A method for improving the resilience of information-physical systems in power restoration
By constructing a defense indicator system and a recovery decision-making framework, the resilience of cyber-physical systems under extreme events was addressed, the system's defense capabilities and recovery efficiency were improved, the risk of system silos and blind adjustments was reduced, and the system's rapid and reliable recovery was achieved.
Patent Information
- Application Number
- CN202611626880.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-21
- Publication Date
- 2026-11-20
AI Technical Summary
Existing technologies have failed to effectively enhance the resilience of cyber-physical systems during power outage recovery from extreme events. In particular, during the recovery phase, when the network structure is weak and measurement capabilities are limited, the systems are unable to cope with deliberate attacks and the continued damage caused by extreme events, resulting in unobservable systems and the risk of blind adjustments.
Construct a defense indicator system, including physical and information-level defense indicators, and establish a recovery decision framework, including an upper-level sequential recovery decision model, a lower-level real-time power scheduling model, and an emergency control model. Enhance the system's defense capabilities by optimizing component recovery sequences and power scheduling schemes.
It effectively enhances the defense capabilities of the system during recovery, reduces the formation of isolated systems, strengthens the defense capabilities at the communication layer, avoids the risk of blind adjustments, optimizes the power generation/load shedding scheme to minimize secondary power outage losses, and meets the real-time requirements of online decision-making.
Smart Images

Figure CN123144040A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power system dispatching technology, and specifically to a method for enhancing the resilience of cyber-physical systems during power outage recovery. Background Technology
[0002] In recent years, severe natural disasters and geopolitical crises have frequently occurred, leading to large-scale power outages in many parts of the world, causing significant economic losses and widespread social impact. Recovery from most such incidents is lengthy, and the power system may still be damaged again during the recovery period. Therefore, enhancing the power grid's ability to quickly restore and continuously supply power after large-scale power outages caused by extreme events is of great significance for reducing losses from such outages and ensuring the power supply needs of critical users.
[0003] During power outage restoration, the system network is vulnerable, with insufficient adjustment capabilities and limited available measurement equipment. If extreme events continue into the restoration phase, they can easily damage the integrity of the restored network and the availability of the restored system. Damage to network integrity or connectivity can trigger cascading failures or system disconnections, resulting in significant power deficits and ultimately causing the restored system to collapse. Furthermore, missing measurement data makes it difficult to effectively monitor the operational status of the restored system, leading to risks of blind commissioning and adjustments during restoration.
[0004] However, existing research on sequential decision-making for cyber-physical system resilience enhancement and system recovery has the following technical shortcomings: (1) The research object of cyber-physical system resilience enhancement is the normally operating power system, and the recovery state system has not been considered. If extreme events continue to act on the recovery phase, the network structure is weak and the measurement capability is limited, which may cause more serious power outage losses and unobservable scenarios; (2) At the physical level, existing sequential recovery decision-making research sets the scenario as a natural disaster when considering the system being damaged again, without involving the recovery risk caused by the continuous targeted damage to the weak network structure in the sequential recovery by deliberate attacks; (3) At the information level, existing sequential recovery decision-making research has not incorporated the global observability constraint of the phasor measurement unit (PMU) into the recovery model, nor has it considered the impact of recovery timing and power scheduling on the measurement redundancy of the PMU.
[0005] Therefore, there is an urgent need for a method to effectively enhance the resilience of cyber-physical systems during power outages caused by various extreme events such as severe natural disasters and deliberate attacks. Summary of the Invention
[0006] The technical problem to be solved by the present invention is to provide a method for improving the resilience of cyber-physical systems during power outage recovery, so as to overcome the technical defects of the prior art that do not consider the unavailability and observability of cyber-physical systems after extreme events during recovery, the targeted damage of weak recovery network by deliberate attacks, and the global observability of PMU measurements in sequential recovery modeling.
[0007] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows.
[0008] A method for enhancing the resilience of cyber-physical systems during power outage recovery includes the following steps: S1. Construct a defense indicator system for the recovered system, which includes physical layer defense indicators and information layer defense indicators; S2. Based on the aforementioned defense index system, a recovery decision framework for enhancing the resilience of cyber-physical systems under extreme scenarios is established. This framework includes an upper-layer sequential recovery decision model, a lower-layer real-time power scheduling model, and an emergency control model. The upper-layer sequential recovery decision model determines the component recovery sequence online based on the initial power outage state, wind power prediction data, and cyber-physical equipment damage information. The lower-layer real-time power scheduling model dynamically updates and executes the power scheduling scheme based on the component recovery sequence and real-time wind power data provided by the upper-layer sequential recovery decision model. The emergency control model is triggered when the restored system is damaged by an extreme event to minimize secondary power outage losses and determine the power scheduling boundary under emergency conditions. S3. Solve the recovery decision framework to determine the component recovery sequence and power scheduling scheme.
[0009] Preferably, in step S1, the physical layer defense indicators include: the average node degree indicator used to characterize the network connectivity. Scale-free metrics used to characterize the uniformity of network density distribution to reflect resilience against attack scenarios Limits on the number of power transmission and loop closing operations at each time step; and external recovery capability indicators used to characterize the ability of a restored system to transmit power externally. and load balance index used to characterize the degree of equilibrium of power flow distribution. ; The information-level defense metrics include: observability constraints used to characterize the complete observability of the system. and the average observable redundancy index used to characterize measurement redundancy. .
[0010] Preferably, the node average degree index The calculation formula is: in, u l,t Indicates the line lIn time step t The recovery state; B i,l Indicates the number of elements in the recovered system correlation matrix. i Line 1 l Column elements; Indicates time step t Number of lines that have been restored to the system; Ω B busbar set; Ω L For the set of routes; This is the set of time steps at which the physical devices of the recovered system may have been damaged. The scale-free index The calculation formula is: The calculation formula for the limit on the number of power-on operations and loop-closing operations at each time step is as follows: in, Indicates time step t The number of ring networks in the restored system; Indicates time step t Number of buses in the system that have been restored; N lp , N en The upper limit for the number of charges and loops at each time step; Ω T To restore the time step set; The outward recovery capability index The calculation formula is: in, u i,t Indicates busbar i In time step t The recovery state; The load balance index The calculation formula is: in, For the line l The deviation between the load rate and the average load rate; The observability constraint The calculation formula is: in, u ij,t Indicates the line ij In time step t The recovery state; A i,j Indicates the number of elements in the recovered system's adjacency matrix. iLine 1 j Column elements; Indicates busbar j Is a PMU configured? z j,t Indicates busbar j In time step t Is it a zero-injection bus? y ij,t Indicates zero-injection bus j In time step t Should the busbar be made i considerable; The average observable redundancy index The calculation formula is: in, Indicates time step t Number of lines that have been restored to the system.
