A new energy station fault overstep early warning method based on protected coupling reachable domain boundary tracking

By constructing a joint reachable domain of electrical and protection systems for new energy power plants, the problem of quantifying the boundaries of multiple evolution outcomes of fault states and the sequence of protection actions in existing technologies has been solved, enabling accurate prediction and early warning in the early warning of fault escalation in new energy power plants.

CN123144033APending Publication Date: 2026-11-20YUNNAN ELECTRIC POWER TESTING & RES INST (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611488103.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-23
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing fault early warning methods for new energy power stations are difficult to characterize the multiple possible evolution results of fault states under actual topology, control and protection constraints, and lack the ability to quantify the boundary of protection action sequence reversal, making it difficult to predict escalation risks.

Method used

Construct an electrical-protection joint reachability domain constrained by actual site conditions, divide protection action sequence areas and track over-level boundaries, realize continuous assessment of over-level boundary distance, expected intersection time and warning level, and establish protection coupling recursive relationship by acquiring fault data for time alignment, quality screening and normalization, construct reachability domain pipeline and track over-level boundary surface.

Benefits of technology

It improves the physical interpretability and early warning capability of fault escalation warning, and can accurately characterize the possible evolution range of fault state and predict the protection action sequence reversal boundary under topology, control and protection constraints.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144033A_ABST
    Figure CN123144033A_ABST
Patent Text Reader

Abstract

The application provides a new energy station fault overstep early warning method based on a protection coupling reachable domain boundary tracking. First, electrical quantity, control state and protection state data before and after the station fault are acquired, and a working condition turning point in a fault evolution process is identified. Then, a protection coupling recursive model is established in combination with a station topology, a fault boundary, a control conversion rule and a protection setting relationship, an electrical-protection joint reachable domain is constructed and propagated. Next, the reachable domain is divided according to an upper and lower level protection action sequence, an overstep boundary surface is formed by tracking a position where the action sequence is reversed, and a distance from a current state to the boundary surface and a predicted intersection time are calculated. Finally, an early warning level is determined in combination with the boundary distance, the intersection time and an upper level first action region proportion. The application can overcome the problem that a single trajectory prediction is difficult to describe various possible evolution states of the fault, and realize an advance, interpretable early warning of a new energy station protection overstep risk.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of relay protection technology for new energy power stations, specifically involving a method for early warning of fault escalation in new energy power stations based on protection coupling reachability domain boundary tracking. Background Technology

[0002] With the large-scale integration of new energy sources such as wind power and photovoltaics, the coupling relationship between converter control and relay protection in new energy power plants is becoming increasingly complex. After a fault occurs in the power plant, the voltage, current, sequence components, equivalent impedance, and protection activation quantities will continuously change with the fault process due to the combined effects of factors such as converter current limiting, fault ride-through, reactive power support, changes in fault location, and switch operation status, resulting in obvious dynamic evolution characteristics of the fault state.

[0003] In the actual fault evolution process, even if the observed state is similar at a certain moment, slight differences such as measurement error, control state switching margin, and protection action delay may change the subsequent fault state and the action sequence of upper and lower level protections. This can cause the fault that was originally cleared by the lower level protection to change to the upper level protection reaching the action condition first, thus creating the risk of protection overstepping level.

[0004] Existing fault early warning methods for new energy power plants typically utilize information collected during a fault, such as voltage, current, sequence components, impedance, and protection activation parameters, to predict subsequent fault states or protection action trends, and determine risk or warning levels based on the prediction results. However, the same current observed state may correspond to multiple different subsequent evolution results. Using a single prediction trajectory or comprehensive risk quantity makes it difficult to fully characterize the range of possible future electrical-protection states.

[0005] Furthermore, the actual evolution of fault states in new energy power plants is also constrained by factors such as primary wiring topology, fault branch boundaries, converter control modes, and protection setting relationships. If subsequent predicted states are generated solely based on data change trends without simultaneously applying the aforementioned physical, control, and protection constraints during the state evolution process, states that are unattainable in actual power plants may occur, thereby affecting the judgment of the sequence of actions of upper and lower level protection and the fault development trend.

[0006] Furthermore, existing methods typically focus on determining whether a fault risk meets the warning criteria, making it difficult to quantify the distance between the current fault state and the critical boundary where the sequence of actions of upper and lower level protections reverses, and also difficult to determine the moment when a possible future state first approaches or touches that boundary. Therefore, how to characterize the possible evolution range of the fault state and track the reversal boundary of the protection action sequence and its approach process, while satisfying the actual site topology, control, and protection constraints, remains a problem to be solved in the early warning of fault escalation in new energy power plants. Summary of the Invention

[0007] Given that existing fault early warning methods for new energy power plants are insufficient to characterize the various possible evolution outcomes of fault states and lack the ability to quantify the boundary of protection action sequence reversal under actual topology, control, and protection constraints, this invention provides a fault over-level early warning method for new energy power plants based on protection coupling reachability domain boundary tracking. This method constructs an electrical-protection joint reachability domain constrained by the actual power plant, divides the protection action sequence region, and tracks the over-level boundary, enabling continuous evaluation of the over-level boundary distance, expected intersection time, and early warning level.

