Charging pile scheduling operation and maintenance method and storage medium

By acquiring and analyzing the operation and location data of charging piles, and using time-series prediction and collaborative scheduling models to generate dynamic road network data, the problem of redundant planning caused by new maintenance work orders in existing technologies is solved, and efficient path updates and responses are achieved.

CN123140933APending Publication Date: 2026-11-20TIANJIN LIANLIAN RUIKE ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611644224.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-23
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

When faced with new maintenance work orders, existing charging pile scheduling and maintenance methods usually require global path planning to be redone, which involves a large amount of calculation, makes it difficult to respond in real time, and cannot determine whether the new work order is in the same direction as the current path, causing maintenance personnel to repeatedly travel back and forth or detour.

Method used

By acquiring the charging pile's operation data, location data, and road network spatiotemporal data, and calling the time series prediction model and collaborative scheduling model, dynamic road network data and initial path data are generated. The path is then updated according to the path insertion cost parameter, enabling the insertion of new maintenance work orders along the route and avoiding redundant planning.

Benefits of technology

It reduces the need for maintenance personnel to make repeated trips and incurs high computing power costs, improves the timeliness of response to new maintenance work orders, and optimizes path planning efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140933A_ABST
    Figure CN123140933A_ABST
Patent Text Reader

Abstract

The application provides a charging pile scheduling operation and maintenance method and a storage medium. The charging pile scheduling operation and maintenance method comprises the following steps: calling a time sequence prediction model, processing operation data to obtain a fault probability parameter; generating operation and maintenance work order data according to the fault probability parameter, operation data, location data and a preset work order threshold; generating a time-space impedance parameter according to road network time-space data; constructing dynamic road network data according to the time-space impedance parameter and the road network time-space data; calling a collaborative scheduling model, obtaining work order allocation data according to the operation and maintenance work order data, operation and maintenance resource data and the dynamic road network data; generating initial path data according to the work order allocation data and the dynamic road network data; receiving new operation and maintenance work order data, generating path insertion cost parameters according to the new operation and maintenance work order data, the dynamic road network data and the initial path data; updating the initial path data according to the path insertion cost parameters, the new operation and maintenance work order data and a preset cost threshold to obtain target path data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of intelligent scheduling technology, and more specifically, to a scheduling and maintenance method and storage medium for charging piles. Background Technology

[0002] Currently, in related technologies, the scheduling and maintenance methods for charging piles typically involve re-planning the global path for all incomplete work orders while maintenance personnel are performing maintenance tasks according to the initial path data. This is done either to re-determine the driving route or to postpone the new work order to the next scheduling round. However, re-planning the global path for all incomplete work orders is computationally intensive, making it difficult to respond to new work orders in real time. Furthermore, these technologies do not determine whether the new work order is in the same direction as the current path, making it impossible to carry it along, leading to maintenance personnel repeating trips or taking detours. Finally, these technologies do not dynamically adjust the initial path data after generation, making it impossible to insert new work orders into the existing path at a low cost. Summary of the Invention

[0003] The present invention aims to solve at least one of the technical problems existing in the prior art or related art.

[0004] Therefore, the first aspect of the present invention proposes a method for scheduling and maintaining charging piles.

[0005] A second aspect of the present invention provides a storage medium.

[0006] In view of this, the first aspect of the present invention proposes a method for scheduling and maintaining charging piles, comprising: acquiring charging pile operation data, charging pile location data, road network spatiotemporal data, and maintenance resource data; calling a time-series prediction model to process the operation data and obtain fault probability parameters; generating maintenance work order data based on the fault probability parameters, operation data, location data, and a preset work order threshold; generating spatiotemporal impedance parameters based on the road network spatiotemporal data; constructing dynamic road network data based on the spatiotemporal impedance parameters and the road network spatiotemporal data; calling a collaborative scheduling model to obtain work order allocation data based on the maintenance work order data, maintenance resource data, and dynamic road network data; generating initial path data based on the work order allocation data and dynamic road network data; receiving new maintenance work order data and generating path insertion cost parameters based on the new maintenance work order data, dynamic road network data, and initial path data; and updating the initial path data based on the path insertion cost parameters, new maintenance work order data, and a preset cost threshold to obtain target path data.

[0007] Optionally, in some technical solutions, a time-series prediction model is invoked to process the operational data and obtain fault probability parameters, including: parsing the operational data to obtain voltage fluctuation data, current change data, insulation resistance data, ambient temperature and humidity data, and sampling time data; obtaining equipment health parameters based on the voltage fluctuation data, current change data, insulation resistance data, and ambient temperature and humidity data; arranging the equipment health parameters in a time sequence based on the sampling time data to generate health time-series data; and invoking the time-series prediction model to obtain fault probability parameters based on the health time-series data.

[0008] Optionally, in some technical solutions, maintenance work order data is generated based on fault probability parameters, operational data, location data, and preset work order thresholds. This includes: parsing the preset work order thresholds to obtain emergency repair probability thresholds and preventive maintenance probability thresholds; obtaining probability comparison results based on fault probability parameters, emergency repair probability thresholds, and preventive maintenance probability thresholds; generating work order level parameters based on the probability comparison results and preset level mapping rules; and generating maintenance work order data based on work order level parameters, operational data, and location data.

[0009] Optionally, in some technical solutions, spatiotemporal impedance parameters are generated based on road network spatiotemporal data, including: parsing the road network spatiotemporal data to obtain road segment identification data, road segment distance parameters, free-flow velocity parameters, and current time parameters; generating free-flow duration parameters based on the road segment distance parameters and free-flow velocity parameters; generating congestion probability parameters based on the current time parameters, preset peak period parameters, and preset congestion change coefficients; generating congestion delay parameters based on the congestion probability parameters and preset congestion weights; obtaining historical traffic flow data based on the road segment identification data; determining queue length parameters based on the current time parameters and historical traffic flow data; generating queue delay parameters based on the queue length parameters and preset queue penalty coefficients; and generating spatiotemporal impedance parameters based on the free-flow duration parameters, congestion delay parameters, and queue delay parameters.

[0010] Optionally, in some technical solutions, dynamic road network data is constructed based on spatiotemporal impedance parameters and road network spatiotemporal data, including: parsing the road network spatiotemporal data to obtain road network topology data and road segment identification data; matching the spatiotemporal impedance parameters with the road segment identification data to obtain road segment impedance mapping data; and configuring the spatiotemporal impedance parameters as road segment weights in the road network topology data based on the road segment impedance mapping data to construct dynamic road network data.

[0011] Optionally, in some technical solutions, a collaborative scheduling model is invoked to obtain work order allocation data based on maintenance work order data, maintenance resource data, and dynamic road network data. This includes: parsing maintenance work order data to obtain work order type data, work order level parameters, work order location data, and response time limit parameters; parsing maintenance resource data to obtain maintenance personnel identification data, maintenance personnel location data, personnel skill data, and personnel load parameters; determining skill requirement data based on work order type data; matching skill requirement data with personnel skill data based on maintenance personnel identification data to generate matching mask data; and invoking the collaborative scheduling model to generate [data missing - likely related to scheduling data]. Candidate work order allocation data; based on the candidate work order allocation data, work order location data, maintenance personnel location data, and dynamic road network data, generate estimated response time parameters and travel cost parameters; based on the estimated response time parameters and response time limit parameters, generate timeliness deviation parameters; based on the candidate work order allocation data and work order location data, determine maintenance personnel spacing parameters; based on the maintenance personnel spacing parameters and preset conflict distance thresholds, generate personnel conflict parameters; based on the work order level parameters, timeliness deviation parameters, and preset benefit weights, generate timeliness benefit parameters; based on the timeliness benefit parameters, travel cost parameters, personnel conflict parameters, and preset benefit weights, obtain scheduling benefit parameters; the candidate work order allocation data with the largest scheduling benefit parameters is determined as the work order allocation data.

[0012] Optionally, in some technical solutions, initial path data is generated based on work order allocation data and dynamic road network data, including: parsing the work order allocation data to obtain maintenance personnel identification data and work order identification data; obtaining maintenance personnel location data from maintenance resource data based on the maintenance personnel identification data; obtaining work order location data from maintenance work order data based on the work order identification data; determining the starting node and target node based on the work order allocation data, maintenance personnel location data, work order location data, and dynamic road network data; and searching for a path from the starting node to the target node based on the dynamic road network data and spatiotemporal impedance parameters to generate initial path data.

[0013] Optionally, in some technical solutions, receiving new maintenance work order data and generating path insertion cost parameters based on the new maintenance work order data, dynamic road network data, and initial path data includes: receiving new maintenance work order data; parsing the new maintenance work order data to obtain new work order location data; parsing the initial path data to obtain path node sequence data; determining the location data of adjacent node pairs based on the path node sequence data and dynamic road network data; generating path deviation distance parameters based on the new work order location data and the location data of adjacent node pairs; identifying initial path data whose path deviation distance parameters are less than a preset deviation distance threshold as candidate path data; generating pre-insertion traffic cost data and post-insertion traffic cost data based on the candidate path data, new work order location data, and dynamic road network data; generating a candidate insertion cost set based on the post-insertion traffic cost data and the pre-insertion traffic cost data; and filtering the candidate insertion cost set to obtain the path insertion cost parameters.

