Mine crushing and screening intelligent production management method and system

By unifying object association, causal dependency verification, and confidence fusion of multi-source heterogeneous data in the mining crushing and screening production process, causal consistency data is generated, solving the problem of fragmented multi-source data, realizing efficient anomaly identification and adaptive safety control, and improving the intelligent decision-making level of the production system.

CN123140757APending Publication Date: 2026-11-20ZHEJIANG ZHEKUANG HEAVY IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611370077.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-04
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In the crushing and screening process of mines, it is difficult to achieve effective unified correlation and fusion analysis of multi-source heterogeneous data. This makes it difficult for managers to gain a global perspective on the overall production situation and to accurately trace the causal relationship between equipment malfunctions and fluctuations in process parameters, thus restricting the level of intelligent decision-making in the production process.

Method used

Multi-source heterogeneous data from multiple business systems are collected and uniformly associated at the equipment-component-spare part level to form time-series associated data. Causal dependency verification and time-series alignment are performed on the data to generate causal consistency data. Based on the causal consistency data, confidence fusion and conflict arbitration are performed on visual anomaly events and production process control anomaly events to generate fused decision events. The state transition of the hierarchical state machine is driven by the fused decision events to dynamically generate safety interlock rules and control command sequences. Finally, the control command sequences are executed after safety verification.

Benefits of technology

It enables collaborative analysis and decision fusion of multi-source sensing information, improves the accuracy and response speed of anomaly identification, and enhances the adaptive safety control capability of the production system through dynamic interlocking and state transition mechanisms.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140757A_ABST
    Figure CN123140757A_ABST
Patent Text Reader

Abstract

The application discloses a mine crushing and screening intelligent production management method and system, relates to the technical field of mine intelligent control and production management, and comprises the following steps: collecting multi-source heterogeneous data from multiple business systems, performing unified object correlation according to equipment-component-spare part levels, and forming time sequence correlation data; performing causal dependence verification and time sequence alignment on the data, and generating causal consistency data; performing confidence fusion and conflict arbitration on visual and process control abnormal events based on the data, and generating fusion decision events; driving state migration of a layered state machine through the events, dynamically generating safety interlocking rules and control instruction sequences; and finally, performing safety verification on the control instruction sequences and issuing the control instruction sequences for execution. Through the above method, collaborative analysis and decision fusion of multi-source sensing information are realized, the accuracy and response speed of abnormal identification are improved, and the adaptive safety control capability of the production system is enhanced through a dynamic interlocking and state migration mechanism.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of intelligent control and production management technology in mines, and in particular to intelligent production management methods and systems for mine crushing and screening. Background Technology

[0002] In mining operations, crushing and screening are crucial links connecting mining and mineral processing. Their stability, efficiency, and safety directly impact the overall economic benefits and safety levels of the mine. Currently, production management at this stage heavily relies on decentralized control systems (such as DCS and PLC), safety monitoring systems (such as video surveillance), and management information systems (such as MES and ERP). While these systems operate effectively within their respective domains, they generally suffer from information silos, making it difficult to achieve effective unified correlation and fusion analysis of multi-source heterogeneous data such as production data, equipment status, visual information, and spare parts resources. This fragmented data makes it difficult for managers to gain a holistic view of production, accurately trace the causal relationships between equipment malfunctions and process parameter fluctuations, and hinders the level of intelligent decision-making in the production process. Summary of the Invention

[0003] The main purpose of this application is to provide an intelligent production management method and system for mine crushing and screening, which can solve the technical problems of insufficient multi-source data fusion, model collaboration, intelligent central control, predictive maintenance and spare parts linkage in the existing technology for the production stage of mine crushing and screening.

[0004] To achieve the above objectives, this application provides an intelligent production management method for mine crushing and screening, the method comprising: Multi-source heterogeneous data from production process control systems, visual monitoring systems, production execution systems, equipment maintenance systems, and warehouse management systems are collected, and the multi-source heterogeneous data are uniformly associated based on a preset equipment-component-spare part hierarchical relationship to obtain time-series associated data with a unified identifier. The time-series correlation data is subjected to causal dependency verification and time-series alignment processing to obtain causal consistency data. The causal dependency is the expected time-series logic between control commands, equipment operating parameters and visual observation events. Based on the aforementioned causal consistency data, confidence fusion and conflict arbitration are performed on visual anomaly events and production process control anomaly events to obtain fused decision events. Based on the fusion decision event, the hierarchical state machine from the device level to the process level and then to the system level is driven to perform state transition, obtain the transitioned state, and dynamically generate safety interlock rules based on the transitioned state to obtain a control command sequence. The control command sequence is subjected to safety constraint verification to obtain the verification result. When the verification result is the preset verification result, the control command sequence is issued to carry out intelligent production management of mine crushing and screening.

[0005] In one embodiment, the step of performing causal dependency verification and time-series alignment on the time-series correlated data to obtain causal consistency data includes: Based on the production process logic, a causal dependency graph is constructed, starting from the control command and proceeding sequentially through the actions of the actuator, changes in equipment operating parameters, visual observation events, and finally to the process result events. An allowable time response window is configured for each dependency relationship in the causal dependency graph. Match the event instances in the time-series correlation data with the nodes in the causal dependency graph, and verify whether the actual time sequence of the event instances conforms to the causal dependency relationship corresponding to the node; Event data that conforms to the causal dependency relationship and the time response window are marked as high-confidence data; All high-confidence data are aggregated and time-series aligned to obtain causal consistency data.

[0006] In one embodiment, the step of performing confidence fusion and conflict arbitration on visual anomaly events and production process control anomaly events based on the causal consistency data to obtain fused decision events includes: For the same monitoring target, the visual anomaly confidence, visual anomaly type and visual anomaly duration of the visual anomaly event corresponding to the monitoring target are extracted from the causal consistency data, as well as the production process control anomaly confidence and production process control anomaly parameter offset of the production process control anomaly event. Obtain historical false alarm rate and data quality score. Based on the historical false alarm rate and data quality score, perform weighted correction on the confidence level of visual anomaly and the confidence level of production process control anomaly to obtain the corrected confidence level of visual anomaly and the corrected confidence level of production process control. The comprehensive confidence level is obtained by weighting and fusing the corrected visual anomaly confidence level and the corrected production process control confidence level. Based on the comparison result of the comprehensive confidence level and the preset threshold, the visual anomaly type, the duration of the visual anomaly, and the offset of the production process control anomaly parameter, conflict arbitration is performed on the visual anomaly event and the production process control anomaly event to obtain the event type; Based on the event type, a corresponding fusion decision event is generated.

[0007] In one embodiment, the event type includes a consistent anomaly event, a soft conflict event, or a hard conflict event, and the step of generating a corresponding fusion decision event based on the event type includes: When the event type is the consistent abnormal event, a fusion decision event containing high-confidence alarm information and first-priority control optimization instructions is generated; When the event type is the soft conflict event, a second priority fusion decision event is generated, which includes a prompt message requesting manual confirmation, an instruction to increase the data sampling frequency, and a restriction on some automatic control actions. When the event type is the hard conflict event, a fusion decision event is generated that includes the highest priority security alarm, emergency control command, and request for immediate human intervention.

[0008] In one embodiment, the step of driving a hierarchical state machine from the device level to the process level and then to the system level to perform state transitions based on the fusion decision event, obtaining the transitioned state, and dynamically generating safety interlocking rules based on the transitioned state to obtain a control command sequence includes: Determine the event type and scope of influence of the fusion decision event, and update the device status of the corresponding device based on the event type and scope of influence to obtain the updated device status; Based on a hierarchical state machine from the equipment level to the process level and then to the system level, the updated equipment states of all equipment within the same process segment are aggregated to obtain the process segment aggregated state. Based on the preset process logic relationship, the aggregation state of the process segment is transitioned to obtain the transitioned state. Obtain the health assessment results and real-time load data of key equipment, and dynamically generate safety interlock rules based on the migrated status, the health assessment results, and the real-time load data; A sequence of control instructions is generated based on the valid safety interlock rules in the aforementioned safety interlock rules.

[0009] In one embodiment, the step of dynamically generating safety interlock rules based on the migrated state, the health assessment result, and the real-time load data includes: Obtain the set of baseline security interlocking rules corresponding to the migrated state; The parameter thresholds in the baseline safety interlock rule set are adjusted based on the health assessment results to obtain the adjusted parameter thresholds; Based on the real-time load data, the equipment start-up and shutdown sequence and process switching logic in the baseline safety interlock rule set are optimized to obtain optimized logic rules; By combining the adjusted parameter thresholds and the optimized logic rules, a safety interlocking rule is generated.

[0010] In one embodiment, the step of performing security constraint verification on the control command sequence to obtain the verification result includes: Verify whether the controlled object in the control command sequence exists and is in a remotely operable mode, and obtain the control object verification result; Verify whether the control parameters in the control command sequence are within the safe operating range allowed by the equipment, and obtain the control parameter verification result; Verify whether the execution of the control command sequence violates the current process interlock logic and the status of upstream and downstream equipment, and obtain the execution status verification result; The verification result is obtained based on the verification result of the controlled object, the verification result of the control parameters, and the verification result of the execution status.

[0011] In one embodiment, the intelligent production management method for mine crushing and screening further includes: By associating the equipment operating parameters, abnormal event records, maintenance work orders, and component replacement records in the time-series correlation data, component feature information is obtained; Extract feature parameters characterizing the degradation trend of the component from the component feature information; The current health level is calculated based on the characteristic parameters, and a prediction is made based on the current health level to obtain the remaining usable lifespan prediction value; Based on the predicted remaining usable life and production plan, calculate the demand probability of each spare part within a specific future time window; Based on the demand probability, current inventory information, and procurement lead time, generate procurement suggestions, allocation instructions, or inventory reservation instructions for spare parts to manage spare parts.

