Multi-process and multi-target optimization regulation and decision-making method and system for lake
By constructing a multi-process coupled model with spatiotemporal scale alignment and utilizing a multi-objective optimization algorithm, the problem of balancing computational efficiency and evaluation accuracy in lake regulation was solved, thus realizing the scientific regulation and continuous improvement of the lake ecosystem.
Patent Information
- Application Number
- CN202611046617.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-15
- Publication Date
- 2026-11-20
AI Technical Summary
Existing lake regulation technologies struggle to balance computational efficiency and evaluation accuracy when dealing with complex coupled simulations, and lack standardized quantitative benchmarks when handling multi-dimensional competitive relationships, leading to subjectivity in regulation schemes.
By acquiring historical monitoring data on lake water resources, water environment, and water ecology, a multi-process coupled model aligned with spatiotemporal scales is constructed. A multi-objective optimization algorithm is used to find the optimal solution, sensitivity indicators are identified, and a multi-objective collaborative regulation decision-making model is constructed to optimize the set of regulation measures to generate a non-dominated solution set.
It improves the computational efficiency and objectivity of lake regulation schemes, provides scientific decision support, and ensures the continuous improvement of lake ecosystems.
Smart Images

Figure CN123140786A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of lake resource and environmental management technology, and more specifically, to a multi-process, multi-objective optimization and control decision-making method and system for lakes. Background Technology
[0002] As complex natural ecosystems, lakes exhibit significant coupling and feedback relationships between water resource allocation, water quality evolution, and biological balance. Accurate numerical simulations revealing the interaction mechanisms between different physical and biochemical processes, and using this as a basis for scientific regulation, provide crucial technical support for maintaining the stability of watershed ecosystems, enhancing water resource security, and ensuring regional environmental safety.
[0003] Currently, river and lake health regulation mainly relies on establishing independent physical models or semi-empirical models for each field, and using intelligent optimization algorithms to find the optimal solution for the regulation target under given constraints. However, in practical applications, due to the involvement of multiple processes such as hydrology, water environment dynamics, and water ecological succession, the time steps and spatial resolutions of the various sub-models are often difficult to align naturally. Furthermore, the numerical simulation after coupling the three models involves large-scale nonlinear calculations, resulting in high computational costs for model evaluation. Meanwhile, with the increasing sophistication of monitoring indicator systems, technical bottlenecks remain in how to eliminate redundant interference from numerous indicators and quantitatively evaluate the responsiveness of indicators to different regulation methods. In addition, facing multi-dimensional conflicting objective functions, existing schemes often lack standardized quantitative trade-off benchmarks when dealing with non-dominated solution sets.
[0004] In summary, existing multi-process control techniques face the challenge of balancing computational efficiency and evaluation accuracy when dealing with complex coupled simulations. Furthermore, the optimization process for control schemes often involves subjectivity when handling high-dimensional competitive relationships. Therefore, it is necessary to investigate a method that can improve the objectivity and computational efficiency of generating multi-process control schemes in complex lake environments. Summary of the Invention
[0005] In view of this, this application provides a multi-process, multi-objective optimization control decision-making method and system for lakes, in order to solve at least one of the above-mentioned problems in the prior art.
[0006] According to one aspect of this application, a multi-process, multi-objective optimization and control decision-making method for lakes includes:
[0007] Acquire historical monitoring data on lake water resources, water environment, and water ecology, and provide a pre-constructed set of control measures;
[0008] Simulation models of water resources, water environment and water ecology subprocesses were constructed based on historical monitoring data, and spatiotemporal scale alignment and coupling of each subprocess were performed to obtain a water system simulation model.
[0009] Each control measure in the control measures set is input into the water system simulation model for simulation, and the control effect of each measure is determined based on the preset evaluation index system.
[0010] The effects of regulation are analyzed to identify the sensitivity of evaluation indicators to the set of regulation measures, and a multi-objective collaborative regulation decision-making model is constructed based on the selected decision indicators that meet the preset sensitivity conditions.
[0011] Based on a multi-objective collaborative regulation decision-making model and a set of regulation measures, a non-dominated solution set is obtained by using a multi-objective optimization algorithm, and then a decision optimization is performed on the non-dominated solution set to obtain the target decision scheme.
[0012] According to another aspect of this application, a multi-process, multi-objective optimization and control decision-making system for lakes is also provided, comprising:
[0013] At least one processor; and a memory communicatively connected to the at least one processor; the memory stores instructions executable by the processor, the instructions being executed by the processor to implement a multi-process, multi-objective optimization control decision-making method for lakes proposed in this application.
[0014] Based on the above, this invention can effectively alleviate the problems of high computational cost, redundant indicators, and difficulty in balancing multiple objectives during the regulation process by using multi-process coupled simulation and sensitivity index dimensionality reduction, thereby improving the objectivity and efficiency of scheme generation and providing technical support for the continuous improvement of lake ecosystems. Attached Figure Description
[0015] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings:
[0016] Figure 1 This is a schematic diagram of a multi-process, multi-objective optimization and control decision-making method for lakes provided in this application.
[0017] Figure 2 This is a schematic diagram of the process for selecting decision indicators that meet the preset sensitivity conditions provided in this application.
[0018] Figure 3 This is a schematic diagram of the process for constructing a multi-objective collaborative regulation and control decision-making model provided in this application.
[0019] Figure 4 This is a schematic diagram of the process for obtaining a non-dominated solution set through optimization provided in this application.
[0020] Figure 5 This is a schematic diagram of the decision-making process for optimizing non-dominated solution sets provided in this application. Detailed Implementation
[0021] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0022] Example 1
[0023] This embodiment provides a multi-process, multi-objective optimization and control decision-making method for lakes, such as... Figure 1 As shown, the method may include, but is not limited to, the following steps:
[0024] Step 101: Obtain historical monitoring data on the lake's water resources, water environment, and water ecology, and provide a pre-constructed set of control measures.
[0025] Historical monitoring data can include water resource data such as lake water level sequences, flow data, rainfall, and evaporation within a preset time period, as well as water environment indicators such as total nitrogen concentration, total phosphorus concentration, dissolved oxygen content, and permanganate index, and aquatic ecological data such as chlorophyll a concentration, phytoplankton biomass, and benthic animal diversity index. This data can serve as the foundation for subsequent model construction, calibration, and current status assessment.
[0026] The set of control measures can specifically refer to a set of candidate schemes pre-designed for lake management, which may include water resource allocation measures, such as inter-basin water transfer schemes; water environment management measures, such as upgrading and renovation of sewage treatment plants; and water ecological restoration measures, such as lakeside wetland restoration projects.
[0027] Obtaining the aforementioned multi-source historical data and clarifying the control measures to be evaluated provides data boundaries and decision space for constructing a multi-process coupled model.
[0028] Step 102: Based on historical monitoring data, simulation models of water resources, water environment and water ecology subprocesses are constructed respectively, and the spatiotemporal scales of each subprocess are aligned and coupled to obtain the water system simulation model.
[0029] Specifically, simulation models for water resources subprocesses can be constructed using distributed hydrological models to calculate watershed runoff generation and confluence processes; simulation models for water environment subprocesses can be constructed using water quality migration and transformation models to describe the physical transport and chemical degradation of pollutants; and simulation models for water ecology subprocesses can focus on the dynamic responses of primary productivity and biological communities.
[0030] After obtaining the simulation models of each independent subprocess, a spatiotemporal scale alignment operation needs to be performed. For example, the time step of each model is uniformly adjusted to 1 day, and the spatial grids used by different models are resampled or interpolated to place all models under the same spatial reference. Through scale alignment, a data exchange channel is established between the sub-models using a pre-defined coupler, which can construct a water system simulation model that can simultaneously reflect the interaction of lake water quantity, water quality, and biological processes.
[0031] Step 103: Input each measure in the control measures set into the water system simulation model for simulation, and determine the control effect of each measure based on the preset evaluation index system.
[0032] This step can also be implemented as follows: input each measure in the control measures set into the water system simulation model for simulation, obtain the initial simulation results, and determine the control effect of each measure based on the preset evaluation index system and the initial simulation results.
[0033] In this embodiment, the evaluation index system specifically refers to a set of parameters used to quantitatively measure the health status of a lake, which may include the degree of ecological baseflow satisfaction, water quality compliance rate, and comprehensive eutrophication index. By transforming each measure in the control measures set into a driving force or parameter setting that the model can recognize, and running the water system simulation model, the predicted values of the lake's state in various dimensions after the implementation of the measure can be output. By comparing these predicted values with the preset evaluation index system, the change in the lake's health status caused by each measure can be calculated, i.e., the control effect. This process can realize the transformation from a qualitative governance approach to a quantitative assessment of technical effects.
[0034] Step 104: Analyze the control effect to identify the sensitivity of evaluation indicators to the set of control measures, and construct a multi-objective collaborative control decision model based on the selected decision indicators that meet the preset sensitivity conditions.
