By identifying and optimizing the most critical links in the energy storage system production process, the problem of the inability to precisely quantify and dynamically identify weak links in existing technologies has been solved, thereby improving the efficiency and accuracy of energy storage system reliability assessment.
Patent Information
- Application Number
- CN202611271327.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-20
- Publication Date
- 2026-11-20
AI Technical Summary
Existing reliability assessment methods for energy storage systems lack refined quantitative means, making it impossible to dynamically identify key weak links during the production process, resulting in resource waste and low efficiency in reliability improvement.
By employing a method based on the maximum confidence gradient, reliability testing and confidence calculation are performed at each production stage to identify the critical links that have the greatest impact on the inherent reliability of the system, and targeted optimization is implemented.
It enables precise identification and targeted optimization of key weak links in the production process of energy storage systems, improving the efficiency and accuracy of reliability assessment and reducing testing costs and time.
Smart Images

Figure CN123140735A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a reliability assessment of an electrochemical energy storage system, specifically to a method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient. Background Technology
[0002] With the deepening implementation of the "dual carbon" goals, electrochemical energy storage systems, as key equipment for new energy consumption and power grid peak shaving and frequency regulation, are receiving increasing attention for their operational reliability and safety. National standards GB / T36545-2023 "Technical Requirements for Mobile Electrochemical Energy Storage Systems" and GB / T36276-2023 "Lithium-ion Batteries for Power Energy Storage" set forth clear requirements for the reliability indicators of energy storage systems. The inherent reliability of an energy storage system refers to the level of reliability inherent in the product's design and manufacturing process and achieved under specified operating conditions, directly affecting the system's life-cycle cost and operational safety.
[0003] Currently, the following methods are mainly used for reliability assessment of energy storage systems: (1) Fault Tree Analysis (FTA) and Failure Mode and Effects Analysis (FMEA), which identify potential failure modes and weak links of the system through top-down or bottom-up logical deduction. This method is a qualitative or semi-quantitative analysis method, and the accuracy of the analysis results is highly dependent on the experience level of experts, making it difficult to accurately quantify the impact of each production link on the overall reliability of the system. (2) Reliability Block Diagram (RBD) method, which decomposes the system into basic reliability structural units such as series and parallel, and estimates the system reliability based on the reliability of each unit. This method assumes that the failure of each unit is independent of each other and ignores the correlation failures introduced during the production and assembly process. (3) Monte Carlo simulation method, which simulates the system state through a large number of random samples, is suitable for reliability assessment of complex systems, but has a large computational load and is sensitive to the distribution assumptions of the input data.
[0004] The common shortcomings of the above methods are: First, they lack refined reliability quantitative assessment methods for each link in the entire production process, making it impossible to dynamically identify the key links that have the greatest impact on the inherent reliability of the system during the production process; Second, reliability testing is usually only carried out at the final product delivery stage, which is a "post-inspection" mode, resulting in a waste of resources and time when problems are discovered; Third, existing sensitivity analysis methods are mostly based on single parameter perturbations and have not established a theoretical framework based on confidence gradient changes to characterize the marginal impact of production links on system reliability.
[0005] Therefore, there is an urgent need for a method that can run through the entire production process of energy storage systems, quantitatively assess the impact of each production stage on the inherent reliability of the system, and accurately identify key process stages, so as to guide the optimal allocation of production resources and targeted improvement of reliability. Summary of the Invention
[0006] To overcome the shortcomings of existing energy storage system reliability assessment methods, such as reliance on qualitative analysis, difficulty in quantifying the impact of each production stage on the inherent reliability of the system, and inability to dynamically identify key weak links during production, this invention provides an inherent reliability assessment method for energy storage systems based on the maximum confidence gradient. This method involves systematically testing reliability at each stage of the entire energy storage system production process, calculating the reliability confidence level of each stage and the confidence gradient between adjacent stages, and identifying the production stage corresponding to the maximum confidence gradient as the key stage with the greatest impact on the inherent reliability of the system. This allows for precise location and targeted optimization of key weak links in the production process, significantly improving the efficiency and accuracy of reliability assessment while enhancing the inherent reliability of the system. This invention is applicable to the quantitative reliability assessment and identification of key process stages in the manufacturing process of lithium-ion battery energy storage systems, and is particularly suitable for production quality control and inherent reliability improvement of mobile electrochemical energy storage systems (such as mobile energy storage vehicles and mobile battery compartments) and stationary energy storage power stations.
