A material data management method of a steel slag metal recovery product processing production line
By utilizing weighted impact damage time-series characteristics and a multi-objective maintenance cost matrix in a steel slag metal recycling production line, equipment maintenance and material management are optimized. This solves the problem of equipment maintenance relying on fixed cycles, achieves synergistic optimization of equipment status and material management, and reduces downtime risks and waste.
Patent Information
- Application Number
- CN202611379495.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-20
AI Technical Summary
In existing industrial data management systems, there is a lack of continuous correlation between equipment wear and material impact characteristics in steel slag metal recycling production lines. This leads to equipment maintenance relying on fixed maintenance cycles, which can easily result in parts waste and unexpected downtime risks. Furthermore, the separation of material management and maintenance arrangements makes it difficult to weigh downtime preparation costs and delayed maintenance risks on a unified scale.
By extracting continuous high-hardness pulse peaks within the sliding time window, weighted impact damage time sequence characteristics are generated. Combined with the wear resistance limit of the liner, the remaining effective processing life of the equipment is output. A multi-objective maintenance cost trade-off matrix is constructed to generate a collaborative shutdown maintenance plan. Combined with the strategic reserve gap in the intermediate silo and the speed-up feeding control command, the collaborative optimization of equipment maintenance and material management is achieved.
It enables dynamic judgment of equipment maintenance and collaborative optimization of material management, reducing the probability of unplanned downtime, empty silos, wasted component lifespan, and delivery delays, and improving the coordination and efficiency of the production line.
Smart Images

Figure CN123140937A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of industrial data management technology, and in particular to a material data management method for a steel slag metal recycling production line. Background Technology
[0002] Industrial data management technology is mainly aimed at the collection, transmission, storage, processing, association, analysis and application management of multi-source, multi-type and multi-timescale data in industrial production processes. It involves the unified organization and collaborative utilization of industrial data such as production equipment operating parameters, material flow parameters, process execution parameters, equipment status parameters, energy consumption parameters, quality inspection parameters, inventory parameters and production planning parameters.
[0003] Current industrial data management typically focuses on collecting, storing, correlating, and statistically analyzing operating parameters of production equipment, material flow parameters, process execution parameters, inventory parameters, and production planning parameters. Different types of data often serve different purposes in actual operation, such as equipment monitoring, inventory management, or production scheduling. There is a lack of continuous correlation between equipment wear status and material impact characteristics, leading to reliance on fixed maintenance cycles, cumulative operating time, or single alarm parameters for equipment maintenance decisions. When there are significant differences in hardness coefficients, processing weights, and block size distributions among batches of steel slag, the same operating time may correspond to different degrees of liner wear. Simply scheduling maintenance based on operating time can easily result in premature replacement of parts with a significant remaining lifespan, or liner wear nearing its tolerance limit before the maintenance plan expires, increasing component waste and the risk of unexpected downtime. Furthermore, traditional maintenance schedules and material management are usually formulated separately. When a single piece of equipment triggers a maintenance request, it is difficult to weigh the downtime preparation costs, losses from premature repairs of related equipment, and risks of delayed repairs on a unified scale, easily leading to multiple scattered downtimes and repeated downtime preparations and resumptions within the same production cycle. Therefore, improvements are needed. Summary of the Invention
[0004] The purpose of this invention is to address the shortcomings of existing technologies by proposing a material data management method for a steel slag metal recycling production line.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: a material data management method for a steel slag metal recycling production line, comprising the following steps:
[0006] Based on the time-series data of the processing weight, hardness coefficient, and block size distribution of each batch of materials from upstream key processing equipment, continuous high-hardness pulse peaks within the sliding time window are extracted, and weighted impact damage time-series characteristics are generated in combination with the processing weight.
[0007] Based on the weighted impact damage timing characteristics and the wear tolerance limit of the liner, the remaining effective processing life of the upstream key processing equipment is output.
[0008] The remaining effective processing life is compared with the critical warning limit to screen the equipment to be maintained and related equipment.
[0009] A multi-objective maintenance cost trade-off matrix is constructed based on the preparation loss cost, the remaining lifetime disposal cost of the associated equipment, and the unexpected downtime risk cost of the equipment to be maintained. The collaborative downtime maintenance plan is output by solving the multi-objective maintenance cost trade-off matrix.
[0010] The planned downtime duration is obtained by parsing the collaborative downtime maintenance plan. Based on the continuous production rated material consumption rate of the downstream magnetic separator, the current real-time material level of the intermediate silo, and the planned downtime duration, the strategic reserve gap of the intermediate silo is calculated.
[0011] The strategic reserve gap in the intermediate material silo is allocated to the available lead time window, and an accelerated feeding control command is generated under the constraint of not exceeding the maximum capacity limit of the upstream key processing equipment.
[0012] The upstream key processing equipment is controlled to operate according to the speed-up and feeding control command, and a dynamic balance prediction curve of the intermediate material warehouse inventory is generated by combining the feed amount of the intermediate material warehouse and the discharge amount of the downstream magnetic separator.
[0013] The dynamic balance prediction curve, the downtime axis of the collaborative downtime maintenance plan, and the order delivery node are verified. After confirming that the intermediate material warehouse has not been emptied and will not cause delivery delays, a global material maintenance linkage work order is generated.
[0014] Preferably, the step of obtaining the weighted impact damage time-series features is as follows:
[0015] Based on the time-series data of the processed weight, hardness coefficient, and block size distribution of each batch of materials from key upstream processing equipment in the steel slag metal recycling production line collected by sensors, the data is aligned point by point according to the batch number and sampling timestamp. The hardness coefficients are sorted within each sliding time window. The median of the hardness coefficients is taken and superimposed with the median of the absolute value of the relative median deviation to form a pulse discrimination benchmark. Hardness coefficient segments whose continuous sampling times all exceed the pulse discrimination benchmark are screened. The local maximum value and corresponding sampling time of each hardness coefficient segment are extracted to obtain the continuous high hardness pulse peak value.
[0016] Hardness coefficient segments other than the peak values of the continuous high-hardness pulses are extracted within the same sliding time window. The fluctuation center and dispersion amplitude of the hardness coefficient segments are statistically analyzed to form a weight benchmark for conventional stable fluctuation data. Attention weights are determined according to the amplitude, duration of sampling, and frequency of occurrence of the peak values of the continuous high-hardness pulses exceeding the pulse discrimination benchmark, and the attention weights are made greater than the weights of conventional stable fluctuation data. The corresponding batch processing weights are matched point by point, and the damage contribution is accumulated according to the square of the excess amplitude, the proportion of processing weight, and the sampling time interval to generate weighted impact damage time series features.
[0017] Preferably, the step of obtaining the remaining effective processing life is as follows:
[0018] Based on the weighted impact damage timing characteristics, the current cumulative damage value and the damage increment of adjacent sliding time windows are extracted from the upstream key processing equipment. The preset liner wear tolerance value of the corresponding upstream key processing equipment is called. The current cumulative damage value is subtracted from the liner wear tolerance value to form the remaining tolerance. It is determined whether the damage increment of adjacent sliding time windows increases continuously. If it increases continuously, the remaining tolerance is compressed according to the ratio of the damage increment before and after. If it does not increase continuously, the current attenuation scale is maintained. The attenuated remaining tolerance is divided by the most recent unit time damage increment to convert into the sustainable processing time and obtain the remaining effective processing life.