[0035] Sensitivity can be understood as the strength of an evaluation indicator's response to changes in the parameters of regulatory measures. In this embodiment, by analyzing the changing patterns of each indicator under different measure inputs, it is possible to identify which indicators are most sensitive to the current regulatory measures. For example, if the change in a certain indicator during the adjustment process exceeds a preset threshold of 5%, it is determined to meet the preset sensitivity condition.
[0036] The multi-objective collaborative regulation decision-making model constructed based on the above-mentioned sensitive indicators can effectively eliminate redundant information that does not respond significantly to regulation measures, making the decision-making model more focused on the core objectives of regulation and improving the pertinence and computational efficiency of the decision-making process.
[0037] Step 105: Based on the multi-objective collaborative regulation decision-making model and regulation measure set, use the multi-objective optimization algorithm to find the non-dominated solution set, and then perform decision optimization on the non-dominated solution set to obtain the target decision scheme.
[0038] In this step, a multi-objective optimization algorithm is used to conduct a large-scale search within the parameter space defined by the control measures. The algorithm iteratively calculates the performance of each candidate solution in the decision model, continuously evolving towards the ideal solution, ultimately obtaining a set of solutions that cannot further improve other objectives without compromising at least one objective—the non-dominated solution set. Based on management needs or pre-defined optimization criteria, a solution with the best overall performance or that meets predetermined priority preferences is selected from the non-dominated solution set as the target decision solution. This solution can simultaneously improve lake water resources, water environment, and water ecology, providing scientific decision support for practical lake management.
[0039] Example 2
[0040] Based on the above embodiment 1, the specific steps of constructing the sub-process simulation model and aligning the spatiotemporal scales are further described in detail.
[0041] In one possible implementation, constructing a water system simulation model may include, but is not limited to, the following steps:
[0042] Step 201: Construct simulation models for water resource subprocesses using hydrological models, water environment subprocesses using water quality models, and water ecology subprocesses using water ecology models.
[0043] Step 202: Within the preset coupling time step, the simulation models of each subprocess are used to perform calculations independently, and the shared state variables between the models are exchanged through the coupler based on the explicit alternating advancement strategy to obtain the water system simulation model, so as to realize the simulation coupling of multiple processes.
[0044] Specifically, this embodiment employs a division-of-labor coupled architecture to achieve refined simulation of multiple lake processes. The hydrological model can be implemented using a semi-distributed hydrological model, for example, by using soil and water assessment tools to simulate water resource processes such as runoff generation and confluence, evapotranspiration, and groundwater recharge within the watershed, obtaining data on river flow and reservoir inflow. The water quality model can be implemented using a model with embedded water quality dynamics equations to calculate the convection, diffusion, and biochemical degradation processes of pollutants within rivers or lakes, thereby outputting environmental parameters such as water temperature, dissolved oxygen, and nitrogen and phosphorus nutrients. The aquatic ecosystem model focuses on the succession patterns of biological communities, for example, using ecosystem simulation software to simulate the dynamic balance of phytoplankton, benthic organisms, and fish populations, outputting biological indicators reflecting ecosystem stability.
[0045] An explicit alternating execution strategy refers to the independent operation of each subsystem model within the same computation time period, either in a predetermined order or in parallel. For example, the water resources submodel might be run first to obtain the hydrodynamic boundary conditions within the current step; these boundary conditions are then used as driving forces input into the water environment and aquatic ecology models for computation. After each submodel completes a preset coupled time step, its key variables are centrally updated and exchanged via a coupler, serving as the initial state for the next time step. This approach effectively reduces the nonlinear iterative overhead of multiphysics coupled computations, improving computational efficiency while maintaining physical consistency.
[0046] In one possible implementation, spatiotemporal scale alignment of each subprocess can include: using a bicubic interpolation algorithm to upsample or downsample the spatial grid based on the spatial resolution differences of the simulation models of each subprocess, so as to unify the spatial scale of each model and obtain a computational grid of each subprocess with a unified spatial scale.
[0047] In this embodiment, physical processes of different dimensions typically correspond to different grid scales. For example, water resource models may use watershed sub-catchments as computational units, while water environment and water ecology models tend to use finer square grids. To eliminate this spatial heterogeneity, interpolation techniques are needed for grid alignment. Specifically, spatial upsampling is performed when coarse grid data needs to be mapped to a fine grid; conversely, spatial downsampling is performed.
[0048] The bicubic interpolation algorithm works by weighted averaging the values of 16 known neighboring grid points around the point to be calculated. Its mathematical logic is as follows: first, a weighted kernel function based on a cubic polynomial is constructed according to the relative position of the point in the grid; then, cubic interpolation operations are performed in both the horizontal and vertical directions. Compared to nearest-neighbor interpolation or bilinear interpolation, bicubic interpolation produces smoother surface features and reduces data truncation errors caused by scale transformation at multi-model coupling boundaries. For example, when interpolating a 1000-meter resolution hydrological raster into a 30-meter resolution ecological computing grid, bicubic interpolation can better preserve the continuity of topographic and water flow changes.
[0049] In one possible implementation, the evaluation indicators for aquatic ecological subprocesses include primary ecological indicators indirectly characterized by water quality parameters (calculated based on water quality parameters), wherein the primary ecological indicators include: chlorophyll a concentration, comprehensive eutrophication state index, and dissolved oxygen saturation.
[0050] It should be noted that the complexity of simulating aquatic ecological processes depends on the selected evaluation indicators. In some preferred embodiments, if the assessment objective focuses primarily on the eutrophication state of the lake, the evaluation indicators can be limited to primary ecological indicators that can be derived from physical water quality parameters.
[0051] Specifically, chlorophyll a concentration is used to characterize the biomass level of phytoplankton in lakes; the comprehensive eutrophication state index is calculated by weighting the measurements of transparency, total phosphorus, total nitrogen, and chlorophyll a; and dissolved oxygen saturation reflects the balance between reoxygenation and oxygen consumption processes in water bodies.
[0052] Under these constraints, the coupling architecture can be simplified because the dynamic processes of primary ecological indicators are highly correlated and have overlapping data with water environment and water quality processes. For example, in application, if the evaluation index system only includes the aforementioned primary indicators, the joint simulation of water resources, water environment, and water ecology can be directly completed using a hydrological model that includes a water quality module, without the need to introduce additional advanced ecological models.
[0053] The model selection strategy based on the characteristics of the indicators described above can flexibly adapt to different accuracy requirements. Furthermore, by establishing a conversion mapping relationship between water quality parameters and primary ecological indicators, a rapid assessment of the health status of lakes can be achieved.
[0054] As an alternative implementation of the above scheme, if the evaluation index system involves biological community indicators at higher trophic levels, such as benthic animal integrity index or fish diversity index, then a water ecological dynamics model must be introduced for division of labor and coupling calculation according to the framework described in step 201, in order to capture complex biological interactions and food web feedback mechanisms.
[0055] Example 3
[0056] Based on the above embodiment 2, the data coupling and bidirectional interaction mechanism of the multi-process subsystem is further described in detail.
[0057] In one possible implementation, exchanging shared state variables among the models may include, but is not limited to, the following steps:
[0058] Step 301: Obtain the water level, flow rate, water quality parameters and biomass parameters output by the simulation model of each subprocess, and store the parameters in a preset shared state variable set;
[0059] Step 302: At the boundary of the coupled time step, based on the memory sharing mechanism or standard interface file, the data in the shared state variable set is fed back to the corresponding subprocess simulation model.
[0060] Specifically, the shared set of state variables can be used to store key physical and biochemical parameters that need to be exchanged in real time between the simulation models of each independent subprocess. Water level and flow rate are calculated and output by the simulation model of the water resources subprocess; water quality parameters, including water temperature, dissolved oxygen concentration, total nitrogen concentration, and total phosphorus concentration, are calculated and output by the simulation model of the aquatic environment subprocess; biomass parameters, mainly including chlorophyll a concentration, are calculated and output by the simulation model of the aquatic ecology subprocess. Within each preset coupling time step, each subprocess model first independently performs time-progression calculations based on the initial boundary conditions at the current moment. When the calculation progresses to the boundary of the coupling time step, each model stops calculating and outputs the corresponding state variables.
[0061] In this embodiment, data interaction adopts an explicit alternating approach. For example, when the simulation models of each subprocess run as multiple sub-modules of the same computational program, a memory-sharing mechanism is used to exchange data. At this time, each sub-module directly reads the latest data in the shared state variable set by accessing a common array or pointer.
[0062] Specifically, after completing a calculation step, the water resources model updates the water level data in memory, and the water environment model then reads this water level data as a hydrodynamic driving condition to simulate pollutant migration. This bidirectional data transfer is further demonstrated by the chlorophyll a concentration output by the aquatic ecosystem model being fed back into the water environment model in the next coupling step. This is used to correct the light attenuation coefficient and recalculate the dissolved oxygen balance, thereby ensuring the physical and biological consistency of the multi-process interactions.
