Optimal scheduling method for integrated power-hydrogen energy system considering time-dependent uncertainty

By constructing a time-dependent photovoltaic uncertainty set and dynamically shrinking the information state, combined with fast robust dual dynamic programming, the problem of insufficient handling of photovoltaic uncertainty in existing technologies is solved, realizing efficient and economical scheduling of the electric-hydrogen integrated energy system, and improving decision-making quality and solution efficiency.

CN123144097APending Publication Date: 2026-11-20STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611644449.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-23
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies fail to effectively utilize temporal correlation and real-time observation information when dealing with photovoltaic uncertainties, resulting in overly conservative scheduling schemes with poor economic efficiency, and failing to fully consider the time coupling characteristics of energy storage status.

Method used

By constructing a time-dependent photovoltaic uncertainty set, introducing dynamic shrinkage of information state, and combining it with a fast robust dual dynamic programming method, a multi-stage robust optimization model is established. Forward recursive solution and backward differential update are performed to optimize the scheduling strategy of the electric-hydrogen integrated energy system.

Benefits of technology

It significantly reduces the conservatism of robust scheduling, improves scheduling economy and decision quality, realizes real-time information utilization and energy storage time-series coupling, provides strict robust cost upper bound guarantee, and improves solution efficiency and online applicability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144097A_ABST
    Figure CN123144097A_ABST
Patent Text Reader

Abstract

The present application relates to a kind of electric-hydrogen integrated energy system optimization scheduling method considering timing correlation uncertainty, the method first obtains historical photovoltaic operation data, calculates photovoltaic output level coefficient and constructs timing correlation photovoltaic uncertainty set;Second, the current period photovoltaic output observation value is obtained to update current information state, by set projection and extreme boundary sampling, the uncertainty set is dynamically contracted, and the photovoltaic output candidate set of predicted period is obtained;Then the system optimization scheduling model of electric-hydrogen integrated energy system is established, and the candidate set is combined to construct multi-stage robust optimization model;Finally, the worst scenario is obtained by solving using fast robust dual dynamic programming method forward recursion, and the cutting plane is updated by backward difference, the optimal scheduling strategy of each device is obtained and rolling scheduling control is carried out.Compared with prior art, the present application effectively reduces the conservatism of robust scheduling, significantly improves the solving efficiency, decision quality and system operation economy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power dispatching technology, and in particular to an optimized dispatching method for an integrated electric-hydrogen energy system that takes into account timing-related uncertainties. Background Technology

[0002] The integrated electric-hydrogen energy system, through electrolyzers, hydrogen storage tanks, and fuel cells, achieves bidirectional conversion between electricity and hydrogen and multi-energy synergy and complementarity, serving as a crucial technological pathway to support the high-proportion consumption of renewable energy. With the continuous increase in photovoltaic power generation penetration, the intermittency and volatility of its output pose severe challenges to system power balance, making the optimal scheduling of the integrated electric-hydrogen energy system a key research focus in this field.

[0003] Currently, most studies use box or ellipsoidal uncertainty sets when dealing with photovoltaic uncertainties, ignoring the temporal correlation of output levels between adjacent time periods, resulting in overly conservative scheduling schemes and poor economic efficiency. Traditional methods usually use a fixed uncertainty set throughout the scheduling cycle, which cannot be dynamically adjusted according to real-time observation information, resulting in insufficient information utilization. Moreover, most methods simplify multi-time period scheduling into a single-stage or two-stage model, failing to fully consider the temporal coupling characteristics of energy storage status.

[0004] Patent application CN121791312A provides a multi-stage robust optimization scheduling method for an electric-hydrogen combined system. The method includes the following steps: S101, constructing a hydrogen energy subsystem and an electric power subsystem, and then constructing an electric-hydrogen combined system based on these subsystems; S102, the hydrogen energy subsystem and electric power subsystem in the electric-hydrogen combined system are time-coupled components, and based on these time-coupled components and the uncertainty of wind power, a multi-stage robust scheduling model for the electric-hydrogen combined system is constructed; S103, the multi-stage robust scheduling model of the electric-hydrogen combined system is solved using a decoupled fast robust dual dynamic programming algorithm; S104, a numerical example analysis is performed on the solved multi-stage robust scheduling model of the electric-hydrogen combined system. However, this method only uses a fixed, unchanging box-type uncertainty set, ignores the temporal correlation of new energy output, and cannot utilize real-time observation information for dynamic contraction, resulting in an overly conservative scheduling strategy, poor economic efficiency, and insufficient information utilization. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings of the existing technology by providing an optimal scheduling method for an electric-hydrogen integrated energy system that takes into account time-related uncertainties. This method involves constructing a time-dependent photovoltaic uncertainty set and introducing dynamic contraction of information state, taking into account the time-series coupling of energy storage, effectively reducing the conservatism of robust scheduling, and improving the solution efficiency, decision quality, and economy.