[0014] Optionally, in some technical solutions, after updating the initial path data based on the path insertion cost parameters, newly added maintenance work order data, and preset cost thresholds to obtain the target path data, the charging pile scheduling and maintenance method further includes: receiving post-maintenance operation data returned based on the target path data; parsing the operation data to obtain pre-maintenance operation data; generating pre-maintenance health parameters and post-maintenance health parameters based on the pre-maintenance operation data and post-maintenance operation data, respectively; generating health change parameters based on the pre-maintenance health parameters and post-maintenance health parameters; obtaining continuous online duration parameters based on the post-maintenance operation data; and generating work order acceptance result data based on the health change parameters, continuous online duration parameters, preset acceptance thresholds, and preset online duration thresholds.

[0015] A second aspect of the present invention provides a storage medium storing a computer program thereon, which, when executed by a processor, implements the steps of the charging pile scheduling and maintenance method in any of the above-described technical solutions. Therefore, this storage medium possesses all the beneficial effects of the charging pile scheduling and maintenance method in any of the above-described technical solutions, which will not be elaborated further here.

[0016] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description

[0017] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the description of the embodiments taken in conjunction with the following drawings, in which: Figure 1 This is one of the flowcharts for a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 2This is a second flowchart of a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 3 This is the third flowchart of a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 4 This is the fourth flowchart of a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 5 This is the fifth flowchart of a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 6 This is the sixth flowchart of a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 7 This is the seventh flowchart of a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 8 This is the eighth flowchart of a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 9 This is flowchart nine of a charging pile scheduling and maintenance method according to an embodiment of the present invention; Figure 10 This is a structural block diagram of a charging pile scheduling and maintenance system according to an embodiment of the present invention; in, Figure 10 The correspondence between the reference numerals and component names in the attached drawings is as follows: 100. Charging pile scheduling and maintenance system; 1002. Acquisition module; 1004. Fault prediction module; 1006. Work order generation module; 1008. Impedance generation module; 1010. Road network construction module; 1012. Cooperative scheduling module; 1014. Path generation module; 1016. Insertion cost module; 1018. Path update module. Detailed Implementation

[0018] To better understand the above-mentioned objectives, features, and advantages of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. It should be noted that, unless otherwise specified, the embodiments of the present invention and the features thereof can be combined with each other.

[0019] Many specific details are set forth in the following description in order to provide a full understanding of the invention. However, the invention may also be practiced in other ways different from those described herein, and therefore the scope of protection of the invention is not limited to the specific embodiments disclosed below.

[0020] The following reference Figures 1 to 10 This invention describes a method for scheduling and maintaining a charging pile and a storage medium according to some embodiments of the present invention.

[0021] In urban charging station operation and maintenance scenarios, after receiving a maintenance work order, maintenance personnel travel to each charging station according to a planned route to perform maintenance tasks. During the personnel's journey, new faults may occur at the charging station, generating new maintenance work orders.

[0022] When a new maintenance work order is generated, the system needs to determine the relationship between the new maintenance work order and the current travel path of the maintenance personnel, and decide whether to insert the new maintenance work order along the current path or keep the current path unchanged.

[0023] When faced with a new maintenance work order, existing maintenance scheduling methods typically recalculate the global path for all incomplete work orders, which involves a large amount of computation and cannot provide real-time response. At the same time, existing methods cannot determine whether the new maintenance work order is in the same direction as the current path, making it difficult to carry it along the same path, resulting in maintenance personnel making repeated trips or experiencing response delays.

[0024] like Figure 1 As shown, in view of this, the first aspect of the present invention proposes a scheduling and operation method for charging piles, comprising: Step 102: Obtain the charging pile's operation data, location data, road network spatiotemporal data, and operation and maintenance resource data; Step 104: Call the time series prediction model to process the running data and obtain the fault probability parameters; Step 106: Generate maintenance work order data based on fault probability parameters, operation data, location data, and preset work order thresholds; Step 108: Generate spatiotemporal impedance parameters based on road network spatiotemporal data; Step 110: Construct dynamic road network data based on the spatiotemporal impedance parameters and the spatiotemporal data of the road network; Step 112: Invoke the collaborative scheduling model to obtain work order allocation data based on maintenance work order data, maintenance resource data, and dynamic road network data; Step 114: Generate initial route data based on work order allocation data and dynamic road network data; Step 116: Receive new maintenance work order data, and generate path insertion cost parameters based on the new maintenance work order data, dynamic road network data, and initial path data; Step 118: Update the initial path data based on the path insertion cost parameters, newly added maintenance work order data, and preset cost thresholds to obtain the target path data.

[0025] The first aspect of this invention proposes a scheduling and maintenance method for charging piles, which is executed through a scheduling and maintenance platform.

[0026] The dispatch and maintenance platform consists of an edge acquisition layer, a cloud service layer, and a mobile terminal layer. Edge acquisition terminals for each charging pile are deployed on the internal control board of each charging pile, using the Modbus Remote Terminal Unit (RTU) protocol to collect electrical data. The cloud service layer includes a time-series database server, a fault prediction computing server, a collaborative scheduling server, a dynamic road network calculation server, and a digital twin rendering server. These servers interact via a hybrid protocol combining HyperText Transfer Protocol (HTTP) and Message Queuing Telemetry Transport (MQTT). Maintenance personnel use a handheld mobile application to maintain a persistent connection to the cloud via mobile communication networks.

[0027] The dispatch and maintenance platform acquires charging pile operation data, charging pile location data, road network spatiotemporal data, and maintenance resource data.

[0028] Among them, operation data reflects the operating status of charging piles, location data describes the geographical location of charging piles, road network spatiotemporal data describes the traffic status of the road network at different times, and operation and maintenance resource data describes the availability status of operation and maintenance resources such as operation and maintenance personnel and vehicles.

[0029] The scheduling and maintenance platform calls the time series prediction model to process the running data and obtain the fault probability parameters.

[0030] Among them, the time-series prediction model is a model used to process time-series data to predict the future state of an object, and the fault probability parameter is a parameter that characterizes the likelihood of a charging pile malfunctioning.

[0031] In other words, the scheduling and operation platform inputs the acquired operational data into the time series prediction model, which processes the operational data and outputs fault probability parameters.

[0032] In some embodiments, the time-series prediction model is a bidirectional long short-term memory (LSTM) network. The running data is input into the long short-term memory network after feature processing, and the long short-term memory network outputs fault probability parameters.

[0033] The scheduling and maintenance platform generates maintenance work order data based on fault probability parameters, operational data, location data, and preset work order thresholds. The preset work order thresholds are the fault probability cutoff values ​​that trigger work order generation, and the maintenance work order data describes the charging pile maintenance tasks that need to be performed.

[0034] In other words, the scheduling and maintenance platform compares the fault probability parameter with the preset work order threshold. When the fault probability parameter reaches the preset work order threshold, it generates maintenance work order data by combining the operation data and location data.

[0035] The dispatch and maintenance platform generates spatiotemporal impedance parameters based on road network spatiotemporal data. These parameters reflect the time cost required to pass through a road segment at a specific moment.

[0036] In other words, the dispatch and maintenance platform extracts road traffic status information from the spatiotemporal data of the road network and converts the road traffic status into spatiotemporal impedance parameters expressed in terms of time cost.

[0037] The dispatch and maintenance platform constructs dynamic road network data based on spatiotemporal impedance parameters and road network spatiotemporal data. This dynamic road network data consists of road network data carrying spatiotemporal impedance information.

[0038] In other words, the scheduling and operation platform combines the spatiotemporal impedance parameters with the road network in the spatiotemporal data of the road network to form dynamic road network data that can reflect the travel costs at different times.

[0039] The scheduling and maintenance platform invokes the collaborative scheduling model to obtain work order allocation data based on maintenance work order data, maintenance resource data, and dynamic road network data. The collaborative scheduling model coordinates the allocation of multiple work orders to multiple maintenance resources, while the work order allocation data describes the correspondence between maintenance work orders and maintenance resources.

[0040] In other words, the scheduling and maintenance platform inputs maintenance work order data, maintenance resource data, and dynamic road network data into the collaborative scheduling model. The collaborative scheduling model coordinates and allocates maintenance work orders and maintenance resources, and outputs work order allocation data.

[0041] The dispatch and maintenance platform generates initial route data based on work order allocation data and dynamic road network data. This initial route data describes the travel routes taken by maintenance resources to each charging station.

[0042] In other words, the dispatch and maintenance platform determines the charging piles that maintenance resources need to go to based on work order allocation data, and plans the driving route for maintenance resources by combining dynamic road network data, generating initial path data.

[0043] The scheduling and maintenance platform receives new maintenance work order data and generates path insertion cost parameters based on the new maintenance work order data, dynamic road network data, and initial path data. The new maintenance work order data is generated after the initial path data is generated, and the path insertion cost parameters reflect the additional cost required to insert the new work order into an existing path.

[0044] In other words, the scheduling and maintenance platform calculates the additional cost required to insert a new maintenance work order into an existing path based on the new maintenance work order data, dynamic road network data, and initial path data, and generates path insertion cost parameters.