[0063] In one possible implementation, the standard interface file adopts a standard text format or a network common data format file, which is used to write out the shared state variables at the end of the coupling time step when each subprocess simulation model runs as an independent executable program, and is read in by the downstream model at the beginning of the next coupling time step.
[0064] For scenarios where different sub-process simulation models use different development languages or run in independent processes, this embodiment provides a data interaction scheme based on standard interface files. The standard text format file can be a structured text file for data storage. Specifically, the general network data format file can be a NetCDF format file. NetCDF format files possess the characteristics of self-description, cross-platform compatibility, and efficient access to large-scale scientific data. They can completely preserve metadata information such as the dimensions and spatiotemporal attributes of variables, avoiding data parsing errors during complex model interactions.
[0065] In this embodiment, the coupler acts as a data management center, coordinating the operation of each independent executable program. At the end of the current coupling time step, the upstream model writes the calculated shared state variables to a standard interface file according to a preset template format. The coupler triggers the downstream model to start, and at the beginning of the next coupling time step, the downstream model first reads the data from the standard interface file as the starting driving force for its simulation calculation. For example, a hydrological model published by a relevant department outputs the flow time series to a NetCDF file, and the independently running ecodynamics model calls this NetCDF file at the beginning of each calculation loop to obtain flow driving parameters. This file-based interaction method ensures model independence while achieving cross-platform water system simulation through the unified scheduling of multi-scale couplers.
[0066] Therefore, to address the scale distortion problem in multi-process coupling, a high-precision physical correlation between water resources, environment, and ecological models can be achieved through an explicit alternation strategy of bicubic interpolation and shared state variables, effectively eliminating the cumulative error caused by spatiotemporal scale inconsistency.
[0067] Example 4
[0068] Based on the above embodiment 1, the logic for type identification and parameterized encoding of the control measure set is further described in detail.
[0069] In one possible implementation, after providing a pre-built set of regulatory measures, the following steps may also be included:
[0070] Step 401: Identify the types of measures in the control measures set, quantify the continuously adjustable engineering measures into continuous decision variables, and encode the management measures with scheme selection properties into discrete integer variables;
[0071] Step 402: Integrate the continuous decision variables and the discrete integer variables to construct a decision variable vector for multi-objective optimization algorithm calculation. This decision variable vector represents the parameterized search space of the control measure set.
[0072] In this embodiment, parameterized encoding is the process of transforming qualitative control strategies into mathematical expressions that can be directly manipulated by optimization algorithms. Specifically, engineering measures can refer to means with physical scale or operational parameter adjustment attributes, whose parameters have the characteristic of continuous value taking values within a preset range. For example, for water resource scheduling measures, the water diversion volume Q for each scheduling period t is... t As a continuous decision variable, where t is an integer between 1 and Ts; for wetland restoration measures, the restoration area S is... wet As a continuous decision variable; for river dredging measures, the dredging depth D is considered. dredge and dredging length L dredgeThey are respectively used as continuous decision variables.
[0073] Furthermore, management measures can refer to control methods involving scheme comparison, start-up and shutdown control, or management mode switching, which exhibit a discontinuous selection attribute. For example, for non-point source pollution control measures, there are P preset control schemes, including buffer zone construction schemes, soil testing and formula fertilization schemes, and ecological ditch schemes. This embodiment uses discrete integer variable z. p Indicates whether the p-th option is implemented, where z p The value can be 0 or 1, where 0 means not to implement and 1 means to implement.
[0074] After completing the variable representation of various measures, all continuous decision variables and discrete integer variables are arranged and combined according to a preset topological order to construct a decision variable vector. The decision variable vector can be represented as follows:
[0075] u=(Q1,Q2,...,Q Ts ,S wet D dredge ,L dredge ,z1,z2,...,z P ) T ;
[0076] Where u is the decision variable vector, Q1 to Q Ts The water diversion volume for each time period, S wet D represents the area of wetland restoration. dredge For the depth of river dredging, L dredge The length of the dredged river channel, from z1 to z P These represent the selection states of each optional control scheme, Ts represents the total number of scheduling periods, and the superscript T indicates transpose.
[0077] Furthermore, while constructing the decision variable vector, it is also necessary to obtain the physical constraints of each variable to define the feasible region of the algorithm. Physical constraints can include upper and lower bound constraints on variables and coupling constraints between measures. For example, the water diversion volume is limited by scheduling capacity and must satisfy Q. t_min ≤Q t ≤Q t_max Q t_min Q represents the lower limit of the water diversion volume in time period t. t_max This represents the upper limit of the water diversion volume in time period t; the restored area is limited by available land resources and must satisfy 0 ≤ S. wet ≤S wet_max S wet_max This represents the upper limit for the wetland restoration area. Simultaneously, the decision variable vector must satisfy a pre-defined constraint function, which may include, but is not limited to, water balance constraints, total investment ceiling constraints, and ecological baseflow guarantee constraints.
[0078] As an alternative implementation method, for ecological compensation measures involving cross-regional cooperation, the compensation amount can be quantified as a continuous decision variable. If the compensation policy includes multiple compensation modes, then discrete integer variables can be used to select and encode different levels of modes. Through a hybrid coding method, qualitative management policies and quantitative engineering parameters can be unified in the same vector space, providing standardized mathematical input for subsequent multi-objective optimization.
[0079] Example 5
[0080] Based on the above embodiments, the specific process of joint dimensionality reduction and sensitivity screening of multidimensional evaluation indicators is further described in detail. In this embodiment, the evaluation indicator system is divided into three dimensions—water resources, water environment, and water ecology—referring to the preset river and lake health evaluation standards. Among them, water resource indicators may include the degree of ecological baseflow satisfaction and water resource development and utilization rate; water environment indicators include dissolved oxygen concentration, total nitrogen concentration, and total phosphorus concentration; and water ecology indicators may include chlorophyll a concentration and comprehensive eutrophication state index, etc.
[0081] In one possible implementation, decision indicators that meet preset sensitivity conditions are selected, and then referred to... Figure 2 This may include, but is not limited to, the following steps:
[0082] Step 501: Based on the initial simulation results generated by the control measures set, calculate the sensitivity index of each evaluation index relative to the measure parameters in the control measures set;
[0083] Step 502: Calculate the pairwise correlation between each evaluation index using the initial simulation results, and remove redundant indexes based on the correlation determination results.
[0084] Step 503: Based on the sensitivity index and the preset screening threshold, extract decision indicators from the evaluation indicators after removing redundancies to obtain a set of decision indicators.
[0085] Specifically, this embodiment first performs statistical analysis on the initial simulation results D0 to obtain the responsiveness of each evaluation index to different control measure parameters. The sensitivity index can be characterized using the total effect sensitivity index, which includes not only the direct contribution of a single measure parameter to the index but also the impact of interactions between parameters. For each evaluation index, the maximum value of its sensitivity index to all measure parameters is taken as the overall sensitivity of that index. Simultaneously, the correlation between indicators is analyzed to identify redundant indicators that exhibit highly synchronous changes during the control process. By eliminating insensitive and highly redundant indicators, a preliminary dimensionality reduction of the evaluation system from the monitoring dimension to the decision-making dimension can be achieved.
[0086] In one possible implementation, the correlation between each pair of evaluation indexes is calculated using the initial simulation results, which may include, but is not limited to, the following process:
[0087] Based on the sequence values of each evaluation index in the initial simulation results, the Spearman rank correlation coefficient between each pair of indexes is calculated to obtain the correlation matrix;
[0088] Based on the correlation matrix, hierarchical clustering is performed on each evaluation index, and the indices whose absolute value of the rank correlation coefficient is greater than the correlation threshold are divided into the same index cluster.
[0089] Within each index cluster, the index with the highest sensitivity index is retained as the representative index, and other indicators within the index cluster are removed to obtain the evaluation index after removing redundancy.
[0090] In this embodiment, correlation analysis is used to quantify the consistency of the evolution of different evaluation indicators under the drive of regulatory measures. For the m regulatory schemes included in the initial simulation results, the simulated value sequences of the j-th and l-th indicators are extracted, and their Spearman rank correlation coefficients are calculated after processing with a rank function. An example of the calculation logic for the rank correlation coefficient is as follows:
[0091] ρ jl =1-(6*∑((rg ij -rg il ) 2 )) / (m*(m 2 -1));
[0092] Where, ρ jl Let rg be the Spearman rank correlation coefficient between the j-th indicator and the l-th indicator. ij Let rg be the rank of the simulated value of the j-th index under the i-th scheme. il Let be the rank of the simulated value of the l-th indicator under the i-th scheme, m be the total number of control schemes, and ∑ be the summation operator for all schemes, i=1…m.
[0093] After obtaining the correlation matrix, the indicators are classified using agglomerative hierarchical clustering algorithm. In this embodiment, the preset correlation threshold is set to 0.8. If the absolute value of the rank correlation coefficient between two indicators is greater than 0.8, these two indicators are considered highly redundant and are assigned to the same indicator cluster. Within each indicator cluster, the previously calculated comprehensive sensitivity is retrieved, and only the indicator with the highest sensitivity within the cluster is retained as the representative of that dimension. For example, if total nitrogen concentration and total phosphorus concentration show a high synchronous correlation under a certain control scenario, and the sensitivity index of total nitrogen concentration is higher than that of total phosphorus concentration, then total nitrogen concentration is retained for the next step. This method removes redundant information while maximizing the retention of the evaluation indicators' feedback capability to control measures.
