A construction and operation method of a large-span pipe gallery system and an intelligent pipe gallery system

Through integrated digital collaborative design and digital twin construction, the problems of data silos and delayed operation and maintenance in large-span utility tunnel projects have been solved, realizing data assetization and predictive operation and maintenance throughout the entire life cycle, improving construction quality and safety, and reducing operation and maintenance costs and accident rates.

CN123140907APending Publication Date: 2026-11-20HUIZHOU DAYA BAY PETROCHEMICAL PUBLIC PIPE GALLERY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611146300.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-30
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing large-span utility tunnel projects suffer from data silos, passive and outdated operation and maintenance models, difficulty in construction quality control, and a lack of safety verification methods for major maintenance decisions. This results in a lack of information support for structural health assessments, low construction efficiency, and high safety risks.

Method used

The system adopts an integrated digital collaborative design approach, integrating a BIM platform, embedded sensing points, and supporting electromechanical systems for collaborative design and simulation. It combines factory prefabrication with low-impact on-site construction to build a digital twin, enabling intelligent operation and maintenance and decision-making through virtual-real interaction. It uses a full-domain intelligent sensing network for real-time monitoring and trend prediction, generates preventive maintenance instructions, and automatically controls equipment.

Benefits of technology

It has achieved full lifecycle data assetization, upgraded the operation and maintenance mode from post-event alarms to pre-event prediction, significantly improved construction quality and efficiency, enhanced the security of major maintenance decisions, and enabled the system to continuously evolve, thereby reducing the rate of sudden safety accidents and operation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140907A_ABST
    Figure CN123140907A_ABST
Patent Text Reader

Abstract

The application relates to the technical field of intelligent pipe gallery construction, in particular to a construction and operation method of a large-span pipe gallery system and an intelligent pipe gallery system. The method constructs a four-in-one intelligent system of structure-construction-sensing-platform, the prestressed concrete structure fundamentally solves the deflection and cracking problems of the super-long span, the durability is far superior to that of a steel structure, and the whole life cycle maintenance cost is lower. The intelligent sensing network realizes all-around monitoring of the pipe gallery structure and environment, replaces high-risk and low-efficiency manual inspection, and guarantees the essential safety of operation and maintenance personnel. Through a BIM+GIS digital twin base, the data chain of design, construction and operation is connected, asset management, maintenance decision and emergency response are established on the basis of comprehensive, real-time and accurate data, and intelligent and fine management of the whole life cycle of the pipe gallery is truly realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of intelligent utility tunnel construction technology, and in particular to a construction and operation method for a large-span utility tunnel system and an intelligent utility tunnel system. Background Technology

[0002] With the clustering development of industrial parks and the networking upgrade of urban infrastructure in my country, integrated utility tunnels, which carry out functions such as power, communication, heat, and industrial media transportation, are increasingly required to cross high-grade transportation corridors such as highways and trunk railways. These large-span utility tunnel projects are characterized by large spans, complex loads, high risks of construction road occupancy, and extremely difficult subsequent inspection and maintenance, which places far more stringent requirements on structural safety, construction efficiency, and full life-cycle operation and maintenance reliability than conventional underground utility tunnels.

[0003] In existing technologies, current cross-line utility tunnel projects generally suffer from the following four core pain points: First, the problem of data silos is serious. BIM models in the design phase, process data in the construction phase, and monitoring data in the operation and maintenance phase are fragmented and cannot form a continuous data asset that runs through the entire life cycle from design to decommissioning, resulting in a lack of complete information support for structural health assessment.

[0004] Second, the operation and maintenance model is passive and lagging behind. Most existing intelligent utility tunnel systems only realize simple collection of sensor data, threshold alarms, and visualization, which is a typical "post-event response" model. It cannot predict the trend of damage evolution based on the actual service status of the structure, and it is difficult to detect potential hidden risks in advance.

[0005] Third, the construction quality control of large-span structures is difficult. Large-span utility tunnels spanning highways generally need to complete the one-time pouring of large volumes of concrete within a limited window of time when traffic is closed at night. Traditional manual control methods are difficult to accurately trace the entire process of hydration heat, vibration quality, and prestressing tension, which can easily leave hidden defects in the project.

[0006] Fourth, there is a lack of safety verification methods for major maintenance decisions. For long-span utility tunnels that have been in service for many years, when major maintenance operations such as reinforcement and component replacement are required, existing technologies cannot conduct pre-construction assessments of the structural safety and stress redistribution impact of the maintenance plan, which can easily lead to secondary safety risks.