[0008] To achieve the above objectives, this invention provides a method for early warning of fault escalation in new energy power plants based on protection coupling reachability domain boundary tracing, specifically including the following steps: S1. Obtain continuous time series data before and after the fault in the new energy power station, and perform time alignment, quality filtering and normalization processing on voltage, current, sequence components, impedance, switch status, converter control status and upper and lower level protection status; identify the operating condition inflection point according to the control status switching, protection status change and multivariate joint mutation, and divide the local fault evolution segment according to the operating condition inflection point. S2. Within the current local fault evolution segment, establish a protection coupling recursive relationship based on the primary wiring topology of the new energy power station, the fault branch boundary, the converter control conversion rules, and the protection setting relationship; jointly encode electrical quantities, control states, lower-level clearing stages, and upper-level action margins into a state vector, and limit the state vector to be passed only to subsequent states that satisfy the topology, fault boundary, control, and protection constraints; S3. Based on the current observation state, the allowable subsequent states that satisfy the topology, control and protection constraints, and the residual range of historical similar fault evolution segments, construct an initial electrical-protection joint reachable domain; propagate the joint reachable domain step by step along the prediction time, and apply the bounded disturbance set constructed according to the residual range to the allowable state propagation process to obtain the electrical-protection joint reachable domain at each prediction time and form a reachable domain pipeline. S4. Substitute the states in the electrical-protection joint reachable domain at each predicted time into the upper and lower level protection action criteria and the lower level clearing completion criteria, and divide them into the lower level clearing first zone, the upper level action first zone and the zone where the action conditions have not yet been met. Record the control state, fault characteristic coordinates, the first time of the upper level action and the time of the lower level clearing completion for each zone. S5. Search for the critical state where the sequence of protection actions is reversed for the first time between the lower-level clear zone and the upper-level action zone. Connect the critical states to form a cross-level boundary surface, and calculate the minimum distance from the current state to the cross-level boundary surface and the corresponding critical state combination. S6. Compare the positional relationship between the reachable domain pipeline and the super-level boundary surface at each predicted time in the future, determine the expected time when the reachable domain pipeline and the super-level boundary surface intersect for the first time, count the proportion of reachable states that fall into the upper-level pre-action zone after the intersection, and determine the fault super-level warning level based on the super-level boundary distance, the expected intersection time and the proportion of reachable states. S7. After new data arrives, the local protection coupling recursive relationship and the over-level boundary surface are re-established only when a new operating condition inflection point, a change in primary wiring topology, a change in the lower-level clearing stage, or a change in the control mode out of bounds is detected. If no such changes occur, the data continues to propagate along the existing reachable domain pipeline and calculates the boundary drift speed. The current action sequence area, the over-level boundary distance, the expected boundary intersection time, the proportion of reachable states in the upper-level first-action area, the boundary drift speed, and the fault over-level warning level are continuously output.

[0009] Compared with the prior art, the beneficial effects of the present invention are: This invention can characterize the possible evolution range of fault states under actual station topology, control and protection constraints, and form a fault boundary by reversing the sequence of actions, and further obtain the boundary distance and the expected first intersection time, thereby improving the physical interpretability and early warning capability of fault fault warning. Attached Figure Description

[0010] Figure 1 A flowchart of a method for early warning of fault escalation in new energy power plants based on protection coupling reachability domain boundary tracing; Figure 2 Schematic diagram for protecting the coupled reachable domain and tracing over-level boundaries Detailed Implementation To make the technical solution, implementation process and technical effects of the present invention clearer, the present invention will be further described below with reference to the accompanying drawings. Figure 1 The method flow shown and Figure 2 The diagram shows the protection coupling reachability domain and over-level boundary tracking. In specific implementation, the process is carried out in the following order: fault data acquisition and operating condition inflection point determination, establishment of protection coupling recursive relationship, construction and propagation of electrical-protection joint reachability domain, protection action sequence area division, over-level boundary surface tracking, prediction of the first intersection of the boundary, and boundary reconstruction triggered by the inflection point. This process yields the distance from the current state to the over-level boundary, the expected first intersection time, and the fault over-level early warning result.

[0011] In the following explanation, Indicates the current discrete sampling time number; This indicates the prediction step number relative to the current time. , Indicates the maximum number of prediction steps; Indicates the sequence number of consecutive electrical characteristics. This represents the total number of consecutive electrical features involved in the joint mutation determination; Indicates the sequence number of the local fault evolution segment; This indicates the categories of similar historical fault segments, categorized by fault type, grid connection method, control mode, and topology status. This indicates the sequence number of the superior protection criterion. It should be noted that, unless otherwise stated, the same symbols retain the same meaning in all steps of this embodiment; This indicates a difference from the current online sampling time. The auxiliary sample sequence number is used for historical reference data statistics, local recursive parameter fitting, and historical residual statistics.

