By identifying the central steps of the ground-mounted knife in the operation ticket and establishing a contextual evidence window, and determining the verification strategy based on the equipment type, the problem of distinguishing between action steps and status inspection steps in the existing technology is solved, thereby improving the accuracy and efficiency of operation ticket review.

CN123140909APending Publication Date: 2026-11-20SHENZHEN POWER SUPPLY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611171989.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-04
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies struggle to accurately distinguish between action steps and status check steps in operation tickets, differentiate between verification evidence from different sources, adapt to the differentiated verification logic for different equipment types, and construct a chain of evidence to analyze the logical relationships between steps, resulting in low review efficiency and a high risk of oversights.

Method used

By identifying the grounding knife center step in the operation ticket, a pre-existing evidence window and a post-existing inspection window are established. The verification strategy is determined according to the equipment type, and the pre-existing electrical testing evidence and post-existing mechanical inspection evidence are combined to generate the verification result.

Benefits of technology

It improves the accuracy and efficiency of operation ticket review, reduces the risk of misjudgment and omission, realizes the automatic construction of the evidence chain between the preceding and following texts and a reliable indirect verification evidence chain, and enhances the interpretability of the review results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140909A_ABST
    Figure CN123140909A_ABST
Patent Text Reader

Abstract

The application discloses an operation ticket checking method, an operation ticket checking terminal and a computer program product, wherein the method comprises the following steps: generating a step list by analyzing a to-be-checked operation ticket; identifying a combined ground knife center step which is a combined ground knife action and whose first step is excluded from checking expression; establishing a preceding evidence window and a subsequent checking window based on the combined ground knife center step; respectively scanning preceding electrical inspection evidence and subsequent mechanical inspection evidence; determining a checking strategy according to a device type involved; and combining the preceding electrical inspection evidence, the subsequent mechanical inspection evidence and the device type according to the checking strategy to generate a checking result. The application can accurately distinguish operation execution steps and state confirmation steps, automatically construct a context evidence chain, and implement adaptive checking according to different device types, thereby effectively reducing a false alarm rate, improving the accuracy of operation ticket checking and the explainability of on-site review.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of intelligent verification technology for power system operation tickets, specifically to an operation ticket verification method, an operation ticket verification terminal, and a computer program product. Background Technology

[0002] In substation operation, operations involving closing grounding switches (grounding switches), connecting grounding-related equipment, and performing grounding switch position checks require a strict logical sequence and interlocking relationships in the operation ticket's step arrangement. Specifically, before closing the grounding switch, a series of prerequisite electrical conditions must typically be met, such as: confirming the corresponding switch is in the open position, confirming the isolating switch is open, confirming the live indicator shows no voltage, and confirming no voltage on the secondary side of the PT (voltage transformer) or TYD (capacitive voltage transformer) collected by the backend. After closing the grounding switch, subsequent mechanical position checks are usually required, such as checking the crank arm's position, the linkage status, or the grounding switch's position indicator, to confirm that the grounding switch has been reliably closed.

[0003] The aforementioned prerequisites and subsequent checks are often scattered across different main items, sub-items, and equipment contexts on the operation ticket, and the logical dependencies between each step are implicit in the contextual structure of the ticket text. During manual review, reviewers need to repeatedly trace and cross-reference the content of multiple steps to determine whether the prerequisites are complete and the subsequent checks are thorough, resulting in low review efficiency and a high risk of oversight.

[0004] Currently, traditional verification methods based on keyword matching have the following technical limitations: First, it is difficult to accurately distinguish between action steps and status check steps. For example, "checking that the floor knife is in the closed position" is a status confirmation step, while "closing the floor knife" is an operation execution step. The two are highly similar at the keyword level, and traditional methods easily confuse them, leading to misjudgments of the nature of the steps.

[0005] Second, it is difficult to distinguish between voltage testing evidence from different sources. Voltage testing evidence that may appear on the operation ticket includes direct voltage testing (such as a voltage detector showing no voltage) and indirect voltage testing (such as a live indicator showing no voltage, or a background PT / TYD showing no voltage). Evidence from different sources is not equivalent in an electrical sense, and their applicable scenarios and credibility also differ. Traditional methods often treat evidence from these different sources as a single category, failing to select an appropriate combination of evidence based on equipment type and site conditions.