[0007] Therefore, there is an urgent need in this field for a new generation of large-span intelligent utility tunnel system that can break down data barriers, enable the synchronous growth of physical entities and digital models, and possess predictive simulation capabilities, so as to fundamentally solve the aforementioned industry pain points. Summary of the Invention

[0008] To address the aforementioned technical problems, this application provides a method for the construction and operation of a large-span utility tunnel system, comprising the following steps: S1. Integrated Digital Collaborative Design: Based on the BIM platform, it integrates multi-disciplinary models to collaboratively design and simulate the structure of prestressed concrete box girders, embedded sensor points and supporting electromechanical systems, and completes prestressing configuration analysis, sensor placement optimization and construction process simulation. S2. Parallel construction of factory prefabrication and low-impact on-site construction: In the factory, the intelligent sensing module and the steel reinforcement skeleton in the key load-bearing structural area are integrated and pre-assembled and verified, so that the intelligent sensing module becomes an embedded component of the prestressed concrete box girder; at the construction site, the support foundations on both sides are constructed during the off-peak hours of the highway, and then, during the approved fully closed traffic window, the straddle-type protective construction support system is installed, and high-performance concrete is poured continuously in one go; S3. Construction and delivery of digital twin: The design model in S1, the full-process construction data flow in S2, and the identity coding information of the pre-embedded sensor module are integrated to create a physically accurate and information-complete digital twin base corresponding to the large-span intelligent pipe gallery, and generate a full life-cycle data interaction standard corresponding to the physical structure. S4. Intelligent Operation and Maintenance and Decision-Making with Virtual and Real Interaction: By connecting the digital twin base with the integrated intelligent operation and maintenance platform, the following closed-loop management is achieved: Based on real-time / near real-time monitoring data from the full-domain intelligent sensing network and supplementary inspection equipment, the digital twin base is dynamically driven to synchronously simulate the structure and environmental status of the utility tunnel; the built-in analysis and diagnostic model is used to identify, diagnose, and predict trends of abnormal data; based on the prediction results and diagnostic analysis, decision information including preventive maintenance instructions, emergency response plans, or instructions for the execution of linked equipment is generated, and key execution equipment in the utility tunnel is automatically adjusted according to the instructions for the execution of linked equipment; at the same time, the feedback data after equipment adjustment is fed back to the digital twin base to update model parameters and track the feedback effect of instruction execution.

[0009] Preferably, in step S2, the intelligent sensing module includes a structural health monitoring submodule and an environmental and safety monitoring submodule. The structural health monitoring submodule is used to monitor the health status of the main structure of the utility tunnel, and the environmental and safety monitoring submodule is used to monitor the internal environment of the main structure of the utility tunnel.

[0010] Preferably, the structural health monitoring submodule and / or environmental and safety monitoring submodule adopts an encapsulated multi-functional monitoring unit, which includes at least a main encapsulation shell, a sensor chip cluster, a miniature self-powered unit, and a wireless data transceiver module; after the multi-functional monitoring unit is installed and calibrated in the factory, its shell becomes an internal component of the prestressed concrete box girder by fixing it to the structural steel reinforcement.

[0011] Preferably, in step S2, the straddle-type protective construction support system is a truss-type integrated safe operation platform, which integrates a closed fall-prevention canopy, an automated concrete placement system, an intelligent vibrating robot, and an embedded video monitoring network. This platform can achieve rapid overall hoisting and dismantling within a single traffic window.

[0012] Preferably, step S3 also includes physical-digital synchronous design: during the project design phase, the data structure, communication interface standards and self-evolution logic of the digital twin are defined synchronously to ensure that every key component in the physical world has a unique corresponding "digital mirror" in the digital world that can be traced throughout its entire life cycle, thus avoiding compatibility obstacles for subsequent data docking from the source.

[0013] Preferably, in step S2, the parallel construction of factory prefabrication and low-impact on-site construction also includes a digital thread recording step: at the construction site, the construction of the support foundations on both sides is completed during the off-peak hours of the highway, and then, during the approved fully closed traffic window, the straddling protective construction support system is installed to complete the one-time continuous pouring of high-performance concrete for the large-span box girder; during this process, all key construction event data are automatically collected through IoT terminals, including the pouring time of each batch of concrete, real-time ambient temperature, vibration intensity, and the entire process curve of prestressing tension, forming an immutable "digital construction log" and injecting it into the digital twin in real time; all key construction data are distributed and stored using blockchain technology to ensure that the data is traceable and immutable throughout the entire process.

[0014] Preferably, step S3 also includes a digital twin activation and calibration step: after the pipe gallery structure is formed and the initial tension is completed, the system activates the data-driven simulation engine and uses the early service data collected by the full-domain perception layer, including the initial static strain, the natural frequency of the structure, and the early strength development curve of the concrete, to perform high-precision calibration on the initial state of the digital twin and complete the first accurate alignment between the virtual entity and the physical entity. Preferably, in step S4, the closed-loop execution of intelligent operation and maintenance and decision-making includes the following steps: A1. Real-time state simulation and health assessment of digital twins driven by continuous sensing data streams; A2. When the evaluation indicators exceed the preset threshold, or the prediction model identifies a trend of structural performance degradation, the system will automatically trigger a graded risk warning and push it to the operation and maintenance management personnel with different permissions in three levels: general, relatively serious, and severe. A3. The system automatically generates a preliminary maintenance plan, runs a virtual verification module in the digital twin, simulates and verifies the security and effectiveness of the proposed maintenance strategy, and optimizes the details of the plan. A4. Issue virtual-verified optimization and maintenance work orders to operations and maintenance personnel to accurately execute maintenance tasks in the physical world; A5. After maintenance is completed, the newly collected structural response data (such as strain distribution and modal frequency changes after reinforcement) will be fed back to the digital twin to update the model parameters, completing a complete closed loop from "perception-prediction-decision-execution-feedback".