[0006] The objective of this invention can be achieved through the following technical solutions: A method for optimizing the scheduling of an integrated electric-hydrogen energy system considering time-series uncertainties includes the following steps: Historical photovoltaic operation data is obtained, the photovoltaic output level coefficient of actual photovoltaic output to rated capacity is calculated, and a time-series correlated photovoltaic uncertainty set is constructed based on the photovoltaic output level coefficient. The photovoltaic output observation value for the current time period is obtained, and the photovoltaic output observation value is transformed into a linear equation constraint to update the current information state. By performing set projection and extreme value boundary sampling on each time period within the remaining scheduling cycle, the time-series related photovoltaic uncertainty set is dynamically shrunk to obtain the photovoltaic output candidate set for the prediction time period. A system optimization scheduling model for an integrated electric-hydrogen energy system is established. The system optimization scheduling model takes the minimum operating cost of the integrated energy system as the objective function and the constraints of the electric energy system, the hydrogen energy system, and power balance as the constraints. The photovoltaic output candidate set for the predicted period is input as an uncertain disturbance variable into the system optimization scheduling model of the integrated electric-hydrogen energy system. A multi-stage robust optimization model is constructed with the goal of minimizing the system operating cost under the worst scenario in the candidate set. Based on the initial physical state and initial information state, a fast robust dual dynamic programming method is used to forward recursively solve the worst-case scenario and backward differential update the cutting plane of the multi-stage robust optimization model to obtain the optimal scheduling strategy for each device, and to perform rolling scheduling control of the electric-hydrogen integrated energy system according to the optimal scheduling strategy.

[0007] Furthermore, the process of constructing the time-related photovoltaic uncertainty set specifically includes: Based on the extracted historical photovoltaic power output level coefficient trajectory of typical operating days, the statistical boundary and mean of the photovoltaic power output level coefficient for each time period are determined; By combining the physical boundary of photovoltaic power output with the statistical boundary truncation correction, the physical upper and lower bounds of the photovoltaic power output level coefficient for each time period are obtained; By introducing positive and negative auxiliary variables representing the photovoltaic power output level coefficient relative to the mean, and using the physical upper and lower bounds as variable boundary conditions, cumulative deviation budget constraints and temporal change constraints between adjacent time periods are set to construct the time-related photovoltaic uncertainty set in the form of a polyhedron.

[0008] Furthermore, the constraints on the power system include constraints on photovoltaic units, battery energy storage, and interaction with the power grid within the power system, specifically including: The sum of the actual power absorbed by the photovoltaic unit and the power curtailed is equal to the predicted output constraint; The upper and lower limits of charging and discharging power constraints for battery energy storage, the time-series recursive equation constraints of state of charge, the upper and lower limits of state of charge constraints, and the net power change rate ramping constraints. The constraints on the upper and lower limits of power purchase and sales for grid interaction, as well as the constraint that the power sold shall not exceed the sum of the actual photovoltaic power absorption and the battery energy storage discharge power.

[0009] Furthermore, the constraints on the hydrogen energy system include constraints on the electrolyzer, compressor, hydrogen storage tank, and fuel cell within the hydrogen energy system, specifically including: The upper and lower limits of input power of the electrolyzer, the hydrogen production constraints of piecewise linear conversion efficiency, and the power ramp-up rate constraints. The linear relationship between the power consumption of the compressor and the amount of hydrogen processed, and the upper limit constraint of the power consumption; The constraints include dynamic evolution of hydrogen storage capacity in hydrogen storage tanks, upper and lower limits of hydrogen storage capacity, conservation of hydrogen storage capacity at the beginning and end of the scheduling cycle, upper and lower limits of hydrogen charging and discharging rates, hydrogen charging in a single period not exceeding the current remaining storage capacity, and hydrogen discharging in a single period not exceeding the hydrogen storage capacity at the end of the previous period. Constraints on the upper and lower limits of power generation of fuel cells and the linear conversion constraint between hydrogen consumption rate and power generation.

[0010] Furthermore, the power balance refers to the balance between electrical power and hydrogen energy, and the specific formula is as follows: The formula for power balance constraint is: in, for Actual photovoltaic power absorbed during the period for Battery energy storage discharge power during the period for Periodic fuel cell power generation for Power purchased from the grid during the specified time period for Periodic electrical load, for Battery energy storage charging power during different time periods for Input electrical power of the electrolytic cell during the time period for Power consumption of the compressor during certain periods for Electricity sold to the grid during a given time period; The hydrogen energy balance constraint formula is: in, for Hydrogen production rate of the electrolyzer during the time period for Hydrogen storage tank charging rate over time period for The hydrogen supply rate of the time-limited electrolyzer producing hydrogen directly supplying the hydrogen load. for Hydrogen release rate from the hydrogen storage tank over a period of time. for The rate at which fuel cells consume hydrogen during a given period. for The hydrogen supply rate of the hydrogen storage tank directly supplying hydrogen to the hydrogen load during a specific time period. for Hydrogen load shortage rate during the period for The system's hydrogen load demand rate during a given period.

[0011] Furthermore, the objective function includes: The costs include grid interaction costs (consisting of grid purchase costs and electricity sales revenue), battery energy storage charging and discharging degradation costs, curtailment penalty costs, hydrogen load shortage penalty costs, electrolyzer operating costs, fuel cell operating costs, and hydrogen storage tank charging and discharging penalty items.

[0012] Furthermore, the process of dynamically shrinking the time-related photovoltaic uncertainty set specifically includes: The photovoltaic output observations obtained in the current time period are solidified into equation constraints, and the intersection with the information state of the previous time period is calculated to update the current information state; Based on the updated current information state, the endpoints of the conditional uncertainty intervals for the corresponding remaining time periods are calculated by solving a linear programming problem that finds the maximum and minimum values ​​of the photovoltaic power output level coefficient for each remaining time period.

[0013] Furthermore, the process of obtaining the photovoltaic output candidate set for the predicted time period specifically includes: Within the uncertainty interval of the corresponding prediction period, select the upper endpoint, lower endpoint, and historical mean point of the interval; On the current information state polyhedron, the linear programming extremum is solved by generating a random weight vector with uniform distribution of each component, and random representative vertices located on the extremum boundary are extracted. For each remaining time period, construct positive and negative unit vectors as deterministic directions, and solve the linear programming extrema to obtain deterministic representative vertices; The values ​​of random representative vertices and deterministic representative vertices in the corresponding prediction period are summarized and, together with the upper endpoint of the interval, the lower endpoint of the interval, and the historical mean point, form a discrete photovoltaic output candidate set for the prediction period.

