Boiler metal equipment maintenance strategy intelligent generation method based on fusion supervision big data

By constructing a big data system for monitoring the entire lifecycle of boiler metal equipment, and utilizing knowledge graphs and digital twin models, the problems of data silos and extensive strategies in the existing maintenance of boiler metal equipment have been solved. This has enabled intelligent and lean multi-objective optimized maintenance, improving maintenance efficiency and equipment reliability.

CN123140905APending Publication Date: 2026-11-20GUODIAN FENGCHENG POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611068483.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-17
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The existing maintenance model for boiler metal equipment is outdated, relies on manual experience, suffers from severe data silos, lacks integration of multi-source monitoring big data, has extensive maintenance strategies, insufficient early warning capabilities, and lacks a closed-loop mechanism, resulting in insufficient targeted and effective maintenance, unreasonable resource allocation, high costs, and long downtime.

Method used

Construct a comprehensive, full-lifecycle monitoring big data system for boiler metal equipment. Through knowledge graphs and digital twin models, achieve unified governance and integration of multi-source data, automatically generate multi-objective optimized maintenance strategies, and form a closed-loop iterative mechanism.

Benefits of technology

It improves maintenance effectiveness, reduces over-inspection/missed inspection, reduces manual programming workload and maintenance resource consumption, shortens downtime, improves unit availability and economic benefits, and forms experience digital assets that are easy to promote and replicate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140905A_ABST
    Figure CN123140905A_ABST
Patent Text Reader

Abstract

The application provides a boiler metal equipment maintenance strategy intelligent generation method based on fusion supervision big data, and relates to the technical field of equipment maintenance. The method comprises the following steps: obtaining historical data samples of maintenance records of a target equipment, and constructing a knowledge graph and a digital twin model representing the state of the equipment; collecting current multi-source supervision data of the target equipment, matching the closest maintenance record in the historical data samples of the multi-source supervision data, and obtaining differentiated information of the current multi-source supervision data and the closest maintenance record; matching the differentiated information in the knowledge graph to obtain maintenance strategy correction information, correcting the maintenance strategy in the closest maintenance record based on the maintenance strategy correction information, and inputting the corrected maintenance strategy into the digital twin model to obtain simulation results. The embodiments provided by the application improve the intelligence of the maintenance scheme generation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of equipment maintenance technology, specifically to a method for intelligently generating maintenance strategies for boiler metal equipment based on fused monitoring big data, a device for intelligently generating maintenance strategies for boiler metal equipment based on fused monitoring big data, and an electronic device. Background Technology

[0002] Metal heating surfaces and pressure-bearing components such as water-cooled walls, superheaters, reheaters, economizers, headers, pipes, and valves in power plant boilers are subjected to harsh conditions such as high temperature, high pressure, corrosion, erosion, and alternating loads for a long time. Under the interaction of multiple damage mechanisms such as creep, fatigue, wear, corrosion, oxidation, and cracking, the material properties continue to deteriorate, directly affecting the safety, stability, and service life of the unit. Therefore, their maintenance is always the core task of equipment management for power generation companies.

[0003] Current boiler metal equipment maintenance practices suffer from five major problems. First, the maintenance model is outdated, relying primarily on periodic maintenance and reactive repairs, depending on manual experience and paper records. Periodic maintenance is prone to over- or under-inspection, while reactive repairs lack preventative measures, resulting in insufficient focus and effectiveness. Second, data silos are severe. Multiple data sources, including DCS / SIS data, metal monitoring, non-destructive testing, maintenance records, life assessments, and defect records, are scattered across heterogeneous systems, with inconsistent formats and lack of correlation, making data integration and analysis difficult and unable to support full lifecycle health management. Third, maintenance strategies are rudimentary, with plans manually prepared and statically fixed, unable to dynamically adjust according to load, degradation trends, and risk levels, leading to unreasonable resource allocation, high costs, and long downtime. Fourth, early warning capabilities are insufficient. There is a lack of multi-factor coupled degradation models and remaining life prediction methods, resulting in weak fault prediction and a high risk of unplanned downtime and safety accidents. Fifth, the lack of a closed-loop mechanism means that the process from defect discovery, diagnosis, handling, verification to review is not in a closed loop, making it difficult to accumulate and reuse experience, and hindering the continuous improvement of maintenance quality and efficiency.

[0004] In summary, existing technologies mostly focus on fragmented aspects such as single monitoring, partial diagnosis, or offline assessment, and have not yet achieved integrated connectivity of deep integration of multi-source monitoring big data, intelligent generation of maintenance strategies, and dynamic optimization throughout the entire life cycle. There is an urgent need for a systematic solution to meet the needs of intelligent and lean maintenance of power plant boilers. Summary of the Invention

[0005] The purpose of this application is to provide an intelligent generation method for boiler metal equipment maintenance strategies based on integrated monitoring big data, to construct a full-dimensional, full-lifecycle monitoring big data system for boiler metal equipment, and to achieve unified data governance, correlation integration, and sharing and reuse, so as to at least solve some of the problems in the background technology.

