A physical information multi-agent frequency automatic control method and system

By employing a physical information multi-agent automatic frequency control method, the problems of foresight, coordination, and stability in automatic frequency control for high-proportion renewable energy grid integration are solved. This method achieves distributed and rapid frequency support, overcoming the lag of traditional methods and the communication burden of centralized control.

CN123144102APending Publication Date: 2026-11-20ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611249508.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-18
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies struggle to achieve proactive, distributed, physical information-driven, and numerically stable automatic frequency control in grids with high proportions of renewable energy integration, leading to grid frequencies easily exceeding limits and failing to meet millisecond-level rapid support requirements.

Method used

The method of automatic frequency control using physical information multi-agents is adopted. Through graph structure modeling, unified representation of power disturbance events, extraction of physical look-ahead risk signals, and distributed collaborative decision-making, fast power commands are generated and virtual inertia is implicitly injected to achieve dynamic closed-loop frequency control.

Benefits of technology

It enables structured early warning before the frequency drops significantly, provides rapid response to frequency disturbances, avoids the lag of local frequency modulation and the communication burden of centralized control, and ensures frequency stability and coordination.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144102A_ABST
    Figure CN123144102A_ABST
Patent Text Reader

Abstract

The application provides a physical information multi-agent frequency automatic control method, comprising the following steps: constructing a power grid into a graph model, using bus effective inertia, power shortage and aggregated fast power support, and building a reduced-order partition swing frequency dynamic model based on bus frequency deviation; converting power disturbance into system total power shortage, completing bus stress distribution according to electrical distance attenuation and power conservation rules, and generating physical information forward feed signal without frequency measurement; configuring an independent local agent for fast power support, combining frequency feedback and forward signal for collaborative decision-making, and generating aggregated power support instruction through electrical distance distribution; calculating equivalent additional inertia of support resources and superimposing it to bus inertia, relying on model closed loop to correct bus frequency deviation, relying on updated frequency data to calculate transient frequency support index, and realizing quantitative evaluation of control effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of frequency regulation and control technology in power systems, and in particular to a method and system for automatic frequency control using physical information multi-agent systems. Background Technology

[0002] With the widespread integration of high-proportion renewable energy sources into the receiving-end power grid, a large number of synchronous generator units have been replaced by renewable energy and DC feeds via power electronic interfaces. This has led to a significant decrease in the system's equivalent inertia and equivalent damping, resulting in frequency dynamics characterized by low inertia, high rate of change of frequency (RoCoF), and vulnerability to exceeding limits. Under large-power deficit disturbances such as UHVDC blocking, large-capacity unit tripping, sudden drops in renewable energy power, and sudden increases in receiving-end load, the frequency minimum point and rate of change of the receiving-end power grid are highly likely to exceed safety constraints, jeopardizing the stable operation of the system.

[0003] Traditional primary frequency regulation relies mainly on the local bus frequency deviation to operate based on droop characteristics, accompanied by dead zones and saturation limiting. It only provides support after the local frequency falls below the droop dead zone, exhibiting inherent lag and lacking pre-emptive structured early warning for sudden high-power shortages such as DC blocking and large-unit tripping. Furthermore, local primary frequency regulation can only operate independently based on local measurements, making it difficult to coordinate responses to frequency drops in neighboring areas during the early stages of disturbance propagation, often resulting in insufficient support or inter-regional strain.

[0004] To improve transient frequency support capabilities, some studies have attempted to adopt centralized coordination control or global optimization schemes. These schemes require the real-time participation of the entire network topology, global state variables, and centralized optimizers, placing a heavy burden on communication links and modeling. They also intervene only after the frequency has dropped significantly following a disturbance, making it difficult to meet the receiving-end power grid's requirement for millisecond-level rapid support. Furthermore, centralized architectures are prone to single-point failures, making engineering implementation difficult.

[0005] Another type of scheme adopts a purely data-driven coordination strategy, which relies on a large amount of historical data for training to support decision-making. It lacks interpretable early physical warning information, and it is difficult to guarantee numerical stability and overcompensation under extreme or unseen compound disturbances. It is also not easy to provide clear physical explanations to dispatchers.

[0006] Therefore, the problem with existing technologies is that there is an urgent need for an automatic frequency control scheme that can integrate physical information to achieve collaborative support through distributed multi-agent systems, in order to solve the problem that power grid transient frequency support technologies cannot simultaneously achieve forward-looking initiative, distributed coordination, physical information-driven operation, and numerical stability. Summary of the Invention

[0007] This invention provides a physical information multi-agent frequency automatic control method and system to solve the problem that power grid transient frequency support technology is difficult to simultaneously achieve forward-looking initiative, distributed coordination, physical information driving force and numerical stability.

[0008] In a first aspect, embodiments of the present invention provide a physical information multi-agent frequency automatic control method, comprising: modeling the target power grid as a graph structure; establishing a reduced-order partitioned swing frequency dynamic model described by the evolution of bus frequency deviation based on the effective inertia of each bus, the power deficit allocated to the bus, and aggregated fast power support; uniformly representing power disturbance events as the total system power deficit of the power grid; allocating the total power deficit to each bus according to the stress distribution that attenuates with electrical distance along the graph structure and satisfies power conservation; and extracting physical information look-ahead risk signals independent of bus frequency measurements based on the stress distribution; and configuring one-to-one fast power support resources for each bus. Each local agent makes collaborative decisions based on the frequency feedback channel formed by the bus frequency deviation and the forward-looking risk signal of the physical information, generating a fast power command formed by the fast power support aggregated by each bus after being allocated by the electrical distance support; determining the equivalent additional inertia provided by each fast power support within its electrical coverage area, and implicitly incorporating the equivalent additional inertia into the effective inertia; updating the frequency deviation of each bus in a closed loop based on the fast power command and the reduced-order partitioned swing frequency dynamic model; and generating a transient frequency support index based on the updated frequency deviation to evaluate the performance of automatic frequency control.

[0009] In conjunction with the first aspect, the present invention provides a first possible implementation of the first aspect, wherein the process of establishing a reduced-order partitioned swing frequency dynamic model described by the evolution of bus frequency deviation includes: defining the frequency deviation of bus i as the deviation relative to the rated frequency. The rated frequency For each bus i, a descending-order partitioned swing frequency dynamic equation is used to describe the evolution of its frequency deviation over time: In the formula, Let i be the effective inertia of bus i. To account for the power deficit allocated to bus i, To support the high-speed power aggregation of bus i, This is the equivalent damping coefficient. Let be the synchronous torque coupling coefficient between bus i and j. This is the coupling attenuation factor. The set of neighboring buses that are in sync with bus i; the synchronous torque coupling term in the set. The coupling attenuation factor describes the physical process by which the frequencies of neighboring busbars tend to become homogeneous. Pick The equivalent damping coefficient Pick , and M is the inertia constant in the formula.

[0010] In conjunction with the first aspect, embodiments of the present invention provide a second possible implementation of the first aspect, wherein the process of allocating the total power deficit to each bus according to the electrical distance attenuation of the graph structure and satisfying power conservation stress distribution, and extracting a forward-looking risk signal of physical information independent of bus frequency measurement based on the stress distribution, includes: modeling the spatial distribution of the disturbance originating from the set B of affected buses as a distribution weight that attenuates with electrical distance and is normalized.

[0011] in, Let i be the normalized stress profile of the busbar i. The power is conserved and the distribution weights satisfy the following conditions: The number of jumps distance Let k be the distance from bus i to the affected bus b, where k is the index variable for traversing the power grid buses. To control the scale parameter of spatial diffusion range, N is the set of all generatrices. Scale parameter values The total power deficit of the system will be reduced. The power conservation distribution weights are allocated to each busbar according to the aforementioned power conservation distribution.