[0015] Preferably, in step S4, the supplementary inspection equipment is a robot that can move autonomously or remotely along the outer wall or internal maintenance passage of the pipe gallery. It is equipped with a lidar, a high-definition vision camera, and a thermal imager to acquire three-dimensional morphology, apparent defects, and temperature field data of the pipe gallery surface, so as to supplement the detection of blind spots in the monitoring of the fixed pre-embedded sensor network. The analysis and diagnosis model includes a multi-level diagnostic model that integrates machine learning and physical mechanisms. It first verifies the authenticity of the data and performs noise reduction based on the spatiotemporal correlation of the sensors, then uses a time series analysis algorithm to identify abnormal patterns, and finally combines a finite element simulation model to diagnose and analyze the causes of the abnormalities.

[0016] Preferably, an intelligent utility tunnel system includes: The physical structure consists of prestressed concrete box girders, embedded sensing modules, and unitized maintenance cabins. The information space architecture supporting the physical entity structure, the digital twin base and the integrated intelligent operation and maintenance platform, and the interactive execution layer connecting the physical entity structure and the information space architecture, include the global intelligent sensing network, the supplementary inspection equipment and key execution equipment controlled by the platform.

[0017] As can be seen from the above, the following beneficial effects can be obtained by applying the method provided in this application: First, it has achieved the assetization of data throughout the entire lifecycle. By synchronously constructing physical entities and digital twins, a "digital asset package" for each component has been generated, bringing together information from the entire process from design and construction to operation and maintenance. This completely breaks down data silos in the traditional model and provides complete and reliable digital evidence for structural health assessment, asset valuation, and insurance claims.

[0018] Second, the operation and maintenance model has achieved a qualitative upgrade. It has been upgraded from the traditional "post-event alarm and passive repair" to a predictive operation and maintenance model of "pre-event prediction and proactive intervention". It can identify the trend of structural performance degradation months or even years in advance, significantly move the handling of major safety risks forward, and greatly reduce the probability of unplanned shutdowns and emergency repairs. It is estimated that it can reduce the rate of sudden safety accidents in cross-line utility tunnels by more than 90%.

[0019] Third, it significantly improves the construction quality and efficiency of cross-line projects. By automatically collecting data throughout the construction process through the Internet of Things and combining it with low-impact construction techniques during nighttime windows, it ensures the quality of large-volume concrete pouring while minimizing disruption to highway traffic, eliminates potential quality hazards in hidden works, and reduces the amount of manual management during the construction phase by 70%.

[0020] Fourth, the safety of major maintenance decisions has been fundamentally improved. The introduction of the virtual verification module has solved the industry problem of the difficulty in predicting the effects of major maintenance plans for large-span structures in advance. All physical operations are simulated and optimized in a digital twin space before implementation, completely avoiding secondary structural safety risks caused by improper maintenance.

[0021] Fifth, the system possesses continuous evolution capabilities. The self-growing nature of the digital twin allows the simulation accuracy of the model to continuously improve as the service life of the utility tunnel increases. The system becomes increasingly intelligent and accurate with use, and the total lifecycle maintenance cost can be reduced by more than 40% compared to the traditional model, resulting in significant overall economic benefits. Attached Figure Description

[0022] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the accompanying drawings used in the description of the embodiments of this application or the prior art will be briefly introduced below. Obviously, the accompanying drawings described below are only a part of the embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0023] Figure 1 This is a flowchart illustrating the construction and operation method of a large-span utility tunnel system according to an embodiment of this application. Figure 2 This is a structural diagram of a large-span intelligent utility tunnel according to an embodiment of this application; Figure 3 This is a front cross-sectional view of a large-span intelligent utility tunnel according to an embodiment of this application. Detailed Implementation

[0024] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application. Example

[0025] To address the aforementioned technical problems, this embodiment provides a method for the construction and operation of a large-span utility tunnel system, such as... Figure 1 As shown, it includes the following steps: S1. Integrated Digital Collaborative Design: Based on the BIM platform, it integrates multi-disciplinary models to collaboratively design and simulate the prestressed concrete box girder structure, embedded sensing points and supporting electromechanical systems, and completes prestressed configuration analysis, sensor placement optimization and construction process simulation. S2. Parallel construction of factory prefabrication and low-impact on-site construction: In the factory, the intelligent sensing module and steel reinforcement skeleton in the key load-bearing structural area are integrated and pre-assembled and verified, so that the intelligent sensing module becomes an embedded component of the prestressed concrete box girder; at the construction site, the support foundations on both sides are constructed during the off-peak hours of the highway, and then, during the approved fully closed traffic window, the straddle-type protective construction support system is installed, and high-performance concrete is poured continuously in one go. S3. Construction and delivery of digital twin: The design model in S1, the full-process construction data flow in S2, and the identity coding information of the pre-embedded sensor module are integrated to create a physically accurate and information-complete digital twin base corresponding to the large-span intelligent pipe gallery, and generate a full life-cycle data interaction standard corresponding to the physical structure. S4. Intelligent Operation and Maintenance and Decision-Making with Virtual and Real Interaction: By connecting the digital twin base in S3 with the integrated intelligent operation and maintenance platform, the following closed-loop management is achieved: Based on real-time / near real-time monitoring data from the full-domain intelligent sensing network and supplementary inspection equipment, the digital twin base is dynamically driven to synchronously simulate the structure and environmental status of the utility tunnel; the built-in analysis and diagnostic model is used to identify, diagnose, and predict trends of abnormal data; based on the prediction results and diagnostic analysis, decision information including preventive maintenance instructions, emergency response plans, or instructions for the execution of linked equipment is generated, and key execution equipment in the utility tunnel is automatically adjusted according to the instructions for the execution of linked equipment; at the same time, the feedback data after equipment adjustment is fed back to the digital twin base to update model parameters and track the feedback effect of instruction execution.

