Nuclear power engineering quality quantitative and qualitative comprehensive evaluation method
By combining AHP-entropy weighting-game theory Nash equilibrium with dynamic adjustment of variable weight theory, and integrating triangular membership functions and LSTM networks, the problems of weight determination, qualitative index quantification, and risk prediction in the quality evaluation of nuclear power engineering were solved, thus achieving scientific and systematic quality management.
Patent Information
- Application Number
- CN202611302916.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-26
- Publication Date
- 2026-11-20
AI Technical Summary
Existing nuclear power engineering quality evaluation methods lack a scientific mechanism for determining indicator weights, qualitative indicators are difficult to quantify, personnel quality behavior evaluation lacks a systematic model, and there is a lack of quality risk prediction capabilities.
A three-dimensional combined weighting method of AHP-entropy weight-game theory Nash equilibrium is adopted, combined with dynamic weight adaptive adjustment of variable weight theory, to construct a three-level evaluation index system. Fuzzy comprehensive evaluation is carried out using triangular membership function, and quality risk prediction is performed using LSTM long short-term memory network.
It has achieved scientific and dynamic adjustment of evaluation indicator weights, precise quantification of qualitative indicators, systematic evaluation of personnel quality behavior, and proactive early warning of quality risks, thereby improving the scientific nature and preventiveness of quality management.
Smart Images

Figure CN123140740A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of nuclear power engineering quality management technology, and specifically relates to a comprehensive quantitative and qualitative evaluation method for nuclear power engineering quality. Background Technology
[0002] Nuclear power engineering, as a complex system engineering project that is technology-intensive, capital-intensive, and carries extremely high safety risks, directly impacts nuclear safety and public interests through its quality management level. With the expansion of nuclear power plant construction and the increasing demands for refined management, traditional engineering quality evaluation methods are no longer sufficient to meet the needs of modern nuclear power engineering management. Existing evaluation methods mainly fall into three categories: Single-indicator assessment method: This evaluation method primarily relies on the statistical analysis of the number of non-compliance reports (NCRs) and simple work hour normalization, such as ranking the NCR occurrence rate per 200,000 work hours. This method does not consider differences in project complexity and safety levels, resulting in a one-sided evaluation.
[0003] Subjective experience evaluation method: Relies on expert scoring or subjective evaluation by management, the results lack objectivity and repeatability, and are difficult to compare across units and time periods.
[0004] The single AHP weighted evaluation method can only reflect expert subjective preferences, cannot utilize objective information from historical data, and does not consider the coordination and optimization between different methods. The aforementioned existing technologies have the following technical shortcomings: Defect 1: The determination of evaluation index weights lacks a scientific method and cannot be dynamically adjusted. Existing technologies either rely entirely on subjective expert judgment (AHP) or use only data-driven methods (entropy weight method), failing to effectively integrate the two; moreover, once the weights are determined, they remain fixed and cannot be adaptively adjusted according to factors such as problem frequency and project stage.
[0005] Defect 2: Qualitative indicators cannot be effectively quantified and lack the ability to comprehensively rank multiple attributes. Qualitative indicators such as quality awareness and procedural compliance lack scientific quantification methods, and often rely on simple grading, resulting in low resolution; moreover, existing methods cannot integrate multiple interrelated indicators into a unified ranking result.
[0006] Deficiency 3: Lack of a systematic model for evaluating personnel quality behavior. Personnel quality behavior is influenced by multiple factors, including knowledge, ability, behavioral performance, and results. Existing technologies have not constructed an evaluation framework covering the complete chain of "knowledge-ability-behavior-results," making it impossible to accurately identify weak links in quality behavior. Deficiency 4: Lack of quality risk prediction and early warning, and normalization does not consider engineering differences. Existing technologies are all post-event evaluations, unable to conduct forward-looking risk predictions based on historical data; furthermore, the widely used simple time normalization method does not consider differences in construction complexity, nuclear safety levels, and technical difficulty, leading to distorted evaluation results. Summary of the Invention
[0007] The purpose of this invention is to provide a comprehensive quantitative and qualitative evaluation method for nuclear power engineering quality, which can solve the technical problems in nuclear power engineering construction such as the lack of scientific basis for determining the weight of evaluation indicators, the difficulty in effectively quantifying and assessing qualitative indicators, the lack of a systematic model for evaluating personnel quality behavior, and the insufficient ability to predict quality risks.
