constraint construction module establishes a set of source-load matching constraints for the integrated ground-air charging and discharging system based on the time-series evaluation dataset. The model building and solution module constructs a source-load matching evaluation model based on the energy replenishment demand analysis results and the source-load matching constraint set, and solves the model to obtain the maximum effective matching power during the allowed energy replenishment period. The matching capability evaluation module compares the maximum effective matching power with the energy replenishment demand analysis results, evaluates the source-load matching capability and limiting factors of the integrated ground-air charging and discharging system based on the comparison results, and obtains the source-load matching capability evaluation results.

[0016] The technical effects and advantages of the method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to the present invention are as follows: This invention uses the maximum effective matching power under the source-load matching constraint set as the core characterization quantity of source-load matching capability, and incorporates the electric vehicle departure time limit and the next mission time limit of the UAV into the evaluation process in a unified manner, so as to avoid overestimation of matching capability caused by relying solely on the total power or instantaneous power difference in the evaluation period. This invention considers photovoltaic time-series output, energy storage cross-time transfer, power available in the distribution network, node power balance, and power and quantity constraints of energy replenishment interfaces in the source-load matching evaluation model, so that the evaluation results can reflect the degree to which the available resources on the source side can meet the ground-to-air energy replenishment demand under the actual equipment operating boundary. This invention outputs source-load matching capability, unmatched replenishment power, and candidate limiting factors, which can be used for the analysis of the operating characteristics of the ground-air integrated charging and discharging system and the verification of equipment parameters, and provide a basis for subsequent planning, configuration, and collaborative operation research. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of a method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system, provided by an embodiment of the present invention. Figure 2 This is a block diagram of a source-load matching capability evaluation system for an integrated ground-to-air charging and discharging system provided in an embodiment of the present invention. Detailed Implementation

[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0019] Example 1, Figure 1 This invention presents a method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system, comprising the following steps: S1. Collect multi-source evaluation data of the integrated ground-air charging and discharging system, and process the multi-source evaluation data to obtain a time-series evaluation dataset.

[0020] In this embodiment, the specific steps of S1 are as follows: A sampling period is set, and multi-source evaluation data of the integrated ground-air charging and discharging system is collected according to the sampling period. The multi-source evaluation data includes photovoltaic output, energy storage state of charge parameters, energy storage charging and discharging power, distribution network switching power, station auxiliary load, energy replenishment interface occupancy status parameters, vehicle state of charge parameters, electric vehicle travel parameters, and UAV flight mission parameters. Among them, electric vehicle travel parameters include arrival time, planned departure time, arrival state of charge, target state of charge, battery rated capacity, maximum allowable energy replenishment power, and access station; UAV flight mission parameters include return time, next mission start time, return state of charge, battery rated capacity, next mission range, mission payload, operation duration, and safety backup requirements. The multi-source evaluation data is preprocessed to obtain a multi-source evaluation dataset. The preprocessing includes timestamp alignment, outlier data processing, and unit unification. The specific data processing techniques are well known to those skilled in the art and will not be described in detail here. The charging and discharging stations and distribution network nodes of the integrated ground-air charging and discharging system are obtained. A mapping relationship between the charging and discharging stations and distribution network nodes is established based on the physical wiring relationship. According to the mapping relationship, the charging and discharging stations and their corresponding distribution network nodes are formed into a spatial node set. The multi-source evaluation dataset is spatially labeled according to the mapping relationship. The evaluation period is set and discretized into T time intervals, each with a length of Δt. The multi-source evaluation dataset with spatial attribution labeling is assigned to the corresponding time interval according to the timestamp to form the time-series evaluation dataset within the evaluation period. The specific value of the time interval is determined based on the sampling period and the operating characteristics of the integrated ground-air charging and discharging system.

