A two-stage cascade power station generation plan and adjustment model construction method

By using spreadsheet models and automated calculation methods, the problems of rapid adjustment of power generation plan models and overflow condition calculation for two-stage cascade hydropower stations were solved, realizing simple and efficient power generation plan preparation and adjustment.

CN123140791APending Publication Date: 2026-11-20CHINA INTERNATIONAL WATER & ELECTRIC CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611271440.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-20
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The existing two-stage cascade hydropower station power generation planning model relies on dedicated scheduling software, which makes it difficult to quickly adjust parameters on-site and cannot fully realize the interlocking calculation of hydraulic parameters under overflow conditions, resulting in inconvenience in power generation planning and adjustment.

Method used

The system employs a spreadsheet model, including a main table and a parameter table. It uses VLOOKUP and MIN functions to automatically calculate water level, reservoir capacity, overflow, and load allocation. Combined with the logic of prioritizing power generation from incoming water in different zones, the system simplifies the formula structure and supports rapid adjustments and interlocking calculations under overflow conditions.

Benefits of technology

It enables the rapid modification of parameters to complete the compilation and adjustment of power generation plans without installing dedicated software, adapting to overflow conditions, improving calculation speed and flexibility, and reducing computational complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140791A_ABST
    Figure CN123140791A_ABST
Patent Text Reader

Abstract

This invention discloses a method for constructing a two-stage cascade hydropower station power generation plan and adjustment model, belonging to the field of cascade hydropower station scheduling technology. The method constructs a linked spreadsheet model including an annual plan table and a daily breakdown plan table, inputting basic data such as reservoir capacity, inflow, and power station parameters; it completes the reservoir capacity-water level conversion through table lookup, and breaks down monthly inflow to obtain daily-scale data; it identifies upstream reservoir overflow conditions and adjusts tailrace water level, net head, and water consumption rate accordingly; it allocates load using the interval flow priority power generation principle, and uses the MIN function to constrain the upper limit of downstream power station output; the statistical results of the daily breakdown table are written back to the annual plan table, and upon receiving adjustment instructions, it automatically recalculates hydraulic and power generation parameters, outputting time-series data of water level, water volume, output, and power generation. This invention relies on a general-purpose spreadsheet, requiring no dedicated scheduling software, and can conveniently complete the compilation and dynamic adjustment of monthly-daily linked power generation plans, applicable to two-stage cascade scheduling consisting of upstream regulating reservoirs and downstream daily regulating reservoirs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of cascade hydropower station scheduling technology, and in particular to a method for constructing a two-stage cascade hydropower station power generation plan and adjustment model. Background Technology

[0002] In a two-stage cascade reservoir scheduling scenario, the upstream reservoir is a regulating reservoir, and the downstream reservoir is a daily regulating reservoir. Existing power generation planning and adjustment models are mostly complex in structure, requiring dedicated scheduling software. This software deployment is challenging, and the computational process is cumbersome. Furthermore, in on-site meeting scenarios, it's impossible to quickly modify independent variables and simultaneously output the adjusted power generation plan results. Simultaneously, the two-stage cascade reservoirs experience upstream overflow conditions. Overflow raises the tailrace level of the upstream power station, altering the net head and further changing the power station's water consumption rate. Existing scheduling models struggle to fully realize the interlocking calculations of overflow, tailrace level, net head, and water consumption rate, hindering the development of power generation plans for the two-stage cascade power stations. Summary of the Invention

[0003] The purpose of this invention is to provide a method for constructing a power generation plan and adjustment model for two-stage cascade hydropower stations. This method addresses the problems of existing two-stage cascade hydropower station power generation plan models relying on dedicated scheduling software, which makes it inconvenient to quickly adjust parameters on-site, and makes it difficult to fully realize the interlocking calculation of hydraulic parameters under overflow conditions, thus hindering the convenient compilation and adjustment of monthly-daily linked power generation plans.