[0008] The technical solution of this invention is as follows: A comprehensive quantitative and qualitative evaluation method for the quality of nuclear power engineering, comprising the following steps: Step S1: Data collection and construction of evaluation index system; Step S2: Weighting of AHP-Entropy Weight-Game Theory Nash Equilibrium Three-Dimensional Combination; Step S3: Dynamic weight adaptive adjustment based on variable weight theory; Step S4: Fuzzy comprehensive evaluation based on triangular membership function; Step S5: Multi-attribute decision ranking based on TOPSIS; Step S6: Multi-factor adaptive normalization processing; Step S7: Quality risk prediction and early warning based on LSTM long short-term memory network.
[0009] Step S1 includes constructing a three-level evaluation index system comprising a target layer, a criterion layer, and an indicator layer; the target layer is the overall objective of the comprehensive evaluation of nuclear power engineering quality management; the criterion layer includes five dimensions: quality management organization and responsibilities, operation of the quality assurance system, personnel quality behavior, engineering entity quality, and continuous quality improvement; the indicator layer consists of specific evaluation indicators under each criterion layer.
[0010] In step S1, the personnel quality behavior dimension is decomposed into secondary indicators using a four-dimensional model of "knowledge-ability-action-result". Knowledge Dimension: Quality knowledge mastery level, which evaluates the extent to which personnel have mastered quality-related knowledge, including secondary indicators such as training and assessment results, qualification certificate holding status, and quality knowledge test scores; Capability dimension: Quality capability level, which evaluates the ability of personnel to apply quality knowledge to solve practical problems, including secondary indicators of professional skills assessment, historical performance, and ability to analyze and solve quality problems; Action dimension: Quality behavior performance, the actual behavior performance of evaluators in engineering practice, including secondary indicators such as on-site inspection compliance rate, procedural execution compliance rate, design change compliance rate, and the standardization of quality record filling; Results Dimension: Quality outcome effectiveness, the actual quality results generated by the evaluators' actions, including secondary indicators such as first-time acceptance rate, rework rate, NCR closure rate, and quality incident incidence rate. Each dimension has 3-5 secondary indicators, and the entire model has 16-20 behavioral evaluation indicators. The weight of each secondary indicator is determined by a combination weighting method.
[0011] Step S2 includes: Step S21: Calculate subjective weights using the AHP (Analytic Hierarchy Process); The judgment matrix is constructed using the 1-9 scaling method. ,in , , ; The meaning of the 1-9 scale: 1 indicates equal importance, 3 indicates slightly important, 5 indicates significant importance, 7 indicates strong importance, 9 indicates extreme importance, and 2, 4, 6, and 8 are the midpoints of adjacent scales; The weight vector is solved using the eigenvector method. : , in, To determine the largest eigenvalue of a matrix, a consistency check is performed: , in, As a consistency indicator, As the average random consistency index, when The matrix is judged to have satisfactory consistency. Step S22: Calculate the objective weights using the entropy weight method; It has Each evaluation object, There are 1 evaluation index, and the original data matrix is: ; First, we perform data standardization. For positive indicators: , For negative indicators: , Calculate the first The first indicator The proportion of each evaluation object: , Calculate the first Information entropy of each indicator: , when When, define Calculate the coefficient of difference Objective weighting: , Step S23: Optimize the combination of weights using game theory Nash equilibrium; Assume there is a total One type of empowerment method, the first The weight vector obtained by this method is Construct a combined weight model ,in Let be the combination coefficients, satisfying , ; Based on the Nash equilibrium concept in game theory, the optimization objective is to minimize the deviation between the combined weights and the weights of each method: , Equivalent to minimizing the objective function: , right Taking the partial derivatives and setting them to zero, we obtain a system of linear equations: , Solving for the combination coefficients After normalization, the final combined weights are obtained: .