[0012] in, To allocate the power deficit to bus i, the power conservation distribution weights ensure that the sum of the deficits of each bus after allocation equals the total power deficit of the system.

[0013] In conjunction with the first aspect, this invention provides a third possible implementation of the first aspect, wherein the process of uniformly representing power disturbance events as the total system power deficit of the power grid includes: classifying the power disturbance events into a first disturbance, a second disturbance, a third disturbance, and a fourth disturbance, wherein the first disturbance is a unit trip, the second disturbance is DC blocking, the third disturbance is a sudden drop in renewable energy power, and the fourth disturbance is a sudden increase in load; and uniformly representing the power disturbance events as the total system power deficit of the power grid. ,in, , , , These are the power deficit magnitudes of the first, second, third, and fourth disturbances, respectively. , , , These represent the times when the corresponding disturbances occurred. The time constant of the third disturbance is... The indicator function is defined as follows: the power deficits of the first, second, and fourth disturbances take a step form, while the power deficit of the third disturbance decays in an exponential recovery manner.

[0014] In conjunction with the first aspect, embodiments of the present invention provide a fourth possible implementation of the first aspect, wherein the process of allocating the total power deficit to each bus according to the electrical distance attenuation of the structure along the graph and satisfying power conservation stress distribution, and extracting a physical information look-ahead risk signal independent of bus frequency measurement based on the stress distribution, includes: extracting a physical information look-ahead risk signal independent of bus frequency measurement from the total power deficit of the system. ,in, The physical information is used to predict risk signals, which are equal to the total power deficit of the system. The risk signal originates from the underlying power disturbance event, and the lowest frequency point appears after the disturbance. The risk signal provides structured early warning input for the multi-agent layer.

[0015] In conjunction with the first aspect, this embodiment of the invention provides a fifth possible implementation of the first aspect, wherein each of the local intelligent agents makes collaborative decisions based on the frequency feedback channel formed by the bus frequency deviation and the feedforward physical information look-ahead risk signal, generating a fast power command jointly formed by the fast power support aggregated by each of the buses after allocation by the electrical distance support. This process includes: each local intelligent agent independently generates its own fast power target command in a distributed manner in each control cycle, and there is no command-level coupling between the agents; wherein the fast power target command is formed by the linear superposition and saturation limiting of four terms: the local lowest frequency feedback channel, the neighborhood average frequency feedback channel, the regional low-frequency alarm feedback channel, and the physical information look-ahead feedforward channel; wherein the local lowest frequency feedback channel takes the lowest frequency deviation within the local neighborhood of the resource, the neighborhood average frequency feedback channel takes the average frequency deviation within one hop of the electrical neighborhood, and the regional low-frequency alarm feedback channel takes... The lowest frequency deviation broadcast in the area where the resource is located is compared with the corresponding trigger threshold by each frequency feedback channel, the positive part is taken and multiplied by the corresponding gain to form a steady-state frequency feedback closed loop; the physical information look-ahead feedforward channel uses the physical information look-ahead risk signal as the feedforward quantity, multiplied by the corresponding feedforward gain and injected, and the feedforward quantity is attenuated by a transient gating function, wherein the transient gating function makes the look-ahead feedforward effective within the transient window after the disturbance occurs and zero in the steady state; the fast power target command is limited to the fast power upper limit by the positive part operator and the saturation operator to form a bounded fast power command; wherein the bounded fast power command is distributed to the electrical coverage area of ​​each bus by a support matrix based on electrical distance, and the fast power support within the electrical distance coverage area of ​​each bus is aggregated to form the fast power command, the support matrix decays exponentially with the hop distance between buses and is hard truncated to zero when the set hop number is exceeded and then normalized.

[0016] In conjunction with the first aspect, embodiments of the present invention provide a sixth possible implementation of the first aspect, wherein the process of determining the equivalent additional inertia provided by each of the fast power supports within its electrical coverage area and implicitly incorporating the equivalent additional inertia into the effective inertia includes: implicitly incorporating the equivalent additional inertia into the effective inertia using the following formula: ,in, The effective inertia of the busbar as described in claim 1, For virtual inertia gain, To quickly determine the electrical coverage factor of bus i for power resources; inject virtual inertial power proportional to the rate of frequency change and in the opposite direction into the reduced-order partitioned swing frequency dynamic model: Moving this term to the left side of the equation yields: The virtual inertia symmetrically suppresses the rate of change of the bus frequency in both the decreasing and increasing directions, wherein the virtual inertia gain is taken as... .

[0017] In conjunction with the first aspect, this invention provides a seventh possible implementation of the first aspect, wherein the process of updating the frequency deviations of each bus based on the fast power command and the reduced-order partitioned swing frequency dynamic model in a closed loop, and generating transient frequency support indices based on the updated frequency deviations, includes: substituting the power deficit, the aggregated fast power support, and the effective inertia into the reduced-order partitioned swing frequency dynamic model, and progressively updating the bus frequency deviations through time-domain integration, assuming the coherence frequency is: In the formula, t0 is the time when the disturbance occurs, and T is the end point of the simulation window; the transient frequency support index includes: the lowest frequency point Maximum frequency change rate Low frequency violation duration Unauthorized area Frequency deviation integral Regulate energy Recovery time Deviation from quasi-steady-state frequency The recovery time is the time after the disturbance. First entry and continued stay in the recovery zone Within a given time period, the quasi-steady-state frequency deviation is the end of the window. The mean.

[0018] In conjunction with the first aspect, the present invention provides an eighth possible implementation of the first aspect, wherein the process of configuring a local intelligent agent corresponding to each of the fast power support resources includes: each local intelligent agent residing in a local controller associated with the resource it controls, and corresponding to the resource it controls, in order to complete the decision on the fast power command of the local resource.

[0019] Secondly, embodiments of the present invention provide a physical information multi-agent frequency automatic control system, comprising: a first modeling module configured to model the target power grid as a graph structure, and based on the effective inertia of each bus, the power deficit allocated to the bus, and the aggregated fast power support, establish a reduced-order partitioned swing frequency dynamic model described by the evolution of bus frequency deviation; a second physical look-ahead module configured to uniformly represent power disturbance events as the total system power deficit of the power grid, allocate the total power deficit to each bus according to the electrical distance attenuation of the graph structure and the stress distribution that satisfies power conservation, and extract physical information look-ahead risk signals independent of bus frequency measurement based on the stress distribution; and a third collaborative decision-making module configured to each of the fast power supports Each local intelligent agent is configured with a corresponding local intelligent agent for each support resource. Each local intelligent agent makes collaborative decisions based on the frequency feedback channel formed by the bus frequency deviation and the forward-looking risk signal of the physical information, generating a fast power command formed by the aggregated fast power support of each bus after the electrical distance support allocation. The fourth frequency deviation update module is configured to determine the equivalent additional inertia provided by each fast power support in its electrical coverage area, and implicitly incorporate the equivalent additional inertia into the effective inertia. Based on the fast power command and the reduced-order partitioned swing frequency dynamic model, the frequency deviation of each bus is updated in a closed loop, and a transient frequency support index is generated based on the updated frequency deviation to evaluate the performance of automatic frequency control.