[0045] The scheduling and maintenance platform updates the initial path data based on the path insertion cost parameters, newly added maintenance work order data, and preset cost thresholds to obtain the target path data. The preset cost threshold is the path cost boundary that triggers the insertion of a new work order; the target path data is the actual travel route data executed by the maintenance resources after the update.

[0046] In other words, the scheduling and maintenance platform compares the path insertion cost parameter with the preset cost threshold. When the path insertion cost parameter meets the conditions corresponding to the preset cost threshold, the new maintenance work order data is inserted into the initial path data, the target path data is updated, and the target path data is used as the actual driving route for the maintenance resources.

[0047] The charging pile scheduling and maintenance method integrates fault prediction, work order generation, spatiotemporal impedance calculation, dynamic road network construction, work order allocation, path generation, and path insertion and update into a complete link. When a new maintenance work order is added during the maintenance process, the scheduling and maintenance platform calculates the path insertion cost parameter for inserting the new maintenance work order into the current path and compares the path insertion cost parameter with a preset cost threshold to determine whether to insert the new maintenance work order along the current path. This achieves the effect of carrying new maintenance work orders along the path, avoiding the high computing power overhead caused by re-planning the global path, reducing the unnecessary travel of maintenance personnel to and from the site, and improving the timeliness of response to new maintenance work orders.

[0048] like Figure 2 As shown, optionally, in some embodiments, a time-series prediction model is invoked to process the runtime data to obtain fault probability parameters, including: Step 202: Analyze the running data to obtain voltage fluctuation data, current change data, insulation resistance data, ambient temperature and humidity data, and sampling time data; Step 204: Based on voltage fluctuation data, current change data, insulation resistance data, and ambient temperature and humidity data, obtain the equipment health parameters; Step 206: Based on the sampling time data, the device health parameters are arranged in time sequence to generate health time sequence data; Step 208: Call the time series prediction model and obtain the failure probability parameters based on the health time series data.

[0049] In the above embodiments, the scheduling and maintenance platform parses the operation data to obtain voltage fluctuation data, current change data, insulation resistance data, ambient temperature and humidity data, and sampling time data.

[0050] Among them, voltage fluctuation data reflects the voltage fluctuation of the charging pile, current change data reflects the current change of the charging pile, insulation resistance data reflects the insulation resistance value of the charging pile, ambient temperature and humidity data reflects the ambient temperature and humidity of the charging pile, and sampling time data is the data that records the sampling time corresponding to the operation data.

[0051] It should be noted that voltage fluctuation data, current change data, insulation resistance data, and ambient temperature and humidity data were collected at the same sampling time. The sampling time data records the sampling time corresponding to the four types of data, which is used to align the four types of data in time.

[0052] The dispatch and maintenance platform obtains equipment health parameters based on voltage fluctuation data, current change data, insulation resistance data, and ambient temperature and humidity data. These equipment health parameters characterize the health status of the charging pile equipment.

[0053] In other words, the scheduling and maintenance platform comprehensively calculates voltage fluctuation data, current change data, insulation resistance data, and ambient temperature and humidity data to obtain equipment health parameters that reflect the overall health status of the charging pile.

[0054] In some embodiments, the formula for calculating the device health parameter is as follows: ; in, For equipment health parameters, For voltage fluctuation data, For voltage standard deviation, For current change data, For current range, This is insulation resistance data. For ambient temperature and humidity data, As the first preset weight, As the second preset weight, As the third preset weight, This is the fourth preset weight.

[0055] It should be noted that the voltage fluctuation data is a voltage sequence within a historical time window with the current time as the right endpoint, and the voltage standard deviation is the standard deviation of the voltage sequence; the current change data is a current sequence within a historical time window, and the current range is the difference between the maximum and minimum values ​​of the current sequence.

[0056] Both voltage fluctuation data and current change data are statistics within a historical time window with the current time as the right endpoint. Voltage fluctuation data is the standard deviation of voltage within this historical time window, and current change data is the difference between the maximum and minimum values ​​of current within this historical time window.

[0057] The scheduling and maintenance platform arranges the device health parameters in time sequence based on the sampling time data, generating health time-series data. This health time-series data is a data sequence formed by arranging the device health parameters according to the sampling time order.

[0058] In other words, the scheduling and maintenance platform arranges the equipment health parameters according to the order of the sampling time data, so that the equipment health parameters form a sequence that changes over time, generating health time series data.

[0059] The scheduling and operation platform calls the time-series prediction model to obtain fault probability parameters based on the health time-series data. In other words, the scheduling and operation platform inputs the health time-series data into the time-series prediction model, the time-series prediction model processes the health time-series data, and outputs fault probability parameters.

[0060] In some embodiments, the third preset weight is higher than any one of the first preset weight, the second preset weight, and the fourth preset weight.

[0061] In some embodiments, the device health parameter is calculated by normalizing the historical quantiles of the operating data.

[0062] In some embodiments, the time-series prediction model outputs the probability of a charging pile failing in a future period based on health time-series data.

[0063] In some embodiments, the time-series prediction model is a bidirectional long short-term memory network. The bias term of the long short-term memory network is dynamically adjusted according to the device aging factor. The long short-term memory network is trained using backpropagation with truncated time steps.

[0064] The scheduling and maintenance platform first obtains equipment health parameters from operational data, and then arranges the equipment health parameters in time sequence according to the sampling time to obtain health time sequence data. This enables the time sequence prediction model to predict faults based on the trend of health changes over time, thus improving the accuracy of fault probability parameters.

[0065] like Figure 3 As shown, optionally, in some embodiments, maintenance work order data is generated based on fault probability parameters, operational data, location data, and preset work order thresholds, including: Step 302: Analyze the preset work order threshold to obtain the emergency repair probability threshold and the preventive maintenance probability threshold; Step 304: Obtain the probability comparison results based on the fault probability parameters, emergency repair probability threshold, and preventive maintenance probability threshold; Step 306: Generate work order level parameters based on the probability comparison results and the preset level mapping rules; Step 308: Generate maintenance work order data based on work order level parameters, operation data, and location data.

[0066] In the above embodiments, the scheduling and maintenance platform parses preset work order thresholds to obtain emergency repair probability thresholds and preventive maintenance probability thresholds. The preset work order thresholds include emergency repair probability thresholds and preventive maintenance probability thresholds. The emergency repair probability threshold is the fault probability threshold that divides emergency repair levels, and the preventive maintenance probability threshold is the fault probability threshold that divides preventive maintenance levels. The emergency repair probability threshold is higher than the preventive maintenance probability threshold.

[0067] The dispatch and maintenance platform obtains probability comparison results based on fault probability parameters, emergency repair probability thresholds, and preventive maintenance probability thresholds. Specifically, the probability comparison results are obtained by comparing the fault probability parameters with the emergency repair probability threshold and the preventive maintenance probability threshold, respectively.

[0068] In other words, the scheduling and maintenance platform compares the fault probability parameter with the emergency repair probability threshold and the preventive maintenance probability threshold respectively to obtain the probability comparison result, and uses the probability comparison result as the basis for generating work order level parameters.

[0069] The scheduling and maintenance platform generates work order level parameters based on the probability comparison results and preset level mapping rules. The preset level mapping rules describe the correspondence between the probability comparison results and work order levels, while the work order level parameters characterize the urgency of the maintenance work order.

[0070] In other words, the scheduling and maintenance platform determines the corresponding work order level according to the preset level mapping rules and the probability comparison results, generates work order level parameters, and uses the work order level parameters as the basis for generating maintenance work order data.

[0071] The dispatch and maintenance platform generates maintenance work order data based on work order level parameters, operational data, and location data. In other words, the dispatch and maintenance platform combines work order level parameters, operational data, and location data to generate maintenance work order data, which simultaneously carries the work order level, charging pile operational status, and charging pile location, and serves as input for subsequent work order allocation.

[0072] It should be noted that the emergency repair probability threshold and the preventive maintenance probability threshold can be adjusted based on the charging station's failure rate and maintenance manpower configuration. In some embodiments, the emergency repair probability threshold is set to 0.8, and the preventive maintenance probability threshold is set to 0.4; in other embodiments, the emergency repair probability threshold and the preventive maintenance probability threshold are adjusted based on the station's historical failure samples.

[0073] The work order level parameter is used to distinguish the urgency of maintenance work orders. In some embodiments, the work order level parameter represents the emergency repair level and the preventive maintenance level. For example, if the work order registration parameter is Level 1 emergency repair work order, then the work order represents the emergency repair level; if the work order level parameter is Level 2 preventive work order, then the work order represents the preventive maintenance level (i.e., routine maintenance).

[0074] In some embodiments, maintenance work order data also includes the fault type and a recommended spare part to carry.

[0075] The dispatch and maintenance platform classifies fault probability parameters into different work order levels by using emergency repair probability thresholds and preventive maintenance probability thresholds. This allows charging piles with higher fault probabilities to be prioritized for emergency repairs, while charging piles with lower fault probabilities are given early preventive maintenance, thus improving the accuracy of matching between work order level classification and charging pile fault risk.