[0012] In one embodiment, the step of generating a spare parts procurement suggestion, allocation instruction, or inventory pre-positioning instruction based on the demand probability, current inventory information, and procurement lead time includes: Identify multiple devices that use the same model of spare parts, determine the component degradation trend of the devices, and associate the component degradation trends of each device to obtain the association result; When the correlation result shows that multiple devices exhibit a synchronous degradation trend, the batch demand for spare parts for the corresponding model of the device is calculated based on the demand probability. Based on the batch demand for spare parts, current inventory information, and procurement lead time, generate batch procurement suggestions, cross-warehouse transfer instructions, or inventory pre-positioning instructions.

[0013] Furthermore, to achieve the above objectives, this application also proposes an intelligent production management system for mine crushing and screening, which includes: The data integration module is used to collect multi-source heterogeneous data from the production process control system, visual monitoring system, production execution system, equipment maintenance system and warehouse management system, and perform unified object association on the multi-source heterogeneous data based on the preset equipment-component-spare part hierarchical relationship to obtain time-series associated data with unified identification. The causal alignment module is used to perform causal dependency verification and time-series alignment processing on the time-series associated data to obtain causal consistency data. The causal dependency is the expected time-series logic between control commands, equipment operating parameters and visual observation events. The decision arbitration module is used to perform confidence fusion and conflict arbitration on visual anomaly events and production process control anomaly events based on the causal consistency data to obtain fused decision events; The state control module is used to drive the hierarchical state machine from the device level to the process level and then to the system level to perform state transitions according to the fusion decision event, obtain the transitioned state, and dynamically generate safety interlock rules based on the transitioned state to obtain a control instruction sequence. The safety execution module is used to perform safety constraint verification on the control command sequence, obtain the verification result, and issue the control command sequence to carry out intelligent production management of mine crushing and screening when the verification result is a preset verification result.

[0014] In addition, to achieve the above objectives, this application also proposes an intelligent production management device for mine crushing and screening, which includes: a memory, a processor, and a computer program stored in the memory and executable on the processor. The computer program is configured to implement the steps of the intelligent production management method for mine crushing and screening as described above.

[0015] In addition, to achieve the above objectives, the present invention also proposes a storage medium, which is a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, it implements the steps of the intelligent production management method for mine crushing and screening as described above.

[0016] In addition, to achieve the above objectives, this application also provides a computer program product, which includes a computer program that, when executed by a processor, implements the steps of the intelligent production management method for mine crushing and screening as described above.

[0017] This application provides an intelligent production management method for mine crushing and screening. It collects multi-source heterogeneous data from multiple business systems, performs unified object association at the equipment-component-spare part level to form time-series correlated data, and performs causal dependency verification and time-series alignment on the data to generate causal consistency data. Based on this, it performs confidence fusion and conflict arbitration on visual and process control anomaly events to generate fused decision events. These events drive the state transition of a hierarchical state machine, dynamically generating safety interlocking rules and control command sequences. Finally, the control command sequences are verified for safety before being issued for execution. Through this method, collaborative analysis and decision fusion of multi-source sensing information are achieved, improving the accuracy and response speed of anomaly identification, and enhancing the adaptive safety control capability of the production system through dynamic interlocking and state transition mechanisms. Attached Figure Description

[0018] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.

[0019] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 This is a flowchart illustrating an embodiment of the intelligent production management method for mine crushing and screening in this application. Figure 2 This is a diagram of a multi-system collaborative intelligent management architecture for mine crushing and screening, representing an embodiment of the intelligent production management method for mine crushing and screening according to this application. Figure 3 This is a causal dependency diagram of an embodiment of the intelligent production management method for mine crushing and screening in this application; Figure 4 This is a flowchart of multi-source abnormal event confidence fusion and conflict arbitration decision-making in an embodiment of the intelligent production management method for mine crushing and screening of this application. Figure 5 This is a flowchart illustrating the dynamic safety interlocking rule generation process of an embodiment of the intelligent production management method for mine crushing and screening in this application. Figure 6 This is a flowchart illustrating the verification of the safety constraints of the control instruction sequence in an embodiment of the intelligent production management method for mine crushing and screening according to this application. Figure 7 This is a schematic diagram of the module structure of the intelligent production management system for mine crushing and screening in an embodiment of this application; Figure 8This is a schematic diagram of the equipment structure of the hardware operating environment involved in the intelligent production management method for mine crushing and screening in the embodiments of this application.

[0021] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0022] It should be understood that the specific embodiments described herein are merely illustrative of the technical solutions of this application and are not intended to limit this application.

[0023] To better understand the technical solution of this application, a detailed description will be provided below in conjunction with the accompanying drawings and specific implementation methods.

[0024] The main solution of this application embodiment is to collect multi-source heterogeneous data from production process control system, visual monitoring system, production execution system, equipment maintenance system and warehouse management system, and to perform unified object association on the multi-source heterogeneous data based on the preset equipment-component-spare part hierarchical relationship to obtain time-series associated data with unified identification; The time-series correlation data is subjected to causal dependency verification and time-series alignment processing to obtain causal consistency data. The causal dependency is the expected time-series logic between control commands, equipment operating parameters and visual observation events. Based on the aforementioned causal consistency data, confidence fusion and conflict arbitration are performed on visual anomaly events and production process control anomaly events to obtain fused decision events. Based on the fusion decision event, the hierarchical state machine from the device level to the process level and then to the system level is driven to perform state transition, obtain the transitioned state, and dynamically generate safety interlock rules based on the transitioned state to obtain a control command sequence. The control command sequence is subjected to safety constraint verification to obtain the verification result. When the verification result is the preset verification result, the control command sequence is issued to carry out intelligent production management of mine crushing and screening.

[0025] In mining operations, crushing and screening are crucial links connecting mining and mineral processing. Their stability, efficiency, and safety directly impact the overall economic benefits and safety levels of the mine. Currently, production management at this stage heavily relies on decentralized control systems (such as DCS and PLC), safety monitoring systems (such as video surveillance), and management information systems (such as MES and ERP). While these systems operate effectively within their respective domains, they generally suffer from information silos, making it difficult to achieve effective unified correlation and fusion analysis of multi-source heterogeneous data such as production data, equipment status, visual information, and spare parts resources. This fragmented data makes it difficult for managers to gain a holistic view of production, accurately trace the causal relationships between equipment malfunctions and process parameter fluctuations, and hinders the level of intelligent decision-making in the production process.

[0026] This application provides a solution that collects multi-source heterogeneous data from multiple business systems, performs unified object association at the equipment-component-spare part level to form time-series correlated data, performs causal dependency verification and time-series alignment on the data to generate causal consistency data, performs confidence fusion and conflict arbitration on visual and process control anomaly events based on this, generates fused decision events, drives the state transition of the hierarchical state machine through these events, dynamically generates safety interlock rules and control command sequences, and finally executes the control command sequences after security verification. Through this approach, collaborative analysis and decision fusion of multi-source sensing information are achieved, improving the accuracy and response speed of anomaly identification, and enhancing the adaptive safety control capabilities of the production system through dynamic interlocking and state transition mechanisms.

[0027] It should be noted that the executing entity in this embodiment can be a computing service device with data processing, network communication, and program execution functions, such as a tablet computer, personal computer, or mobile phone, or an electronic device capable of performing the above functions, such as intelligent production management equipment for mining crushing and screening. This embodiment does not specifically limit it in this regard. The following uses intelligent production management equipment for mining crushing and screening as an example to describe this embodiment and the following embodiments.

[0028] The embodiments of this application are geared towards the crushing and screening production stage in mining, and are particularly applicable to continuous production lines including feed hoppers, vibrating feeders, jaw crushers, cone crushers, vibrating screens, return systems, finished product hoppers, and multi-stage belt conveyors.

[0029] This application provides an intelligent production management method for mine crushing and screening, referring to... Figure 1 , Figure 1 This is a flowchart illustrating the first embodiment of the intelligent production management method for mine crushing and screening in this application.

[0030] In this embodiment, the intelligent production management method for mine crushing and screening includes steps S10 to S50: Step S10: Collect multi-source heterogeneous data from the production process control system, vision monitoring system, production execution system, equipment maintenance system and warehouse management system, and perform unified object association on the multi-source heterogeneous data based on the preset equipment-component-spare part hierarchical relationship to obtain time-series associated data with unified identification.

[0031] It should be noted that multi-source heterogeneous data refers to real-time sensor readings and control commands from the production process control system, image and video stream analysis events from the vision monitoring system, production tasks and process formula information from the production execution system, equipment files and maintenance history records from the equipment maintenance system, and spare parts inventory and material information from the warehouse management system.

[0032] Additionally, it should be noted that, referring to Figure 2 The production process control system, visual monitoring system, production execution system, equipment maintenance system, and warehouse management system together form the underlying pillars of mine crushing and screening production operations. Specifically, the production process control system is the nerve center of the site, directly controlling the start-up, shutdown, speed, pressure, and valve opening of key equipment such as jaw crushers, cone crushers, vibrating screens, and belt conveyors through PLCs and DCSs. The real-time data it generates (such as motor current, bearing temperature, and chamber pressure) is the most direct basis for judging the instantaneous operating status of the equipment, but its perspective is limited to physical parameters and cannot see overall equipment appearance abnormalities or process results (such as finished material particle size). The visual monitoring system acts as the system's eyes, using cameras deployed at key locations such as the crushing chamber inlet, outlet, and belt transfer points to monitor visible abnormalities such as material blockage, deviation, foreign objects, smoke, and fire using computer vision technology. It provides macroscopic and superficial information that the control system cannot capture, but its judgment is easily affected by light and dust, and it is difficult to perceive the internal state of the equipment. The Manufacturing Execution System (MES) acts as the brain and scheduling center, responsible for breaking down monthly / weekly production plans into specific daily / shift work instructions. It specifies process parameters such as product type, output, and particle size requirements for the crushing and screening process. It translates management goals into actionable work orders and serves as the benchmark for judging whether production is proceeding as planned. However, it does not directly perceive the real-time dynamic execution capabilities of the equipment on-site. The Equipment Maintenance System (EMS) is the health record that ensures stable system operation. It records the inspection, maintenance, and repair history of each piece of equipment, as well as data throughout the equipment's lifecycle. When the control or vision system detects anomalies, the EMS can provide historical maintenance records as a diagnostic reference. However, its information updates typically lag behind the occurrence of the fault, lacking the ability to predict equipment performance degradation.