[0094] In one possible implementation, the screening threshold can be determined in the following way:
[0095] The sensitivity indices of each evaluation indicator are arranged in descending order of their numerical values to obtain the sensitivity distribution curve;
[0096] The sensitivity distribution curve is normalized at both ends, and the vertical distance from each point on the normalized curve to the line connecting the beginning and end ends is calculated.
[0097] The sensitivity index corresponding to the point with the maximum vertical distance is determined as the screening threshold.
[0098] To achieve data-driven objective screening, this embodiment uses an inflection point detection method to adaptively determine the screening threshold, replacing manual experience-based setting. Specifically, the sensitivity indices of all candidate indicators are arranged in descending order, and a distribution curve is established with the indicator number q as the horizontal axis and the sensitivity index Sq as the vertical axis. The curve coordinates are then normalized.
[0099] q norm =(q-1) / (n-1);
[0100] Sq norm =(Sq-S n ) / (S1-S n );
[0101] Where, q norm Here, Sq represents the normalized index number, n represents the total number of indicators, and Sq represents the index index. norm S1 is the normalized sensitivity index, and S2 is the maximum sensitivity index value. n This is the minimum sensitivity index value.
[0102] In the normalized plane, construct a reference line connecting the starting point (0,1) and the ending point (1,0). The equation of this line can be:
[0103] q norm +Sq norm -1=0.
[0104] Calculate the perpendicular distance from each point on the curve to the reference line:
[0105] dist(q) = |q norm +Sq norm -1| / 1.414;
[0106] Where dist(q) is the vertical distance from the q-th index point to the reference line, and 1.414 is the approximate square root of the sum of squares of the coefficients of the reference line.
[0107] By traversing all points, the inflection point where the vertical distance dist(q) reaches its maximum value is identified. This point represents the turning point where the rate of sensitivity decreases from rapid to gradual. The sensitivity index Sq* corresponding to this inflection point is determined as the final screening threshold. All indicators with a comprehensive sensitivity greater than or equal to this threshold are included in the decision indicator set.
[0108] This method can automatically identify the most critical control indicators based on the specific characteristics of a lake, thereby improving the objectivity of the decision-making model.
[0109] Therefore, in the indicator selection process, the use of correlation redundancy removal and inflection point adaptive detection technology has enabled data-driven objective dimensionality reduction, effectively solving the problem of blindness caused by manually setting thresholds.
[0110] Example 6
[0111] Based on Embodiment 5 above, the sensitivity analysis method based on the polynomial chaotic expansion surrogate model is further described in detail. Unlike Embodiment 5, it replaces the computation of the time-consuming water system simulation model by constructing a lightweight surrogate model, completing the sensitivity analysis without increasing the number of simulations.
[0112] In one possible implementation, calculating the sensitivity index of each evaluation indicator may include, but is not limited to, the following steps:
[0113] Step 601: Using the measure parameters in the initial simulation results as independent variables and the simulated values of the evaluation indicators as dependent variables, construct the polynomial chaotic expansion surrogate model corresponding to each evaluation indicator through orthogonal polynomial basis functions.
[0114] Step 602: Determine the expansion coefficients of the polynomial chaotic expansion surrogate model using the least squares method, and analyze the total effect sensitivity index corresponding to each evaluation index based on the expansion coefficients.
[0115] Specifically, the polynomial chaotic expansion surrogate model decomposes the nonlinear response of the evaluation index to the measure parameters into a linear combination of a set of orthogonal polynomial basis functions. In this embodiment, the initial simulation result D0 is first extracted, which contains N0 sets of control measure parameters and their corresponding simulated values of the evaluation index. These parameters are used as the input vector u, and the corresponding simulated values are used as the response y. j Construct the following proxy model structure:
[0116] ;
[0117] Among them, y j (u) represents the predicted response value of the j-th evaluation indicator, u is the parameter vector of the control measures, α is the multi-indicator index, A is the preset cutoff set, and c j,αΨ is the expansion coefficient to be determined. α (u) is the orthogonal polynomial basis function corresponding to the characteristics of the parameter probability distribution.
[0118] In this embodiment, the selection of orthogonal polynomial basis functions is tied to the probability distribution type of the parameters. For example, for parameters that are uniformly distributed within a preset range, Legendre polynomials can be used as basis functions; for parameters that are normally distributed, Hemet polynomials are used. Through orthogonality assurance, polynomials of different orders are statistically uncorrelated.
[0119] Furthermore, the least squares method is used to perform regression analysis on the initial simulation result D0 to determine the expansion coefficients c corresponding to each basis function. j,α This process may specifically include constructing an observation matrix consisting of the values of basis functions at sample points, and obtaining the optimal estimates of the coefficients by solving a system of normal equations.
[0120] After obtaining the expansion coefficients, based on the orthogonality of polynomial chaotic expansion, variance decomposition can be directly performed using the squared terms of the expansion coefficients, thereby analytically obtaining the sensitivity indices of each indicator. The analytical calculation logic of the total effect sensitivity index is as follows:
[0121] ;
[0122] Among them, S ji Let A be the total effect sensitivity index of the j-th evaluation index to the i-th measure parameter. i Let A be the set of all multi-index indices containing the i-th parameter in the truncated set A, where |α| is the modulus of the multi-index and represents the total order of the polynomial.
[0123] Through the above analytical process, the contribution of each control measure parameter to the fluctuation of the evaluation index is directly determined by utilizing the proportional relationship of the coefficients in the formula. Since this process only involves regression and algebraic operations on the completed simulation data, it does not require calling the complex water system simulation model again. Therefore, when dealing with high-dimensional sensitivity analysis involving the coupling of three models of water resources, water environment, and water ecology, it can alleviate the time cost bottleneck of model operation and help to achieve efficient acquisition of sensitivity indices.
[0124] In some alternative implementations, to further improve the fitting accuracy of the surrogate model, a sparsity strategy can be used to optimize the truncation set A, retaining only low-order and predetermined interaction terms that significantly contribute to the response. Furthermore, if the initial simulation sample size N0 is small, cross-validation can be used to evaluate the generalization ability of the surrogate model and adjust the order of the polynomial accordingly.
[0125] Therefore, in terms of computational efficiency, this invention transforms time-consuming sensitive calculations into algebraic analytical operations by constructing a polynomial chaotic expansion proxy model, thereby achieving accurate quantification of the response of indicators to measures without the need for additional calls to simulation models.
[0126] Example 7
[0127] Based on the above embodiments, the process of constructing a multi-objective deviation function with optimization driving force is further described in detail. In one possible implementation, refer to... Figure 3 Constructing a multi-objective collaborative regulation and control decision-making model may include, but is not limited to, the following steps:
[0128] Step 701: Obtain the preset threshold range and ideal value corresponding to each decision indicator;
[0129] Step 702: Construct a deviation function for each decision indicator: If the decision indicator is within a preset threshold range, calculate the normalized deviation distance between the actual value and the ideal value of the indicator; if the decision indicator exceeds the preset threshold range, add a preset penalty term on top of the deviation distance.
[0130] Step 703: For the fields of water resources, water environment and water ecology, perform weighted summation on the deviation functions of each field to obtain the objective function corresponding to each field.
[0131] Step 702 can also be implemented as follows: construct a deviation function for each decision indicator: if the simulated value of the decision indicator is within the preset threshold range, calculate the normalized deviation distance between the simulated value and the ideal value; if the simulated value of the decision indicator exceeds the preset threshold range, then add a preset penalty term on the basis of the deviation distance.
[0132] Specifically, the objective function constructed in this embodiment is used to address the problem of insufficient optimization driving force caused by the prior art's reliance solely on whether an indicator falls within a threshold as the judgment criterion. By introducing a calculation term approaching the ideal value into the deviation function, it can be ensured that the optimization algorithm can still guide the decision scheme to continuously evolve towards the optimal state even when all indicators meet the threshold requirements.
[0133] In this embodiment, for each selected decision indicator, the corresponding preset threshold range is defined by a lower limit L. j and upper limit U j Composition. Ideal value v j * Specifically, the value can be the center of a preset threshold range, or determined based on the ecological reference value of the indicator. An example of how the deviation function can be expressed is as follows:
[0134] ;
[0135] Where, Δ j v is the comprehensive deviation value of the j-th decision indicator; j The simulated values of the decision indicators; v j * L represents the ideal value corresponding to the decision indicator. j U is the lower limit of the preset threshold range corresponding to the decision indicator; j is the upper limit of the preset threshold range corresponding to the decision indicator; max is the maximization operator; M is the preset penalty coefficient, whose value is not less than 10.