[0014] Furthermore, the process of forward recursion to solve for the worst-case scenario specifically includes: A value function approximation model is constructed using piecewise linear functions; In the current iteration, starting from the initial physical state and initial information state, the algorithm iterates time by time, and solves a single-stage optimization sub-problem for each candidate photovoltaic scenario in the photovoltaic output candidate set for the prediction period, so as to obtain the control strategy and comprehensive cost corresponding to the candidate photovoltaic scenario. The candidate photovoltaic scenario that maximizes the overall cost is selected as the worst-case scenario for the current time period. The physical state is updated according to the control strategy corresponding to the worst-case scenario. The worst-case scenario is added to the information state to update the information state for subsequent time periods. The system recursively calculates the total operating cost of each time period until the end of the scheduling cycle, and uses this total cost as the upper bound of the system operating cost.

[0015] Furthermore, the process of updating the cutting plane via backward differential specifically includes: Based on the state trajectory obtained by forward recursion, the gradient of the value function with respect to the physical state at each time period is calculated using the finite difference method. The cut plane is generated based on the calculated gradient and added to the value function approximation model. The lower bound of the system operating cost is calculated based on the value function of the initial physical state. Determine whether the relative gap between the upper bound and the lower bound of the system operating cost is less than the preset convergence threshold. If the convergence condition is met, terminate the iteration and output the converged value function approximation model. The rolling scheduling control process specifically includes: in the online rolling scheduling stage, updating the current information status based on the real-time collected photovoltaic output observation values ​​and constructing a photovoltaic output candidate set for the predicted time period of the remaining future time period; and rollingly solving for the optimal control command for the current time period with the goal of minimizing the sum of the operating costs of the current time period and the remaining future time period, and issuing and executing the command.

[0016] Compared with the prior art, the present invention has the following beneficial effects: 1. Overcoming the excessive conservatism of traditional robust ensembles and significantly improving scheduling economy: By acquiring historical photovoltaic operation data, calculating the photovoltaic output level coefficient of actual photovoltaic output relative to rated capacity, and constructing a time-dependent photovoltaic uncertainty set, the technical characteristics overcome the shortcomings of traditional box-type sets that ignore the time-series correlation between adjacent time periods. It accurately depicts the time-series evolution and fluctuation correlation of photovoltaic output, eliminates the excessively conservative physical scenario of taking the extreme worst value in all time periods, effectively reduces the conservatism of robust scheduling and the worst-case operating cost of the system, and improves the overall scheduling economy.

[0017] 2. Realizing closed-loop utilization of real-time information and adaptive shrinkage of uncertainty to improve decision-making quality: By acquiring the observed photovoltaic output value of the current period and converting it into linear equality constraints to update the current information state, and then performing set projection, extreme value boundary sampling and dynamic shrinkage on the time-series related photovoltaic uncertainty set to obtain the candidate set of photovoltaic output for the prediction period, the technical characteristics overcome the shortcomings of insufficient information utilization caused by the traditional fixed uncertainty set throughout the entire cycle. It realizes the time-by-time nested adaptive shrinkage of the uncertainty set with the observed facts, so that subsequent scheduling decisions face a smaller range of uncertainty, and significantly improve the accuracy and quality of scheduling decisions.

[0018] 3. Taking into account the time-series coupling of multi-stage energy storage, providing a strict theoretical guarantee of robust cost upper bound: By establishing a system optimization scheduling model for the integrated electric-hydrogen energy system, and substituting the candidate set of photovoltaic output for the predicted period into the optimization scheduling model to construct a multi-stage robust optimization model, the technical feature of this model is to overcome the shortcomings of single-stage or two-stage models that fail to fully consider the dynamic time-series coupling between battery energy storage and hydrogen storage equipment. A sequential decision-making mechanism that satisfies the unpredictability constraint is established, providing a robust upper bound theoretical guarantee that the system will not exceed the worst-case cost under any actual photovoltaic output scenario.

[0019] 4. Overcoming the curse of dimensionality and the challenges of high-dimensional non-convexity, significantly improving solution efficiency and online applicability: By employing a fast robust dual dynamic programming method based on initial physical and information states, the multi-stage robust optimization model is solved by forward recursion to find the worst-case scenario and backward difference to update the cutting plane, thereby solving the optimal scheduling strategy and performing rolling scheduling control. Combined with the shrunken discrete candidate set, the exhaustive search of all vertices of the high-dimensional polyhedron is avoided, generating a more targeted value function cutting plane, significantly shortening the algorithm's convergence and solution time, and greatly improving computational efficiency, providing strong support for the online real-time optimization and scheduling of the electric-hydrogen integrated energy system. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the IES system framework of the present invention; Figure 2 This is a flowchart of the method of the present invention; Figure 3 This is a typical daily photovoltaic power output versus electricity and hydrogen load curve; Figure 4 A nested photovoltaic envelope diagram that contracts hourly for information states; Figure 5 A comparison of the width contraction and reduction rate of the conditional projection interval; Figure 6 This is a graph showing the evolution of battery SOC and charge / discharge power. Figure 7 The graph shows the evolution of hydrogen storage capacity and hydrogen charging / discharging rate in the hydrogen storage tank. Figure 8 This is a diagram showing the distribution of hydrogen production from the electrolyzer. Figure 9 Decomposition diagram of hydrogen supply sources for hydrogen load. Detailed Implementation

[0021] The present invention will now be described in detail with reference to the accompanying drawings and specific embodiments. These embodiments are based on the technical solution of the present invention and provide detailed implementation methods and specific operating procedures. However, the scope of protection of the present invention is not limited to the following embodiments.