[0033] The warehouse management system is the logistical support of the supply chain, managing the inventory status, age, and location information of various spare parts, from jaw plates and liners to bearings and lubricants. Its data directly impacts the efficiency of maintenance decisions: if wear is detected in critical components, the system must immediately know whether the corresponding spare parts are in stock and where they are located; otherwise, predictive maintenance cannot form a closed loop. This application aims to break down the barriers between these five systems, deeply integrating and intelligently coordinating their respective data to achieve a thorough understanding of the entire crushing production process, enabling intelligent decision-making and precise execution.

[0034] Understandably, the initial step involves deploying data acquisition interface adapters to interface with industrial communication protocols such as OPC UA, Modbus, and HTTP / REST, extracting data from various source systems in real-time or near real-time. Subsequently, the system core maintains a unified equipment information model, structured around a hierarchical relationship of "equipment-component-spare part." For example, a jaw crusher (equipment) includes a moving jaw assembly (component), which is associated with a specific jaw plate (spare part). The data association engine utilizes this model to analyze the extracted raw data—such as a bearing temperature reading from the control system, a jaw plate replacement work order from the maintenance system, and an abnormal discharge particle size event from the vision system—and associates it with the object chain of "jaw crusher-moving jaw assembly-jaw plate" by parsing the equipment codes or location tags contained within the data. All successfully associated data is then assigned a unified timestamp and object identifier, ultimately forming clear, sequentially related data records that lay the data foundation for subsequent causal analysis.

[0035] Step S20: Perform causal dependency verification and timing alignment processing on the time-series associated data to obtain causal consistency data. The causal dependency is the expected timing logic between control commands, equipment operating parameters and visual observation events.

[0036] It should be noted that causal consistency data not only satisfies strict time sequence alignment, but also verifies the causal dependencies between data. Causal dependencies refer to the expected changes in equipment operating parameters after a control command is issued in industrial production, which in turn triggers events that can be observed by the vision system.

[0037] Understandably, in the case of a material blockage at the feed inlet in a mining crushing and screening process, the central control system detects that the current of the cone crusher continues to rise and exceeds the warning threshold. It then issues an instruction automatically or manually to reduce the feed inlet of the upstream feeder to decrease the feed rate and alleviate the blockage trend.

[0038] The expected logic is as follows: Within a very short time (milliseconds) after the control command is issued, the feed port setpoint of the belt feeder should be updated immediately; within the following seconds, the actual current of the belt motor should decrease (load reduction), and the power reading should also drop synchronously; further on (seconds to ten seconds), the vision monitoring system deployed above the crusher should observe the following sequence of visual events: The material layer on the belt has become noticeably thinner; The material accumulation at the crusher feed inlet gradually collapsed and disappeared; The material flow rate at the crusher discharge port has returned to normal.

[0039] Thus, a complete causal chain is obtained: Reduce feed opening (control) → Belt motor current decreases (equipment parameter) → Material layer on belt becomes thinner (visual event 1) → Feed opening accumulation disappears (visual event 2) → Discharge flow rate recovers (visual event 3) By verifying the strict chronological order and logical relationship of these five types of data points on the timeline, the causal consistency of the data for that period can be confirmed. Conversely, if any of the following situations occur, the causal chain is considered broken, and that segment of data needs to be cleaned or corrected: The visual system has detected that the blockage has disappeared, but the belt motor current remains high, indicating that the current signal is lagging or the sensor is malfunctioning. The material layer on the belt has become thinner, but the accumulation at the feed inlet is still present—this indicates that there may be mechanical blockage inside the crusher, and the internal condition cannot be reflected visually. The instruction to reduce the feed opening has been issued, but the current of the belt conveyor motor has increased instead—indicating that the instruction has not been executed or the equipment is responding abnormally.

[0040] In practical implementation, the first step is time alignment. Since the timestamps of data from the control system and vision system come from different sources, there may be slight deviations. Therefore, interpolation or event-based dynamic time warping algorithms are used to unify all data to the same time baseline. Next is causal dependency verification, which is based on a predefined process knowledge rule base or utilizes causal discovery algorithms (such as PC algorithms and Granger causality tests). For example, the rule base might specify that "increasing the crusher speed (control command)" should cause "increased motor current (equipment parameter)" within milliseconds, and possibly lead to "increased material flow rate at the discharge port (visual event)" a few seconds later. The system checks each data stream to ensure it conforms to these expected logics. Data segments that violate causality (such as the vision system detecting blockage first, but the control system's abnormal current data appearing later) are marked, removed, or re-aligned to ensure that the data ultimately used for model training and analysis has a solid causal logic foundation, thereby improving the reliability of subsequent predictions and decisions.

[0041] In one feasible implementation, the step of performing causal dependency verification and time-series alignment on the time-series correlated data to obtain causal consistent data includes: Based on the production process logic, a causal dependency graph is constructed, starting from the control command and proceeding sequentially through the actions of the actuator, changes in equipment operating parameters, visual observation events, and finally to the process result events. An allowable time response window is configured for each dependency relationship in the causal dependency graph. Match the event instances in the time-series correlation data with the nodes in the causal dependency graph, and verify whether the actual time sequence of the event instances conforms to the causal dependency relationship corresponding to the node; Event data that conforms to the causal dependency relationship and the time response window are marked as high-confidence data; All high-confidence data are aggregated and time-series aligned to obtain causal consistency data.

[0042] It should be noted that a causal dependency graph is a directed graph model describing the causal logic of a production process. Its nodes represent different types of event states, and edges represent the causal relationships between them. The time response window is the allowed time delay range defined for each edge in the causal dependency graph, used to quantitatively evaluate the reasonableness of causal relationships. An event instance refers to a specific event occurrence record identified from the actually collected data. High-confidence data refers to data points whose actual occurrence order and time intervals both conform to the constraints of the causal dependency graph and the preset time response window.

[0043] In its implementation, it first relies on a predefined causal dependency graph, referring to... Figure 3 This graph, constructed based on production process knowledge, formally describes the causal logic of the system. For example, its edges can be represented as... And associate a time response window with each edge. This means that after the causal event occurs, the result event should follow. after, It was observed previously.

[0044] Next, the system matches event instances from the real-time stream or historical batches with nodes in the causal dependency graph. For each directed path in the graph, the system retrieves matching causal event pairs from the data. The core of the verification is to determine the difference in timestamps between two event instances. Whether it falls within the preset time response window, i.e., whether it meets the requirements. This check also ensures the sequential order of events. And the rationality of the time delay.

[0045] All event instances that pass the above tests will be marked as high-confidence data. For complex causal relationships, such as a control command triggering a series of chain reactions, the system requires that all consecutive events on the path must satisfy their respective temporal constraints in order to mark the data on the entire chain as high-confidence.

[0046] Finally, the highly reliable data obtained from the labeling is time-series aligned. Due to the heterogeneity of the data sources, timestamps may have systematic biases. Typically, a high-precision control system clock is used as a reference, and interpolation or state estimation methods are employed to align data such as visual events onto the same timeline. This ultimately generates a dataset that is highly consistent in both time and causal logic, i.e., causal consistent data.

[0047] Step S30: Based on the causal consistency data, confidence fusion and conflict arbitration are performed on visual anomaly events and production process control anomaly events to obtain fused decision events.

[0048] It should be noted that visual anomalies refer to visual events that deviate from normal conditions, such as material blockage, deviation, or foreign object intrusion, identified through visual analysis models. Production process control anomalies refer to parameter exceeding limits, equipment malfunctions, or abnormal commands detected from control systems such as PLCs and sensors. Confidence level is a quantitative indicator used to represent the reliability of each anomaly detection result; its value range is typically 0 to 1. Conflict arbitration refers to the process of making a decision based on preset rules or higher-level evidence when anomalies from different sources point to contradictory conclusions. Fusion decision events integrate judgments from multiple sources and are the final, unified anomaly conclusion output after confidence level fusion and conflict arbitration.

[0049] Understandably, the system first assigns a confidence score to each detected visual and control anomaly event. This score can be derived based on the probability of the model output, historical accuracy, or signal quality. Subsequently, the system employs fusion algorithms such as DS evidence theory, Bayesian networks, or weighted averaging to fuse the confidence scores of multiple anomalies targeting the same objective or related processes, generating a comprehensive confidence score. When a conflict is found in the event conclusions during the fusion process (e.g., a visual report of "material blockage" while the control system displays "normal current"), a conflict arbitration mechanism is triggered. Arbitration strategies may include: prioritizing the event with higher confidence, adopting the event with stronger consistency with the control parameter logic chain, or introducing third-party data (such as equipment status) for final adjudication. The goal of the entire process is to generate a unique, reliable, and highly confident fusion decision event.