[0076] like Figure 4 As shown, optionally, in some embodiments, generating spatiotemporal impedance parameters based on road network spatiotemporal data includes: Step 402: Analyze the spatiotemporal data of the road network to obtain road segment identification data, road segment distance parameters, free flow velocity parameters, and current time parameters; Step 404: Generate free-flow duration parameters based on road segment distance parameters and free-flow speed parameters; Step 406: Generate congestion probability parameters based on the current time parameters, preset peak period parameters, and preset congestion change coefficients; Step 408: Generate congestion delay parameters based on congestion probability parameters and preset congestion weights; Step 410: Obtain historical traffic flow data based on road segment identification data; Step 412: Determine the queue length parameter based on the current time parameter and historical traffic flow data; Step 414: Generate queuing delay parameters based on the queue length parameter and the preset queuing penalty coefficient; Step 416: Generate the spatiotemporal impedance parameters based on the free-flow duration parameters, congestion delay parameters, and queuing delay parameters.

[0077] In the above embodiments, the scheduling and maintenance platform parses the spatiotemporal data of the road network to obtain road segment identification data, road segment distance parameters, free flow speed parameters, and current time parameters.

[0078] Among them, the road segment identification data is used to uniquely identify road segments, the road segment distance parameter is a parameter that represents the length of the road segment, the free flow speed parameter is a parameter that represents the speed of traffic when the road segment is unobstructed, and the current time parameter is a parameter that represents the current time.

[0079] The dispatch and operation platform generates free-flow duration parameters based on road segment distance parameters and free-flow speed parameters. The free-flow duration parameter characterizes the time required for passage through a road segment in a free-flow state. In other words, the dispatch and operation platform calculates the passage time for a road segment under unobstructed conditions based on the road segment distance parameters and free-flow speed parameters, and then generates the free-flow duration parameter.

[0080] The dispatch and maintenance platform generates congestion probability parameters based on current time parameters, preset peak period parameters, and preset congestion change coefficients. The preset peak period parameters are pre-defined parameters for peak traffic periods, the preset congestion change coefficient is a coefficient characterizing the sensitivity of congestion probability to changes over time, and the congestion probability parameters characterize the probability of congestion occurring on a road segment.

[0081] In other words, the dispatch and maintenance platform determines the probability of road segment congestion based on the similarity between the current time parameters and the preset peak period parameters, as well as the preset congestion change coefficient, and generates congestion probability parameters.

[0082] The scheduling and operation platform generates congestion delay parameters based on congestion probability parameters and preset congestion weights. The preset congestion weights are pre-defined weights for congestion items, while the congestion delay parameters characterize the travel delays caused by congestion.

[0083] In other words, the scheduling and operation platform calculates the delay time caused by congestion based on the congestion probability parameter and the preset congestion weight, and generates congestion delay parameters.

[0084] The dispatch and maintenance platform obtains historical traffic flow data based on road segment identification data. This historical traffic flow data refers to the historical traffic volume of each road segment. In other words, the dispatch and maintenance platform determines the corresponding road segment based on the road segment identification data and obtains the historical traffic flow data for that segment.

[0085] The dispatch and operation platform determines the queue length parameter based on current time parameters and historical traffic flow data. The queue length parameter is a parameter that characterizes the queue length of a road segment. In other words, the dispatch and operation platform determines the queue length of a road segment at the current time based on current time parameters and historical traffic flow data, and generates the queue length parameter.

[0086] The scheduling and maintenance platform generates queuing delay parameters based on the queue length parameter and the preset queuing penalty coefficient. The preset queuing penalty coefficient is a pre-set queuing penalty factor, and the queuing delay parameter represents the passage delay caused by queuing. In other words, the scheduling and maintenance platform calculates the delay duration caused by queuing based on the queue length parameter and the preset queuing penalty coefficient, and then generates the queuing delay parameter.

[0087] The scheduling and maintenance platform generates spatiotemporal impedance parameters based on free-flow duration parameters, congestion delay parameters, and queuing delay parameters.

[0088] In other words, the scheduling and operation platform adds up the free-flow duration parameter, congestion delay parameter, and queuing delay parameter to generate a spatiotemporal impedance parameter that reflects the total time cost of passage of a road segment at a specific time, and uses the spatiotemporal impedance parameter as the basis for subsequent construction of dynamic road network data.

[0089] In some embodiments, the spatiotemporal impedance parameter is calculated as follows: ; in, For spatiotemporal impedance parameters, For road segment distance parameters, For free flow velocity parameters, The parameters are for the current time. To preset peak period parameters, To preset the congestion variation coefficient, To preset congestion weights, To preset the queuing penalty coefficient, For the road segment corresponding to the road segment identification data, For queue length parameters, For the free-flow duration parameter, For congestion probability parameters, For congestion delay parameters, This is a parameter for queuing delay.

[0090] It should be noted that historical traffic flow data is not directly included in the above formula; the queue length parameter... Determined based on current time parameters and historical traffic flow data.

[0091] In some embodiments, the congestion probability parameter is calculated using a sigmoid function based on the proximity of the current time parameter to the preset peak time parameter; in other embodiments, the congestion probability parameter is determined segmented based on the time difference between the current time parameter and the preset peak time parameter.

[0092] It should be noted that the free-flow speed parameter, preset congestion weight, preset congestion variation coefficient, and preset queuing penalty coefficient can be calibrated values. In some embodiments, the free-flow speed parameter is set to 60 km / h, the preset congestion weight is set to 1.8, the preset congestion variation coefficient is set to 0.3, and the preset queuing penalty coefficient is set to 0.5.

[0093] In some embodiments, the preset peak time parameters include morning peak time and evening peak time, and the congestion probability parameter increases during morning peak time and evening peak time.

[0094] The dispatch and maintenance platform breaks down the spatiotemporal impedance parameter into free-flow duration parameters, congestion delay parameters, and queuing delay parameters, which respectively reflect the time cost of smooth traffic, congestion, and queuing on a road segment. This enables the spatiotemporal impedance parameter to comprehensively reflect the actual travel time cost of a road segment at a specific moment, thereby improving the accuracy of the spatiotemporal impedance parameter in representing traffic conditions.

[0095] like Figure 5 As shown, optionally, in some embodiments, dynamic road network data is constructed based on spatiotemporal impedance parameters and road network spatiotemporal data, including: Step 502: Parse the spatiotemporal data of the road network to obtain road network topology data and road segment identification data; Step 504: Match the spatiotemporal impedance parameters with the road segment identification data to obtain the road segment impedance mapping data; Step 506: Based on the road segment impedance mapping data, configure the spatiotemporal impedance parameters as road segment weights in the road network topology data to construct dynamic road network data.

[0096] In the above embodiments, the scheduling and maintenance platform parses the spatiotemporal data of the road network to obtain road network topology data and road segment identification data. The topology data describes the connection relationships between roads in the road network, while the segment identification data is used to uniquely identify road segments.

[0097] The dispatch and maintenance platform matches spatiotemporal impedance parameters with road segment identification data to obtain road segment impedance mapping data. This road segment impedance mapping data describes the correspondence between road segments and spatiotemporal impedance parameters.

[0098] In other words, the scheduling and operation platform establishes a correspondence between the spatiotemporal impedance parameters and the corresponding road segments one by one according to the road segment identification data, forming road segment impedance mapping data, and uses the road segment impedance mapping data as the basis for subsequent configuration of road segment weights.

[0099] The dispatch and maintenance platform configures spatiotemporal impedance parameters as segment weights in the road network topology data based on road segment impedance mapping data, thus constructing dynamic road network data. Here, segment weights are the weight values ​​configured on each road segment in the road network topology data, and dynamic road network data is road network data carrying these segment weights.

[0100] In other words, the scheduling and maintenance platform assigns each spatiotemporal impedance parameter to the corresponding road segment in the road network topology data according to the road segment impedance mapping data, as the weight of the road segment. This ensures that each road segment in the road network topology data carries the corresponding road segment weight, thereby constructing dynamic road network data. The dynamic road network data is then used as the basis for subsequent work order allocation and route generation.

[0101] In some embodiments, road network topology data describes the road network in the form of nodes and edges, where nodes correspond to road intersections or charging station sites, and edges correspond to road segments; in other embodiments, road network topology data describes the connection relationships between roads in the form of an adjacency list; in still other embodiments, road network topology data consists of station nodes and road segment edges, where station nodes correspond to charging station sites, road segment edges correspond to road segments connecting stations, and spatiotemporal impedance parameters are used as edge weights of road segment edges in path search.

[0102] The scheduling and operation platform configures the spatiotemporal impedance parameters as the segment weights of the road network topology data, so that each segment in the dynamic road network data carries the travel time cost that changes with traffic conditions, providing a travel network that can dynamically change with traffic conditions for subsequent route planning.