[0007] The objective of this invention is achieved through the following technical solution:
[0008] A method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient includes the following steps:
[0009] Step 1: Division of Production Processes
[0010] Based on the hierarchical architecture and assembly process of the electrochemical energy storage system, the entire production process is divided into: A sequential production process, denoted as... ;in It is a positive integer greater than or equal to 3;
[0011] Step 2, Reliability testing of each stage:
[0012] For each production stage Based on the key quality characteristics of this process, a reliability testing plan is developed, and the sampling size is determined. Acceptance criteria; after this step is completed, random samples are drawn from the output batch. A reliability test was performed on each sample, and the number of failed samples was recorded. Calculate the reliability observation value of this step. ;
[0013] Step 3, Confidence Calculation:
[0014] Set the system target reliability For each production stage Calculate the observed This test appeared Under conditions of secondary failure, the true reliability of the system Not lower than the target reliability confidence level ;
[0015] Step 4: Calculate the confidence gradient:
[0016] Definition of the first The production process and the first Confidence gradient between production stages The absolute value of the difference between the confidence levels of the two:
[0017]
[0018] For the initial stage Define its confidence gradient ;
[0019] Step 5: Identification and Optimization of Key Processes
[0020] Determine the maximum value of the confidence gradient across all production stages:
[0021]
[0022] Then the first Production links The critical production link is identified as having the greatest impact on the inherent reliability of the energy storage system. For this critical production link, its failure mechanism is analyzed, and targeted process optimization and quality control measures are formulated and implemented. After optimization, steps 2 to 5 are repeated for iterative evaluation until the overall reliability of the system meets the design requirements.
[0023] Compared with the prior art, the present invention has the following advantages:
[0024] 1. Precise quantification and objective assessment: This invention, by defining a confidence gradient index, transforms for the first time the marginal impact of each production stage on the inherent reliability of the energy storage system into a quantifiable value. This overcomes the shortcomings of traditional qualitative methods such as FTA / FMEA, which rely on expert experience and are highly subjective, and achieves an objective and precise measurement of the reliability impact of the production stage.
[0025] 2. Dynamic identification and targeted optimization: This invention runs through the entire production process. Reliability testing and confidence gradient calculation can be performed after each step is completed. It can identify the key links that have the greatest impact on the inherent reliability of the system online and dynamically, realizing the transformation from "post-event inspection" to "process control" and guiding the precise allocation of production resources to key weak links.
[0026] 3. Iterative closed-loop for continuous improvement: This invention uses a closed-loop iterative mechanism of "test-calculation-identification-optimization-retesting" to re-evaluate system reliability after optimizing key links, ensuring the effectiveness of optimization measures, and accumulating prior knowledge for reliability assessment of subsequent batches, thereby achieving continuous improvement of the inherent reliability of the system.
[0027] 4. High versatility and wide applicability: The method of this invention does not depend on a specific model of energy storage system. It can be adapted to lithium-ion battery energy storage systems of different capacity levels (such as hundreds of kWh to MWh) and different topologies (such as centralized and distributed). It is also seamlessly connected with national standard systems such as GB / T36545-2023 and GB / T36276-2023, and has broad application prospects.
[0028] 5. High efficiency and low cost: Compared with the traditional "full system full testing" mode, this invention only needs to extract a limited number of samples for testing at each stage to achieve accurate positioning of key stages, which significantly reduces testing costs and time and improves the overall efficiency of reliability assessment. Attached Figure Description
[0029] Figure 1 This is an overall flowchart of the method for assessing the inherent reliability of energy storage systems based on the maximum confidence gradient.
[0030] Figure 2 The diagram illustrates the division of the production process of the electrochemical energy storage system in this embodiment. Taking a mobile lithium-ion battery energy storage system as an example, it shows the division of 10 production processes and the three-level structure.
[0031] Figure 3 The above figure shows the confidence level and confidence gradient calculation results for each production stage in the example. The following figure shows the trend of change and its confidence interval, and illustrates the confidence gradient of each stage. The bar chart and the identification of key components (S7 temperature control system integration). Detailed Implementation
[0032] The technical solution of the present invention will be further described below with reference to the accompanying drawings, but it is not limited thereto. Any modifications or equivalent substitutions to the technical solution of the present invention that do not depart from the spirit and scope of the technical solution of the present invention should be covered within the protection scope of the present invention.