[0021] It should be noted that the integrated ground-air charging and discharging system can consist of one or more charging and discharging stations. Each charging and discharging station includes a distributed photovoltaic unit, a fixed energy storage unit, a distribution network interaction unit, a replenishment demand unit, an in-station auxiliary load unit, and a data acquisition and energy management unit. The units are connected to each other through AC / DC buses and corresponding energy conversion devices. The distributed photovoltaic unit supplies power to the station's auxiliary load unit and the fixed energy storage unit; the fixed energy storage unit is used to absorb surplus photovoltaic power or release power when the source-side power is insufficient; the distribution network interaction unit is used to provide external energy supply or receive power that the system allows to be transmitted within the equipment's allowable range; the energy replenishment demand unit provides energy replenishment services for ground electric vehicles and low-altitude electric vehicles; and the data acquisition and energy management unit acquires multi-source assessment data according to a preset sampling period.

[0022] S2, calculate the energy replenishment demand of ground-to-air vehicles based on the time-series assessment dataset, determine the allowable energy replenishment period for each energy replenishment demand, and obtain the energy replenishment demand analysis results.

[0023] In this embodiment, step S2 includes: S21, calculate the charging power demand of each electric vehicle; Based on the electric vehicle travel parameters in the time series evaluation dataset, the effective refueling period for each electric vehicle is determined, wherein the effective refueling period for each electric vehicle is from the arrival time to the planned departure time. Based on the time-series evaluation dataset, the target state of charge (SBC) of each electric vehicle is analyzed. If the target SBC is less than or equal to the arrival SBC, the refueling demand is set to 0. If the target SBC is higher than the arrival SBC, the refueling demand for each electric vehicle is calculated. Specifically: The electricity demand for recharging the nth electric vehicle Represented as:

[0024] In the formula, The rated capacity of the battery of the nth electric vehicle is given in kWh. and These are the target state of charge and the arrival state of charge of the nth electric vehicle, respectively, with the state of charge represented by a per-unit value from 0 to 1. S22, calculates the power required for the next flight mission of each drone; Based on the UAV flight mission parameters in the time series evaluation dataset, the effective recharge period for each UAV is determined. The effective recharge period for each UAV is from the return time to the start time of the next mission. Based on the UAV flight mission parameters in the time-series evaluation dataset, the recharge demand of each UAV from its return to base until the start of its next mission is calculated, where the power required for the m-th UAV's next flight mission is... Represented as:

[0025] In the formula, , , , , and These are the power requirements for the m-th drone during takeoff, cruise, hovering, mission operation, return to base, and safety standby phases, respectively. Determine the minimum takeoff charge state based on the power required for the next mission:

[0026] In the formula, The rated capacity of the battery for the m-th drone is given in kWh. and These are the minimum takeoff state of charge and the maximum permissible state of charge for the m-th UAV battery, respectively, with the state of charge represented by per-unit values ​​from 0 to 1; If the minimum takeoff state of charge calculated from the energy consumption of the next mission exceeds the upper limit of the battery's allowable state of charge, it indicates that the mission is not energy-feasible under the current battery configuration. Based on this, the energy replenishment requirement for the m-th UAV after its return is determined by the difference between the minimum takeoff state of charge for the next mission and the return state of charge. Represented as:

[0027] In the formula, This represents the return-to-home state of charge of the m-th drone's battery.

[0028] S23 unifies the refueling requirements of various electric vehicles and drones; The recharge demand of each electric vehicle and the power required for the next flight mission of each UAV are uniformly converted into a recharge demand unit, which includes the access node, recharge interface type, time of entering rechargeable state, recharge cutoff time, required power, and maximum allowable power. In order to describe the recharge availability status of different vehicles on a unified time scale, the state variable of the k-th recharge demand at time t is used. :

[0029] In the formula, and These are the time when the k-th energy replenishment demand enters the energy replenishment state and the energy replenishment deadline, respectively, which are determined by the electric vehicle's arrival time, departure time or the drone's return time and the next mission plan.