[0006] To achieve the above objectives, this application provides an intelligent generation method for boiler metal equipment maintenance strategies based on fused monitoring big data, comprising: acquiring historical data samples of maintenance records of the target equipment, constructing a knowledge graph and digital twin model representing the equipment status, and obtaining the association mapping between multi-source monitoring data of the target equipment and corresponding maintenance strategies; collecting current multi-source monitoring data of the target equipment, matching the closest maintenance record in the historical data samples of the multi-source monitoring data, and obtaining the differential information between the current multi-source monitoring data and the closest matched maintenance record; matching the differential information in the knowledge graph to obtain maintenance strategy correction information, correcting the maintenance strategy in the closest maintenance record based on the maintenance strategy correction information, and inputting the corrected maintenance strategy into the digital twin model to obtain simulation results; performing multi-objective review on the corrected maintenance strategy based on the simulation results; generating a maintenance work order based on the corrected maintenance strategy; and optimizing at least one of the corrected maintenance strategy, the knowledge graph, and the digital twin model before the maintenance work order is completed, when new multi-source monitoring data is detected to meet preset update trigger conditions.

[0007] Optionally, the multi-source monitoring data includes at least operating parameters, metal monitoring data, non-destructive testing data, maintenance logs, defect records, environmental data, and material and lifespan data. Before constructing a knowledge graph and digital twin model representing the equipment status, a data governance step is also included, which includes cleaning, denoising, normalizing, temporal alignment, missing value completion, and outlier removal of the data. The historical data samples of the target equipment's maintenance records come from a matching standard operating procedure library, a typical defect library, an expert knowledge base, and a specification library.

[0008] Optionally, historical data samples of maintenance records of the target equipment are obtained, and a knowledge graph representing the equipment status is constructed, including: extracting knowledge from the historical data samples, taking the target equipment as an entity node, taking the fault phenomena and replaced parts in the multi-source monitoring data as the status attribute values ​​of the entity node, and taking the maintenance strategy as the relation edge connecting different states to construct the knowledge graph; and using the knowledge graph to represent the state evolution of the target equipment under different maintenance cycles.

[0009] Optionally, the state evolution of the target equipment under different maintenance cycles is characterized by the knowledge graph, including: sequentially connecting maintenance events according to time order based on the timestamps corresponding to each maintenance record; forming a state evolution path with temporal characteristics in the knowledge graph to obtain the state change process of the target equipment under different maintenance cycles.

[0010] Optionally, collecting current multi-source monitoring data of the target equipment and matching the closest maintenance record in the historical data samples of the multi-source monitoring data includes: extracting key feature parameters of the current multi-source monitoring data; calculating the similarity between the key feature parameters and the feature parameters corresponding to each maintenance record in the historical data samples; selecting the maintenance record with the highest similarity as the closest maintenance record; and obtaining the difference information between the current multi-source monitoring data and the matched closest maintenance record, including: obtaining the deviation value of the current multi-source monitoring data and the closest maintenance record on the key feature parameters, and generating an equipment status warning prompt based on the deviation value.

[0011] Optionally, the maintenance strategy correction information is obtained by matching the differentiated information in the knowledge graph, including: extracting matching elements from the differentiated information, wherein the matching elements include one of: key feature parameter deviation value, equipment status warning prompt, and associated component identifier; constructing query conditions based on the matching elements according to the structure definition of the knowledge graph, wherein the query conditions include one of: fault phenomenon matching, component association matching, and severity constraint; using a combination of attribute filtering and relation traversal, retrieving and matching the status attribute values ​​of the target equipment entity based on the query conditions; locating the entity node corresponding to the target equipment in the knowledge graph according to the target equipment identifier corresponding to the differentiated information, traversing and matching the historical status attribute values ​​of the target equipment entity node, sorting by matching degree, and outputting the result. The system identifies one or more historical state attribute values ​​that best match the current differentiated information and their corresponding entity node state snapshots, while also outputting the knowledge graph node positions where the matched state attribute values ​​are located. Based on the nodes where the historical state attribute values ​​are located, the system obtains the maintenance strategies used in historical maintenance events by identifying relational edges. The system reads the attribute information of the relational edge to obtain the content of the historical maintenance strategy, and extracts the successful maintenance strategy based on the fault phenomenon attribute value of the next state node pointed to by the relational edge. The system compares the strategy item by item with the current differentiated information and the original maintenance strategy in the closest maintenance record to generate correction information. The correction information includes at least one of the following: deviation parameter corresponding correction, maintenance parameter value correction, new maintenance project suggestion, component replacement correction, and early warning level association correction. The system summarizes the correction information to obtain structured maintenance strategy correction information.

[0012] Optionally, the revised maintenance strategy is input into the digital twin model to obtain simulation results. Based on the simulation results, the revised maintenance strategy is reviewed for multiple objectives, including: performing structured analysis on the revised maintenance strategy to extract the input parameters required by the digital twin model, the input parameters including: maintenance operation sequence, maintenance process parameters, maintenance execution conditions, parts replacement list, and expected state after maintenance; importing the input parameters into the initialized and configured digital twin model to obtain maintenance process simulation and post-maintenance operation simulation, collecting the output data of the digital twin model during the simulation process, and forming a simulation result report; and evaluating the revised maintenance strategy item by item based on the simulation results, considering maintenance cost, equipment reliability, downtime, and safety risks, and performing conflict analysis on the maintenance cost, equipment reliability, downtime, and safety risks.