[0033] This invention provides a method for assessing the inherent reliability of energy storage systems based on the maximum confidence gradient, such as... Figure 1 As shown, the method includes the following steps:
[0034] Step 1: Division of Production Processes
[0035] Based on the hierarchical architecture and assembly process of the electrochemical energy storage system, the entire production process is divided into: A sequential production process, denoted as... ;in It is a positive integer greater than or equal to 3. Each production stage corresponds to an independent assembly or testing process, and there is a definite sequential dependency between each stage.
[0036] In this step, the production process is divided based on one or more of the following: battery cell incoming material inspection, battery module assembly and testing, battery cluster integration and testing, battery management unit (BMU) production and testing, battery cluster management unit (BCMU) production and testing, battery stack management system (BAMS) integration and testing, temperature control system integration and testing, fire protection system integration and testing, battery container final assembly, and system-level commissioning and testing.
[0037] In this step, the electrochemical energy storage system is a lithium-ion battery energy storage system, including a mobile energy storage system and / or a stationary energy storage power station; the mobile energy storage system includes a mobile energy storage vehicle or a mobile battery compartment.
[0038] Step 2, Reliability testing of each stage:
[0039] For each production stage Based on the key quality characteristics of this process, a reliability testing plan is developed, and the sampling size is determined. Acceptance criteria; after this step is completed, random samples are drawn from the output batch. A reliability test was performed on each sample, and the number of failed samples was recorded. Calculate the reliability observation value of this step. .
[0040] In this step, reliability testing includes, but is not limited to, one or more of the following: electrical performance testing, insulation withstand voltage testing, communication function testing, protection function testing, environmental adaptability testing, and charge-discharge cycle testing. The electrical performance testing includes capacity testing, internal resistance testing, or self-discharge rate testing. The protection function testing includes overcharge protection testing, over-discharge protection testing, over-temperature protection testing, or short-circuit protection testing.
[0041] Step 3, Confidence Calculation:
[0042] Set the system target reliability For each production stage Based on the binomial distribution model or the Weibull distribution model, calculate the value of the observed data. This test appeared Under conditions of secondary failure, the true reliability of the system Not lower than the target reliability confidence level When using a binomial distribution model, the confidence score is calculated using the following formula:
[0043]
[0044] in, The number of combinations is used. When the test data for a component includes continuous lifetime data, the lifetime data is fitted using a Weibull distribution model, and the lower confidence limit of the reliability is calculated based on the maximum likelihood estimation method, thereby obtaining the confidence level of that component. .
[0045] In this step, when using the Weibull distribution model, the lifetime data is first fitted with a Weibull distribution, and the shape parameters are obtained through maximum likelihood estimation. and scale parameters The maximum likelihood estimate is obtained; then, based on the Fisher information matrix or the likelihood ratio method, the lower confidence limit of the reliability at a given confidence level is calculated, which serves as the confidence level for this stage. .
[0046] Step 4: Calculate the confidence gradient:
[0047] Definition of the first The production process and the first Confidence gradient between production stages The absolute value of the difference between the confidence levels of the two:
[0048]
[0049] For the initial stage Define its confidence gradient .
[0050] Step 5: Identification and Optimization of Key Processes
[0051] Determine the maximum value of the confidence gradient across all production stages:
[0052]
[0053] Then the first Production links The critical production link is identified as having the greatest impact on the inherent reliability of the energy storage system. For this critical production link, its failure mechanism is analyzed, and targeted process optimization and quality control measures are formulated and implemented. After optimization, steps 2 to 5 are repeated for iterative evaluation until the overall reliability of the system meets the design requirements.
[0054] In this step, optimization measures for key production processes include, but are not limited to, one or more of the following: improving incoming material inspection standards, optimizing process parameters, increasing the frequency of process inspections, introducing statistical process control (SPC), improving tooling and fixture design, and strengthening operator training.
[0055] The present invention also includes step 6: establishing a production process-confidence gradient database, accumulating historical evaluation data of different batches and models of energy storage systems, forming a priori knowledge base, which is used to guide the pre-allocation of production resources and the prediction of reliability risks for subsequent products.