[0030] The energy replenishment power of the k-th energy replenishment demand at time t satisfy:

[0031] In the formula, The interface occupancy status variable is a binary variable used to indicate whether the k-th energy replenishment demand occupies the matching energy replenishment interface at time t; This is the maximum power limit for the k-th energy replenishment demand; For the k-th energy replenishment demand at its node i, the upper limit of the interactive power that can be accessed through the interface q corresponding to the k-th energy replenishment demand is defined, where the node mapping function i and the interface type mapping function q determine the corresponding access node and interface type, respectively.

[0032] This step integrates the electric vehicle's departure time limit and the drone's next mission time limit into the evaluation process, avoiding overestimation of matching capabilities based solely on the difference in total battery power or instantaneous power during the evaluation period.

[0033] S3, establish the source-load matching constraint set of the integrated ground-air charging and discharging system based on the time-series evaluation dataset.

[0034] The source-load matching constraint set includes distributed photovoltaic unit output constraints, fixed energy storage unit constraints, distribution network interaction power constraints, distribution node power balance constraints, and energy replenishment interface constraints.

[0035] In this embodiment, step S3 includes: S31, Establish output constraints for distributed photovoltaic units; Distributed photovoltaic units use predicted or measured values ​​as the available output for each time period. The photovoltaic power actually participating in source-load matching shall not exceed the available output for the corresponding time period. When the photovoltaic output is greater than the immediate power demand in the station, the surplus power can be used for energy storage charging within the range of the remaining energy storage capacity and the allowable charging power, or it can be used for energy exchange with the distribution network according to the interaction boundary allowed by the ground-air integrated charging and discharging system.

[0036] The photovoltaic utilization power of node i participating in source-load matching at time t satisfies:

[0037] In the formula, Let be the photovoltaic power utilization of node i at time t; Let be the available photovoltaic output of node i at time t; When the photovoltaic output cannot be directly utilized by the ground-to-ground energy replenishment demand, it can be transferred to subsequent time periods within the allowable range of energy storage capacity and charging power.

[0038] S32, Establish constraints for fixed energy storage units; The stationary energy storage unit uses a continuous state-of-charge equation to describe the energy transfer process between different evaluation periods. The energy storage state of charge and charging / discharging power are limited by the equipment's rated parameters and safe operating range, respectively. To avoid simultaneous charging and discharging of the same device within the same time interval, this embodiment introduces mutually exclusive charging / discharging state variables. In scenarios where only rapid approximate evaluation is needed and it can be proven that the objective function will not induce simultaneous charging and discharging, an equivalent continuous variable model can also be used for simplification.

[0039] The energy storage charge state continuity equation for node i is expressed as:

[0040] In the formula, and These represent the charge states of node i at time t and time t+1, respectively. and These are charging efficiency and discharging efficiency, respectively. and Let be the charging power and discharging power of node i at time t, respectively; For time step; This refers to the rated total capacity of stationary energy storage units; The energy storage state of charge and charge / discharge mutual exclusion constraints satisfy the following:

[0041]

[0042] In the formula, and These represent the minimum and maximum charge states of node i, respectively. and These are the maximum charging power and maximum discharging power of node i, respectively; Let be the charging and discharging mutually exclusive state variable of node i at time t. The charging and discharging mutually exclusive state variable is a binary variable used to ensure that the same energy storage device is not in the charging and discharging state at the same time interval. Set terminal state of charge constraints according to the assessment purpose to avoid overestimating the system's continuous matching capability by excessively consuming the initial energy storage capacity of the assessment period.

[0043] The above constraints ensure that the energy storage remains within the allowable state of charge and rated power range throughout the evaluation process, and prevent simultaneous charging and discharging within the same time period. To avoid overestimating the system's continuous matching capability based solely on the initial energy storage capacity consumed during the evaluation period, terminal state of charge constraints are set according to the evaluation objectives.