[0019] Preferably, the steps for obtaining the multi-objective maintenance cost trade-off matrix are as follows:
[0020] Call the corresponding critical warning limit for each machine, establish the correspondence between the remaining effective processing life and the critical warning limit according to the equipment number, perform life difference direction judgment for each upstream key processing equipment, mark the upstream key processing equipment whose remaining effective processing life is less than or equal to the critical warning limit as triggered warning state, filter the equipment corresponding to the triggered warning state as equipment to be maintained, and then search the upstream key processing equipment that has not triggered the warning and has a continuous material transfer relationship from the equipment connection relationship of the same production line to obtain the equipment to be maintained and the associated equipment.
[0021] The system reads the downtime preparation time, capacity loss during downtime, and recovery costs corresponding to a single production line downtime, and calculates the preparation loss cost for each item. It also reads the remaining effective processing life, component replacement time, and component unit value of the associated equipment, and calculates the remaining lifespan scrap cost based on the proportion of remaining effective processing life sacrificed for early replacement. Furthermore, it reads the delayed operation time, the decrease in remaining effective processing life, and the capacity loss caused by unexpected downtime of the equipment to be maintained, and calculates the risk cost of unexpected downtime caused by delayed equipment maintenance. Finally, it arranges three types of costs according to different combined maintenance combinations of the equipment to be maintained and the associated equipment, and constructs a multi-objective maintenance cost trade-off matrix.
[0022] Preferably, the steps for obtaining the collaborative shutdown and maintenance plan are as follows:
[0023] Read the preparation loss cost, remaining life scrap cost, and unexpected downtime risk cost for each different combined maintenance combination. Compare the cost increase and decrease directions for each combined maintenance combination. Eliminate combined maintenance combinations where none of the three types of costs improves and any cost continues to increase. For the retained combined maintenance combinations, readjust the maintenance affiliation and downtime batch of the associated equipment. Repeat the calculation of the three types of costs and update the multi-objective maintenance cost trade-off matrix until the retained combined maintenance combinations no longer change after two consecutive rounds. Select the combination with the minimum total downtime cost from the retained results that satisfies the requirement that the equipment to be maintained must enter the maintenance batch. Determine whether the associated equipment should be merged into the maintenance batch of the equipment to be maintained and generate a collaborative downtime maintenance plan.
[0024] Preferably, the step of obtaining the strategic reserve gap of the intermediate silo is as follows:
[0025] According to the collaborative shutdown maintenance plan, the shutdown timeline is analyzed item by item according to the shutdown start time, maintenance operation end time and production resumption time recorded in the plan. The shutdown start time is used as the continuous timing start point and the production resumption time is used as the continuous timing end point. It is checked whether the maintenance operation end time is within the time range from the shutdown start time to the production resumption time. If the maintenance operation end time is outside the time range, the continuous timing end point is adjusted according to the production resumption time. The continuous time length between the continuous timing start point and the continuous timing end point is calculated to obtain the planned shutdown maintenance duration.
[0026] Read the continuous production rated material consumption rate of the downstream magnetic separator, divide the continuous time segment covered by the planned shutdown maintenance duration into equally spaced consumption segments, convert the continuous production rated material consumption rate corresponding to each consumption segment into segment material consumption, continuously accumulate the material consumption of all segments in chronological order to obtain the total material consumption during the shutdown period, read the current real-time material level of the intermediate silo, deduct the available material quantity corresponding to the current real-time material level from the total material consumption during the shutdown period, and reset the calculation result less than zero to zero to obtain the strategic reserve gap of the intermediate silo.
[0027] Preferably, the step of obtaining the accelerated feeding control command is as follows:
[0028] The system reads the available lead time window that allows for continuous production before the planned shutdown time. This window is then divided into multiple continuous feeding segments based on time sequence. The system reads the current processing load and maximum capacity limit of the upstream key processing equipment within each continuous feeding segment. It calculates the escalable load after subtracting the current processing load from the maximum capacity limit. The strategic reserve gap in the intermediate material silo is allocated segment by segment starting from the continuous feeding segment closest to the planned shutdown time. Each allocation amount does not exceed the escalable load of the corresponding continuous feeding segment. If there is still an unallocated gap after allocation, the allocation continues to the previous continuous feeding segment until the strategic reserve gap in the intermediate material silo is fully covered. An accelerated feeding control command is then generated based on the determined escalation load, execution time period, and corresponding upstream key processing equipment for each continuous feeding segment.
[0029] Preferably, the steps for obtaining the global material maintenance linkage work order are as follows:
[0030] According to the speed-up and feeding control command, the speed-up start time, speed-up end time, target processing load, and feeding execution order of the upstream key processing equipment are read one by one. The upstream key processing equipment is controlled to operate within the corresponding execution period. The material level sensor collects the feed amount of the intermediate silo and the discharge amount of the downstream magnetic separator according to the unified sampling timestamp. The intermediate silo inventory at the starting time is used as the calculation basis. The inventory increase or decrease after deducting the discharge amount of the downstream magnetic separator from the feed amount of the intermediate silo is calculated at each sampling interval. The intermediate silo inventory at each sampling time is continuously updated in time order. The intermediate silo inventory values corresponding to each sampling time are connected to generate a dynamic balance prediction curve.
[0031] The shutdown start time, shutdown end time, and production resumption time in the collaborative shutdown maintenance plan are read. The dynamic balance prediction curve segment corresponding to the shutdown start time to shutdown end time is extracted point by point. It is determined whether the intermediate material warehouse inventory at each sampling time is greater than the emptying judgment lower limit. Then, the order delivery nodes of the production line are read in chronological order. The production resumption time and subsequent production recovery progress are checked to see if they exceed the corresponding order delivery nodes. If the intermediate material warehouse inventory within the shutdown time range is greater than the emptying judgment lower limit, and the production completion time corresponding to each order does not exceed the order delivery node, the verification result is obtained that the intermediate material warehouse inventory has not been emptied during the shutdown and has not caused delivery delays.
[0032] Based on the verification results that the intermediate material warehouse inventory was not emptied during the shutdown period and did not cause delivery delays, the upstream key processing equipment number, acceleration execution period, target processing load, and material feeding execution order are extracted from the acceleration feeding control command. The equipment to be maintained, associated equipment, shutdown start time, shutdown end time, and maintenance batch are extracted from the collaborative shutdown maintenance plan. The same equipment number and corresponding execution period are bound in chronological order. The acceleration feeding execution content before shutdown is arranged before the shutdown maintenance execution content. The acceleration end time is verified to be no later than the shutdown start time. The equipment operation control content, shutdown maintenance content, and corresponding time nodes are uniformly encapsulated to generate a global material maintenance linkage work order.