[0103] like Figure 6 As shown, optionally, in some embodiments, a collaborative scheduling model is invoked to obtain work order allocation data based on maintenance work order data, maintenance resource data, and dynamic road network data, including: Step 602: Parse the maintenance work order data to obtain work order type data, work order level parameters, work order location data, and response time limit parameters; Step 604: Parse the operation and maintenance resource data to obtain operation and maintenance personnel identification data, operation and maintenance personnel location data, personnel skill data, and personnel load parameters; Step 606: Determine skill requirement data based on work order type data; Step 608: Based on the maintenance personnel identification data, match the skill requirement data with the personnel skill data to generate matching mask data; Step 610: Invoke the collaborative scheduling model to generate candidate work order allocation data based on maintenance work order data, maintenance personnel location data, personnel load parameters, dynamic road network data, and matching mask data; Step 612: Based on the candidate work order allocation data, work order location data, maintenance personnel location data, and dynamic road network data, generate the expected response time parameter and travel cost parameter; Step 614: Generate the timeliness deviation parameter based on the expected response duration parameter and the response time limit parameter; Step 616: Determine the spacing parameters between maintenance personnel based on the candidate work order allocation data and work order location data; Step 618: Generate personnel conflict parameters based on the distance parameters between maintenance personnel and the preset conflict distance threshold; Step 620: Generate timeliness revenue parameters based on work order level parameters, timeliness deviation parameters, and preset revenue weights; Step 622: Obtain scheduling revenue parameters based on timeliness revenue parameters, travel cost parameters, personnel conflict parameters, and preset revenue weights; Step 624: The candidate work order allocation data with the largest scheduling benefit parameter is determined as the work order allocation data.

[0104] In the above embodiments, the scheduling and maintenance platform parses the maintenance work order data to obtain work order type data, work order level parameters, work order location data, and response time limit parameters. The work order type data describes the type of maintenance work order, the work order level parameter characterizes the urgency of the maintenance work order, the work order location data describes the location of the charging pile corresponding to the work order, and the response time limit parameter characterizes the required response time limit for the maintenance work order.

[0105] The scheduling and maintenance platform parses the maintenance resource data to obtain maintenance personnel identification data, maintenance personnel location data, personnel skill data, and personnel load parameters. Among them, maintenance personnel identification data is used to uniquely identify maintenance personnel, maintenance personnel location data describes the current location of maintenance personnel, personnel skill data describes the skills possessed by maintenance personnel, and personnel load parameters characterize the current load level of maintenance personnel.

[0106] The dispatch and maintenance platform determines skill requirement data based on work order type data. This skill requirement data describes the skills required to process the work order.

[0107] The dispatch and maintenance platform matches skill requirement data with personnel skill data based on personnel identification data, generating a matching mask. This matching mask marks whether a personnel is allowed or prohibited from accepting orders. When a personnel's skill data contains the skill corresponding to the skill requirement data, the dispatch and maintenance platform marks the personnel as allowed to accept orders; when the personnel's skill data does not contain the corresponding skill, the dispatch and maintenance platform marks the personnel as prohibited from accepting orders.

[0108] The scheduling and maintenance platform invokes the collaborative scheduling model to generate candidate work order allocation data based on maintenance work order data, maintenance personnel location data, personnel load parameters, dynamic road network data, and matching mask data. The collaborative scheduling model is used to coordinate the allocation of multiple work orders across multiple maintenance resources, and the candidate work order allocation data consists of candidate allocation schemes generated by the collaborative scheduling model.

[0109] In other words, the scheduling and operation platform inputs operation and maintenance work order data, operation and maintenance personnel location data, personnel load parameters, dynamic road network data, and matching mask data into the collaborative scheduling model. The collaborative scheduling model generates candidate work order allocation data under the constraints of the matching mask data.

[0110] The dispatch and maintenance platform generates estimated response time and travel cost parameters based on candidate work order allocation data, work order location data, maintenance personnel location data, and dynamic road network data. The estimated response time parameter represents the estimated time it takes for maintenance personnel to reach the work order location, while the travel cost parameter represents the travel cost for maintenance personnel to travel to the work order location.

[0111] In other words, the scheduling and maintenance platform calculates the estimated time and travel cost for maintenance personnel to reach the work order location based on candidate work order allocation data, work order location data, maintenance personnel location data, and dynamic road network data, and generates estimated response time parameters and travel cost parameters.

[0112] The scheduling and operation platform generates a timeliness deviation parameter based on the expected response time parameter and the response time limit parameter. This timeliness deviation parameter characterizes the deviation between the expected response time and the response time limit. In other words, the scheduling and operation platform compares the expected response time parameter with the response time limit parameter to obtain the timeliness deviation parameter.

[0113] The scheduling and maintenance platform determines the spacing parameter between maintenance personnel based on candidate work order allocation data and work order location data. This spacing parameter characterizes the distance between maintenance personnel.

[0114] In other words, the scheduling and maintenance platform determines the location of each maintenance personnel when executing a work order based on the candidate work order allocation data and work order location data, and determines the maintenance personnel spacing parameter based on the distance between the locations.

[0115] The scheduling and maintenance platform generates personnel conflict parameters based on the distance parameters between maintenance personnel and the preset conflict distance threshold. The preset conflict distance threshold is a pre-defined distance threshold for determining conflicts between maintenance personnel, and the personnel conflict parameters are parameters that characterize the occurrence of conflicts between maintenance personnel.

[0116] In other words, when the distance parameter between maintenance personnel is less than the preset conflict distance threshold, the scheduling maintenance platform generates conflict parameters indicating that there is a conflict; when the distance parameter between maintenance personnel is not less than the preset conflict distance threshold, the scheduling maintenance platform generates conflict parameters indicating that there is no conflict, thereby avoiding too many maintenance personnel from flooding into the same area.

[0117] The scheduling and maintenance platform generates timeliness benefit parameters based on work order level parameters, timeliness deviation parameters, and preset benefit weights. Among them, the timeliness benefit parameter is a parameter that characterizes the benefit of candidate work order allocation data in terms of timeliness.

[0118] In other words, the scheduling and maintenance platform calculates the timeliness benefit of candidate work order allocation data and generates timeliness benefit parameters based on work order level parameters, timeliness deviation parameters, and preset benefit weights.

[0119] The scheduling and operation platform derives scheduling revenue parameters based on timeliness revenue parameters, travel cost parameters, personnel conflict parameters, and preset revenue weights. Among these, the scheduling revenue parameters characterize the overall revenue from candidate work order allocation data.

[0120] In other words, the scheduling and operation platform integrates timeliness benefit parameters, travel cost parameters, personnel conflict parameters, and preset benefit weights to obtain the scheduling benefit parameters corresponding to the candidate work order allocation data.

[0121] In some embodiments, the formula for calculating the scheduling revenue parameter is as follows: ; in, For scheduling revenue parameters, This is the work order level coefficient. This is the time-related decay coefficient. For timeliness deviation parameters, As a weight for travel costs, For travel cost parameters, For personnel conflict penalty coefficient, For personnel conflict parameters, For time-sensitive revenue parameters, For travel costs, This is a personnel conflict item.

[0122] The scheduling and operation platform determines the candidate work order allocation data with the highest scheduling benefit parameter as the work order allocation data. In other words, the scheduling and operation platform determines the scheduling benefit parameter for each candidate work order allocation data, determines the candidate work order allocation data with the highest scheduling benefit parameter as the work order allocation data, and uses the work order allocation data as the basis for generating the initial path data.

[0123] In some embodiments, the collaborative scheduling model is a Multi-Agent Deep Deterministic Policy Gradient (MADDPG) model. The collaborative scheduling model takes maintenance work order data, maintenance personnel location data, personnel load parameters, dynamic road network data, and matching mask data as state inputs, outputs the order acceptance results of each maintenance personnel, and generates candidate work order allocation data based on the order acceptance results. In other embodiments, the collaborative scheduling model is a multi-agent reinforcement learning model. The collaborative scheduling model generates candidate work order allocation data after excluding maintenance personnel without the necessary skills based on the matching mask data.

[0124] In some embodiments, the collaborative scheduling model uses the MADDPG algorithm to train an actor network, which outputs the order acceptance results of each operations and maintenance personnel.

[0125] In some embodiments, the state space of the collaborative scheduling model includes work order state, maintenance personnel state, and traffic state, and the state space is extended to 28 dimensions. The action space is the probability of each maintenance personnel accepting each work order, and the reward function consists of a timeliness term, a travel cost term, and a personnel conflict term.

[0126] The scheduling and maintenance platform first excludes maintenance personnel without the necessary skills by matching mask data, and then calculates scheduling benefit parameters based on timeliness benefit parameters, travel cost parameters, and personnel conflict parameters. This ensures that work order allocation data takes into account skill matching, response timeliness, travel cost, and personnel conflict, thereby improving the matching rationality between work order allocation and maintenance resources.

[0127] like Figure 7 As shown, optionally, in some embodiments, initial path data is generated based on work order allocation data and dynamic road network data, including: Step 702: Parse the work order allocation data to obtain the maintenance personnel identification data and the work order identification data; Step 704: Obtain the location data of maintenance personnel from the maintenance resource data based on the maintenance personnel identification data; Step 706: Obtain work order location data from the maintenance work order data based on the work order identifier data; Step 708: Determine the starting node and target node based on work order allocation data, maintenance personnel location data, work order location data, and dynamic road network data; Step 710: Based on the dynamic road network data and spatiotemporal impedance parameters, search for a path from the starting node to the target node and generate initial path data.

[0128] In the above embodiment, the scheduling and maintenance platform parses the work order allocation data to obtain maintenance personnel identification data and work order identification data. The maintenance personnel identification data is used to uniquely identify maintenance personnel; the work order identification data is used to uniquely identify work orders; the work order allocation data records the correspondence between the maintenance personnel identification data and the work order identification data, indicating that each work order is handled by a specific maintenance personnel.