[0012] Step S3 includes setting the first The frequency of problems for each indicator is The average problem frequency for all indicators is ; The penalty-incentive weight adjustment formula based on contingency theory: , in, The combined weights determined in step S2, For the adjusted weights, Let be the penalty coefficient, when Time weight increases, when Time weight decreases, Normalize the adjusted weights: Apply boundary constraints to ensure weight stability: , That is, the change in weight does not exceed the original weight. Finally, the weights are normalized again to obtain the final dynamic weights; A sliding window mechanism is adopted to recalculate the frequency of issues for each indicator and adjust the weights each quarter based on newly added historical data.
[0013] Step S4 includes setting the factor set as follows: The collection of comments is Define the triangular membership function for each rating level: , , , The membership degree of each indicator to each rating level is obtained through expert evaluation, and a fuzzy evaluation matrix is constructed. A weighted average operator is used. Perform fuzzy synthesis: , in, The combined weight vector calculated in step S2; Weighted average method is used for deblurring, and the overall score is as follows: , in, Standard score: excellent, good, medium, Pass Failed.
[0014] Step S5 includes setting... Each evaluation object, One evaluation index, original decision matrix Vector normalization is used: , Construct a weighted standardized decision matrix: , Determine the ideal solution and negative ideal solution : , Calculate the Euclidean distance from each evaluation object to the positive and negative ideal solutions: , Calculate proximity: , , The larger the value, the closer the evaluated object is to the ideal state. Sort the values from largest to smallest; A comprehensive four-dimensional score: "Knowledge-Ability-Action-Result". in , , , The weights for the four dimensions are determined by the combined weighting method in step S2.
[0015] Step S6 includes, Construction complexity coefficient Determine the complexity level of different construction activities based on the WBS, and specify the range of values. A larger value indicates a more complex construction process; Nuclear safety level coefficient The nuclear safety level is determined based on the nuclear safety level involved in the construction activities. Non-safety level ; Technical difficulty level The range of values is determined based on the technical difficulty of the construction process. ; Adaptive normalized score: in This is the original quality deduction value. Based on standard working hours, a comprehensive adjustment factor is applied. value range .
[0016] Step S7 includes: Step S71: Input feature set; Collect and organize the following historical data as model input: historical deduction data sequence Problem type distribution vector and time series characteristics; Step S72: LSTM network structure; LSTM cells include the following gating mechanisms: Forgotten Gate: , Input Gate: , Candidate memory states: , Update memory status: , Output gate: , Hidden state output: , in, It is the Sigmoid activation function. The hyperbolic tangent activation function is used. This is element-wise multiplication; Step S73: Calculate the quality risk index; , in, As a measure of historical trends, For the current state component, To predict the deviation component, ; Step S74: Dynamic early warning threshold; Let the mean of the historical QRI series be The standard deviation is : Level 1 Warning: , Level 2 warning: , Level 3 Warning: , when A level 3 warning is triggered at any time; when A level-two warning is triggered at this time; when A Level 1 warning is triggered when the warning threshold is reached, and the warning threshold is updated adaptively every quarter based on newly accumulated historical data.