[0020] The physical information multi-agent frequency automatic control method provided by this invention represents power disturbance events as a total system power deficit and extracts a physical information look-ahead risk signal independent of bus frequency measurement, thus achieving physical information look-ahead risk early warning. Since this risk signal originates directly from the underlying power disturbance event rather than the measured frequency, it is known at the moment the disturbance occurs, while the lowest frequency point usually appears several seconds after the disturbance. Therefore, it can provide structured early warning input to the multi-agent layer before the frequency has fully dropped, effectively overcoming the lag of local primary frequency modulation, which can only act after the fact. Furthermore, this invention uses four linear superpositions of local agents—local lowest frequency feedback, neighborhood average frequency feedback, regional low-frequency alarm feedback, and physical information look-ahead feedforward—and saturation limiting to form a fast power command. The first three frequency feedback channels form a steady-state closed loop to ensure accurate convergence of steady-state frequency deviation. The fourth look-ahead feedforward is attenuated by a transient gating function and automatically returns to zero in steady state, thereby obtaining foresight while avoiding frequency overshoot caused by open-loop feedforward, achieving coordinated support that is both forward-looking and overcompensated. Furthermore, this invention implicitly incorporates the equivalent additional inertia provided by the fast power support within its electrical coverage area into the effective inertia term of the swing equation. Mathematically, this is equivalent to injecting virtual inertia power with a proportional frequency change rate in the opposite direction. This symmetrically suppresses the frequency change rate in both the decreasing and increasing directions, smoothing the frequency trajectory and suppressing transient overshoot. Because it incorporates effective inertia rather than injecting it through explicit feedback force terms, it maintains absolute numerical stability under discrete time-domain integration, avoiding numerical oscillations and divergences caused by the explicit virtual inertia term due to the proportional frequency change rate. Additionally, this invention configures a one-to-one corresponding local agent for each fast power support resource. These agents reside on local controllers and make independent decisions in each control cycle in a distributed manner. The entire network does not have a centralized optimizer or rely on fully interconnected communication. Coordination emerges through neighborhood channel information exchange and network physical coupling (electrical distance support matrix allocation, frequency synchronization trend driven by synchronous torque coupling), achieving global coordination through local communication and avoiding the communication and modeling burden of centralized schemes.

[0021] Other features and advantages of the invention will be set forth in the following description, or may be learned by practicing the invention. The objects and other advantages of the invention are realized and obtained through the structures particularly pointed out in the description, claims, and drawings.

[0022] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, preferred embodiments are described below in detail with reference to the accompanying drawings. Attached Figure Description

[0023] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0024] Figure 1 This is a flowchart illustrating the physical information multi-agent frequency automatic control method provided in Embodiment 1 of the present invention. Figure 2 This is a schematic diagram of the physical information multi-agent frequency automatic control system provided in Embodiment 2 of the present invention; Figure 3 Comparison of the coherent frequency responses of uncontrolled, local primary frequency modulation, and Physical Information Multi-Agent Learning-Frequency Agent (PIML-freq-agent) under six types of received-end disturbances; Figure 4 This is a comparison chart of the minimum frequency drop, maximum RoCoF, and frequency deviation integral for three strategies under six types of received-end disturbances. Detailed Implementation

[0025] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0026] To address the current challenge of simultaneously achieving proactive forward-looking capabilities, distributed coordination, physical information-driven mechanisms, and numerical stability in power grid transient frequency support technologies, this invention proposes a physical information multi-agent automatic frequency control method. Its core process comprises four progressive stages: reduced-order partitioned frequency dynamic modeling, power imbalance stress modeling and physical forward-looking risk channel extraction, physical information multi-agent coordinated frequency modulation control, and implicit virtual inertia and closed-loop evaluation.

[0027] First, in the reduced-order partitioning modeling stage, the reference power flow solution is used as the initialization anchor point. The actual inertia of the reference system synchronous machine is read and the equivalent inertia of each bus and the support matrix based on electrical distance are calibrated, so as to define a consistent initialization and network coupling basis for transient comparison. Subsequently, we entered the stage of power imbalance stress modeling and physical forward-looking risk channel extraction. We uniformly represented four types of disturbances, namely unit tripping, DC blocking, sudden drop in renewable energy and sudden increase in load, as power deficit that satisfies power conservation, and used the total power deficit of the system as an early warning forward-looking signal. Next, the physical information multi-agent coordinated frequency modulation control stage is executed. The steady-state closed loop is formed by three frequency feedback channels: local, neighborhood, and region. The physical look-ahead feedforward channel is superimposed. Bounded fast power commands are dynamically generated through transient gating, saturation limiting, and first-order commands. Finally, in the implicit virtual inertia and closed-loop evaluation stage, the equivalent additional inertia provided by the fast power resources is implicitly incorporated into the effective inertia to symmetrically suppress RoCoF, the frequency dynamics are updated in a closed loop, and each strategy is evaluated using a comprehensive index system.

[0028] The overall data flow of this invention is as follows: the benchmark example provides network topology, initial power flow state, and real synchronous machine inertia; the reduced-order partitioned frequency model generates frequency time-domain trajectories under a given power deficit curve; the power imbalance model outputs physical look-ahead risk channels; the physical information multi-agent control layer generates fast power commands based on three strategies: no control, local primary frequency modulation, and physical information multi-agent learning-frequency agent (PIML-freq-agent); the commands are fed back to the frequency model via the support matrix and implicit virtual inertia; and the time-domain trajectory is then evaluated by an index system. In an exemplary embodiment, the benchmark network contains 39 buses, 46 branches, and 19 PQ load items, including 10 synchronous machines (located on buses 30 to 39), and fast power support resources are deployed near buses 16, 20, 23, 25, 29, and 4.

[0029] Example 1: The following example illustrates the physical information multi-agent frequency automatic control method of the present invention. Figure 1 This is a flowchart illustrating the physical information multi-agent frequency automatic control method provided in Embodiment 1 of the present invention. In this embodiment, the method includes the following steps: Step 100: Model the target power grid as a graph structure. Based on the effective inertia of each bus, the power deficit allocated to the bus, and the aggregated fast power support, establish a reduced-order regional swing frequency dynamic model described by the evolution of bus frequency deviation. In this embodiment, the target power grid is modeled as a graph structure. Where N is the set of buses and E is the set of branches; the Institute of Electrical and Electronics Engineers (IEEE) 39-node New England benchmark system (including dynamic synchronous machine model) is loaded using the open-source Nonlinear Dynamic Electric System Simulator (ANDES) framework and the power flow is solved to obtain the convergent initial operating point as the anchor point for transient evolution; the adjacency matrix is ​​constructed from the branch set, and the hop distance between all bus pairs is calculated by breadth-first search, which serves as the basis for electrical distance weighting and stress space distribution.

[0030] Preferably, in this embodiment, the true inertia constants of all synchronous machines (classical model of salient-pole synchronous generator, GENeral-ROund rotor synchronous machine model, GENROU model) in the reference system are read, and their equivalent large-machine inertia is limited (the inertia of external equivalent machines exceeding the limiting threshold is truncated to prevent them from anchoring the system frequency independently). The relative inertia structure is taken and normalized to the mean. Then, the equivalent inertia of each synchronous machine bus is calibrated according to the low inertia benchmark of the high-proportion renewable energy receiving-end grid. The equivalent inertia constant of the non-synchronous machine (renewable energy / load) bus is taken as close to zero inertia. Thus, while preserving the true inertia difference structure between units, the low inertia characteristics after a large number of renewable energy sources replace synchronous machines are depicted. Optionally, in an exemplary embodiment, the true inertia of the synchronous machine is distributed between 47.15 and 1199.00, the equivalent large-machine limiting threshold is 150, the low inertia benchmark is 0.40, and the equivalent inertia constant of the non-synchronous machine bus is 0.30. After calibration, the equivalent inertia of the entire system is approximately 12.70.

[0031] In this embodiment, the frequency deviation of bus i is... Defined as the deviation from the rated frequency, where the rated frequency is...