[0011] Preferred, t The zero-injection bus mentioned in the time step j The basis for judgment is: The busbar i In time step t status The determination rule is as follows: in, Indicates busbar i In time step t The injection power.
[0012] Preferably, the objective function of the upper-level sequential recovery decision model is... for: in, This represents the cost factor for power outage losses due to unrestored loads; Indicates busbar i Total load; Indicates time step t busbar i The amount of load recovery; This represents the cumulative load recovery benefit weighting coefficient; , , and , , To restore the weighting coefficients of the cyber-physical system resilience index, and These are the weighting coefficients for topology and operational-level physical defense indicators, respectively. The weighting coefficients for communication-level defense indicators. , and These are the weighting coefficients for the topology-level node average degree index, scale-free index, and power transmission capacity index, respectively.
[0013] Preferably, the constraint formula of the upper-level sequential recovery decision model is: Among them, Ω W Ω E Ω G It consists of a wind farm, an energy storage power station, and a generator set. , They are time steps t wind farm w Efforts contributed (either positive or negative); , They are time steps t busbar i The restored active / reactive load; , They are time steps t line ij The active / reactive current; , They are time steps t line ij Phase angle difference and voltage difference at both ends; For generator g In time step t The starting power; For the line ij The charging power; busbar i The reactive power compensation at the location; b ij , g ij The lines are respectively ij susceptance and conductivity; For the line ij The transmission power limit; The maximum allowable phase angle difference; For generator g The rate of climb; , These are the grid connection and stable combustion state variables of the generator, respectively; , They are time steps t dynamo g Efforts contributed (either positive or negative); , Energy storage power stations e In time step t State of charge and output power; For energy storage power stations e The charge and discharge efficiency; The recovery step size; and Energy storage power stations e The minimum and maximum states of charge; For energy storage power stations e Rated power; , Indicates energy storage power station e In time step t The inertia and primary frequency modulation response capability that can be responded to; , Indicates wind farm w In time step t Inertia and primary frequency modulation response capability; For wind farm w In time step t Maximum power tracking power, , , These are the frequency drop rate, minimum point, and steady-state frequency deviation limits, respectively. , and These are the startup, grid connection, and stable combustion times, respectively. and These are the minimum time intervals required for generator grid connection and stable combustion, respectively; and These are the minimum times required for generator grid connection and stable combustion, respectively; and Representing time steps t , t -1 The recovery state of system components; u ij,t , u i,t They represent the lines respectively. ij busbar i In time step t The recovery status is indicated by a value of 1, which means the system has recovered, and a value of 0 means it has not recovered. The power factor angle; T d , D f , C f These represent the frequency response time, damping coefficient, and frequency response margin, respectively. , The recovered system is in time step t Inertia and primary frequency response capability.
[0014] Preferably, the objective function of the lower-level real-time power scheduling model is... for: .
[0015] Preferably, the objective function of the emergency control model for: in, This indicates the amount of load shedding.
[0016] Preferably, the constraints and output adjustment constraint formulas of the emergency control model are as follows: in, τ 0 represents the moment before the extreme event occurs. , τ This is the time for adjusting emergency control measures; This indicates the generator's starting power before the extreme event occurred; Indicates the load shedding amount. Indicates before the occurrence of extreme events τ 0 node i The amount of load recovery; , These represent the events before the extreme events occurred. τ 0 generator g Wind farm w The level of output; , and These represent the recovery status of power lines, wind farms, and energy storage before the occurrence of extreme events, respectively. , These represent the emergency backup power of the generator and the wind farm, respectively. and These represent the off-peak status of the generator and the wind farm, respectively; , , , and They represent the busbars respectively. i ,line ij ,dynamo g Wind farm w and energy storage power station e In time step τ Whether it has been damaged by an extreme event; 0 indicates damage, 1 indicates no damage; Ω Vδ For a balanced set of nodes; For balancing nodes i In time step τ The phase angle.
[0017] Preferably, step S3 specifically includes: S31. Normalize the terms in the objective function of the upper-level sequential recovery decision model, and solve the problem step by step by setting different combinations of weight coefficients to obtain the optimal values of each normalized term, thereby determining the final comprehensive objective function. : in, Represents the revenue from load recovery. , and These represent the topology-level node average degree index, scale-free index, and power transmission capacity index, respectively. This indicates that the system's operational indicators have been restored. This indicates that a considerable number of system indicators have been restored; And the weighting coefficients satisfy the following formula: S32. Linearize the nonlinear terms in the upper-level sequential recovery decision model, and transform the upper-level sequential recovery decision model into a mixed-integer linear programming model for solution.
[0018] The technological advancements achieved by this invention are as follows, thanks to the adoption of the above technical solutions.
[0019] This invention expands the research object of cyber-physical system resilience enhancement from normal operating power systems to recovered systems. In view of the characteristics of weak grid structure and limited measurement capabilities in the recovery phase, it constructs a defense index system for recovered systems covering both physical and information layers, which effectively enhances the defense capability of the system in the recovery phase against extreme events.
[0020] At the physical level, the node average degree index, scale-free index, outward recovery capability index, and load balance index proposed in this invention improve the resilience of the recovered system from four dimensions: topological connectivity, degree distribution balance, outward recovery capability, and power flow distribution balance. In particular, it effectively reduces the probability of island formation by reducing the scale-freeness of the network structure, which is crucial for the continuous and targeted damage to the weak recovery network structure caused by deliberate attacks.
[0021] At the information level, this invention incorporates the global observability constraint of the PMU into the recovery model and considers the impact of recovery timing and power scheduling on the redundancy of PMU measurements. By increasing the measurement redundancy of key buses on the recovery path, it enhances the defense capability of the power system recovery scheme at the communication level and avoids the risk of blind commissioning and blind adjustment caused by missing measurement data.
[0022] This invention constructs a recovery decision framework that coordinates an upper-level sequential recovery decision model, a lower-level real-time power scheduling model, and an emergency control model. When a restored system is damaged, the emergency control model can be triggered to optimize the power generation / load shedding scheme and adjust the subsequent recovery sequence, minimizing the losses from secondary power outages and achieving synchronous recovery on both the physical and information sides.