[0026] Preferably, step S2 specifically includes the following steps: Collaborative design and support preparation: The integrated design of prestressed box girders was completed based on the BIM platform, and the foundation and support column construction on both sides of the highway was completed during non-road-occupying periods. Low-impact construction during the window period: During the approved full closure window period of the expressway, quickly complete the installation of the crossing section support and formwork, and continuously pour high-performance concrete of strength grade C50 and above in one go.

[0027] Specifically, the main structure of the utility tunnel adopts a large-span prestressed concrete single-box multi-cell box girder 1. The interior of box girder 1 is divided into multiple independent compartments according to functional requirements, such as a power compartment and a comprehensive process pipeline compartment. Longitudinal, transverse, and vertical prestressed steel strands 3 are installed within box girder 1. The longitudinal prestressing effectively offsets most of the tensile stress caused by the self-weight of the utility tunnel, internal pipeline loads, and some wind loads, thus strictly controlling the maximum mid-span deflection within L / 800 (L is the span), significantly improving the overall stiffness, crack resistance, and durability of the structure. The web of box girder 1 adopts a reasonable haunch design, optimizing the structural stress and reducing stress concentration. The structure exhibits excellent performance and superior durability: prestressed concrete structures fundamentally solve the deflection and cracking problems of ultra-long spans, with durability far exceeding that of steel structures and lower maintenance costs throughout their entire life cycle.

[0028] A longitudinally continuous maintenance passage 2 is set inside the box girder 1, and maintenance holes are reserved on the side walls of each functional compartment. The box girder structure is divided into several standard segments (e.g., one segment every 20-30 meters) longitudinally. Miniature intelligent sensors are pre-embedded at key stress locations in each segment (such as near supports, mid-span sections, and prestressed anchor ends), and digital twins are injected in real time to achieve physical and logical connection with external data interfaces.

[0029] Furthermore, step A2 includes the following construction procedures: Portal scaffolding system: A robust spread foundation or pile foundation is constructed on both sides of the highway, upon which high-strength Bailey beams or disc-lock scaffolding are erected to form a portal support system spanning the highway. Distribution beams and bottom formwork are laid above the scaffolding.

[0030] Preparations during non-road occupancy period: Before obtaining formal construction permits, during normal highway traffic hours, complete foundation construction, support column installation, and most ground preparation work in the area of ​​bridge piers on both sides.

[0031] Rapid Operation During Traffic Window: Within the approved, brief, fully enclosed traffic window (typically several consecutive nights), the installation of the spanning section's support beams, distribution beams, and formwork system is rapidly completed. Subsequently, high-performance concrete of strength grade C50 or higher is continuously poured in a single operation using pumping. In step S2, the spanning protective construction support system is a truss-type integrated safe operation platform, incorporating a closed fall-prevention canopy, an automated concrete placement system, an intelligent vibrating robot, and an embedded video monitoring network. This platform allows for rapid overall hoisting and dismantling within a single traffic window. The entire support erection and concrete pouring process is conducted under a robust safety protective canopy, ensuring the absolute safety of the road below.

[0032] Prestressing tensioning and scaffold dismantling: After the concrete reaches its design strength, the prestressed steel strands are tensioned, grouted, and anchored during non-road-occupying periods. Finally, during the next nighttime window, the scaffolding system for the crossing section is dismantled quickly and systematically, restoring normal highway traffic. The construction process is safe and controllable, with significant social benefits: The cast-in-place scaffolding process places most high-risk operations under a robust protective scaffold, and through precise window management, minimizes disruption to normal highway operations.

[0033] In step S3, the entire construction data stream includes the operating posture data of construction machinery, real-time monitoring data of concrete mix proportions and performance, and dual control data of stress and elongation during prestressing tensioning. These data are automatically collected and stamped with time and space stamps through IoT terminals and automatically bound to specific components in the BIM model.

[0034] Furthermore, in step S2, the intelligent sensing module includes a structural health monitoring submodule and an environmental and safety monitoring submodule. The structural health monitoring submodule is used to monitor the health status of the main structure of the utility tunnel, and the environmental and safety monitoring submodule is used to monitor the internal environment of the main structure of the utility tunnel.

