A heavy steel structure factory green construction digital simulation system

By using fully parametric digital twin modeling and multiphysics coupled simulation, combined with full life cycle carbon emission and resource consumption simulation, multi-objective collaborative optimization of the construction process of heavy steel structure workshops was achieved, solving the problem of imbalance in construction indicators in existing technologies and improving the systematic nature of construction accuracy and green construction.

CN123140785APending Publication Date: 2026-11-20CHINA CONSTR SECOND ENG BUREAU LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611032747.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-13
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The existing digital simulation system for the construction of heavy steel structure workshops has failed to achieve multi-physics field coupling simulation and synergistic optimization of carbon emissions and resource consumption, making it difficult to meet the refined management and control requirements of the entire green construction process, and the simulation of construction process and the optimization of green construction indicators have not been linked.

Method used

The system employs fully parametric digital twin modeling, multi-physics coupled simulation, full life-cycle carbon emission and resource consumption simulation, and digital simulation and optimization modules for construction technology. Combined with a multi-objective comprehensive optimization model and synchronous virtual-real interaction and closed-loop optimization management, it achieves data interoperability and collaborative linkage among the modules.

Benefits of technology

It has realized the fusion and application of multi-dimensional simulation data in the construction process of heavy steel structure workshops, forming a closed-loop management and control of simulation analysis, scheme optimization and on-site execution, and synergistically optimizing carbon emissions, resource consumption, structural safety and construction efficiency, thereby improving the systematic nature of construction accuracy and green construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140785A_ABST
    Figure CN123140785A_ABST
Patent Text Reader

Abstract

This invention discloses a digital simulation system for green construction of heavy steel structure factory buildings, relating to the field of computer-aided design and digital simulation technology for heavy steel structure factory building construction. The system includes a fully parametric digital twin modeling module, a multi-physics coupled simulation module for the entire green construction process, a simulation module for carbon emissions and resource consumption throughout the entire life cycle, a construction process simulation optimization module, a multi-condition twin verification module, a multi-objective comprehensive optimization module, a virtual-real synchronous closed-loop management module, and a simulation result output and delivery module. The digital twin modeling module constructs a high-precision digital twin that maps one-to-one with the physical entity, providing a unified digital foundation for the entire process simulation and optimization. The modules collaborate to achieve data interoperability and linkage, forming a closed-loop management system for simulation analysis and on-site execution. This invention achieves collaborative optimization of multiple construction objectives, improves the accuracy of construction control, and provides full-process digital support for the green construction of heavy steel structure factory buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of computer-aided design and digital simulation technology for the construction of heavy steel structure workshops, and in particular to a digital simulation system for green construction of heavy steel structure workshops. Background Technology

[0002] Heavy steel structure workshops, with their large spans, high load-bearing capacity, and short construction cycles, are widely used in industrial buildings, warehousing and logistics, and new energy plants. Green construction has become a core development direction in the steel structure engineering field. The gradual maturation of digital simulation and digital twin technologies has provided technical support for the digital management and control of the steel structure workshop construction process. Construction management systems incorporating digital twin technology have gradually emerged in the industry, enabling basic modeling, progress tracking, and on-site data collection during the construction process, thus providing the foundation for the digital management of steel structure workshop construction.

[0003] Existing digital simulation systems related to steel structure construction are mostly based on digital twin infrastructure, only realizing basic functions such as design modeling, on-site data acquisition, and virtual-real mapping. The simulation modules within these systems are mostly independent single-function units. Multiphysics coupling simulation, steel structure construction process simulation, and carbon emission calculation are all independent technical means, failing to achieve data interoperability and collaborative linkage between modules. Existing systems are mostly simple superpositions of independent functional modules, unable to achieve the integrated application of multi-dimensional simulation data during the construction process, and difficult to form a closed-loop management of simulation analysis, scheme optimization, and on-site execution, thus failing to provide systematic digital support for the entire green construction process.

[0004] Meanwhile, existing technologies in the green construction simulation of steel structure workshops often focus on optimizing a single construction objective, failing to achieve synergistic optimization of multiple dimensions such as carbon emissions, resource consumption, structural safety, and construction efficiency. This can easily lead to imbalances in other construction indicators due to the optimization of a single objective. Simulation analyses of the hoisting construction of heavy steel structure components primarily rely on single-mechanical simulations, lacking systematic prediction and control of construction accuracy. Furthermore, they fail to link the simulation results of construction processes with the optimization of green construction indicators, making it difficult to meet the refined, full-process management requirements for green construction of heavy steel structure workshops. Summary of the Invention

[0005] This invention proposes a digital simulation system for green construction of heavy steel structure factory buildings to solve the problems mentioned in the prior art.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: a digital simulation system for green construction of heavy steel structure factory buildings, comprising the following modules: The fully parametric digital twin modeling module for heavy steel structure workshops connects with steel structure design drawings, geological survey data, and site environmental data to complete the fully parametric modeling of the main steel structure, enclosure structure, foundation system, and supporting facilities of the workshop. It constructs a high-precision digital twin that maps one-to-one with the physical entity and performs lightweight model processing and multi-scale accuracy adaptation. The green building full-process multi-physics field coupling simulation module has a built-in multi-physics field coupling simulation engine for structural mechanics, fluid mechanics, and thermodynamics. Based on digital twins, it completes multi-dimensional simulation analysis of stress deformation, wind vibration response, temperature effect and hoisting stability of steel structure factory buildings throughout the construction process, and outputs simulation analysis results and structural safety thresholds. The digital simulation module for carbon emissions and resource consumption throughout the entire life cycle is equipped with a green building carbon emission accounting model and a resource consumption calculation model. Based on a digital twin, it completes the digital simulation calculation of carbon emissions, steel consumption, building material loss, and energy consumption of steel structure workshops throughout the entire life cycle from component processing, transportation, on-site installation, operation and maintenance, and outputs simulation results of green building indicators. The digital simulation and optimization module for steel structure construction technology has a built-in hoisting construction accuracy deviation prediction model. It performs digital simulation of the entire process of heavy steel structure component construction, simulates the process accuracy, construction efficiency and safety risks of different construction schemes, and outputs the optimal construction process scheme and construction progress simulation plan. The multi-condition green construction scenario twin simulation verification module constructs different simulation environments based on digital twins to complete multi-scenario twin simulation verification of green construction solutions and identify various risks and abnormal issues in the entire construction process; The green building solution multi-objective comprehensive optimization module has a built-in multi-objective collaborative optimization model. Based on the core optimization objectives of carbon emissions, resource consumption, structural safety and construction efficiency, it quantitatively evaluates the comprehensive performance of different green building solutions. The virtual-real synchronization interaction and closed-loop optimization management module connects to sensors, monitoring equipment and construction machinery at the physical construction site through the Internet of Things acquisition unit to collect the construction progress, structural parameters, environmental data and equipment operating status of the physical entity, and complete the data synchronization and virtual-real mapping interaction between the digital twin and the physical entity. The green building simulation results output and digital delivery module integrates and processes simulation analysis data, optimization schemes, green building indicators, and construction process parameters, and outputs standardized data reports, optimization schemes, and digital delivery results.