[0023] This invention transforms the mixed-integer nonlinear programming problem into a mixed-integer linear programming model by linearizing the nonlinear terms in the upper-level model, which significantly improves the solution efficiency and meets the real-time requirements of online decision-making. Attached Figure Description
[0024] Figure 1 This is a flowchart of the present invention; Figure 2 This is a schematic diagram illustrating the topology survivability analysis of a restored network structure under physical damage, as described in this invention. Figure 2 (a) is a diagram showing the impact of physical damage on the restored network connectivity. Figure 2 (b) is a diagram showing the impact of node degree distribution on the survivability of the network structure; Figure 3 This is a schematic diagram illustrating the system observability under different recovery paths according to the present invention, wherein, Figure 3 (a) is a schematic diagram of the system observability under recovery path 1. Figure 3(b) is a schematic diagram of the system observability under recovery path 2. Figure 3 (c) is a schematic diagram of the system observability under recovery path 3; Figure 4 This is a framework diagram of the recovery decision framework for enhancing the resilience of cyber-physical systems under extreme events, as presented in this invention. Figure 5 This is a schematic diagram of the topology and PMU placement points of the New England 39-node system in the example of this invention; Figure 6 This is a diagram showing the results of the power restoration scheduling scheme and the weighting coefficients of the objective function according to the present invention. Figure 6 (a) is a diagram showing the power recovery distribution of generators, wind farms, and energy storage power stations at each time step. Figure 6 (b) is a bar chart showing the inertial response of wind farms and energy storage power stations at different time points. Figure 6 (c) is a bar chart of the droop control support power of wind farms and energy storage power stations at various time steps. Figure 6 (d) is a bar chart of the weight coefficients of the objective function of the upper-level sequential recovery decision model; Figure 7 This invention presents recovery schemes and corresponding defense index results considering and not considering the risks of extreme events. Figure 7 (a) is a graph showing the total load recovery results. Figure 7 (b) is a graph showing the results of the node average degree index. Figure 7 (c) is a graph showing the results of the scale-free index. Figure 7 (d) is a graph showing the results of the outward recovery capability index. Figure 7 (e) is a graph showing the results of the load balance index. Figure 7 (f) is a graph showing the results of the power flow entropy index; Figure 8 The figures shown are Monte Carlo simulation results with and without considering the risk of extreme events in this invention. Figure 8 (a) is a simulation result diagram of the total load shedding. Figure 8 (b) Simulation results for the number of scenes forming the maximum number of isolated islands; Figure 9 This is a comparison diagram of the apparent redundancy of different recovery schemes of the present invention. Detailed Implementation
[0025] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.
[0026] A method for enhancing the resilience of cyber-physical systems during power outage recovery, combining Figure 1 As shown, it includes the following steps: S1. Construct a defense indicator system for the recovered system.
[0027] The defense indicator system includes physical defense indicators and information defense indicators.
[0028] (1) Physical defense indicators: From a topological connectivity perspective, a highly connected topology helps reduce the formation of islands during power system recovery from physical component failures. Since the number of generators restored during power system recovery is limited, island formation can easily lead to significant load losses and may render the system unable to continue recovery. Figure 2 As shown in (a), the failure of a restored component splits the system into two islands. Since island B has no restored generator, the load will be completely lost and cannot be restored.
[0029] Furthermore, the scale-free nature of a space frame is closely related to the consequences of different types of physical damage. For physical damage caused by targeted attacks, the stronger the scale-free nature of the space frame, the higher its vulnerability, and the two are strongly correlated; therefore, the scale-free nature of the space frame can be appropriately reduced when reconstructing the space frame structure. However, for natural disaster scenarios with weaker targeting, the correlation between scale-free nature and space frame vulnerability is weaker, and the requirements for scale-free nature indicators can be appropriately relaxed.
[0030] Figure 2 (b) shows different degree distributions for the same number of nodes. From top to bottom, the degree sequences are (1,1,3,1), (1,2,3,2), and (2,2,2,2), with average node degrees of 1.5, 2, and 2, respectively. Figure 2 (b) Any node or edge in the top graph will form an island; removing node A in the middle graph will form two islands, while removing one edge does not necessarily form an island; for the bottom graph, removing any node or edge will not form an island. It can be seen that under targeted physical destruction, the more uneven the degree distribution of the restored system, that is, the stronger the scale-freeness, the greater the probability of island formation.
[0031] Based on the above analysis, the indices shown in equations (1)-(2) are proposed to characterize the time step. t The network connectivity and degree distribution balance of the system have been restored. Equation (1) represents the time step. t The average degree of nodes in the restored system can partially reflect the connectivity of the restored system; the index defined in Equation (2) is used to characterize the balance of node degree distribution, so as to further reflect the connectivity of the restored system under targeted attack scenarios. Figure 2 (b) Scale-free indices of the central grid structure The calculated values are 3, 2, and 0, respectively. The smaller the value, the better the resilience of the recovered system under attack scenarios.
[0032] Furthermore, the number of power-on operations and loop-closing operations at each time step is limited, as shown in Equation (3). Further, to ensure the restored system has sufficient external recovery capability, the index shown in Equation (4) is introduced. The larger the value of this index, the more available recovery power transmission channels there are.
[0033] (1) (2) (3) (4) in, u l,t Indicates the line l In time step t The recovery state; u i,t Indicates busbar i In time step t The recovery state; Indicates time step t The number of ring networks in the restored system; Indicates time step t Number of buses in the system that have been restored; Indicates time step t The number of lines that have been restored to the system; B i,l Indicates the number of elements in the recovered system correlation matrix. i Line 1 l Column elements; N lp , N en The upper limit for the number of charges and loops at each time step; Ω T To recover the time step set; Ω L For the set of lines; Ω B busbar set; This is a set of time steps where the physical equipment of the restored system may have been damaged.
[0034] From the perspective of the restored system operation, the power flow entropy index can reflect the degree of balance of the power flow distribution in the system. The larger the power flow entropy, the more uneven the power flow distribution of the line, and the easier it is to trigger large-scale power flow transfer and cascading failures under physical damage; the more uniform the power flow distribution, the smaller the entropy value. Therefore, the load balance index can be used to reflect the defense capability of the restored system against physical damage, as shown in equations (5)-(8). Equation (5) represents the absolute value of the line load rate, equation (6) represents the average line load rate, and equation (7) represents the line load rate. l The deviation between the load rate and the average load rate, Equation (8) represents the average value of the line load rate deviation, i.e. the load balance index.
[0035] (5) (6) (7) (8) in, This is the set of time steps at which extreme events may occur. Indicates the line l In time step t The meritorious trend; Indicates the line l Thermal stability limit, For the line l In time step t load factor For time step t Average load rate of all lines For time step t Number of lines restored For the line l The absolute value of the difference between the average load factor and the mean load factor. For all lines The average value, i.e., the load balance index.
[0036] In summary, physical defense metrics include: the average degree of nodes used to characterize network connectivity. Scale-free metrics used to characterize the uniformity of network density distribution to reflect resilience against attack scenarios Limits on the number of power transmission and loop closing operations at each time step; and external recovery capability indicators used to characterize the ability of a restored system to transmit power externally. and load balance index used to characterize the degree of equilibrium of power flow distribution. .