[0033] Compared with the prior art, the advantages and positive effects of the present invention are as follows:
[0034] In this invention, by temporally correlating the processing weight, hardness coefficient, and block size distribution of each batch of materials in upstream key processing equipment, the continuous hardness pulse peaks within the sliding time window are distinguished from ordinary fluctuations. Combined with the processing weight, a weighted impact damage temporal characteristic is formed, enabling equipment wear assessment to simultaneously reflect the combined effects of material impact intensity, impact duration, and actual processing load on liner consumption. Furthermore, correlating the weighted impact damage temporal characteristic with liner wear tolerance limits transforms previously dispersed material parameters into remaining effective processing life that characterizes the equipment's remaining load-bearing capacity. This shifts maintenance judgment from relying solely on fixed cycles or single operating parameters to dynamic judgment based on the actual cumulative impact state of materials. Further, comparing the remaining effective processing life with critical warning limits identifies related equipment while screening equipment to be maintained. The preparation loss cost, the remaining lifespan disposal cost of related equipment, and the risk cost of unexpected downtime of the equipment to be maintained are all placed in a unified trade-off. This ensures that downtime maintenance is no longer limited to the local optimization of a single piece of equipment but comprehensively considers the wasted lifespan caused by premature maintenance and the downtime risk caused by delayed maintenance, thus forming a collaborative downtime arrangement for the entire production line. Based on the collaborative shutdown maintenance plan, the planned shutdown duration is further analyzed. Combined with the downstream magnetic separator's continuous production rated material consumption rate and the current real-time material level in the intermediate silo, the strategic reserve gap in the intermediate silo is calculated. This allows for further mapping of equipment maintenance needs into actual material support needs during shutdown. The strategic reserve gap in the intermediate silo is then allocated in reverse to the available lead time window. Under the constraint of the maximum capacity limit of upstream key processing equipment, an accelerated feeding control command is generated, ensuring that the production load adjustment before shutdown has clear reserve targets and capacity boundaries. By continuously extrapolating changes in intermediate silo inventory based on the intermediate silo feed rate and the downstream magnetic separator discharge rate, and verifying the dynamic balance prediction curve against the shutdown time axis and order delivery nodes, the continuous material supply capacity and order fulfillment capacity can be simultaneously verified before executing shutdown maintenance. This creates a continuous closed loop between equipment status, maintenance costs, material inventory, production load, and delivery nodes, reducing the probability of unplanned shutdowns, silo emptying, excessive material preparation, wasted component life, and delivery delays. This improves the synergy between maintenance decisions and material organization in the steel slag metal recycling production line. Attached Figure Description
[0035] Figure 1 A schematic diagram of continuous high-hardness pulse peaks;
[0036] Figure 2 This is a schematic diagram of the dynamic balance prediction curve for intermediate material warehouse inventory. Detailed Implementation
[0037] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0038] Please see Figure 1-2 This invention provides a technical solution: a material data management method for a steel slag metal recycling production line, comprising the following steps:
[0039] Based on the time-series data of the processing weight, hardness coefficient, and block size distribution of each batch of materials from upstream key processing equipment, continuous high-hardness pulse peaks within the sliding time window are extracted, and weighted impact damage time-series characteristics are generated by combining the processing weight; based on the weighted impact damage time-series characteristics and the wear tolerance limit of the liner, the remaining effective processing life of the upstream key processing equipment is output.
[0040] The remaining effective processing life is compared with the critical warning limit to screen the equipment to be maintained and related equipment; a multi-objective maintenance cost trade-off matrix is constructed based on the preparation loss cost, the remaining life scrap cost of related equipment, and the unexpected downtime risk cost of the equipment to be maintained; the multi-objective maintenance cost trade-off matrix is solved to output a collaborative downtime maintenance plan.
[0041] The system analyzes the collaborative shutdown and maintenance plan to obtain the planned shutdown duration. Based on the continuous production rated material consumption rate of the downstream magnetic separator, the current real-time material level of the intermediate silo, and the planned shutdown duration, it calculates the strategic reserve gap of the intermediate silo. The strategic reserve gap of the intermediate silo is allocated to the available lead time window, and an acceleration feeding control command is generated under the constraint of not exceeding the maximum capacity limit of the upstream key processing equipment.
[0042] The upstream key processing equipment is controlled according to the speed-up feeding control command. The dynamic balance prediction curve of the intermediate material warehouse inventory is generated by combining the feeding amount of the intermediate material warehouse and the discharge amount of the downstream magnetic separator. The dynamic balance prediction curve, the downtime axis of the collaborative shutdown maintenance plan and the order delivery node are checked. After confirming that the intermediate material warehouse inventory has not been emptied and will not cause delivery delays, a global material maintenance linkage work order is generated.
[0043] The steps for obtaining the weighted impact damage time-series characteristics are as follows:
[0044] Based on the time-series data of the processed weight, hardness coefficient, and block size distribution of each batch of materials from key upstream processing equipment in the steel slag metal recycling production line collected by sensors, the data is aligned point by point according to the batch number and sampling timestamp. The hardness coefficients are sorted within each sliding time window. The median of the hardness coefficients is taken and superimposed with the median of the absolute value of the relative median deviation to form a pulse discrimination benchmark. Hardness coefficient segments whose continuous sampling times all exceed the pulse discrimination benchmark are screened. The local maximum value and corresponding sampling time of each hardness coefficient segment are extracted to obtain the continuous high hardness pulse peak value.
[0045] Hardness coefficient segments other than the peak values of continuous high-hardness pulses are extracted within the same sliding time window. The fluctuation center and dispersion amplitude of the hardness coefficient segments are statistically analyzed to form a weight benchmark for conventional stable fluctuation data. Attention weights are determined according to the amplitude, duration of continuous sampling, and frequency of occurrence of the peak values of continuous high-hardness pulses exceeding the pulse discrimination benchmark. The attention weights are made greater than the weights of conventional stable fluctuation data. The corresponding batch processing weights are matched point by point, and the damage contribution is accumulated according to the square of the excess amplitude, the proportion of processing weight, and the sampling time interval to generate weighted impact damage time series features.
[0046] Specifically, based on the obtained processing weight, hardness coefficient, and block size distribution time series data, a sampling index is established according to the same batch number. Then, the three types of data are placed at the same sampling position according to the sampling timestamp. For positions lacking corresponding values at the same time, the time interpolation result between two adjacent valid sampling points is used. Within each sliding time window, the hardness coefficients are arranged from smallest to largest. The median is read, and the absolute deviation of each hardness coefficient relative to the median is calculated. The median of the absolute deviations is then read, and the two are added together as the pulse discrimination benchmark for that window. In the example, the median hardness coefficient within the calibration window is 1.18, and the median absolute deviation is... At 0.09, the pulse discrimination benchmark is set to 1.27. The actual benchmark is updated with the window data. The sliding time window length is determined by the shortest high-hardness impact duration in the known abnormal wear records of the liner and the sampling interval, ensuring that one window covers at least one complete impact segment. The window step size is one sampling interval. Then, by comparing the historical normal operation segments with the abnormal segments before maintenance, the window length with the fewest false triggers in the normal segment and the fewest missed triggers in the abnormal segment is taken as the window setting for this equipment. The continuous sampling length is converted according to the shortest effective impact duration in the historical abnormal segments. In the example, the sampling interval is 0.1. When the confirmed shortest duration of effective impact is 0.4 s, four sampling points are taken for the corresponding continuous judgment length. The hardness coefficient is checked point by point to see if it is higher than the pulse discrimination benchmark of the window. Only the super-benchmark segment whose continuous length reaches the continuous judgment length is retained. For each retained segment, the sampling point with the largest hardness coefficient is taken as the local maximum value. If multiple adjacent sampling points are the same maximum value, the point corresponding to the earliest sampling time is taken. The processing weight and block size distribution at that time are synchronously associated. The local maximum values of each retained segment and the corresponding sampling time are summarized to obtain the continuous high hardness pulse peak value.