[0004] To solve the above problems, the technical solution of the present invention is as follows: S1. Build an electronic spreadsheet model, which includes a main table, a parameter table, and a water level-reservoir capacity and overflow query table; the main table contains an annual plan table and a daily breakdown plan table, and the annual plan table and the daily breakdown plan table are interconnected. S2. Enter basic input data, which includes the initial reservoir capacity of the upstream reservoir, the predicted inflow value of the upstream reservoir, the predicted inflow value between the upstream and downstream stations, the total output setting value of the two-stage cascade, the basic parameters of the power station's water consumption rate, the water level-reservoir capacity correspondence data, and the water level-overflow correspondence data. S3. In the annual plan table, based on the reservoir water volume of the previous month, the predicted inflow of water from the upstream reservoir, and the outflow of water from the upstream reservoir, calculate the water storage volume of the upstream reservoir for each time period. Use the VLOOKUP function to call the water level-storage capacity and overflow query table to find the corresponding reservoir water level from the water storage volume. S4. Decompose the monthly inflow data in the annual plan to obtain daily inflow data and input it into the daily decomposed plan table; calculate the inflow of water to the downstream power station based on the daily upstream inflow and the daily interval inflow; the downstream power station is a daily regulating reservoir, and the outflow of water from the downstream power station is equal to the sum of the outflow from the upstream and the inflow between the stations. S5. Identify the overflow status of the upstream reservoir. When the reservoir water level reaches the overflow dam crest elevation, call the water level-overflow correspondence to obtain the overflow volume; convert the overflow volume into the tailwater level increment, correct the tailwater level of the upstream power station, recalculate the net head, and update the water consumption rate of the upstream power station. S6. Based on the inflow of water from the interval, prioritize power generation based on the flow of water from the interval and convert the water volume of water from the interval into a load that can be carried; based on the updated water consumption rate of the two-level power stations, calculate the load allocation ratio of the two-level power stations and allocate the remaining total load after removing the load corresponding to the inflow of water from the interval; convert the overflow to obtain the additional load corresponding to the overflow. S7. For the total load calculated for the downstream power station, the MIN function is used to compare it with the maximum stable operating load of the downstream power station, and the actual output of the downstream power station is output; the output of the upstream power station is the total output of the two-stage cascade minus the actual output of the downstream power station. S8. After calculating water balance, water level, output, and power generation line by line in the daily breakdown plan, the outflow of water, output, and power generation of the corresponding month in the daily breakdown plan are statistically summarized and written back to the corresponding row in the annual plan. S9. Receive input adjustment instructions, including instructions to modify incoming water data, instructions to modify total output of two stages, and instructions to set target water level. The spreadsheet automatically recalculates all water levels, water volume, output, and power generation based on the modified independent variables. S10: Output the annual plan table and daily breakdown plan table, including water level sequence, water volume sequence, power output sequence, and power generation sequence, to complete the compilation and adjustment of the power generation plan for the two-stage cascade power stations.

[0005] Furthermore, the spreadsheet model is an Excel spreadsheet or a WPS spreadsheet, requiring no additional application software installation.

[0006] Furthermore, the formula for calculating the upstream reservoir inventory in the annual plan is: except for the initial time period, the current inventory = the previous inventory + the predicted inflow of water from the upstream reservoir - the outflow of water from the upstream reservoir.

[0007] Furthermore, the monthly water inflow data in the annual plan is divided into averages to obtain the daily upstream water inflow and daily inter-station water inflow for the corresponding month.

[0008] Furthermore, the tailwater level of the upstream power station is obtained by superimposing three parts: the lowest tailwater level upstream, the tailwater level rise caused by the power generation load, and the tailwater level increment caused by the overflow.

[0009] Furthermore, the inter-station flow priority power generation includes: the water volume of the inter-station interval is converted into the load that the water volume of the interval can provide according to the rated water consumption rate of the downstream power station, and this part of the load is preferentially allocated to the downstream power station.