[0007] Furthermore, the green building scheme multi-objective comprehensive optimization module incorporates a green building multi-objective optimization calculation formula: ; in The overall score for green construction solutions for heavy steel structure factory buildings was determined. The weighting coefficient for carbon emission indicators. The weighting coefficient for resource consumption indicators. For structural safety indicators, weighting coefficients This represents the weighting coefficient for construction efficiency indicators; the sum of all weighting coefficients is 1. The standardized carbon emission index value. The standardized resource consumption index value. These are the standardized structural safety index values. The standardized construction efficiency index values ​​are obtained by standardizing the output results of the corresponding simulation modules.

[0008] Furthermore, it also includes a dynamic calibration module for the accuracy of the digital twin throughout the entire steel structure construction process. Based on data collected from the physical site and simulation data of the digital twin, it completes the dynamic calibration and accuracy optimization of the geometric parameters, physical parameters, and boundary conditions of the twin model, and updates the basic parameters of each simulation module and optimization module simultaneously.

[0009] Furthermore, the hoisting construction accuracy deviation prediction model of the digital simulation and optimization module for steel structure construction technology incorporates a calculation formula for predicting hoisting construction accuracy deviation: ; in This represents the predicted total accuracy deviation during the hoisting and installation of heavy steel structure components. This refers to the elastic deformation deviation value during the component hoisting process. This refers to the positioning deviation value of the hoisting equipment. For on-site installation alignment deviation values, This refers to the deviation value caused by environmental factors.

[0010] Furthermore, the fully parametric digital twin modeling module for heavy steel structure workshops has a built-in parametric component library for steel structures, covering parametric models of standard steel structure components such as heavy H-beams, box columns, trusses, and space frames. It automatically completes parametric modeling and virtual assembly of components based on design drawing parameters. At the same time, it supports the synchronous integrated modeling of workshop geological models, site models, temporary facility models, and construction machinery models, constructing a full-element digital twin that includes the main body of the workshop, construction environment, temporary facilities, and construction equipment, and completing the conversion and lightweighting of models of different precision.

[0011] Furthermore, the green construction full-process multi-physics coupling simulation module realizes the full-process multi-physics bidirectional coupling simulation of steel structure factory construction, including the coupling simulation of structural mechanics and rigid body dynamics in the steel structure hoisting process, the coupling simulation of thermodynamics and structural mechanics in the welding process, and the coupling simulation of wind engineering fluid mechanics and structural mechanics in the enclosure structure; it simulates the structural response characteristics under extreme wind, high and low temperature, and complex geological conditions, outputs the simulation results of structural stress, strain, deformation, and stability coefficients at each construction stage, identifies structural safety risk points, and outputs parameter optimization suggestions.

[0012] Furthermore, the digital simulation module for carbon emissions and resource consumption throughout the entire life cycle has a built-in standard factor library for building carbon emission accounting, covering carbon emission accounting factors and resource consumption calculation parameters for the steel production, component processing, building material transportation, on-site construction, and operation and maintenance stages. Based on the component parameters, construction plans, and operation parameters of the digital twin, it automatically completes the sub-item accounting of carbon emissions and resource consumption calculations for each stage, simulates the impact of different building material selections, construction processes, transportation routes, and operation modes on carbon emissions and resource consumption, and outputs low-carbon optimization solutions.

[0013] Furthermore, the digital simulation and optimization module for steel structure construction process also includes a built-in welding deformation simulation unit and a digital pre-assembly unit to simulate the welding deformation and residual stress distribution under different welding process parameters, complete the digital pre-assembly and installation accuracy simulation of steel structure components, output the optimal welding process parameters and pre-assembly accuracy control scheme, and simultaneously synchronize the optimized construction process parameters to the multi-objective comprehensive optimization module of green construction scheme to complete the secondary iterative optimization of the construction scheme.

[0014] Furthermore, the multi-condition green construction scenario twin simulation verification module constructs a digital twin simulation scenario of the entire construction process of steel structure factory buildings, completes the simulation and verification of green construction solutions under various scenarios, supports the simulation of sudden working conditions and emergency response plans during construction, outputs the verification results of solution adaptability and risk prevention and control suggestions under different scenarios, and synchronizes the verification results to the multi-objective comprehensive optimization module to achieve closed-loop optimization of the solution.

[0015] Furthermore, the IoT acquisition unit of the virtual-real synchronous interaction and closed-loop optimization control module connects to the structural stress sensors, displacement monitoring equipment, environmental monitoring sensors, intelligent terminals of construction machinery, and smart construction site management platform at the construction site. It collects on-site monitoring data of physical entities in real time, completes real-time data-driven updates of the digital twin, and sends the simulation-optimized construction parameters, process requirements, and control commands to the on-site construction equipment and management terminals. This achieves closed-loop control and bidirectional optimization of digital simulation and physical construction, and synchronizes the on-site measured data to the digital twin accuracy dynamic calibration module to complete the continuous optimization of the twin model.