[0037] (2) Information-level defense indicators: The high-frequency synchronous data provided by the PMU significantly improves the accuracy of state estimation and dynamic monitoring capabilities. During normal operation, complete observability of each bus is typically required, which is a core constraint of optimal PMU configuration. Since the PMU on each bus can measure the voltage phasor of that bus and the current phasor of all associated branches, system-wide observability does not necessitate installing a PMU on every bus. Installing PMUs on a subset of all buses is sufficient to ensure high measurement redundancy during normal operation. During Power System Restoration (PSR), real-time sensing of frequency, voltage, and other states is required, and the observability and controllability of the restoration operation require synchronous restoration between the information and physical systems. The choice of restoration path affects whether the PMU configuration during normal operation can achieve complete observability in the restoration phase topology. Figure 3As shown, a normally operating system is fully observable. According to the PMU observability principle, Figure 3 In (a), buses 4, 5, and 12 are unobservable under the recovery path, while Figure 3 (b) and Figure 3 All buses in the recovery path in (c) are observable. Therefore, the sequential recovery scheme should ensure the complete observability of the recovered system at each time step, as shown in equations (9)-(12).
[0038] Furthermore, zero-injection buses can be divided into two categories: structural and temporary. Structural zero-injection buses are determined by the system topology design (such as switchyards and tie buses) and maintain zero injection throughout the entire recovery process, regardless of the operating state. Temporary zero-injection buses, on the other hand, depend on the system operating state: when the connected load or generator recovers, they will become non-zero-injection buses. If a recovered bus receives neither power injection from the connected generator / wind farm / energy storage nor recovering load, it can be considered a zero-injection bus, as shown in equation (11).
[0039] In cyber-physical system (CPS) disruption scenarios, damage to physical components and communication unavailability reduce measurement redundancy. However, high measurement redundancy is required to accurately identify the restored system state under extreme events and enable rapid activation of safety and stabilization devices after system disturbances. Therefore, by increasing the measurement redundancy of critical buses on the recovery path, the defensive capabilities of the system recovery scheme at the communication layer can be enhanced. The measurement redundancy index is defined as shown in Equation (12), and its larger value indicates stronger robustness of the communication system when the CPS is disrupted.
[0040] (9) (10) (11) (12) in, u ij,t Indicates the line ij In time step t The recovery state; A i,j Indicates the number of elements in the recovered system's adjacency matrix. i Line 1 j Column elements; Indicates busbar j Is a PMU configured? z j,t Indicates busbar j In time step t Is it a zero-injection bus? y ij,t Indicates zero-injection bus jIn time step t Should the busbar be made i considerable; Indicates busbar i In time step t The injection power; Indicates time step t Number of lines that have been restored to the system.
[0041] In summary, information-level defense metrics include: observability constraints used to characterize the complete observability of a system. As shown in equation (9), and the average observable redundancy index used to characterize the redundancy of measurements. As shown in equation (12). Specifically, zero-injection bus j The judgment basis is Equation (10); busbar i In time step t status The determination rule is given by equation (11).
[0042] S2. Based on the defense indicator system, establish a recovery decision framework for improving the resilience of cyber-physical systems under extreme scenarios.
[0043] (1) Recovery decision framework for enhancing the resilience of cyber-physical systems in extreme scenarios: Figure 4 The proposed recovery decision-making framework and the coupling relationships between its various decision-making modules are demonstrated. Based on differences in decision logic, the framework is divided into two distinct layers: the upper layer constructs a sequential system recovery model, which comprehensively considers recovery benefits, the safety and stability level of the restored system, and resilience. Utilizing the initial power outage state, wind power prediction data, and cyber-physical equipment damage information, it determines the component recovery sequence online. The lower layer establishes a real-time power scheduling model, which dynamically updates and executes the power scheduling scheme based on the component recovery sequence and real-time wind power data provided by the upper layer.
[0044] However, when extreme events cause recovered components to fail, traditional top-down and bottom-up decision-making must be dynamically adjusted based on the destructive consequences of the extreme event, such as... Figure 4 As shown. To address this emergency, an emergency control model is introduced into the framework. This model takes steps when a recovered system is damaged. τ Zero-trigger design aims to optimize generation / load shedding schemes under emergency conditions, thereby minimizing secondary power outage losses and determining power dispatch boundaries in emergency situations. Based on this, the output of the emergency control model serves as a prerequisite for driving timing adjustments of upper-level execution components. Subsequently, the adjusted component recovery timing is used in subsequent time steps ( t k , t k+1 , …) Determine the power scheduling scheme.
[0045] In summary, the recovery decision framework includes an upper-level sequential recovery decision model, a lower-level real-time power scheduling model, and an emergency control model. The upper-level sequential recovery decision model is used to determine the component recovery sequence online based on the initial power outage state, wind power prediction data, and information on damage to cyber-physical equipment. The lower-level real-time power scheduling model is used to dynamically update and execute the power scheduling scheme based on the component recovery sequence and real-time wind power data provided by the upper-level sequential recovery decision model. The emergency control model is triggered when the restored system is damaged by an extreme event to minimize secondary power outage losses and determine the power scheduling boundary under emergency conditions.
[0046] (2) Upper-level sequential recovery decision model: The upper-level sequential recovery decision model aims to maximize recovery benefits and enhance the resilience of cyber-physical systems during recovery. Its objective function... As shown in equation (13): (13) in, This represents the cost factor for power outage losses due to unrestored loads; Indicates busbar i Total load; Indicates time step t busbar i The amount of load recovery; This represents the cumulative load recovery benefit weighting coefficient; and These are the weighting coefficients for topology and operational-level physical defense indicators, respectively. The weighting coefficients for communication-level defense indicators. , and These are the weighting coefficients for the topology-level node average degree index, scale-free index, and power transmission capacity index, respectively.
[0047] The constraint formulas for the upper-level sequential recovery decision model are as follows: (14) (15) (16) (17) (18) (19) (20) (twenty one) (twenty two) (twenty three) (twenty four) (25) (26) (27) (28) (29)
[0048] Among them, Ω W Ω E Ω G It consists of a wind farm, an energy storage power station, and a generator set. , They are time steps t wind farm w Efforts contributed (either positive or negative); , They are time steps t busbar i The restored active / reactive load; , They are time steps t line ij The active / reactive current; , They are time steps t line ij Phase angle difference and voltage difference at both ends; For generator g In time step t The starting power; For the line ij The charging power; busbar i The reactive power compensation at the location; b ij , g ij The lines are respectively ij susceptance and conductivity; For the line ij The transmission power limit; The maximum allowable phase angle difference; For generator g The rate of climb; , These are the grid connection and stable combustion state variables of the generator, respectively; , They are time steps t dynamo g Efforts contributed (either positive or negative); , Energy storage power stations e In time step t State of charge and output power; For energy storage power stations e The charge and discharge efficiency; The recovery step size; and Energy storage power stations e The minimum and maximum states of charge; For energy storage power stations e Rated power; , Indicates energy storage power station e In time step t Inertia and primary frequency modulation response capability; , Indicates wind farm w In time step t Inertia and primary frequency modulation response capability; For wind farm w In time step t Maximum power tracking power, , , These are the frequency drop rate, minimum point, and steady-state frequency deviation limits, respectively. , and These are the startup, grid connection, and stable combustion times, respectively. and These are the minimum time intervals required for generator grid connection and stable combustion, respectively; and These are the minimum times required for generator grid connection and stable combustion, respectively; and Representing time steps t , t -1 The recovery state of system components; u ij,t , u i,t They represent the lines respectively. ij busbar i In time step t The recovery status is indicated by a value of 1, which means the system has recovered, and a value of 0 means it has not recovered. The power factor angle; T d , D f , C f These represent the frequency response time, damping coefficient, and frequency response margin, respectively. , The recovered system is in time step t Inertia and primary frequency response capability.