[0050] In one feasible implementation, the step of performing confidence fusion and conflict arbitration on visual anomaly events and production process control anomaly events based on the causal consistency data to obtain fused decision events includes: For the same monitoring target, the visual anomaly confidence, visual anomaly type and visual anomaly duration of the visual anomaly event corresponding to the monitoring target are extracted from the causal consistency data, as well as the production process control anomaly confidence and production process control anomaly parameter offset of the production process control anomaly event. Obtain historical false alarm rate and data quality score. Based on the historical false alarm rate and data quality score, perform weighted correction on the confidence level of visual anomaly and the confidence level of production process control anomaly to obtain the corrected confidence level of visual anomaly and the corrected confidence level of production process control. The comprehensive confidence level is obtained by weighting and fusing the corrected visual anomaly confidence level and the corrected production process control confidence level. Based on the comparison result of the comprehensive confidence level and the preset threshold, the visual anomaly type, the duration of the visual anomaly, and the offset of the production process control anomaly parameter, conflict arbitration is performed on the visual anomaly event and the production process control anomaly event to obtain the event type; Based on the event type, a corresponding fusion decision event is generated.

[0051] It should be noted that the monitoring target refers to specific equipment, areas, or process links in the industrial production process that are jointly monitored, such as conveyor belts, crushers, or sintering furnaces. Visual anomaly type is a classification of visual anomalies according to preset rules, such as material blockage, deviation, or equipment smoke. Visual anomaly duration refers to the length of time elapsed from the first detection by the vision system until the anomaly disappears or the current moment. Production process control anomaly parameter offset is the deviation between the actual value of the control parameter and the normal threshold or set value. Historical false alarm rate refers to the frequency of false alarms from a particular anomaly detection source in historical data. Data quality score is a comprehensive indicator used to assess the reliability of the current data source, possibly based on signal strength, data integrity, or noise level. Weighted correction refers to the process of adjusting the original confidence level using weighting factors. Weighted fusion is a calculation method that combines multiple confidence values ​​according to weights into a single comprehensive value. The comprehensive confidence level is a single confidence value representing the overall probability of an anomaly after fusion. The preset threshold is a manually set confidence threshold used to determine whether an anomaly is valid. The event type is the final anomaly type conclusion determined after conflict arbitration.

[0052] In practical implementation, the system first extracts multi-dimensional features from causal consistency data for the same monitoring target, providing a rich information foundation for fusion and arbitration. Subsequently, the system enters the confidence level correction phase. The core purpose of this correction is to dynamically adjust the original confidence level of each information source based on its long-term reliability and current data quality. For example, the following formula can be used for correction:

[0053]

[0054] in, and These are the original visual and the control anomaly confidence levels, respectively. and The weights (between 0 and 1) are calculated based on the real-time signal quality; the higher the quality, the closer the weight is to 1. and These are their respective historical false alarm rates. Through this correction, the influence of data sources with low reliability and high false alarm rates will be weakened.

[0055] The next stage is the confidence score fusion. The system performs weighted fusion on the corrected confidence scores to obtain a comprehensive score. An example of the fusion formula is as follows:

[0056] in, It is the overall confidence level. and These are preset fixed weights used to reflect the relative importance of visual or control signals in decision-making.

[0057] Finally, in the conflict arbitration phase, the system first... The data is compared to a preset threshold; if it exceeds the threshold, it is initially judged as an anomaly. Then, a deeper arbitration is performed based on specific business logic and characteristics: for example, if the visual report indicates severe material blockage for a long period, but the deviation of control parameters (such as motor current) is minor, it may be arbitrated as a visual false alarm or a minor anomaly, and continued observation is required; if both show anomalies and the type logic is consistent (such as visual deviation accompanied by the control correction mechanism exceeding the travel limit), it is confirmed as a real anomaly. Arbitration rules are usually implemented in the form of decision trees or production rules, ultimately outputting a definite event type, and generating a fusion decision event based on this.

[0058] In one feasible implementation, the event type includes a consistent anomaly event, a soft conflict event, or a hard conflict event, and the step of generating a corresponding fusion decision event based on the event type includes: When the event type is the consistent abnormal event, a fusion decision event containing high-confidence alarm information and first-priority control optimization instructions is generated; When the event type is the soft conflict event, a second priority fusion decision event is generated, which includes a prompt message requesting manual confirmation, an instruction to increase the data sampling frequency, and a restriction on some automatic control actions. When the event type is the hard conflict event, a fusion decision event is generated that includes the highest priority security alarm, emergency control command, and request for immediate human intervention.

[0059] It should be noted that a consistent anomaly event refers to an event where the visual anomaly and the production process control anomaly are logically consistent in type and their combined confidence levels exceed the alarm threshold. A soft conflict event refers to an event where one of the visual or control signals shows an anomaly while the other shows normal, or both show anomalies but their types are logically contradictory and their overall confidence level is in an intermediate ambiguity range. A hard conflict event refers to an event where both the visual and control signals issue high-confidence anomaly alarms, but the anomaly types indicated by the two are completely contradictory and irreconcilable in terms of physical principles. A high-confidence alarm message is an alarm issued by the system after it is certain that an anomaly has occurred, containing the specific anomaly type and location.

[0060] The first priority control optimization command is a non-emergency control command designed to automatically adjust process parameters to eliminate anomalies. The request for manual confirmation message is a prompt message generated by the system in uncertain situations, requesting operator judgment. The command to increase the data sampling frequency is a command to temporarily increase the data acquisition rate of relevant sensors. Limiting some automatic control actions is a conservative strategy to prevent the system from making incorrect decisions when information is incomplete. The highest priority safety alarm is the highest level alarm requiring immediate emergency measures to prevent major safety accidents. Emergency control commands are used for emergency shutdown, emergency stop, or switching to a safe mode. The request for immediate manual intervention is an emergency call requiring operators or maintenance personnel to immediately handle the situation on-site.

[0061] In the specific implementation, refer to Figure 4 Based on the arbitrated event type, the system executes a preset strategy template to generate specific, executable fusion decision events. A decision event is typically a structured data object containing alarm levels, notification messages, and a set of control instructions.

[0062] When the event type is a consistent anomaly event, it indicates that the system is highly confident that the anomaly has occurred and the root cause is clear. The decision events generated by the system will trigger high-confidence alarms (such as being highlighted on the monitoring screen) and automatically issue first-priority control optimization instructions. These instructions are based on a cause-effect graph for decision-making. For example, if it is determined that there is a feed blockage, a series of instructions will be automatically generated and executed, such as reducing the feeder frequency and briefly increasing the crusher speed to attempt to clear the blockage. The action logic can be represented as follows:

[0063] in It is an optimized sequence of operations derived from the causal dependency graph.

[0064] When the event type is a soft conflict event, it indicates that the system is in an uncertain state. In this case, the system will not rashly take major automatic control measures, but instead generates a decision event aimed at improving situational awareness and preventing misoperation. It will send a prompt requesting manual confirmation to the control panel, while automatically increasing the data sampling frequency of relevant sensors (such as camera frame rate and vibration sensor sampling rate) to obtain more detailed real-time data. Furthermore, it will restrict the permissions of some high-order automatic control actions, such as pausing the automatic optimization program and switching the control mode to manual priority. The strategy can be described as follows:

[0065] When the event type is a hard conflict event, it indicates that the system has detected a fundamental contradiction, which may mean that a critical sensor has failed or an extremely dangerous unknown malfunction has occurred. In this case, safety is the top priority. The system will immediately generate a high-priority safety alarm (such as an audible and visual alarm, SMS notification to the responsible person), and execute preset emergency control commands, such as triggering an emergency shutdown (E-Stop) or switching to a safe mode, to minimize the risk. Simultaneously, the system will strongly request immediate manual intervention for on-site troubleshooting and repair. The response mode is:

[0066] This hierarchical response mechanism ensures the rationality and security of the system's behavior under different levels of determinism.

[0067] Step S40: Based on the fusion decision event, drive the hierarchical state machine from the device level to the process level and then to the system level to perform state transition, obtain the transitioned state, and dynamically generate safety interlocking rules based on the transitioned state to obtain a control command sequence.

[0068] It's important to note that a hierarchical state machine is a mathematical model used to describe the behavioral patterns of a system at different levels (equipment, process, system). Each level contains a set of predefined states and rules for transitioning between states. Equipment-level state machines describe the operating state of a single physical device (such as a motor or valve). Process-level state machines describe the overall state of a complete technological unit (such as a crushing or sintering process) completed collaboratively by multiple devices. System-level state machines describe the macroscopic operating state of the entire production system. State transition refers to the process by which a state machine changes from its current state to a new state due to an external event (such as a fusion decision event). Safety interlock rules are logical conditions set to ensure production safety, used to force or prohibit certain equipment actions; they can be dynamically generated or adjusted based on the system state. Control command sequences are a set of ordered control commands that can be issued to specific equipment for execution, calculated from dynamically generated safety interlock rules.

[0069] Understandably, the fusion decision event serves as an external trigger signal, inputting into a hierarchical state machine model comprised of three levels: equipment, process, and system. The state machine transitions between states based on the event type and the current state, according to pre-defined transition rules. For example, a "hard conflict event" might trigger a transition from "running" to "emergency stop" at the equipment level, from "production" to "fault" at the process level, and from "automatic" to "manual intervention" at the system level. After the state transition is complete, the system calculates or matches a new set of safety interlocking rules in real time based on the new state combination (e.g., {equipment: emergency stop, process: fault, system: manual intervention}). These dynamic rules strictly constrain the generation logic of control commands, ensuring that the commands absolutely match the current safety situation. Ultimately, an ordered sequence of control commands (e.g., "stop feeder → shut down main motor → activate emergency brake") is generated and issued to the actuators, thereby achieving intelligent, safe, and adaptive control.