[0129] The scheduling and maintenance platform retrieves the location data of maintenance personnel from the maintenance resource data based on their identification data. This location data describes the current location of the maintenance personnel. In other words, the scheduling and maintenance platform searches for the corresponding maintenance personnel in the maintenance resource data based on their identification data to obtain their location information.

[0130] The dispatch and maintenance platform retrieves work order location data from the maintenance work order data based on the work order identifier data. This work order location data describes the location of the charging pile corresponding to the work order. In other words, the dispatch and maintenance platform searches for the corresponding work order in the maintenance work order data based on the work order identifier data to obtain the work order location data.

[0131] The dispatch and maintenance platform determines the starting node and the target node based on work order allocation data, maintenance personnel location data, work order location data, and dynamic road network data. The starting node is the starting point of the path search, and the target node is the ending point of the path search.

[0132] In other words, the scheduling and maintenance platform determines the location corresponding to the location data of maintenance personnel as the starting node and the location corresponding to the work order location data as the target node.

[0133] The scheduling and maintenance platform searches for a path from the starting node to the target node based on dynamic road network data and spatiotemporal impedance parameters, generating initial path data. This initial path data describes the travel route taken by maintenance personnel from the starting node to the target node.

[0134] In other words, the scheduling and maintenance platform uses spatiotemporal impedance parameters as the basis for path search, searches for the path with the shortest travel time from the starting node to the target node in the dynamic road network data, generates initial path data, and uses the initial path data as the basis for subsequent path insertion processing.

[0135] In some embodiments, the path search employs Dijkstra's algorithm, using the spatiotemporal impedance parameter as the edge weight, to search for the path with the shortest travel time; in other embodiments, the path search employs A* algorithm, using the spatiotemporal impedance parameter as the edge weight, to search for the path with the shortest travel time.

[0136] The scheduling and maintenance platform uses spatiotemporal impedance parameters as the basis for path search, searching for the path with the shortest travel time in dynamic road network data. This makes the initial path data reflect the actual travel time cost under traffic conditions, thus improving the adaptability of the initial path data to traffic conditions.

[0137] In some embodiments, the scheduling and maintenance platform uses the spatiotemporal impedance parameter as the edge weight of Dijkstra's algorithm to search for the path with the shortest travel time from the starting node to the target node.

[0138] Optionally, in some technical solutions, receiving new maintenance work order data and generating path insertion cost parameters based on the new maintenance work order data, dynamic road network data, and initial path data includes: receiving new maintenance work order data; parsing the new maintenance work order data to obtain new work order location data; parsing the initial path data to obtain path node sequence data; determining the location data of adjacent node pairs based on the path node sequence data and dynamic road network data; generating path deviation distance parameters based on the new work order location data and the location data of adjacent node pairs; identifying initial path data whose path deviation distance parameters are less than a preset deviation distance threshold as candidate path data; generating pre-insertion traffic cost data and post-insertion traffic cost data based on the candidate path data, new work order location data, and dynamic road network data; generating a candidate insertion cost set based on the post-insertion traffic cost data and the pre-insertion traffic cost data; and filtering the candidate insertion cost set to obtain the path insertion cost parameters.

[0139] like Figure 8 As shown, optionally, in some embodiments, receiving new maintenance work order data, and generating path insertion cost parameters based on the new maintenance work order data, dynamic road network data, and initial path data, including: Step 802: Receive new maintenance work order data, parse the new maintenance work order data, and obtain the location data of the new work order; Step 804: Parse the initial path data to obtain the path node sequence data; Step 806: Determine the location data of adjacent node pairs based on the path node sequence data and dynamic road network data; Step 808: Generate path deviation distance parameters based on the location data of the newly added work order and the location data of adjacent node pairs; Step 810: Initial path data whose path deviation distance parameter is less than the preset deviation distance threshold are identified as candidate path data; Step 812: Based on the candidate path data, the location data of the newly added work order, and the dynamic road network data, generate the toll cost data before insertion and the toll cost data after insertion. Step 814: Generate a candidate insertion cost set based on the access cost data after insertion and the access cost data before insertion; Step 816: Filter the candidate insertion cost set to obtain the path insertion cost parameters.

[0140] In the above embodiment, the scheduling and maintenance platform receives newly added maintenance work order data, parses the newly added maintenance work order data, and obtains the location data of the newly added work order. The newly added maintenance work order data is the maintenance work order data generated after the initial path data is generated, and the location data of the newly added work order describes the location of the charging pile corresponding to the newly added maintenance work order.

[0141] The scheduling and operations platform parses the initial path data to obtain path node sequence data. This path node sequence data describes the order in which the path nodes are arranged within the initial path data. In other words, the scheduling and operations platform parses the order of the path nodes in the initial path data to obtain the path node sequence data.

[0142] The scheduling and operation platform determines the location data of adjacent node pairs based on path node sequence data and dynamic road network data. The location data of adjacent node pairs describes the positions of two adjacent path nodes in the initial path data. In other words, the scheduling and operation platform determines adjacent node pairs in the initial path data based on the path node sequence data, and then determines the location data of these adjacent node pairs by combining this information with dynamic road network data.

[0143] The scheduling and maintenance platform generates path deviation distance parameters based on the location data of newly added work orders and the location data of adjacent node pairs. The path deviation distance parameter characterizes the degree to which the location of a newly added work order deviates from the initial path.

[0144] In other words, the scheduling and maintenance platform calculates the distance of the new work order location from the initial path based on the location data of the new work order and the location data of adjacent nodes, and generates the path deviation distance parameter.

[0145] The scheduling and operation platform identifies initial path data whose path deviation distance parameter is less than a preset deviation distance threshold as candidate path data. Here, the preset deviation distance threshold is a pre-defined deviation distance determination threshold, and the candidate path data are initial path data whose deviation distance meets the condition.

[0146] In other words, the scheduling and maintenance platform retains the initial path data whose path deviation distance parameter is less than the preset deviation distance threshold as candidate path data, so that the initial path data whose location of the new work order is in the same direction as the initial path can be included in the subsequent insertion cost calculation.

[0147] The dispatch and maintenance platform generates pre-insertion and post-insertion traffic cost data based on candidate path data, new work order location data, and dynamic road network data. The pre-insertion traffic cost data represents the traffic cost before the new work order is inserted, while the post-insertion traffic cost data represents the traffic cost after the new work order is inserted.

[0148] In other words, the dispatch and maintenance platform calculates the passage cost when no new work order is inserted based on candidate path data and dynamic road network data, and calculates the passage cost after inserting a new work order based on candidate path data, new work order location data, and dynamic road network data.

[0149] The scheduling and operation platform generates a candidate insertion cost set based on the post-insertion traffic cost data and the pre-insertion traffic cost data. This candidate insertion cost set is a collection of multiple candidate insertion costs. In other words, the scheduling and operation platform generates candidate insertion costs corresponding to each candidate path based on the difference between the post-insertion traffic cost data and the pre-insertion traffic cost data, thus forming the candidate insertion cost set.

[0150] The scheduling and operation platform filters the candidate insertion cost set to obtain the path insertion cost parameter. The path insertion cost parameter reflects the additional cost required to insert a new work order into an existing path.

[0151] In other words, the scheduling and maintenance platform filters the candidate insertion cost set and determines the candidate insertion cost with the smallest value as the path insertion cost parameter. The path insertion cost parameter serves as the basis for subsequent decisions on whether to insert a new work order.

[0152] In some embodiments, the path insertion cost parameter is calculated using the following formula: ; in, Insert cost parameters for the path. This is the current location of the operations and maintenance personnel. To add work order location data, The next stop as originally planned, The cost of traveling from the current location to the new work order. The cost of traveling from the new work order to the originally planned next stop. The cost of traveling directly from the current location to the planned next stop.

[0153] In some embodiments, after inserting a new work order into the initial path, the scheduling and maintenance platform only replans the path for the remaining path nodes, without replanning the path nodes that have already been passed; in other embodiments, the scheduling and maintenance platform performs local replanning on the candidate path data to obtain the path after inserting the new work order.

[0154] In some embodiments, the insertion is performed when the path insertion cost parameter does not exceed a preset time threshold, where the preset time threshold is 30 minutes.

[0155] The scheduling and maintenance platform first performs a preliminary screening of the initial path data based on the path deviation distance parameter. Then, it calculates the candidate insertion cost based on the toll cost data before and after insertion. This concentrates the calculation of the insertion cost of new work orders on the initial path in the same direction, reducing the amount of computation required for insertion cost calculation and improving the real-time performance of new work order insertion processing.

[0156] like Figure 9As shown, optionally, in some embodiments, after updating the initial path data based on the path insertion cost parameter, newly added maintenance work order data, and preset cost threshold to obtain the target path data, the charging pile scheduling and maintenance method further includes: Step 902: Receive post-maintenance operation data returned based on the target path data; Step 904: Analyze the operating data to obtain the operating data before maintenance; Step 906: Based on the pre-maintenance operation data and the post-maintenance operation data, generate the pre-maintenance health parameters and the post-maintenance health parameters respectively; Step 908: Generate health change parameters based on the health parameters before and after maintenance; Step 910: Obtain the continuous online duration parameter based on the post-maintenance operation data; Step 912: Generate work order acceptance result data based on health status change parameters, continuous online duration parameters, preset acceptance threshold, and preset online duration threshold.