[0016] Compared with existing technologies, the beneficial effects of this invention are: This system constructs a high-precision digital twin that maps one-to-one with the physical entity through a fully parameterized digital twin modeling module. This forms a unified digital foundation for the full-process simulation of green construction of heavy steel structure factory buildings, realizing the digital integration of all elements of the factory building, construction environment, facilities and equipment, and providing a unified data foundation for subsequent multi-dimensional simulation analysis.

[0017] This system enables data exchange and collaborative linkage between modules such as multi-physics field coupled simulation, construction process simulation, carbon emission and resource consumption simulation, multi-scenario verification, and multi-objective optimization. The modules are not simply an aggregation of independent functions, but can realize the full-process flow and integrated application of simulation data, forming a closed-loop management and control system for simulation analysis, scheme optimization, and on-site execution, resulting in synergistic and efficient technical effects.

[0018] This system, through a multi-objective collaborative optimization model, can achieve synergistic optimization of multiple construction objectives, including carbon emissions, resource consumption, structural safety, and construction efficiency, solving the problem of imbalances in other construction indicators caused by single-objective optimization in existing technologies. The system deeply integrates hoisting construction accuracy prediction with multi-physics simulation analysis, improving the rationality of construction process schemes and reducing material waste and rework during construction. Simultaneously, through synchronous virtual-real interaction and closed-loop optimization management, it achieves bidirectional optimization of digital simulation and physical construction, providing full-process digital simulation support for the green construction of heavy steel structure workshops and promoting the refinement and digitalization of the steel structure construction process. Attached Figure Description

[0019] Figure 1 This is a schematic block diagram of a digital simulation system for green construction of heavy steel structure factory buildings proposed in this invention; Figure 2 Flowchart for fully parametric digital twin modeling and model adaptation; Figure 3 A flowchart for multiphysics coupling simulation and green index calculation; Figure 4 Flowchart for construction process accuracy prediction and multi-scenario twin verification; Figure 5 A decision graph for closed-loop control of virtual and real interaction and multi-objective collaborative optimization. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," and "counterclockwise," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0022] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, features defined with "first" and "second" may explicitly or implicitly include one or more of the stated features. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified. Furthermore, the terms "installed," "connected," and "linked" should be interpreted broadly; for example, they may refer to a fixed connection, a detachable connection, or an integral connection; they may refer to a mechanical connection or an electrical connection; they may refer to a direct connection or an indirect connection through an intermediate medium; and they may refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances. The invention will now be described in further detail with reference to the accompanying drawings.

[0023] Reference Figures 1 to 5 A digital simulation system for green construction of heavy steel structure factory buildings, comprising the following modules: The fully parametric digital twin modeling module for heavy steel structure workshops connects with steel structure design drawings, geological survey data, and site environmental data to complete the fully parametric modeling of the main steel structure, enclosure structure, foundation system, and supporting facilities of the workshop. It constructs a high-precision digital twin that maps one-to-one with the physical entity, and simultaneously completes the lightweighting and multi-scale accuracy adaptation of the model, providing a unified digital foundation for the simulation and quantitative optimization of the entire green construction process. The green building full-process multi-physics coupling simulation module communicates with the fully parameterized digital twin modeling module. It has a built-in multi-physics coupling simulation engine for structural mechanics, fluid mechanics, and thermodynamics. Based on the digital twin, it completes multi-dimensional simulation analysis of stress deformation, wind vibration response, temperature effect, and hoisting stability of the entire construction process of steel structure workshops. It outputs simulation analysis results and structural safety thresholds, providing mechanical data support for construction accuracy control. The full life cycle carbon emission and resource consumption digital simulation module communicates with the fully parameterized digital twin modeling module. It has a built-in green building carbon emission accounting model and resource consumption calculation model. Based on the digital twin, it completes the digital simulation calculation of carbon emissions, steel consumption, building material loss and energy consumption of steel structure workshops throughout the entire life cycle from component processing, transportation, on-site installation and operation and maintenance, and outputs the simulation results of green building indicators. The digital simulation and optimization module for steel structure construction technology communicates with the fully parameterized digital twin modeling module and the multi-physics field coupled simulation module. It has a built-in hoisting construction accuracy deviation prediction model to complete the digital simulation of the entire construction process of heavy steel structure components, including processing, pre-assembly, hoisting, welding and installation. It simulates the process accuracy, construction efficiency and safety risks under different construction schemes and outputs the optimal construction process scheme and construction progress simulation plan. The multi-condition green construction scenario twin simulation verification module communicates and connects with all the aforementioned modules. Based on the digital twin, it constructs simulation environments with different geological conditions, climate environments, construction conditions, and operation scenarios to complete multi-condition twin simulation verification of green construction solutions and identify resource waste, excessive carbon emissions, structural safety, and construction risks throughout the entire construction process. The multi-objective comprehensive optimization module for green building solutions communicates with all the aforementioned simulation modules. It has a built-in multi-objective collaborative optimization model, with carbon emissions, resource consumption, structural safety, and construction efficiency as the core optimization objectives. It quantitatively evaluates the comprehensive performance of different green building solutions and achieves collaborative optimization of multiple construction objectives. The virtual-real synchronization interaction and closed-loop optimization control module communicates with the digital twin, various simulation and optimization modules, and connects to sensors, monitoring equipment and construction machinery at the physical construction site through the Internet of Things acquisition unit. It collects the construction progress, structural parameters, environmental data and equipment operating status of the physical entity in real time, and completes the real-time data synchronization and virtual-real mapping interaction between the digital twin and the physical entity, realizing two-way closed-loop optimization of digital simulation and physical construction. The green building simulation results output and digital delivery module communicates and connects with all simulation, optimization and control modules to integrate and process simulation analysis data, optimization schemes, green building indicators and construction process parameters, and outputs standardized simulation analysis reports, green building optimization schemes, digital delivery models and full-process simulation archives.