[0070] In one feasible implementation, the step of driving a hierarchical state machine from the device level to the process level and then to the system level to perform state transitions based on the fusion decision event, obtaining the transitioned state, and dynamically generating safety interlocking rules based on the transitioned state to obtain a control command sequence includes: Determine the event type and scope of influence of the fusion decision event, and update the device status of the corresponding device based on the event type and scope of influence to obtain the updated device status; Based on a hierarchical state machine from the equipment level to the process level and then to the system level, the updated equipment states of all equipment within the same process segment are aggregated to obtain the process segment aggregated state. Based on the preset process logic relationship, the aggregation state of the process segment is transitioned to obtain the transitioned state. Obtain the health assessment results and real-time load data of key equipment, and dynamically generate safety interlock rules based on the migrated status, the health assessment results, and the real-time load data; A sequence of control instructions is generated based on the valid safety interlock rules in the aforementioned safety interlock rules.

[0071] It should be noted that "event type" refers to the classification of fusion decision events, such as consistency anomaly, soft conflict, or hard conflict. "Scope of impact" refers to the specific equipment, process segment, or area affected by the event. "Equipment status" is the operating mode of a single piece of equipment, such as running, standby, faulty, or emergency stop. "Process segment aggregation status" is the overall status of a process segment obtained by integrating the statuses of all equipment within the same process segment through logical operations. "Preset process logic relationship" is a business rule describing the order and dependency of state transitions between different process segments under normal production, fault, or shutdown conditions. "Critical equipment" refers to equipment that has a significant impact on the continuity and safety of the production process. "Health assessment result" is a quantitative score of the current reliability status of the equipment based on equipment operating data, historical maintenance records, etc. "Real-time load data" refers to the instantaneous operating parameters of the equipment, such as current throughput, power, temperature, and pressure. "Effective safety interlock rules" refer to safety constraints that are activated in the current system state and need to be enforced.

[0072] In the specific implementation, refer to Figure 5 First, the system analyzes and merges decision events to extract their event types (such as hard conflict) and specific impact ranges (such as "conveyor belt No. 1" and "crusher"). Then, the system queries a predefined equipment status mapping table based on the event type and updates the equipment status of the affected equipment to the corresponding status (such as setting the equipment status to "emergency stop").

[0073] Next, the system performs bottom-up state aggregation and transition based on the hierarchical state machine model. For each process segment, its aggregated process segment state... The status of all devices within this segment is determined by an aggregation function. Calculations show that, for example

[0074] in, It is the polymerization state of the process segment. It is the first The updated status of each device, aggregate function Use logical AND or OR operations (e.g., "if any equipment fails, the process section status is faulty").

[0075] Then, the system performs state transitions based on preset process logic relationships. These logic relationships can be represented as a state transition diagram or a set of rules. The system applies rules based on the current polymerization status of all process segments. Derive the new system-level state . This is the top-level state after the migration.

[0076] During the generation of security interlocking rules, the system incorporates the migrated state. Health assessment results of key equipment (A value between 0 and 1) and real-time load data The rules are calculated using a dynamic rule engine. The rule generation logic can be represented as follows:

[0077] function It will select a basic rule template based on the status and utilize... and The thresholds or conditions in the rules are dynamically adjusted (e.g., if the equipment health is low, its maximum allowable load threshold is reduced).

[0078] Finally, the system selects the rules that are active in the current state from all dynamically generated safety interlock rules; these are the valid safety interlock rules. These valid rules are then compiled into specific, executable sequences of control instructions. And then send it to the actuator.

[0079] In one feasible implementation, the step of dynamically generating safety interlock rules based on the migrated state, the health assessment result, and the real-time load data includes: Obtain the set of baseline security interlocking rules corresponding to the migrated state; The parameter thresholds in the baseline safety interlock rule set are adjusted based on the health assessment results to obtain the adjusted parameter thresholds; Based on the real-time load data, the equipment start-up and shutdown sequence and process switching logic in the baseline safety interlock rule set are optimized to obtain optimized logic rules; By combining the adjusted parameter thresholds and the optimized logic rules, a safety interlocking rule is generated.

[0080] It should be noted that the baseline safety interlock rule set is a set of standard safety rule templates preset for a specific system state (such as "normal operation" or "emergency shutdown"), containing fixed parameter thresholds and equipment action logic. Parameter thresholds are the critical values ​​used in the rules to determine whether to trigger interlock actions, such as maximum pressure and maximum temperature. Adjusted parameter thresholds are new critical values ​​obtained by flexibly correcting the baseline thresholds based on equipment health. Equipment start-up / shutdown sequence and process switching logic define the sequential dependencies of a series of equipment starts or stops under specific operating conditions, as well as the rules for transitioning production process paths. Optimized logic rules are a more efficient and safer equipment collaborative working sequence obtained by fine-tuning the baseline logic in conjunction with real-time system load.

[0081] In the specific implementation, firstly, the system uses the migrated state (such as "system level: degraded operation") as an index to retrieve the corresponding set of baseline security interlocking rules from the rule base. These rules are static templates, such as "if the crusher current..." Threshold "Then the feeder will be stopped."

[0082] Next, the system assesses the health status of key equipment. (A nominal value of 1 indicates perfect health) The parameter thresholds in the baseline rules are dynamically adjusted. The adjustment formula can be expressed as:

[0083] in, It is the adjusted parameter threshold. It is the baseline parameter threshold. It is the result of the health assessment ( ), It is an adjustment factor (usually) This is used to control the sensitivity of health status to the impact of thresholds. This means that the worse the device's health status, the lower the trigger threshold of its related protective rules will be set, thereby intervening in advance and reducing the risk of failure.

[0084] Then, the system will base its decisions on real-time load data. Optimize the device start-up / shutdown sequence and process switching logic (e.g., the current total system throughput). For example, under high load... Under normal circumstances, the shutdown logic might be optimized to first quickly cut off the feed and then stop the main unit to avoid blockages; while at low loads... In such cases, a more gradual shutdown sequence can be adopted to save energy. This process can be described as an optimization function. ,in It is a rule engine or algorithm based on load optimization logic.

[0085] Finally, the system injects the adjusted parameter thresholds into the rule template and integrates them with the optimized logical rules to ultimately generate dynamic safety interlocking rules suitable for the current specific working condition. This rule set reflects both the changing warning lines based on equipment health and the operational procedures adapted to real-time production rhythms.

[0086] Step S50: Perform safety constraint verification on the control command sequence to obtain the verification result. When the verification result is the preset verification result, issue the control command sequence to carry out intelligent production management of mine crushing and screening.

[0087] It should be noted that safety constraint verification refers to the process of simulating and verifying the logical consistency and safety of a sequence of control commands to be issued, using a set of predefined, inviolable safety boundary conditions. The preset verification result refers to the pass / fail standard that the verification process needs to achieve, typically meaning that all safety constraints are met and the command sequence has no conflicts or dangerous operations. Intelligent production management in mining crushing and screening refers to the actual control of equipment such as crushers, screening machines, and conveyors through the issuance of verified control command sequences, achieving automatic, safe, and efficient operation of the production process.

[0088] Understandably, safety constraint verification is typically performed in a separate, high-priority sandbox environment or simulation module. This module loads a real-time snapshot of the entire production system's status (including the status of all equipment, process segment aggregation status, material positions, etc.) as initial conditions. The verification engine then pre-executes the control instruction sequence step by step, comparing each operation and its resulting state changes in real time to ensure they conform to a pre-defined safety constraint library. These constraints include, but are not limited to: equipment interlocks (e.g., the upstream feeder cannot stop when the crusher is running), process sequence constraints (e.g., the conveyor belt below the screening machine must be running before the screening machine starts), physical limit constraints (e.g., the motor starting frequency cannot exceed limits), and environmental safety constraints (e.g., the emergency stop button has the highest priority). The verification process generates a detailed report as the verification result. Only if all instructions pass the verification (i.e., the verification result is the pre-defined "pass" state) will the system safely send the instruction sequence to the field PLC or DCS for execution. If any operation violates a constraint, the verification will immediately terminate, trigger an alarm, and simultaneously feed back the failed instruction and the specific constraint violated to the upper-level system for replanning and decision-making.

[0089] In one feasible implementation, the step of performing security constraint verification on the control command sequence to obtain the verification result includes: Verify whether the controlled object in the control command sequence exists and is in a remotely operable mode, and obtain the control object verification result; Verify whether the control parameters in the control command sequence are within the safe operating range allowed by the equipment, and obtain the control parameter verification result; Verify whether the execution of the control command sequence violates the current process interlock logic and the status of upstream and downstream equipment, and obtain the execution status verification result; The verification result is obtained based on the verification result of the controlled object, the verification result of the control parameters, and the verification result of the execution status.

[0090] It should be noted that a control command sequence refers to a set of instructions arranged according to specific logic and timing for the automated control of production equipment such as mining crushing and screening equipment. The controlled object is the physical equipment or system specified in the control command sequence that receives and executes the instructions. Remote operation mode means that the equipment is ready to receive automated instructions from the central control system, rather than being in a local manual or maintenance state. Control parameters are the specific operational values ​​set in the control command sequence, such as motor speed and valve opening. The permissible safe operating range of the equipment is the upper and lower limits of parameters specified by the equipment manufacturer or process design to ensure safe operation of the equipment. Process interlocking logic is a constraint rule set according to production process requirements to ensure that equipment works collaboratively in a safe sequence. Upstream and downstream equipment status refers to the real-time operating status of the front-end and back-end equipment directly related to the current controlled object in the process flow.

[0091] In the specific implementation, refer to Figure 6 The verification process is executed by an independent safety verification service, which maintains a real-time status database and safety rule database for all equipment in the plant. First, by querying the equipment management module, it verifies the existence of each controlled object ID in the instruction sequence and whether it is marked as "online" or "remotely controllable" in the database, ruling out erroneous operations on offline or manually controlled equipment. Second, it compares the control parameters in the instruction (such as the set frequency) with the preset safe operating ranges (such as minimum-maximum frequency) of each device in the database in real time to ensure there is no risk of exceeding limits. Most importantly, it performs status verification. The system calls the interlocking logic engine to "pre-play" the instruction sequence in the context of the current real-time status of the entire production system, dynamically checking whether each operation will violate the established interlocking conditions. For example, when performing the "start crusher" instruction, it verifies whether the upstream feeder and downstream belt conveyor are already running or ready. The three verification results are then logically ANDed; if all pass, a final result of "verification successful" is generated.