[0017] The beneficial effects of this invention are as follows: It employs a three-dimensional combined weighting method of AHP-entropy weighting-game theory Nash equilibrium, optimally integrating expert subjective experience with historical objective data through game theory Nash equilibrium. Combined with the penalty-incentive dynamic weight adaptive adjustment mechanism of variable weight theory, it solves the technical problem of lacking scientific methods for determining evaluation index weights and the inability to dynamically adjust them, thus improving the scientificity and rationality of weight allocation. It uses a fuzzy comprehensive evaluation method based on triangular membership functions to accurately map qualitative indicators to quantitative scores, and combines this with TOPSIS multi-attribute decision ranking to achieve comprehensive ranking, solving the technical problem of qualitative indicators being unable to be effectively quantified and lacking multi-attribute comprehensive ranking capabilities. It constructs a four-dimensional quality behavior evaluation model of "knowledge, ability, action, and result," providing a comprehensive and systematic evaluation of personnel quality behavior from four dimensions: knowledge acquisition, ability level, behavioral performance, and result effectiveness, thus solving the technical problem of lacking a systematic model for personnel quality behavior evaluation. By employing an LSTM (Long Short-Term Memory) network to achieve early prediction and dynamic warning of quality risks, and combining it with a multi-factor adaptive normalization method to comprehensively consider construction complexity, nuclear safety level, and technical difficulty, this approach solves the technical problems of lacking quality risk prediction and warning and the normalization method not taking into account engineering differences, thus promoting the transformation of quality management from passive response to proactive prevention. Attached Figure Description
[0018] Figure 1 The present invention provides an overall flowchart of a quantitative and qualitative comprehensive evaluation method for nuclear power engineering quality. Figure 2 A schematic diagram illustrating portfolio weighting and dynamic weight adjustment; Figure 3 A schematic diagram of four-dimensional behavioral evaluation and risk warning based on knowledge, ability, action, and result. Detailed Implementation
[0019] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0020] like Figure 1 As shown, a comprehensive quantitative and qualitative evaluation method for nuclear power engineering quality includes the following steps: Step S1: Data collection and construction of evaluation index system; A three-tiered evaluation index system is constructed, comprising an objective layer, a criterion layer, and an indicator layer. The objective layer represents the overall evaluation objective for nuclear power engineering quality management. The criterion layer includes five dimensions: quality management organization and responsibilities, operation of the quality assurance system, personnel quality behavior, engineering entity quality, and continuous quality improvement. The indicator layer comprises specific evaluation indicators under each criterion layer. The personnel quality behavior dimension is decomposed into secondary indicators using a four-dimensional model of "knowledge-ability-action-result." Knowledge dimension: Quality knowledge mastery, which evaluates the extent to which personnel have mastered quality-related knowledge, including secondary indicators such as training and assessment results, qualification certificate holding status, and quality knowledge test scores; Ability dimension: Quality capability level, which evaluates the ability of personnel to apply quality knowledge to solve practical problems, including secondary indicators such as professional skills assessment, historical performance, and ability to analyze and solve quality problems; Behavior dimension: Quality behavior performance, the actual behavior performance of evaluators in engineering practice, including secondary indicators such as on-site inspection compliance rate, procedural execution compliance rate, design change compliance rate, and standardization of quality record filling; Result dimension: Quality results effectiveness, the actual quality results produced by the behavior of the evaluators, including secondary indicators such as first-time acceptance rate, rework rate, NCR closure rate, and quality incident occurrence rate.
[0021] Each dimension has 3-5 secondary indicators, and the entire model has 16-20 behavioral evaluation indicators. The weight of each secondary indicator is determined by the combination weighting method in step S2.
[0022] Step S2: Weighting of AHP-Entropy Weight-Game Theory Nash Equilibrium Three-Dimensional Combination; Step S21: Calculate subjective weights using the AHP (Analytic Hierarchy Process).
[0023] The judgment matrix is constructed using the 1-9 scaling method. ,in , , The 1-9 scale means: 1 indicates equal importance, 3 indicates slightly important, 5 indicates significant importance, 7 indicates strong importance, 9 indicates extreme importance, and 2, 4, 6, and 8 are the midpoints of adjacent scales.
[0024] in, To determine the element in the i-th row and j-th column of the matrix, we need to represent the importance comparison result of the i-th indicator relative to the j-th indicator; To determine the importance of an indicator compared to itself, the elements on the main diagonal of the matrix are always equal to 1. To determine the element in the j-th row and i-th column of the matrix, representing the importance comparison result of the j-th indicator relative to the i-th indicator, and... They are reciprocals of each other, that is =1 / This reflects the reciprocity of the judgment matrix.
[0025] The weight vector is solved using the eigenvector method. : , in, To determine the largest eigenvalue of a matrix, a consistency check is performed: , in, As a consistency indicator, The average random consistency index (obtained by looking up a table) hour , hour , hour ).when The matrix is judged to have satisfactory consistency.
[0026] Step S22: Calculate the objective weights using the entropy weight method; It has Each evaluation object, There are 1 evaluation index, and the original data matrix is: .