[0022] Example 1 This embodiment provides an optimized scheduling method for an integrated electric-hydrogen energy system that takes into account time-related uncertainties. The optimized scheduling method is applied to an integrated electric-hydrogen energy system (IES), which consists of an electric energy system module and a hydrogen energy system module. The system architecture is as follows: Figure 1 As shown. The specific optimized scheduling process is as follows: Figure 2 As shown: The rated capacity and actual photovoltaic output of the photovoltaic power station within a given time period are obtained, and a photovoltaic output level coefficient is defined. The photovoltaic output level coefficient represents the proportion of actual photovoltaic output to rated capacity. The historical photovoltaic output level coefficient trajectory for typical operating days is extracted based on historical operating data, as shown in equations (1) and (2). in, for The photovoltaic output level coefficient for a given time period indicates the proportion of actual photovoltaic output to rated capacity. for Actual photovoltaic output during the period The rated capacity of the photovoltaic power station, The total number of time periods in a single scheduling cycle. For the first A typical operating day Historical photovoltaic power output level coefficient for a given period This represents the total number of typical historical operating days extracted.

[0023] Based on the historical photovoltaic power output level coefficient trajectory, the statistical boundary and mean of the photovoltaic power output level coefficient for each period are determined. The historical statistical range is then corrected in conjunction with the physical boundary of photovoltaic power output. The corrected lower bound is shown in equation (3), and the corrected upper bound is shown in equation (4). in, Determined based on historical data statistics The lower bound of the statistical coefficient for photovoltaic power output level during a given period. Determined based on historical data statistics The upper limit of the statistical coefficient for photovoltaic power output level during a given time period.

[0024] By introducing positive and negative deviation auxiliary variables, and setting cumulative deviation budget constraints and time series change constraints, a time-series correlated polyhedral uncertainty set based on historical data is obtained, as shown in equation (5): in, This is a vector of photovoltaic power output level coefficients. , The positive deviation auxiliary variable vector and its corresponding Auxiliary variable for positive deviation over time period , The negative bias auxiliary variable vector and its corresponding Negative bias auxiliary variable over time period Determined by historical statistics Average value of photovoltaic power output level coefficient during the period This represents the upper limit of the allowable temporal variation of the photovoltaic power output level coefficient between adjacent time periods. The cumulative positive deviation budget limit, This is the cumulative negative deviation budget limit.

[0025] The photovoltaic output observation value for the current time period is obtained, and the photovoltaic output observation value is transformed into a linear equation constraint to update the current information state. By performing set projection and extreme value boundary sampling on each time period within the remaining scheduling cycle, the time-series related photovoltaic uncertainty set is dynamically shrunk to obtain the photovoltaic output candidate set for the prediction time period, as shown in equation (6): in, For the updated current Time period information status set for Photovoltaic power output level coefficient during the period This is a vector of photovoltaic power output level coefficients. This represents the observed photovoltaic power output for the current time period t.

[0026] The information state continuously shrinks as the scheduling process progresses, as shown in equation (7): Based on the current information status, by performing a set projection on the feasible range of photovoltaic power output level coefficients for each time period within the remaining scheduling cycle, the conditional uncertainty interval is obtained, as shown in equation (8): in, for The lower endpoint of the interval with uncertain time conditions (obtained by solving the minimum value of linear programming). for The upper endpoint value of the weights with uncertain time-period conditions (obtained by solving the maximum value of the linear programming problem).

[0027] Within the uncertain interval, boundary points, historical mean points, and representative vertices of the polyhedron are selected to construct a finite candidate set, as shown in equation (9): For the set of information states based on the previous time period The constructed current forecast period ( Limited candidate set of photovoltaic power output (time period).

[0028] A system optimization scheduling model for an integrated electric-hydrogen energy system is established. The system optimization scheduling model takes the minimum operating cost of the integrated energy system as the objective function and the constraints of the electric energy system, the hydrogen energy system, and power balance as the constraints. The photovoltaic output candidate set for the predicted period is substituted into the system optimization scheduling model to construct a multi-stage robust optimization model. The power system constraints include constraints on photovoltaic units, battery energy storage, and interaction with the power grid within the power system, specifically including: The relationship and constraints between the actual photovoltaic power absorbed and the curtailed power are shown in equations (10) and (11): In the formula: for Actual photovoltaic power absorbed during the time period, in kW; for Curtailed power of light during a given period, in kW; for Forecasted photovoltaic output for the specified time period, in kW.

[0029] The charging and discharging power constraints, state of charge recursion, SOC constraints, and ramping constraints for battery energy storage are shown in equations (12) to (15): In the formula: , They are respectively Charging and discharging power during a given period, in kW; for Battery state of charge at the end of the period; , These are the charging and discharging efficiencies, respectively. The rated capacity of the battery is expressed in kWh. , These represent the minimum and maximum states of charge, respectively. Net power change rate limit, in kW / h; The time interval is expressed in hours (h). The maximum charging power limit for battery energy storage, in kW; This represents the maximum discharge power of the battery, expressed in kW.

[0030] The power purchase and sale constraints of the power grid interaction are shown in equations (16) and (17): In the formula: , They are respectively Power purchased and power sold during different time periods, in kW; , These are the maximum power purchase capacity and the maximum power sales capacity, respectively, in kW.