[0157] In the above embodiment, the scheduling and maintenance platform receives post-maintenance operation data returned based on the target path data. This post-maintenance operation data refers to the charging pile operation data returned by maintenance personnel after completing maintenance according to the target path data. In other words, maintenance personnel travel to each charging pile to perform maintenance according to the target path data, and after the maintenance is completed, the scheduling and maintenance platform receives the post-maintenance operation data.

[0158] The dispatch and maintenance platform parses the operational data to obtain the pre-maintenance operational data. This pre-maintenance operational data refers to the operational data of the charging pile prior to the maintenance. In other words, the dispatch and maintenance platform extracts the pre-maintenance operational data from the operational data.

[0159] The dispatch and maintenance platform generates pre-maintenance health parameters and post-maintenance health parameters based on pre-maintenance and post-maintenance operational data. The pre-maintenance health parameter characterizes the health status of the charging pile before maintenance, while the post-maintenance health parameter characterizes the health status of the charging pile after maintenance. In other words, the dispatch and maintenance platform calculates the pre-maintenance health status based on the pre-maintenance operational data and the post-maintenance health status based on the post-maintenance operational data.

[0160] The dispatch and maintenance platform generates health change parameters based on the health parameters before and after maintenance. These health change parameters characterize the change in the health status of the charging pile before and after maintenance. In other words, the dispatch and maintenance platform generates health change parameters based on the difference between the health parameters before and after maintenance.

[0161] The dispatch and maintenance platform obtains the continuous online duration parameter based on post-maintenance operational data. This continuous online duration parameter characterizes the length of time a charging pile remains continuously online after maintenance. In other words, the dispatch and maintenance platform determines the continuous online duration of the charging pile after maintenance based on the post-maintenance operational data and obtains the continuous online duration parameter.

[0162] The scheduling and maintenance platform generates work order acceptance result data based on health status change parameters, continuous online duration parameters, preset acceptance thresholds, and preset online duration thresholds. The preset acceptance threshold is the boundary value for determining whether a health status change meets the acceptance standard, the preset online duration threshold is the boundary value for determining whether continuous online duration meets the acceptance standard, and the work order acceptance result data represents the work order acceptance result.

[0163] In other words, when the health status change parameter reaches the preset acceptance threshold and the continuous online duration parameter reaches the preset online duration threshold, the scheduling and maintenance platform generates work order acceptance result data indicating that the acceptance has been passed; when the health status change parameter does not reach the preset acceptance threshold or the continuous online duration parameter does not reach the preset online duration threshold, the scheduling and maintenance platform generates work order acceptance result data indicating that the review is required.

[0164] It should be noted that the preset acceptance threshold and preset online time threshold can be adjusted according to the type of charging station. In some embodiments, the preset acceptance threshold is 0.3 and the preset online time threshold is 2 hours; in some embodiments, for high-power, heavy-load fast charging stations, the preset online time threshold is 3 hours.

[0165] In some embodiments, when the data representation of the work order acceptance result needs to be verified, the scheduling and maintenance platform issues a deep self-inspection command and performs a secondary judgment using high-frequency sampling.

[0166] In some embodiments, the scheduling and maintenance platform pushes review sub-work orders and performs image comparison before and after maintenance.

[0167] In some embodiments, if a single charging pile fails acceptance multiple times consecutively within a preset time, the scheduling and maintenance platform triggers a hardware scrap warning.

[0168] The dispatch and maintenance platform automatically generates work order acceptance result data based on health status change parameters and continuous online duration parameters, reducing the workload of manual on-site verification and improving the objectivity and efficiency of maintenance acceptance.

[0169] In some embodiments, after the maintenance resources have been repaired according to the target path data, the scheduling and maintenance platform receives the maintenance data and performs acceptance testing. If the acceptance test fails, remote self-diagnosis or image verification is performed.

[0170] In some embodiments, the charging pile edge acquisition terminal samples at a first frequency under normal operation and maintenance conditions, and switches to a second frequency higher than the first frequency after receiving a self-test command.

[0171] In some embodiments, the mobile app switches to local offline mode when it loses connection with the cloud and uploads the data generated during the offline period after the network is restored.

[0172] In some embodiments, when the battery management system (BMS) of a charging pile experiences a communication interruption and is unable to obtain operational data, the scheduling and maintenance platform dispatches orders based on the statistical patterns of historical mean time between failures (MTBF).

[0173] In some embodiments, the scheduling and maintenance platform deploys a lightweight, trimmed bidirectional long short-term memory network fault prediction sub-model and basic electrical health calculation logic to the local edge gateway of the charging pile. The edge gateway performs local electrical feature preprocessing and simple fault risk assessment in real time, uploads high-risk abnormal time series segments to the cloud, and caches normal stable operation data locally.

[0174] In other embodiments, the cloud is responsible for global collaborative scheduling, path optimization, and digital twin rendering, while the edge gateway is responsible for local preprocessing and initial fault risk assessment, thereby achieving hierarchical collaborative computing between the edge and the cloud.

[0175] In some embodiments, the collaborative scheduling model includes an actor network and a critic network. The scheduling and maintenance platform uses a multi-agent deep deterministic policy gradient algorithm to train the actor network and the critic network. The actor network outputs the order acceptance probability of each maintenance worker, and the critic network evaluates the global value of the joint action.

[0176] In some embodiments, the scheduling and maintenance platform accesses the charging station maintenance resources of multiple regions. When the maintenance manpower in a single region is saturated, the scheduling and maintenance platform can mobilize idle maintenance personnel from adjacent stations to participate in collaborative operations and simultaneously update the dynamic spatiotemporal road network across the entire region for cross-regional path planning.

[0177] In some embodiments, when the personnel skill data of maintenance personnel does not include the skills corresponding to the skill requirement data, the scheduling maintenance platform will forcibly set the probability of maintenance personnel accepting work orders to zero.

[0178] In some embodiments, when the path insertion cost parameter does not exceed a preset time threshold and the newly added maintenance work order is a level 1 work order, the scheduling maintenance platform performs the insertion.

[0179] In some embodiments, the time-delay coefficient is 0.01, the travel cost weight is 0.2, the personnel conflict penalty coefficient is 10.0, and the preset conflict distance threshold is 2km.

[0180] In some embodiments, the device health parameters are obtained by weighted summation of voltage fluctuation data, current change data, insulation resistance data and ambient temperature and humidity data, with the first preset weight being 0.25, the second preset weight being 0.25, the third preset weight being 0.4, and the fourth preset weight being 0.1.

[0181] In some embodiments, the first preset weight, the second preset weight, the third preset weight, and the fourth preset weight may be determined using grid search and cross-validation.

[0182] In some embodiments, when the mobile app detects that it has lost connection with the cloud for more than 30 seconds, it switches to local offline mode, calls a greedy algorithm cached locally, and provides temporary route guidance based on the last synchronized road network data.

[0183] In some embodiments, after the network is restored, the mobile app compresses and uploads the trajectory data and operation logs generated during the offline period, and the scheduling and maintenance platform performs breakpoint resume-type data cleaning and merging on the uploaded data.

[0184] A second aspect of the present invention provides a storage medium storing a computer program thereon, which, when executed by a processor, implements the steps of the charging pile scheduling and maintenance method in any of the above embodiments. Therefore, this storage medium possesses all the beneficial effects of the charging pile scheduling and maintenance method in any of the above embodiments, and will not be elaborated further here.

[0185] Storage media include read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0186] The present invention also proposes an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the steps of the charging pile scheduling and maintenance method in any of the above embodiments. Therefore, this electronic device possesses all the beneficial effects of the charging pile scheduling and maintenance method in any of the above embodiments, which will not be elaborated further here.

[0187] like Figure 10As shown, this invention also proposes a charging pile scheduling and maintenance system 100, comprising: an acquisition module 1002, used to acquire charging pile operation data, charging pile location data, road network spatiotemporal data, and maintenance resource data; a fault prediction module 1004, used to call a time-series prediction model to process the operation data and obtain fault probability parameters; a work order generation module 1006, used to generate maintenance work order data based on the fault probability parameters, the operation data, the location data, and a preset work order threshold; an impedance generation module 1008, used to generate spatiotemporal impedance parameters based on the road network spatiotemporal data; and a road network construction module 1010, used to construct a road network based on the spatiotemporal impedance parameters and the road network spatiotemporal data. The system comprises: a dynamic road network data set; a collaborative scheduling module 1012, used to invoke a collaborative scheduling model to obtain work order allocation data based on the maintenance work order data, the maintenance resource data, and the dynamic road network data; a path generation module 1014, used to generate initial path data based on the work order allocation data and the dynamic road network data; an insertion cost module 1016, used to receive new maintenance work order data and generate path insertion cost parameters based on the new maintenance work order data, the dynamic road network data, and the initial path data; and a path update module 1018, used to update the initial path data based on the path insertion cost parameters, the new maintenance work order data, and a preset cost threshold to obtain target path data.