[0044] The energy storage terminal's state of charge satisfies:

[0045] In the formula, Let i be the state of charge of node i at the final moment of the evaluation period; The lowest charged state of node i at the end of the evaluation period; For typical daily or other periodic operation assessments, the first and last charge state consistency constraint can be further adopted:

[0046] In the formula, The state of charge at the start of the evaluation cycle is used for node i.

[0047] S33, establish power constraints for power distribution network interaction; The power exchange capacity of the distribution network is determined based on the rated parameters and safety margins of transformers, lines, and energy conversion equipment. Power balance relationships are established for each distribution node, and the power replenishment capacity of ground-to-air vehicles is aggregated to the corresponding nodes according to the mapping relationship between charging and discharging stations and distribution network nodes.

[0048] The power exchange between node i and the distribution network satisfies:

[0049] In the formula, and These are the upper limits of the output power from node i to the distribution network point and the upper limits of the input power from the distribution network to node i, respectively. The upper limits of the output power and the upper limits of the input power are determined by the corresponding transformer, line, energy conversion equipment and operating safety margin.

[0050] S34, Establish power balance constraints for power distribution nodes; Based on the mapping relationship between charging and discharging stations and their corresponding distribution network nodes, the actual power replenishment on the bus side for each individual unit's power replenishment needs is aggregated to the corresponding distribution node:

[0051] In the formula, Let be the electric vehicle refueling power of node i at time t; Let be the power of the UAV refueling at node i at time t; The actual energy replenishment power for the k-th energy replenishment demand at time t; and These are the sets of electric vehicles and drones connected to node i, respectively. Node i satisfies the following power balance relationship at time t:

[0052] In the equation, the left side represents the power exchanged by node i at time t. Photovoltaic power utilization and energy storage discharge power The right side of the equation represents the electric vehicle's refueling power at node i at time t. , UAV power replenishment and station auxiliary load and energy storage charging power All power outputs are uniformly converted to the common busbar side within the station. This power balance relationship is used to ensure that the assessment results meet the actual energy conservation principle.

[0053] S35, Establish power replenishment interface constraints; The constraints on the charging interface include interface type compatibility, rated power of a single interface, and the number of interfaces available at any given time. For contact charging and wireless charging, a joint description of continuous charging power and interface occupancy status is used; for wireless charging, coupling efficiency and allowable offset range can be further considered. For battery swapping, a discrete service state model is used, further considering the inventory of fully charged batteries, the number of battery swapping devices, and the service time of a single battery swap, and the battery swapping process is not equated with continuous charging power. All of the above additional constraints can be included in the source-load matching constraint set as the operating boundaries of the corresponding charging interface.

[0054] For the same node and the same type of power replenishment interface, the number of interfaces occupied at any given time satisfies the following:

[0055] In the formula, This is an interface occupancy status variable used to indicate whether the k-th energy replenishment request occupies the corresponding type of interface; Let q be the number of available interfaces for node i at time t.

[0056] This embodiment considers photovoltaic time-series output, energy storage cross-time transfer, distribution network available power, node power balance, and power and quantity constraints of energy replenishment interfaces in the source-load matching constraint set, so that the evaluation results can reflect the degree to which the available resources on the source side can meet the ground-to-air energy replenishment demand under the actual equipment operating boundary.

[0057] S4. Based on the energy replenishment demand analysis results and the source-load matching constraint set, construct a source-load matching evaluation model and solve it to obtain the maximum effective matching power during the allowed energy replenishment period.

[0058] In this embodiment, step S4 includes: The effective matching power is defined as the amount of power actually obtained by each energy replenishment demand within the allowed energy replenishment period and not exceeding its demand power. An objective function is established with the goal of maximizing the sum of the effective matching power of all energy replenishment demands. A source-load matching evaluation model is constructed in combination with the source-load matching constraint set. The source-load matching evaluation model is solved to obtain the maximum effective matching power during the allowable energy replenishment period.