[0031] The constraints on the hydrogen energy system include constraints on the electrolyzer, compressor, hydrogen storage tank, and fuel cell within the hydrogen energy system, specifically including: The power constraints, segmented efficiency models, and ramp-up constraints of the electrolytic cell are shown in equations (18) to (20): In the formula: for Input electrical power of the electrolytic cell during a given time period, in kW; The rated maximum power of the electrolytic cell is expressed in kW. for Hydrogen production rate of the electrolyzer during a given time period, in kg / h; The lower calorific value of hydrogen is expressed in kWh / kg. The number of segments; For the first Segment conversion efficiency; , These represent the uphill and downhill gradients, respectively, in kW. This is the climbing speed limit, in kW / h; for The time-phase electrolyzer in the first The input electrical power at each efficiency segment, in units .

[0032] The linear relationship between the compressor's power consumption and the amount of hydrogen processed, as well as the power constraints, are shown in equations (21) and (22): In the formula: for Compressor power consumption during a given period, in kW; The unit compression power consumption coefficient is expressed in kWh / kg. for Hydrogen gas compression rate per period, in kg / h; This is the compressor's maximum power, expressed in kW.

[0033] The dynamic evolution of hydrogen storage capacity, capacity constraints, hydrogen charging and discharging rate constraints, and constraints for preventing over-storage and venting are shown in equations (23) to (27): In the formula: for Hydrogen storage capacity in the hydrogen storage tank at the end of the period, in kg; , They are respectively Hydrogen charging and decharging rates over time periods, in kg / h; , These represent the minimum and maximum hydrogen storage capacity of the hydrogen storage tank, in kg. , These represent the maximum hydrogen charging and discharging rates, in kg / h.

[0034] The fuel cell power constraints and hydrogen-to-electricity conversion constraints are shown in equations (28) and (29): In the formula: for Fuel cell power generation during a given time period, in kW; The rated maximum power of the fuel cell is expressed in kW. For fuel cell power generation efficiency; for Hydrogen consumption rate of fuel cell during a given time period, in kg / h.

[0035] The power balance refers to the balance between electrical power and hydrogen energy, and the specific formula is as follows: The formula for power balance constraint is: in, for Actual photovoltaic power absorbed during the period for Battery energy storage discharge power during the period for Periodic fuel cell power generation for Power purchased from the grid during the specified time period for Periodic electrical load, for Battery energy storage charging power during different time periods for Input electrical power of the electrolytic cell during the time period for Power consumption of the compressor during certain periods for Electricity sold to the grid during a given time period; The hydrogen energy balance constraint formula is: in, for Hydrogen production rate of the electrolyzer during the time period for Hydrogen storage tank charging rate over time period for The hydrogen supply rate of the time-limited electrolyzer producing hydrogen directly supplying the hydrogen load. for Hydrogen release rate from the hydrogen storage tank over a period of time. for The rate at which fuel cells consume hydrogen during a given period. for The hydrogen supply rate of the hydrogen storage tank directly supplying hydrogen to the hydrogen load during a specific time period. for Hydrogen load shortage rate during the period for The system's hydrogen load demand rate during a given period.

[0036] With the goal of minimizing the total system operating cost, the operating costs for each time period are shown in equation (34): in, for Time-of-use grid interaction costs for Operating costs of time-limited electrolyzers for Operating costs of fuel cells during specific time periods for Operating costs of battery energy storage during specific time periods for Cost of time-of-use curtailment for The cost of hydrogen supply shortages during certain periods The penalty coefficient for charging and discharging hydrogen from the hydrogen storage tank. for Hydrogen storage tank charging rate over time period for Hydrogen release rate from hydrogen storage tanks over a period of time.

[0037] Among them, the grid interaction cost, battery energy storage operation cost, curtailment cost, and hydrogen load shortage penalty are shown in equations (35) to (38): in, for The value of electricity purchased from the grid during a given period. for Power purchased during specific time periods The value of electricity sold to the grid. for Electricity sales power during specific time periods The unit cost coefficient for battery energy storage charging. for Battery energy storage charging power during different time periods This is the unit cost coefficient for battery energy storage discharge. for Battery energy storage discharge power during the period The unit curtailment penalty cost coefficient, for Light power wasted during the period The cost factor for hydrogen supply shortages per unit load. for Hydrogen load shortage rate during specific time periods.

[0038] Based on the initial physical state and initial information state, the fast robust dual dynamic programming method is used to solve the worst scenario and the backward differential update cutting plane of the multi-stage robust optimization model in a forward recursive manner to obtain the optimal scheduling strategy of each device. The electric-hydrogen integrated energy system is then subjected to rolling scheduling control according to the optimal scheduling strategy, as shown in Equation (39): In the formula: for The state at the end of the period is The future operating cost value function is a piecewise linear lower bound function. for System physical state vector at the end of the time period; for Time-cutting plane set; and The first The intercepts and normal vectors of each cutting plane.

[0039] In the In each iteration, starting from the initial state, a candidate uncertainty set is constructed according to the current information state for each time period. The control variables are solved for each candidate photovoltaic scenario. The scenario with the largest comprehensive cost is selected as the worst scenario. The physical state and information state are updated accordingly until all time periods are completed. The upper bound of the system operating cost is calculated, as shown in Equation (40): In the formula: For the first Upper bound of system operating cost for the next iteration; For the first iteration The optimal control variable vector for the time period; For the first iteration The worst-case scenario for that period of time.

[0040] Using the state trajectory obtained from the forward process, the gradient of the value function is calculated using the finite difference method, as shown in equation (41): In the formula: This is the gradient vector of the value function calculated using the finite difference method; The preset state perturbation vector.