[0013] Optionally, before the maintenance work order is completed, when new multi-source monitoring data is detected that meets the preset update triggering conditions, at least one of the revised maintenance strategy, knowledge graph, and digital twin model is optimized, including: the preset update triggering conditions include: parameter exceeding limit triggering, deviation expansion triggering, new abnormal feature appearance triggering, time window triggering, and external event triggering; when a triggering event is detected, the target object and priority of this optimization are determined according to the type, severity, and scope of influence of the triggering conditions; the target object is at least one of the revised maintenance strategy, knowledge graph, and digital twin model, and the priority includes: the order of optimization and the urgency of optimization.

[0014] This application also provides an intelligent generation device for boiler metal equipment maintenance strategies based on fused monitoring big data. The device includes: a data fusion module, used to acquire historical data samples of maintenance records for the target equipment, construct a knowledge graph and digital twin model representing the equipment status, and obtain the association mapping between multi-source monitoring data and corresponding maintenance strategies for the target equipment; a preliminary strategy module, used to collect current multi-source monitoring data of the target equipment, match the closest maintenance record in the historical data samples of the multi-source monitoring data, and obtain the differential information between the current multi-source monitoring data and the matched closest maintenance record; and a strategy generation module, used for... Based on the differentiated information, the maintenance strategy correction information is obtained by matching in the knowledge graph. The maintenance strategy in the closest maintenance record is corrected based on the maintenance strategy correction information, and the corrected maintenance strategy is input into the digital twin model to obtain simulation results. The corrected maintenance strategy is then subject to multi-objective review based on the simulation results. A closed-loop optimization module is also included, used to generate maintenance work orders based on the corrected maintenance strategy. Before the maintenance work order is completed, when new multi-source supervision data is detected that meets the preset update trigger conditions, at least one of the corrected maintenance strategy, the knowledge graph, and the digital twin model is optimized.

[0015] This application also provides an electronic device, including: at least one processor; and a memory connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the at least one processor implements the aforementioned intelligent generation method for boiler metal equipment maintenance strategies based on fused supervisory big data by executing the instructions stored in the memory.

[0016] This application also provides a machine-readable storage medium storing instructions that, when executed by a processor, configure the processor to perform the aforementioned intelligent generation method for boiler metal equipment maintenance strategies based on fused supervisory big data.

[0017] This application also provides a computer program product, including a computer program that, when executed by a processor, implements the aforementioned intelligent generation method for boiler metal equipment maintenance strategies based on fused supervisory big data.

[0018] The above technical solution has the following beneficial effects: The intelligent generation method for boiler metal equipment maintenance strategies proposed in this application employs big data technology, knowledge graphs, and digital twin models to automatically generate multi-objective optimized maintenance plans, dynamically adapt to operating conditions, reduce over-inspection / missed inspections, and improve maintenance effectiveness. It reduces manual programming workload, maintenance resource consumption, and downtime, thereby improving unit availability and economic benefits. Simultaneously, it forms a closed-loop iterative mechanism, transforming experience into digital assets, reducing reliance on senior personnel, and facilitating promotion and replication.

[0019] Other features and advantages of the embodiments of this application will be described in detail in the following detailed description section. Attached Figure Description

[0020] The accompanying drawings are provided to further illustrate the embodiments of this application and form part of the specification. They are used together with the following detailed description to explain the embodiments of this application, but do not constitute a limitation on the embodiments of this application. In the drawings: Figure 1 This illustration schematically shows the steps of the intelligent generation method for boiler metal equipment maintenance strategy based on fused monitoring big data according to the embodiments of this application; Figure 2 This illustration shows a schematic diagram of the intelligent generation device for boiler metal equipment maintenance strategy based on fused monitoring big data according to an embodiment of this application; Figure 3 The diagram schematically illustrates the internal structure of an electronic device according to an embodiment of this application. Detailed Implementation

[0021] The specific embodiments of this application will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustration and explanation only and are not intended to limit the embodiments of this application.

[0022] Figure 1 The illustration shows a schematic diagram of the steps in the intelligent generation method for boiler metal equipment maintenance strategies based on fused monitoring big data, according to an embodiment of this application. For example... Figure 1 As shown, a method for intelligently generating boiler metal equipment maintenance strategies based on fused monitoring big data includes: S01. Obtain historical data samples of the maintenance records of the target equipment, construct a knowledge graph and digital twin model representing the equipment status, and obtain the association mapping between the multi-source supervision data of the target equipment and the corresponding maintenance strategy. S02. Collect the current multi-source monitoring data of the target equipment, match the closest maintenance record in the historical data sample of the multi-source monitoring data, and obtain the difference information between the current multi-source monitoring data and the closest matching maintenance record. S03. Based on the differentiated information, match the knowledge graph to obtain maintenance strategy correction information. After correcting the maintenance strategy in the closest maintenance record based on the maintenance strategy correction information, input the corrected maintenance strategy into the digital twin model to obtain simulation results. Perform multi-objective review on the corrected maintenance strategy based on the simulation results. S04. Generate a maintenance work order based on the revised maintenance strategy; before the maintenance work order is completed, when new multi-source supervision data is detected that meets the preset update triggering conditions, optimize at least one of the revised maintenance strategy, knowledge graph and digital twin model.