[0032] For each bus i, the evolution of its frequency deviation over time is described by a descending-order partitioned swing frequency dynamic equation:

[0033] In the formula, The effective inertia of bus i (including the virtual inertia increment in step 103). To account for the power deficit allocated to bus i, To support the high-speed power aggregation of bus i, This is the equivalent damping coefficient. Let be the synchronous torque coupling coefficient between bus i and j. This is the coupling attenuation factor. The set of neighboring buses that are in sync with bus i; the synchronous torque coupling term in this set is:

[0034] This describes the physical process by which the frequencies of neighboring buses tend to become synchronized, allowing the same power deficit curve to be applied to different control strategies under the same conditions. Preferably, in this embodiment, the coupling attenuation factor... Pick The equivalent damping coefficient Pick , and M is the inertia constant in the formula.

[0035] Furthermore, in this embodiment, it is assumed that there are a total A fast power support resource, Representing resources The rapid power output of the busbar The cohesive support effect is described by the following formula:

[0036] in, A support matrix based on electrical distance; the support matrix Based on the network hop distance structure, and cut off to zero outside the limited electrical action range, it reflects the physical characteristics of fast power attenuation with electrical distance and acting only on the adjacent bus. Optionally, the support matrix is ​​arranged according to... Distance decays exponentially with the number of jumps, decay scale parameter Pick and the jump distance exceeds The jump point is hard-cut off to zero, and then normalized.

[0037] Furthermore, the inertia-weighted coherence (COI) frequency deviation is defined as a representative quantity of the system frequency and described by the following formula:

[0038] It can also be used for the index calculation in step 103.

[0039] Step 101: Represent power disturbance events as the total power deficit of the power grid system. Allocate this total power deficit to each bus according to the stress distribution that attenuates with electrical distance and satisfies power conservation, and extract forward-looking risk signals based on the stress distribution, which are independent of bus frequency measurements. In this embodiment, the spatial distribution of the disturbance originating from the affected bus set B is modeled as a normalized distribution weight that decays with electrical distance:

[0040] in, Let i be the normalized stress profile of the busbar i. The power is conserved and the distribution weights satisfy the following conditions: The number of jumps distance Let k be the distance from bus i to the affected bus b, where k is the index variable for traversing the power grid buses. To control the scale parameter of spatial diffusion range, N is the set of all generatrices, and the scale parameter is taken as... The use of power conservation distributed weights is one of the key differences between this invention and voltage / reactive power type support modeling—since the active power deficit is a conserved quantity for the entire system, the total deficit is distributed according to... Distributing the deficit to each bus ensures that the sum of the deficits of each bus after distribution is exactly equal to the total deficit of the system, thus accurately depicting the frequency dynamics.

[0041] In this embodiment, power disturbance events are classified into a first disturbance, a second disturbance, a third disturbance, and a fourth disturbance. The first disturbance is a generator trip, the second disturbance is DC blocking, the third disturbance is a sudden drop in renewable energy power, and the fourth disturbance is a sudden increase in load. All power disturbance events are uniformly represented as the total system power deficit of the power grid.

[0042] in, , , , These are the power deficit amplitudes of the first, second, third, and fourth disturbances, respectively. In this embodiment, the total system power deficit is composed of the superposition of these four types of disturbances over time: the unit tripping deficit... At that time UHVDC blocking deficit in At that time The sharp drop in new energy power has resulted in a shortage of [resources / capacity]. The index will be restored to its normal value at any time. The sudden increase in load at the receiving end resulted in a shortage of funds. At that time .in, The time constant of the third disturbance is... The indicator function is defined as follows: the power deficits of the first, second, and fourth disturbances take a step form, while the power deficit of the third disturbance decays exponentially. By adjusting the amplitude, timing, and affected bus set of the four types of deficits, various receiving-end frequency scenarios covering unit tripping, DC blocking, sudden drop in renewable energy, combined disturbances, delayed reserve, and adjacent tie-line disturbances can be constructed.

[0043] In this embodiment, the total power deficit of the system is allocated to each bus according to the power conservation distribution weight:

[0044] in, To allocate the power deficit to bus i, the power conservation distribution weights ensure that the sum of the deficits of each bus after allocation equals the total power deficit of the system.

[0045] In this embodiment, a forward-looking risk signal based on physical information, independent of bus frequency measurement, is extracted from the total power deficit of the system:

[0046] in, The physical information is a forward-looking risk signal, which is directly equal to the total power deficit of the system. The risk signal comes directly from the underlying power disturbance event rather than the measured frequency. It is known at the moment the disturbance occurs, while the lowest frequency point usually appears several seconds after the disturbance. Therefore, the risk signal provides a structured early warning input to the multi-agent layer before the frequency has dropped sufficiently. This is the key to the present invention that makes the support action forward-looking.

[0047] Step 102: Configure a corresponding local agent for each of the aforementioned fast power support resources. Each local agent makes collaborative decisions based on the frequency feedback channel formed by the bus frequency deviation and the forward-looking risk signal of the physical information, generating a fast power command formed by the aggregated fast power support of each bus after being allocated by the electrical distance support. In this embodiment, each of the aforementioned fast power support resources is configured with a corresponding local agent: each agent resides in the local controller associated with its controlled resource, corresponds one-to-one with its controlled resource, and independently completes the decision-making of fast power commands for its own resource. There is no centralized optimizer or reliance on fully interconnected communication across the entire network. Each local agent obtains decision information through four information channels: the first feedback channel collects frequency measurements of its own bus and takes the lowest frequency deviation within its local neighborhood, where the local neighborhood is a set of buses whose electrical distance from the resource bus is no greater than 1; the second feedback channel exchanges frequency measurements with measurement points and adjacent agents within a one-hop electrical neighborhood and generates a neighborhood average frequency deviation; the third feedback channel broadcasts the lowest frequency deviation of the region to each agent within the region from the regional coordination node, transmitting only one scalar per control cycle; the fourth feedforward channel gathers relay protection action signals, circuit breaker position changes, DC blocking signals, and power telemetry steps from the disturbance identification link, and its decision quantity is the physical information look-forward risk signal.

[0048] In this embodiment, each local agent independently generates its own fast power target instruction in a distributed manner during each control cycle, and there is no instruction-level coupling between the agents. The fast power target instruction is formed by the linear superposition and saturation limiting of four components: the local minimum frequency feedback channel, the neighborhood average frequency feedback channel, the regional low-frequency alarm feedback channel, and the physical information look-ahead feedforward channel. The local minimum frequency feedback channel takes the lowest frequency deviation within the local neighborhood of the resource, the neighborhood average frequency feedback channel takes the average frequency deviation within a one-hop electrical neighborhood, and the regional low-frequency alarm feedback channel takes the lowest frequency deviation broadcast in the region where the resource is located. Each frequency feedback channel compares the corresponding frequency deviation with its respective trigger threshold, takes the positive part, and multiplies it by the corresponding gain to form a steady-state frequency feedback closed loop to ensure stability. The state frequency deviation is precisely converged without compensation; the physical information look-ahead feedforward channel uses the physical information look-ahead risk signal as the feedforward quantity, multiplied by the corresponding feedforward gain, and the feedforward quantity is attenuated by a transient gating function. The transient gating function makes the look-ahead feedforward effective within the transient window after the disturbance occurs and zero in the steady state; the fast power target command is limited to the fast power upper limit by the positive part operator and the saturation operator to form a bounded fast power command; the bounded fast power command is distributed to the electrical coverage area of ​​each bus by a support matrix based on electrical distance. The fast power support within the electrical distance coverage area of ​​each bus is aggregated to form the fast power command. The support matrix decays exponentially with the hop distance between buses and is hard-truncated to zero when the set hop number is exceeded, and then normalized.

[0049] Preferably, in step 102 of this embodiment, the three control strategies are compared. No control strategy is allowed. The frequency baseline is given, which only includes inertial and damped responses; the local primary frequency modulation strategy operates based solely on the local bus frequency deviation, using a drooping law and saturation limiting, and is described by the following formula:

[0050] in For controlled bus, This is the local droop dead zone (optionally set to 0.05 Hz). For droop gain (optionally 8.0). The upper limit for fast power (optionally 0.85). , It is a saturation operator; the baseline can only operate after the local frequency falls below the dead zone, and has inherent hysteresis.