[0136] It is understandable that when the simulated value v j At the lower limit L j and upper limit U j When the value is between 0 and 1, the result of the max operator is 0. At this point, the deviation value is determined by the normalized distance from the ideal value; a smaller value indicates a better solution. When the simulated value v... j When the value deviates from the preset threshold range, the max operator will output a positive value, which is amplified by the penalty coefficient M and superimposed on the deviation result, thereby producing a significant numerical penalty effect and forcibly guiding the optimization algorithm back to the feasible region.
[0137] Based on this, the decision indicators are categorized into three types according to their respective technical fields: water resources, water environment, and water ecology. By assigning corresponding weights to each indicator, the sum of weighted deviations for each field is calculated, which is the objective function for each field. An example of the objective function is as follows:
[0138] f k (u)=∑ j=1 n (w j_k *Δ j );
[0139] Among them, f k (u) is the objective function for the k-th domain, where k is the domain identifier for water resources, water environment, or water ecology; w j_k Let be the weight coefficient of the j-th decision indicator within the k-th domain, and the sum of the weights within the same domain is 1; Δ j ∑ represents the comprehensive deviation value of the decision indicators; ∑ is the summation operator.
[0140] In this embodiment, the weighting coefficient w j_k The value of w can be determined based on management needs using the analytic hierarchy process (AHP) or the equal-weighting method. By default, each decision indicator can be assigned equal weight within its respective domain, i.e., w... j_k The value is the reciprocal of the total number of indicators in this field. Those skilled in the art can adaptively adjust the weights according to the management priorities of specific lakes.
[0141] Through the above construction method, this embodiment transforms the complex lake regulation problem into a three-dimensional multi-objective optimization problem. Each dimension represents the objective of minimizing the normalized bias in a given domain. This definition not only helps eliminate differences between different physical dimensions but also improves the robustness of the optimization process and the ecological rationality of the results through a combination of penalty and driving mechanisms.
[0142] Furthermore, in some optional implementations, the priority of objective functions in different domains can be dynamically adjusted according to the management needs of a predetermined period. For example, during the dry season, the global weight coefficient of the water resources objective function can be appropriately increased to ensure basic ecological flow requirements. For some highly sensitive indicators, the sensitivity of the model to exceeding the limit of that indicator can be improved by increasing the value of the penalty coefficient M.
[0143] The aforementioned improvements to the objective function structure ensure that even after the solution falls within the preset threshold range, it still has the optimization drive to continuously evolve towards the ideal ecological state, thus avoiding the optimization trap.
[0144] Example 8
[0145] Based on Embodiments 1 to 7 above, the adaptive multi-objective optimization process assisted by a surrogate model is further described in detail. Since the water system simulation model involved in this invention couples three sub-processes—water resources, water environment, and water ecology—the computational cost of a single complete simulation is significant. If the real model is directly called for scheme evaluation in each iteration of the multi-objective optimization algorithm, the overall optimization efficiency will be low and convergence will be difficult within a finite time. This embodiment achieves efficient allocation of computational resources by introducing a surrogate model substitution technique and an active learning point-addition mechanism.
[0146] In one possible implementation, refer to Figure 4 The optimization process to obtain the set of non-dominated solutions can include, but is not limited to, the following steps:
[0147] Step 801: Construct an initial training set using the initial simulation results, and train Gaussian process regression surrogate models for each objective function based on this (initial training set);
[0148] Step 802: Generate a population of candidate control schemes, and use each surrogate model to evaluate each scheme to obtain the predicted target value;
[0149] Step 803: Select a scheme for the target number from the population based on the active learning addition criterion, calculate the true target value of the selected scheme using the water system simulation model, and update the initial training set and retrain the agent model based on this (true target value).
[0150] Step 804: Perform non-dominated sorting based on each predicted target value and each true target value, and output the non-dominated solution set after the convergence condition is met.
[0151] Alternatively, the process can also be:
[0152] An initial training set was constructed using the initial simulation results, and Gaussian process regression surrogate models were trained based on the initial training set for each objective function in the multi-objective collaborative regulation decision model.
[0153] The following steps are iteratively executed until convergence is achieved: a population of candidate control schemes is generated, and each scheme is evaluated using a surrogate model to obtain predicted target values; schemes with a target number are selected from the population based on the active learning addition criterion, the true target values of the selected schemes are calculated using a water system simulation model, and the initial training set is updated accordingly and the surrogate model is retrained; non-dominated sorting is performed based on each predicted target value and each true target value, and the current non-dominated solution set is updated.
[0154] Output the non-dominated solution set after the convergence condition is met.
[0155] Specifically, the Gaussian process regression surrogate model is the Kriging surrogate model. In this embodiment, the simulation result data D0 is first extracted to form the initial training set. Independent surrogate models are constructed for the objective functions of water resources, water environment, and water ecology, respectively. For any regulation scheme parameter u to be evaluated, the calculation logic of the predicted target value output by the surrogate model is shown in the following example:
[0156] f' k (u)=μ k +r k (u) T *R k -1 *(F k -μ k *1);
[0157] Among them, f' k (u) is the surrogate prediction value of the k-th objective function; μ k r is the mean estimate of the k-th objective. k (u) is the correlation vector between the scheme to be evaluated and the trained sample points, with the superscript T indicating transpose; R k F is the correlation matrix between training sample points; k 1 represents the true target value vector corresponding to each sample point in the training set; 1 represents a column vector with all elements being 1.
[0158] Correlation matrix R kEach element can be calculated by a preset correlation function. Those skilled in the art can choose commonly used kernel function types in the field, such as Gaussian correlation function and Matérn correlation function, and determine the shape parameters of the kernel function during the hyperparameter training process.
[0159] A surrogate model is used to quickly evaluate the candidate control schemes generated by the algorithm, and schemes with potential are selected for active learning. The active learning mechanism identifies regions where the surrogate model's prediction accuracy is low or the target space solution set is sparsely distributed, and selects schemes with a target quantity of q to perform high-precision calculations using a real water system simulation model. The calculated real target values are used to enrich the training set and drive the dynamic reconstruction of the surrogate model, continuously improving its fitting accuracy near the Pareto front. The schemes calculated using real data are then merged with those predicted by the surrogate model, and a non-dominated ranking is performed to select the current non-dominated solutions.
[0160] The target number q can be determined by those skilled in the art based on the single computation time and total available computational budget of the real model, and is typically taken as 5% to 20% of the population size. When computational resources are abundant, q can be appropriately increased to accelerate convergence, while when computational resources are limited, q can be decreased to control the total number of simulations.
[0161] One possible implementation, a scheme for selecting the target number from the population based on an active learning point-addition criterion, may include, but is not limited to, the following process:
[0162] Obtain the standard deviation of the prediction output of each proxy model for the candidate solution;
[0163] The density of the distribution of the current non-dominated solution set or the initial non-dominated solution set determined by the initial training set in the target space is estimated, and the sparsity index value reflecting the sparsity of the solution set distribution is calculated.
[0164] The comprehensive evaluation function is constructed by multiplying the prediction standard deviation of each candidate solution in each field with the sparsity index value of the corresponding field.
[0165] The scheme that maximizes the comprehensive evaluation function in the population is selected as the scheme for calculating the true target value in the simulation model of the water system to be utilized.
[0166] In this embodiment, the active learning addition criterion is the infill criterion (IC), used to address the problem that traditional methods only focus on prediction accuracy while ignoring the diversity of the solution set. For each candidate solution u, its uncertainty, i.e., the prediction mean square error, is first calculated using each surrogate model. An example of its calculation logic is as follows:
[0167] σ k 2 (u)=σk 2 *(1-r k (u) T *R k -1 *r k (u));
[0168] Where, σ k 2 (u) represents the mean square error of the prediction of the k-th objective function at parameter point u; σ k 2 This is the global variance term for the objective; r k (u) is the correlation vector, and the superscript T indicates transpose; R k The above formula represents the correlation matrix. It is an engineering approximation of the prediction variance of the Gaussian process regression surrogate model, providing an effective uncertainty measure for the active learning addition criterion in surrogate-assisted optimization applications. A larger mean square error in prediction indicates lower prediction reliability of the surrogate model in that region.
[0169] Simultaneously, the density distribution of the current non-dominated solution set in the target space is calculated, and its reciprocal is taken to obtain the sparsity index value δk(u). The larger δk(u) is, the more open the target space region where the solution is located. Supplementing this region with real computational samples helps improve the uniformity and distribution width of the non-dominated solution set. In this embodiment, density estimation can be achieved using kernel density estimation or a density metric based on k-nearest neighbor distance. Those skilled in the art can choose an appropriate density estimation method according to the solution set size and target dimension.