[0024] In this invention, the multi-objective comprehensive optimization module for green building schemes incorporates a multi-objective optimization calculation formula for green building: ; in The overall score for green construction solutions for heavy steel structure factory buildings was determined. The weighting coefficient for carbon emission indicators. The weighting coefficient for resource consumption indicators. For structural safety indicators, weighting coefficients The weighting coefficients for construction efficiency indicators are all set to 1, and are pre-defined based on green building goals. The standardized carbon emission index value. The standardized resource consumption index value. These are the standardized structural safety index values. The standardized construction efficiency index values ​​are obtained by standardizing the output results of the corresponding simulation modules, with values ​​ranging from 0 to 1. Through multi-objective weighted fusion calculation, the comprehensive performance of different green building schemes can be quantitatively evaluated, providing a quantitative decision-making basis for scheme comparison and optimization. This achieves multi-objective synergistic optimization of carbon emissions, resource consumption, structural safety and construction efficiency, solving the problem of imbalance of other construction indicators caused by single-objective optimization in existing technologies.

[0025] This invention also includes a dynamic calibration module for the accuracy of the digital twin throughout the entire steel structure construction process. Based on measured data collected from the physical site and simulation data of the digital twin, it can perform dynamic calibration and accuracy optimization of the geometric parameters, physical parameters, and boundary conditions of the twin model, and simultaneously update the basic parameters of each simulation module and optimization module. This ensures the consistency of the full-element mapping between the digital twin and the physical entity, and improves the accuracy and reliability of subsequent simulation analysis, accuracy prediction, and scheme optimization results.

[0026] In this invention, the hoisting construction accuracy deviation prediction model of the digital simulation and optimization module for steel structure construction technology has a built-in calculation formula for hoisting construction accuracy deviation prediction: ; in This represents the predicted total accuracy deviation during the hoisting and installation of heavy steel structure components. This refers to the elastic deformation deviation value during the component hoisting process. This refers to the positioning deviation value of the hoisting equipment. For on-site installation alignment deviation values, By calculating the square root of each sub-item deviation to account for the deviation caused by environmental factors, the total construction deviation under different hoisting schemes can be accurately predicted. This provides quantitative data support for optimizing hoisting schemes and controlling installation accuracy, reduces component rework rate and steel loss during construction, and provides a basis for boundary condition correction for multi-physics coupling simulation.

[0027] In this invention, the fully parametric digital twin modeling module for heavy steel structure workshops has a built-in parametric component library for steel structures, covering parametric models of standard steel structure components such as heavy H-beams, box columns, trusses, and space frames. It can automatically complete the parametric modeling and virtual assembly of components according to the parameters of the design drawings. At the same time, it supports the synchronous integrated modeling of workshop geological models, site models, temporary facility models, and construction machinery models, constructing a full-element digital twin including the main body of the workshop, construction environment, temporary facilities, and construction equipment. The model accuracy can be dynamically adapted to multiple scales from LOD100 to LOD500 according to the simulation scenario requirements. It can also complete one-click conversion and lightweight processing of models with different accuracy to adapt to the simulation operation requirements of different terminals.

[0028] In this invention, the green construction full-process multi-physics coupling simulation module can realize multi-physics bidirectional coupling simulation of the entire construction process of steel structure factory buildings, including coupled simulation of structural mechanics and rigid body dynamics during steel structure hoisting, coupled simulation of thermodynamics and structural mechanics during welding, and coupled simulation of wind engineering fluid mechanics and structural mechanics of factory building envelope. At the same time, it can simulate the structural response characteristics under extreme wind, high and low temperature, and complex geological conditions, and output simulation results of structural stress, strain, deformation, and stability coefficients at different construction stages. It can accurately identify structural safety risk points and output corresponding parameter optimization suggestions to ensure structural safety throughout the steel structure construction process, and at the same time provide basic data related to elastic deformation for predicting hoisting construction accuracy deviations.

[0029] In this invention, the digital simulation module for full life-cycle carbon emissions and resource consumption has a built-in library of accounting factors corresponding to the building carbon emission accounting standard. It covers carbon emission accounting factors and resource consumption calculation parameters for each stage of steel production, component processing, building material transportation, on-site construction, and operation and maintenance. Based on the component parameters, construction plan, and operation parameters of the digital twin, it can automatically complete the sub-item accounting of carbon emissions and the consumption calculation of various resources such as steel, concrete, water and electricity for each stage. At the same time, it can simulate the impact of different building material selections, construction processes, transportation routes, and operation modes on carbon emissions and resource consumption, and output corresponding low-carbon optimization solutions to help achieve the green construction goals of heavy steel structure workshops. It also provides basic indicator data for multi-objective optimization of green construction solutions.

[0030] In this invention, the digital simulation and optimization module for steel structure construction process also includes a built-in welding deformation simulation unit and a digital pre-assembly unit. It can simulate the welding deformation and residual stress distribution under different welding process parameters, complete the digital pre-assembly and installation accuracy simulation of steel structure components, and output the optimal welding process parameters and pre-assembly accuracy control scheme. This reduces on-site cutting and welding rework during construction, and reduces steel loss and energy consumption during construction. At the same time, the optimized construction process parameters can be synchronized to the multi-objective comprehensive optimization module of green construction scheme to complete the secondary iterative optimization of the construction scheme.

[0031] In this invention, the multi-condition green construction scenario twin simulation verification module can construct a digital twin simulation scenario of the entire construction process of steel structure workshops, including component processing factory scenario, component transportation route scenario, on-site construction site scenario, different climate environment scenario, and different construction progress scenario. It can complete the simulation and verification of green construction solutions under various scenarios, and at the same time support the simulation of sudden working conditions and emergency response plans during the construction process. It outputs the solution adaptability verification results and risk prevention and control suggestions under different scenarios, improves the adaptability and reliability of green construction solutions under complex working conditions, and synchronizes the verification results to the multi-objective comprehensive optimization module to complete the closed-loop optimization of the solution.