[0051] Furthermore, in this embodiment, the Physics-Informed Multi-Agent Learning-Frequency Agent (PIML-freq-agent) strategy consists of a linear superposition and saturation-limited combination of a frequency feedback closed loop and a physical look-ahead feedforward, described by the following formula:

[0052] Its fast power target command From the first local lowest frequency feedback channel Item 2 Item 3 With the fourth physical look-forward feedforward term Superimposed, and limited to [0, ] .

[0053] The first item is the local lowest frequency feedback channel. For resources Lowest frequency deviation in the neighborhood Its trigger threshold (optionally set) The second item is the neighborhood average frequency feedback channel. For the neighborhood Average frequency deviation on Its trigger threshold (optionally set) The third item is the regional low-frequency alarm feedback channel. For the lowest frequency deviation in the fast power resource region, Its trigger threshold (optionally set) The fourth item is the physical look-ahead feedforward channel. That is, the power deficit risk signal extracted in step two. Its feedforward gain (optionally taken) ), For transient gating functions (optionally) This causes the feedforward to decay transiently and return to zero in steady state. to For the gain of each frequency feedback channel (optionally taken) , , ), Optional The first three frequency feedback channels form a steady-state closed loop, ensuring that the steady-state frequency deviation is accurately converged without overcompensation; the fourth physical look-ahead feedforward channel, because it does not rely on the measurement frequency drop, can provide support in advance before the disturbance is fully reflected in the measurement frequency, thereby overcoming the lag of local primary frequency modulation; feedforward gating. This ensures that the look-ahead feedforward only operates in transient states, automatically returns to zero in steady state, and is then handed over to the frequency feedback closed loop for precise convergence. This achieves foresight while avoiding frequency overshoot caused by open-loop feedforward. When the timing of the physical look-ahead feedforward and the frequency feedback closed loop is coordinated, for example, during severe complex disturbances, the power deficit risk channel ρ(t) rises before the frequency drops significantly. The PIML-freq-agent uses this information to rapidly apply power in advance, and then the frequency feedback closed loop completes precise convergence.

[0054] In this embodiment, more preferably, to reflect the limited ramp rate of fast power devices (energy storage, grid-connected converters, etc.), the actual fast power output follows first-order command dynamics:

[0055] in, The ramp time constant is the command ramp time constant; optionally, the ramp time constant of the PIML-freq-agent of this invention is taken as... The ramp time constant for local primary frequency modulation is taken as 0.35 s, and the control cycle of the local agent is consistent with the time-domain integration step size and is taken as... The smaller slope time constant of this invention allows for faster deployment of support after early warning is obtained.

[0056] Step 103: Determine the equivalent additional inertia provided by each of the aforementioned fast power supports within its electrical coverage area, and implicitly incorporate this equivalent additional inertia into the effective inertia. Update the frequency deviation of each of the aforementioned buses in a closed loop based on the fast power command and the reduced-order partitioned swing frequency dynamic model, and generate transient frequency support indices based on the updated frequency deviations to evaluate the performance of automatic frequency control. In this embodiment, the equivalent additional inertia is implicitly incorporated into the effective inertia described above:

[0057] in, The equivalent inertia of the busbar calibrated in step 100, For virtual inertia gain, The electrical coverage factor of the fast power resources on bus i is obtained by normalizing the sum of the columns of the support matrix. This implementation is mathematically equivalent to injecting virtual inertial power proportional to the rate of frequency change and in the opposite direction into the reduced-order partitioned swing frequency dynamic model:

[0058] Moving this term to the left side of the equation yields:

[0059] This allows the virtual inertia to symmetrically suppress the rate of change of the bus frequency in both the decreasing and increasing directions (providing positive support during decreasing frequency and reverse absorption during increasing frequency), thus smoothing the frequency trajectory, suppressing transient overshoot, and maintaining absolute numerical stability under discrete-time integration—avoiding the numerical oscillations and divergences caused by the proportional rate of change of frequency when implementing virtual inertia with an explicit feedback force term. Optionally, the virtual inertia gain of the PIML-freq-agent of this invention is taken as... Local primary frequency modulation has only a negligible equivalent inertia increment (virtual inertia gain is 0.12).

[0060] In this embodiment, the aforementioned power deficit, the aforementioned aggregated fast power support, and the effective inertia described in this step are combined. Substituting into the reduced-order partitioned swing frequency dynamic model, the bus frequency deviation is progressively updated by time-domain integration, with the coherence frequency set as:

[0061] In the formula, t0 is the time when the disturbance occurs, and T is the end point of the simulation window. Preferably, in this embodiment, the simulation step size is 0.01 s, the simulation window is 15 s, the low-frequency violation threshold is 49.5 Hz, the recovery band is ±0.10 Hz, and the time when the disturbance occurs in each scenario is 1.0 s.

[0062] In this embodiment, a comprehensive transient frequency support index is calculated for each frequency time-domain trajectory. The transient frequency support index includes: the lowest frequency point. Maximum frequency change rate Low frequency violation duration Unauthorized area Frequency deviation integral Regulate energy Recovery time Deviation from quasi-steady-state frequency The recovery time is the time after the disturbance. First entry and continued stay in the recovery zone Within a given time period, the quasi-steady-state frequency deviation is the end of the window. The mean of the values ​​is used. The evaluation focuses on the lowest frequency point, the maximum rate of frequency change, and the frequency deviation integral, as these three factors simultaneously reflect the frequency drop depth, rate of change, and recovery speed. The three control strategies are evaluated under identical scenario definitions, generating 18 time-domain trajectories for six receiver-end frequency scenarios as a basis for comparison.

[0063] In this embodiment, a specific scenario is used as an example: Suppose there is an ultra-high voltage direct current blocking scenario, and the DC blocking deficit amplitude is... Take 8.4 (per unit value), time of occurrence Taking 1.0 s as an example, the affected bus set B consists of the DC feed bus and its adjacent buses. The disturbance identification link provides the total power deficit of the system at t = 1.0 s and broadcasts it to each agent through the physical look-ahead risk channel. At this time, the network measurement frequency has not yet dropped significantly. Each agent has already increased its output in advance according to the look-ahead feed-forward channel. The neighborhood and regional channels enhance the feedback step by step as the frequency drops. The actual output of each resource mainly benefits the electrical coverage area adjacent to the DC feed bus through the support matrix. The implicit virtual inertia synchronously reduces the initial frequency change rate. Then, the frequency feedback closed loop completes the precise convergence, thereby achieving early, bounded, and coordinated rapid power support and virtual inertia support before the frequency drops sufficiently.

[0064] By implementing steps 100 to 103 above, a reduced-order partitioned swing frequency model is constructed by using the reference power flow solution as an anchor point, reading the inertia of the real synchronous machine, and calibrating the equivalent inertia according to the new energy penetration. This provides a consistent and reproducible transient evaluation basis for different control strategies under the same power deficit curve. By treating the total power deficit of the system as a forward-looking risk channel directly from the underlying disturbance, the controller obtains a structured early warning input before the measured frequency has fully dropped, overcoming the lag of local primary frequency regulation that can only act after the fact and the lack of physical early warning in pure data-driven coordination. By fusing the frequency feedback closed loop with the gated attenuated physical forward-looking feedforward into a bounded fast power command and distributing it through the electrical distance support matrix, a forward-looking and overcompensated coordination support is achieved without relying on complete centralized optimization, overcoming the problem of heavy burden of centralized coordination communication and modeling. By implicitly incorporating the virtual inertia into the effective inertia, a virtual inertia support that symmetrically suppresses the rate of frequency change, is naturally overshoot-free, and numerically stable is achieved.