[0027] First, perform data standardization. For positive indicators: , For negative indicators: , in, This represents the original value of the j-th evaluation index across all m evaluation objects.
[0028] Calculate the first The first indicator The proportion of each evaluation object: , Calculate the first Information entropy of each indicator: , when When, define Calculate the coefficient of difference. Objective weighting: , in, Let be the information entropy of the j-th evaluation index, used to measure the dispersion of the index value and the amount of information it contains.
[0029] Step S23: Optimize the combination of weights using game theory Nash equilibrium; Assume there is a total Seed weighting method (in this invention) ), No. The weight vector obtained by this method is Constructing a combined weight model ,in, Let be the combination coefficients, satisfying , .
[0030] Based on the Nash equilibrium concept in game theory, the optimization objective is to minimize the deviation between the combined weights and the weights of each method: , Equivalent to minimizing the objective function: , right Taking the partial derivatives and setting them to zero, we obtain a system of linear equations: , Solving for the combination coefficients After normalization, the final combined weights are obtained: , Step S3: Dynamic weight adaptive adjustment based on variable weight theory; Let the first The frequency of problems for each indicator is (Number of problems occurring for this indicator per unit time), the average problem frequency for all indicators is .
[0031] The penalty-incentive weight adjustment formula based on contingency theory: , in, The combined weights determined in step S2, For the adjusted weights, Penalty coefficient ( ).when Time weighting increases (punitive enhancement), when The time weight decreases (the incentive is reduced).
[0032] Normalize the adjusted weights: Apply boundary constraints to ensure weight stability: , That is, the change in weight does not exceed the original weight. Finally, normalization is performed again to obtain the final dynamic weights.
[0033] A sliding window mechanism is adopted to recalculate the frequency of issues for each indicator and adjust the weights each quarter based on newly added historical data.
[0034] Step S4: Fuzzy comprehensive evaluation based on triangular membership function; Let the factor set (evaluation index set) be... The collection of comments is .
[0035] Define the triangular membership function for each rating level: , , , The membership degree of each indicator to each rating level is obtained through expert evaluation, and a fuzzy evaluation matrix is constructed. A weighted average operator is used. Perform fuzzy synthesis: , in, The combined weight vector is calculated in step S2.
[0036] Weighted average method is used for deblurring, and the overall score is as follows: , in, Standard score: (excellent), (good), (medium), (Pass) (Failed).
[0037] Step S5: Multi-attribute decision ranking based on TOPSIS; It has Each evaluation object, One evaluation index, original decision matrix Vector normalization is used: , Construct a weighted standardized decision matrix: , Determine the ideal solution and negative ideal solution : , Calculate the Euclidean distance from each evaluation object to the positive and negative ideal solutions: , in, The value of the positive ideal solution on the j-th index is the optimal value of all evaluation objects in the weighted standardized value of the index (the maximum value is taken for positive indicators and the minimum value is taken for negative indicators). The value of the negative ideal solution on the j-th index is the worst value among all evaluation objects in the weighted standardized value of the index (the minimum value is taken for positive indexes and the maximum value is taken for negative indexes). The weighted standardized vector of the i-th evaluation object to the positive ideal solution The smaller the Euclidean distance, the closer the evaluation object is to the optimal state; For the i-th evaluation object to the negative ideal solution The larger the Euclidean distance, the further the evaluation object is from the worst state.
[0038] Calculate proximity: , , The larger the value, the closer the evaluated object is to the ideal state. Sort the values from largest to smallest.
[0039] A comprehensive four-dimensional score: "Knowledge-Ability-Action-Result". in , , , The weights for the four dimensions are determined by the combined weighting method in step S2.
[0040] Step S6: Multi-factor adaptive normalization processing; Taking into account the following adjustment factors: Construction complexity coefficient Determine the complexity level of different construction activities based on the WBS (Work Breakdown Structure), and set the value range accordingly. A larger value indicates a more complex construction process; Nuclear safety level coefficient The nuclear safety level is determined based on the nuclear safety level involved in the construction activities. Non-safety level ; Technical difficulty level The range of values is determined based on the technical difficulty of the construction process. .