[0023] Through the above implementation methods, an initial maintenance strategy is obtained based on historical data samples, including standard operating procedures and expert knowledge bases. However, the actual maintenance scenario may not be completely consistent with the maintenance scenario corresponding to the initial maintenance strategy. Therefore, it is necessary to revise the initial maintenance strategy, automatically generate multi-objective optimized maintenance solutions, dynamically adapt to operating conditions, reduce over-inspection / missed inspection, and improve maintenance effectiveness.

[0024] In some embodiments of this application, the multi-source monitoring data includes at least operating parameters, metal monitoring data, non-destructive testing data, maintenance logs, defect records, environmental data, and material and lifespan data. Before constructing a knowledge graph and digital twin model representing the equipment status, a data governance step is also included, which includes cleaning, denoising, normalizing, temporal alignment, missing value completion, and outlier removal of the data. The historical data samples of the target equipment's maintenance records come from a matching standard operating procedure library, a typical defect library, an expert knowledge base, and a specification library.

[0025] In some embodiments of this application, historical data samples of maintenance records for the target equipment are obtained, and a knowledge graph representing the equipment state is constructed. This includes: extracting knowledge from the historical data samples; using the target equipment as an entity node; using fault phenomena and replaced parts from multi-source monitoring data as state attribute values ​​of the entity node; and using maintenance strategies as relational edges connecting different states to construct the knowledge graph; and using the knowledge graph to represent the state evolution of the target equipment under different maintenance cycles. Specifically, using the target equipment as an entity node in the knowledge graph, fault phenomena and replaced parts information extracted from the maintenance records are used as state attribute values ​​of the entity node at different time sections; simultaneously, the maintenance strategies adopted for each maintenance are used as relational edges connecting different state nodes to reflect the driving forces and paths of equipment state transformation. The knowledge graph constructed in this way not only records the fault performance and parts replacement history of the equipment under different maintenance cycles, but also connects each state change through maintenance strategy relational edges to form a time-series-based equipment lifecycle state evolution diagram. Based on this map, the complete state transition process of equipment from initial commissioning to each failure, maintenance, and recovery can be intuitively traced, providing structured knowledge support for the intelligent generation and dynamic optimization of subsequent maintenance strategies.

[0026] In some embodiments of this application, the state evolution of the target equipment under different maintenance cycles is characterized by the knowledge graph, including: sequentially connecting maintenance events according to time order based on the timestamps corresponding to each maintenance record; forming a state evolution path with temporal characteristics in the knowledge graph to obtain the state change process of the target equipment under different maintenance cycles. Specifically, based on the timestamp information extracted from each maintenance record, each maintenance event is sequentially connected in the knowledge graph according to time order. Each maintenance event corresponds to a state node in the graph, and the timestamp, as the time attribute of the node, ensures the temporal accuracy and traceability of the state records. Adjacent state nodes are connected by maintenance strategy relationship edges, thereby constructing a device state evolution path along the time axis in the knowledge graph. This path fully presents the continuous change process of the target equipment from its initial state, through each fault occurrence, maintenance handling, component replacement, and performance recovery, reflecting the dynamic change law of the equipment's state under different maintenance cycles, the fault reproduction mode, and the phased effects of maintenance measures.

[0027] In some embodiments of this application, collecting current multi-source monitoring data of the target equipment and matching the closest maintenance record in historical data samples of the multi-source monitoring data includes: extracting key feature parameters of the current multi-source monitoring data; calculating the similarity between the key feature parameters and the feature parameters corresponding to each maintenance record in the historical data samples; selecting the maintenance record with the highest similarity as the closest maintenance record; and obtaining the difference information between the current multi-source monitoring data and the matched closest maintenance record, including: obtaining the deviation value of the current multi-source monitoring data and the closest maintenance record on the key feature parameters, and generating an equipment status warning based on the deviation value. Specifically, the matching method here is preferably a database matching method, that is, performing conventional matching in historical data samples. The similarity here includes text similarity calculation or semantic matching.

[0028] In some embodiments of this application, maintenance strategy correction information is obtained by matching the differentiated information in the knowledge graph. This includes: extracting matching elements from the differentiated information, wherein the matching elements include: key feature parameter deviation values, including deviation parameter name, current collected value, historical baseline value, absolute deviation value, and deviation percentage; and equipment status warning prompts, including warning level, warning type, and warning trigger time. Associated component identifiers include the corresponding equipment component or subsystem identifiers extracted from the deviation parameter name and warning prompts, serving as the basis for locating entity nodes in the knowledge graph.