[0065] Example 2 Based on the above method embodiments, this second embodiment provides a physical information multi-agent frequency automatic control system, such as... Figure 2 As shown. Among them Figure 2 This is a schematic diagram of the structure of the physical information multi-agent frequency automatic control system provided in Embodiment 2 of the present invention. Figure 2 The physical information multi-agent frequency automatic control system 200 includes: a first modeling module 201, a second physical look-ahead module 202, a third collaborative decision-making module 203 and a fourth frequency deviation update module 204, which correspond to steps 100, 101, 102 and 103 of the method described in Embodiment 1, respectively.

[0066] The first modeling module 201 is configured to model the target power grid as a graph structure. Based on the effective inertia of each bus, the power deficit allocated to the bus, and the aggregated fast power support, it establishes a reduced-order partitioned swing frequency dynamic model described by the evolution of bus frequency deviation. In specific implementation, the first modeling module 201 preferably reads the power grid topology and the actual inertia of the synchronizing machine, calibrates the equivalent inertia according to the penetration of new energy sources, and constructs the hop distance as the basis for electrical distance. Finally, it outputs the reduced-order partitioned swing frequency dynamic equation (the implementation details of which are consistent with the equation and corresponding technical disclosure in step 100 of Embodiment 1, and can be cited here without further elaboration) as well as parameters such as bus frequency deviation, effective inertia, power deficit, aggregated fast power support, equivalent damping coefficient, synchronizing torque coupling coefficient, and neighborhood set.

[0067] The second physical look-ahead module 202 is configured to uniformly represent power disturbance events as the total power deficit of the power grid system. It allocates this total power deficit to each bus according to a stress distribution that decays with electrical distance and satisfies power conservation, and extracts a physical information look-ahead risk signal independent of bus frequency measurements based on this stress distribution. Specifically, the second physical look-ahead module 202 classifies disturbances into four categories: unit tripping, DC blocking, sudden drop in renewable energy power, and sudden load increase. It constructs a stress distribution weight that decays with electrical distance and maintains power conservation, allocates the total power deficit to each bus, and directly outputs the total power deficit as a physical information look-ahead risk signal to the third collaborative decision-making module 203 (its implementation details are consistent with the technical disclosure corresponding to step 101 in Embodiment 1, and can be cited here without further elaboration).

[0068] The third collaborative decision-making module 203 is configured to assign a local intelligent agent to each of the aforementioned fast power support resources. Each local intelligent agent makes collaborative decisions based on the frequency feedback channel formed by the bus frequency deviation and the forward-looking physical information risk signal, generating a fast power command that is aggregated by the fast power support of each bus after being allocated by the electrical distance support. In specific implementation, the third collaborative decision-making module 203 deploys a local intelligent agent at each fast power support resource. Each local intelligent agent acquires measurements through four information channels: local, neighborhood, regional, and physical forward-looking risk. It independently generates a fast power target command in each control cycle in a distributed manner. The command is dynamically formed by saturation limiting and first-order command, and then allocated to each bus through a support matrix based on electrical distance to form the fast power command (the implementation details are consistent with the technical disclosure corresponding to step 102 in Embodiment 1, which can be cited here and will not be repeated).

[0069] The fourth frequency deviation update module 204 is configured to determine the equivalent additional inertia provided by each of the aforementioned fast power supports within its electrical coverage area, implicitly incorporate this equivalent additional inertia into the effective inertia, update the frequency deviation of each of the aforementioned buses in a closed loop based on the fast power command and the reduced-order partitioned swing frequency dynamic model, and generate transient frequency support indicators based on the updated frequency deviations to evaluate the performance of automatic frequency control. Specifically, the fourth frequency deviation update module 204 implicitly incorporates the equivalent additional inertia into the effective inertia (its implementation details are consistent with the technical disclosure corresponding to step 103 in Embodiment 1, and can be cited here without further elaboration), substitutes the fast power command and power deficit into the reduced-order partitioned swing frequency dynamic model for time-domain integration update, and calculates comprehensive transient frequency support indicators such as the lowest frequency point, maximum frequency change rate, low-frequency violation duration, violation area, frequency deviation integral, regulation energy, recovery time, and quasi-steady-state frequency deviation based on the updated frequency deviations to quantitatively characterize the transient frequency quality of the system.

[0070] Preferably, the above four modules can be deployed in the power grid dispatching master station or in each local controller. The first modeling module 201 and the second physical look-ahead module 202 can be implemented centrally or distributed. The third collaborative decision-making module 203 and the fourth frequency deviation update module 204 reside in the local controllers of each fast power support resource as local intelligent agents, thereby achieving globally coordinated transient frequency automatic control through local communication and physical coupling. Preferably, the connection relationship of the four modules in this embodiment can be transmitted through the connection between modules. For example, the fourth frequency deviation update module 204 can also call the first modeling module 201 through the intermediate second physical look-ahead module 202 and the third collaborative decision-making module 203. Such interconnection is also within the protection scope of this invention.

[0071] Example 3 Example 3 is another preferred embodiment of the physical information multi-agent frequency automatic control method provided by the present invention. It is merely an example and should not impose any limitations on the function and scope of use of the embodiments of this application. Some technical steps in Example 3 are based on the technical implementation in Example 1 and will be referenced in Example 3 without being repeated. Example 3 focuses on illustrating the specific manifestation of multi-agent in the present invention.

[0072] In Example 3, the IEEE 39-node New England receiving-end power grid is used as the implementation object. The reference network includes 39 buses, 46 branches, and 19 PQ load items, including 10 synchronous machines (located on buses 30 to 39). Fast power support resources are arranged near buses 16, 20, 23, 25, 29, and 4, and each resource is an energy storage power station or a grid-connected converter. Each fast power support resource corresponds to a local agent (6 in this example). The agent resides in the local controller (energy storage converter controller or grid-connected converter control unit) associated with the resource, corresponds one-to-one with the resource it controls, and independently completes the decision-making of fast power commands for that resource. There is no centralized optimizer for the entire network, and it does not rely on full interconnection communication. Optionally, the upper limit of fast power for a single resource is 0.95, and the command ramp time constant is 0.08 s.

[0073] Furthermore, each agent acquires decision information through four information channels: the first is the local channel, where the agent collects frequency measurements of its own bus and takes the lowest frequency deviation within its local neighborhood, which is a set of buses whose hop distance from the resource bus is no greater than 1; the second is the neighborhood channel, where the agent exchanges frequency measurements only with measurement points within one hop electrical neighborhood and with adjacent agents, and calculates the neighborhood average frequency deviation; the third is the regional channel, where the regional coordination node broadcasts the regional lowest frequency deviation to all agents within the region, optionally taking the minimum value of all resource bus frequency measurements, and this channel transmits only one scalar per control cycle; the fourth is the physical forward-looking risk channel, where the disturbance identification link gathers relay protection action signals, circuit breaker position changes, UHVDC blocking signals, and new energy power station power telemetry step changes, gives the system total power deficit ρ(t), and broadcasts it to all agents. Since the risk channel signal originates directly from the underlying power disturbance event rather than the measured frequency, it is known the instant the disturbance occurs, earlier than the frequency drop propagates in the network, thus providing structured early warning input for each agent.

[0074] Furthermore, each agent makes decisions in a distributed manner: each agent independently executes the scheme described in step 102 of Embodiment 1 in each control cycle (optionally, the control cycle is consistent with the simulation step size, taken as 0.01 s) to generate its own fast power target command and saturate limit it to [0, Then, the first-order instruction ramp is dynamically applied to the power execution device; there is no instruction-level coupling between intelligent agents, and their coordination emerges through information exchange in the neighborhood channel and network physical coupling (support matrix allocation based on electrical distance and frequency coherence trend driven by synchronous torque coupling term), thereby achieving global coordination through local communication and avoiding the communication and modeling burden of centralized coordination schemes.