[0041] Adaptive normalized score: ,in, This is the original quality deduction value. Based on standard working hours. Comprehensive adjustment coefficient. value range .
[0042] Step S7: Quality risk prediction and early warning based on LSTM long short-term memory network; Step S71: Input feature set; Collect and organize the following historical data as model input: historical deduction data sequence Problem type distribution vector And time series characteristics (month / quarter identifiers, project progress stage identifiers, historical comparison characteristics, etc.).
[0043] Step S72: LSTM network structure; LSTM cells include the following gating mechanisms: Forgotten Gate: , Input Gate: , Candidate memory states: , Update memory status: , Output gate: , Hidden state output: , in, Let be the input feature vector at time t; , The outputs of the hidden states at time t-1 and time t are respectively. This represents the state of the memory cell at time t-1. Let be the candidate memory state at time t. The state of the memory cell after time t; , , The outputs of the forget gate, input gate, and output gate at time t are respectively, with values ranging from (0,1), representing the proportion of information that passes through; , , , These are the weight matrices for the forget gate, input gate, candidate memory states, and output gate, respectively. , , , These are the corresponding bias vectors, which are parameters learned during network training. This represents the concatenated vector of the hidden state at the previous time step and the input vector at the current time step.
[0044] in, It is the Sigmoid activation function. The hyperbolic tangent activation function is used. This is element-wise multiplication.
[0045] Step S73: Calculate the quality risk index.
[0046] , in, This is the historical trend component (historical deduction moving average). This represents the current state component (the actual deduction value for the current period). This refers to the prediction bias component (the deviation between the LSTM predicted value and the actual value). .
[0047] Step S74: Dynamic early warning threshold; Let the mean of the historical QRI series be The standard deviation is : Level 1 Warning (Attention): , Level 2 Warning (Alert): , Level 3 Warning (Severe Warning): , when A level 3 warning is triggered at any time; when A level-two warning is triggered at this time; when A Level 1 alert is triggered at certain times. The alert threshold is updated adaptively every quarter based on newly accumulated historical data.
[0048] Example 1: Complete Calculation of Combined Weighting, Fuzzy Comprehensive Evaluation, and TOPSIS Ranking Step 1: Determine the evaluation object and indicator system.
[0049] Four major contractors (A, B, C, and D) were selected as evaluation subjects, and their performance was evaluated based on six secondary indicators under the "Personnel Quality Behavior" criterion. (Training assessment results) (Certificate and qualification holding rate) (On-site inspection compliance rate) (Program execution compliance) (First-time acceptance rate) (NCR closure rate).
[0050] Step 2: Calculate subjective weights using the AHP (Analytic Hierarchy Process).
[0051] Five nuclear power engineering quality management experts were invited to construct a comprehensive judgment matrix using the 1-9 scale method: , , The eigenvector method is used to solve for the largest eigenvalue, and the corresponding eigenvector (after normalization): , Consistency check: From the table, we can find The judgment matrix passed the consistency test, and the subjective weights are valid.
[0052] Step 3: Calculate the objective weights using the entropy weight method Original data matrix (anonymized values) of 4 contractors across 6 indicators: , The data is standardized (all are positive indicators), and the information entropy and difference coefficient of each indicator are calculated: Calculate objective weights: , Step 4: Optimize the combination of weights using game theory Nash equilibrium; Inner product calculation: , , , , Solution: , The verification sum is 1, so no additional normalization is needed.
[0053] .
[0054] Step 5: Fuzzy comprehensive evaluation; Taking contractor A as an example (scores for each indicator: 85, 90, 88, 82, 91, 87), calculate the membership degree of each indicator to the rating level.
[0055] : (Excellent), the rest are 0; : (Excellent), the rest are 0; : (Excellent), the rest are 0; : (excellent), (Good), the rest are 0; : (Excellent), the rest are 0; : (Excellent), the rest are 0.
[0056] Fuzzy evaluation matrix: , Using weighted average operator Perform fuzzy synthesis: , , , because Normalization process: , .