[0170] Construct a comprehensive evaluation function:
[0171] IC(u) = ∑ k∈{A,B,C} (σ k (u)*δ k (u));
[0172] Where IC(u) is the value of the comprehensive evaluation function; σ k (u) represents the prediction standard deviation of the k-th target, i.e., the square root of the prediction mean square error; δ k (u) is the sparsity index value of the k-th target at the candidate scheme, which is the reciprocal of the density estimate. The larger the value, the sparser the solution set distribution in the region, and it is used to characterize the degree of sparsity; ∑ is the summation operator, k∈{A,B,C} is the target dimension index, which corresponds to the three dimensions of water resources A, water environment B, and water ecology C, respectively.
[0173] By searching for several individuals that maximize IC(u) across the entire candidate population, the algorithm adaptively selects schemes that are both in the blind spot of the surrogate model and in the sparse region of the solution set for realistic simulation. This on-demand computational addition strategy allows the optimization algorithm to concentrate a limited number of realistic simulations on the positions that contribute most to improving the quality of the Pareto front, obtaining high-quality target decision schemes while maintaining low computational cost.
[0174] As an alternative implementation method, in the early stages of optimization, since the training set samples are small, the weight of the prediction mean square error in the filling criterion can be increased to prioritize improving the global accuracy of the surrogate model; as the iteration progresses, the weight of the density estimate is gradually increased to strengthen the exploration of the diversity of the solution set distribution.
[0175] Therefore, to address the performance bottleneck in the optimization process, this invention introduces an adaptive proxy assistance mechanism. By actively learning criteria, it dynamically captures the sparse regions of the target space and the blind spots of model cognition, significantly reducing the number of calls to the real simulation model and ensuring rapid convergence in complex coupled scenarios.
[0176] Example 9
[0177] Based on Embodiment 8 above, the hyperparameter solving and convergence determination steps of the optimization process are further described in detail. By introducing a bounded optimization algorithm with multiple starting points and monitoring of hypervolume indicators, the training quality of the surrogate model and the reliability of the multi-objective optimization results are improved.
[0178] In one possible implementation, the convergence condition can be determined in the following way:
[0179] Step 901: Obtain the preset reference point in the target space and calculate the hypervolume index formed by the current non-dominated solution set and the preset reference point;
[0180] Step 902: Monitor the change of the hypervolume index with the number of algorithm iterations, and calculate the relative rate of change of the hypervolume index within the preset number of iterations;
[0181] Step 903: When the relative rate of change continuously reaches the preset generation number and is less than the preset convergence threshold, it is determined that the convergence condition is met.
[0182] The determination process can also be as follows: obtain a preset reference point in the target space and calculate the hypervolume index formed by the current non-dominated solution set and the preset reference point; monitor the change of the hypervolume index with the algorithm iteration algebra and calculate the relative change rate of the hypervolume index within a preset consecutive algebra; when the relative change rate is less than the preset convergence threshold within a consecutive preset algebra, it is determined that the convergence condition is met.
[0183] Specifically, the hypervolume index, or hypervolume indicator (HV), is used to simultaneously evaluate the convergence and diversity of the non-dominated solution set. The preset reference point is typically chosen as the worst point in the target space, i.e., a vector composed of the maxima of each objective function within the current search range. In this embodiment, the non-dominated solution set P of generation t is calculated. t The calculation logic for the hypervolume index relative to the preset reference point r is shown in the following example:
[0184] HV t =λ(F(P t )|r);
[0185] Among them, HV t P is the hypervolume index of the non-dominated solution set in generation t; t F(P) is the set of non-dominated solutions in the current generation; t P is the non-dominated solution set. t The mapping in the target space, r is the preset reference point; λ is the Lebesgue measure, used to calculate the total volume of the region dominated by the non-dominated solution set in the target space.
[0186] The equilibrium of the optimization process is determined by monitoring the dynamic changes of the hypervolume index during the iteration process. Specifically, an observation window G0 is set, for example, G0 is 5 or 10 generations, and the relative rate of change of the hypervolume index within this window is calculated. An example of the calculation formula is as follows:
[0187] Δ HV =|HV t -HV t-G0 | / HV t-G0 ;
[0188] Where, Δ HV HV represents the relative rate of change of the supervolume index. t HV is the hypervolume index for the current iteration. t-G0 This refers to the super-volume index prior to the G0 generation.
[0189] When the relative rate of change Δ HV The convergence threshold ε is continuously less than the preset convergence threshold throughout generation G0. HV For example, ε HV The value is 10 -3 If the value is less than or equal to a stable Pareto front, the algorithm is considered to have captured the convergence condition and is stopped iterating. This stopping criterion based on hypervolume measure, compared to simple algebraic constraints, can more objectively reflect the quality evolution state of the solution set in multi-objective optimization problems.
[0190] In one possible implementation, when training the Gaussian process regression surrogate model, the bounded-constrained finite-memory Broyden-Fletcher-Goldfaber-Shannon algorithm is used to solve the model hyperparameters, and a multi-starting-point initialization strategy is used to select the set of solutions with the largest likelihood function values as the final hyperparameters.
[0191] In this embodiment, the finite-memory Broyden-Fletcher-Goldfaber-Shannon algorithm is the L-BFGS-B algorithm. As a variant of the quasi-Newton method, this algorithm is suitable for handling large-scale nonlinear optimization problems with variable boundary constraints. By storing the approximate Hessian matrix in finite memory, it effectively reduces the memory overhead and computational complexity when solving the hyperparameters of the Gaussian process regression model (Kriging model).
[0192] To avoid getting trapped in local optima when solving for the maxima of the likelihood function, this embodiment employs a multi-initialization strategy. Specifically, multiple sets of independent initial values are generated beforehand within the domain of the hyperparameters. To ensure search coverage, these initial values are uniformly distributed in the logarithmic space. An example of calculating the likelihood function of the hyperparameters is shown below:
[0193] L θ =-(Nt / 2)*ln(σ k 2 )-(1 / 2)*ln(|R k |);
[0194] Among them, L θ σ is the likelihood function value; Nt is the number of training samples; k 2 R is the global variance of the k-th objective; k R is the correlation matrix between training sample points; k | represents the absolute value of the determinant of the correlation matrix; ln is the natural logarithm operator.
[0195] For each set of initial values, the L-BFGS-B algorithm is used for iterative search. After calculating all sets of starting points, the final likelihood function values obtained from each set are compared, and the set of hyperparameter solutions with the largest likelihood function value is selected as the final hyperparameter θ of each target surrogate model. By combining global and local search strategies, the fitting accuracy of the Gaussian process regression surrogate model for the complex nonlinear response of multiple processes in water systems is improved, providing a reliable mathematical foundation for subsequent rapid optimization.
[0196] Example 10
[0197] Based on Embodiment 9 above, the non-dominated solution set decision optimization process based on the permutation ratio knee point method is further described in detail. Since the non-dominated solution set obtained through multi-objective optimization contains multiple conflicting solutions, it is necessary to select an optimal solution from this set that balances the benefits in the three areas of water resources, water environment, and water ecology. This embodiment achieves objective optimization of the target decision solution through quantitative trade-off analysis and distance discrimination.
[0198] In one possible implementation, refer to Figure 5 Decision optimization for non-dominated solution sets may include, but is not limited to, the following steps:
[0199] Step 1001: Project the solutions in the non-dominated solution set onto the two-dimensional objective space composed of the objective functions of water resources, water environment and water ecology in the multi-objective collaborative regulation decision-making model;
[0200] Step 1002: In each two-dimensional target space, sort the solutions according to the objective function value of one of the neighborhoods, and calculate the local permutation ratio between adjacent solutions after sorting.
[0201] Step 1003: Identify the local maxima locations in the local permutation ratio sequence and determine them as the knee points reflecting the competitive relationship between targets in different domains;
[0202] Step 1004: Based on the knee point, calculate the weighted distance between each solution and the preset normalized ideal point, and determine the solution with the smallest weighted distance as the target decision scheme. Specifically, determine the weight coefficients of the objective function for each domain based on the knee point, calculate the weighted distance between each solution and the preset normalized ideal point, and determine the solution with the smallest weighted distance as the target decision scheme.
[0203] Specifically, the nondominated solution set can refer to the set of nondominated individuals on the Pareto front surface output by Examples 8 and 9. In this example, the three-dimensional nondominated solution set is projected onto three sets of two-dimensional target pairs, namely, onto the plane formed by water resources and water environment (fA, fB), water environment and water ecology (fB, fC), and water resources and water ecology (fA, fC).
[0204] In this embodiment, the local permutation ratio is calculated to quantify the degree of sacrifice of one objective for another among adjacent solutions, representing a unit improvement in one objective. Taking water resource objective fA and water environment objective fB as examples, the non-dominated solutions are sorted in ascending order of fA value to obtain an ordered solution sequence (fA1, fB1), (fA2, fB2), ..., (fA... Np ,fB Np Np represents the number of solutions in the non-dominated solution set on the current projection plane, i.e., the number of non-dominated individuals. An example of the formula for calculating the local permutation ratio is shown below:
[0205] TR AB_x =|fB x+1 -fB x | / |fA x+1 -fA x |;
[0206] Among them, TR AB_x fB is the local permutation ratio between the x-th adjacent solutions; x+1 and fB x The objective function values for the water environment are the adjacent non-dominated solutions after sorting; fA x+1 andfA x The objective function values for water resources are the sorted adjacent non-dominated solutions.