[0092] In one feasible implementation, the intelligent production management method for mine crushing and screening further includes: By associating the equipment operating parameters, abnormal event records, maintenance work orders, and component replacement records in the time-series correlation data, component feature information is obtained; Extract feature parameters characterizing the degradation trend of the component from the component feature information; The current health level is calculated based on the characteristic parameters, and a prediction is made based on the current health level to obtain the remaining usable lifespan prediction value; Based on the predicted remaining usable life and production plan, calculate the demand probability of each spare part within a specific future time window; Based on the demand probability, current inventory information, and procurement lead time, generate procurement suggestions, allocation instructions, or inventory reservation instructions for spare parts to manage spare parts.

[0093] It should be noted that component characteristic information refers to integrated information formed by combining multi-source data such as equipment operating parameters, abnormal events, maintenance records, and component replacement records, which can comprehensively describe the historical status and maintenance history of key components. Characteristic parameters are extracted from component characteristic information and are key indicators that quantify the trend of component performance degradation or damage aggravation, such as the slow upward trend of vibration amplitude and the gradual decline rate of working efficiency. Current health is a value between 0 and 100%, used to intuitively represent the component's condition relative to its brand-new state at the current moment. Remaining usable life prediction is the estimated operating time of the component from the current moment until it reaches an unusable state or failure threshold, estimated by a predictive model based on current health and degradation trends. Demand probability is a quantitative assessment of the likelihood of needing to replace the spare part within a future time window, usually a percentage value. Procurement lead time is the average time period required from initiating a purchase order to the spare part being available in the warehouse.

[0094] In its implementation, the system first uses a data association service to align and fuse real-time operating parameters from the SCADA system (such as motor current and bearing temperature), abnormal downtime records from the MES system, and maintenance work order details and component replacement history from the EAM system, forming a full lifecycle data view for each key component. Subsequently, the feature engineering module extracts wear and fatigue-related degradation features from these time-series data, such as the root mean square trend of vibration signals and the efficiency decay slope of operating cycles. These feature parameters are input into a pre-trained machine learning model (such as a regression model, survival analysis model, or LSTM neural network). This model outputs a quantified current health score and extrapolates its degradation curve, intersecting it with a preset failure threshold to calculate the remaining usable life. Combining the prediction results with future production plans, the system uses probabilistic models (such as Weibull distribution or Monte Carlo simulation) to assess the probability of needing to replace spare parts due to predictive failure within the considered production cycle. Finally, the intelligent inventory management module performs a comprehensive optimization calculation based on this demand probability, current inventory level, safety stock threshold, and supplier procurement lead time, and automatically generates suggestions: for spare parts with high probability and low inventory, an emergency purchase order is generated; for spare parts already in the warehouse, an inter-operation area transfer instruction may be generated or an inventory pre-positioning instruction may be generated before planned downtime maintenance, so as to achieve accurate spare parts replenishment and optimized configuration.

[0095] In one feasible implementation, the step of generating a spare parts procurement suggestion, allocation instruction, or inventory pre-positioning instruction based on the demand probability, current inventory information, and procurement lead time includes: Identify multiple devices that use the same model of spare parts, determine the component degradation trend of the devices, and associate the component degradation trends of each device to obtain the association result; When the correlation result shows that multiple devices exhibit a synchronous degradation trend, the batch demand for spare parts for the corresponding model of the device is calculated based on the demand probability. Based on the batch demand for spare parts, current inventory information, and procurement lead time, generate batch procurement suggestions, cross-warehouse transfer instructions, or inventory pre-positioning instructions.

[0096] It should be noted that synchronous degradation trend refers to the high similarity and temporal proximity of the rate of health decline or failure characteristic evolution patterns of components of the same model in multiple devices under the same working environment or operating cycle. Spare parts batch demand refers to the aggregated demand calculated based on the predicted potential replacement needs of multiple devices for that model of spare parts within a similar future timeframe after identifying synchronous degradation trends. Batch purchasing recommendations are centralized purchasing schemes proposed based on aggregated spare parts batch demand to leverage economies of scale (such as discounts) and reduce purchasing frequency. Cross-warehouse transfer instructions refer to internal material allocation instructions generated to balance inventory and ensure production continuity when a shortage of a particular model of spare parts is expected in one warehouse, while another warehouse has sufficient inventory. Inventory pre-positioning instructions refer to the operation of reserving specific spare parts in advance in the inventory management system for known, upcoming maintenance tasks before the physical release of spare parts, to prevent them from being used by other tasks.

[0097] In its implementation, the system first automatically clusters all equipment using the same spare parts model from the component model's component list. Then, the trend analysis engine calculates the health time-series curves for each component of each device in the list in parallel, and uses time-series similarity analysis algorithms (such as Dynamic Time Warping (DTW) or Pearson correlation coefficient) to perform correlation calculations on these curves, identifying clusters of devices whose health is synchronously and rapidly declining. When the correlation results confirm a significant synchronous degradation trend, the system aggregates the spare parts demand probabilities of these individual devices and uses methods such as convolution or Monte Carlo simulation to calculate the total demand distribution for that spare parts model within a future critical time window (such as a major overhaul period), thereby determining the optimal spare parts batch demand. The inventory optimization engine then compares the batch demand with the current real-time inventory, safety stock threshold, and procurement lead time of each warehouse: if the total inventory is much lower than the batch demand, it generates a batch procurement suggestion with the expected procurement quantity to strive for business discounts; if a warehouse in a certain region is running low on inventory while other warehouses have surplus, it generates a cross-warehouse transfer instruction; for equipment with a clear maintenance plan, it immediately generates an inventory pre-positioning instruction to lock the required spare parts to a specific work order, thereby achieving lean collaborative inventory management.

[0098] This embodiment provides an intelligent production management method for mine crushing and screening. It collects multi-source heterogeneous data from multiple business systems, performs unified object association at the equipment-component-spare part level, forming time-series correlated data. Causal dependency verification and time-series alignment are performed on the data to generate causal consistency data. Based on this, confidence fusion and conflict arbitration are performed on visual and process control anomaly events to generate fused decision events. These events drive the state transition of a hierarchical state machine, dynamically generating safety interlocking rules and control command sequences. Finally, the control command sequences are verified for safety before being issued for execution. Through this method, collaborative analysis and decision fusion of multi-source sensing information are achieved, improving the accuracy and response speed of anomaly identification, and enhancing the adaptive safety control capability of the production system through dynamic interlocking and state transition mechanisms.

[0099] It should be noted that the above examples are only for understanding this application and do not constitute a limitation on the intelligent production management method for mine crushing and screening in this application. Any simple modifications based on this technical concept are within the scope of protection of this application.

[0100] This application also provides an intelligent production management system for mine crushing and screening; please refer to [reference needed]. Figure 7 The intelligent production management system for mine crushing and screening includes: The data integration module 10 is used to collect multi-source heterogeneous data from the production process control system, visual monitoring system, production execution system, equipment maintenance system and warehouse management system, and perform unified object association on the multi-source heterogeneous data based on the preset equipment-component-spare part hierarchical relationship to obtain time-series associated data with unified identification. Causal alignment module 20 is used to perform causal dependency verification and time-series alignment processing on the time-series associated data to obtain causal consistency data. The causal dependency is the expected time-series logic between control commands, equipment operating parameters and visual observation events. The decision arbitration module 30 is used to perform confidence fusion and conflict arbitration on visual abnormal events and production process control abnormal events based on the causal consistency data to obtain fused decision events. The state control module 40 is used to drive the hierarchical state machine from the device level to the process level and then to the system level to perform state transition according to the fusion decision event, obtain the transitioned state, and dynamically generate safety interlock rules based on the transitioned state to obtain a control instruction sequence. The safety execution module 50 is used to perform safety constraint verification on the control command sequence, obtain the verification result, and issue the control command sequence to carry out intelligent production management of mine crushing and screening when the verification result is a preset verification result.

[0101] In one feasible implementation, the causal alignment module 20 is further configured to construct a causal dependency graph based on the production process logic, starting from the control command, sequentially passing through the actuator action, equipment operating parameter changes, visual observation events, and finally the process result event, and configure an allowed time response window for each dependency relationship in the causal dependency graph. Match the event instances in the time-series correlation data with the nodes in the causal dependency graph, and verify whether the actual time sequence of the event instances conforms to the causal dependency relationship corresponding to the node; Event data that conforms to the causal dependency relationship and the time response window are marked as high-confidence data; All high-confidence data are aggregated and time-series aligned to obtain causal consistency data.

[0102] In one feasible implementation, the decision arbitration module 30 is further used to extract, from the causal consistency data, the visual anomaly confidence level, visual anomaly type and visual anomaly duration of the visual anomaly event corresponding to the monitoring target, as well as the production process control anomaly confidence level and production process control anomaly parameter offset of the production process control anomaly event, respectively. Obtain historical false alarm rate and data quality score. Based on the historical false alarm rate and data quality score, perform weighted correction on the confidence level of visual anomaly and the confidence level of production process control anomaly to obtain the corrected confidence level of visual anomaly and the corrected confidence level of production process control. The comprehensive confidence level is obtained by weighting and fusing the corrected visual anomaly confidence level and the corrected production process control confidence level. Based on the comparison result of the comprehensive confidence level and the preset threshold, the visual anomaly type, the duration of the visual anomaly, and the offset of the production process control anomaly parameter, conflict arbitration is performed on the visual anomaly event and the production process control anomaly event to obtain the event type; Based on the event type, a corresponding fusion decision event is generated.