[0059] It should be noted that the objective function is specifically:

[0060] In the formula, To maximize the effective matching power; The effective matching power for the k-th energy replenishment demand; The effective matching power for the kth energy replenishment demand is represented as:

[0061] In the formula, Let be the overall efficiency of the k-th energy replenishment demand at time t, used to characterize the efficiency of the corresponding energy replenishment interface and energy conversion link; Let be the actual power supplied for the k-th energy demand at time t, and let be the power supplied on the common bus side. The required electricity for the kth refueling demand is determined by the current travel or flight mission conditions.

[0062] The total power demand for air transport vehicles in mainland China during the assessment period Represented as:

[0063] In the formula, and These are collections of electric vehicles and drones, respectively. Let n be the amount of electricity required to recharge the nth electric vehicle. The power requirement for the m-th drone to recharge after returning to base; It should be noted that solving the source-load matching evaluation model yields the source-side energy supply capacity, energy storage status, distribution network boundary, energy replenishment interface capacity, and maximum effective matching power under the conditions of energy replenishment time limit. This solution process is used to evaluate system capabilities and does not change the original travel or mission plans of electric vehicles and drones.

[0064] In a simplified scenario where interface allocation is predetermined, concurrent discrete states of interfaces are not considered, and binary variables for mutual exclusion of energy storage charging and discharging are not set, if the energy conversion efficiency is constant, the source-load matching evaluation model can degenerate into a linear programming problem. When considering the occupancy status of the energy replenishment interface, the mutual exclusion status of energy storage charging and discharging, or the status of battery swapping services, the source-load matching evaluation model becomes a mixed-integer linear programming problem. The solver outputs the photovoltaic utilization power, energy storage charging and discharging power, distribution network switching power, actual replenishment power obtained for each replenishment demand, and maximum effective matching power for each evaluation period.

[0065] For application scenarios involving emergency drone missions or other rigid support requirements, minimum guaranteed power constraints or priority order for fulfilling corresponding power replenishment needs can be set without changing the definition of source-load matching capability. These constraints reflect the operational rules of specific application scenarios, and the system's source-load matching capability is still calculated based on the maximum effective matched power and the total power replenishment requirement.

[0066] S5. The maximum effective matching power is compared with the energy replenishment demand analysis results. Based on the comparison results, the source-load matching capability and limiting factors of the integrated ground-air charging and discharging system are evaluated to obtain the source-load matching capability evaluation result.

[0067] In this embodiment, step S5 includes: Obtain the total energy demand from the energy demand analysis results, and calculate the source-load matching capability of the integrated ground-air charging and discharging system based on the ratio of the maximum effective matching capacity to the total energy demand. Specifically:

[0068] In the formula, To assess the maximum effective matching power that empty vehicles in various regions can obtain during their permitted refueling periods within the assessment period, The total energy demand is the sum of the energy demands of all available electric vehicles and drones. The source-load matching capability is analyzed based on the total replenishment demand, and the source-load matching capability assessment result is obtained, specifically: When the total energy demand is greater than 0, the source-load matching capability ranges from 0 to 1. The closer the value is to 1, the higher the degree to which the source-side resources can meet the ground-to-air energy demand under the given system structure and operating boundary. When the source-load matching capability is equal to 1, it means that under the given system structure, operating status and energy replenishment time constraints, the system can meet the energy replenishment needs of all ground-to-air vehicles. When the total energy demand is 0, the source-load matching capability is not calculated in this assessment cycle.

[0069] When the source-load matching capability is less than 1, the unmatched replenishment power is... Calculate using the following formula:

[0070] The unmatched replenishment power is used to quantify the effective demand power that could not be met during the allowed replenishment period under the current assessment conditions, and serves as the basis for subsequent constraint bottleneck analysis.