[0012] (1) Fault data acquisition, preprocessing and determination of operating condition inflection points The system acquires the three-phase voltage, three-phase current, positive and negative zero-sequence voltage and current, frequency or phase angle and equivalent impedance before and after the fault through the fault recording device of the new energy power station; it acquires the start-up, output and operation status of the upper and lower level protection through the relay protection device; it acquires the current limiting, fault ride-through and reactive power support status through the converter control system; and it acquires the status of circuit breakers, disconnect switches and primary equipment through the power station monitoring system, and retains the original timestamp and quality mark.

[0013] Establish a unified sampling timeline:

[0014] For the Data source selection The original record with the smallest time difference:

[0015] And require:

[0016] In the formula, This is the start time of data processing; For data source category number; The original record number; For the corresponding record timestamp; To match the record sequence number; This indicates the record number that minimizes the time difference; This is the maximum permissible time synchronization error. Data with invalid quality markings, exceeding the effective range, or with time synchronization errors exceeding the limit will not participate in the joint state construction.

[0017] Normalize the continuous electrical characteristics:

[0018] In the formula, These are continuous electrical characteristic serial numbers; and These are the eigenvalues ​​before and after normalization, respectively; and These are the first two valid reference time windows before the fault. The mean and standard deviation of each feature; To prevent positive numbers with a denominator of zero.

[0019] The converter control state vector is generated based on current limiting, fault ride-through, and reactive power support signals. The integrated protection phase status is formed based on the activation, output, and circuit breaker status of the upper and lower level protection systems. .in, This is only used for identifying the inflection point of the operating condition in this step; subsequent steps will not be conducted. This specifically refers to the lower-level fault clearing phase.

[0020] Calculate the first Scaled neighboring variations of each feature:

[0021] And the intensity of multivariate joint mutations:

[0022] In the formula, To scale adjacent changes; For the first The reference scale of change for each feature; The total number of continuous electrical characteristics involved in the judgment; The feature weights are taken when there are no prior differences in importance. ; For the first Multivariate joint mutation intensity at time point.

[0023] The joint mutation threshold was determined using historical reference samples:

[0024] In the formula, This is the reference sample number that is not at the current time. The joint mutation intensity of the historical reference sample; express quantiles; Preset quantile level; This is the threshold for joint mutations.

[0025] The inflection point of the operating condition is determined by the following formula:

[0026] In the formula, Indicator of inflection point for operating conditions; It is an indicator function; Indicates a logical "OR". A breakpoint is directly triggered when the control state or protection phase changes; continuous electrical quantities are judged only through multivariate joint mutations. If multiple consecutive sampling times are continuously triggered by the same joint mutation and during... and If no further changes are made, they are merged into the same inflection point, retaining only the initial trigger moment.

[0027] The final inflection point is denoted as:

[0028] And form a local fault evolution fragment:

[0029] In the formula, It is a set of inflection points; For the first One turning point; This represents the total number of inflection points; For the first A segment of local fault evolution.

[0030] (2) Establishment of protection coupling recursive relationship The current operating status is determined based on the circuit breaker, disconnector, and converter control and protection operating status obtained in step (1); further, line and transformer parameters are obtained from the primary wiring data of the site, fault branches, fault types, and fault locations are determined from fault waveforms and protection event records, control mode conversion rules are obtained from the converter control configuration file, and upper and lower level protection start thresholds, action delays, and coordination relationships are obtained from the protection setting file, and associations are established according to equipment number and branch number. This avoids the duplication of dynamic status data collection with step (1). The original manuscript clearly states that these actual site parameters are the basis for constructing the protection coupling recursive relationship.

[0031] Establish a node-branch association matrix based on the actual switching status. Establish the branch impedance matrix based on the parameters of the currently operational branches. The candidate electrical states satisfy:

[0032] In the formula, Inject current vectors into nodes; The branch current vector; The node voltage vector; This is the node-branch association matrix of the current effective network; This represents the actual effective branch impedance matrix. For faulty branches, the corresponding fault boundary conditions are updated based on the actual fault type, location, and fault impedance.

[0033] The electrical state, control state, and protection dynamic state are combined to form a joint state:

[0034] in:

[0035] In the formula, It is a combined electrical-control-protection state; It is a continuous electrical state; These are voltage and current vectors, respectively; These are the voltage and current sequence component vectors, respectively; This is the equivalent impedance eigenvector; This is the converter control state; This is the next stage of fault clearing. To provide margin for superior protection actions; A vector composed of the cumulative effective action times of each higher-level protection criterion; The cumulative time for the current stage of protection by the lower level; The total time for the circuit breaker to trip.