[0103] In one feasible implementation, the decision arbitration module 30 is further configured to generate a fused decision event containing high-confidence alarm information and a first-priority control optimization instruction when the event type is the consistent abnormal event; When the event type is the soft conflict event, a second priority fusion decision event is generated, which includes a prompt message requesting manual confirmation, an instruction to increase the data sampling frequency, and a restriction on some automatic control actions. When the event type is the hard conflict event, a fusion decision event is generated that includes the highest priority security alarm, emergency control command, and request for immediate human intervention.

[0104] In one feasible implementation, the state control module 40 is further configured to determine the event type and scope of influence of the fusion decision event, and update the device status of the corresponding device based on the event type and scope of influence to obtain the updated device status; Based on a hierarchical state machine from the equipment level to the process level and then to the system level, the updated equipment states of all equipment within the same process segment are aggregated to obtain the process segment aggregated state. Based on the preset process logic relationship, the aggregation state of the process segment is transitioned to obtain the transitioned state. Obtain the health assessment results and real-time load data of key equipment, and dynamically generate safety interlock rules based on the migrated status, the health assessment results, and the real-time load data; A sequence of control instructions is generated based on the valid safety interlock rules in the aforementioned safety interlock rules.

[0105] In one feasible implementation, the state control module 40 is further configured to acquire a set of baseline security interlocking rules corresponding to the migrated state; The parameter thresholds in the baseline safety interlock rule set are adjusted based on the health assessment results to obtain the adjusted parameter thresholds; Based on the real-time load data, the equipment start-up and shutdown sequence and process switching logic in the baseline safety interlock rule set are optimized to obtain optimized logic rules; By combining the adjusted parameter thresholds and the optimized logic rules, a safety interlocking rule is generated.

[0106] In one feasible implementation, the security execution module 50 is further used to verify whether the controlled object in the control instruction sequence exists and is in a remotely operable mode, and to obtain the control object verification result. Verify whether the control parameters in the control command sequence are within the safe operating range allowed by the equipment, and obtain the control parameter verification result; Verify whether the execution of the control command sequence violates the current process interlock logic and the status of upstream and downstream equipment, and obtain the execution status verification result; The verification result is obtained based on the verification result of the controlled object, the verification result of the control parameters, and the verification result of the execution status.

[0107] In one feasible implementation, the safety execution module 50 is further used to associate the equipment operating parameters, abnormal event records, maintenance work orders and component replacement records in the time-series association data to obtain component feature information; Extract feature parameters characterizing the degradation trend of the component from the component feature information; The current health level is calculated based on the characteristic parameters, and a prediction is made based on the current health level to obtain the remaining usable lifespan prediction value; Based on the predicted remaining usable life and production plan, calculate the demand probability of each spare part within a specific future time window; Based on the demand probability, current inventory information, and procurement lead time, generate procurement suggestions, allocation instructions, or inventory reservation instructions for spare parts to manage spare parts.

[0108] In one feasible implementation, the safety execution module 50 is further configured to identify multiple devices using the same model of spare parts, determine the component degradation trend of the devices, and associate the component degradation trends of each device to obtain an association result; When the correlation result shows that multiple devices exhibit a synchronous degradation trend, the batch demand for spare parts for the corresponding model of the device is calculated based on the demand probability. Based on the batch demand for spare parts, current inventory information, and procurement lead time, generate batch procurement suggestions, cross-warehouse transfer instructions, or inventory pre-positioning instructions.

[0109] The intelligent production management system for mine crushing and screening provided in this application, employing the intelligent production management method for mine crushing and screening described in the above embodiments, can solve the technical problems of insufficient multi-source data fusion, model collaboration, intelligent central control, predictive maintenance, and spare parts linkage in the mine crushing and screening production stage. Compared with the prior art, the beneficial effects of the intelligent production management system for mine crushing and screening provided in this application are the same as those of the intelligent production management method for mine crushing and screening provided in the above embodiments, and other technical features in the intelligent production management system for mine crushing and screening are the same as those disclosed in the methods of the above embodiments, and will not be repeated here.

[0110] This application provides an intelligent production management device for mine crushing and screening, which includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to execute the intelligent production management method for mine crushing and screening in the above embodiment 1.

[0111] The following is for reference. Figure 8The diagram illustrates a structural schematic suitable for implementing the intelligent production management equipment for mine crushing and screening in the embodiments of this application. The intelligent production management equipment for mine crushing and screening in the embodiments of this application may include, but is not limited to, mobile terminals such as mobile phones, laptops, tablets, digital broadcast receivers, PDAs (Personal Digital Assistants), PMPs (Portable Media Players), vehicle terminals (e.g., vehicle navigation terminals), and fixed terminals such as digital TVs and desktop computers. Figure 8 The intelligent production management equipment for crushing and screening in mines shown is merely an example and should not impose any limitations on the functionality and scope of use of the embodiments of this application.

[0112] like Figure 8 As shown, the intelligent production management equipment for mine crushing and screening may include a processing unit 1001 (e.g., a central processing unit, a graphics processor, etc.), which can perform various appropriate actions and processes according to the program stored in ROM (Read Only Memory) 1002 or the program loaded from storage device 1003 into RAM (Random Access Memory) 1004. RAM 1004 also stores various programs and data required for the operation of the intelligent production management equipment for mine crushing and screening. The processing unit 1001, ROM 1002, and RAM 1004 are interconnected via bus 1005. Input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to I / O interface 1006: input devices 1007 including, for example, touchscreens, touchpads, keyboards, mice, image sensors, microphones, accelerometers, gyroscopes, etc.; output devices 1008 including, for example, LCDs (Liquid Crystal Displays), speakers, vibrators, etc.; storage devices 1003 including, for example, magnetic tapes, hard disks, etc.; and communication devices 1009. Communication device 1009 allows the intelligent production management equipment for mine crushing and screening to exchange data wirelessly or via wired communication with other devices. Although the figure shows intelligent production management equipment for mine crushing and screening with various systems, it should be understood that it is not required to implement or possess all the systems shown. More or fewer systems can be implemented alternatively.

[0113] Specifically, according to the embodiments disclosed in this application, the processes described above with reference to the flowcharts can be implemented as computer software programs. For example, embodiments disclosed in this application include a computer program product comprising a computer program carried on a computer-readable medium, the computer program containing program code for performing the methods shown in the flowcharts. In such embodiments, the computer program can be downloaded and installed from a network via a communication device, or installed from storage device 1003, or installed from ROM 1002. When the computer program is executed by processing device 1001, it performs the functions defined in the methods of the embodiments disclosed in this application.

[0114] The intelligent production management equipment for mine crushing and screening provided in this application, employing the intelligent production management method for mine crushing and screening described in the above embodiments, can solve the technical problems of intelligent production management for mine crushing and screening. Compared with the prior art, the beneficial effects of the intelligent production management equipment for mine crushing and screening provided in this application are the same as those of the intelligent production management method for mine crushing and screening provided in the above embodiments, and other technical features of this intelligent production management equipment are the same as those disclosed in the method of the previous embodiment, and will not be repeated here.

[0115] It should be understood that the various parts disclosed in this application can be implemented using hardware, software, firmware, or a combination thereof. In the description of the above embodiments, specific features, structures, materials, or characteristics can be combined in any suitable manner in one or more embodiments or examples.

[0116] The above are merely specific embodiments of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

[0117] This application provides a computer-readable storage medium having computer-readable program instructions (i.e., a computer program) stored thereon, which are used to execute the intelligent production management method for mine crushing and screening in the above embodiments.

[0118] The computer-readable storage medium provided in this application may be, for example, a USB flash drive, but is not limited to, electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or any combination thereof. More specific examples of computer-readable storage media may include, but are not limited to: electrical connections having one or more wires, portable computer disks, hard disks, RAM (Random Access Memory), ROM (Read Only Memory), EPROM (Erasable Programmable Read Only Memory or Flash Memory), optical fibers, CD-ROM (CD-Read Only Memory), optical storage devices, magnetic storage devices, or any suitable combination thereof. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, system, or device. The program code contained on the computer-readable storage medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination thereof.

[0119] The aforementioned computer-readable storage medium may be included in the intelligent production management equipment for mining crushing and screening; or it may exist independently and not be assembled into the intelligent production management equipment for mining crushing and screening.

[0120] The aforementioned computer-readable storage medium carries one or more programs. When the aforementioned one or more programs are executed by the intelligent production management equipment for mining crushing and screening, the intelligent production management equipment for mining crushing and screening will: collect multi-source heterogeneous data from the production process control system, visual monitoring system, production execution system, equipment maintenance system, and warehouse management system, and perform unified object association on the multi-source heterogeneous data based on the preset equipment-component-spare part hierarchical relationship to obtain time-series associated data with a unified identifier; The time-series correlation data is subjected to causal dependency verification and time-series alignment processing to obtain causal consistency data. The causal dependency is the expected time-series logic between control commands, equipment operating parameters and visual observation events. Based on the aforementioned causal consistency data, confidence fusion and conflict arbitration are performed on visual anomaly events and production process control anomaly events to obtain fused decision events. Based on the fusion decision event, the hierarchical state machine from the device level to the process level and then to the system level is driven to perform state transition, obtain the transitioned state, and dynamically generate safety interlock rules based on the transitioned state to obtain a control command sequence. The control command sequence is subjected to safety constraint verification to obtain the verification result. When the verification result is the preset verification result, the control command sequence is issued to carry out intelligent production management of mine crushing and screening.