[0035] Furthermore, the structural health monitoring submodule and / or environmental and safety monitoring submodule are packaged multifunctional monitoring units, which at least include a main packaging shell, a sensor chip cluster (including at least two of the sensor types for measuring stress, vibration, temperature, and humidity), a miniature self-powered unit, and a wireless data transceiver module; after the module is installed and calibrated in the factory, its shell becomes a permanent built-in component of the prestressed concrete box girder by fixing it to the structural steel reinforcement.

[0036] Specifically, the structural health monitoring submodule's multifunctional monitoring units include fiber optic gratings (FBGs) for long-term stress / strain monitoring, triaxial MEMS accelerometers for capturing dynamic responses (such as wind-induced vibration and vehicle vibration), and magnetic flux sensors for monitoring cable force changes. These sensors are installed and calibrated during the factory prefabrication stage, becoming an integral part of the structure. Specifically, by pre-embedding the stress / strain monitoring FBGs within the structure, changes in the concrete hydration heat temperature field are monitored in real time, and this data is synchronized to a digital twin base for adjusting curing plans, assessing early strength development, and identifying potential microcrack risks.

[0037] The environmental and safety monitoring submodule's multi-functional monitoring unit includes composite sensors. These sensors are arranged at standard intervals within various functional compartments (such as the power compartment and process pipeline compartment) inside the pipe gallery to monitor temperature, humidity, and toxic and harmful gases (H2S, CH4, etc.) in real time. All sensors are explosion-proof and corrosion-resistant, adapting to the harsh environment of the petrochemical park.

[0038] In some other implementations, this embodiment provides a packaged intelligent sensing module, which includes a corrosion-resistant and long-term stable encapsulation housing, a main circuit board integrating a microprocessor chip and a memory, a physical anchoring interface connected to the structural substrate, a strain / temperature composite sensor as the core sensor, a motion accelerometer, an ambient temperature and humidity meter or a combination of the aforementioned sensors, and a wireless communication antenna for receiving data and instructions; the module as a whole meets the protection level of IP68 or higher and has a low-power self-wake-up working mode.

[0039] Based on the above solution, by embedding a comprehensive intelligent sensing network inside the main body of the utility tunnel, the network includes a structural health monitoring subsystem for monitoring the structural health of the main tunnel and an environmental safety monitoring subsystem for monitoring the internal environment of the main tunnel. This structure-integrated intelligent sensing network enables 24 / 7 comprehensive monitoring of both the tunnel's "skeleton" (structure) and "internal organs" (environment), completely replacing high-risk and inefficient manual inspections and ensuring the inherent safety of maintenance personnel.

[0040] Furthermore, in step S4, the supplementary inspection equipment is a robot that can move autonomously or remotely along the outer wall or internal maintenance passage of the utility tunnel. It is equipped with lidar, high-definition vision camera and thermal imager to acquire three-dimensional morphology, apparent defects and temperature field data of the utility tunnel surface, so as to supplement the detection of the monitoring blind spots of the fixed pre-embedded sensor network.

[0041] Furthermore, in step S4, the analysis and diagnostic model can include a multi-level diagnostic model that integrates machine learning and physical mechanisms. It first verifies the authenticity of the data and performs noise reduction based on the spatiotemporal correlation of the sensors, then uses time series analysis algorithms to identify abnormal patterns, and finally combines a finite element simulation model to perform diagnostic analysis of the causes of the anomalies.

[0042] Furthermore, the digital twin platform is divided into a high-fidelity basic twin and multiple simplified twins for different scenarios, based on the data update frequency and computing requirements. Among them, at least one emergency response high-speed twin is used for real-time security monitoring. This emergency twin can be instantly activated when it senses that key parameters exceed the threshold, and loads a lightweight model to perform second-level damage prediction and emergency plan simulation.

[0043] Furthermore, step S3 includes synchronous physical-digital design: during the project design phase, the data structure, communication interface standards, and self-evolution logic of the digital twin are defined synchronously to ensure that every key component in the physical world has a unique, traceable "digital mirror" in the digital world, avoiding compatibility obstacles for subsequent data integration from the outset. A high-precision BIM+GIS fusion model is built from the project's initial design stage. This model serves not only as the basis for design and construction but also as the "digital brain" for operation and maintenance. All components have a unique identifier (ID), linked to their material quality certificates, processing records, welding procedure qualifications, non-destructive testing reports, and other information throughout the entire process.

[0044] In step S2, the parallel construction of factory prefabrication and low-impact on-site construction also includes a digital thread recording step: at the construction site, the construction of the support foundations on both sides is completed during the off-peak hours of the highway. Subsequently, during the approved fully closed traffic window, the straddle-type protective construction support system is installed to complete the one-time continuous pouring of high-performance concrete for the large-span box girder. During this process, all key construction event data are automatically collected through IoT terminals, including the pouring time of each batch of concrete, real-time ambient temperature, vibration intensity, and the entire process curve of prestressing tension, forming an immutable "digital construction log" and injecting it into the digital twin in real time. All key construction data are distributed and stored using blockchain technology to ensure that the data is traceable and tamper-proof throughout the entire process.