[0029] Based on the structural definition of the knowledge graph, query conditions are constructed according to the matching elements. These query conditions include: fault phenomenon matching, i.e., mapping the warning type and deviation parameter name in the warning prompt to the fault phenomenon field in the status attribute value of the target equipment entity node in the knowledge graph, as an attribute matching condition; component association matching, i.e., mapping the associated component identifier to the replaceable component field in the status attribute value of the target equipment entity node in the knowledge graph, used to limit the matching range; and severity constraint, i.e., combining the deviation percentage with the warning level to convert it into a fault severity classification, as a threshold constraint condition for matching. A combination of attribute filtering and relationship traversal is used to retrieve and match the status attribute values ​​of the target equipment entity based on the query conditions.

[0030] Based on the target device identifier corresponding to the differentiated information, the entity node corresponding to the target device is located in the knowledge graph. The historical state attribute values ​​of the target device entity node are traversed and matched, sorted by matching degree, and output one or more historical state attribute values ​​that best match the current differentiated information and their corresponding entity node state snapshots. At the same time, the knowledge graph node position where the matched state attribute values ​​are located is also output.

[0031] Utilizing the structural definition of "maintenance strategies as relational edges connecting different states" in a knowledge graph, relation tracing is performed, including: identifying the maintenance strategies used in historical maintenance events by recognizing relational edges based on the nodes containing historical state attribute values; reading the attribute information of the relational edge to obtain the content of the historical maintenance strategy, including: a detailed description of the maintenance strategy measures, maintenance process parameters and setpoints, maintenance execution conditions and time consumption, and the fault phenomenon attribute value of the state node after maintenance. Successful maintenance strategies are extracted based on the fault phenomenon attribute value of the next state node pointed to by the relational edge, including: determining whether the fault phenomenon attribute value of the next state node pointed to by the relational edge is "normal" or the fault has been eliminated; if so, marking the maintenance strategy corresponding to the relational edge as a successful maintenance strategy; otherwise, tracing back along the timeline until the state node where the fault has been eliminated is found, and extracting its corresponding maintenance strategy.

[0032] The system compares each item with the current differentiated information and the original maintenance strategy in the closest maintenance record to generate correction information. This correction information includes: corrections to deviation parameters (e.g., if the original strategy was "inspect the bearing" and the successful strategy was "replace the bearing", then the correction item "change inspect bearing to replace bearing" is generated); corrections to maintenance parameter values ​​(e.g., changing the clearance adjustment from 0.10mm to 0.05mm); suggestions for new maintenance items (e.g., if the successful maintenance strategy includes maintenance steps or inspection items not covered by the original strategy, these are extracted as suggested additions); corrections to component replacements (e.g., comparing with the attribute values ​​of currently replaced components, and generating a replacement component list correction item if discrepancies exist); and corrections related to warning levels (e.g., if the current warning level is emergency, it is suggested to shorten the maintenance response time to 50% of the original strategy).

[0033] The summarized correction information yields structured maintenance strategy correction information. Simultaneously, the source path of the maintenance strategy correction information is marked in the output, i.e., the complete path in the knowledge graph tracing from the matching state node through relation edges to the successful state node, ensuring the traceability of the correction information. This correction information will serve as the input basis for subsequent maintenance strategy correction stages.

[0034] In some embodiments of this application, the modified maintenance strategy is input into the digital twin model to obtain simulation results, and the modified maintenance strategy is reviewed based on the simulation results. This includes: performing structured analysis on the modified maintenance strategy to extract the input parameters required by the digital twin model. The input parameters include: maintenance operation sequence, maintenance process parameters, maintenance execution conditions, parts replacement list, and expected state after maintenance.

[0035] The input parameters are imported into the initialized digital twin model to obtain the maintenance process simulation and post-maintenance operation simulation. Output data from the digital twin model during the simulation is collected to generate a simulation result report. The maintenance process simulation includes: simulating the execution of each maintenance step sequentially in the digital twin model according to the maintenance operation sequence of the revised maintenance strategy; replacing the performance parameters of corresponding components in the model for component replacement operations; updating the composition structure of the equipment digital twin; and modifying the corresponding parameter values ​​in the model for process parameter adjustments to reflect the maintenance adjustment effect. The post-maintenance operation simulation includes: after completing the virtual maintenance operation, driving the digital twin model to continuously run under the configured operating conditions. During the simulation, the response changes of each key characteristic parameter are continuously monitored, and the parameter change curves over time are recorded. The simulation duration should cover the expected running time of at least one complete maintenance cycle to fully verify the medium- and long-term effects of the revised strategy. The simulation result report includes: the recovery status and stable values ​​of each key characteristic parameter after maintenance, the change curves of equipment operating performance indicators, and predictions of component wear or degradation trends during the simulation cycle.

[0036] Based on the simulation results, the revised maintenance strategy is evaluated item by item in terms of maintenance cost, equipment reliability, downtime, and safety risks. A conflict analysis is then performed on these factors. Specifically, conflicts between different dimensions in the audit results are identified; for example, shortening downtime may lead to increased maintenance costs or safety risks. A trade-off analysis is then conducted among the conflicting dimensions to determine whether the current strategy achieves a multi-objective equilibrium.