[0121] Computer program code for performing the operations of this application can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, and C++, as well as conventional procedural programming languages ​​such as the "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network—including LAN (Local Area Network) or WAN (Wide Area Network)—or can be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0122] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of this application. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code containing one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions indicated in the blocks may occur in a different order than those indicated in the drawings. For example, two consecutively indicated blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in the block diagrams and / or flowcharts, and combinations of blocks in the block diagrams and / or flowcharts, can be implemented using a dedicated hardware-based system that performs the specified function or operation, or using a combination of dedicated hardware and computer instructions.

[0123] The modules described in the embodiments of this application can be implemented in software or hardware. The names of the modules do not necessarily limit the functionality of the unit itself.

[0124] The readable storage medium provided in this application is a computer-readable storage medium that stores computer-readable program instructions (i.e., a computer program) for executing the above-described intelligent production management method for mine crushing and screening, and can solve the technical problems of intelligent production management for mine crushing and screening. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in this application are the same as the beneficial effects of the intelligent production management method for mine crushing and screening provided in the above embodiments, and will not be repeated here.

[0125] This application also provides a computer program product, including a computer program that, when executed by a processor, implements the steps of the intelligent production management method for mine crushing and screening as described above.

[0126] The computer program product provided in this application can solve the technical problems of insufficient multi-source data fusion, model collaboration, intelligent central control, predictive maintenance, and spare parts linkage in the mining crushing and screening production stage. Compared with the prior art, the beneficial effects of the computer program product provided in this application are the same as those of the intelligent production management method for mining crushing and screening provided in the above embodiments, and will not be repeated here.

[0127] The above are only some embodiments of this application and do not limit the patent scope of this application. All equivalent structural transformations made under the technical concept of this application and using the contents of the specification and drawings of this application, or direct / indirect applications in other related technical fields, are included in the patent protection scope of this application.

Claims

1. A method for intelligent production management of crushing and screening in mines, characterized in that, The intelligent production management method for mine crushing and screening includes: Multi-source heterogeneous data from production process control systems, visual monitoring systems, production execution systems, equipment maintenance systems, and warehouse management systems are collected, and the multi-source heterogeneous data are uniformly associated based on a preset equipment-component-spare part hierarchical relationship to obtain time-series associated data with a unified identifier. The time-series correlation data is subjected to causal dependency verification and time-series alignment processing to obtain causal consistency data. The causal dependency is the expected time-series logic between control commands, equipment operating parameters and visual observation events. Based on the aforementioned causal consistency data, confidence fusion and conflict arbitration are performed on visual anomaly events and production process control anomaly events to obtain fused decision events. Based on the fusion decision event, the hierarchical state machine from the device level to the process level and then to the system level is driven to perform state transition, obtain the transitioned state, and dynamically generate safety interlock rules based on the transitioned state to obtain a control command sequence. The control command sequence is subjected to safety constraint verification to obtain the verification result. When the verification result is the preset verification result, the control command sequence is issued to carry out intelligent production management of mine crushing and screening.

2. The method as described in claim 1, characterized in that, The step of performing causal dependency verification and time-series alignment on the time-series correlated data to obtain causal consistent data includes: Based on the production process logic, a causal dependency graph is constructed, starting from the control command and proceeding sequentially through the actions of the actuator, changes in equipment operating parameters, visual observation events, and finally to the process result events. An allowable time response window is configured for each dependency relationship in the causal dependency graph. Match the event instances in the time-series correlation data with the nodes in the causal dependency graph, and verify whether the actual time sequence of the event instances conforms to the causal dependency relationship corresponding to the node; Event data that conforms to the causal dependency relationship and the time response window are marked as high-confidence data; All high-confidence data are aggregated and time-series aligned to obtain causal consistency data.

3. The method as described in claim 1, characterized in that, The steps of performing confidence fusion and conflict arbitration on visual anomaly events and production process control anomaly events based on the causal consistency data to obtain fused decision events include: For the same monitoring target, the visual anomaly confidence, visual anomaly type and visual anomaly duration of the visual anomaly event corresponding to the monitoring target are extracted from the causal consistency data, as well as the production process control anomaly confidence and production process control anomaly parameter offset of the production process control anomaly event. Obtain historical false alarm rate and data quality score. Based on the historical false alarm rate and data quality score, perform weighted correction on the confidence level of visual anomaly and the confidence level of production process control anomaly to obtain the corrected confidence level of visual anomaly and the corrected confidence level of production process control. The comprehensive confidence level is obtained by weighting and fusing the corrected visual anomaly confidence level and the corrected production process control confidence level. Based on the comparison result of the comprehensive confidence level and the preset threshold, the visual anomaly type, the duration of the visual anomaly, and the offset of the production process control anomaly parameter, conflict arbitration is performed on the visual anomaly event and the production process control anomaly event to obtain the event type; Based on the event type, a corresponding fusion decision event is generated.

4. The method as described in claim 3, characterized in that, The event types include consistent anomaly events, soft conflict events, or hard conflict events, and the step of generating corresponding fusion decision events based on the event types includes: When the event type is the consistent abnormal event, a fusion decision event containing high-confidence alarm information and first-priority control optimization instructions is generated; When the event type is the soft conflict event, a second priority fusion decision event is generated, which includes a prompt message requesting manual confirmation, an instruction to increase the data sampling frequency, and a restriction on some automatic control actions. When the event type is the hard conflict event, a fusion decision event is generated that includes the highest priority security alarm, emergency control command, and request for immediate human intervention.

5. The method as described in claim 1, characterized in that, The steps of driving a hierarchical state machine from the device level to the process level and then to the system level to perform state transitions based on the fusion decision event, obtaining the transitioned state, and dynamically generating safety interlocking rules based on the transitioned state to obtain a control command sequence include: Determine the event type and scope of influence of the fusion decision event, and update the device status of the corresponding device based on the event type and scope of influence to obtain the updated device status; Based on a hierarchical state machine from the equipment level to the process level and then to the system level, the updated equipment states of all equipment within the same process segment are aggregated to obtain the process segment aggregated state. Based on the preset process logic relationship, the aggregation state of the process segment is transitioned to obtain the transitioned state. Obtain the health assessment results and real-time load data of key equipment, and dynamically generate safety interlock rules based on the migrated status, the health assessment results, and the real-time load data; A sequence of control instructions is generated based on the valid safety interlock rules in the aforementioned safety interlock rules.

6. The method as described in claim 5, characterized in that, The steps for dynamically generating safety interlock rules based on the migrated status, the health assessment results, and the real-time load data include: Obtain the set of baseline security interlocking rules corresponding to the migrated state; The parameter thresholds in the baseline safety interlock rule set are adjusted based on the health assessment results to obtain the adjusted parameter thresholds; Based on the real-time load data, the equipment start-up and shutdown sequence and process switching logic in the baseline safety interlock rule set are optimized to obtain optimized logic rules; By combining the adjusted parameter thresholds and the optimized logic rules, a safety interlocking rule is generated.

7. The method as described in claim 1, characterized in that, The steps for performing security constraint verification on the control command sequence and obtaining the verification result include: Verify whether the controlled object in the control command sequence exists and is in a remotely operable mode, and obtain the control object verification result; Verify whether the control parameters in the control command sequence are within the safe operating range allowed by the equipment, and obtain the control parameter verification result; Verify whether the execution of the control command sequence violates the current process interlock logic and the status of upstream and downstream equipment, and obtain the execution status verification result; The verification result is obtained based on the verification result of the controlled object, the verification result of the control parameters, and the verification result of the execution status.

8. The method as described in claim 1, characterized in that, The intelligent production management method for mine crushing and screening also includes: By associating the equipment operating parameters, abnormal event records, maintenance work orders, and component replacement records in the time-series correlation data, component feature information is obtained; Extract feature parameters characterizing the degradation trend of the component from the component feature information; The current health level is calculated based on the characteristic parameters, and a prediction is made based on the current health level to obtain the remaining usable lifespan prediction value; Based on the predicted remaining usable life and production plan, calculate the demand probability of each spare part within a specific future time window; Based on the demand probability, current inventory information, and procurement lead time, generate procurement suggestions, allocation instructions, or inventory reservation instructions for spare parts to manage spare parts.

9. The method as described in claim 8, characterized in that, The steps for generating spare parts procurement suggestions, allocation instructions, or inventory pre-positioning instructions based on the demand probability, current inventory information, and procurement lead time include: Identify multiple devices that use the same model of spare parts, determine the component degradation trend of the devices, and associate the component degradation trends of each device to obtain the association result; When the correlation result shows that multiple devices exhibit a synchronous degradation trend, the batch demand for spare parts for the corresponding model of the device is calculated based on the demand probability. Based on the batch demand for spare parts, current inventory information, and procurement lead time, generate batch procurement suggestions, cross-warehouse transfer instructions, or inventory pre-positioning instructions.

10. A smart production management system for mine crushing and screening, characterized in that, The intelligent production management system for mine crushing and screening includes: The data integration module is used to collect multi-source heterogeneous data from the production process control system, visual monitoring system, production execution system, equipment maintenance system and warehouse management system, and perform unified object association on the multi-source heterogeneous data based on the preset equipment-component-spare part hierarchical relationship to obtain time-series associated data with unified identification. The causal alignment module is used to perform causal dependency verification and time-series alignment processing on the time-series associated data to obtain causal consistency data. The causal dependency is the expected time-series logic between control commands, equipment operating parameters and visual observation events. The decision arbitration module is used to perform confidence fusion and conflict arbitration on visual anomaly events and production process control anomaly events based on the causal consistency data to obtain fused decision events; The state control module is used to drive the hierarchical state machine from the device level to the process level and then to the system level to perform state transitions according to the fusion decision event, obtain the transitioned state, and dynamically generate safety interlock rules based on the transitioned state to obtain a control instruction sequence. The safety execution module is used to perform safety constraint verification on the control command sequence, obtain the verification result, and issue the control command sequence to carry out intelligent production management of mine crushing and screening when the verification result is a preset verification result.