[0056] This invention overcomes the problem that traditional reliability assessment methods are mainly qualitative and have difficulty in quantifying the impact of each production stage. It achieves accurate dynamic identification and targeted optimization of key weak links in the production process, and significantly improves the efficiency and accuracy of the inherent reliability assessment of energy storage systems.
[0057] Example:
[0058] This embodiment takes a certain model of 4.18MWh mobile lithium-ion battery energy storage system (hereinafter referred to as "mobile battery compartment") as the research object, and applies the method of this invention to conduct inherent reliability assessment and key link identification of its production process. The system architecture of the mobile battery compartment is: battery cell → battery module (PACK) → battery cluster → battery container. The battery management system (BMS) adopts a three-level architecture (BMU→BCMU→BAMS) and is equipped with a liquid cooling temperature control system, a thermal aerosol fire protection system and an energy management system (EMS).
[0059] Step 1: Division of Production Processes
[0060] like Figure 2 As shown, based on the hierarchical architecture and assembly process of the mobile battery compartment, the entire production process is divided into the following 10 sequential production stages:
[0061] S1. Incoming inspection of battery cells: Visual inspection, capacity sorting, internal resistance testing, self-discharge rate testing and insulation testing are carried out on the lithium iron phosphate (LFP) battery cells delivered by the supplier.
[0062] S2. Battery Module (PACK) Assembly and Testing: Selected qualified battery cells are assembled into battery modules according to the series-parallel design scheme. After completion, module-level capacity testing, internal resistance testing, and insulation withstand voltage testing are performed.
[0063] S3. Battery Cluster Integration and Testing: Install the battery modules into the battery rack, connect the high-voltage box and matching wiring harness to form a battery cluster. After completion, perform cluster-level voltage equalization test and charge / discharge function verification.
[0064] S4, BMU module production testing phase: Perform single-cell voltage acquisition accuracy test, temperature acquisition accuracy test, and static equalization function test on the battery management unit (BMU);
[0065] S5, BCMU module production testing phase: Perform cluster voltage acquisition accuracy test, current acquisition accuracy test, and communication protocol consistency test on the battery cluster management unit (BCMU);
[0066] S6, BAMS System Integration Testing: Verify full-channel data acquisition, test SOC / SOH estimation accuracy, and verify protection logic functions of the Battery Stack Management System (BAMS);
[0067] S7. Temperature control system integration test: Connect the liquid-cooled thermal management unit to the battery cluster and conduct switching tests of three working modes: cooling / heating / self-circulation. Test the temperature control accuracy and temperature rise rate at key temperature nodes.
[0068] S8. Fire protection system integration test: Install thermal aerosol fire extinguishing devices and detection and alarm systems, and test and verify the functions of combustible gas detection, heat and smoke detection and fire extinguishing linkage.
[0069] S9. Battery Container Assembly: Load the battery clusters, BMS, temperature control and fire protection subsystems into the container body, and complete the electrical connection, communication cable laying and structural fixation.
[0070] S10, System-level commissioning and testing phase: Conduct full-cabin charge and discharge cycle tests, full-item verification of protection functions, EMS energy dispatch function tests, and full-link stress tests of communication.
[0071] Step 2, Reliability testing of each stage:
[0072] For each of the 10 production stages mentioned above, a reliability testing plan was developed. The target reliability was then determined. Based on the baseline, a sampling plan is determined according to the criticality of each link and historical failure data.
[0073] The specific testing plans for each stage are as follows:
[0074] (1) Incoming inspection of battery cells: sampling quantity Only one batch underwent four tests: capacity, internal resistance, self-discharge, and insulation. Failure in any one of these tests constituted a failure. The actual number of failed tests in this batch is as follows: Only, reliability observations .
[0075] (2) Battery module assembly test: sampling size Each module underwent capacity consistency and insulation withstand voltage tests. The actual number of failures in this batch was [number missing]. One, reliability observation value .
[0076] (3) Battery cluster integration test: sampling size Each battery cluster underwent voltage equalization and charge / discharge function verification. The actual number of failures measured in this batch... One, reliability observation value .