[0045] Step S3 also includes a digital twin activation and calibration step: After the pipe gallery structure is formed and the initial tension is completed, the system activates the data-driven simulation engine and uses the early service data collected by the global perception layer, including the initial static strain, the natural frequency of the structure, and the early strength development curve of the concrete, to perform high-precision calibration on the initial state of the digital twin and complete the first accurate alignment between the virtual entity and the physical entity.

[0046] The operations and maintenance platform receives massive amounts of data from the global perception network in real time and dynamically maps it onto the digital twin model. Using machine learning algorithms (such as LSTM and random forest), the platform can predict trends in structural health status, provide early warnings of environmental anomalies, and automatically generate structural health assessment reports.

[0047] In step S4, the closed-loop execution of intelligent operation and maintenance and decision-making includes the following steps: A1. Real-time state simulation and health assessment of digital twins driven by continuous sensing data streams; A2. When the evaluation indicators exceed the preset threshold, or the prediction model identifies a trend of structural performance degradation, the system will automatically trigger a graded risk warning and push it to the operation and maintenance management personnel with different permissions in three levels: general, relatively serious, and severe. A3. The system automatically generates a preliminary maintenance plan, runs a virtual verification module in the digital twin, simulates and verifies the security and effectiveness of the proposed maintenance strategy, and optimizes the details of the plan. A4. Issue virtual-verified optimization and maintenance work orders to operations and maintenance personnel to accurately execute maintenance tasks in the physical world; A5. After maintenance is completed, the newly collected structural response data (such as strain distribution and modal frequency changes after reinforcement) will be fed back to the digital twin to update the model parameters, completing a complete closed loop from "perception-prediction-decision-execution-feedback".

[0048] The platform integrates functional modules such as equipment asset management, preventative maintenance planning, emergency command and dispatch, and energy consumption analysis. When the system issues an early warning, it can automatically link to the emergency plan, push disposal work orders to relevant responsible persons, and coordinate with actuators such as fans and pumps for initial intervention, realizing a shift from "passive response" to "proactive prevention." Through the BIM+GIS digital twin foundation, the data chain of design, construction, and operation and maintenance is connected, enabling asset management, maintenance decisions, and emergency response to be based on comprehensive, real-time, and accurate data, truly achieving intelligent and refined management of the entire life cycle of the utility tunnel.

[0049] This embodiment provides a large-span intelligent utility tunnel system, and the construction and operation and maintenance method of the large-span intelligent utility tunnel system described above includes: The physical structure consists of prestressed concrete box girders, embedded sensing modules, and unitized maintenance cabins. The information space architecture supporting the physical entity structure, the digital twin base and the integrated intelligent operation and maintenance platform, and the interactive execution layer connecting the physical entity structure and the information space architecture, which includes a global intelligent sensing module, supplementary inspection equipment and key execution equipment controlled by the platform.

[0050] This embodiment uses an industrial integrated pipe gallery project with a span of 120 meters that crosses an eight-lane highway in both directions as the application scenario.

[0051] like Figure 2-3As shown, the main physical entity of this embodiment is a C55 prestressed concrete single-box multi-cell box girder 1, with a total width of 14.5 meters. The girder 1 is internally divided into multiple functional compartments, such as an electrical compartment, a thermal medium compartment, and an integrated process pipeline compartment. A longitudinally connected maintenance passage 2 is provided inside the box girder, and maintenance holes are pre-reserved on the side walls of each functional compartment. The box girder structure is longitudinally divided into several standard segments (e.g., one segment every 20-30 meters). Miniature intelligent sensors are pre-embedded at key stress locations in each segment (such as near supports, mid-span sections, and prestressed anchorage ends), and data from these sensors, along with data from the intelligent sensing module, is injected into the digital twin in real time. This data is then interfaced with an external intelligent operation and maintenance platform to form a physical and logical connection.

[0052] The intelligent sensing module is laid out along the maintenance passage 2. Longitudinal, transverse, and vertical prestressed steel strands 3 are configured within the box girder 1. The longitudinal prestressing effectively offsets most of the tensile stress caused by the self-weight of the pipe gallery, internal pipeline loads, and some wind loads, thus strictly controlling the maximum mid-span deflection within L / 800 (L is the span), significantly improving the overall stiffness, crack resistance, and durability of the structure. The web of box girder 1 adopts a reasonable haunch design, optimizing the structural stress and reducing stress concentration. Box girder 1 is divided into 6 standard unit segments longitudinally. Each segment's prestressed steel strands 3 and intelligent sensing module are assigned a unique RFID electronic tag, achieving digital identification throughout the asset's entire lifecycle.

[0053] The sensing layer of the full-domain intelligent sensing module is integrated during the factory prefabrication stage: a total of 1200 meters of distributed strain sensing optical fiber is laid along the main reinforcement of the box girder. A total of 64 FBG fiber grating strain-temperature composite measurement points are deployed in key stress areas such as the mid-span section, the 1 / 4-span section, and the support diaphragm. Simultaneously, 32 miniature wireless sensor clusters integrating MEMS accelerometers, temperature and humidity sensors, and combustible gas detectors are deployed inside each compartment. All sensors are uniformly calibrated before leaving the factory and welded to the steel mesh to form an "intelligent reinforcement cage." Upon arrival at the site, they are directly hoisted into place, avoiding the error and damage risks associated with secondary on-site sensor deployment. The distributed fiber optic neural network simultaneously undertakes both sensing and communication functions. Even if the main communication link is interrupted, the optical fiber itself can serve as a backup transmission channel to ensure that core data is not lost.