[0010] Furthermore, the load allocation ratio is determined based on the ratio of the real-time water consumption rates of the upstream and downstream power stations, and the remaining total load after deducting the load corresponding to the inflow of water in the interval is allocated.

[0011] Furthermore, the additional load corresponding to the overflow is calculated by multiplying the ratio of the overflow to the rated flow of the unit by the rated capacity of the unit.

[0012] Furthermore, the daily breakdown plan statistical summary includes: summing the daily upstream outflows within the month to obtain the monthly upstream outflow; averaging the daily power output to obtain the monthly average power output; and summing the daily power generation to obtain the monthly total power generation.

[0013] Furthermore, when a target water level setting instruction is received, the total output of the two stages is adjusted iteratively, and the daily power generation flow is calculated in reverse to ensure that the water level of the upstream reservoir matches the set target water level.

[0014] The beneficial effects of this invention are as follows: 1. This method relies on general-purpose spreadsheet software and does not require the installation of dedicated scheduling software. It is easy to operate, has a fast calculation speed, and can be quickly mastered by scheduling personnel. After modifying the input parameters in a meeting or discussion scenario, the updated power generation plan results can be obtained quickly.

[0015] 2. This method sets up a two-way linkage between the annual plan table and the daily breakdown plan table, and the monthly plan and daily calculation data reference each other. After inputting independent variables such as water inflow and total output, it automatically predicts the subsequent reservoir water level, water volume, output and power generation.

[0016] 3. This method fully realizes the interlocking calculation of the upstream reservoir overflow condition. After the overflow is identified, the overflow flow rate is calculated, the tailwater level is corrected, the net head is updated, and the water consumption rate is updated in sequence. Based on the updated water consumption rate, the load distribution of the two-stage power station is carried out to adapt to the actual operation of the two-stage cascade overflow condition.

[0017] 4. This method adopts the load allocation logic of priority power generation based on inter-station flow, which prioritizes the allocation of the load corresponding to the water inflow between stations to the downstream daily regulating power station, thereby reducing the risk of downstream overflow.

[0018] 5. This method uses the MIN function to constrain the upper limit of downstream power plant output, replacing multi-layered nested IF statements, shortening the length of calculation formulas in the table, reducing the difficulty of formula maintenance, and reducing the workload of calculation.

[0019] 6. This method supports iteratively adjusting the total output to solve for the daily power generation flow rate given the target water level of the upstream reservoir, thus meeting the business requirements of preparing power generation plans given water level constraints in the scheduling work. Attached Figure Description

[0020] The invention will be further described below with reference to the accompanying drawings: Figure 1 This is a flowchart illustrating the overall steps of the method for constructing a two-stage cascade power plant power generation plan and adjustment model according to the present invention. Figure 2 This is a flowchart illustrating the calculation logic for the upstream reservoir overflow condition in this invention. Figure 3 This is a flowchart of the power plant load allocation calculation for the present invention; Figure 4 This is a diagram of the Suapiti-Kaleta cascade drainage system of the present invention; Figure 5 This is a diagram showing the storage capacity of the Suapiti Reservoir in this invention. Figure 6 This is a diagram of the overflow curve of the Suapiti Reservoir, as presented in this invention. Detailed Implementation

[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0022] like Figures 1 to 6 As shown, this embodiment takes the Souapiti-Kaleta two-stage cascade hydropower station in Guinea as the implementation object, with Souapiti as the upstream regulating reservoir and Kaleta as the downstream daily regulating reservoir. The method of constructing the power generation plan and adjustment model of the two-stage cascade hydropower station is built using Excel.

[0023] Fixed parameters in this embodiment: Soapiti lowest tailwater level 109.96m; spillway crest elevation 210m; Kaleta rated water consumption rate 8.3; Soapiti unit rated flow rate 180m³ / s, unit rated capacity 78.2MW; full-load total load 690MW; Kaleta grid maximum allowable stable operating load 230MW; hydropower conversion related parameters: water density ρ=1000kg / m³, gravitational acceleration g=9.81m / s², turbine efficiency 93%, generator efficiency 96%, overall efficiency η=89%; from the hydropower output formula... ;Derived The empirical coefficient, HS is the water consumption rate of the Suapiti unit, and H is the net water head.