[0075] Furthermore, the specific operation process of the system in each control cycle is as follows: the disturbance identification link updates the total power deficit ρ(t) of the system according to step two; unit tripping, DC blocking and load surge take the step form, and the sudden drop in renewable energy takes the exponential recovery form; the four types of deficits are superimposed over time and distributed to each bus according to the spatial distribution weight that satisfies power conservation; each agent reads the measurements of the four channels, and feeds back the local lowest frequency, the neighborhood average frequency, and the regional lowest frequency, along with the look-ahead feedforward term. The linear superposition calculation target instruction, wherein the look-forward feedforward term is transiently gated. As the frequency decays over time and returns to zero in a steady state, the forward-looking support only functions in the transient state, and the steady-state accuracy is guaranteed by the frequency feedback closed loop without compensation. The actual output of each resource is distributed to its electrical coverage area bus via the support matrix, and its equivalent additional inertia is implicitly incorporated into the effective inertia term of the coverage area bus according to step 103 in Embodiment 1 of this invention, symmetrically suppressing the RoCoF in both the rising and falling directions of frequency. Subsequently, the reduced-order partition swing frequency dynamic model closes the loop to update the frequency status of the entire network, and completes the closed-loop evaluation based on indicators such as the lowest frequency point, the maximum RoCoF, the frequency deviation integral, and the low-frequency violation duration.

[0076] Furthermore, taking the scenario of UHVDC blocking of bus 16 with a deficit amplitude of 8.4 (per unit value) as an example, the system operation process is illustrated: At t = 1.0 s, the DC blocking signal is generated, and the disturbance identification link instantly gives ρ = 8.4 and broadcasts it to all agents through the physical look-ahead risk channel. At this time, the network-wide measurement frequency has not yet dropped significantly, and each agent has already increased its output in advance according to the look-ahead feed-forward channel. The neighborhood and regional channels enhance the feedback step by step as the frequency drops. Each resource command mainly benefits the adjacent buses 16, 21, and 24 through the support matrix, and the implicit virtual inertia synchronously reduces the initial RoCoF. In the actual measurement of this scenario, the lowest frequency point has increased from the drop level when there is no control to 49.984 Hz, and the maximum RoCoF has decreased from 0.661 Hz / s to 0.252 Hz / s. After the transient gating is zeroed, the steady-state deviation is accurately converged by the frequency feedback closed loop (the average quasi-steady-state frequency deviation of 6 scenarios is 0.011 Hz), without overcompensation.

[0077] The following further reveals the beneficial effects of the present invention and verifies its effectiveness: A simulation environment was built on the IEEE 39-node New England benchmark power system. A dynamic simulation example containing 10 synchronous machines (buses 30 to 39) was loaded using the open-source ANDES framework (version 1.10.1). The power flow was solved as initialization, and the actual inertia of the synchronous machines was read. Transient simulation was performed using… Step length, Window, low-frequency violation threshold Recovery band The time of occurrence of disturbances in each scenario is as follows: To cover different disturbance modes, six representative receiving-end frequency scenarios were selected, as shown in Table 1.

[0078] Table 1 Selected frequency disturbance scenarios at the receiving end

[0079] Simulation results show that, after adopting the method described in this invention, the frequency response after disturbance is significantly improved in all received-end frequency scenarios. Figure 3 This is a comparison of the coherent frequency responses of uncontrolled, local single-mode, and Physical Information Multi-Agent Learning-Frequency Agent (PIML-freq-agent) agents under six types of received-end disturbances; for example... Figure 3As shown in Table 2, among the method-level average metrics across the six scenarios, PIML-freq-agent outperforms local primary frequency modulation and no control in all frequency quality metrics, including the lowest frequency point, maximum RoCoF, frequency deviation integral, low-frequency violation duration, and quasi-steady-state frequency deviation. The lowest average frequency point is determined by the performance of no control. Local primary frequency modulation Raise to The average maximum RoCoF is determined by , Down to The integral of the average frequency deviation is derived from , Down to The average duration of low-frequency violations was reduced from , Down to .

[0080] Table 2 is shown below, which includes average metrics for 6 scenarios ( , Unit: Hz; maxRoCoF unit: Hz / s; Unit: s; Unit: Hz·s; (Unit: pu²·s)

[0081]

[0082] Furthermore, it also shows that Figure 4 , Figure 4 This is a comparison chart of the minimum frequency drop, maximum RoCoF, and frequency deviation integral for three strategies under six types of received-end disturbances. Figure 4 Compared with the scene-level frequency deviation integral and maximum RoCoF shown in Table 3, PIML-freq-agent achieved the highest minimum frequency point, minimum maximum RoCoF, and minimum frequency deviation integral in all 6 scenes; compared with no control, it reduced the frequency deviation integral by 76.9% to 98.3%, with an average reduction of 88.67% per scene; it reduced the maximum RoCoF by 54.0% to 61.9%, with an average reduction of 59.11% per scene; and it raised the minimum frequency point on average. .

[0083] Table 3 is shown below, which includes scene-level frequency deviation integrals, and a comparison between the maximum RoCoF and the lowest frequency point. The unit is Hz·s, and RoCoF is in Hz / s. The unit is Hz; the reduction is PIML-freq-agent (relatively uncontrolled).

[0084]

[0085] Furthermore, Table 4 is also shown. Among the supplementary indicators shown in Table 4, the severe composite disturbance is the most demanding scenario, which superimposes four types of power deficits: UHVDC blocking, unit tripping, sudden drop in renewable energy, and sudden increase in load. Without control, the lowest frequency point in this scenario drops to [missing information]. Low-frequency violation time is long PIML-freq-agent keeps the lowest frequency point at [the specified location]. Low-frequency violations were eliminated, and the maximum RoCoF was reduced from [previous value]. Down to This fully demonstrates the synergistic support capability of physical forward-looking risk channels and implicit virtual inertia under extreme power shortages.

[0086] Table 4 is shown below, which includes a comparison of the presence and absence of control versus PIML-freq-agent in a severely complex disturbance scenario. , Unit: Hz; RoCoF unit: Hz / s; Unit: s; (Unit: Hz·s)

[0087]

[0088] In summary, under the swing frequency scenario, this invention integrates the power deficit look-ahead risk channel, the frequency feedback-look-forward coordinated control law, and the implicit virtual inertia, and achieves frequency minimum point raising, maximum RoCoF suppression, frequency deviation integral reduction, and low-frequency violation elimination simultaneously without relying on fully centralized optimization. Moreover, it consistently outperforms the two baselines of no control and local primary frequency modulation in all six scenarios.

[0089] The foregoing has described specific embodiments of the present invention. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps described in the claims may be performed in a different order than that shown in the embodiments and may still achieve the desired results. Furthermore, the processes depicted in the drawings do not necessarily require the specific or sequential order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0090] In the description of the embodiments of the present invention, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In the embodiments of the present invention, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. Furthermore, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in the embodiments of the present invention, as well as the features of the different embodiments or examples.

[0091] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of embodiments of the present invention, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0092] Any process or method description in the flowchart or otherwise herein can be understood as representing a module, segment, or portion of code comprising one or more executable instructions for implementing custom logic functions or processes, and the scope of preferred embodiments of the invention includes additional implementations in which functions may be performed not in the order shown or discussed, including substantially simultaneously or in reverse order depending on the functions involved, as should be understood by those skilled in the art to which embodiments of the invention pertain.