[0006] Third, it is difficult to adapt to the differentiated verification logic of different equipment types. For different types of equipment such as PT grounding switches, switchgear cabinets, station service transformers, grounding transformers, and low-voltage capacitors, the preconditions required for grounding switch operation are not entirely the same, and the acceptable alternative evidence and exemption criteria on site also differ. Traditional methods use uniform keyword rules for verification, which cannot select corresponding evidence combinations and judgment standards for different equipment types, easily leading to missed judgments or false alarms.

[0007] Fourth, existing single-step review methods typically only determine whether a certain keyword appears in the current line of text. They cannot establish a complete closed-loop evidence chain centered on the "closing the knife" step, tracing back to prior evidence, and tracking back to the mechanical inspection. They also find it difficult to construct contextual windows in the step sequence of the operation ticket to analyze the logical relationships between the steps. Summary of the Invention

[0008] The technical problem to be solved by the present invention is to provide an operation ticket verification method, operation ticket verification terminal and computer program product, which can select evidence combinations according to the differences in equipment type to improve the accuracy and completeness of verification.

[0009] To solve the above-mentioned technical problems, the present invention provides a method for verifying operation tickets, comprising the following steps: Receive operation tickets to be reviewed, parse the operation step text of the operation tickets to be reviewed, and generate a list of step rows according to the physical line order on the ticket; Identify the grounding knife center step in the step row list. The grounding knife center step is the step whose row beginning contains the action of closing the grounding knife. During identification, grounding knife position checking steps and non-grounding knife steps are excluded. Based on the aforementioned ground-joining knife center step, a preceding evidence window and a subsequent inspection window are established in the step row list; Scan the preceding electrical testing evidence in the preceding evidence window, and scan the subsequent mechanical inspection evidence in the subsequent inspection window; The corresponding verification strategy is determined based on the type of equipment involved in the above-mentioned ground-joining knife center step; According to the verification strategy, the pre-examination electrical evidence, the post-examination mechanical inspection evidence, and the equipment type are combined and judged to generate the verification result of the grounding knife center step.

[0010] Preferably, the step of identifying the center of the grounding knife in the step row list specifically includes: Identify keywords related to grounding equipment from the text of the operation steps to determine whether the current step involves grounding equipment; For steps involving ground-operated equipment, check phrases are removed from the operation step text, including phrases such as "in the closed position" and / or "in the open position". After stripping the check statement phrase, determine whether the closing action is located at the beginning of the step line. If so, the corresponding step is determined as the closing knife center step. If the current step is the action of pulling open the ground knife or closing it, and it is not located at the beginning of the step line, then this step will not be determined as the central step of closing the ground knife.

[0011] Preferably, the step of establishing a preceding evidence window and a subsequent inspection window in the step row list, based on the central step of the ground-joining knife, specifically includes: Based on the main item where the ground-joining knife center step is located, the scanning boundary of the preceding evidence window is determined by counting forward according to the main item, and the scanning boundary of the subsequent inspection window is determined by counting backward according to the main item. During the scanning process, sub-item steps participate in evidence matching but do not occupy the main item window quota independently.

[0012] Preferably, scanning the prior electrical testing evidence in the prior evidence window specifically includes: Evidence keywords are matched for each step row in the preceding evidence window, and the matching results are classified and stored into the corresponding evidence categories. The evidence categories include switch type, knife switch type, live display type, voltage transformer type and direct verification type. If multiple evidence categories are matched in the same step row, each evidence category and its matching position are recorded separately.

[0013] Preferably, the method further includes: When direct electrical verification evidence is scanned in the preceding evidence window and crank arm inspection evidence or connecting rod inspection evidence is scanned in the subsequent inspection window, the output should be a verification result using indirect electrical verification.

[0014] Preferably, the step of determining the corresponding verification strategy based on the equipment type involved in the grounding knife center step includes at least one of the following: When the device type is a line grounding switch, three types of non-same-source evidence are identified in the preceding evidence window: evidence of switch opening, evidence of no power on live display, and evidence of no voltage in the background. When the number of non-same-source evidence is less than the preset number, the verification result of insufficient non-same-source inspection is output. When the equipment type is a voltage transformer grounding switch, the evidence of no voltage in the background, the evidence of the voltage transformer switch being opened, the evidence of the secondary voltage air switch being disconnected, and the evidence of no voltage in the live display are used as a combination of preliminary evidence, and the evidence of the switch being opened is not used as a necessary preliminary condition. When the equipment type is a switchgear cabinet, station service transformer, grounding transformer or capacitor-related grounding switch, the switch opening evidence, switchgear position evidence and live display no-power evidence are used as a preliminary evidence combination, and the equivalent switch open state is allowed to replace the switchgear position evidence.