[0024] Taking January 31, 2026 as an example, the initial reference data is as follows: the initial water storage in Suapiti is 5.897963 billion m³, the water inflow to Suapiti in January is 241.2 million m³, and the water inflow between Suapiti and Kaleta is 13.5 million m³; the total number of days in January is 31, and the total output of the two-stage cascade is set at 360MW.

[0025] S1. Build an electronic spreadsheet model, which includes a main table, a parameter table, and a water level-reservoir capacity and overflow query table; the main table contains an annual plan table and a daily breakdown plan table, and the annual plan table and the daily breakdown plan table are interconnected and linked.

[0026] The main table is divided into two parts: the upper part is the annual plan table, with the calendar month as the time step; the lower part is the daily breakdown plan table, with the calendar day as the time step. The parameter table stores fixed parameters, including fixed values ​​such as the Kaleta rated water consumption rate, unit rated flow rate, unit rated capacity, upstream minimum tailwater level, and overflow dam crest elevation. The water level-reservoir capacity and overflow lookup table stores pre-processed discrete data on water level and reservoir capacity, and discrete data on water level and overflow, serving as the lookup data source for the VLOOKUP function. Cross-table references are set between cells in the annual plan table and the daily breakdown plan table, so changes in data in one table can be reflected synchronously in the other.

[0027] S2. Enter basic input data, which includes the initial reservoir capacity of the upstream reservoir, the predicted inflow value of the upstream reservoir, the predicted inflow value between the upstream and downstream stations, the total output setting value of the two-stage cascade, the basic parameters of the power station's water consumption rate, the data corresponding to the water level and reservoir capacity, and the data corresponding to the water level and overflow.

[0028] The actual reservoir capacity of the Suapiti Reservoir at the beginning of the year is entered as the initial capacity of the upstream reservoir; the predicted inflow values ​​of the upstream reservoir and the inter-station interval are entered separately for each month of the year; the total output of the two-stage cascade is set as the sum of the outputs of the two power stations; the basic parameters of water consumption rate are stored in the parameter table, and the empirical coefficient of hydropower conversion is obtained through the hydropower output formula. The derivation shows that discrete data on water level-reservoir capacity and water level-overflow are batch imported into the water level-reservoir capacity and overflow lookup table. In the example, the initial reservoir capacity of Soapiti at the beginning of the year is recorded as 5.897963 billion m³; the upstream inflow and inter-station inflow for each month are recorded according to the forecast results; the total output of the two-stage cascade is taken as 360 MW in the example.

[0029] S3. In the annual plan table, based on the reservoir water volume of the previous month, the predicted inflow of water from the upstream reservoir, and the outflow of water from the upstream reservoir, calculate the water storage volume of the upstream reservoir for each time period. Use the VLOOKUP function to call the water level-storage capacity and overflow lookup table to find the corresponding reservoir water level from the water storage volume.

[0030] Formula for calculating water storage volume: ; This represents the water inventory for this period. This represents the water inventory from the previous period. This refers to the upstream water flow during this period; This represents the upstream water outflow during this period.

[0031] Taking January as an example, 100 million m³ 100 million m³ Based on the calculation, the water inventory at the end of January was 5.38914 billion m³.

[0032] In Excel, the VLOOKUP formula is: =VLOOKUP(Inventory Water Cell,'2-Storage Capacity Table'!$A$3:'2-Storage Capacity Table'!$B$3600,2,TRUE); Inputting the inventory water volume of 5.38914 billion m³, the formula looks up the corresponding reservoir water level of 205.57 m. Except for the initial reservoir capacity at the beginning of the year, which is directly entered, the inventory water volume for each month is calculated using this water balance formula, and then the lookup formula is used to automatically convert the reservoir capacity to the water level.