[0047] Based on the obtained continuous high-hardness pulse peak values, sampling positions covered by pulse segments are excluded within the same sliding time window. The median of the remaining hardness coefficients is taken as the center of normal fluctuation. The median of the absolute deviation is calculated as the discrete amplitude. The discrete amplitude is divided by the center of normal fluctuation to form a dimensionless fluctuation ratio. The median of the fluctuation ratio between the stable window and all windows in the same period after the most recent liner replacement and before the first abnormal inspection is taken. The median of the stable window is divided by the sum of the two medians to obtain the weight benchmark of the normal stable fluctuation data. In the example, when the two medians are 0.08 and 0.20, the weight benchmark is 0.286. For each high-hardness pulse, the proportion of the peak value exceeding the pulse discrimination benchmark, the proportion of the continuous sampling length to the number of sampling points in the window, and the proportion of the pulse occurrence times multiplied by the minimum continuous judgment length are calculated. The proportion of the number of sampling points in the window yields the relative overshoot, duration proportion, and frequency proportion from 0 to 1. Non-negative least squares regression is performed using these three proportions from historical maintenance records and the contemporaneous liner thickness loss. The three regression coefficients are divided by the sum of the coefficients to obtain the amplitude weight coefficient, duration weight coefficient, and frequency weight coefficient. When the calibration results in the example are 0.50, 0.30, and 0.20, these proportions are used. The three proportions are summed according to their corresponding weight coefficients, and interpolated within the weighted range of the regular stable fluctuation data from the baseline to 1. In the example, when the relative overshoot, duration proportion, and frequency proportion are 0.25, 0.20, and 0.10 respectively, the attention weight is set to 0.432. The weights are recalculated pulse by pulse. The processing weight proportion is formed by dividing the batch processing weight by the median batch processing weight in the stable operating segment, and then... Cumulative damage contribution, of which, This represents the weighted impact damage value for the current sliding time window. This represents the number of high-hardness pulses within the window. Represents the pulse sequence number. Representing the Attention weights for each pulse, Representing the The relative overshoot of each pulse, This represents the corresponding weight percentage to be processed. Represents the pulse duration. Represents the duration of the sliding time window, connecting the windows in chronological order. Generate weighted impact damage time-series features.
[0048] The steps to obtain the remaining effective processing life are as follows:
[0049] Based on the weighted impact damage time sequence characteristics, the current cumulative damage value and the damage increment of adjacent sliding time windows are extracted from the upstream key processing equipment. The preset liner wear tolerance value of the corresponding upstream key processing equipment is called. The remaining tolerance is formed by subtracting the current cumulative damage value from the liner wear tolerance value. It is determined whether the damage increment of adjacent sliding time windows increases continuously. If it increases continuously, the remaining tolerance is compressed according to the ratio of the damage increment before and after. If it does not increase continuously, the current attenuation scale is maintained. The attenuated remaining tolerance is divided by the most recent unit time damage increment to convert into the sustainable processing time and obtain the remaining effective processing life.
[0050] Specifically, based on the obtained weighted impact damage time series characteristics, the current cumulative damage value is obtained by accumulating the damage values of each sliding time window according to the equipment number, and the damage increment of adjacent windows is read. The wear tolerance limit of the liner is established by establishing a correspondence between the measured remaining thickness of the same model liner during previous maintenance and the cumulative damage value during the same period. The minimum allowable liner thickness specified in the equipment manufacturing data is read, and two sets of records closest to the upper and lower sides of this thickness are selected from the historical correspondence for linear interpolation. The cumulative damage value corresponding to the minimum allowable thickness is set as the wear tolerance limit of the liner. In the example calibration, the two measured remaining thicknesses were 20 mm and 18 mm, respectively. When the thickness is mm, the corresponding cumulative damage values are 0.82 and 0.87 respectively, and the minimum allowable thickness in the manufacturing data is 19 mm, the interpolation yields a liner wear tolerance limit of 0.845. The actual limit is recalibrated for each piece of equipment. The number of continuously increasing judgment windows is taken as the lower quartile of the number of continuous windows in the accelerated damage increment section before the historical maintenance, rounded up. When the calibration result of the example is 3 windows, the damage increment of 3 consecutive adjacent windows increases sequentially, which is judged as continuously increasing. The current remaining tolerance is obtained by subtracting the current cumulative damage value from the liner wear tolerance limit. When the condition of continuously increasing is met, it is calculated as follows: Forming a decay scale, wherein, Represents the current decay scale. This represents the damage increment from the previous sliding time window. This represents the damage increment within the current sliding time window. The smaller of the two values is taken. If the continuous increase condition is not met, the decay scale of the previous window is used. The damage increment per unit time of the most recent window is the same number of the total damage increments of the most recent windows divided by the corresponding total time, and then... Converting to sustainable processing time, among which, Represents the remaining effective processing life. This represents the wear resistance limit of the liner. Represents the current cumulative damage value. Represents the current decay scale. This represents the recent unit time damage increment, yielding the remaining effective processing life.
[0051] The steps to obtain the multi-objective maintenance cost trade-off matrix are as follows:
[0052] Call the corresponding critical warning limit for each machine, establish the correspondence between the remaining effective processing life and the critical warning limit according to the equipment number, perform life difference direction judgment for each upstream key processing equipment, mark the upstream key processing equipment whose remaining effective processing life is less than or equal to the critical warning limit as the triggered warning state, filter the equipment corresponding to the triggered warning state as the equipment to be maintained, and then search the upstream key processing equipment that has not triggered the warning and has a continuous material transfer relationship from the equipment connection relationship of the same production line to obtain the equipment to be maintained and the associated equipment.
[0053] The system reads the downtime preparation time, capacity loss during downtime, and recovery costs for each production line downtime, and calculates the preparation loss cost for each downtime item. It also reads the remaining effective working life of related equipment, the replacement time of parts, and the unit value of parts, and calculates the remaining lifespan scrap cost according to the proportion of remaining effective working life sacrificed by early replacement. Then, it reads the delayed running time of the equipment to be maintained, the decrease in remaining effective working life, and the capacity loss caused by unexpected downtime, and calculates the risk cost of unexpected downtime caused by delayed maintenance. The system arranges three types of costs according to different combined maintenance combinations of the equipment to be maintained and related equipment, and constructs a multi-objective maintenance cost trade-off matrix.
[0054] Specifically, based on the obtained remaining effective processing life, maintenance preparation data for each upstream key processing equipment is retrieved according to equipment number. Critical warning limits are jointly determined by spare parts arrival time, shutdown preparation time, planned maintenance time, and planned execution deviation buffer time. Spare parts arrival time is taken from the current effective procurement and delivery cycle; shutdown preparation time is taken from the median duration of the most recent similar shutdown record; planned maintenance time is taken from the larger of the standard working hours of the corresponding maintenance item and the actual working hours of the most recent similar maintenance; and planned execution deviation buffer time is taken from the 90th percentile of the delay between the actual end time and the planned end time of the most recent complete maintenance cycle for the same type of maintenance. Critical early warning limits are established, among which, This represents the critical warning limit. This represents the time it takes for spare parts to arrive. This represents the preparation time for the shutdown organization. This represents the planned maintenance time. The buffer period for deviations in the planned execution is represented by the following data. In the example settings, the four data items are set to 3 days, 0.5 days, 1 day, and 0.5 days respectively. The corresponding critical warning limit is 5 days. In actual use, the corresponding data is reread for each device. Devices with remaining effective processing life less than or equal to the critical warning limit are marked as triggering the warning state and included in the devices to be maintained. Then, according to the actual material connection relationship, it is checked whether the device outlet enters the next device inlet through the same conveyor belt, chute, or feeding channel. The material transfer path is continuously tracked along the device to be maintained. Upstream key processing devices that have not triggered the warning and have no intermediate inventory barriers between them and the device to be maintained are selected. If there is a silo in the middle that can independently maintain downstream production, the tracking is terminated at the location of the silo. The devices to be maintained and related devices are then summarized.