[0015] Preferably, determining the corresponding verification strategy based on the equipment type involved in the grounding knife center step further includes: When the device type is a low-voltage capacitor or a low-voltage reactor, the indirect voltage verification is skipped according to the preset exemption strategy, and the exempted verification result is output.

[0016] Preferably, when generating the verification result for the grounding knife center step by combining and judging the pre-examination electrical test evidence, the post-examination mechanical inspection evidence, and the equipment type according to the verification strategy, the following auxiliary information is also recorded: The step line number and step text of the hit step, the hit invoice number, the comparison invoice number, the rule label, and the review level are used for locating and reviewing the verification results.

[0017] The present invention also provides an operation ticket verification terminal, comprising: One or more processors; Memory; One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the one or more processors, and the one or more applications are configured to perform the operation ticket verification method.

[0018] The present invention also provides a computer program product, including computer instructions, which instruct a computer device to perform the operation corresponding to the operation ticket verification method.

[0019] The beneficial effects of this invention are as follows: By extracting the checking phrases from the operation step text and then determining whether the closing action is at the beginning of the line, this invention can effectively distinguish between operation execution and status confirmation steps, reducing the risk of misidentifying the checking of the grounding switch position as a grounding switch closing operation. Simultaneously, by establishing a preceding evidence window and a subsequent inspection window based on the grounding switch closing central step, the true step context can be preserved in ticket forms with mixed main and sub-items, achieving automatic construction of the preceding and following evidence chains and reducing the workload of manual item-by-item tracing. Furthermore, classifying the preceding electrical verification evidence by source helps to form a more reliable indirect electrical verification evidence chain; determining differentiated verification strategies based on equipment type allows for the selection of appropriate preceding evidence combinations for different equipment, reducing false alarms or omissions caused by applying uniform rules. Finally, by combining and judging the preceding evidence, subsequent mechanical inspection evidence, and equipment type, and outputting the verification results in a hierarchical manner, the interpretability of the audit results is improved, facilitating on-site personnel to quickly locate problematic steps and trace the basis for judgment, thereby improving the accuracy and efficiency of operation ticket audits. Attached Figure Description

[0020] To more clearly describe the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings required in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained based on these drawings without any creative effort.

[0021] Figure 1 is a schematic flow chart of an operation ticket checking method according to the first embodiment of the present invention.

[0022] Figure 2 is an overall architecture diagram of the context window for closing the grounding knife switch in the embodiment of the present invention.

[0023] Figure 3 is a flow chart for identifying the central step of closing the grounding knife switch in the embodiment of the present invention.

[0024] Figure 4 is a scanning diagram of the pre-order evidence window in the embodiment of the present invention.

[0025] Figure 5 is a diagram of post-order mechanical inspection and indirect electricity verification judgment in the embodiment of the present invention.

[0026] Figure 6 is a diagram of device type strategy and hierarchical output in the embodiment of the present invention. Detailed Description of the Embodiments

[0027] The descriptions of the following embodiments refer to the accompanying drawings to illustrate specific embodiments in which the present invention can be implemented.

[0028] Please refer to Figure 1 as shown, the first embodiment of the present invention provides an operation ticket checking method, including the following steps: Step S1: Receive the operation ticket to be checked, parse the operation step text of the operation ticket to be checked, and generate a step row list according to the physical row order of the ticket surface; Step S2: Identify the central step of closing the grounding knife switch in the step row list, where the central step of closing the grounding knife switch is a step whose line start contains the action of closing the grounding knife switch, and steps of grounding knife switch position inspection type and non-grounding knife switch type are excluded during identification; Step S3: Taking the central step of closing the grounding knife switch as a reference, establish a pre-order evidence window and a post-order inspection window in the step row list; Step S4: Scan the pre-positive electricity verification evidence in the pre-order evidence window, and scan the post-positive mechanical inspection evidence in the post-order inspection window; Step S5: Determine the corresponding checking strategy according to the device type involved in the central step of closing the grounding knife switch; Step S6: According to the verification strategy, combine and judge the pre-examination electrical evidence, the post-examination mechanical inspection evidence, and the equipment type to generate the verification result of the grounding knife center step.

[0029] The technical solution of the present invention will now be described in detail with reference to the accompanying drawings.