[0037] In some embodiments of this application, before the maintenance work order is completed, when new multi-source monitoring data is detected that meets preset update triggering conditions, at least one of the revised maintenance strategy, knowledge graph, and digital twin model is optimized. This includes optimizing the preset update triggering conditions as follows: the preset update triggering conditions include parameter exceeding limits triggering, deviation amplification triggering, new abnormal feature appearance triggering, time window triggering, and external event triggering. Upon detecting a triggering event, the target object and priority of this optimization are determined based on the type, severity, and scope of impact of the triggering conditions. The target object is at least one of the revised maintenance strategy, knowledge graph, and digital twin model, and the priority includes the order of optimization and the urgency of optimization. For example, when new multi-source monitoring data is detected that meets the parameter exceeding limits triggering condition, the optimization object is the revised maintenance strategy. When new multi-source monitoring data is detected that meets the deviation amplification triggering condition, the optimization object is the revised maintenance strategy plus the digital twin model, etc. The priority ranking includes: trigger events involving safety risks are of the highest priority, and the current high-risk maintenance steps are immediately suspended and optimization is performed first; trigger events involving policy effectiveness correction are of the second highest priority, and maintenance strategies are updated first before execution continues; trigger events involving only model accuracy optimization or knowledge graph expansion are of normal priority and can be processed in parallel in the background of maintenance work orders.

[0038] Taking the high-temperature superheater and reheater piping system of a 300MW coal-fired boiler as an example, the implementation steps are as follows: Data acquisition and fusion. By integrating two years of historical operating data, pipe wall temperature, oxide scale detection, wall thickness measurement, metallographic / creep / flaw detection data, maintenance records, defect ledgers, material parameters, etc., a unified spatiotemporal database and digital twin model are constructed.

[0039] Health assessment and risk classification. The model outputs the health status, deterioration rate, remaining life and risk level of each pipe segment, and identifies 12 high-risk pipe segments (overheating, oxidation, creep coupling), which are marked as Class A priority maintenance.

[0040] Intelligent generation of maintenance strategies. Maintenance targets: 12 pipe sections of Category A + 10 pipe sections of Category B (random inspection); Level: C-level special maintenance; Content: wall thickness re-measurement, oxide scale removal, creep deformation measurement, non-destructive testing, replacement determination; Duration: 3 days; resource allocation and process path optimization; acceptance standards and risk control measures.

[0041] Dynamic optimization and closed-loop execution. During execution, two new microcracks were discovered. The system updated the risk level in real time, automatically added flaw detection and metallographic inspection, adjusted the process and schedule, and generated supplementary work orders.

[0042] Results Verification: Maintenance cycles are shortened by 40% compared to traditional methods, costs are reduced by approximately 25%, high-risk pipe sections are inspected without failure, there are no leaks on heated surfaces in the next 12 months, and unit reliability is significantly improved.

[0043] Based on the same inventive concept, this application also provides an intelligent generation device for boiler metal equipment maintenance strategies based on integrated monitoring big data. Figure 2 The diagram illustrates the structure of an intelligent generation device for boiler metal equipment maintenance strategies based on fused monitoring big data, according to an embodiment of this application. Figure 2 As shown, the device includes: a data fusion module, used to acquire historical data samples of maintenance records of the target equipment, construct a knowledge graph and digital twin model representing the equipment status, and obtain the association mapping between multi-source supervision data of the target equipment and corresponding maintenance strategies; a preliminary strategy module, used to collect current multi-source supervision data of the target equipment, match the closest maintenance record in the historical data samples of the multi-source supervision data, and obtain the differential information between the current multi-source supervision data and the matched closest maintenance record; and a strategy generation module, used to generate strategies based on the differential information in the knowledge graph. The system performs matching to obtain maintenance strategy correction information, corrects the maintenance strategy in the closest maintenance record based on the correction information, and inputs the corrected maintenance strategy into the digital twin model to obtain simulation results. Based on the simulation results, the corrected maintenance strategy is subjected to multi-objective review. A closed-loop optimization module is also included, used to generate maintenance work orders based on the corrected maintenance strategy. Before the maintenance work order is completed, when new multi-source monitoring data is detected that meets preset update trigger conditions, at least one of the corrected maintenance strategy, knowledge graph, and digital twin model is optimized.

[0044] The specific limitations of each functional module in the aforementioned intelligent generation device for boiler metal equipment maintenance strategies based on fused monitoring big data can be found in the limitations of the intelligent generation method for boiler metal equipment maintenance strategies based on fused monitoring big data described above, and will not be repeated here. Each module in the above system can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device in hardware form, or stored in the memory of a computer device in software form, so that the processor can call and execute the corresponding operations of each module. It also employs knowledge graphs and digital twin models, and has the beneficial effects of automatically generating multi-objective optimized maintenance plans and dynamically adapting to operating conditions.