[0057] Deblurring Overall Score: , Similarly, calculate the costs for other contractors: , , .
[0058] Step 6: TOPSIS sorting; Construct a standardized decision matrix, and then construct a weighted standardized matrix by combining the weights. Determine the positive and negative ideal solutions, and calculate the Euclidean distance and proximity. Sorting results: Contractor C has the best overall quality management level, while contractor B is the weakest.
Claims
1. A comprehensive quantitative and qualitative evaluation method for the quality of nuclear power engineering, characterized in that, Includes the following steps: Step S1: Data collection and construction of evaluation index system; Step S2: Weighting of AHP-Entropy Weight-Game Theory Nash Equilibrium Three-Dimensional Combination; Step S3: Dynamic weight adaptive adjustment based on variable weight theory; Step S4: Fuzzy comprehensive evaluation based on triangular membership function; Step S5: Multi-attribute decision ranking based on TOPSIS; Step S6: Multi-factor adaptive normalization processing; Step S7: Quality risk prediction and early warning based on LSTM long short-term memory network.
2. The method for comprehensive quantitative and qualitative evaluation of nuclear power engineering quality as described in claim 1, characterized in that: Step S1 includes constructing a three-level evaluation index system comprising a target layer, a criterion layer, and an indicator layer; the target layer is the overall objective of the comprehensive evaluation of nuclear power engineering quality management; the criterion layer includes five dimensions: quality management organization and responsibilities, operation of the quality assurance system, personnel quality behavior, engineering entity quality, and continuous quality improvement; the indicator layer consists of specific evaluation indicators under each criterion layer.
3. The method for comprehensive quantitative and qualitative evaluation of nuclear power engineering quality as described in claim 2, characterized in that, In step S1, the personnel quality behavior dimension is decomposed into secondary indicators using a four-dimensional model of "knowledge-ability-action-result". Knowledge Dimension: Quality knowledge mastery level, which evaluates the extent to which personnel have mastered quality-related knowledge, including secondary indicators such as training and assessment results, qualification certificate holding status, and quality knowledge test scores; Capability dimension: Quality capability level, which evaluates the ability of personnel to apply quality knowledge to solve practical problems, including secondary indicators of professional skills assessment, historical performance, and ability to analyze and solve quality problems; Action dimension: Quality behavior performance, the actual behavior performance of evaluators in engineering practice, including secondary indicators such as on-site inspection compliance rate, procedural execution compliance rate, design change compliance rate, and the standardization of quality record filling; Results Dimension: Quality outcome effectiveness, the actual quality results generated by the evaluators' actions, including secondary indicators such as first-time acceptance rate, rework rate, NCR closure rate, and quality incident incidence rate. Each dimension has 3-5 secondary indicators, and the entire model has 16-20 behavioral evaluation indicators. The weight of each secondary indicator is determined by a combination weighting method.
4. The method for comprehensive quantitative and qualitative evaluation of nuclear power engineering quality as described in claim 1, characterized in that, Step S2 includes: Step S21: Calculate subjective weights using the AHP (Analytic Hierarchy Process); The judgment matrix is constructed using the 1-9 scaling method. ,in , , ; The meaning of the 1-9 scale: 1 indicates equal importance, 3 indicates slightly important, 5 indicates significant importance, 7 indicates strong importance, 9 indicates extreme importance, and 2, 4, 6, and 8 are the midpoints of adjacent scales; The weight vector is solved using the eigenvector method. : , in, To determine the largest eigenvalue of a matrix, a consistency check is performed: , in, As a consistency indicator, As the average random consistency index, when The matrix is judged to have satisfactory consistency. Step S22: Calculate the objective weights using the entropy weight method; It has Each evaluation object, There are 1 evaluation index, and the original data matrix is: ; First, we perform data standardization. For positive indicators: , For negative indicators: , Calculate the first The first indicator The proportion of each evaluation object: , Calculate the first Information entropy of each indicator: , when When, define Calculate the coefficient of difference Objective weighting: , Step S23: Optimize the combination of weights using game theory Nash equilibrium; Assume there is a total One type of empowerment method, the first The weight vector obtained by this method is Construct a combined weight model ,in Let be the combination coefficients, satisfying , ; Based on the Nash equilibrium concept in game theory, the optimization objective is to minimize the deviation between the combined weights and the weights of each method: , Equivalent to minimizing the objective function: , right Taking the partial derivatives and setting them to zero, we obtain a system of linear equations: , Solving for the combination coefficients After normalization, the final combined weights are obtained: 。 5. The method for comprehensive quantitative and qualitative evaluation of nuclear power engineering quality as described in claim 1, characterized in that: Step S3 includes setting the first The frequency of problems for each indicator is The average problem frequency for all indicators is ; The penalty-incentive weight adjustment formula based on contingency theory: , in, The combined weights determined in step S2, For the adjusted weights, As the penalty coefficient, when Time weight increases, when Time weight decreases, Normalize the adjusted weights: Apply boundary constraints to ensure weight stability: , That is, the change in weight does not exceed the original weight. Finally, the weights are normalized again to obtain the final dynamic weights; A sliding window mechanism is adopted, and the frequency of problems for each indicator is recalculated and the weights are adjusted every quarter based on the newly added historical data.