[0055] Based on the identified equipment to be maintained and related equipment, establish merged maintenance combinations one by one. Read the downtime preparation time, downtime capacity loss, recovery costs, remaining effective processing life of related equipment, planned component replacement time, component unit value, extended operating time of the equipment to be maintained, and unexpected downtime capacity loss. The unit downtime cost is calculated by dividing fixed labor and auxiliary energy costs within the most recent settlement period by the effective downtime. The unit capacity loss value is calculated as the weighted average of the contribution of qualified products per unit of currently unfulfilled orders. The unit recovery cost is calculated as the average of the converted amounts of consumables, electricity, and scrap materials in the most recent similar start-up records. Calculate the preparation loss cost, where, This represents the cost of preparing for losses. Represents the unit's downtime cost. This represents the downtime preparation time. Value of loss per unit of production capacity This represents the amount of production capacity lost during the downtime. The cost incurred by the representative unit in resuming operations, The remaining lifespan of associated equipment is calculated as the proportion of the remaining effective working life at the point of early replacement to the median lifespan of the most recent complete service life of components of the same model. The combined remaining lifespan disposal cost is calculated based on... Calculate, where, Representing the The remaining life-cycle disposal cost of a combined maintenance unit. Represents the combination number. This represents the set of associated devices that were replaced in advance within the group. Represents the sequence number of the associated device within the set. Representing the Unit value of related equipment components in Taiwan Representing the proportion of its remaining lifespan, the probability of unexpected downtime risk is set according to the frequency of conditional failures of the same model of equipment within the same quartile of the remaining effective working life in the historical data. In the example, when two unexpected downtimes occur within 20 comparable delayed operation records, the probability of risk is taken as 0.10. This probability of risk is multiplied by the sum of the corresponding unexpected downtime capacity loss and the median value of the historical emergency repair cost for the same type of failure, and then accumulated for the delayed maintenance equipment in the combination to obtain the unexpected downtime risk cost. The costs are arranged into three categories according to each combined maintenance combination to construct a multi-objective maintenance cost trade-off matrix.
[0056] The steps to obtain the collaborative shutdown and maintenance plan are as follows:
[0057] Read the preparation loss cost, remaining life scrap cost, and unexpected downtime risk cost for each different combined maintenance combination. Perform a cost increase / decrease comparison for each combined maintenance combination. Eliminate combined maintenance combinations where none of the three types of costs improves and any cost continues to increase. For the retained combined maintenance combinations, readjust the maintenance affiliation and downtime batch of the associated equipment. Repeat the calculation of the three types of costs and update the multi-objective maintenance cost trade-off matrix until the retained combined maintenance combinations no longer change after two consecutive rounds. Select the combination with the minimum total downtime cost from the retained results that satisfies the requirement that the equipment to be maintained must enter the maintenance batch. Determine whether the associated equipment should be merged into the maintenance batch of the equipment to be maintained and generate a collaborative downtime maintenance plan.
[0058] Specifically, based on the constructed multi-objective maintenance cost trade-off matrix, the preparation loss cost, remaining life scrap cost, and unexpected downtime risk cost of each combined maintenance combination are read row by row. Any two combined maintenance combinations are then compared in the same direction. and These represent two combined maintenance combinations to be compared. The costs of all three types are no higher than those of the combination. And at least one type has a lower cost than the combination Then remove the combination. All three types of costs are converted to monetary amounts using the aforementioned method and then compared. For each retained combination, the maintenance batch to which the associated equipment belongs is checked. One associated equipment is then successively merged into the maintenance batch of the equipment to be maintained, retained in the original maintenance batch, or moved to an adjacent executable maintenance batch. For each change of attribution, the corresponding number of downtimes, advance replacement time, and delay duration are re-read. The three types of costs are then updated according to the calculation methods of preparation loss cost, remaining life scrap cost, and unexpected downtime risk cost. The executable range of the maintenance batch is read from the time intervals allowed for downtime in the existing production schedule. After completing one round of adjustments to all associated equipment, the allocation decision is re-executed. The equipment number, maintenance attribution, and downtime batch of the retained combination in this round are compared item by item with those of the previous round. The update stops when two consecutive rounds are completely consistent. In this example, both the previous and current rounds involve retained combinations. The candidate set is considered stable when the equipment ownership and maintenance batch of all three combinations are consistent. , , These represent three retained combined maintenance combinations, and the final retained combination is determined according to... Calculate the total downtime cost, where, Representing the Total downtime cost of each retained portfolio This represents the cost of preparing for losses. Represents the cost of disposal over the remaining lifespan. Represents the cost of unexpected downtime risk. The system retains the combination number, first eliminating combinations that do not include all the equipment to be maintained, then selecting the combination with the lowest total downtime cost. If the total downtime costs are the same, combinations with fewer downtime batches and lower unexpected downtime risk costs are selected in sequence. The system then determines whether related equipment should be included in the maintenance batch of the equipment to be maintained and generates a collaborative downtime maintenance plan.
[0059] The steps for obtaining the strategic reserve gap in intermediate material silos are as follows:
[0060] According to the collaborative shutdown and maintenance plan, the shutdown timeline is analyzed item by item according to the shutdown start time, maintenance operation end time and production resumption time recorded in the plan. The shutdown start time is used as the continuous timing start point and the production resumption time is used as the continuous timing end point. It is checked whether the maintenance operation end time is within the time range from the shutdown start time to the production resumption time. If the maintenance operation end time is outside the time range, the continuous timing end point is adjusted according to the production resumption time. The continuous time length between the continuous timing start point and the continuous timing end point is calculated to obtain the planned shutdown maintenance duration.
[0061] Read the continuous production rated material consumption rate of the downstream magnetic separator, divide the continuous time segment covered by the planned shutdown maintenance duration into equally spaced consumption segments, convert the continuous production rated material consumption rate corresponding to each consumption segment into segment material consumption, continuously accumulate the material consumption of all segments in chronological order to obtain the total material consumption during the shutdown period, read the current real-time material level of the intermediate silo, deduct the available material quantity corresponding to the current real-time material level from the total material consumption during the shutdown period, and reset the calculation result less than zero to zero to obtain the strategic reserve gap of the intermediate silo.
[0062] Specifically, based on the obtained collaborative shutdown and maintenance plan, the shutdown start time, maintenance end time, and production resumption time are read by maintenance batch and converted into continuous timestamps in the same time zone according to a unified production calendar. The shutdown start time is taken from the time corresponding to the first upstream critical processing equipment to enter the shutdown state in the plan. The production resumption time is taken from the planned time when the last piece of equipment in the maintenance batch completes the start-up check and is allowed to resume material handling. The maintenance end time is taken from the planned time when all maintenance tasks are completed. The priority relationship of the three times is checked first. If the shutdown start time is earlier than or equal to the maintenance end time and the maintenance end time is earlier than or equal to the production resumption time, the three times recorded in the plan are retained. When the end time of maintenance work is later than the time of resumption of production, the maintenance task completion record and resumption of production constraint of the same maintenance batch are read. If there is a conflict in the order of plan entry, the continuous timing endpoint is kept as the time of resumption of production and the end time of maintenance work is limited to the time of resumption of production. The time exceeding the time of resumption of production is not included in the downtime maintenance duration. When the end time of maintenance work is earlier than the start time of shutdown, the maintenance batch is returned to recheck the batch to which the maintenance task belongs before entering the time statistics. Then, starting from the start time of shutdown, the time is continuously accumulated according to the minimum time granularity used in the production schedule until the time of resumption of production. The minimum time granularity of the production schedule is read from the shortest schedulable time interval in the current production line schedule. If the schedule is updated in 5 minutes, the time is continuously counted in 5 minutes. If the schedule is updated in 1 minute, the time is continuously counted in 1 minute. When crossing shifts or dates, the time is still accumulated continuously. Trial production sections that are clearly not in the shutdown state in the plan are deducted, and start-up inspection sections where the equipment is still stopped from material handling are retained. The total length of each continuous timing section is summarized to obtain the planned downtime maintenance duration.