[0045] In some embodiments of this application, an electronic device is also provided, comprising: at least one processor; and a memory connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the at least one processor executes the aforementioned intelligent generation method for boiler metal equipment maintenance strategies based on fused supervisory big data. Its internal structure diagram can be shown as follows. Figure 3 As shown. Figure 3 The diagram schematically illustrates the internal structure of an electronic device according to an embodiment of this application. The electronic device includes a processor A01, a network interface A02, a memory (not shown), and a database (not shown) connected via a system bus. The processor A01 provides computing and control capabilities. The memory includes internal memory A03 and a non-volatile storage medium A04. The non-volatile storage medium A04 stores an operating system B01, a computer program B02, and a database (not shown). The internal memory A03 provides an environment for the operation of the operating system B01 and the computer program B02 stored in the non-volatile storage medium A04. The network interface A02 is used for communication with external terminals via a network connection. When the computer program B02 is executed by the processor A01, it implements a method for intelligently generating boiler metal equipment maintenance strategies based on fused monitoring big data.

[0046] Those skilled in the art will understand that Figure 3 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the electronic device to which the present application is applied. The specific electronic device may include more or fewer components than shown in the figure, or combine certain components, or have different component arrangements.

[0047] In one embodiment provided in this application, a machine-readable storage medium is provided, on which instructions are stored, which, when executed by a processor, cause the processor to be configured to execute the aforementioned intelligent generation method for boiler metal equipment maintenance strategies based on fused supervisory big data.

[0048] In one embodiment provided in this application, a computer program product is provided, including a computer program that, when executed by a processor, implements the aforementioned intelligent generation method for boiler metal equipment maintenance strategies based on fused supervisory big data.

[0049] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0050] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0051] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0052] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxesFigure 1 The steps of the function specified in one or more boxes.

[0053] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0054] Memory may include non-persistent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM. Memory is an example of computer-readable media.

[0055] Computer-readable media includes both permanent and non-permanent, removable and non-removable media that can store information using any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technologies, CD-ROM, digital versatile optical disc (DVD) or other optical storage, magnetic tape, magnetic magnetic disk storage or other magnetic storage devices, or any other non-transferable medium that can be used to store information accessible by a computing device. As defined herein, computer-readable media does not include transient computer-readable media, such as modulated data signals and carrier waves.

[0056] It should also be noted that the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element.

[0057] The above are merely embodiments of this application and are not intended to limit the scope of this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the scope of the claims of this application.

Claims

1. A method for intelligently generating maintenance strategies for boiler metal equipment by integrating big data monitoring, characterized in that, The method includes: Historical data samples of maintenance records of the target equipment are obtained, a knowledge graph and digital twin model representing the equipment status are constructed, and the association mapping between the multi-source supervision data of the target equipment and the corresponding maintenance strategy is obtained. Collect the current multi-source monitoring data of the target equipment, match the closest maintenance record in the historical data sample of the multi-source monitoring data, and obtain the difference information between the current multi-source monitoring data and the closest matching maintenance record; Based on the differentiated information, the maintenance strategy correction information is obtained by matching in the knowledge graph. The maintenance strategy in the closest maintenance record is corrected based on the maintenance strategy correction information. The corrected maintenance strategy is then input into the digital twin model to obtain simulation results. Based on the simulation results, the corrected maintenance strategy is subject to multi-objective review. A maintenance work order is generated based on the revised maintenance strategy; before the maintenance work order is completed, when new multi-source monitoring data is detected that meets the preset update triggering conditions, at least one of the revised maintenance strategy, knowledge graph and digital twin model is optimized.

2. The method according to claim 1, characterized in that, The multi-source monitoring data includes at least operating parameters, metal monitoring data, non-destructive testing data, maintenance logs, defect records, environmental data, and material and lifespan data. Before constructing the knowledge graph and digital twin model representing the device status, a data governance step is also included, which includes cleaning, denoising, normalizing, temporal alignment, missing value completion, and outlier removal of the data. The historical data sample of the maintenance records of the target equipment comes from the matching standard operation library, typical defect library, expert knowledge base and specification library.

3. The method according to claim 1, characterized in that, Obtain historical data samples of the target equipment's maintenance records, and construct a knowledge graph representing the equipment's status, including: Knowledge is extracted from the historical data samples. The target device is used as the entity node. The fault phenomena and replaced parts in the multi-source supervision data are used as the state attribute values ​​of the entity node. The maintenance strategy is used as the relation edge connecting different states to construct the knowledge graph. The knowledge graph is used to characterize the state evolution of the target equipment under different maintenance cycles.

4. The method according to claim 1, characterized in that, The knowledge graph is used to characterize the state evolution of the target equipment under different maintenance cycles, including: Based on the timestamps corresponding to each maintenance record, the maintenance events are sequentially linked together in chronological order. A state evolution path with temporal characteristics is formed in the knowledge graph to obtain the state change process of the target equipment under different maintenance cycles.