[0049] Specifically, Equation (14) indicates that the recovery status of the restored bus, line, generator, wind farm and energy storage will not change when the physical components are damaged.
[0050] Equations (15)-(16) define the recovery logic for busbars and lines.
[0051] Equation (17) defines the time limit for generator recovery.
[0052] Equation (18) defines the recovery time limit for wind farms / energy storage.
[0053] Equation (19) represents the power balance constraint.
[0054] Equations (20)-(21) are steady-state power flow constraints, where the state variables of the power flow equations are restricted to the safe operating range.
[0055] Equation (22) represents the generator g The active power output before reaching a stable combustion state.
[0056] Equation (23) is for generator g Climbing constraints.
[0057] Equation (24) specifies the upper and lower limits of the active and reactive power output of the generator.
[0058] Equation (25) represents the time step. t busbar i The amount of active / reactive load recovery.
[0059] Equation (26) represents the recovery time step. t The state of charge of stored energy.
[0060] Equation (27) represents the charging and discharging power limit of energy storage, wherein the charging power limit takes into account the reserve power of energy storage for inertial support and primary frequency regulation.
[0061] Equation (28) represents the reserve power of wind power used for inertial support and primary frequency regulation.
[0062] Equation (29) is the frequency security constraint during recovery, specifying the time step. t Maximum power change within The frequency regulation capability of the restored system must not be exceeded, which is characterized by the maximum permissible rate of frequency change / frequency minimum / steady-state frequency deviation.
[0063] Furthermore, the observability constraints in equations (9)-(11) are also included in the upper-level decision-making. When a component is damaged due to an extreme event and the subsequent recovery timing needs to be adjusted, the upper-level model consisting of equations (9)-(11) and (14)-(29) should be resolved based on the updated equipment damage state. In some extreme scenarios, the recovered system may not be able to meet the complete observability requirement. Therefore, equation (9) can be introduced as a penalty term into the objective function to relax this constraint.
[0064] (3) Lower-level real-time power scheduling model: The lower-level real-time power scheduling model aims to maximize time steps. t The recovery benefits, its objective function As shown in equation (30), the component recovery sequence has been obtained through the upper-level sequential recovery decision model, and the constraints are given by equations (19)-(29). p mppt w,t updated to wind farm w In time step t The measured power.
[0065] (30) (4) Emergency control model: In a restored system, it is assumed that any component could potentially be damaged, including lines, generators, substations, wind farms, and energy storage. During the recovery process... τ After an extreme event occurs, the fault states of system components are respectively represented by... , , , and The value of 0 indicates that the component is damaged. Therefore, the emergency control model of the system that has recovered after an extreme event can be expressed as equations (31)-(38). Equation (31) is the objective function, equations (32)-(34) are the constraints, and equations (35)-(38) are the output adjustment constraints.
[0066] (31) (32) (33) (34) (35) (36) (37) (38) in, τ 0 represents the moment before the extreme event occurs. , τ This is the time for adjusting emergency control measures; This indicates the generator's starting power before the extreme event occurred; Indicates the load shedding amount. Indicates before the occurrence of extreme events τ 0 node i The amount of load recovery; , These represent the events before the extreme events occurred. τ 0 generator g Wind farm w The level of output; , and These represent the recovery status of power lines, wind farms, and energy storage before the occurrence of extreme events, respectively. , These represent the emergency backup power of the generator and the wind farm, respectively. and These represent the off-peak status of the generator and the wind farm, respectively; , , , and They represent the busbars respectively. i ,line ij ,dynamo g Wind farm w and energy storage power station e In time step τ Whether it has been damaged by an extreme event; 0 indicates damage, 1 indicates no damage; Ω Vδ For a balanced set of nodes; For balancing nodes i In time step τ The phase angle.
[0067] S3. Solve the recovery decision framework to determine the component recovery sequence and power scheduling scheme.
[0068] Step S3 specifically includes: S31. Normalize the terms in the objective function of the upper-level sequential recovery decision model, and solve the problem step by step by setting different combinations of weight coefficients to obtain the optimal values of each normalized term, thereby determining the final comprehensive objective function. The details are as follows: The objective function (13) of the upper-level sequential recovery decision model contains multiple optimization objectives. To better determine the weight coefficients, each objective needs to be normalized. Normalization involves dividing each objective by a reference denominator to ensure it falls within a specific range. This includes the following steps: S311. The first term in the objective function can be normalized as: (39) in, This refers to the cumulative load recovery benefit term in the normalized objective function.
[0069] S312. Will α res , β 2. β 3. α oper and α obs Set to 0, α topo and β Set 1 to 1, and then solve the upper-level sequential recovery decision model to obtain the target value. . I AD Normalization can be performed using equation (40).
[0070] (40) in, This refers to the node average degree index in the normalized objective function.
[0071] S313. Will α topo , α oper and α obs Set the value to 0 and solve the upper-level model. At this point, the model degenerates into a conventional system recovery optimization problem with the objective of maximizing load recovery benefits. The optimized result... I SF,t , value , As its upper bound, the normalized expression is shown in equations (41)-(42).
[0072] (41) (42) in, , These are the scale-free index term and the load balance index term in the normalized objective function, respectively.
[0073] S314. Will α res , β 1. β 2. α oper and α obs Set to 0, α topoand β Set 3 to 1, and then solve the upper-level sequential recovery decision model to obtain the target value. . I EX Normalization can be performed using equation (43).
[0074] (43) in, This refers to the power transmission capacity index in the normalized objective function.
[0075] S315. [The following appears to be a separate, unrelated sentence:] Will α res , α topo and α oper Set to 0, α obs Set it to 1, and then solve the upper-level sequential recovery decision model to obtain the target value. . o SY It can be normalized by equation (44).
[0076] (44) in, This refers to the observable redundancy index in the normalized objective function.