[0030] In this embodiment of the invention, the operation ticket verification method can be executed by a terminal. The terminal includes, but is not limited to, a local computer, a server, a mobile terminal, or intelligent verification equipment deployed at a substation site. The terminal can execute the following steps based on local structured tables, ticket text, standard ledgers, rule bases, or ticket sets.

[0031] like Figure 2 As shown, after receiving the operation ticket, the terminal first generates a list of steps, binds the operation sequence, step text, dual name and main item identifier to the physical line sequence, and establishes a pre-sequence evidence window and a post-sequence inspection window with the actual closing of the ground knife as the central step, thereby forming a bidirectional scanning structure with the closing of the ground knife as the anchor point in the step sequence.

[0032] In step S1, the terminal receives the operation ticket to be reviewed, parses the operation step text of the operation ticket to be reviewed, and generates a list of step rows according to the physical row order on the ticket.

[0033] Specifically, the terminal extracts the operation sequence, operation step text, dual name field, and main item identifier information from the operation ticket data source, and binds these fields to the physical row order on the ticket to form an ordered list of step rows. The dual name field contains the device name and device number, used for subsequent device type identification and location matching. The main item identifier is used to distinguish between main item steps and sub-item steps, so as to determine the scan boundary in subsequent window scanning.

[0034] In one embodiment, the data source for the operation ticket may be an electronic operation ticket file, a database record of the operation ticket management system, or a scanned copy of a paper operation ticket after optical character recognition. This invention does not specifically limit the method of obtaining the operation ticket.

[0035] In step S2, the terminal identifies the grounding knife center step in the step row list. The grounding knife center step is the step whose row beginning includes the action of closing the grounding knife, and grounding knife position checking steps and non-grounding knife steps are excluded during identification.

[0036] like Figure 3 As shown, the process of identifying the center of the grounding knife includes: Identify keywords related to grounding switch equipment from the operation step text to determine whether the current step involves grounding switch equipment. If the current step does not involve grounding switch equipment, mark it as a non-grounding switch step and skip it.

[0037] For steps involving ground-operated devices, firstly, check statements are extracted from the operation step text. These check statements include, but are not limited to, status confirmation statements such as "in the closed position" and "in the open position." The purpose of this extraction is to eliminate the interference of status check statements on the identification of action steps.

[0038] After stripping away the check statement phrases, determine whether the closing action is at the beginning of the step line. If the closing action is at the beginning of the line, then the step is identified as the closing knife center step; if the closing action is not at the beginning of the line, or if the step is the pulling knife action, then the closing knife check strategy is not triggered.

[0039] Through the above identification process, the terminal can distinguish between status confirmation steps such as "checking that the grounding switch is in the closed position" and operation execution steps such as "closing the XX grounding switch", avoiding misidentification of the inspection steps as grounding switch closing operations, thereby ensuring the accuracy of anchor point positioning in subsequent verification.

[0040] In one embodiment, when the terminal identifies multiple combined knife center steps, it can independently execute the subsequent context window establishment, evidence scanning and combination judgment steps for each combined knife center step, and finally output their respective verification results.

[0041] In step S3, the terminal establishes a preceding evidence window and a subsequent inspection window in the step row list, based on the central step of the ground-joining knife.

[0042] The preceding evidence window is used to scan pre-examination evidence before the centering step of the scalpel, and the following inspection window is used to scan post-mechanical inspection evidence after the centering step of the scalpel. The two windows together constitute a bidirectional scanning structure with the centering step of the scalpel as the anchor point.

[0043] In one embodiment, the preceding evidence window and the subsequent inspection window determine the scanning boundaries according to the main item count. Specifically, the preceding evidence window counts backward from the main item containing the center step of the grappling knife, covering a preset number of main item steps; the subsequent inspection window counts backward from the main item containing the center step of the grappling knife, covering a preset number of main item steps. During the scanning process, sub-item steps are allowed to participate in evidence matching, but do not occupy the main item window quota separately. That is, the evidence carried by the sub-item steps can be extracted and recorded, but this will not compress the scanning range of the main item window.

[0044] The advantages of using principal item counting to determine the scan boundary are that it ensures sufficient coverage of preceding evidence and avoids premature compression of the principal item window when there are too many sub-item steps, thus making the scan range more reasonable.