[0071] Furthermore, constraints that are active and have reached the operating boundary in the optimal solution of the source-load matching constraint set are selected as candidate limiting factors. Specifically, if the available power of photovoltaic and distribution networks reaches its limit and energy storage cannot continue to discharge, insufficient available power on the source side or insufficient available energy storage capacity can be listed as a candidate limiting factor; if the switching power of distribution nodes reaches its limit, the power boundary of distribution nodes can be listed as a candidate limiting factor; if the power or number of energy replenishment interfaces reaches its limit, the capacity of energy replenishment interfaces can be listed as a candidate limiting factor; if there is still unmet demand after the energy replenishment deadline, insufficient allowable energy replenishment time can be listed as a candidate limiting factor.

[0072] This step outputs the source-load matching capability, the amount of unmatched replenishment power, and candidate limiting factors, which can be used for the analysis of the operating characteristics of the integrated ground-air charging and discharging system and the verification of equipment parameters, and provide a basis for subsequent planning, configuration, and collaborative operation research.

[0073] Example 2, Figure 2 A source-load matching capability evaluation system for an integrated ground-to-air charging and discharging system is presented, including: The data acquisition module collects multi-source evaluation data from the integrated ground-air charging and discharging system, processes the multi-source evaluation data, and obtains a time-series evaluation dataset. The energy replenishment demand calculation module calculates the energy replenishment demand of ground-to-air vehicles based on the time-series assessment dataset, determines the allowable energy replenishment period for each energy replenishment demand, and obtains the energy replenishment demand analysis results. The constraint construction module establishes a set of source-load matching constraints for the integrated ground-air charging and discharging system based on the time-series evaluation dataset. The model building and solution module constructs a source-load matching evaluation model based on the energy replenishment demand analysis results and the source-load matching constraint set, and solves the model to obtain the maximum effective matching power during the allowed energy replenishment period. The matching capability evaluation module compares the maximum effective matching power with the energy replenishment demand analysis results, evaluates the source-load matching capability and limiting factors of the integrated ground-air charging and discharging system based on the comparison results, and obtains the source-load matching capability evaluation results.

[0074] The above formulas are all dimensionless calculations. The formulas are derived from software simulations based on a large amount of collected data to obtain the most recent real-world results. The preset parameters in the formulas are set by those skilled in the art according to the actual situation.

[0075] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments can be implemented, in whole or in part, in the form of a computer program product.

[0076] Those skilled in the art will recognize that the modules and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0077] In addition, the functional modules in the various embodiments of this application can be integrated into one processing module, or each module can exist physically separately, or two or more modules can be integrated into one module.

[0078] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

[0079] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system, characterized in that, Includes the following steps: Collect multi-source evaluation data of the integrated ground-air charging and discharging system, and process the multi-source evaluation data to obtain a time-series evaluation dataset. Based on the time-series assessment dataset, the refueling demand of ground-to-air vehicles is calculated, and the allowable refueling time period for each refueling demand is determined to obtain the refueling demand analysis results. A source-load matching constraint set for an integrated ground-air charging and discharging system is established based on a time-series evaluation dataset. Based on the energy replenishment demand analysis results and the source-load matching constraint set, a source-load matching evaluation model is constructed and solved to obtain the maximum effective matching power during the allowed energy replenishment period. The maximum effective matching power is compared with the energy replenishment demand analysis results. Based on the comparison results, the source-load matching capability and limiting factors of the integrated ground-air charging and discharging system are evaluated to obtain the source-load matching capability evaluation results.

2. The method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to claim 1, characterized in that, The steps for obtaining the energy replenishment demand analysis results include: Based on the electric vehicle travel parameters in the time-series evaluation dataset, the effective refueling periods for each electric vehicle are determined. The target state of charge of each electric vehicle is analyzed based on the time-series evaluation dataset, and the energy demand for recharging of each electric vehicle is calculated based on the analysis results. Based on the flight mission parameters of the UAVs in the time series evaluation dataset, calculate the power required for the next flight mission of each UAV, determine the minimum takeoff charge state, judge the mission feasibility based on the minimum takeoff charge state, and calculate the power required for recharging the UAVs after returning to base based on the judgment result. The energy replenishment requirements of various electric vehicles and drones were unified to obtain the energy replenishment demand analysis results.