[0036] The upper-level protection action margin is defined as:

[0037] In the formula, The serial number of the superior protection criterion; This is the set of higher-level protection criteria used in the judgment; To protect the startup quantity; This corresponds to the set threshold; Scale factor; This is the action direction coefficient. It is set to 1 for the action criterion when the starting amount increases to the threshold, and to -1 for the action criterion when the starting amount decreases to the threshold. This indicates that none of the current higher-level protection criteria have yet reached the corresponding activation boundary; This indicates that at least one higher-level protection criterion has reached the activation boundary; This indicates that at least one higher-level protection criterion has crossed the corresponding activation boundary.

[0038] Let the continuous part of the joint state be denoted as The converter control state and the next-level clearing stage are composed of discrete parts.

[0039] In the current local segment Internally, a nominal recursion for continuous states is established using a first-order affine relation:

[0040] in:

[0041] In the formula, This is the set of sample indices within the current local segment that have complete adjacent state data; It is a local recursive matrix; It is the bias vector; It is a Euclidean norm. Discrete control states and protection stages are enumerated according to the actual control conversion table, protection output logic, and circuit breaker operation sequence, without using continuous interpolation.

[0042] The candidate states that satisfy the above network equations are formed into a set of topological constraints, which, together with the fault, control, and protection constraints, form a set of permissible successor states:

[0043] In the formula, the four subsets correspond to the actual primary wiring topology, the fault branch boundary, the converter control switching, and the protection action logic, respectively. Candidate states that violate any constraint are directly eliminated.

[0044] (3) Construction and dissemination of the electrical-protection joint reach domain Based on the current fault type, grid connection method, converter control mode, and primary wiring topology, historical fault segments of the same type with matching four attributes are retrieved from the historical fault recording database of the site to be warned. If historical recordings are insufficient, simulation verification data under the same fault type, grid connection method, control mode, and topology conditions are used to supplement them, and this category is recorded as […]. .

[0045] For adjacent observed states in historical segments, the nominal successor state without superimposed historical disturbances is calculated on the allowable state branch consistent with the actual historical discrete control state and the clearing stage, using the protective coupling recursive relationship of step (2). And calculate:

[0046] In the formula, The sampling sequence number for the historical segment; For the first The residual disturbance vector for historical fragments. For discrete states such as converter control state and lower-level clearing stage, its residual component is fixed at 0, and residual disturbance is applied only to continuous electrical state and continuous protection margin.

[0047] Outlier filtering is performed on historical residuals. For the first... For each continuous residual component, calculate:

[0048]

[0049]

[0050] And determine the effective scope:

[0051]

[0052] in, Anomaly discrimination coefficients are pre-configured based on historical waveforms and simulation verification data of the stations to be warned.

[0053] Only retain the residual vector where all continuous state components are within their respective valid ranges:

[0054] Then determine based on the effective residual after cleaning:

[0055] Thus, the following can be constructed:

[0056] If no valid residual samples are found after outlier removal, the simulation verification data under the corresponding conditions will be used to supplement and recalculate; if a valid residual set still cannot be formed, the historical category will be marked as having no valid residual data and will not be used to construct the current perturbation set.

[0057] Based on the current actual observation joint state As the starting point for propagation, the joint reachability region of the first prediction step is:

[0058] The subsequent recursion is as follows:

[0059] in, ; The maximum number of prediction steps; For the first Each prediction step is a joint reachable domain; Indicates Minkowski and; Represents the union of sets; For the first The allowed joint state space that simultaneously satisfies the actual topology, fault, control, and protection constraints at all times.

[0060] Each time a residual disturbance is added, the allowable state constraint screening is re-executed to ensure that the residual disturbance does not produce an actual unreachable state.

[0061] like:

[0062] This indicates that there is no valid reachable state in the prediction step, so stop propagating from the empty set and record the "no valid reachable state" flag.

[0063] (4) Division of protection action sequence area For each reachable state obtained in step (3), the protection setting parameters of step (2) are called, and the protection stage and cumulative timing status carried by the reachable state itself are used to calculate the action time of the upper and lower level protections. The current protection status of step (1) is not read again. In the original manuscript, this part was used to complete the division of the action sequence area.

[0064] For any:

[0065] No. The estimated first action time of the superior protection is:

[0066] Further steps:

[0067] In the formula, For the first Delay of the upper-level protection setting action; This refers to the cumulative effective action time in the joint state; This marks the earliest moment when the superior's protective action is first taken.

[0068] The remaining operating time of the downstream protection and the remaining opening time of the circuit breaker are calculated as follows:

[0069]

[0070] In the formula, To set the actual action time according to the current lower-level protection stage; This refers to the actual opening time of the circuit breaker; and These represent the cumulative time in the joint state.

[0071] The time when the lower-level fault clearing is completed is:

[0072] The above This only indicates that there are no finitely effective actions or clearing moments under the current forecast conditions.