[0033] S4. Decompose the monthly inflow data in the annual plan to obtain daily inflow data, and input it into the daily decomposed plan table; calculate the inflow of water to the downstream power station based on the daily upstream inflow and the daily interval inflow; the downstream power station is a daily regulating reservoir, and the outflow of water from the downstream power station is equal to the sum of the outflow from the upstream and the inflow between the stations.

[0034] Daily water supply decomposition formula: ; ; Monthly upstream water inflow Monthly water inflow Number of days in the month; Example January: 100 million m³; 100 million m³. Formula for downstream outflow: ; The daily water volume of Suapiti Reservoir This refers to the daily water inflow; example: 100 million m³ The daily water volume of Kaleta Reservoir is 0.2444 billion m³.

[0035] As a daily regulating reservoir, Kaleta has a weak capacity for water regulation. The outflow from the reservoir is directly equal to the outflow from the upstream Suapiti reservoir plus the inflow between stations.

[0036] S5. Identify the overflow status of the upstream reservoir. When the reservoir water level reaches the overflow dam crest elevation, use the water level-overflow correspondence to obtain the overflow volume. Convert the overflow volume into the tailwater level increment, correct the tailwater level of the upstream power station, recalculate the net head, and update the water consumption rate of the upstream power station.

[0037] Formula for calculating the tailwater level of Suapiti: ; Minimum tailwater level; Total output at both levels; 690MW full-load total capacity; Overflow rate (m³ / s); every 1125 m³ / s of overflow rate corresponds to a 1 m rise in tailwater level.

[0038] Water purifier head: ; Suapiti water consumption rate: ; The system determines whether the current water level of the Suapiti Reservoir is greater than or equal to the overflow dam crest elevation. If it reaches the overflow dam crest elevation, the overflow volume is obtained by reading the water level-overflow lookup table using the VLOOKUP function. The tailrace level of the upstream power station is calculated by superimposing three parts: the lowest tailrace level upstream, the tailrace level rise caused by the power generation load, and the tailrace level increment caused by the overflow. The net head equals the upstream reservoir water level minus the corrected tailrace level; the water consumption rate is recalculated and updated based on the net head. If no overflow occurs, the overflow volume is 0, the tailrace level increment is 0, and only the tailrace level rise corresponding to the power generation load is calculated. Example: In January, the water level was 205.57m, there was no overflow, and the overflow volume was 0.

[0039] S6. Based on the inflow of water from the interval, prioritize power generation based on the flow of water from the interval and convert the water volume of water from the interval into a load that can be carried; based on the updated water consumption rate of the two-level power stations, calculate the load allocation ratio of the two-level power stations and allocate the remaining total load after removing the load corresponding to the inflow of water from the interval; convert the overflow flow into the additional load corresponding to the overflow.

[0040] Formula for load corresponding to water inflow in interval: ; Unit: 100 million m³; 8.3 Kaleta rated water consumption rate; Example: The calculated load for the interval is 2.209MW, based on 100 million m³. This load is preferentially allocated to the downstream Kaleta Power Station.

[0041] Remaining load to be allocated: ; Load allocation ratio: Kaleta allocation ratio = Suapiti's allocation percentage = .

[0042] Overflow additional load formula: ; Overflow flow (m³ / s); rated flow rate of 180 m³ / s unit, rated capacity of 78.2 MW unit; no overflow. .

[0043] Kaleta calculates total load .

[0044] After the real-time water consumption rates of the upstream and downstream power stations are updated, the load allocation ratio is determined based on the ratio of their water consumption rates. The total output of the two stations is reduced by the load corresponding to the inflow in the interval to obtain the remaining total load. The remaining total load is then allocated between the two power stations using the load allocation ratio. The additional load corresponding to the overflow is calculated by multiplying the overflow by the rated flow rate of the unit by the rated capacity of the unit. This additional load is then added to the load of the downstream power station.