[0045] In one embodiment, the threshold for the number of main items in the preceding evidence window and the threshold for the number of main items in the subsequent inspection window can be configured according to actual needs, and the present invention does not impose specific limitations on this. For example, the preceding evidence window can be set to cover 3 to 5 main items forward, and the subsequent inspection window can be set to cover 1 to 3 main items backward.

[0046] In step S4, the terminal scans the prior electrical verification evidence in the prior evidence window.

[0047] The prior electrical testing evidence includes, but is not limited to, at least one of the following types: (1) Directly verify electrical evidence, such as the steps of using an electroscope to verify that there is no electricity; (2) Evidence of a live display device, such as the steps of displaying no power while the device is live; (3) Evidence of background voltage, such as the step of no voltage indication from the background PT (voltage transformer) or TYD (capacitive voltage transformer); (4) Evidence of switch opening, such as steps to confirm that the corresponding switch is in the open position; (5) Evidence that the disconnect switch has been opened, such as the steps to confirm that the disconnect switch has been opened; (6) Evidence of the handcart's position, such as the steps taken when the handcart is in the test or maintenance position; (7) Evidence of the secondary voltage circuit breaker being disconnected, such as the steps of the PT secondary voltage circuit breaker being disconnected.

[0048] like Figure 4 As shown, before the central step, the terminal controls the scanning boundary according to the number of main items. Sub-item steps can provide evidence such as the secondary voltage air switch being open or no voltage in the background, but do not compress the main item window separately. The scanning results are categorized and stored according to evidence types, including switch types, knife switch types, live display types, PT / TYD types, and directly verifiable electrical types, so as to facilitate subsequent combination and judgment based on equipment type strategies.

[0049] In one embodiment, when scanning the preceding evidence window, the terminal first performs evidence keyword matching on each step row, and then classifies it into the corresponding evidence category based on the matching results. If multiple evidence categories are matched in the same step row, they are recorded separately; if a certain evidence category is matched multiple times in the preceding window, its matching position and number of matches are recorded for subsequent strategy judgment.

[0050] In step S4, the terminal also scans for subsequent mechanical inspection evidence in the subsequent inspection window.

[0051] The evidence obtained through post-mechanical examination includes, but is not limited to, at least one of the following types: (1) Evidence of the crank arm inspection, such as the steps for checking the crank arm in place; (2) Evidence of link inspection, such as the steps for inspecting the link condition; (3) Location check evidence, such as checking the position indicator of the grounding switch body in the closed position.

[0052] like Figure 5 As shown, the terminal scans mechanical evidence of position, such as crank arms, linkages, or position checks, after the central step.

[0053] In one embodiment, after completing the preceding evidence window scan and the subsequent inspection window scan, the terminal also performs the following association judgment: When direct electrical verification evidence is scanned in the preceding evidence window and crank arm inspection evidence or connecting rod inspection evidence is scanned in the subsequent inspection window, the terminal determines that the current grounding knife scenario should adopt indirect electrical verification and outputs the verification result "indirect electrical verification should be adopted".

[0054] The technical logic behind this correlation judgment is as follows: when both the direct verification of electricity and the mechanical positioning inspection steps appear simultaneously in the operation ticket, it indicates that the electricity verification scenario of the grounding switch operation involves a closed or semi-closed equipment structure where the live body cannot be directly observed. In this case, using only direct electricity verification as a prerequisite for grounding switch operation may not be sufficient. It is advisable to use indirect electricity verification methods (such as a combination of multiple non-same-source evidence, such as a live display device or a background PT / TYD no voltage indication) as a prerequisite.

[0055] In step S5, the terminal determines the corresponding verification strategy based on the equipment type involved in the grounding knife center step.

[0056] like Figure 6 The terminal identifies the device type based on the dual name field associated with the central step and selects a differentiated verification strategy accordingly. The device types include, but are not limited to, the following: (1) Line 40 grounding switch; (2) B0 / C0 ground knife; (3) Main transformer 40 ground knife; (4) PT grounding switch (the upper and lower grounding switches of the voltage transformer bay); (5) Busbar grounding switch; (6) Fixed knife switch cabinet; (7) Handcart cabinet; (8) Station use change; (9) Grounding transformer; (10) Capacitors (including low-voltage capacitors); (11) Low-voltage reactor.

[0057] The verification strategies differ for different equipment types, specifically in the requirements for the combination of prior evidence, the permissible scope of alternative evidence, and exemption conditions. The verification strategies for each typical equipment type are explained below.