3. The method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to claim 2, characterized in that, The effective refueling period for each electric vehicle is from the arrival time to the planned departure time; the effective refueling period for each UAV is from the return time to the start time of the next mission.

4. The method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to claim 3, characterized in that, The steps for analyzing the target state of charge of each electric vehicle include: If the target state of charge is less than or equal to the arrival state of charge, then the required energy replenishment is set to 0. If the target state of charge is higher than the arrival state of charge, then the recharge demand of each electric vehicle is calculated.

5. The method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to claim 4, characterized in that, The steps to unify the refueling requirements of various electric vehicles and drones include: Set up a state variable for the energy replenishment period to describe the energy replenishment availability status of different vehicles under a unified time scale; Set an interface occupancy status variable to describe whether each power replenishment requirement occupies the matching power replenishment interface at time t. The power required for each energy replenishment demand is constrained based on the energy replenishment period state variables and the interface occupancy state variables, thus obtaining the energy replenishment demand analysis results.

6. The method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to claim 5, characterized in that, The source-load matching constraint set includes distributed photovoltaic unit output constraints, fixed energy storage unit constraints, distribution network interaction power constraints, distribution node power balance constraints, and energy replenishment interface constraints.

7. The method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to claim 6, characterized in that, The calculation process for the maximum effective matching power during the allowed replenishment period is as follows: Obtain the effective matching power for each energy replenishment demand, and establish an objective function with the goal of maximizing the sum of the effective matching power for each energy replenishment demand; A source-load matching evaluation model is constructed by combining the aforementioned source-load matching constraint set; The source-load matching evaluation model is solved to obtain the maximum effective matching power during the allowable energy replenishment period.

8. The method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to claim 7, characterized in that, The steps for obtaining the source-load matching capability assessment results include: Obtain the total energy demand from the energy demand analysis results, and calculate the source-load matching capability of the air-ground integrated charging and discharging system based on the ratio of the maximum effective matching power to the total energy demand. The source-load matching capability is analyzed by the total replenishment power demand, and the source-load matching capability assessment result is obtained.

9. The method for evaluating the source-load matching capability of an integrated ground-to-air charging and discharging system according to claim 8, characterized in that, The steps for analyzing the source-load matching capability include: When the total energy demand is greater than 0, the source-load matching capability ranges from 0 to 1. When the source-load matching capability is equal to 1, it means that the energy demand of all ground and air vehicles can be met. When the total energy demand is 0, the source-load matching capability is not calculated in the current assessment period. When the source-load matching capability is less than 1, the unmatched replenishment power is calculated. The unmatched replenishment power is used to quantify the effective demand power that cannot be met within the allowed replenishment period under the current evaluation conditions.

10. A source-load matching capability evaluation system for an integrated ground-to-air charging and discharging system, characterized in that, include: The data acquisition module collects multi-source evaluation data from the integrated ground-air charging and discharging system, processes the multi-source evaluation data, and obtains a time-series evaluation dataset. The energy replenishment demand calculation module calculates the energy replenishment demand of ground-to-air vehicles based on the time-series assessment dataset, determines the allowable energy replenishment period for each energy replenishment demand, and obtains the energy replenishment demand analysis results. The constraint construction module establishes a set of source-load matching constraints for the integrated ground-air charging and discharging system based on the time-series evaluation dataset. The model building and solution module constructs a source-load matching evaluation model based on the energy replenishment demand analysis results and the source-load matching constraint set, and solves the model to obtain the maximum effective matching power during the allowed energy replenishment period. The matching capability evaluation module compares the maximum effective matching power with the energy replenishment demand analysis results, evaluates the source-load matching capability and limiting factors of the integrated ground-air charging and discharging system based on the comparison results, and obtains the source-load matching capability evaluation results.

Citation Information

Patent Citations

  • Openable capacity evaluation method and system of distributed power supply, electronic equipment and medium

    CN121813506A