[0045] S7. For the total load calculated for the downstream power station, the MIN function is used to compare it with the maximum stable operating load of the downstream power station, and the actual output of the downstream power station is output; the output of the upstream power station is the total output of the two-stage cascade minus the actual output of the downstream power station. Excel calculation formula: =MIN(Interval load + Remaining allocated load + Overflow additional load, 230); 230MW is the maximum stable operating load of Kaleta. ; ; Multi-level nested IF statements are no longer required. For example, the calculated load of Kaleta is 124MW, which is less than 230MW, so the actual output is taken as 124MW; the output of Suapiti is 360-124=236MW. The downstream power station's calculated total load is obtained by adding the inflow load, remaining allocated load, and overflow additional load. Using the MIN function, the smaller value between the calculated total load and the maximum stable operating load of the downstream power station is taken as the actual output of the downstream power station. The output of the upstream Suapiti power station is directly obtained by subtracting the actual output of the downstream power station from the total output of the two cascades.

[0046] S8. After calculating water balance, water level, output, and power generation line by line in the daily breakdown plan, the outflow of water, output, and power generation for the corresponding month in the daily breakdown plan are statistically summarized and written back to the corresponding row in the annual plan.

[0047] Relationship between daily power generation and daily electricity output: ; ; Monthly statistics: Monthly upstream outflow: = SUM(Daily outflow from Suapiti in the current month); Monthly average output of Kaleta: = AVERAGE (Daily output of Kaleta in the current month); Monthly average output of Suapiti: = AVERAGE (daily output of Suapiti in the current month); Monthly Kaleta power generation: = AVERAGE (Daily Kaleta output in the current month) * 24 * Number of days in the current month; Monthly Suapiti power generation: = AVERAGE (daily Suapiti power output in the current month) * 24 * number of days in the current month.

[0048] Taking January as an example: Kaleta's average monthly output is 124MW, and its monthly power generation = 124 × 24 × 31 = 91991.26MWh; Souapiti's average monthly output is 236MW, and its monthly power generation = 236 × 24 × 31 = 175848.74MWh. These figures are then summarized and added back to the annual plan.

[0049] The monthly upstream outflow is obtained by summing the daily upstream outflow within the monthly breakdown plan; the monthly average power output is obtained by averaging the daily power output; and the monthly total power output is obtained by summing the daily power generation. The summation and averaging results are then written back to the corresponding monthly cell in the annual plan, thus enabling the daily-scale calculation results to be aggregated upwards to the annual plan.

[0050] S9. Receive input adjustment commands, including commands to modify incoming water data, commands to modify total output of two stages, and commands to set target water level. The spreadsheet automatically recalculates all water levels, water volume, output, and power generation based on the modified independent variables.

[0051] When the water inflow forecast and total output of the two tiers in the annual plan are modified, the daily breakdown plan will be automatically recalculated because all cell formulas are automatically referenced. After the recalculation is complete, the statistical summary results will be synchronously updated back to the annual plan. When a target water level setting instruction is received, the total output of the two tiers is adjusted iteratively to solve for the daily power generation flow rate in reverse, so that the upstream reservoir water level matches the set target water level.

[0052] S10: Output the annual plan table and daily breakdown plan table, including water level sequence, water volume sequence, power output sequence, and power generation sequence, to complete the compilation and adjustment of the power generation plan for the two-stage cascade power stations.

[0053] The spreadsheet directly outputs all time-series data within the table, providing monthly statistics of the annual power generation plan and daily power generation plans for dispatchers to conduct dispatch analysis.