[0207] By analyzing the local permutation ratio sequence in each two-dimensional target space, the locations where the values abruptly change or reach a maximum are identified, and these locations are designated as Knee Points. The Knee Point represents the area near which the competition between the targets is most intense; that is, to further optimize one target, it is necessary to sacrifice the significant deterioration of the other target.
[0208] Optionally, based on the knee point distribution identified in each two-dimensional target space, the weight coefficients for each domain are determined as follows: If the knee points in a certain two-dimensional projection are densely distributed in the region close to the optimal end of a certain domain, the weight of that domain is appropriately increased to reflect the sensitive competitive characteristics of that domain in the Pareto front. When there is no obvious preference information, the weights of each domain are set to an equal weight of 1 / 3 by default.
[0209] In some embodiments, the weight adjustment can be determined based on the distribution density ratio of knee points in each two-dimensional projection. For example, if the knee point density in the water resources-water environment projection is higher than in other projections, weights can be assigned to each domain according to the knee point density ratio. In a default implementation, the weights of each domain are all equal at 1 / 3, and those skilled in the art can make adaptive adjustments according to the management preferences of specific lakes.
[0210] After identifying the knee points in each domain, the weighted distance between all non-dominated solutions and the normalized ideal point is calculated in the normalized objective space. In this embodiment, the normalized ideal point corresponds to the origin (0,0,0) where the objective functions of all three domains have reached their minimum values. An example of the weighted distance calculation formula is as follows:
[0211] D F =sqrt(wA*fA norm 2 +wB*fB norm 2 +wC*fC norm 2 );
[0212] Among them, D F fA is the weighted Euclidean distance between the non-dominated solution and the normalized ideal point. norm fB norm fC norm These are the normalized objective function values for water resources, water environment, and water ecology, respectively; wA, wB, and wC are the preset weights for the corresponding fields, which are set to 1 / 3 by default in this embodiment, but can also be dynamically adjusted by the decision-maker according to the knee distribution; sqrt is the square root operator.
[0213] Optionally, the default method for decision-making based on knee points is as follows: Using the set of knee points identified in each 2D projection as the center, determine the preferred candidate domain in the target space—calculate the weighted distance only for non-dominated solutions located within the neighborhood of any set of knee points. The neighborhood range can be taken as half the distance between adjacent knee points along each target axis. By limiting the preferred candidate domain, it ensures that the final recommended solution is within the trade-off region where the competitive relationship between the targets is most obvious.
[0214] By traversing the non-dominated solution set, the weighted distance D is selected. F The minimum solution is taken as the final target decision scheme. Through this method, the decision-making process not only considers the minimization of the overall goal, but also takes into account the sensitive trade-offs between different goals through permutation ratio analysis, and selects the most technically and economically reasonable decision result in the coordinated control of multiple processes in the water system.
[0215] In some alternative implementations, if the knee point distribution exhibits a significant unilateral tilt within a predetermined region, decision-makers can correspondingly increase the weight of that region to reflect the emphasis on management priorities. Furthermore, when calculating the weighted distance, optimization can be performed only in the local solution set near the knee point to further ensure that the recommended solution is located in the transition region of the objective trade-off.
[0216] Therefore, by using local permutation ratio and knee point recognition technology, a quantitative cost-benefit benchmark is provided for decision-makers, which can effectively reduce subjective bias in the process of scheme selection.
[0217] Example 11
[0218] Based on the above embodiments 1 to 10, the real-time monitoring and trigger-based dynamic correction process of the decision-making scheme is further described in detail.
[0219] In one possible implementation, after obtaining the target decision scheme, the following process is also included:
[0220] The target decision scheme is compared with real-time monitored hydrological and water quality data. If the measured value deviates from the expected control value by more than the preset deviation threshold, the multi-objective collaborative control decision model is automatically triggered to re-optimize and output the corrected decision scheme.
[0221] The process can further involve inputting the target decision scheme into the water system simulation model to calculate the expected control value; comparing the expected control value with real-time monitored hydrological and water quality data to calculate the deviation of the measured value from the expected control value; if the deviation exceeds a preset deviation threshold, then using the current real-time monitoring data as the initial condition, automatically triggering the re-optimization process of the multi-objective collaborative control decision model, and outputting the corrected decision scheme.
[0222] Specifically, in this embodiment, after the target decision-making scheme is issued and executed, a closed-loop monitoring phase begins. Real-time hydrological and water quality data can be collected in real time by automatic monitoring stations deployed at key locations in the lake. This data may include indicators such as real-time water level, instantaneous flow rate, chemical oxygen demand (COD), ammonia nitrogen concentration, total phosphorus concentration, and chlorophyll a concentration. Measured values are obtained according to a preset sampling frequency, such as once per hour or once per day, and the expected control values of the target decision-making scheme under current meteorological and upstream boundary conditions are calculated using a water system simulation model.
[0223] The deviation of the control plan from the expected control value is assessed by calculating the magnitude of the deviation. An example of deviation calculation is as follows:
[0224] Err v =|V real -V pre | / V pre ;
[0225] Among them, Err v For the deviation range, V real V represents the measured values of real-time monitored hydrological and water quality data. pre The expected value of regulation corresponding to the target decision-making scheme.
[0226] When the deviation of any key evaluation indicator Err v When the deviation exceeds a preset threshold, it is determined that the current control scheme has significantly deviated under actual environmental disturbances. At this point, the current real-time status data is automatically extracted as initial conditions, and the aforementioned multi-objective collaborative control decision model and multi-objective optimization algorithm are invoked again to perform a re-optimization process.
[0227] During the re-optimization process, the penalty coefficients or weight distributions in the multi-objective collaborative regulation decision-making model are dynamically adjusted based on the deviation distribution between measured and expected data, and the surrogate model is incrementally trained using the latest observational data. Through the aforementioned trigger-based correction mechanism, a revised decision scheme can be output, thereby achieving dynamic rolling optimization of the multi-process regulation scheme for lakes. This ensures that the regulation objectives remain within a controllable range even under the interference of uncertain factors such as extreme weather or sudden changes in upstream water inflow.
[0228] In some optional implementations, the preset deviation threshold can be set in stages according to the importance level of the indicator. Those skilled in the art can determine the deviation threshold for each indicator based on the allowable fluctuation range of the thresholds at each level in the relevant water quality standards, combined with the measurement accuracy of the actual monitoring equipment. For example, a lower deviation threshold, such as 10%, can be set for ecological red line indicators such as dissolved oxygen; while a higher deviation threshold, such as 25%, can be set for indicators with a certain tolerance range, such as water level fluctuations. Furthermore, before outputting the corrected decision scheme, a secondary verification can be performed using human expert rules to ensure the engineering feasibility of the corrective instructions.
[0229] Therefore, this solution, supplemented by a monitoring-triggered dynamic correction mechanism, can flexibly respond to environmental changes and improve the robustness of regulatory decisions in actual implementation.
[0230] Example 12
[0231] Based on the same inventive concept as the above-described method embodiments, a multi-process, multi-objective optimization and control decision-making system for lakes is provided. This system can be used to execute the methods provided in Embodiments 1 to 11 above. Its implementation principle and technical effects are similar, and the same parts will not be repeated here; the following focuses on describing the hardware structure.
[0232] A multi-process, multi-objective optimization and control decision-making system for lakes may include: at least one processor; and a memory communicatively connected to the at least one processor; the memory stores instructions executable by the processor, which are used to be executed by the processor to implement the multi-process, multi-objective optimization and control decision-making method for lakes described in this invention.
[0233] Specifically, in this embodiment, at least one processor can be implemented using computing units such as a general-purpose central processing unit, a graphics processing unit, an application-specific integrated circuit (ASIC), or a field-programmable gate array (FPGA). The processor is capable of performing floating-point operations and logical decision-making operations, and is used to run water system simulation models, construct proxy models, and execute multi-objective optimization algorithms.
[0234] The memory communicates with the processor and may include high-speed random access memory and non-volatile memory, such as hard disk drives or solid-state drives. The memory is used to store various data and instruction codes required to implement this method, including but not limited to: acquired historical monitoring data, pre-built sets of control measures, and simulation models of each subprocess.
[0235] In this embodiment, considering that lake multi-process simulation involves massive spatial grid data and long-term observational data, the memory has large-scale data access capabilities. For example, the memory can employ an extended architecture with large storage capacity to ensure complete coverage of historical meteorological, hydrological, water quality, and ecological succession data at the watershed level.
[0236] During instruction execution, the processor controls each sub-process model to explicitly and alternately advance the calculation. Because the computing environment involves cross-language data processing requirements, the system supports reading technical documents and parsing instructions in both Chinese and English, and can output target decision solutions in a Chinese interface according to preset requirements.