[0063] Based on the planned downtime duration, the rated continuous production material consumption rate corresponding to the current production plan of the downstream magnetic separator is read. The downtime start time to production resumption time is divided into equally spaced consumption segments according to the minimum time granularity of the production line schedule. The rated continuous production material consumption rate is first read from the rated processing rate corresponding to the current feed size range in the equipment manufacturing data, and then from the median of the actual continuous processing rate of the most recent complete production shift without downtime or protection actions. The lower of the two is taken. In the example setting, with manufacturing data of 80 t / h and the median actual continuous processing rate of the most recent production shift of 76 t / h, the rated continuous production material consumption rate is taken as 76 t / h. The actual settings are updated according to the current feed conditions and the most recent complete production shift. Each consumption segment is then processed according to... Total material consumption during the cumulative downtime, of which... This represents the total material consumption during the downtime. This represents the total number of segments consumed during the planned downtime. Represents the consumption segment number. Representing the The rated material consumption rate for continuous production in each consumption section. Representing the For each consumption segment duration, the current real-time material level in the intermediate silo is converted to the current available material quantity according to the existing material level and available material quantity calibration relationship. The calibration relationship is established by creating a segmented linear correspondence between the silo empty base point, the known batch weighing and feeding quantities, and the synchronous material level reading. The segment nodes are taken as the measured material level after each known weighing and feeding, and then... A gap was obtained, among which, This represents the strategic reserve gap in intermediate material warehouses. This represents the total material consumption during the downtime. This represents the available material quantity calculated from the current real-time material level. The larger of the two values is taken to obtain the strategic reserve gap in the intermediate silo.
[0064] The steps for obtaining the speed-up feeding control command are as follows:
[0065] The system reads the available lead time window that allows for continuous production before the planned shutdown time. This window is then divided into multiple continuous feeding segments based on time sequence. The system reads the current processing load and maximum capacity limit of the upstream key processing equipment within each continuous feeding segment. It calculates the escalable load after subtracting the current processing load from the maximum capacity limit. The strategic reserve gap in the intermediate material silo is then allocated segment by segment, starting from the continuous feeding segment closest to the planned shutdown time. Each allocation amount does not exceed the escalable load of the corresponding continuous feeding segment. If there is still an unallocated gap after allocation, the allocation continues to the previous continuous feeding segment until the strategic reserve gap in the intermediate material silo is fully covered. Accelerated feeding control commands are then generated based on the determined escalation load, execution time period, and corresponding upstream key processing equipment for each continuous feeding segment.
[0066] Specifically, based on the obtained strategic reserve gap in the intermediate silo, the continuous production sections that have not been scheduled for shutdown, liner replacement, material switching, or order-related production restrictions before the planned shutdown time are identified. Available lead time windows are determined, and then continuous feeding sections are divided according to the minimum time granularity of the schedule. The current processing load is read for each section. The maximum capacity limit is the minimum value of three factors: the rated processing capacity from the equipment manufacturing data, the highest alarm-free percentile of historical stable load, and the allowable load corresponding to the current protection setting. The highest alarm-free percentile is determined by replaying the load and recordings of motor overload protection and bearing overtemperature protection. In the example replay, when there are no alarms below the 95th percentile and alarms occur at higher percentiles, the 95th percentile is used. The allowable load corresponding to the protection setting is the protection boundary load from the commissioning and debugging records. In the example, when the three factors are 120 t / h, 114 t / h, and 116 t / h respectively, the maximum capacity limit is 114 t / h. The process is then carried out section by section. The convertible increase is calculated, among which, Representing the The amount of material that can be increased in a continuous feeding section This represents the maximum production capacity limit for this section. Represents the current processing load. This represents the duration of that segment. Representing the continuous feeding section sequence number, it is assigned in reverse order from the section closest to the planned shutdown time. Determine the allocation of the sections, where, Representing the The actual allocation gap in each section This represents the strategic reserve gap in intermediate silos that was not yet covered before allocation. The meaning is the same as described above. The smaller of the two values is taken, and the allocation amount is divided by the segment duration and the current processing load is added to form the target processing load. The allocation is carried out forward until the strategic reserve gap in the intermediate silo is fully covered. Acceleration feeding control instructions are formed according to equipment number, load increase, execution time period and feeding execution order.
[0067] The steps to obtain a global material maintenance linkage work order are as follows:
[0068] According to the speed-up and feeding control command, the speed-up start time, speed-up end time, target processing load and feeding execution order of the upstream key processing equipment are read one by one. The operation of the upstream key processing equipment is controlled within the corresponding execution period. The material level sensor collects the feed amount of the intermediate silo and the discharge amount of the downstream magnetic separator according to the unified sampling timestamp. The intermediate silo inventory at the starting time is used as the calculation basis. The inventory increase or decrease after deducting the discharge amount of the downstream magnetic separator from the feed amount of the intermediate silo is calculated at each sampling interval. The intermediate silo inventory at each sampling time is continuously updated in time order. The intermediate silo inventory values corresponding to each sampling time are connected to generate a dynamic balance prediction curve.
[0069] Read the shutdown start time, shutdown end time, and production resumption time from the collaborative shutdown maintenance plan. Extract the dynamic balance prediction curve segment corresponding to the shutdown start time to shutdown end time point by point. Determine whether the intermediate material warehouse inventory at each sampling time is greater than the lower limit for emptying judgment. Then, read the order delivery nodes of the production line in chronological order and check whether the production resumption time and subsequent production recovery progress exceed the corresponding order delivery node. If the intermediate material warehouse inventory within the shutdown time range is greater than the lower limit for emptying judgment, and the production completion time corresponding to each order does not exceed the order delivery node, the verification result is obtained that the intermediate material warehouse inventory was not emptied during the shutdown and did not cause delivery delay.
[0070] Based on the verification results that the intermediate material warehouse inventory was not emptied during the shutdown and did not cause delivery delays, the upstream key processing equipment number, acceleration execution period, target processing load, and material feeding execution order were extracted from the acceleration feeding control command. The equipment to be maintained, related equipment, shutdown start time, shutdown end time, and maintenance batch were extracted from the collaborative shutdown maintenance plan. The same equipment number and corresponding execution period were bound in chronological order. The acceleration feeding execution content before shutdown was arranged before the shutdown maintenance execution content. The acceleration end time was verified to be no later than the shutdown start time. The equipment operation control content, shutdown maintenance content, and corresponding time nodes were uniformly encapsulated to generate a global material maintenance linkage work order.
[0071] Specifically, based on the obtained speed-up and feeding control instructions, the start time, end time, target processing load, and feeding execution order of the speed-up are read sequentially according to the upstream key processing equipment number. The equipment feeding setpoints are updated according to the execution period. The target processing load adopts the value determined in the speed-up and feeding control instructions and is limited by the maximum capacity limit of the corresponding equipment. The unified sampling timestamp adopts the minimum stable sampling interval common to the three types of records: intermediate silo level, upstream feed metering, and downstream magnetic separator discharge metering. If the original sampling intervals are different, they are aligned according to the slower sampling interval and the material quantity within the faster sampling interval is accumulated without interpolation to generate the material quantity. The initial inventory is calculated from the real-time level of the intermediate silo at the start of the calculation according to the existing level and available material quantity calibration relationship, and then calculated according to the discrete material conservation relationship. Inventory is updated at sampling intervals, where, Representing the Intermediate material warehouse inventory at each sampling time This represents the intermediate material warehouse inventory at the previous sampling time. Representing the The amount of material entering the intermediate silo within each sampling interval. Representing the The amount of material discharged from the downstream magnetic separator within each sampling interval. The sampling time sequence is arranged chronologically. For sampling segments that have already occurred, the actual recorded feed and discharge rates are used. For sampling segments that have not yet occurred but are within the execution period of the speed-up feeding control command, the target processing load is multiplied by the corresponding sampling interval to obtain the planned feed rate, and the planned discharge rate is calculated using the rated material consumption rate of the downstream magnetic separator during continuous production. Each time a new actual sampling segment is obtained, the corresponding planned value is replaced with the actual value. Starting from the simulation start time, each sampling segment is connected chronologically. At the corresponding points, a dynamic equilibrium prediction curve is generated.