[0077] Finally, the objective function of the upper-level sequential recovery decision model can be expressed as equation (45). The weight coefficients satisfy the relationship shown in equation (46).
[0078] (45) (46) S32. Linearize the nonlinear terms in the upper-level sequential recovery decision model, and transform the upper-level sequential recovery decision model into a mixed-integer linear programming model for solution.
[0079] The mixed integer model established at the upper level contains nonlinear terms. To improve the solution efficiency, the model needs to be linearized. Equations (2), (5), and (7) contain absolute value terms. Taking equation (5) as an example, its linear expression is shown in equation (47). Equations (1), (4), (6), (8), and (11) contain the product of continuous variables and integer variables, and need to be linearized. Taking equation (1) as an example, it can be linearized using equations (48)-(51) to express the integer variables of the number of busbars. By introducing binary variables Let it be expressed as shown in equation (49). Substituting equation (49) into equation (48) yields equations (50) and (51). Furthermore, equation (11) can be linearized using equation (52).
[0080] (47) (48) (49) (50) (51) (52) Where M is a sufficiently large positive number; It is a binary auxiliary variable used to represent the two possible states of the absolute value term; ρ Satisfy 2 ρ-1 |Ω B | 2 ρ ; The introduced auxiliary variable takes the value of Or 0.
[0081] Example: To verify the feasibility and effectiveness of the proposed method, a New England 39-node system was used as an example. All tests were performed on a standard PC equipped with a Core i9-14900KF 3.2GHz CPU and 128 GB RAM, and solved using the GUROBI 12.0.3 solver in the MATLAB environment. Frequency response parameters f max,ss , f max and ROCOF max The frequencies are set to 0.5Hz, 0.8Hz, and 0.5Hz / s, respectively. Assuming a recovery step size of 15 minutes (1 pu), the black-start generator G1 can provide recovery power in the first time step. The minimum and maximum state-of-charge percentages (SoCs) of the energy storage system are set to 0.1 and 0.9, respectively, and the initial SoCs of both energy storage systems are set to 0.8. The maximum inertia constants of the wind farm and energy storage system are set to 4s and 5s, respectively. The maximum droop coefficients of the generator, wind farm, and energy storage system are all set to 5%. The system topology is as follows: Figure 5 As shown in Table 1, the generator data is set to G1 for black start units. N en and N lpThe time domain for recovery decision-making is set to 25 time steps, with 4 and 2 respectively. Wind farms are connected to buses 3, 5, 14, 16, and 17, with rated capacities of 150MW, 250MW, 150MW, 200MW, and 150MW respectively. Two energy storage systems are located on buses 8 and 15, each with a capacity of 20 MW / 40 MW·h. Reactive power generated during line charging can be compensated by reactive power compensation devices. The installation locations of PMUs are determined based on the principle of ensuring complete observability and maintaining a certain degree of redundancy under normal operating conditions, with a total of 25. Table 1 shows the generator data for the New England 39-node grid; Table 2 provides the coefficients of the normalized objective function, as follows: Table 1. New England 39-node generator data
[0082] Table 2. Normalized objective function coefficients (1) System recovery plan: The component recovery timing is shown in Table 3: Table 3 Component Recovery Timing All components are restored before time step 13, with all generators, wind farms, and energy storage restored at time steps 11, 5, and 10, respectively. Figure 6 This demonstrates the power recovery scheme for generators / wind farms / energy storage, the frequency support scheme for wind farms and energy storage, and the normalized values of each term in the objective function. From... Figure 6 (a) It can be seen that all loads have been restored by step 24. From Figure 6 (b) It can be seen that all wind farms and energy storage provided inertial response power support throughout the recovery process, and the total support power of wind farms and energy storage reached a maximum of 76 MW at time steps 10-18 and 21. Figure 6 (c) shows that W2, W3, and W5 provide droop control power support for most time steps, reaching a maximum of 220 MW in time steps 4–6 and 15–18. W1 and W4 provide droop control power support only in time steps 2 and 9, respectively, for 60 MW and 9.72 MW. Figure 6 (d) gives the normalization term of the objective function. I AD , I SF and I EX The optimized value is close to its estimated value, indicating that the optimization margin of topology reconstruction is limited throughout the recovery process. In contrast, the load balancing index ( F upp5 ) and observability indicators ( F upp6It exhibits a relatively large optimization margin.
[0083] (2) Verification of the effectiveness of the proposed defense indicators under the scenario of physical component damage: Physical component failures caused by extreme events during system recovery can lead to system crashes and delay subsequent recovery processes. To improve the resilience of recovered systems to extreme events from both topology and operational safety boundaries, this invention proposes three metrics: F upp2 , F upp3 and F upp5 In addition, to enhance the system's ability to sustain recovery after extreme events, an outward recovery capability indicator was added to the aforementioned resilience indicators. I EX To verify the effectiveness of the defense indicators in the proposed model, it is compared with recovery schemes that do not consider these indicators. A comparison of the defense indicators of the scheme that does not consider the risk of extreme events (Scheme 1-1) and the scheme of this invention (Scheme 1-2) is shown below. Figure 7 As shown.
[0084] Figure 7 (a) It is evident that the impact of schemes 1-2 on the total load recovery at each time step is negligible. Therefore, using the method proposed in this invention to improve the resilience of the recovery scheme under extreme scenarios will not reduce the load recovery benefits. Figure 7 (b) and Figure 7 (c) It can be seen that under schemes 1-2, the recovery scheme... I AD and I SF Significant improvements were observed at time steps 9-12 and 4-12, respectively. In the early to mid-stages of recovery, rapid load recovery and limited recovery operational capability hampered topology connectivity metrics. I AD Effective improvement; in the early stages of recovery, the limited number of scalable buses reduces the number of recovery path options, thus limiting the reflection of the network's scale-free characteristics. I SF index. Figure 7 (d) shows the average degree of the restored busbar. When not considering... I EX At time step 3, the average degree of the restored bus decreases significantly, and the number of buses that can be restored externally is significantly reduced. This makes the system more susceptible to losing its ability to supply power or obtain restoration power from external sources after physical damage under extreme events. The load balancing index used in this invention has been proven to have a significant effect on improving power flow entropy, thereby enhancing the disturbance immunity of the restored system. Figure 7 (e) and Figure 7(f) shows a positive correlation between the two indicators. In the power flow entropy calculation, the line load rate interval [0,1] is uniformly divided into 100 parts.