[0237] Furthermore, the processor can interact with a pre-configured high-performance computing platform via a multi-model call interface, utilizing high-performance computing models to assist in sensitivity calculations during metric selection and proxy model updates during the optimization process. This hardware-software co-architecture can improve decision-making efficiency in time-consuming three-model coupled scenarios.
[0238] In addition, the system may further include input / output interfaces and a communication interface. The input / output interfaces are used to connect to external devices such as displays and printers to present non-dominated solution sets and target decision-making schemes to decision-makers. The communication interface is used to establish data pathways with the sensor network of on-site monitoring stations to acquire real-time water level, flow rate, water quality concentration, and biomass parameters, providing a real-time data source for the dynamic correction of decision-making schemes.
[0239] Through the interconnection and collaborative operation of the above hardware modules, this system can not only accurately simulate the evolution process of lake water systems, but also efficiently search for the optimal control scheme under complex constraints, thus meeting the technical requirements of multi-process coordination and multi-objective trade-off in lake management.
[0240] To verify the effectiveness of the method of this invention, an application experiment was conducted using a typical shallow lake as the research object. The results show that, through the surrogate-assisted optimization mechanism, the number of real model calls required to achieve the same convergence accuracy is significantly reduced compared to directly using a multi-objective evolutionary algorithm; the analytical sensitivity method based on polynomial chaotic expansion completes the calculation of the full-effect sensitivity index without increasing additional simulation calls; and the adaptive inflection point detection technology significantly reduces the number of selected decision indicators compared to the original evaluation indicator system. Those skilled in the art will understand that the specific efficiency improvement and indicator simplification ratio may vary depending on the size of the lake, the number of indicators, and the complexity of the control measures.
[0241] According to one aspect of this application, in one possible implementation, the following steps may also be included:
[0242] Using collected historical monitoring data of lakes, the simulation period was divided into a calibration period and a verification period. The water system simulation model was calibrated using a parameter optimization algorithm, and the simulation accuracy was verified using preset evaluation coefficients.
[0243] Specifically, to ensure that the water system simulation model accurately reflects the physical, chemical, and biological processes of the designated lake, the model parameters must be locally calibrated before applying control and decision-making methods. In this embodiment, the acquired historical monitoring data is divided into a calibration period and a validation period in a 7:3 ratio. For example, if 10 consecutive years of hydrological and water quality data are available, the first 7 years are used as the calibration period for parameter adjustment, and the last 3 years are used as the validation period to verify the model's extrapolation capability.
[0244] In this embodiment, the SUFI-2 sequential uncertainty fitting algorithm is used for automatic parameter optimization of the water resources and water environment models. Multiple iterative simulations are performed within a calibration period by pre-setting the value ranges of various physical parameters (such as the Manning coefficient of the river channel, soil permeability coefficient, and comprehensive nutrient attenuation coefficient). For the water ecology model, a combination of manual and automatic parameter tuning is used to calibrate the maximum growth rate of chlorophyll a and the light attenuation coefficient.
[0245] The Nash efficiency coefficient, coefficient of determination, and percentage deviation are used as accuracy evaluation indicators. The formula for calculating the Nash efficiency coefficient is as follows:
[0246] NSE=1-(∑(Q) obs_t -Q sim_t ) 2 ) / ∑((Q obs_t -Q obs_avg ) 2 ));
[0247] Where NSE is the Nash efficiency coefficient; Q obs_t Q is the observation value at time t; sim_t Q is the simulated value at time t; obs_avg ∑ is the global average of the observations; ∑ is the summation operator.
[0248] When the Nash efficiency coefficient is greater than 0.5 during both the calibration and validation periods, and the absolute value of the percentage deviation is less than 25%, the simulation accuracy of the water system simulation model is deemed to have met the preset standard. This calibration process further improves the realism and reliability of subsequent initial simulation results and regulatory effect assessments generated based on the model.
[0249] The preferred embodiments of the present invention have been described in detail above. However, the present invention is not limited to the specific details in the above embodiments. Within the scope of the technical concept of the present invention, various equivalent transformations can be made to the technical solutions of the present invention, and these equivalent transformations all fall within the protection scope of the present invention.
Claims
1. A multi-process, multi-objective optimization and control decision-making method for lakes, characterized in that, include: Acquire historical monitoring data on lake water resources, water environment, and water ecology, and provide a pre-constructed set of control measures; Simulation models of water resources, water environment and water ecology subprocesses were constructed based on historical monitoring data, and spatiotemporal scale alignment and coupling of each subprocess were performed to obtain a water system simulation model. Each control measure in the control measures set is input into the water system simulation model for simulation, and the control effect of each measure is determined based on the preset evaluation index system. The effects of regulation are analyzed to identify the sensitivity of evaluation indicators to the set of regulation measures, and a multi-objective collaborative regulation decision-making model is constructed based on the selected decision indicators that meet the preset sensitivity conditions. Based on a multi-objective collaborative regulation decision-making model and a set of regulation measures, a non-dominated solution set is obtained by using a multi-objective optimization algorithm to find the optimal solution, and then a decision is made on the solution to obtain the target decision scheme.
2. The method according to claim 1, characterized in that, Constructing a water system simulation model includes: Simulation models for water resource subprocesses are constructed using hydrological models, simulation models for water environment subprocesses are constructed using water quality models, and simulation models for water ecology subprocesses are constructed using water ecology models. Within a preset coupling time step, the simulation models of each subprocess are used to perform calculations independently, and the shared state variables between the models are exchanged through the coupler based on an explicit alternating advancement strategy, so as to achieve simulation coupling of multiple processes.
3. The method according to claim 1, characterized in that, After providing a pre-built set of regulatory measures, it also includes: Identify the types of measures in the control measures set, quantify continuously adjustable engineering measures into continuous decision variables, and encode management measures with scheme selection properties into discrete integer variables; By integrating continuous decision variables and discrete integer variables, a decision variable vector is constructed for multi-objective optimization algorithm computation.
4. The method according to claim 1, characterized in that, Decision indicators that meet the preset sensitivity criteria are selected, including: Based on the initial simulation results generated by the set of control measures, the sensitivity index of each evaluation index relative to the measure parameters in the set of control measures is calculated. The correlation between each pair of evaluation indicators is calculated using the initial simulation results, and redundant indicators are removed based on the correlation determination results. Based on the sensitivity index and the preset screening threshold, decision indicators are extracted from the evaluation indicators after removing redundancies, resulting in a set of decision indicators.
5. The method according to claim 1, characterized in that, Constructing a multi-objective collaborative regulation and control decision-making model, including: Obtain the preset threshold range and ideal value corresponding to each decision indicator; For each decision indicator, a deviation function is constructed: if the decision indicator is within the preset threshold range, the normalized deviation distance between the actual value and the ideal value of the indicator is calculated; if the decision indicator exceeds the preset threshold range, a preset penalty term is added on the deviation distance. For the fields of water resources, water environment, and water ecology, a weighted summation is performed on the deviation functions of each field to obtain the corresponding objective function.
6. The method according to claim 4, characterized in that, The optimal solution yields a set of non-dominated solutions, including: An initial training set was constructed using the initial simulation results, and Gaussian process regression surrogate models were trained for each objective function accordingly. A population of candidate regulatory schemes is generated, and each scheme is evaluated using a surrogate model to obtain the predicted target value. Based on the active learning addition criterion, a scheme is selected from the population to determine the target number. The water system simulation model is used to calculate the true target value of the selected scheme, and the initial training set is updated and the agent model is retrained accordingly. Perform non-dominated sorting based on each predicted target value and each true target value, and output the non-dominated solution set after the convergence condition is met.
7. The method according to claim 1, characterized in that, Making decisions on non-dominated solution sets includes: The solutions in the non-dominated solution set are projected into a two-dimensional objective space composed of pairwise objective functions from the fields of water resources, water environment, and water ecology. Within each two-dimensional objective space, the solutions are sorted according to the objective function value of one of the neighborhoods, and the local permutation ratio between adjacent solutions after sorting is calculated. Identify the locations of local maxima in the local permutation ratio sequence and determine them as knee points reflecting the competitive relationship between targets in different domains; By combining the knee point, the weighted distance between each solution and the preset normalized ideal point is calculated, and the solution with the smallest weighted distance is determined as the target decision scheme.
8. The method according to claim 1, characterized in that, Evaluation indicators for aquatic ecological subprocesses include primary ecological indicators indirectly characterized by water quality parameters, including chlorophyll a concentration, comprehensive eutrophication state index, and dissolved oxygen saturation.
9. The method according to claim 1, characterized in that, After obtaining the target decision-making plan, it also includes: The target decision scheme is compared with real-time monitored hydrological and water quality data. If the measured value deviates from the expected control value by more than the preset deviation threshold, the multi-objective collaborative control decision model is automatically triggered to re-optimize and output the corrected decision scheme.
10. A multi-process, multi-objective optimization and control decision-making system for lakes, characterized in that, include: At least one processor; as well as Memory that is communicatively connected to at least one processor; The memory stores instructions executable by a processor to implement the method as described in any one of claims 1 to 9.