[0077] (4) BMU module testing: sampling size Each unit underwent voltage / temperature acquisition accuracy testing. The actual number of failures in this batch was [number missing]. One, reliability observation value .
[0078] (5) BCMU module test: sampling size One sample was tested for data acquisition accuracy and communication protocol. The actual number of failures in this batch was [number missing]. One, reliability observation value .
[0079] (6) BAMS system integration testing: sampling size The set was used for full-channel data acquisition and SOC estimation accuracy testing. The actual number of failures in this batch was [not specified]. Set, reliability observation value .
[0080] (7) Temperature control system integration test: sampling size The set underwent three operating mode switching and temperature control accuracy tests, with an average temperature error >20% at key temperature nodes used as the failure criterion. The actual number of failures measured in this batch... Set, reliability observation value .
[0081] (8) Fire protection system integration testing: sampling quantity The set was used for testing of detection, alarm, and fire suppression linkage functions. The actual number of failures in this batch was [number missing]. Set, reliability observation value .
[0082] (9) Container assembly: sampling quantity The equipment was used for electrical connection correctness and communication link testing. The actual number of failures measured in this batch was [number missing]. Platform, reliability observation value .
[0083] (10) System cascade testing: sampling size The batch underwent full-scale charge / discharge cycle and protection function testing. The actual number of failures in this batch was [number missing]. Platform, reliability observation value .
[0084] Step 3, Confidence Calculation:
[0085] Set the system target reliability For each step Calculate confidence level based on binomial distribution model .
[0086] Taking the incoming inspection of S1 battery cells as an example ( ):
[0087]
[0088] Through numerical calculation:
[0089]
[0090]
[0091] Similarly, the confidence levels for each step are shown in the table below:
[0092]
[0093] Step 4: Calculate the confidence gradient
[0094] Calculate the confidence gradient between adjacent stages The results are as follows:
[0095]
[0096] Step 5: Identification and Optimization of Key Processes
[0097] The confidence gradient calculation results are as follows Figure 3 As shown, among all production stages, the confidence gradient of stage S8 (fire protection system integration test) reached 0.179, the highest value, indicating that the fire protection system integration stage has the most significant impact on the inherent reliability of the energy storage system. This is followed by stage S7 (temperature control system integration) with a gradient of 0.151, and stage S10 (system cascade testing) with a gradient of 0.117.
[0098] Based on the above identification results, the integration of the S8 fire protection system was identified as the primary critical link, and specific optimization measures include:
[0099] (1) Improve the incoming material inspection standards for the detection and alarm system, and conduct 100% full inspection of the response time and sensitivity of combustible gas detectors, heat detectors and smoke detectors;
[0100] (2) Optimize the communication protocol implementation of the fire control host, add a communication timeout retry mechanism and heartbeat packet detection, and improve the reliability of linkage with BMS;
[0101] (3) Add a pipeline air tightness test procedure to the fire extinguishing device installation process to ensure that the thermal aerosol fire extinguishing device can effectively release the extinguishing agent when it is actually triggered;
[0102] (4) Introduce Statistical Process Control (SPC) charts to conduct online monitoring and trend analysis of key parameters of fire protection system linkage (alarm response time, fire extinguishing device activation delay, etc.).
[0103] Meanwhile, auxiliary optimization measures were developed for the integration of the S7 temperature control system:
[0104] (1) Add an online airtightness testing device for liquid cooling pipeline joints and upgrade manual visual inspection to automated pressure decay testing;
[0105] (2) Optimize the pre-shipment aging test program for thermal management units, extending the aging time from 24 hours to 72 hours to expose early faults in advance.
[0106] After implementing the optimization measures, steps 2 through 5 are repeated for iterative evaluation. Secondary evaluation results (after optimization):
[0107]
[0108] After targeted optimization, the reliability observation value of the S8 fire protection system integration improved from 0.967 to 0.967 (since the original data was already good), but the confidence level of the S7 temperature control system integration significantly improved from 0.748 to 0.927 (the number of failures decreased from 4 to 1). More importantly, the confidence level of the final system component S10 improved from 0.731 to 0.854, resulting in a significant improvement in overall reliability.