[0073] Define the timing difference of actions:

[0074] when:

[0075] When transferring to a lower level, first clear the area. ;when:

[0076] When included in the superior's priority action zone .

[0077] If neither the superior nor the subordinate has an effective action or a clearing opportunity, that is:

[0078] Then it is classified into the region where the action condition has not yet been met; when both are finite values ​​and When the action sequence is critical, it is marked as a critical state, and the fault over-level boundary is uniformly constructed by step (5).

[0079] (5) Cross-level boundary surface tracking and boundary distance calculation To simultaneously obtain the current boundary distance and the future dynamic boundary, the same set of boundary search rules is applied to the current time step and each prediction step. Based on the current observation status Centered on the current topology, faulty branches, control modes, and protection constraints, continuous boundary variables are locally evaluated, and the current local candidate state set is formed through constraint screening in step (2). ;for ,Pick: ,in, Indicates the current time Next, the The set of candidate joint states that participate in the fault-crossing boundary search at each boundary search moment; The set of local candidate states corresponding to the current moment. exist The time is determined by the joint reachability domain of the corresponding prediction step. Provided.

[0080] Calculate according to the same rules as in step (4). The timing difference of actions in each state.

[0081] Map the joint state to fault escalation boundary search coordinates:

[0082] In the formula, Mapping of boundary coordinates; To protect the continuous time coordinates consisting of remaining actions and clearing time; One-hot encoding for control states; The fault characteristics include continuous fault location, sequence components, and equivalent impedance. Discrete variables such as fault type and fault branch are enumerated separately, and numerical interpolation is not performed.

[0083] To standardize the coordinate scales, the following definition is provided:

[0084] as well as:

[0085] In the formula, The dimension of the boundary coordinates; For the first Each boundary coordinate scale factor; The scaling matrix; This represents the scaled boundary coordinate distance.

[0086] Clear the status of any subordinate first. Under the same control mode, fault type, and fault branch conditions, select the state with the closest joint coordinate distance from the preceding action states of the higher level:

[0087] And require:

[0088] Therefore, "adjacent candidate states" are defined as the nearest pair of states with opposite signs in the joint coordinate space.

[0089] Under the condition of fixed discrete control states and fault categories, perform local bisection on the continuous coordinates between candidate states:

[0090] Based on the actual topology, faults, control and protection constraints in step (2), obtain the feasible joint state corresponding to the continuous coordinates. If multiple feasible states exist, the state with the smallest distance from the current bisection segment is selected; if no feasible state exists, the intermediate point is discarded and a new feasible point is selected within the current interval.

[0091] Continue according to The symbols are updated to reflect the states on both sides of the boundary until:

[0092] In the formula, The binary search iteration number; To allow for time tolerance of the boundary search, states that satisfy the termination condition and originate from the positive and negative action time difference flip search constitute the first... Step-by-step fault boundary surface:

[0093] Therefore, the fault escalation boundary is formed only by reversing the action sequence between the lower level clearing first and the upper level acting first, rather than a normal risk threshold.

[0094] If there are no valid candidate boundary states, then:

[0095] If both the upper and lower action sequence regions are not empty but still cannot form a valid boundary, then mark it as "boundary search invalid", improve the local search accuracy and search again.

[0096] The minimum distance from the current state to the current fault escalation boundary is defined as:

[0097] The boundary state that achieves the minimum value is denoted as The corresponding boundary coordinates are:

[0098] At the same time, define the shortest approximation direction of the current state pointing to the nearest fault escalation boundary:

[0099] In the formula, To unify the shortest approximation direction in the boundary coordinate space, it is used to characterize the critical combination of changes in protection delay, control state, and fault characteristics as they approach the fault escalation boundary; when When, calculate the shortest approach direction to the fault escalation boundary according to the above formula; when When this occurs, it indicates that the current observation state is already at the fault escalation boundary. In this case, the above normalization operation is not performed, and the... Marked as having no effective approximation direction.

[0100] like:

[0101] but and All are marked as invalid, not assigned a value of 0, and should not be used to determine that there is no risk of fault escalation.

[0102] (6) Prediction of first intersection of boundaries and early warning of fault escalation For each prediction step, the following conditions must be met simultaneously:

[0103] At that time, calculate the minimum distance between the joint reachable domain and the corresponding fault escalation boundary surface:

[0104] In the formula, State of reachable domain; This is the boundary state; For the first The minimum distance between the predicted step reachable domain and the fault escalation boundary.

[0105] when: When the prediction step occurs, it is determined that the reachable domain and boundary intersect; Tolerance for intersection determination.

[0106] If the reachable domain or boundary is empty, then the prediction step... Mark it as invalid, but do not force it to be interpreted as "disjoint".