[0032] In this invention, the IoT acquisition unit of the virtual-real synchronous interaction and closed-loop optimization control module can connect to structural stress sensors, displacement monitoring equipment, environmental monitoring sensors, intelligent terminals of construction machinery, and smart construction site management platforms at the construction site. It can collect construction progress data, structural monitoring data, environmental parameters, and equipment operating status data of physical entities in real time, and complete the real-time data-driven update of the digital twin. At the same time, it can send the simulation-optimized construction parameters, process requirements, and control commands to the on-site construction equipment and management terminals to achieve closed-loop control and two-way optimization of digital simulation and physical construction, ensuring the on-site implementation effect of green construction solutions. Simultaneously, it can synchronize the on-site measured data to the digital twin accuracy dynamic calibration module to complete the continuous optimization of the twin model.

[0033] The following examples further illustrate the specific implementation of this system: Example 1: Implementation of Digital Simulation for Green Construction of Large-Span Heavy Steel Structure Mechanical Processing Plant This embodiment is applied to a single-story, large-span heavy-duty steel structure machinery processing plant project. The plant has a single span of 36 meters, an eaves height of 12 meters, and a total longitudinal length of 120 meters. The main load-bearing structure adopts heavy-duty box-type steel columns and trapezoidal steel roof trusses. The roof and walls use a profiled steel sheet cladding system. The core requirements of the project are to achieve digital simulation analysis, multi-objective collaborative optimization, construction accuracy control, and virtual-real closed-loop management of the entire green construction process of the plant, ensuring structural safety, low-carbon environmental protection, and high construction efficiency during the plant construction process. This embodiment fully covers all technical solutions of the system, and all functions correspond completely to the overall system design, with no technical content exceeding the design scope.

[0034] This embodiment implements a digital simulation system for green construction of heavy steel structure factory buildings. First, through the fully parametric digital twin modeling module for heavy steel structure factory buildings, it connects with the project's steel structure construction drawings, geological survey reports, and site environmental mapping data. It calls upon the module's built-in parametric component library for steel structures to complete the fully parametric modeling of the factory building's main box columns, steel roof trusses, enclosure structure, foundation system, and supporting facilities. Simultaneously, it completes the integrated modeling of the site terrain model, temporary facility model, and hoisting machinery model, constructing a high-precision digital twin that maps one-to-one with the physical entity. According to the requirements of different simulation scenarios, it completes multi-scale accuracy adaptation of the model from LOD100 to LOD500, and simultaneously completes the model lightweighting process, providing a unified digital foundation for the simulation and quantitative optimization of the entire green construction process.

[0035] Subsequently, through the multi-physics coupling simulation module of the entire green building process, a two-way multi-physics coupling simulation of the entire factory construction process was completed based on the digital twin. This included the coupled simulation of structural mechanics and rigid body dynamics during the steel roof truss hoisting process, the coupled simulation of thermodynamics and structural mechanics during the on-site welding process, and the coupled simulation of wind engineering fluid mechanics and structural mechanics of the factory building envelope. The simulation simulated the structural response characteristics under extreme wind and high and low temperature environments at the project site, and output the simulation analysis results of structural stress, strain, deformation, stability coefficient and structural safety threshold at different construction stages, providing mechanical data support for construction accuracy control.

[0036] Through the digital simulation module for carbon emissions and resource consumption throughout the entire life cycle, the built-in carbon emission accounting factor library is invoked. Based on the component parameters, construction plans, and operation parameters of the digital twin, the module completes the digital simulation calculation of carbon emissions, steel consumption, building material loss, and energy consumption throughout the entire life cycle of the factory building, from component processing, transportation, on-site installation, operation, and maintenance. The module outputs the simulation results of green building indicators at each stage, simulates the impact of different building material selections, construction processes, and transportation routes on carbon emissions and resource consumption, and outputs corresponding low-carbon optimization solutions.

[0037] The digital simulation and optimization module for steel structure construction technology incorporates a built-in hoisting construction accuracy deviation prediction model. It enables digital simulation of the entire construction process of heavy steel columns and large-span steel roof trusses, including processing, pre-assembly, hoisting, welding, and installation. It simulates the construction accuracy, efficiency, and safety risks under different hoisting schemes and welding process parameters. Through welding deformation simulation units and digital pre-assembly units, it completes welding deformation simulation and digital pre-assembly of components, outputting the optimal construction process scheme and construction progress simulation plan.

[0038] The multi-condition green construction scenario twin simulation verification module constructs simulation scenarios with different geological conditions, climate environments, and construction progress based on digital twins. This allows for multi-scenario simulation and verification of green construction solutions, as well as simulations of unexpected working conditions and emergency response plans. The module outputs solution adaptability verification results and risk prevention recommendations. Furthermore, the multi-objective comprehensive optimization module for green construction solutions uses carbon emissions, resource consumption, structural safety, and construction efficiency as core optimization objectives to quantitatively evaluate the comprehensive performance of different green construction solutions, achieving synergistic optimization of multiple construction goals.

[0039] Through the dynamic calibration module for the digital twin of the entire steel structure construction process, based on measured and simulation data collected from the physical site, the module dynamically calibrates and optimizes the geometric parameters, physical parameters, and boundary conditions of the twin model. It also synchronously updates the basic parameters of each module, ensuring the consistency of the full-element mapping between the digital twin and the physical entity. Through the virtual-physical synchronous interaction and closed-loop optimization control module, it connects to structural stress sensors, displacement monitoring equipment, environmental monitoring sensors, and intelligent terminals of construction machinery at the construction site. This allows for real-time collection of construction progress, structural parameters, environmental data, and equipment operating status of the physical entity, enabling real-time data-driven updates of the digital twin. The optimized construction parameters and control commands are then sent to the on-site construction equipment and management terminals, achieving bidirectional closed-loop optimization between digital simulation and physical construction. Finally, through the green building simulation result output and digital delivery module, the module integrates and processes all data throughout the process, outputting standardized simulation analysis reports, green building optimization schemes, digital delivery models, and a complete simulation archive.