[0085] To further verify the effectiveness of the proposed defense metrics, the Monte Carlo method was used to simulate the physical damage caused by extreme events to the recovered system. In the Monte Carlo simulation, the time period for line faults was selected as the first 13 time steps, and the damaged components were defined as recovered lines. The physical damage risk defense capability was quantified by the amount of load shedding after the attack and the number of islands. The amount of load shedding directly reflects the system's defense capability: the higher the load shedding, the weaker the defense. Meanwhile, the formation of islands in the recovered system after the attack severely weakens subsequent recovery capabilities, mainly for the following reasons: 1) Recovered resources may be unevenly distributed among multiple islands, resulting in inefficient utilization of overall available resources. 2) Subsequent coordinated recovery and synchronization between islands increases the difficulty of recovery decisions and operations. Figure 8 The simulations show the load shedding and the proportion of scenarios that form the maximum number of islands after 500 Monte Carlo simulations. Figure 8 (a) It is evident that, in the simulated scenario where physical components are damaged, the load shedding capacity of the recovery scheme without considering defense indicators is significantly inferior to that of the scheme considering defense indicators. In the case of random damage to two lines, the maximum number of islands formed by both recovery schemes (considering and not considering defense indicators) is 3. Figure 8 (b) shows that the number of scenarios reaching the maximum number of isolated islands was 321 and 286, respectively. This result indicates that the scheme considering defense metrics has a significant advantage.
[0086] (3) Verification of the effectiveness of defense indicators at the information system level: To illustrate the importance of considering observability constraints and metrics, this invention constructs three recovery schemes: Scheme 1 does not consider observability constraints and metrics, Scheme 2 considers observability constraints but not observability metrics, and Scheme 3 considers both observability constraints and metrics.
[0087] Table 4 shows the bus observability during the recovery period for different comparative schemes. It can be seen that, in a scenario where the cyber-physical system is not compromised, scheme 1 results in some bus observability. This invention, by assuming that certain line measurements are available, uses the Monte Carlo method to simulate network attack or physical damage scenarios to analyze extreme cases.
[0088] Table 4. Observability of restoring the busbar in the absence of damage to the cyber-physical system Table 5 presents the global observability results of the recovered system in 500 Monte Carlo simulations. In the extreme scenario of randomly selected information system failures, Scheme 2 exhibits global unobservability more frequently than Scheme 3. Furthermore, from... Figure 9It can be seen that the considerable redundancy of Scheme 2 at each time step is significantly lower than that of Scheme 3. It should be noted that from time steps 9 to 25, the total number of bus measurements in Scheme 3 is greater than that in Scheme 2. The main reason is that the number of zero-injection buses is increased by optimizing the power recovery scheduling scheme.
[0089] Specifically, in time steps 23 to 25, the total number of bus measurements in Scheme 3 is two more than that in Scheme 2. This is because in Scheme 3, 6.5 MW and 8.53 MW of load on bus 9 and bus 12 respectively have not yet been restored, thus providing two additional zero-injection measurements.
[0090] Table 5. Global observability of the recovered system under 500 Monte Carlo simulations The working principle of this invention is as follows: First, considering the characteristics of a weak system network, insufficient regulation capacity, and limited available measurement equipment during power outage recovery, a defense index system for the recovered system is constructed from both physical and informational perspectives. At the physical level, the average node degree index characterizes network connectivity, a scale-free index characterizes the uniformity of network degree distribution to reflect resilience against attack scenarios, the number of power-on and loop-closing operations constrains the recovery operation rhythm, an outward recovery capability index characterizes the outward recovery capability of the recovered system, and a load balance index characterizes the degree of power flow distribution balance. At the informational level, observability constraints ensure that the recovered system is fully observable at each time step, the average observable redundancy index characterizes measurement redundancy, and structural zero-injection buses and temporary zero-injection buses are distinguished to accurately calculate measurement redundancy.
[0091] Secondly, based on the aforementioned defense indicator system, a recovery decision framework for enhancing the resilience of cyber-physical systems (CPS) under extreme scenarios is established. This framework includes an upper-level sequential recovery decision model, a lower-level real-time power scheduling model, and an emergency control model. The upper-level sequential recovery decision model aims to maximize recovery benefits and enhance the resilience of CPS during recovery. It comprehensively considers recovery gains, the safety and stability level of the restored system, and its resilience, utilizing the initial power outage state, wind power prediction data, and information on damage to CPS equipment to determine the component recovery sequence online. The lower-level real-time power scheduling model dynamically updates and executes the power scheduling scheme based on the component recovery sequence and real-time wind power data provided by the upper layer. When an extreme event causes a failure in a restored component, the emergency control model is triggered to optimize the generation / load shedding scheme under emergency conditions, minimize secondary power outage losses, and determine the power scheduling boundary under emergency conditions. The output of the emergency control model serves as a prerequisite for driving the upper-level component timing adjustments; the adjusted component recovery timing is used to determine the power scheduling scheme in subsequent time steps.
[0092] Finally, the recovery decision framework is solved. The terms in the objective function of the upper-level sequential recovery decision model are normalized. By setting different combinations of weight coefficients, the solution is obtained step-by-step to obtain the optimal values of each normalized term, thereby determining the final comprehensive objective function. The nonlinear terms in the upper-level sequential recovery decision model are linearized, transforming the mixed-integer nonlinear programming problem into a mixed-integer linear programming model. The GUROBI solver is used to solve this model, determining the component recovery sequence and power scheduling scheme.
[0093] Through the above-mentioned technical solution, this invention effectively enhances the cyber-physical system's ability to defend against physical and information damage during power outage recovery, improves the resilience of the system's continuous recovery and power supply, and has significant technological progress and practical value.
Claims
1. A method for enhancing the resilience of a cyber-physical system during power outage recovery, characterized in that: Includes the following steps: S1. Construct a defense indicator system for the recovered system, which includes physical layer defense indicators and information layer defense indicators; S2. Based on the aforementioned defense index system, establish a recovery decision framework for enhancing the resilience of cyber-physical systems under extreme scenarios; The recovery decision framework includes an upper-level sequential recovery decision model, a lower-level real-time power scheduling model, and an emergency control model. The upper-level sequential recovery decision model is used to determine the component recovery sequence online based on the initial power outage state, wind power prediction data, and cyber-physical equipment damage information. The lower-level real-time power scheduling model is used to dynamically update and execute the power scheduling scheme based on the component recovery sequence and real-time wind power data provided by the upper-level sequential recovery decision model. The emergency control model is used to trigger when the restored system is damaged by an extreme event, in order to minimize secondary power outage losses and determine the power scheduling boundary under emergency conditions. S3. Solve the recovery decision framework to determine the component recovery sequence and power scheduling scheme.
2. The method for enhancing the resilience of cyber-physical systems during power outage recovery according to claim 1, characterized in that: In step S1, the physical defense metrics include: an average node degree metric to characterize network connectivity, and a scale-free metric to characterize the uniformity of network degree distribution to reflect resilience against attack scenarios. Limits on the number of power transmission and loop closing operations at each time step; and external recovery capability indicators used to characterize the ability of a restored system to transmit power externally. and load balance index used to characterize the degree of equilibrium of power flow distribution. ; The information-level defense metrics include: observability constraints used to characterize the complete observability of the system. and the average observable redundancy index used to characterize measurement redundancy. .