5. The method according to claim 1, characterized in that, Collect current multi-source monitoring data of the target equipment, and match the closest maintenance record in the historical data sample of the multi-source monitoring data, including: Extract the key feature parameters of the current multi-source supervision data, and calculate the similarity between the key feature parameters and the feature parameters corresponding to each maintenance record in the historical data sample; select the maintenance record with the highest similarity as the closest maintenance record; Obtaining the differential information between the current multi-source monitoring data and the closest matching maintenance record includes: obtaining the deviation value between the current multi-source monitoring data and the closest maintenance record on the key feature parameters, and generating equipment status warning prompts based on the deviation value.

6. The method according to claim 1, characterized in that, Based on the differential information, the maintenance strategy correction information is obtained by matching it in the knowledge graph, including: The matching elements are extracted from the differential information, and the matching elements include one of the following: key feature parameter deviation value, equipment status warning prompt and associated component identifier; Based on the structural definition of the knowledge graph, query conditions are constructed according to the matching elements. The query conditions include one of the following: fault phenomenon matching, component association matching, and severity constraint. The state attribute values ​​of the target equipment entity are retrieved and matched based on the query conditions by combining attribute filtering and relation traversal. Based on the target device identifier corresponding to the differentiated information, the entity node corresponding to the target device is located in the knowledge graph. The historical state attribute values ​​of the target device entity node are traversed and matched, sorted by matching degree, and output one or more historical state attribute values ​​that best match the current differentiated information and their corresponding entity node state snapshots. At the same time, the knowledge graph node position where the matched state attribute values ​​are located is also output. Based on the node where the historical state attribute value is located, the maintenance strategy adopted in the historical maintenance event is obtained by identifying the relation edge; the attribute information of the relation edge is read to obtain the content of the historical maintenance strategy, and the successful maintenance strategy is extracted based on the fault phenomenon attribute value of the next state node pointed to by the relation edge. Compare each item with the current differentiated information and the original maintenance strategy in the closest maintenance record to generate correction information. The correction information includes at least one of the following: correction of deviation parameters, correction of maintenance parameter values, suggestions for new maintenance items, correction of component replacement, and correction of early warning level association. By summarizing the aforementioned correction information, structured maintenance strategy correction information is obtained.

7. The method according to claim 1, characterized in that, The revised maintenance strategy is input into the digital twin model to obtain simulation results. Based on the simulation results, a multi-objective review of the revised maintenance strategy is performed, including: The revised maintenance strategy is structured and analyzed to extract the input parameters required for the digital twin model. The input parameters include: maintenance operation sequence, maintenance process parameters, maintenance execution conditions, parts replacement list and expected state after maintenance. The input parameters are imported into the initialized digital twin model to obtain the maintenance process simulation and the post-maintenance operation simulation. The output data of the digital twin model during the simulation process is collected to form a simulation result report. Based on the simulation results, the revised maintenance strategy is evaluated item by item in terms of maintenance cost, equipment reliability, downtime, and safety risks. Conflict analysis is then performed on the maintenance cost, equipment reliability, downtime, and safety risks.

8. The method according to claim 1, characterized in that, Before the maintenance work order is completed, when new multi-source monitoring data is detected that meets the preset update trigger conditions, at least one of the revised maintenance strategy, knowledge graph, and digital twin model is optimized, including: The preset update triggering conditions include: parameter exceeding the limit triggering, deviation expansion triggering, new abnormal feature appearance triggering, time window triggering, and external event triggering; Once a triggering event is detected, the target object and priority of this optimization are determined based on the type, severity, and scope of impact of the triggering conditions. The target object is at least one of the corrected maintenance strategy, knowledge graph, and digital twin model. The priority includes the order of optimization and the urgency of optimization.

9. A smart generation device for boiler metal equipment maintenance strategies based on fused monitoring big data, characterized in that, The device includes: The data fusion module is used to acquire historical data samples of the maintenance records of the target equipment, construct a knowledge graph and digital twin model representing the equipment status, and obtain the association mapping between the multi-source supervision data of the target equipment and the corresponding maintenance strategy. The preliminary strategy module is used to collect the current multi-source monitoring data of the target equipment, match the closest maintenance record in the historical data sample of the multi-source monitoring data, and obtain the difference information between the current multi-source monitoring data and the closest matching maintenance record. The strategy generation module is used to match the differentiated information in the knowledge graph to obtain maintenance strategy correction information, modify the maintenance strategy in the closest maintenance record based on the maintenance strategy correction information, input the modified maintenance strategy into the digital twin model to obtain simulation results, and perform multi-objective review on the modified maintenance strategy based on the simulation results; and A closed-loop optimization module is used to generate maintenance work orders based on the revised maintenance strategy; before the maintenance work order is completed, when new multi-source supervision data is detected that meets the preset update trigger conditions, at least one of the revised maintenance strategy, knowledge graph and digital twin model is optimized.

10. An electronic device, characterized in that, include: At least one processor; A memory connected to the at least one processor; The memory stores instructions that can be executed by the at least one processor, and the at least one processor implements the intelligent generation method for boiler metal equipment maintenance strategy based on fused monitoring big data as described in any one of claims 1 to 8 by executing the instructions stored in the memory.