[0040] Table 1: Performance Comparison of This System and Traditional Construction Simulation Mode for Large-Span Steel Structure Factory Buildings Table 1 visually demonstrates the comprehensive application advantages of this system in the construction of large-span heavy steel structure factory buildings. Traditional construction simulation modes are mostly simple superpositions of independent modules, with no data linkage between simulation units. This makes it impossible to achieve collaborative optimization of multiple construction objectives, lacks systematic prediction for hoisting construction accuracy control, and is prone to the problem of disconnect between the plan and on-site implementation. Furthermore, the verification coverage of multiple working conditions is insufficient, making it difficult to ensure the adaptability of construction plans under complex working conditions. This system, through full-module data interoperability and collaborative linkage, achieves multi-objective collaborative optimization and closed-loop management of the entire process, improves the level of hoisting construction accuracy control, enables full-scenario verification of construction plans, ensures consistency between the plan and on-site construction, and adapts to the refined management requirements of green construction of heavy steel structure factory buildings.

[0041] Example 2: Implementation of Digital Simulation for Green Construction of Heavy Steel Structure Plant for New Energy Photovoltaic Module Production This embodiment is applied to a double-span, multi-span heavy steel structure factory building project for the production of new energy photovoltaic modules. The factory building has a single span of 30 meters, a total longitudinal length of 180 meters, and an eaves height of 10 meters. The main structure adopts heavy H-shaped steel columns and a large-span roof truss. It is equipped with a clean production workshop and auxiliary production facilities. The core requirements of the project are to achieve low-carbon construction management throughout the entire lifecycle of the factory building, high-precision construction process simulation, clean workshop construction adaptability verification, and closed-loop management of the entire construction process, meeting the green construction and high-precision construction requirements of new energy factories. This embodiment fully covers all technical solutions of the system, and all functions correspond completely to the overall system design, with no technical content exceeding the design scope.

[0042] This embodiment implements a digital simulation system for green construction of heavy steel structure factory buildings. First, through the fully parametric digital twin modeling module for heavy steel structure factory buildings, it connects with the project's detailed steel structure design drawings, geological survey data, cleanroom design parameters, and site environmental data. It calls upon the module's built-in parametric component library for steel structures to complete the fully parametric modeling of the factory building's main steel columns, roof trusses, enclosure structure, foundation system, and cleanroom supporting facilities. Simultaneously, it completes the integrated modeling of the factory site model, temporary clean processing area model, construction machinery model, and transportation path model, constructing a high-precision digital twin that maps one-to-one with the physical entity. Based on the simulation scenario requirements, it completes multi-scale accuracy adaptation and lightweight processing of the model, providing a unified digital foundation for the whole-process simulation and quantitative optimization of green construction.

[0043] Subsequently, through the multi-physics coupling simulation module of the entire green building process, a two-way multi-physics coupling simulation of the entire factory construction process was completed based on the digital twin. This included the coupled simulation of structural mechanics and rigid body dynamics during the hoisting of large-span trusses, the coupled simulation of thermodynamics and structural mechanics during the welding of cleanroom enclosure structures, and the coupled simulation of fluid mechanics and structural mechanics for the overall wind vibration response of the factory. The simulation of the structural response characteristics under the coastal wind and high humidity environment of the project site was carried out, and the simulation results of structural stress, strain, deformation, stability coefficient and structural safety threshold at different construction stages were output, providing mechanical data support for construction accuracy control.

[0044] Through the digital simulation module for carbon emissions and resource consumption throughout the entire life cycle, the module calls upon the built-in carbon emission accounting factor library. Based on the component parameters, construction plans, and operational energy consumption parameters of the digital twin, it completes the digital simulation calculation of carbon emissions, steel consumption, building material loss, and energy consumption throughout the entire life cycle of the factory building, from component processing, transportation, on-site installation, operation, and maintenance. It outputs the simulation results of green building indicators at each stage, simulates the impact of different building material selections, clean energy applications, construction processes, and transportation plans on carbon emissions and resource consumption, and outputs corresponding low-carbon optimization solutions, providing data support for the green star rating certification of the factory building.

[0045] The digital simulation and optimization module for steel structure construction processes includes a built-in model for predicting hoisting construction accuracy deviations. This module enables digital simulation of the entire construction process for heavy steel columns and large-span roof trusses, from processing and pre-assembly to hoisting, welding, and installation. It simulates construction accuracy, efficiency, and safety risks under different hoisting schemes and welding process parameters. Through welding deformation simulation units and digital pre-assembly units, it simulates welding deformation, high-precision digital pre-assembly, and installation accuracy. The module outputs the optimal hoisting scheme, welding process parameters, and construction progress simulation plan to meet the high-precision construction requirements of cleanrooms.

[0046] The multi-condition green construction scenario twin simulation verification module constructs simulation environments based on digital twins for different geological conditions, coastal climates, clean construction conditions, and rainy season construction scenarios. This allows for multi-scenario twin simulation verification of green construction solutions, as well as simulations of unexpected construction conditions and emergency response plans. The module outputs verification results on the suitability of solutions for different scenarios and risk prevention recommendations. Furthermore, the multi-objective comprehensive optimization module for green construction solutions uses carbon emissions, resource consumption, structural safety, construction efficiency, and clean construction accuracy as core optimization objectives to quantitatively evaluate the comprehensive performance of different green construction solutions, achieving synergistic optimization of multiple construction goals.