[0054] This embodiment takes the Souapiti-Kaleta two-stage hydropower station in Guinea as an example to carry out the complete implementation process: The model file was created using Excel software, and a main table, a parameter table, and a water level-reservoir capacity and overflow query table were created sequentially. Fixed parameters such as the minimum tailwater level of Suapiti, the rated water consumption rate of Kaleta, the rated flow rate of the generating units, the rated capacity of the generating units, the crest elevation of the Suapiti overflow dam, and the empirical coefficient of hydropower conversion were entered into the parameter table. The water level-reservoir capacity and overflow query table imported the measured discrete data of water level and reservoir capacity and the discrete data of water level and overflow from the Suapiti Reservoir. The annual plan table entered the actual reservoir capacity of Suapiti at the beginning of the year, the predicted upstream inflow values ​​for each month from January to December, and the predicted inflow values ​​between the Suapiti and Kaleta stations, and set the total output of the two-stage cascade system.

[0055] The monthly water inventory in the annual plan is calculated based on the previous month's inventory, the current month's inflow, and the current month's outflow. The water level for the current month is obtained by looking up a table using the VLOOKUP function. The monthly inflow is averaged and broken down into daily breakdown plans to calculate the daily upstream and downstream water volume relationship. The plan checks daily whether the Suapiti Reservoir overflows; if overflow occurs, the overflow rate is read, the tailrace level is calculated, and the net head and Suapiti water consumption rate are updated. Inflow from different areas is converted into load and prioritized for allocation to the Kaleta Hydropower Station. The remaining load is allocated based on the real-time water consumption rates of the two power stations, and the additional load from overflow is added. The MIN function is used to constrain the maximum stable operating load of the Kaleta Hydropower Station to obtain its actual output. The output of the Suapiti Hydropower Station is the total output of the two power stations minus the actual output of the Kaleta Hydropower Station. Daily power generation is calculated. At the end of each calendar month, the daily breakdown plan summarizes the monthly outflow, average output, and total power generation and writes it back to the annual plan.

[0056] When conducting scheme discussions, dispatchers can directly modify the inflow forecast or the total output of the two cascade hydropower stations in the annual plan. All table cells will be automatically recalculated, immediately providing the modified water level, water volume, output, and power generation of the entire power generation plan. If the dispatcher provides a target water level for the Suapiti Reservoir at the end of the month, the total output of the two cascade hydropower stations will be iteratively adjusted, and the daily power generation flow will be calculated in reverse to ensure that the reservoir water level reaches the given target level at the end of the month, outputting a complete power generation plan adapted to water level constraints. Comparing the model output with actual operating data from the past two years, the calculation error is within 3% for most months and within 10% for a few months, which can meet the needs of daily power generation plan preparation, scheme comparison, and adjustment for the two-stage cascade hydropower stations.

[0057] The embodiments described in this specification are merely examples of implementations of the inventive concept. The scope of protection of this invention should not be considered as limited to the specific forms stated in the embodiments. The scope of protection of this invention also extends to equivalent technical means that can be conceived by those skilled in the art based on the inventive concept.