[0072] Based on the obtained dynamic balance prediction curve and collaborative shutdown maintenance plan, the shutdown start time and shutdown end time are read, and all inventory sampling points corresponding to the shutdown start time to shutdown end time are extracted. The lower limit for emptying judgment is calculated based on the minimum material level required to maintain continuous discharge from the intermediate silo outlet, the upper limit of the bottom blind zone of the material level sensor, and the material quantity required for the minimum time granularity of one cycle of the downstream magnetic separator. The maximum value is taken after converting these three items into inventory quantity. The minimum material level is read from the silo design data, the upper limit of the bottom blind zone of the sensor is read from the sensor calibration record, and the required material quantity for the downstream is calculated based on the rated material consumption rate of continuous production and the minimum time granularity of the cycle. In the example settings, when the three converted inventory quantities are 6 t, 4.5 t, and 5.2 t respectively, the lower limit for emptying judgment is 6 t. The actual settings are updated according to the corresponding data. For each segment, the dynamic balance forecast curve inventory value is compared with the lower limit for emptying judgment. If any sampling point is less than or equal to this lower limit, it is judged as having an emptying risk. If all sampling points are higher than this lower limit, the order delivery node is read again. For each incomplete order, the sequence of completed quantity before shutdown, remaining order quantity, and planned output after production resumption is read, and then... Determine the order completion time, among which, Representing the The predicted production completion time for each order. This means selecting the earliest time from the candidate times that satisfy the conditions within the parentheses. Representing the first day after production resumed Each scheduling time, Represents the scheduling time sequence number. Represents the cumulative production segment number. Representing the The order in the 1st The planned completion amount for each section Representing the The remaining order quantity before the shutdown began. Representing the order sequence number, the predicted production completion time of each order is compared with the corresponding order delivery date. If all the predicted completion times are not later than the corresponding order delivery date, the verification result is obtained that the intermediate material warehouse inventory has not been emptied during the downtime and has not caused delivery delays.
[0073] Based on the verification results that the intermediate material warehouse inventory was not emptied during the downtime and did not cause delivery delays, the upstream key processing equipment number, speed-up start time, speed-up end time, target processing load, and feeding execution order are read from the speed-up feeding control command. Simultaneously, the equipment to be maintained, associated equipment, downtime start time, downtime end time, and maintenance batch are read from the collaborative downtime maintenance plan. First, a time sequence for the same equipment is established by equipment number. Then, the time from the speed-up start time to the speed-up end time is taken as the operation control segment, and the time from the downtime start time to the downtime end time is taken as the downtime maintenance segment. For the same equipment, the two segments are arranged chronologically. If a piece of equipment appears in both the equipment to be maintained and associated equipment records, one maintenance record is retained as the equipment to be maintained, and duplicate associated records are deleted. If multiple speed-up feeding control commands act on the same equipment and their execution times are adjacent, then when the target processing load is the same... Merge continuous time periods, retain segmented order when target processing loads differ, check the relationship between the acceleration end time and the shutdown start time of the maintenance batch to which the equipment belongs. If the acceleration end time is earlier than or equal to the shutdown start time, maintain the original order. If the acceleration end time is later than the shutdown start time, do not enter work order encapsulation and return to the corresponding continuous feeding section to redistribute the strategic reserve gap of intermediate material warehouse. Then, bind the target processing load, feeding execution order, maintenance identity and maintenance batch according to the equipment number. Then, according to the entire production line timeline, arrange all pre-shutdown acceleration feeding execution content before the corresponding shutdown maintenance execution content. For equipment within the same maintenance batch, uniformly adopt the shutdown start time and shutdown end time given by the collaborative shutdown maintenance plan. For different maintenance batches, maintain their own time nodes. Finally, summarize the equipment operation control content, shutdown maintenance content and corresponding time nodes in chronological order to generate a global material maintenance linkage work order.
[0074] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention in any other way. Any person skilled in the art may make changes or modifications to the above-disclosed technical content to create equivalent embodiments that can be applied to other fields. However, any simple modifications, equivalent changes, and modifications made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the protection scope of the present invention.
Claims
1. A material data management method for a steel slag metal recycling production line, characterized in that, Includes the following steps: Based on the time-series data of the processing weight, hardness coefficient, and block size distribution of each batch of materials from upstream key processing equipment, continuous high-hardness pulse peaks within the sliding time window are extracted, and weighted impact damage time-series characteristics are generated in combination with the processing weight. Based on the weighted impact damage timing characteristics and the wear tolerance limit of the liner, the remaining effective processing life of the upstream key processing equipment is output. The remaining effective processing life is compared with the critical warning limit to screen the equipment to be maintained and related equipment. A multi-objective maintenance cost trade-off matrix is constructed based on the preparation loss cost, the remaining lifetime disposal cost of the associated equipment, and the unexpected downtime risk cost of the equipment to be maintained. The collaborative downtime maintenance plan is output by solving the multi-objective maintenance cost trade-off matrix. The planned downtime duration is obtained by parsing the collaborative downtime maintenance plan. Based on the continuous production rated material consumption rate of the downstream magnetic separator, the current real-time material level of the intermediate silo, and the planned downtime duration, the strategic reserve gap of the intermediate silo is calculated. The strategic reserve gap in the intermediate material silo is allocated to the available lead time window, and an accelerated feeding control command is generated under the constraint of not exceeding the maximum capacity limit of the upstream key processing equipment. The upstream key processing equipment is controlled to operate according to the speed-up and feeding control command, and a dynamic balance prediction curve of the intermediate material warehouse inventory is generated by combining the feed amount of the intermediate material warehouse and the discharge amount of the downstream magnetic separator. The dynamic balance prediction curve, the downtime axis of the collaborative downtime maintenance plan, and the order delivery node are verified. After confirming that the intermediate material warehouse has not been emptied and will not cause delivery delays, a global material maintenance linkage work order is generated.
2. The material data management method for the steel slag metal recycling production line according to claim 1, characterized in that, The steps for obtaining the weighted impact damage time-series features are as follows: Based on the time-series data of the processed weight, hardness coefficient, and block size distribution of each batch of materials from key upstream processing equipment in the steel slag metal recycling production line collected by sensors, the data is aligned point by point according to the batch number and sampling timestamp. The hardness coefficients are sorted within each sliding time window. The median of the hardness coefficients is taken and superimposed with the median of the absolute value of the relative median deviation to form a pulse discrimination benchmark. Hardness coefficient segments whose continuous sampling times all exceed the pulse discrimination benchmark are screened. The local maximum value and corresponding sampling time of each hardness coefficient segment are extracted to obtain the continuous high hardness pulse peak value. Hardness coefficient segments other than the peak values of the continuous high-hardness pulses are extracted within the same sliding time window. The fluctuation center and dispersion amplitude of the hardness coefficient segments are statistically analyzed to form a weight benchmark for conventional stable fluctuation data. Attention weights are determined according to the amplitude, duration of sampling, and frequency of occurrence of the peak values of the continuous high-hardness pulses exceeding the pulse discrimination benchmark, and the attention weights are made greater than the weights of conventional stable fluctuation data. The corresponding batch processing weights are matched point by point, and the damage contribution is accumulated according to the square of the excess amplitude, the proportion of processing weight, and the sampling time interval to generate weighted impact damage time series features.