[0107] The first effective intersection prediction step is:

[0108] The estimated time remaining until the first intersection of the fault escalation boundary is:

[0109] If the joint reachability region propagates normally to the end of the prediction window and no intersection occurs in all valid prediction steps, then:

[0110] in, This only indicates that the first intersection was not predicted within the current prediction window; if the prediction is prematurely interrupted due to an empty reachable domain or an invalid boundary search, then... Mark it as invalid directly.

[0111] Calculate the percentage of reachable states in the higher-level advance action zone for the effective joint reachable domain:

[0112] In the formula, It is a set measure; when using finite state representation, the number of valid states is taken, and when using continuous set representation, the numerator and denominator are calculated with the same discrete precision.

[0113] When there is a finite At that time, only the first intersection and subsequent prediction steps are counted:

[0114] And define:

[0115] In the formula, This represents the percentage of reachable states within the largest preceding action zone of the predicted window after the first intersection. If no valid... If the value is not specified, the indicator is marked as invalid.

[0116] Set them separately:

[0117]

[0118]

[0119] The distance, time, and percentage thresholds are predetermined based on the actual protection coordination requirements of the site to be warned, historical fault recordings, and simulation verification results, and remain unchanged during the same fault escalation warning process.

[0120] The distance indicator level is:

[0121] The time indicator level is:

[0122] when Furthermore, this value is taken when there is no intersection within the complete prediction window. .

[0123] The percentage indicator level is:

[0124] Among them, levels 0, 1, 2 and 3 represent normal, attention, warning and severe warning, respectively.

[0125] Define the set consisting of all valid single-indicator early warning levels:

[0126] when:

[0127] At that time, the final fault escalation warning level is:

[0128] If all indicators are invalid, the output "Fault escalation warning calculation invalid" will be displayed, and the system will not be considered normal.

[0129] If there exists a prediction step that satisfies:

[0130] If all reachable states are located in the priority action zone of the higher-level system, then it is directly stipulated that:

[0131] The percentage of reachable states in the superior advance action zone is only used for fault over-level early warning classification and does not replace relay protection setting verification and manual review.

[0132] (7) Boundary reconstruction and continuous output triggered by inflection points Each time new fault observation data arrives, the current joint state is updated according to step (1), and a topology state vector is formed based on the states of the circuit breaker and disconnector. .

[0133] Define the boundary reconstruction trigger identifier:

[0134] In the formula, A boundary reconstruction trigger identifier; This is the current topology state vector; This represents the set of control states allowed by the current protection coupling recursive relationship.

[0135] when:

[0136] If triggered by a new working condition inflection point, the local fault evolution segment is updated first; then steps (2) to (6) are re-executed to rebuild the protection coupling recursive relationship, joint reachable domain pipeline, action sequence region, fault overshoot boundary and fault overshoot early warning result.

[0137] when: At the same time, the protection coupling recursive relationship established in step (2) and the current effective bounded disturbance set remain unchanged. The newly added joint observation state is used as the new propagation starting point. The reachable domain propagation in step (3) and the action sequence division, fault over-level boundary tracking and fault over-level early warning calculation in steps (4) to (6) are executed in a rolling manner without re-reconstructing the recursive model. The original draft stipulates that the boundary is reconstructed only when there are substantial changes in the inflection point, topology, control or protection stage.

[0138] To characterize the overall change of the fault escalation boundary, the first The prediction step boundary is mapped as follows:

[0139] In the formula, For the current update time, the The set of fault boundary coordinates for the prediction step.

[0140] Let the current boundary update be separated from the previous boundary update by an interval of There are 10 actual sampling steps, and a set of prediction steps for which both updates have valid boundaries is defined:

[0141] for Define the bidirectional maximum and minimum distance between two boundary sets:

[0142] In the formula, and These are the coordinates in the boundary set corresponding to the current and previous updates, respectively; This represents the overall change in the boundary set corresponding to the prediction step.

[0143] Further steps:

[0144] And define the fault escalation boundary change rate:

[0145] In the formula, This represents the maximum overall change in the fault escalation boundary within the current update cycle. This represents the rate of change of the fault escalation boundary.

[0146] like:

[0147] but Mark as invalid and do not assign a value of 0.

[0148] After each rolling calculation is completed, the current action sequence region and the fault escalation boundary distance are continuously output. Shortest approximation direction The estimated time remaining until the first intersection of the fault escalation boundary. The percentage of reachable states in the maximum superior advance action zone Fault grade boundary change rate and fault escalation warning level .

[0149] For situations such as no effective protection action, no effective clearing action, empty joint reachable domain, non-existent fault escalation boundary, invalid boundary search, invalid residual set, and no first intersection within the prediction window, corresponding status identifiers are output simultaneously to distinguish between the three types of statuses: normal low risk, current prediction window non-intersection, and invalid calculation. Any empty set, no boundary, or invalid index should not be directly interpreted as the absence of current fault escalation risk.