[0054] The digital twin computing layer is built concurrently with the design phase: the BIM model of the utility tunnel is imported into finite element analysis software to complete initial mechanical simulation calculations. During construction, the system automatically collects hydration heat and temperature data during concrete pouring, records the temperature field distribution across the entire cross-section every 5 minutes, and injects this data into the digital twin in real time to dynamically calibrate the concrete's elastic modulus time history curve and shrinkage and creep parameters. After the utility tunnel is completed and opened to traffic, the system uses structural response data collected over the first three months under vehicle and temperature loads to train the LSTM neural network model in the data-driven simulation engine, completing the first high-precision calibration of the digital twin. At this point, the twin's prediction error for strain at each measuring point is controlled within 2%.

[0055] During its subsequent three years of service, the system continuously operated its self-growing mechanism. Whenever the root mean square error between the measured data and the simulated prediction data exceeded a set threshold of 1.5 times, the system automatically triggered an active learning process to update the weight parameters of the machine learning model, resulting in a year-on-year improvement in the prediction accuracy of the digital twin. Prior to a deep foundation pit construction project on a nearby site, maintenance personnel input the ground displacement parameters from the pit excavation into the digital twin. The system pre-calculated and predicted that the differential settlement of the foundation supports on the side of the utility tunnel closest to the pit would reach 1.2 mm, and the local stress increase would reach 6%. The system automatically generated a preventative monitoring and reinforcement plan and simulated a "micro-steel pipe pile replacement and reinforcement" maintenance plan in virtual space. This verified that the plan would not adversely affect the overall stress of the box girder. The optimized plan was successfully implemented in the actual construction, avoiding the potential risk of subsequent structural cracking.

[0056] During an annual routine health assessment, the system, through predictive simulation, discovered that under the cumulative load over the next five years, the prestress loss in the mid-span bottom region would exceed the design allowable value. The system automatically generated a maintenance work order for external prestressing reinforcement. In the virtual verification module, it simulated the tensioning of three external prestressed steel strands. Simulation results showed that this measure could reduce the tensile stress at the mid-span by 18%, fully meeting the service requirements for the remaining 30 years. The virtually optimized maintenance plan was successfully implemented during nighttime traffic windows. The measured structural strain data after implementation showed a high degree of agreement with the twin simulation results. The data was then fed back into the twin to update the model, forming a complete operation and maintenance closed loop.

[0057] The embodiments described above do not constitute a limitation on the scope of protection of this technical solution. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the above embodiments should be included within the scope of protection of this technical solution.

Claims

1. A method for the construction and operation and maintenance of a large-span intelligent utility tunnel system, characterized in that: Includes the following steps: S1. Integrated Digital Collaborative Design: Based on the BIM platform, it integrates multi-disciplinary models to collaboratively design and simulate the structure of prestressed concrete box girders, embedded sensor points and supporting electromechanical systems, and completes prestressing configuration analysis, sensor placement optimization and construction process simulation. S2. Parallel construction of factory prefabrication and low-impact on-site construction: In the factory, the intelligent sensing module and the steel reinforcement skeleton in the key load-bearing structural area are integrated and pre-assembled and verified, so that the intelligent sensing module becomes an embedded component of the prestressed concrete box girder; at the construction site, the support foundations on both sides are constructed during the off-peak hours of the highway, and then, during the approved fully closed traffic window, the straddle-type protective construction support system is installed, and high-performance concrete is poured continuously in one go; S3. Construction and delivery of digital twin: The design model in S1, the full-process construction data flow in S2, and the identity coding information of the pre-embedded sensor module are integrated to create a physically accurate and information-complete digital twin base corresponding to the large-span intelligent pipe gallery, and generate a full life-cycle data interaction standard corresponding to the physical structure. S4. Intelligent Operation and Maintenance and Decision-Making with Virtual and Real Interaction: By connecting the digital twin base with the integrated intelligent operation and maintenance platform, the following closed-loop management is achieved: Based on real-time / near real-time monitoring data from the full-domain intelligent sensing network and supplementary inspection equipment, the digital twin base is dynamically driven to synchronously simulate the structure and environmental status of the utility tunnel; the built-in analysis and diagnostic model is used to identify, diagnose, and predict trends of abnormal data; based on the prediction results and diagnostic analysis, decision information including preventive maintenance instructions, emergency response plans, or instructions for the execution of linked equipment is generated, and key execution equipment in the utility tunnel is automatically adjusted according to the instructions for the execution of linked equipment; at the same time, the feedback data after equipment adjustment is fed back to the digital twin base to update model parameters and track the feedback effect of instruction execution.