6. The method for comprehensive quantitative and qualitative evaluation of nuclear power engineering quality as described in claim 1, characterized in that: Step S4 includes setting the factor set as follows: The collection of comments is Define the triangular membership function for each rating level: , , , The membership degree of each indicator to each rating level is obtained through expert evaluation, and a fuzzy evaluation matrix is constructed. A weighted average operator is used. Perform fuzzy synthesis: , in, The combined weight vector calculated in step S2; The weighted average method was used for deblurring, and the overall score was as follows: , in, Standard score: excellent, good, medium, Pass Failed.
7. The method for comprehensive quantitative and qualitative evaluation of nuclear power engineering quality as described in claim 1, characterized in that: Step S5 includes setting... Each evaluation object, One evaluation index, original decision matrix Vector normalization is used: , Construct a weighted standardized decision matrix: , Determine the ideal solution and negative ideal solution : , Calculate the Euclidean distance from each evaluation object to the positive and negative ideal solutions: , Calculate proximity: , , The larger the value, the closer the evaluated object is to the ideal state. Sort the values from largest to smallest; A comprehensive four-dimensional score encompassing "Knowledge, Ability, Action, and Results": in , , , The weights for the four dimensions are determined by the combined weighting method in step S2.
8. The method for comprehensive quantitative and qualitative evaluation of nuclear power engineering quality as described in claim 1, characterized in that: Step S6 includes, Construction complexity coefficient Determine the complexity level of different construction activities based on the WBS, and specify the range of values. A larger value indicates a more complex construction process; Nuclear safety level coefficient The nuclear safety level is determined based on the nuclear safety level involved in the construction activities. Non-safety level ; Technical difficulty level The range of values is determined based on the technical difficulty of the construction process. ; Adaptive normalized score: in This is the original quality deduction value. Based on standard working hours, a comprehensive adjustment factor is applied. value range .
9. The method for comprehensive quantitative and qualitative evaluation of nuclear power engineering quality as described in claim 1, characterized in that, Step S7 includes: Step S71: Input feature set; Collect and organize the following historical data as model input: historical deduction data sequence Problem type distribution vector and time series characteristics; Step S72: LSTM network structure; LSTM cells include the following gating mechanisms: Forgotten Gate: , Input Gate: , Candidate memory states: , Update memory status: , Output gate: , Hidden state output: , in, It is the Sigmoid activation function. The hyperbolic tangent activation function is used. This is element-wise multiplication; Step S73: Calculate the quality risk index; , in, As a measure of historical trends, For the current state component, To predict the deviation component, ; Step S74: Dynamic early warning threshold; Let the mean of the historical QRI series be The standard deviation is : Level 1 Warning: , Level 2 warning: , Level 3 Warning: , when A level 3 warning is triggered at any time; when A level-two warning is triggered at this time; when A Level 1 warning is triggered when the warning threshold is reached, and the warning threshold is updated adaptively every quarter based on newly accumulated historical data.