[0150] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for early warning of fault escalation in new energy power plants based on protection coupling reachability domain boundary tracing, characterized in that, The method includes the following steps: S1. Obtain continuous time series data before and after the fault in the new energy power station, and perform time alignment, quality filtering and normalization processing on voltage, current, sequence components, impedance, switch status, converter control status and upper and lower level protection status; identify the operating condition inflection point according to the control status switching, protection status change and multivariate joint mutation, and divide the local fault evolution segment according to the operating condition inflection point. S2. Within the current local fault evolution segment, establish a protection coupling recursive relationship based on the primary wiring topology of the new energy power station, the fault branch boundary, the converter control conversion rules, and the protection setting relationship; jointly encode electrical quantities, control states, lower-level clearing stages, and upper-level action margins into a state vector, and limit the state vector to be passed only to subsequent states that satisfy the topology, fault boundary, control, and protection constraints; S3. Based on the current observation state, the allowable subsequent states that satisfy the topology, control and protection constraints, and the residual range of historical similar fault evolution segments, construct the initial electrical-protection joint reachability domain. The joint reachability domain is propagated step by step along the prediction time, and a bounded set of disturbances constructed according to the residual range is applied to the permissible state transfer process to obtain the electrical-protection joint reachability domain at each prediction time and form a reachability domain pipeline. S4. Substitute the states in the electrical-protection joint reachable domain at each predicted time into the upper and lower level protection action criteria and the lower level clearing completion criteria, and divide them into the lower level clearing first zone, the upper level action first zone and the zone where the action conditions have not yet been met. Record the control state, fault characteristic coordinates, the first time of the upper level action and the time of the lower level clearing completion for each zone. S5. Search for the critical state where the sequence of protection actions is reversed for the first time between the lower-level clear zone and the upper-level action zone. Connect the critical states to form a cross-level boundary surface, and calculate the minimum distance from the current state to the cross-level boundary surface and the corresponding critical state combination. S6. Compare the positional relationship between the reachable domain pipeline and the super-level boundary surface at each predicted time in the future, determine the expected time when the reachable domain pipeline and the super-level boundary surface intersect for the first time, count the proportion of reachable states that fall into the upper-level pre-action zone after the intersection, and determine the fault super-level warning level based on the super-level boundary distance, the expected intersection time and the proportion of reachable states. S7. After new data arrives, the local protection coupling recursive relationship and the over-level boundary surface are re-established only when a new operating condition inflection point, a change in primary wiring topology, a change in the lower-level clearing stage, or a change in the control mode out of bounds is detected. If no such changes occur, the data continues to propagate along the existing reachable domain pipeline and calculates the boundary drift speed. The current action sequence area, the over-level boundary distance, the expected boundary intersection time, the proportion of reachable states in the upper-level first-action area, the boundary drift speed, and the fault over-level warning level are continuously output.

2. The method as described in claim 1, characterized in that, The S1 includes: Continuous time-series data before and after a fault are acquired through fault recording devices, relay protection devices, converter control systems, and station monitoring systems in new energy power plants. This data includes voltage, current, sequence components, equivalent impedance, switch status, converter control status, and upstream and downstream protection status. The data undergoes time alignment, quality filtering, and normalization. Inflection points in the operating conditions are identified based on converter control status switching, protection phase changes, and multivariate joint abrupt changes. The criteria are as follows: In the formula, This represents the current discrete sampling time number; This is the indicator for the inflection point of the operating condition; a value of 1 indicates that an inflection point of the operating condition has been detected, and a value of 0 indicates that no inflection point has been detected. For the first The converter control state vector at time t. This indicates that at least one control state has changed; This is a protected phase state; For electrical characteristic serial numbers; The total number of electrical features involved in the joint mutation determination; For the first Time of the first A normalized electrical characteristic value; This serves as a reference scale for the corresponding feature. For feature weights, satisfying and ; The threshold for determining joint mutations; This is an indicator function; it takes the value 1 if the condition is true, and 0 otherwise. This represents the logical "OR" operator. Will satisfy The inflection points of the operating conditions are arranged in chronological order, and the local fault evolution segments are divided by adjacent inflection points.

3. The method as described in claim 1, characterized in that, The S2 includes: Within the current local fault evolution segment, the actual primary wiring topology, fault branch information, converter control conversion table, and upper and lower level protection setting and action coordination parameters of the new energy power station to be warned are read. The electrical quantities, control states, lower-level clearing stages, and upper-level action margins are jointly encoded into a state vector, and a protection coupling recursive relationship is established: In the formula, For the first The combined electrical-control-protection state at any given moment; It is an electrical state vector consisting of voltage, current, sequence components, and equivalent impedance; The meaning of the converter control state vector in S1 is the same; This is the next stage of cleanup. To provide margin for superior protection actions; Indicates vector transpose; The set of allowed successor states corresponding to the current state; , , and These are sets of states that satisfy the primary wiring topology, fault branch boundaries, control transitions, and protection constraints, respectively. Represents the intersection of sets; Only joint states are allowed to be passed on to subsequent states that simultaneously satisfy the above constraints; the topology, fault branches, control transitions and protection setting parameters are all based on actual data from the stations to be warned.