3. The method for enhancing the resilience of cyber-physical systems during power outage recovery according to claim 2, characterized in that: The node average degree index The calculation formula is: in, u l,t Indicates the line l In time step t The recovery state; B i,l Indicates the number of elements in the recovered system correlation matrix. i Line 1 l Column elements; Indicates time step t Number of lines that have been restored to the system; Ω B busbar set; Ω L For the set of routes; This is the set of time steps at which the physical devices of the recovered system may have been damaged. The scale-free index The calculation formula is: The calculation formula for the limit on the number of power-on operations and loop-closing operations at each time step is as follows: in, Indicates time step t The number of ring networks in the restored system; Indicates time step t Number of buses in the system that have been restored; N lp , N en The upper limit for the number of charges and loops at each time step; Ω T To restore the time step set; The outward recovery capability index The calculation formula is: in, u i,t Indicates busbar i In time step t The recovery state; The load balance index The calculation formula is: in, For the line l The deviation between the load rate and the average load rate; The observability constraint The calculation formula is: in, u ij,t Indicates the line ij In time step t The recovery state; A i,j Indicates the number of elements in the recovered system's adjacency matrix. i Line 1 j Column elements; Indicates busbar j Is a PMU configured? z j,t Indicates busbar j In time step t Is it a zero-injection bus? y ij,t Indicates zero-injection bus j In time step t Should the busbar be made i considerable; The average observable redundancy index The calculation formula is: in, Indicates time step t Number of lines that have been restored to the system.
4. The method for enhancing the resilience of a cyber-physical system during power outage recovery according to claim 3, characterized in that: t The zero-injection bus mentioned in the time step j The basis for judgment is: The busbar i In time step t status The determination rule is as follows: in, Indicates busbar i In time step t The injection power.
5. A method for enhancing the resilience of cyber-physical systems during power outage recovery according to claim 4, characterized in that: The objective function of the upper-level sequential recovery decision model for: in, This represents the cost factor for power outage losses due to unrestored loads; Indicates busbar i Total load; Indicates time step t busbar i The amount of load recovery; This represents the cumulative load recovery benefit weighting coefficient; , , and , , To restore the weighting coefficients of the cyber-physical system resilience index, and These are the weighting coefficients for topology and operational-level physical defense indicators, respectively. The weighting coefficients for communication-level defense indicators. , and These are the weighting coefficients for the topology-level node average degree index, scale-free index, and power transmission capacity index, respectively.
6. The method for enhancing the resilience of a cyber-physical system during power outage recovery according to claim 5, characterized in that: The constraint formula for the upper-level sequential recovery decision model is as follows: Among them, Ω W Ω E Ω G It consists of a wind farm, an energy storage power station, and a generator set. , They are time steps t wind farm w Efforts contributed (either positive or negative); , They are time steps t busbar i The restored active / reactive load; , They are time steps t line ij The active / reactive current; , They are time steps t line ij Phase angle difference and voltage difference at both ends; For generator g In time step t The starting power; For the line ij The charging power; busbar i The reactive power compensation at the location; b ij , g ij The lines are respectively ij susceptance and conductivity; For the line ij The transmission power limit; The maximum allowable phase angle difference; For generator g The rate of climb; , These are the grid connection and stable combustion state variables of the generator, respectively; , They are time steps t dynamo g Efforts contributed (either positive or negative); , Energy storage power stations e In time step t State of charge and output power; For energy storage power stations e The charge and discharge efficiency; The recovery step size; and Energy storage power stations e The minimum and maximum states of charge; For energy storage power stations e Rated power; , Indicates energy storage power station e In time step t Inertia and primary frequency modulation response capability; , Indicates wind farm w In time step t Inertia and primary frequency modulation response capability; For wind farm w In time step t Maximum power tracking power; , , These are the frequency drop rate, minimum point, and steady-state frequency deviation limits, respectively. , and These are the startup, grid connection, and stable combustion times, respectively. and These are the minimum time intervals required for generator grid connection and stable combustion, respectively; and These are the minimum times required for generator grid connection and stable combustion, respectively; and Representing time steps t , t -1 The recovery state of system components; u ij,t , u i,t They represent the lines respectively. ij busbar i In time step t The recovery status is indicated by a value of 1, which means the system has recovered, and a value of 0 means it has not recovered. The power factor angle; T d , D f , C f These represent the frequency response time, damping coefficient, and frequency response margin, respectively. , The recovered system is in time step t Inertia and primary frequency response capability.
7. A method for enhancing the resilience of a cyber-physical system during power outage recovery according to claim 6, characterized in that: The objective function of the lower-level real-time power scheduling model for: 。 8. A method for enhancing the resilience of a cyber-physical system during power outage recovery according to claim 7, characterized in that: The objective function of the emergency control model for: in, This indicates the amount of load shedding.
9. A method for enhancing the resilience of a cyber-physical system during power outage recovery according to claim 8, characterized in that: The constraints and output adjustment constraint formulas of the emergency control model are as follows: in, τ 0 represents the moment before the extreme event occurs. , τ This is the time for adjusting emergency control measures; This indicates the generator's starting power before the extreme event occurred; Indicates the load shedding amount. Indicates before the occurrence of extreme events τ 0 node i The amount of load recovery; , These represent the events before the extreme events occurred. τ 0 generator g Wind farm w The level of output; , and These represent the recovery status of power lines, wind farms, and energy storage before the occurrence of extreme events, respectively. , These represent the emergency backup power of the generator and the wind farm, respectively. and These represent the off-peak status of the generator and the wind farm, respectively; , , , and They represent the busbars respectively. i ,line ij ,dynamo g Wind farm w and energy storage power station e In time step τ Whether it has been damaged by an extreme event; 0 indicates damage, 1 indicates no damage; Ω Vδ For a balanced set of nodes; For balancing nodes i In time step τ The phase angle.
10. A method for enhancing the resilience of a cyber-physical system during power outage recovery according to claim 8, characterized in that: Step S3 specifically includes: S31. Normalize the terms in the objective function of the upper-level sequential recovery decision model, and solve the problem step by step by setting different combinations of weight coefficients to obtain the optimal reference value of each normalized term, thereby determining the final comprehensive objective function. : in, Represents the revenue from load recovery. , and These represent the topology-level node average degree index, scale-free index, and power transmission capacity index, respectively. This indicates that the system's operational indicators have been restored. This indicates that a considerable number of system indicators have been restored; And the weighting coefficients satisfy the following formula: S32. Linearize the nonlinear terms in the upper-level sequential recovery decision model, and transform the upper-level sequential recovery decision model into a mixed-integer linear programming model for solution.