[0058] In step S6, the terminal performs a combined judgment on the pre-examination electrical evidence, the post-examination mechanical inspection evidence, and the equipment type according to the verification strategy, and generates the verification result of the grounding knife center step.

[0059] The verification results include, but are not limited to, at least one of the following types: (1) Lack of prerequisites: The necessary electrical testing or electrical isolation evidence is missing from the preliminary evidence window; (2) Direct voltage testing is not suitable: If there is direct voltage testing in the preceding process and mechanical positioning check in the following process, it suggests that indirect voltage testing should be used; (3) Insufficient non-homologous evidence: The number of multi-source non-homologous evidence is lower than the preset threshold; (4) Exemption: If the equipment type falls within the exemption scope, indirect voltage verification is not required; (5) Requires review: If the chain of evidence is incomplete or questionable, it is recommended to conduct a further manual review.

[0060] The following section provides a detailed explanation of the combined judgment process, taking into account various typical equipment types.

[0061] (a) Line 40 grounding switch When the equipment type involved in the grounding switch center step is a line 40 grounding switch, the terminal identifies the following three types of non-same-source evidence in the preceding evidence window: Evidence that the switch was opened (e.g., four switches were opened); The indicator shows no electricity despite being live. There is no voltage evidence from the background PT or TYD.

[0062] The terminal counts the number of hits for the above three types of non-same-source evidence, and outputs a verification result of "insufficient non-same-source checks" when the number of non-same-source evidence is lower than the preset number.

[0063] The technical logic of this strategy is that the closing operation of the 40-cell grounding switch on the line requires the joint support of electrical evidence from multiple different sources. Evidence from a single source is insufficient to prove that the line side has been reliably de-energized. Therefore, it is necessary to obtain non-same-source evidence from three independent sources: the position of the switch, the live display, and the background voltage.

[0064] (ii) PT ground knife When the equipment type involved in the grounding switch center step is a PT grounding switch or the upper and lower grounding switches of a voltage transformer bay, the terminal identifies the following preliminary evidence in the preliminary evidence window: There is no voltage evidence from the background PT or TYD; Evidence that the PT switch was opened; Evidence of the PT secondary voltage circuit breaker being disconnected; The presence of electricity indicates no evidence of electricity.

[0065] For PT grounding switches, since the voltage transformer bay where they are located usually does not have independent switching equipment, the terminal applies a differentiated strategy for scenarios lacking independent switch opening conditions. That is, it does not take the evidence of switch opening as a necessary prerequisite, but instead uses the combination of no voltage in the back-end PT / TYD, PT disconnection, and secondary voltage air circuit breaker disconnection as the main prerequisite evidence.

[0066] (iii) Handcart cabinets, station service transformers, grounding transformers and capacitors When the equipment type involved in the grounding switch centering step is a handcart cabinet, station service transformer, grounding transformer, or capacitor-related grounding switch, the terminal identifies the following combination of prior evidence in the prior evidence window: Evidence of switch tripping; Evidence that the handcart is in the test or maintenance position; The presence of electricity indicates no evidence of electricity.

[0067] In one embodiment, for the handcart cabinet equipment, the terminal allows an equivalent open switch state to replace the handcart location evidence. Specifically, if the operation ticket does not explicitly show the handcart location evidence, but there is an equivalent open switch step, the terminal can treat it as a substitute for the handcart location evidence and continue to perform combined judgments according to the verification strategy.

[0068] (iv) Low-voltage capacitors and low-voltage reactors When the equipment involved in the grounding switch center step is a low-voltage capacitor or a low-voltage reactor, the terminal makes a judgment based on a preset exemption strategy.

[0069] Specifically, the terminal determines whether the current device type falls within the exemption scope. If it falls within the exemption scope, the indirect voltage verification process is skipped, and a "waiverable" verification result is output; if it does not fall within the exemption scope, a combination of pre-examination evidence and post-examination mechanical inspection evidence is performed according to the general verification strategy.

[0070] The technical basis for this exemption strategy is that low-voltage capacitors and low-voltage reactors have lower operating voltage levels, and their grounding switch operation has relatively lower safety risks. Under specific field conditions, some indirect voltage testing prerequisites can be exempted.

[0071] (v) Busbar grounding switches, fixed disconnect switch cabinets and other equipment types For equipment types such as busbar grounding switches, fixed disconnect switch cabinets, B0 / C0 grounding switches, and main transformer 40 grounding switches, the terminal selects the corresponding pre-existing evidence combinations and judgment criteria based on a preset rule base. The pre-existing evidence combination requirements for different equipment types can be pre-configured in the rule base, and the terminal reads the corresponding strategy parameters from the rule base for combination judgment during verification.