3. The material data management method for the steel slag metal recycling production line according to claim 1, characterized in that, The steps for obtaining the remaining effective processing life are as follows: Based on the weighted impact damage timing characteristics, the current cumulative damage value and the damage increment of adjacent sliding time windows are extracted from the upstream key processing equipment. The preset liner wear tolerance value of the corresponding upstream key processing equipment is called. The current cumulative damage value is subtracted from the liner wear tolerance value to form the remaining tolerance. It is determined whether the damage increment of adjacent sliding time windows increases continuously. If it increases continuously, the remaining tolerance is compressed according to the ratio of the damage increment before and after. If it does not increase continuously, the current attenuation scale is maintained. The attenuated remaining tolerance is divided by the most recent unit time damage increment to convert into the sustainable processing time and obtain the remaining effective processing life.
4. The material data management method for the steel slag metal recycling production line according to claim 1, characterized in that, The steps for obtaining the multi-objective maintenance cost trade-off matrix are as follows: Call the corresponding critical warning limit for each machine, establish the correspondence between the remaining effective processing life and the critical warning limit according to the equipment number, perform life difference direction judgment for each upstream key processing equipment, mark the upstream key processing equipment whose remaining effective processing life is less than or equal to the critical warning limit as triggered warning state, filter the equipment corresponding to the triggered warning state as equipment to be maintained, and then search the upstream key processing equipment that has not triggered the warning and has a continuous material transfer relationship from the equipment connection relationship of the same production line to obtain the equipment to be maintained and the associated equipment. The system reads the downtime preparation time, capacity loss during downtime, and recovery costs corresponding to a single production line downtime, and calculates the preparation loss cost for each item. It also reads the remaining effective processing life, component replacement time, and component unit value of the associated equipment, and calculates the remaining lifespan scrap cost based on the proportion of remaining effective processing life sacrificed for early replacement. Furthermore, it reads the delayed operation time, the decrease in remaining effective processing life, and the capacity loss caused by unexpected downtime of the equipment to be maintained, and calculates the risk cost of unexpected downtime caused by delayed equipment maintenance. Finally, it arranges three types of costs according to different combined maintenance combinations of the equipment to be maintained and the associated equipment, and constructs a multi-objective maintenance cost trade-off matrix.
5. The material data management method for the steel slag metal recycling production line according to claim 1, characterized in that, The steps for obtaining the collaborative shutdown and maintenance plan are as follows: Read the preparation loss cost, remaining life scrap cost, and unexpected downtime risk cost for each different combined maintenance combination. Compare the cost increase and decrease directions for each combined maintenance combination. Eliminate combined maintenance combinations where none of the three types of costs improves and any cost continues to increase. For the retained combined maintenance combinations, readjust the maintenance affiliation and downtime batch of the associated equipment. Repeat the calculation of the three types of costs and update the multi-objective maintenance cost trade-off matrix until the retained combined maintenance combinations no longer change after two consecutive rounds. Select the combination with the minimum total downtime cost from the retained results that satisfies the requirement that the equipment to be maintained must enter the maintenance batch. Determine whether the associated equipment should be merged into the maintenance batch of the equipment to be maintained and generate a collaborative downtime maintenance plan.
6. The material data management method for the steel slag metal recycling production line according to claim 1, characterized in that, The steps for obtaining the strategic reserve gap in the intermediate silos are as follows: According to the collaborative shutdown maintenance plan, the shutdown timeline is analyzed item by item according to the shutdown start time, maintenance operation end time and production resumption time recorded in the plan. The shutdown start time is used as the continuous timing start point and the production resumption time is used as the continuous timing end point. It is checked whether the maintenance operation end time is within the time range from the shutdown start time to the production resumption time. If the maintenance operation end time is outside the time range, the continuous timing end point is adjusted according to the production resumption time. The continuous time length between the continuous timing start point and the continuous timing end point is calculated to obtain the planned shutdown maintenance duration. Read the continuous production rated material consumption rate of the downstream magnetic separator, divide the continuous time segment covered by the planned shutdown maintenance duration into equally spaced consumption segments, convert the continuous production rated material consumption rate corresponding to each consumption segment into segment material consumption, continuously accumulate the material consumption of all segments in chronological order to obtain the total material consumption during the shutdown period, read the current real-time material level of the intermediate silo, deduct the available material quantity corresponding to the current real-time material level from the total material consumption during the shutdown period, and reset the calculation result less than zero to zero to obtain the strategic reserve gap of the intermediate silo.
7. The material data management method for the steel slag metal recycling production line according to claim 1, characterized in that, The steps for obtaining the speed-up feeding control command are as follows: The system reads the available lead time window that allows for continuous production before the planned shutdown time. This window is then divided into multiple continuous feeding segments based on time sequence. The system reads the current processing load and maximum capacity limit of the upstream key processing equipment within each continuous feeding segment. It calculates the escalable load after subtracting the current processing load from the maximum capacity limit. The strategic reserve gap in the intermediate material silo is allocated segment by segment starting from the continuous feeding segment closest to the planned shutdown time. Each allocation amount does not exceed the escalable load of the corresponding continuous feeding segment. If there is still an unallocated gap after allocation, the allocation continues to the previous continuous feeding segment until the strategic reserve gap in the intermediate material silo is fully covered. An accelerated feeding control command is then generated based on the determined escalation load, execution time period, and corresponding upstream key processing equipment for each continuous feeding segment.
8. The material data management method for the steel slag metal recycling production line according to claim 1, characterized in that, The steps for obtaining the global material maintenance linkage work order are as follows: According to the speed-up and feeding control command, the speed-up start time, speed-up end time, target processing load, and feeding execution order of the upstream key processing equipment are read one by one. The upstream key processing equipment is controlled to operate within the corresponding execution period. The material level sensor collects the feed amount of the intermediate silo and the discharge amount of the downstream magnetic separator according to the unified sampling timestamp. The intermediate silo inventory at the starting time is used as the calculation basis. The inventory increase or decrease after deducting the discharge amount of the downstream magnetic separator from the feed amount of the intermediate silo is calculated at each sampling interval. The intermediate silo inventory at each sampling time is continuously updated in time order. The intermediate silo inventory values corresponding to each sampling time are connected to generate a dynamic balance prediction curve. The shutdown start time, shutdown end time, and production resumption time in the collaborative shutdown maintenance plan are read. The dynamic balance prediction curve segment corresponding to the shutdown start time to shutdown end time is extracted point by point. It is determined whether the intermediate material warehouse inventory at each sampling time is greater than the emptying judgment lower limit. Then, the order delivery nodes of the production line are read in chronological order. The production resumption time and subsequent production recovery progress are checked to see if they exceed the corresponding order delivery nodes. If the intermediate material warehouse inventory within the shutdown time range is greater than the emptying judgment lower limit, and the production completion time corresponding to each order does not exceed the order delivery node, the verification result is obtained that the intermediate material warehouse inventory has not been emptied during the shutdown and has not caused delivery delays. Based on the verification results that the intermediate material warehouse inventory was not emptied during the shutdown period and did not cause delivery delays, the upstream key processing equipment number, acceleration execution period, target processing load, and material feeding execution order are extracted from the acceleration feeding control command. The equipment to be maintained, associated equipment, shutdown start time, shutdown end time, and maintenance batch are extracted from the collaborative shutdown maintenance plan. The same equipment number and corresponding execution period are bound in chronological order. The acceleration feeding execution content before shutdown is arranged before the shutdown maintenance execution content. The acceleration end time is verified to be no later than the shutdown start time. The equipment operation control content, shutdown maintenance content, and corresponding time nodes are uniformly encapsulated to generate a global material maintenance linkage work order.