[0047] Through the dynamic calibration module for the digital twin of the entire steel structure construction process, based on the measured data of component installation, structural monitoring data, and simulation data collected from the physical site, the module dynamically calibrates and optimizes the geometric parameters, physical parameters, and boundary conditions of the twin model. It also synchronously updates the basic parameters of each simulation and optimization module, ensuring the consistency of the full-element mapping between the digital twin and the physical entity. Through the virtual-physical synchronous interaction and closed-loop optimization control module, it connects to the structural monitoring sensors, displacement monitoring equipment, environmental monitoring sensors, intelligent terminals of construction machinery, and the smart construction site management platform at the construction site. This allows for real-time collection of construction progress, structural parameters, environmental data, and equipment operating status data of the physical entity, enabling real-time data-driven updates of the digital twin. The optimized construction parameters, process requirements, and control commands are then distributed to the on-site construction equipment and management terminals, achieving bidirectional closed-loop optimization between digital simulation and physical construction. Finally, through the green building simulation result output and digital delivery module, the module integrates and processes all the data throughout the process, outputting standardized simulation analysis reports, green building optimization schemes, digital delivery models, and full-process simulation archives.

[0048] Table 2: Performance Comparison of New Energy Steel Structure Factory Building Simulation System and Traditional Construction Simulation Mode Table 2 clearly demonstrates the comprehensive advantages of this system in the construction of new energy heavy steel structure workshops. Traditional construction simulation methods struggle to achieve precise simulation and calculation of carbon emissions throughout the entire lifecycle in new energy steel structure workshop construction. The digital twin and physical entity lack dynamic calibration, resulting in insufficient mapping accuracy. Furthermore, the control of welding deformation and installation precision lacks simulation support, hindering closed-loop management of the entire construction process and leading to low efficiency in scheme optimization. This system achieves precise management of low-carbon construction through lifecycle carbon emissions and resource consumption simulation. Dynamic calibration of the digital twin ensures consistency between the virtual and physical mappings, while simulation of welding and installation processes enhances precision control. This enables closed-loop management and efficient iteration of the entire construction process, meeting the dual requirements of green and high-precision construction for new energy workshops.

[0049] refer to Figure 1 This diagram illustrates the entire logical chain of the system, from basic modeling to final digital delivery. The process is based on digital twin modeling, ensuring structural safety through multiphysics simulation, and calculating green indicators through full lifecycle simulation. The core of the system lies in combining construction process simulation with multi-scenario verification, utilizing a multi-objective optimization model to achieve a synergistic balance between carbon emissions, resources, safety, and efficiency. Finally, a closed-loop virtual-physical interaction achieved through the Internet of Things ensures that the simulation optimization plan accurately guides on-site construction and outputs standardized delivery documentation.

[0050] Reference Figure 2This diagram details the construction process of the digital twin. The system integrates drawings, geological and site data, and automatically generates models using a built-in parametric component library. A key feature of this module is its support for full-element modeling, from macroscopic site data to microscopic components, and its multi-scale accuracy adaptation capability. It can switch between different accuracy levels according to varying simulation requirements and perform lightweight processing, providing a unified digital foundation for subsequent full-process simulations.

[0051] Reference Figure 3 This diagram illustrates how the system simulates from two dimensions: "physical safety" and "green environmental protection." The physics engine handles the coupling of mechanics, fluid dynamics, and thermodynamics, analyzing hoisting stability and wind-induced vibration response. Simultaneously, the calculation model, based on a carbon emission factor library, simulates and calculates energy and material losses throughout the entire lifecycle from manufacturing to operation and maintenance. The output data from both are aggregated into the optimization module, providing a quantitative basis for selecting green building solutions.

[0052] Reference Figure 4 This diagram highlights the error prevention and verification mechanisms during the construction phase. The system incorporates a deviation prediction model that comprehensively considers factors such as deformation, positioning, and environment to estimate hoisting accuracy. Potential rework points are identified through simulations of pre-assembly and welding processes. Simultaneously, a multi-condition verification module can simulate extreme weather or unexpected conditions to "stress test" the construction plan. This pre-simulation mechanism significantly reduces on-site steel consumption and energy waste, and identifies and controls various risks throughout the entire construction process.

[0053] refer to Figure 5 This diagram illustrates how the system achieves intelligent decision-making and on-site implementation. The multi-objective optimization module comprehensively scores and compares solutions based on the weights of carbon emissions, resources, safety, and efficiency. The selected solution is then distributed to the intelligent machinery on-site via the virtual-physical interaction module. The IoT unit transmits real-time measured data, driving the digital twin to perform dynamic accuracy calibration. This closed-loop mechanism of "simulation guiding construction and on-site model correction" ensures that green building solutions can be dynamically optimized as the physical site changes, achieving precise attainment of construction goals.

[0054] The above are merely preferred embodiments of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.

Claims

1. A digital simulation system for green construction of heavy steel structure factory buildings, characterized in that, Includes the following modules: The fully parametric digital twin modeling module for heavy steel structure workshops connects with steel structure design drawings, geological survey data, and site environmental data to complete the fully parametric modeling of the main steel structure, enclosure structure, foundation system, and supporting facilities of the workshop. It constructs a high-precision digital twin that maps one-to-one with the physical entity and performs lightweight model processing and multi-scale accuracy adaptation. The green building full-process multi-physics field coupling simulation module has a built-in multi-physics field coupling simulation engine for structural mechanics, fluid mechanics, and thermodynamics. Based on digital twins, it completes multi-dimensional simulation analysis of stress deformation, wind vibration response, temperature effect and hoisting stability of steel structure factory buildings throughout the construction process, and outputs simulation analysis results and structural safety thresholds. The digital simulation module for carbon emissions and resource consumption throughout the entire life cycle is equipped with a green building carbon emission accounting model and a resource consumption calculation model. Based on a digital twin, it completes the digital simulation calculation of carbon emissions, steel consumption, building material loss, and energy consumption of steel structure workshops throughout the entire life cycle from component processing, transportation, on-site installation, operation and maintenance, and outputs simulation results of green building indicators. The digital simulation and optimization module for steel structure construction technology has a built-in hoisting construction accuracy deviation prediction model. It performs digital simulation of the entire process of heavy steel structure component construction, simulates the process accuracy, construction efficiency and safety risks of different construction schemes, and outputs the optimal construction process scheme and construction progress simulation plan. The multi-condition green construction scenario twin simulation verification module constructs different simulation environments based on digital twins to complete multi-scenario twin simulation verification of green construction solutions and identify various risks and abnormal issues in the entire construction process; The green building solution multi-objective comprehensive optimization module has a built-in multi-objective collaborative optimization model. Based on the core optimization objectives of carbon emissions, resource consumption, structural safety and construction efficiency, it quantitatively evaluates the comprehensive performance of different green building solutions. The virtual-real synchronization interaction and closed-loop optimization management module connects to sensors, monitoring equipment and construction machinery at the physical construction site through the Internet of Things acquisition unit to collect the construction progress, structural parameters, environmental data and equipment operating status of the physical entity, and complete the data synchronization and virtual-real mapping interaction between the digital twin and the physical entity. The green building simulation results output and digital delivery module integrates and processes simulation analysis data, optimization schemes, green building indicators, and construction process parameters, and outputs standardized data reports, optimization schemes, and digital delivery results.

2. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, The multi-objective comprehensive optimization module of the green building scheme has a built-in multi-objective optimization calculation formula for green building: ; in The overall score for green construction solutions for heavy steel structure factory buildings was determined. The weighting coefficient for carbon emission indicators. The weighting coefficient for resource consumption indicators. For structural safety indicators, weighting coefficients This represents the weighting coefficient for construction efficiency indicators; the sum of all weighting coefficients is 1. The standardized carbon emission index value. The standardized resource consumption index value. These are the standardized structural safety index values. The standardized construction efficiency index values ​​are obtained by standardizing the output results of the corresponding simulation modules.

3. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, It also includes a dynamic calibration module for the accuracy of the digital twin throughout the entire steel structure construction process. Based on data collected from the physical site and simulation data of the digital twin, it performs dynamic calibration and accuracy optimization of the geometric parameters, physical parameters, and boundary conditions of the twin model, and updates the basic parameters of each simulation module and optimization module simultaneously.

4. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, The hoisting construction accuracy deviation prediction model of the digital simulation and optimization module for steel structure construction technology has a built-in calculation formula for hoisting construction accuracy deviation prediction: ; in This represents the predicted total accuracy deviation during the hoisting and installation of heavy steel structure components. This refers to the elastic deformation deviation value during the component hoisting process. This refers to the positioning deviation value of the hoisting equipment. For on-site installation alignment deviation values, This refers to the deviation value caused by environmental factors.

5. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, The fully parametric digital twin modeling module for heavy steel structure workshops has a built-in parametric component library for steel structures, covering parametric models of standard steel structure components such as heavy H-beams, box columns, trusses, and space frames. It automatically completes parametric modeling and virtual assembly of components based on design drawing parameters. It also supports the synchronous integrated modeling of workshop geological models, site models, temporary facility models, and construction machinery models, constructing a full-element digital twin that includes the main body of the workshop, construction environment, temporary facilities, and construction equipment, and completing the conversion and lightweighting of models of different precision.

6. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, The green building full-process multi-physics field coupling simulation module realizes the full-process multi-physics field bi-directional coupling simulation of steel structure workshop construction, including the coupling simulation of structural mechanics and rigid body dynamics in the steel structure hoisting process, the coupling simulation of thermodynamics and structural mechanics in the welding process, and the coupling simulation of wind engineering fluid mechanics and structural mechanics in the enclosure structure. Simulates the structural response characteristics under extreme wind, high and low temperature, and complex geological conditions, outputs simulation results of structural stress, strain, deformation, and stability coefficient at each construction stage, identifies structural safety risk points, and outputs parameter optimization suggestions.

7. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, The digital simulation module for carbon emissions and resource consumption throughout the entire life cycle has a built-in standard factor library for building carbon emission accounting, covering carbon emission accounting factors and resource consumption calculation parameters for the steel production, component processing, building material transportation, on-site construction, and operation and maintenance stages. Based on the component parameters, construction plans, and operation parameters of the digital twin, it automatically completes the sub-item accounting of carbon emissions and resource consumption calculations for each stage, simulates the impact of different building material selections, construction processes, transportation routes, and operation modes on carbon emissions and resource consumption, and outputs low-carbon optimization solutions.

8. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, The digital simulation and optimization module for steel structure construction process also includes a built-in welding deformation simulation unit and a digital pre-assembly unit. It simulates the welding deformation and residual stress distribution under different welding process parameters, completes the digital pre-assembly and installation accuracy simulation of steel structure components, outputs the optimal welding process parameters and pre-assembly accuracy control scheme, and synchronizes the optimized construction process parameters to the multi-objective comprehensive optimization module of green construction scheme to complete the second iteration optimization of the construction scheme.

9. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, The multi-condition green construction scenario twin simulation verification module constructs a digital twin simulation scenario for the entire construction process of steel structure workshops, completes the simulation and verification of green construction solutions under various scenarios, supports the simulation of sudden working conditions and emergency response plans during construction, outputs the verification results of solution adaptability and risk prevention and control suggestions under different scenarios, and synchronizes the verification results to the multi-objective comprehensive optimization module to achieve closed-loop optimization of the solution.

10. The digital simulation system for green construction of heavy steel structure factory buildings according to claim 1, characterized in that, The IoT acquisition unit of the virtual-real synchronous interaction and closed-loop optimization control module connects to the structural stress sensors, displacement monitoring equipment, environmental monitoring sensors, intelligent terminals of construction machinery, and smart construction site management platform at the construction site. It collects on-site monitoring data of physical entities in real time, completes real-time data-driven updates of the digital twin, and sends the simulation-optimized construction parameters, process requirements, and control commands to the on-site construction equipment and management terminals. This achieves closed-loop control and two-way optimization of digital simulation and physical construction. The on-site measured data is synchronized to the digital twin accuracy dynamic calibration module to complete the continuous optimization of the twin model.