[0072] In one embodiment, when outputting the verification result, the terminal also records the following auxiliary information: Hit Step: The line number and text of the operation ticket that triggered the verification result; Hit the ticket: Verify the operation ticket number on which it is based; Comparison Tickets: Standard or historical ticket numbers used for cross-referencing; Rule tags: Identifiers of the corrected verification rules, facilitating the traceability of the judgment basis; Review level: The confidence level of the verification result, used to distinguish between results that require manual review and results that can be directly confirmed.

[0073] The recording of the above-mentioned auxiliary information helps on-site auditors quickly locate the problem steps, trace the basis for judgment, and conduct a review, thereby improving the traceability and on-site usability of the verification results.

[0074] It should be noted that the execution order of the above steps is as described in the accompanying drawings and embodiments. However, without departing from the essential scope of the technical solution of this invention, the execution order of some steps can be adjusted. For example, the determination of the device type in step S5 can be performed before step S4, so that the terminal can extract evidence in a targeted manner according to the corresponding strategy during the pre-scan and post-scan windows; alternatively, strategy matching can be performed uniformly after the scan is completed. This invention does not strictly limit the specific execution order of each step.

[0075] Furthermore, the specific equipment types, evidence types, verification strategies, and exemption conditions involved in the above steps are all illustrative examples. Those skilled in the art can expand or adjust the above based on actual needs, and all such extensions should be included within the scope of protection of this invention.

[0076] Corresponding to the operation ticket verification method in Embodiment 1 of the present invention, Embodiment 2 of the present invention also provides an operation ticket verification terminal, including: One or more processors; Memory; One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the one or more processors, and the one or more applications are configured to perform the operation ticket verification method.

[0077] Corresponding to the operation ticket verification method in Embodiment 1 of the present invention, Embodiment 3 of the present invention also provides a computer program product, including computer instructions, which instruct a computer device to perform the operation corresponding to the operation ticket verification method.

[0078] Preferably, the processor can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor can be a microprocessor, or the processor can be any conventional processor. The processor is the control center of the device, connecting various parts of the device through various interfaces and lines.

[0079] The memory mainly includes a program storage area and a data storage area. The program storage area can store the operating system, applications required for at least one function, etc., while the data storage area can store related data, etc. Furthermore, the memory can be a high-speed random access memory, or a non-volatile memory, such as a plug-in hard drive, a SmartMedia Card (SMC), a Secure Digital (SD) card, and a Flash Card, or other volatile solid-state storage devices.

[0080] It should be noted that the above-mentioned devices may include, but are not limited to, processors and memory, as will be understood by those skilled in the art.

[0081] For the working principle and process of the above embodiments, please refer to the description of Embodiment 1 of the present invention, which will not be repeated here.

[0082] Compared with existing technologies, this invention has the following significant advantages: By extracting the checking phrases from the operation steps text and then determining whether the closing action is at the beginning of the line, this invention can effectively distinguish between operation execution and status confirmation steps, reducing the risk of misidentifying the checking of the grounding switch position as the closing operation. Simultaneously, by establishing a preceding evidence window and a subsequent inspection window based on the closing center step, the true step context can be preserved in tickets with mixed main and sub-items, achieving automatic construction of the preceding and following evidence chains and reducing the workload of manual item-by-item tracing. Furthermore, classifying the preceding electrical verification evidence by source helps to form a more reliable indirect electrical verification evidence chain; determining differentiated verification strategies based on equipment type allows for the selection of appropriate preceding evidence combinations for different equipment, reducing false alarms or omissions caused by applying uniform rules. Finally, by combining and judging the preceding evidence, subsequent mechanical inspection evidence, and equipment type, and outputting the verification results in a hierarchical manner, the interpretability of the audit results is improved, facilitating on-site personnel to quickly locate problematic steps and trace the basis for judgment, thereby improving the accuracy and efficiency of operation ticket audits.

[0083] The above description is merely a preferred embodiment of the present invention and should not be construed as limiting the scope of the invention. Therefore, any equivalent variations made in accordance with the claims of the present invention are still within the scope of the present invention.