4. The method as described in claim 1, characterized in that, The S3 mentioned above includes: An initial electrical-protection joint reachability domain is constructed based on the current observation state, the permissible subsequent state determined by S2, and the residual range of historical similar fault evolution segments. The historical similar segments are filtered according to fault type, grid connection mode, control mode, and topology state, and a bounded disturbance set is determined based on fault waveform recordings or simulation verification data. The bounded perturbation is applied to the allowed state transition process along the prediction time, and the joint reachability domain at each prediction time is recursively derived according to the following formula: In the formula, This category represents a fragment of the evolution of similar historical faults. For the corresponding bounded perturbation set; The residual disturbance vector has its components corresponding to the discrete control state and the next-level clearing stage set to zero. and These are the lower and upper bounds of the residual perturbation, respectively. For the first The joint state obtained from actual observation at any given moment; relative to the current time The prediction step number; For the first The joint reachable domain of each prediction step; This represents the set union operation; Let Minkowski sum be the sum of the elements selected from the two sets.

5. The method as described in claim 1, characterized in that, S4 includes: Substitute the states in the joint reachable domain at each predicted time into the actual upper and lower level protection action criteria and the lower level clearing completion criteria of the site to be warned. Divide the action sequence region according to the chronological relationship between the first arrival time of the upper level protection action and the completion time of the lower level clearing: In the formula, Clear the area first for the lower level; This is a priority action zone for higher authorities; Always indicate a united state The corresponding time when the lower-level fault clearing is completed; Always indicate a united state The corresponding first arrival time of the superior protection action; States that have not yet met the conditions for action of the upper and lower level protection and the conditions for completion of clearing of the lower level protection are classified into the area where the conditions for action have not yet been met; the control status, fault characteristic coordinates and protection action time corresponding to each area are recorded; the judgment criteria are determined based on the actual protection settings, logic output and circuit breaker tripping completion signal.

6. The method as described in claim 1, characterized in that, S5 includes: Determine the critical state of the first flip of the protection action sequence, and form a step-over boundary surface in the joint state space that satisfies the S2 state constraints: in: After scaling the boundary search coordinates, the minimum distance from the current state to the boundary surface is: In the formula, For the first The boundary surface at each predicted time; To satisfy the permissible joint state space of the topology, fault, control, and protection constraints described in S2; To protect the timing margin of actions; Coordinate mapping for extracting protection delay, control status coding, and fault characteristics from the joint state; Search for the coordinate vector for the corresponding boundary; This is the minimum distance from the current state to the boundary surface of the next level; This is a positive definite scaling matrix used to unify the search coordinate scales of all boundaries; This indicates taking the minimum value that satisfies the condition; Will obtain The boundary state is determined as the critical state combination corresponding to the current state.

7. The method as described in claim 1, characterized in that, S6 includes: By comparing the positional relationship between the joint reachable domain and the corresponding cross-level boundary surface at each prediction time along the prediction time, the prediction step in which the two first intersect is determined as: And calculate the percentage of reachable states that fall into the higher-level pre-action zone after intersection: In the formula, This is the prediction step number where the first boundary intersection occurs; This represents the remaining time from the current moment until the expected first boundary intersection. The time interval between adjacent prediction steps; Indicates the empty set; The percentage of reachable states in the area where the superior has taken the initiative; Let be a set measure function used to characterize the size of the corresponding reachable state set; Based on the distance of the cross-level boundary Expected first boundary intersection time The level of fault warning is determined by the percentage of reachable states in the higher-level advance action zone.

8. The method as described in claim 1, characterized in that, S7 includes: After new fault observation data arrives, it is determined whether a new operating condition inflection point, primary wiring topology change, lower-level clearing stage change, or converter control mode out-of-bounds change has occurred. If any of the above changes are detected, the current local fault evolution segment is redefined, and the protection coupling recursive relationship, propagation joint reachability domain, and out-of-level boundary surface are reconstructed based on the updated actual site information. If the aforementioned changes do not occur, maintain the current protection coupling recursive relationship and the overstepping boundary structure, continue propagating along the existing reachable domain pipeline and calculate the boundary drift velocity; It continuously outputs the current action sequence area, the distance to the over-level boundary, the expected boundary intersection time, the percentage of reachable states in the previous action area, the boundary drift speed, and the fault over-level warning level.

9. A method for early warning of fault escalation in new energy power stations based on protection coupling reachability domain boundary tracing, characterized in that, The fault over-level warning result includes one or more of the following: current action sequence area, over-level boundary distance, critical state combination, expected boundary intersection time, percentage of reachable states in the superior first-action area, boundary drift speed, and warning level; the fault over-level warning result is sent to the new energy power station monitoring module, protection setting review module, or manual handling module for fault over-level status display, protection coordination review, and warning handling.