Claims

1. A method for constructing a two-stage cascade power plant power generation planning and adjustment model, characterized in that, Includes the following steps: S1. Build an electronic spreadsheet model, which includes a main table, a parameter table, and a water level-reservoir capacity and overflow query table; the main table contains an annual plan table and a daily breakdown plan table, and the annual plan table and the daily breakdown plan table are interconnected. S2. Enter basic input data, which includes the initial reservoir capacity of the upstream reservoir, the predicted inflow value of the upstream reservoir, the predicted inflow value between the upstream and downstream stations, the total output setting value of the two-stage cascade, the basic parameters of the power station's water consumption rate, the water level-reservoir capacity correspondence data, and the water level-overflow correspondence data. S3. In the annual plan table, based on the reservoir water volume of the previous month, the predicted inflow of water from the upstream reservoir, and the outflow of water from the upstream reservoir, calculate the water storage volume of the upstream reservoir for each time period. Use the VLOOKUP function to call the water level-storage capacity and overflow query table to find the corresponding reservoir water level from the water storage volume. S4. Decompose the monthly water inflow data in the annual plan table to obtain daily water inflow data, and input it into the daily decomposed plan table; The inflow to the downstream power station is calculated based on the daily upstream inflow and the daily inter-station inflow. The downstream power station is a daily regulating reservoir, and the outflow from the downstream power station is equal to the sum of the upstream outflow and the inter-station inflow. S5. Identify the overflow status of the upstream reservoir. When the reservoir water level reaches the overflow dam crest elevation, call the water level-overflow correspondence to obtain the overflow volume; convert the overflow volume into the tailwater level increment, correct the tailwater level of the upstream power station, recalculate the net head, and update the water consumption rate of the upstream power station. S6. Based on the inflow of water from the interval, prioritize power generation based on the flow of water from the interval and convert the water volume of water from the interval into a load that can be carried; based on the updated water consumption rate of the two-level power stations, calculate the load allocation ratio of the two-level power stations and allocate the remaining total load after removing the load corresponding to the inflow of water from the interval; convert the overflow to obtain the additional load corresponding to the overflow. S7. For the total load calculated for the downstream power station, the MIN function is used to compare it with the maximum stable operating load of the downstream power station, and the actual output of the downstream power station is output; the output of the upstream power station is the total output of the two-stage cascade minus the actual output of the downstream power station. S8. After calculating water balance, water level, output, and power generation line by line in the daily breakdown plan, the outflow of water, output, and power generation of the corresponding month in the daily breakdown plan are statistically summarized and written back to the corresponding row in the annual plan. S9. Receive input adjustment instructions, including instructions to modify incoming water data, instructions to modify total output of two stages, and instructions to set target water level. The spreadsheet automatically recalculates all water levels, water volume, output, and power generation based on the modified independent variables. S10: Output the annual plan table and daily breakdown plan table, including water level sequence, water volume sequence, power output sequence, and power generation sequence, to complete the compilation and adjustment of the power generation plan for the two-stage cascade power stations.

2. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to claim 1, characterized in that, In S1, the spreadsheet model is an Excel spreadsheet or a WPS spreadsheet.

3. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to claim 1, characterized in that, In S3, the formula for calculating the upstream reservoir water volume in the annual plan is: except for the initial time, the current water volume = the previous water volume + the predicted inflow of water from the upstream reservoir - the outflow of water from the upstream reservoir.

4. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to claim 1, characterized in that, In S4, the monthly water inflow data of the annual plan is split into equal parts to obtain the daily upstream water inflow and daily inter-station water inflow for the corresponding month.

5. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to claim 1, characterized in that, In S5, the tailwater level of the upstream power station is obtained by superimposing three parts: the lowest tailwater level upstream, the tailwater level rise caused by the power generation load, and the tailwater level increment caused by the overflow.

6. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to claim 1, characterized in that, In S6, the priority power generation based on inter-station flow includes: the load that the water inflow between stations can provide is calculated based on the rated water consumption rate of the downstream power station, and this portion of the load is preferentially allocated to the downstream power station.

7. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to claim 1, characterized in that, In S6, the load allocation ratio is determined based on the ratio of the real-time water consumption rates of the upstream power station and the downstream power station, and the remaining total load after deducting the load corresponding to the inflow of water in the interval is allocated.

8. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to claim 1, characterized in that, In S6, the additional load corresponding to the overflow is calculated by multiplying the ratio of the overflow to the rated flow of the unit by the rated capacity of the unit.

9. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to claim 1, characterized in that, In S8, the daily breakdown plan statistics summary includes: summing the daily upstream outflow water volume within the month to obtain the monthly upstream outflow water volume; taking the average of the daily power output to obtain the monthly average power output; and summing the daily power generation to obtain the monthly total power generation.

10. The method for constructing a two-stage cascade power plant power generation planning and adjustment model according to any one of claims 1 to 9, characterized in that, In S9, when a target water level setting instruction is received, the total output of the two stages is adjusted iteratively, and the daily power generation flow is calculated in reverse so that the water level of the upstream reservoir matches the set target water level.