2. The construction and operation method of the large-span intelligent utility tunnel system according to claim 1, characterized in that: In step S2, the intelligent sensing module includes a structural health monitoring submodule and an environmental and safety monitoring submodule. The structural health monitoring submodule is used to monitor the health status of the main structure of the utility tunnel, and the environmental and safety monitoring submodule is used to monitor the internal environment of the main structure of the utility tunnel.

3. The construction and operation method of the large-span intelligent utility tunnel system according to claim 2, characterized in that: The structural health monitoring submodule and / or the environmental and safety monitoring submodule adopt an encapsulated multi-functional monitoring unit, which includes at least a main encapsulation shell, a sensor chip cluster, a miniature self-powered unit, and a wireless data transceiver module; after the multi-functional monitoring unit is installed and calibrated in the factory, its shell becomes an internal component of the prestressed concrete box girder by fixing it to the structural steel reinforcement.

4. The construction and operation method of the large-span intelligent utility tunnel system according to claim 1, characterized in that: In step S2, the straddle-type protective construction support system is a truss-type integrated safe operation platform, which integrates a closed fall-prevention canopy, an automated concrete placement system, an intelligent vibration robot, and an embedded video monitoring network. This platform can achieve rapid overall hoisting and dismantling within a single traffic window.

5. The construction and operation method of the large-span intelligent utility tunnel system according to claim 1, characterized in that: Step S3 also includes physical-digital synchronous design: during the project design phase, the data structure, communication interface standards and self-evolution logic of the digital twin are defined synchronously to ensure that every key component in the physical world has a unique corresponding "digital mirror" in the digital world that can be traced throughout its entire life cycle, thus avoiding compatibility obstacles for subsequent data docking from the source.

6. The construction and operation method of the large-span intelligent utility tunnel system according to claim 1, characterized in that: In step S2, the parallel construction of factory prefabrication and low-impact on-site construction also includes a digital thread recording step: at the construction site, the construction of the support foundations on both sides is completed during the off-peak hours of the highway. Subsequently, during the approved fully closed traffic window, the straddle-type protective construction support system is installed to complete the one-time continuous pouring of high-performance concrete for the large-span box girder. During this process, all key construction event data are automatically collected through IoT terminals, including the pouring time of each batch of concrete, real-time ambient temperature, vibration intensity, and the entire process curve of prestressing tension, forming an immutable "digital construction log" and injecting it into the digital twin in real time. All key construction data are distributed and stored using blockchain technology to ensure that the data is traceable and tamper-proof throughout the entire process.

7. The construction and operation method of the large-span intelligent utility tunnel system according to claim 1, characterized in that: Step S3 also includes a digital twin activation and calibration step: After the pipe gallery structure is formed and the initial tension is completed, the system activates the data-driven simulation engine and uses the early service data collected by the global perception layer, including the initial static strain, the natural frequency of the structure, and the early strength development curve of the concrete, to perform high-precision calibration on the initial state of the digital twin and complete the first accurate alignment between the virtual entity and the physical entity.

8. The construction and operation method of the large-span intelligent utility tunnel system according to claim 1, characterized in that: In step S4, the closed-loop execution of intelligent operation and maintenance and decision-making includes the following steps: A1. Real-time state simulation and health assessment of digital twins driven by continuous sensing data streams; A2. When the evaluation indicators exceed the preset threshold, or the prediction model identifies a trend of structural performance degradation, the system will automatically trigger a graded risk warning and push it to the operation and maintenance management personnel with different permissions in three levels: general, relatively serious, and severe. A3. The system automatically generates a preliminary maintenance plan, runs a virtual verification module in the digital twin, simulates and verifies the security and effectiveness of the proposed maintenance strategy, and optimizes the details of the plan. A4. Issue virtual-verified optimization and maintenance work orders to operations and maintenance personnel to accurately execute maintenance tasks in the physical world; A5. After maintenance is completed, the newly collected structural response data is fed back to the digital twin to update the model parameters, completing a complete closed loop from "perception-prediction-decision-execution-feedback".

9. The construction and operation method of the large-span intelligent utility tunnel system according to claim 1, characterized in that: In step S4, the supplementary inspection equipment is a robot that can move autonomously or remotely along the outer wall or internal maintenance passage of the pipe gallery. It is equipped with lidar, high-definition vision camera and thermal imager to acquire three-dimensional morphology, apparent defects and temperature field data of the pipe gallery surface, so as to supplement the detection of the monitoring blind spots of the fixed pre-embedded sensor network. The analysis and diagnosis model includes a multi-level diagnostic model that integrates machine learning and physical mechanism. It first performs authenticity verification and noise reduction on the data based on the spatiotemporal correlation of the sensors, then uses time series analysis algorithm to identify abnormal patterns, and finally combines finite element simulation model to diagnose and analyze the causes of abnormalities.

10. An intelligent utility tunnel system, characterized in that: include: The physical structure consists of prestressed concrete box girders, embedded sensing modules, and unitized maintenance cabins. The information space architecture supporting the physical entity structure includes a digital twin base and an integrated intelligent operation and maintenance platform, as well as an interactive execution layer connecting the physical entity structure and the information space architecture. This layer includes intelligent sensing modules, supplementary inspection equipment, and key execution equipment controlled by the platform.