[0041] A new cutting plane is generated based on the gradient and added to the approximate set of value functions. The lower bound of the system running cost is then updated, as shown in equation (42). In the formula: To establish the initial physical state for system scheduling, For the first The lower bound of the system operating cost for the next iteration.

[0042] The convergence criterion for iteration is shown in equation (43). If the criterion is satisfied, the iteration terminates, and the approximate model of the value function for each time period is output: In the formula: This is the preset convergence tolerance threshold.

[0043] Online rolling scheduling: After offline training is completed, the actual output for the current period is updated according to the real-time photovoltaic observation values, as shown in equation (44): In the formula: for Actual photovoltaic power output during the time period; For the present Photovoltaic power output observations for the specified time period; This refers to the rated capacity of the photovoltaic power station.

[0044] The candidate set for future time periods is constructed based on the updated information state, as shown in equation (45): In the formula: Index for future time periods; For the future Candidate set of photovoltaic power output for different time periods.

[0045] The current control command is continuously optimized with the goal of minimizing the sum of current and future operating costs, as shown in equation (46): In the formula: For the present The optimal control command output by the time-period solution; and For the future Control variables for different time periods and photovoltaic power output level coefficients.

[0046] After executing the current control command, the information status is updated based on the observations of the next time period, and the rolling optimization process is repeated.

[0047] Example 2 This embodiment selects an industrial park and sets up four scenarios to verify the scheduling optimization effect of the proposed method: 1) Scenario 1 is a multi-stage robust optimization scheduling that uses a time-dependent uncertain set and performs information state shrinkage; 2) Scenario 2 adopts a traditional box-type uncertain set and performs multi-stage robust optimization scheduling with information state shrinkage; 3) Scenario 3: Deterministic and robust optimization scheduling for photovoltaic systems; 4) Scenario 4 is a multi-stage robust optimization scheduling that does not perform information state shrinkage using time-related uncertain sets.

[0048] The scheduling cycle is 24 hours, with a time scale of 1 hour. Typical daily photovoltaic output versus electricity and hydrogen load curves are shown below. Figure 3 The parameters of each device in the system are shown in Table 1.

[0049] Table 1 Parameters of each device in the system Nested photovoltaic envelopes with time-varying information state contraction, such as Figure 4 The comparison of the width shrinkage and reduction rate of the conditional projection interval is as follows: Figure 5 , combined Figure 4 and Figure 5 It can be seen that the information state shrinks and nests with the observed information over time. The initial uncertain set covers a wide range from the historical minimum output to the physical upper limit during the effective sunshine period. The envelope area of ​​each subsequent layer decreases sequentially, and the actual photovoltaic trajectory always falls within the envelope. Quantitative analysis shows that the initial interval width at 5:00 is 5761.77 kW. After observing the actual output from 5:00 to 7:00, the interval at 7:00 shrinks from 3177.58 kW to 1236.53 kW, a reduction rate of 61.1%. After 12:00, it shrinks to 0, indicating that the actual output pattern matches the historical trajectory. The reduction rate is 0 at 11:00, and the initial set during this period is at the historical minimum. This mechanism uses logical reasoning based on observed facts to reduce the uncertainty of later decisions and make more accurate scheduling decisions.

[0050] The 24-hour evolution trajectory of battery SOC and charge / discharge power is as follows: Figure 6 As shown, the battery's SOC is charged to its maximum of 80% during off-peak hours, maintained at a high level during normal hours, gradually discharged to around 30% during peak hours, and then recharged to 50% during late-night off-peak hours, forming a complete "off-peak charging and peak discharging" cycle.

[0051] according to Figure 7 , Figure 8 , Figure 9It is evident that the inter-period regulation of hydrogen energy storage is a core characteristic of hydrogen energy system operation. The hydrogen storage capacity in the storage tank gradually increases from an initial value of 500 kg to a peak of approximately 575 kg (reaching approximately 546 kg in the early morning) from 0-9 hours. During this period, the electrolyzer operates at high power, producing approximately 10.34 kg / h of hydrogen. Most of this hydrogen is compressed and stored in the storage tank, with a small portion directly supplied to the hydrogen load. From 10-11 hours, the hydrogen storage capacity begins to decline, and the electrolyzer's hydrogen production still prioritizes direct supply to the hydrogen load. During the peak hydrogen load period from 12-15 hours, hydrogen release from the storage tank increases significantly, peaking at approximately 22 kg / h for the hydrogen load and approximately 2.06-2.18 kg / h for the fuel cell; the hydrogen storage capacity rapidly decreases from its peak to approximately 500 kg around 15 hours. From 16-17 hours, the storage tank continues to release some hydrogen, while from 18-21 hours, the release is smaller, and the hydrogen storage capacity continues to decline, reaching a minimum of approximately 470 kg around 21 hours. During the 22-24 hour nighttime period, the electrolyzer resumes high-power operation, producing approximately 9.83 kg / h of hydrogen. Most of the hydrogen is compressed and stored in the hydrogen storage tank, increasing the storage capacity from approximately 470 kg to 500 kg by the end of the 24-hour period, thus meeting end-user constraints. This establishes a daily cycle scheduling mode of "hydrogen storage in the early morning and at night, hydrogen release during peak hydrogen load periods, and hydrogen consumption by fuel cells on demand," validating the core role of hydrogen storage in cross-period energy regulation.

[0052] Table 2 shows a comparison of the planned costs and worst-case costs of the four schemes. The planned costs of schemes A and B are exactly the same, but the worst-case cost of scheme A is about 4.5% lower than that of scheme B. This indicates that the time-dependent polyhedron set effectively eliminates the overly conservative scenario of "all time periods taking extreme values ​​at the same time" in the box set through the cumulative deviation constraint and the adjacent time period change rate constraint, thereby improving the economy in the worst case while ensuring that the planned cost remains unchanged.