[0188] The present invention also proposes a charging pile scheduling and maintenance system 100, wherein each module in the charging pile scheduling and maintenance system 100 corresponds one-to-one with each step of the above-mentioned charging pile scheduling and maintenance method, and is used to implement all the steps of the above-mentioned charging pile scheduling and maintenance method.

[0189] Since the above-mentioned charging pile scheduling and maintenance system 100 adopts the same technical means as the above-mentioned charging pile scheduling and maintenance method, the above-mentioned charging pile scheduling and maintenance system 100 has the same beneficial effects as the above-mentioned charging pile scheduling and maintenance method, which will not be elaborated here.

[0190] In the claims, description, and accompanying drawings of this invention, the term "plural" refers to two or more. Unless otherwise explicitly defined, the terms "upper," "lower," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the invention and simplifying the descriptive process, and are not intended to indicate or imply that the device or element referred to must have the described specific orientation, or be constructed and operated in a specific orientation. Therefore, these descriptions should not be construed as limiting the invention. The terms "connected," "installed," "fixed," etc., should be interpreted broadly. For example, "connected" can be a fixed connection between multiple objects, a detachable connection between multiple objects, or an integral connection; it can be a direct connection between multiple objects or an indirect connection between multiple objects through an intermediate medium. For those skilled in the art, the specific meaning of the above terms in this invention can be understood based on the specific circumstances described above.

[0191] In the claims, description, and accompanying drawings of this invention, the terms "one embodiment," "some embodiments," "specific embodiment," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of the invention. In the claims, description, and accompanying drawings of this invention, illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0192] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for scheduling and maintaining charging piles, characterized in that, include: Acquire charging pile operation data, charging pile location data, road network spatiotemporal data, and operation and maintenance resource data; The time-series prediction model is invoked to process the operational data and obtain fault probability parameters; Based on the fault probability parameters, the operating data, the location data, and the preset work order threshold, maintenance work order data is generated. Based on the aforementioned road network spatiotemporal data, spatiotemporal impedance parameters are generated; Dynamic road network data is constructed based on the spatiotemporal impedance parameters and the road network spatiotemporal data. The collaborative scheduling model is invoked to obtain work order allocation data based on the maintenance work order data, the maintenance resource data, and the dynamic road network data; Initial path data is generated based on the work order allocation data and the dynamic road network data; Receive new maintenance work order data, and generate path insertion cost parameters based on the new maintenance work order data, the dynamic road network data, and the initial path data; The initial path data is updated based on the path insertion cost parameter, the newly added maintenance work order data, and the preset cost threshold to obtain the target path data.

2. The scheduling and maintenance method for charging piles according to claim 1, characterized in that, The invocation of the time-series prediction model processes the operational data to obtain fault probability parameters, including: The operational data is analyzed to obtain voltage fluctuation data, current change data, insulation resistance data, ambient temperature and humidity data, and sampling time data; Based on the voltage fluctuation data, the current change data, the insulation resistance data, and the ambient temperature and humidity data, the equipment health parameters are obtained; Based on the sampling time data, the device health parameters are arranged in time sequence to generate health time sequence data; The time-series prediction model is invoked to obtain the failure probability parameters based on the health time-series data.

3. The scheduling and maintenance method for charging piles according to claim 1, characterized in that, The step of generating maintenance work order data based on the fault probability parameter, the operating data, the location data, and the preset work order threshold includes: The preset work order threshold is analyzed to obtain the emergency repair probability threshold and the preventive maintenance probability threshold. Based on the fault probability parameter, the emergency repair probability threshold, and the preventive maintenance probability threshold, the probability comparison result is obtained; Based on the probability comparison results and the preset level mapping rules, work order level parameters are generated; The maintenance work order data is generated based on the work order level parameters, the operation data, and the location data.

4. The scheduling and maintenance method for charging piles according to claim 1, characterized in that, The step of generating spatiotemporal impedance parameters based on the road network spatiotemporal data includes: The road network spatiotemporal data is analyzed to obtain road segment identification data, road segment distance parameters, free flow velocity parameters, and current time parameters; Based on the road segment distance parameter and the free flow speed parameter, a free flow duration parameter is generated; Based on the current time parameter, the preset peak period parameter, and the preset congestion change coefficient, a congestion probability parameter is generated; Based on the congestion probability parameter and the preset congestion weight, a congestion delay parameter is generated; Based on the road segment identification data, historical traffic flow data is obtained; The queue length parameter is determined based on the current time parameter and the historical traffic flow data; Based on the queue length parameter and the preset queue penalty coefficient, a queue delay parameter is generated; The spatiotemporal impedance parameter is generated based on the free-flow duration parameter, the congestion delay parameter, and the queuing delay parameter.

5. The scheduling and maintenance method for charging piles according to claim 1, characterized in that, The step of constructing dynamic road network data based on the spatiotemporal impedance parameters and the road network spatiotemporal data includes: The road network spatiotemporal data is analyzed to obtain road network topology data and road segment identification data; The spatiotemporal impedance parameters are matched with the road segment identification data to obtain road segment impedance mapping data; Based on the road segment impedance mapping data, the spatiotemporal impedance parameters are configured as road segment weights in the road network topology data to construct the dynamic road network data.

6. The scheduling and maintenance method for charging piles according to claim 1, characterized in that, The aforementioned collaborative scheduling model, based on the maintenance work order data, the maintenance resource data, and the dynamic road network data, obtains work order allocation data, including: The maintenance work order data is parsed to obtain work order type data, work order level parameters, work order location data, and response time limit parameters. The operation and maintenance resource data is parsed to obtain operation and maintenance personnel identification data, operation and maintenance personnel location data, personnel skill data, and personnel load parameters; Based on the work order type data, determine the skill requirement data; Based on the maintenance personnel identification data, the skill requirement data is matched with the personnel skill data to generate matching mask data; The collaborative scheduling model is invoked to generate candidate work order allocation data based on the maintenance work order data, the maintenance personnel location data, the personnel load parameters, the dynamic road network data, and the matching mask data. Based on the candidate work order allocation data, the work order location data, the maintenance personnel location data, and the dynamic road network data, generate the expected response time parameter and the travel cost parameter; Based on the expected response duration parameter and the response time limit parameter, a timeliness deviation parameter is generated; Based on the candidate work order allocation data and the work order location data, determine the spacing parameters between maintenance personnel; Based on the maintenance personnel spacing parameters and the preset conflict distance threshold, personnel conflict parameters are generated; Based on the work order level parameters, the timeliness deviation parameters, and the preset revenue weight, generate timeliness revenue parameters; The scheduling revenue parameter is obtained based on the timeliness revenue parameter, the travel cost parameter, the personnel conflict parameter, and the preset revenue weight; The candidate work order allocation data with the largest scheduling benefit parameter is determined as the work order allocation data.

7. The scheduling and maintenance method for charging piles according to claim 1, characterized in that, The step of generating initial path data based on the work order allocation data and the dynamic road network data includes: Parse the work order allocation data to obtain maintenance personnel identification data and work order identification data; Based on the maintenance personnel identification data, obtain the maintenance personnel location data from the maintenance resource data; Based on the work order identification data, obtain the work order location data from the maintenance work order data; Based on the work order allocation data, the maintenance personnel location data, the work order location data, and the dynamic road network data, determine the starting node and the target node; Based on the dynamic road network data and the spatiotemporal impedance parameters, a path from the starting node to the target node is searched to generate the initial path data.

8. The scheduling and maintenance method for charging piles according to claim 1, characterized in that, The process of receiving new maintenance work order data, generating path insertion cost parameters based on the new maintenance work order data, the dynamic road network data, and the initial path data includes: Receive the newly added maintenance work order data, parse the newly added maintenance work order data, and obtain the location data of the newly added work order; The initial path data is parsed to obtain the path node sequence data; Based on the path node sequence data and the dynamic road network data, determine the location data of adjacent node pairs; Based on the location data of the newly added work order and the location data of the adjacent node pairs, a path deviation distance parameter is generated; The initial path data whose path deviation distance parameter is less than a preset deviation distance threshold are determined as candidate path data; Based on the candidate path data, the new work order location data, and the dynamic road network data, generate the toll cost data before insertion and the toll cost data after insertion; Based on the post-insertion access cost data and the pre-insertion access cost data, a candidate insertion cost set is generated; The candidate insertion cost set is filtered to obtain the path insertion cost parameters.

9. The scheduling and maintenance method for charging piles according to claim 1, characterized in that, After updating the initial path data based on the path insertion cost parameter, the newly added maintenance work order data, and the preset cost threshold to obtain the target path data, the charging pile scheduling and maintenance method further includes: Receive post-maintenance operation data returned based on the target path data; The operational data is analyzed to obtain the operational data before maintenance; Based on the pre-maintenance operation data and the post-maintenance operation data, pre-maintenance health parameters and post-maintenance health parameters are generated respectively; Based on the health parameters before and after maintenance, generate health change parameters; Based on the post-maintenance operation data, obtain the continuous online duration parameter; Based on the health status change parameter, the continuous online duration parameter, the preset acceptance threshold, and the preset online duration threshold, work order acceptance result data is generated.

10. A storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the steps of the scheduling and maintenance method for charging piles as described in any one of claims 1 to 9.