Claims

1. A method for verifying operation tickets, characterized in that, Includes the following steps: Receive operation tickets to be reviewed, parse the operation step text of the operation tickets to be reviewed, and generate a list of step rows according to the physical line order on the ticket; Identify the grounding knife center step in the step row list. The grounding knife center step is the step whose row beginning contains the action of closing the grounding knife. During identification, grounding knife position checking steps and non-grounding knife steps are excluded. Based on the aforementioned ground-joining knife center step, a preceding evidence window and a subsequent inspection window are established in the step row list; Scan the preceding electrical testing evidence in the preceding evidence window, and scan the subsequent mechanical inspection evidence in the subsequent inspection window; The corresponding verification strategy is determined based on the type of equipment involved in the above-mentioned ground-joining knife center step; According to the verification strategy, the pre-examination electrical evidence, the post-examination mechanical inspection evidence, and the equipment type are combined and judged to generate the verification result of the grounding knife center step.

2. The method according to claim 1, characterized in that, The step of identifying the center of the grounding knife in the step row list specifically includes: Identify keywords related to grounding equipment from the text of the operation steps to determine whether the current step involves grounding equipment; For steps involving ground-operated equipment, check phrases are removed from the operation step text, including phrases such as "in the closed position" and / or "in the open position". After stripping the check statement phrase, determine whether the closing action is located at the beginning of the step line. If so, the corresponding step is determined as the closing knife center step. If the current step is the action of pulling open the ground knife or closing it, and it is not located at the beginning of the step line, then this step will not be determined as the central step of closing the ground knife.

3. The method according to claim 1, characterized in that, Based on the central step of the ground-joining knife, the establishment of a preceding evidence window and a subsequent inspection window in the step row list specifically includes: Based on the main item where the ground-joining knife center step is located, the scanning boundary of the preceding evidence window is determined by counting forward according to the main item, and the scanning boundary of the subsequent inspection window is determined by counting backward according to the main item. During the scanning process, sub-item steps participate in evidence matching but do not occupy the main item window quota independently.

4. The method according to claim 1, characterized in that, The scanning of prior electrical testing evidence in the prior evidence window specifically includes: Evidence keywords are matched for each step row in the preceding evidence window, and the matching results are classified and stored into the corresponding evidence categories. The evidence categories include switch type, knife switch type, live display type, voltage transformer type and direct verification type. If multiple evidence categories are matched in the same step row, each evidence category and its matching position are recorded separately.

5. The method according to claim 1, characterized in that, The method further includes: When direct electrical verification evidence is scanned in the preceding evidence window and crank arm inspection evidence or connecting rod inspection evidence is scanned in the subsequent inspection window, the output should be a verification result using indirect electrical verification.

6. The method according to claim 1, characterized in that, The step of determining the corresponding verification strategy based on the equipment type involved in the grounding knife center step includes at least one of the following: When the device type is a line grounding switch, three types of non-same-source evidence are identified in the preceding evidence window: evidence of switch opening, evidence of no power on live display, and evidence of no voltage in the background. When the number of non-same-source evidence is less than the preset number, the verification result of insufficient non-same-source inspection is output. When the equipment type is a voltage transformer grounding switch, the evidence of no voltage in the background, the evidence of the voltage transformer switch being opened, the evidence of the secondary voltage air switch being disconnected, and the evidence of no voltage in the live display are used as a combination of preliminary evidence, and the evidence of the switch being opened is not used as a necessary preliminary condition. When the equipment type is a switchgear cabinet, station service transformer, grounding transformer or capacitor-related grounding switch, the switch opening evidence, switchgear position evidence and live display no-power evidence are used as a preliminary evidence combination, and the equivalent switch open state is allowed to replace the switchgear position evidence.

7. The method according to claim 6, characterized in that, The step of determining the corresponding verification strategy based on the equipment type involved in the grounding knife center step also includes: When the device type is a low-voltage capacitor or a low-voltage reactor, the indirect voltage verification is skipped according to the preset exemption strategy, and the exempted verification result is output.

8. The method according to claim 1, characterized in that, When generating the verification result for the grounding knife center step by combining and judging the pre-existing electrical testing evidence, the post-existing mechanical inspection evidence, and the equipment type according to the verification strategy, the following auxiliary information is also recorded: The step line number and step text of the hit step, the hit invoice number, the comparison invoice number, the rule label, and the review level are used for locating and reviewing the verification results.

9. A ticket verification terminal, characterized in that, include: One or more processors; Memory; One or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the one or more processors, and the one or more applications are configured to perform the operation ticket verification method as described in any one of claims 1 to 8.