[0109] Establish a production process-confidence gradient database to structure and store the evaluation data for this batch (including test plans, sampling sizes, failure data, confidence levels, and confidence gradients for each process). As production batches accumulate, this database can form a priori distribution based on historical data, which can be used to guide the pre-allocation of production resources for subsequent batches. For example, if historical data shows that the S8 fire protection system and the S7 temperature control system exhibit the largest confidence gradients in more than two batches, these two processes can be pre-marked as key monitoring processes, and enhanced quality control measures can be implemented before the new batch is produced.
[0110] In this embodiment, the key links (fire protection system integration and temperature control system integration) in the production process of the mobile battery compartment were successfully identified using the method of the present invention. After targeted optimization, the overall reliability confidence of the system was improved by about 17%, which verified the effectiveness and practicality of the method of the present invention.
Claims
1. A method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient, characterized in that... The method includes the following steps: Step 1: Division of Production Processes Based on the hierarchical architecture and assembly process of the electrochemical energy storage system, the entire production process is divided into: A sequential production process, denoted as... ;in It is a positive integer greater than or equal to 3; Step 2, Reliability testing of each stage: For each production stage Based on the key quality characteristics of this process, a reliability testing plan is developed, and the sampling size is determined. Acceptance criteria; after this step is completed, random samples are drawn from the output batch. A reliability test was performed on each sample, and the number of failed samples was recorded. ; Calculate the reliability observation value of this step. ; Step 3, Confidence Calculation: Set the system target reliability For each production stage Calculate the observed This test appeared Under conditions of secondary failure, the true reliability of the system Not lower than the target reliability confidence level ; Step 4: Calculate the confidence gradient: Definition of the first The production process and the first Confidence gradient between production stages The absolute value of the difference between the confidence levels of the two: For the initial stage Define its confidence gradient ; Step 5: Identification and Optimization of Key Processes Determine the maximum value of the confidence gradient across all production stages: Then the first Production links The critical production link is identified as having the greatest impact on the inherent reliability of the energy storage system. For this critical production link, its failure mechanism is analyzed, and targeted process optimization and quality control measures are formulated and implemented. After optimization, steps 2 to 5 are repeated for iterative evaluation until the overall reliability of the system meets the design requirements.
2. The method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient as described in claim 1, characterized in that... In step 1, the production process is divided based on one or more of the following: battery cell incoming material inspection, battery module assembly and testing, battery cluster integration and testing, battery management unit production testing, battery cluster management unit production testing, battery stack management system integration testing, temperature control system integration testing, fire protection system integration testing, battery container final assembly, and system-level commissioning testing.
3. The method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient as described in claim 1, characterized in that... In step 1, the electrochemical energy storage system is a lithium-ion battery energy storage system, including mobile energy storage systems and / or stationary energy storage power stations.
4. The method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient as described in claim 3, characterized in that... The mobile energy storage system includes a mobile energy storage vehicle or a mobile battery compartment.
5. The method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient as described in claim 1, characterized in that... In step 3, when the test data for a component includes continuous lifetime data, the lifetime data is fitted using a Weibull distribution model, and the reliability confidence lower limit is calculated based on the maximum likelihood estimation method, thereby obtaining the confidence level of the component. .
6. The method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient as described in claim 5, characterized in that... When fitting the lifetime data using the Weibull distribution model, the lifetime data is first fitted with a Weibull distribution, and the shape parameters are obtained through the maximum likelihood estimation method. and scale parameters The maximum likelihood estimate is obtained; then, based on the Fisher information matrix or the likelihood ratio method, the lower confidence limit of the reliability at a given confidence level is calculated, which serves as the confidence level for this stage. .
7. The method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient as described in claim 1, 5, or 6, characterized in that... The confidence level The calculation formula is: in, It is the combination number.
8. The method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient as described in claim 1, characterized in that... In step 5, optimization measures for key production processes include, but are not limited to, one or more of the following: improving incoming material inspection standards, optimizing process parameters, increasing the frequency of process inspections, introducing statistical process control, improving tooling and fixture design, and strengthening operator training.
9. The method for assessing the inherent reliability of an energy storage system based on the maximum confidence gradient as described in claim 1, characterized in that... The method also includes step 6: establishing a production process-confidence gradient database, accumulating historical evaluation data of different batches and models of energy storage systems, forming a priori knowledge base, which is used to guide the pre-allocation of production resources and the prediction of reliability risks for subsequent products.