[0053] Table 2. Comparison of planned costs and worst-case costs for four scenarios. The planned cost of Option A is approximately 66.2% lower than that of Option C (deterministic), validating the significant advantage of robust optimization over deterministic optimization in addressing photovoltaic uncertainties. It's worth noting that Option C's worst-case cost is lower than Option A's. This is because the optimal strategy of the deterministic option lacks the ability to cope with photovoltaic deviations from predictions, requiring large-scale electricity purchases during periods of high electricity prices to maintain supply-demand balance. Its "worst-case cost" is merely the cost of simulating the deterministic strategy under the worst-case photovoltaic scenario, not a guarantee of the worst-case outcome after robust optimization. Although Option A has a higher nominal worst-case cost, it provides an upper bound on the cost that guarantees it will not exceed that value under any photovoltaic scenario. This is the essential characteristic that distinguishes robust optimization from deterministic options.

[0054] Compared to Scheme D, Scheme A reduces the worst-case cost by approximately 4.3%, indicating that the information state mechanism, through dynamic shrinkage of the uncertain set and the cutting plane, is more targeted, improving both solution efficiency and the ability to handle worst-case scenarios. The main value of the information state mechanism in the current example lies in its improved solution efficiency—the introduction of information states significantly shortens the convergence time, while also improving the worst-case cost to some extent.

[0055] The preferred embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make numerous modifications and variations based on the concept of the present invention without creative effort. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the present invention through logical analysis, reasoning, or limited experimentation on the basis of existing technology should be within the scope of protection defined by the claims.

Claims

1. A method for optimal scheduling of an integrated electric-hydrogen energy system considering time-series uncertainties, characterized in that, Includes the following steps: Historical photovoltaic operation data is obtained, the photovoltaic output level coefficient of actual photovoltaic output to rated capacity is calculated, and a time-series correlated photovoltaic uncertainty set is constructed based on the photovoltaic output level coefficient. The photovoltaic output observation value for the current time period is obtained, and the photovoltaic output observation value is transformed into a linear equation constraint to update the current information state. By performing set projection and extreme value boundary sampling on each time period within the remaining scheduling cycle, the time-series related photovoltaic uncertainty set is dynamically shrunk to obtain the photovoltaic output candidate set for the prediction time period. A system optimization scheduling model for an integrated electric-hydrogen energy system is established. The system optimization scheduling model takes the minimum operating cost of the integrated energy system as the objective function and the constraints of the electric energy system, the hydrogen energy system, and power balance as the constraints. The photovoltaic output candidate set for the predicted period is input as an uncertain disturbance variable into the system optimization scheduling model of the integrated electric-hydrogen energy system. A multi-stage robust optimization model is constructed with the goal of minimizing the system operating cost under the worst scenario in the candidate set. Based on the initial physical state and initial information state, a fast robust dual dynamic programming method is used to forward recursively solve the worst-case scenario and backward differential update the cutting plane of the multi-stage robust optimization model to obtain the optimal scheduling strategy for each device, and to perform rolling scheduling control of the electric-hydrogen integrated energy system according to the optimal scheduling strategy.

2. The method for optimizing the scheduling of an integrated electric-hydrogen energy system based on time-series uncertainties according to claim 1, characterized in that, The process of constructing the time-related photovoltaic uncertainty set specifically includes: Based on the extracted historical photovoltaic power output level coefficient trajectory of typical operating days, the statistical boundary and mean of the photovoltaic power output level coefficient for each time period are determined; By combining the physical boundary of photovoltaic power output with the statistical boundary truncation correction, the physical upper and lower bounds of the photovoltaic power output level coefficient for each time period are obtained; By introducing positive and negative auxiliary variables representing the photovoltaic power output level coefficient relative to the mean, and using the physical upper and lower bounds as variable boundary conditions, cumulative deviation budget constraints and temporal change constraints between adjacent time periods are set to construct the time-related photovoltaic uncertainty set in the form of a polyhedron.

3. The method for optimizing the scheduling of an integrated electric-hydrogen energy system based on time-series uncertainties according to claim 1, characterized in that, The power system constraints include constraints on photovoltaic units, battery energy storage, and interaction with the power grid within the power system, specifically including: The sum of the actual power absorbed by the photovoltaic unit and the power curtailed is equal to the predicted output constraint; The upper and lower limits of charging and discharging power constraints for battery energy storage, the time-series recursive equation constraints of state of charge, the upper and lower limits of state of charge constraints, and the net power change rate ramping constraints. The constraints on the upper and lower limits of power purchase and sales for grid interaction, as well as the constraint that the power sold shall not exceed the sum of the actual photovoltaic power absorption and the battery energy storage discharge power.

4. The method for optimizing the scheduling of an integrated electric-hydrogen energy system based on time-series uncertainties according to claim 1, characterized in that, The constraints on the hydrogen energy system include constraints on the electrolyzer, compressor, hydrogen storage tank, and fuel cell within the hydrogen energy system, specifically including: The upper and lower limits of input power of the electrolyzer, the hydrogen production constraints of piecewise linear conversion efficiency, and the power ramp-up rate constraints. The linear relationship between the power consumption of the compressor and the amount of hydrogen processed, and the upper limit constraint of the power consumption; The constraints include dynamic evolution of hydrogen storage capacity in hydrogen storage tanks, upper and lower limits of hydrogen storage capacity, conservation of hydrogen storage capacity at the beginning and end of the scheduling cycle, upper and lower limits of hydrogen charging and discharging rates, the constraint that the amount of hydrogen charged in a single period should not exceed the current remaining storage capacity, and the constraint that the amount of hydrogen discharged in a single period should not exceed the amount of hydrogen stored at the end of the previous period. Constraints on the upper and lower limits of power generation of fuel cells and the linear conversion constraint between hydrogen consumption rate and power generation.

5. The method for optimizing the scheduling of an integrated electric-hydrogen energy system based on time-series uncertainties according to claim 1, characterized in that, The power balance refers to the balance between electrical power and hydrogen energy, and the specific formula is as follows: The formula for power balance constraint is: in, for Actual photovoltaic power absorbed during the period for Battery energy storage discharge power during the period for Periodic fuel cell power generation for Power purchased from the grid during the specified time period for Periodic electrical load, for Battery energy storage charging power during different time periods for Input electrical power of the electrolytic cell during the time period for Power consumption of the compressor during certain periods for Electricity sold to the grid during a given time period; The hydrogen energy balance constraint formula is: in, for Hydrogen production rate of the electrolyzer during the time period for Hydrogen storage tank charging rate over time period for The hydrogen supply rate of the time-limited electrolyzer producing hydrogen directly supplying the hydrogen load. for Hydrogen release rate from the hydrogen storage tank over a period of time. for The rate at which fuel cells consume hydrogen during a given period. for The hydrogen supply rate of the hydrogen storage tank directly supplying hydrogen to the hydrogen load during a specific time period. for Hydrogen load shortage rate during the period for The system's hydrogen load demand rate during a given period.

6. The method for optimizing the scheduling of an integrated electric-hydrogen energy system based on time-series uncertainties according to claim 1, characterized in that, The objective function includes: The costs include grid interaction costs (consisting of grid purchase costs and electricity sales revenue), battery energy storage charging and discharging degradation costs, curtailment penalty costs, hydrogen load shortage penalty costs, electrolyzer operating costs, fuel cell operating costs, and hydrogen storage tank charging and discharging penalty items.

7. The method for optimal scheduling of an integrated electric-hydrogen energy system considering time-series uncertainties according to claim 1, characterized in that, The process of dynamically shrinking the time-related photovoltaic uncertainty set specifically includes: The photovoltaic output observations obtained in the current time period are solidified into equation constraints, and the intersection with the information state of the previous time period is calculated to update the current information state; Based on the updated current information state, the endpoints of the conditional uncertainty intervals for the corresponding remaining time periods are calculated by solving a linear programming problem that finds the maximum and minimum values ​​of the photovoltaic power output level coefficient for each remaining time period.

8. The method for optimizing the scheduling of an integrated electric-hydrogen energy system based on time-series uncertainties according to claim 7, characterized in that, The process of obtaining the candidate set of photovoltaic power output for the predicted time period specifically includes: Within the uncertainty interval of the corresponding prediction period, select the upper endpoint, lower endpoint, and historical mean point of the interval; On the current information state polyhedron, the linear programming extremum is solved by generating a random weight vector with uniform distribution of each component, and random representative vertices located on the extremum boundary are extracted. For each remaining time period, construct positive and negative unit vectors as deterministic directions, and solve the linear programming extrema to obtain deterministic representative vertices; The values ​​of random representative vertices and deterministic representative vertices in the corresponding prediction period are summarized and, together with the upper endpoint of the interval, the lower endpoint of the interval, and the historical mean point, form a discrete photovoltaic output candidate set for the prediction period.

9. The method for optimal scheduling of an integrated electric-hydrogen energy system considering time-series uncertainties according to claim 1, characterized in that, The process of forward recursion to solve for the worst-case scenario specifically includes: A value function approximation model is constructed using piecewise linear functions; In the current iteration, starting from the initial physical state and initial information state, the algorithm iterates time by time, and solves a single-stage optimization sub-problem for each candidate photovoltaic scenario in the photovoltaic output candidate set for the prediction period, so as to obtain the control strategy and comprehensive cost corresponding to the candidate photovoltaic scenario. The candidate photovoltaic scenario that maximizes the overall cost is selected as the worst-case scenario for the current time period. The physical state is updated according to the control strategy corresponding to the worst-case scenario. The worst-case scenario is added to the information state to update the information state for subsequent time periods. The system recursively calculates the total operating cost of each time period until the end of the scheduling cycle, and uses this total cost as the upper bound of the system operating cost.

10. The method for optimizing the scheduling of an integrated electric-hydrogen energy system based on time-series uncertainties according to claim 9, characterized in that, The process of updating the cutting plane using backward difference specifically includes: Based on the state trajectory obtained by forward recursion, the gradient of the value function with respect to the physical state at each time period is calculated using the finite difference method. The cut plane is generated based on the calculated gradient and added to the value function approximation model. The lower bound of the system operating cost is calculated based on the value function of the initial physical state. Determine whether the relative gap between the upper bound and the lower bound of the system operating cost is less than the preset convergence threshold. If the convergence condition is met, terminate the iteration and output the converged value function approximation model. The rolling scheduling control process specifically includes: in the online rolling scheduling stage, updating the current information status based on the real-time collected photovoltaic output observation values ​​and constructing a photovoltaic output candidate set for the predicted time period of the remaining future time period; and rollingly solving for the optimal control command for the current time period with the goal of minimizing the sum of the operating costs of the current time period and the remaining future time period, and issuing and executing the command.

Citation Information

Patent Citations

  • Multi-stage robust optimization scheduling method for electricity-hydrogen combined system

    CN121791312A