[0093] Depending on the context, the word "if" as used here can be interpreted as "when," "when," "in response to determination," or "in response to detection." Similarly, depending on the context, the phrase "if determination" or "if detection (of the stated condition or event)" can be interpreted as "when determination," "in response to determination," "when detection (of the stated condition or event)," or "in response to detection (of the stated condition or event)."

[0094] In the embodiments provided in this invention, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the system embodiments described above are merely illustrative. For instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be indirect coupling or communication connection through some interfaces, modules, or units, and may be electrical, mechanical, or other forms.

[0095] Furthermore, in the various embodiments of the present invention, the functional units can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or in the form of hardware plus software functional units.

[0096] Those skilled in the art will recognize that the embodiments described herein are intended to help the reader understand the implementation methods of the present invention, and should be understood that the scope of protection of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific modifications and combinations based on the technical teachings disclosed in this invention without departing from the spirit of the invention, and these modifications and combinations are still within the scope of protection of the present invention.

Claims

1. A method for automatic frequency control of multiple agents based on physical information, comprising: The target power grid is modeled as a graph structure. Based on the effective inertia of each bus, the power deficit allocated to the bus, and the aggregated fast power support, a reduced-order partitioned swing frequency dynamic model is established, which is described by the evolution of bus frequency deviation. Power disturbance events are uniformly represented as the total power deficit of the power grid system. The total power deficit is allocated to each bus according to the stress distribution that is attenuated by electrical distance along the structure and satisfies power conservation. Based on the stress distribution, a forward-looking risk signal of physical information independent of bus frequency measurement is extracted. Each of the aforementioned fast power support resources is configured with a corresponding local intelligent agent. Each of the aforementioned local intelligent agents makes collaborative decisions based on the frequency feedback channel formed by the bus frequency deviation and the forward-looking risk signal of the physical information, and generates a fast power command that is jointly formed by the fast power support aggregated by each of the aforementioned buses after being allocated by the electrical distance support. The equivalent additional inertia provided by each of the fast power supports within its electrical coverage area is determined, and this equivalent additional inertia is implicitly incorporated into the effective inertia. The frequency deviation of each of the buses is updated in a closed loop based on the fast power command and the reduced-order partitioned swing frequency dynamic model. A transient frequency support index is generated based on the updated frequency deviation to evaluate the performance of automatic frequency control.

2. The method according to claim 1, characterized in that, The process of establishing a reduced-order partitioned swing frequency dynamic model described by the evolution of bus frequency deviation includes: The frequency deviation of bus i is defined as the deviation relative to the rated frequency. The rated frequency ; For each bus i, the evolution of its frequency deviation over time is described by a descending-order partitioned swing frequency dynamic equation: In the formula, Let i be the effective inertia of bus i. To account for the power deficit allocated to bus i, To support the high-speed power aggregation of bus i, This is the equivalent damping coefficient. Let be the synchronous torque coupling coefficient between bus i and j. This is the coupling attenuation factor. Let i be the set of neighboring buses that are homology with bus i. The synchronous torque coupling term The coupling attenuation factor describes the physical process by which the frequencies of neighboring busbars tend to become homogeneous. Pick The equivalent damping coefficient Pick And M is the inertia constant in the formula.

3. The method according to claim 1, characterized in that, The process of allocating the total power deficit to each bus according to the electrical distance attenuation of the structure along with the diagram and satisfying power conservation stress distribution, and extracting forward-looking risk signals of physical information independent of bus frequency measurements based on the stress distribution, includes: The spatial distribution of the disturbance originating from the affected bus set B is modeled as a normalized distribution weight that decays with electrical distance. in, Let i be the normalized stress profile of the busbar i. The power is conserved and the distribution weights satisfy the following conditions: The number of jumps distance Let k be the distance from bus i to the affected bus b, where k is the index variable for traversing the power grid buses. To control the scale parameter of spatial diffusion range, N is the set of all generatrices. Scale parameter values The total power deficit of the system will be reduced. The power conservation distribution weights are allocated to each busbar according to the aforementioned power conservation distribution. in, To allocate the power deficit to bus i, the power conservation distribution weights ensure that the sum of the deficits of each bus after allocation equals the total power deficit of the system.

4. The method according to claim 1, characterized in that, The process of uniformly representing power disturbance events as the total power deficit of the power grid includes: The power disturbance events are classified into four categories: first disturbance, second disturbance, third disturbance, and fourth disturbance. The first disturbance is a generator trip, the second disturbance is DC blocking, the third disturbance is a sudden drop in renewable energy power, and the fourth disturbance is a sudden increase in load. All power disturbance events are uniformly represented as the total system power deficit of the power grid. in, , , , These are the power deficit magnitudes of the first, second, third, and fourth disturbances, respectively. , , , These represent the times when the corresponding disturbances occurred. The time constant of the third disturbance is... The indicator function is defined as follows: the power deficits of the first, second, and fourth disturbances take a step form, while the power deficit of the third disturbance decays in an exponential recovery manner.

5. The method according to claim 1, characterized in that, The process of allocating the total power deficit to each bus according to the electrical distance attenuation of the structure along with the diagram and satisfying power conservation stress distribution, and extracting forward-looking risk signals of physical information independent of bus frequency measurements based on the stress distribution, includes: Extract physical information and forward-looking risk signals from the total power deficit of the system, independent of bus frequency measurements. in, The physical information is used to predict risk signals, which are equal to the total power deficit of the system. The risk signal originates from the underlying power disturbance event, and the lowest frequency point appears after the disturbance. The risk signal provides structured early warning input for the multi-agent layer.

6. The method according to claim 1, characterized in that, The process by which each local agent makes collaborative decisions based on the frequency feedback channel formed by the bus frequency deviation and the forward-looking risk signal of the feedforward physical information, and generates a fast power command jointly formed by the fast power support aggregated by each bus after being allocated by the electrical distance support, includes: Each local agent independently generates its own fast power target instruction in each control cycle in a distributed manner, and there is no instruction-level coupling between the agents; wherein the fast power target instruction is formed by the linear superposition and saturation limiting of four terms: local lowest frequency feedback channel, neighborhood average frequency feedback channel, regional low frequency alarm feedback channel and physical information look-ahead feedforward channel. The local minimum frequency feedback channel takes the lowest frequency deviation within the local neighborhood of the resource, the neighborhood average frequency feedback channel takes the average frequency deviation within a one-hop electrical neighborhood, and the regional low frequency alarm feedback channel takes the lowest frequency deviation broadcast in the region where the resource is located. Each frequency feedback channel compares the corresponding frequency deviation with its respective trigger threshold, takes the positive part, and multiplies it by the corresponding gain to form a steady-state frequency feedback closed loop. The physical information look-ahead feed-forward channel uses the physical information look-ahead risk signal as the feed-forward quantity, multiplied by the corresponding feed-forward gain, and the feed-forward quantity is attenuated by a transient gating function, wherein the transient gating function makes the look-ahead feed-forward effective within the transient window after the disturbance occurs and zero in the steady state. The fast power target command is limited to the fast power upper limit by the positive part operator and the saturation operator to form a bounded fast power command; wherein the bounded fast power command is distributed to the electrical coverage area of ​​each bus by a support matrix based on electrical distance, and the fast power support within the electrical distance coverage area of ​​each bus is aggregated to form the fast power command. The support matrix decays exponentially with the number of hops between buses and is hard-truncated to zero when the number of hops exceeds a set number and then normalized.

7. The method according to claim 1, characterized in that, The process of determining the equivalent additional inertia provided by each of the fast power supports within its electrical coverage area and implicitly incorporating this equivalent additional inertia into the effective inertia includes: The equivalent additional inertia is implicitly incorporated into the effective inertia, and is described by the following formula. in, The effective inertia of the busbar as described in claim 1, For virtual inertia gain, The electrical coverage factor of the fast power resources to bus i; Inject virtual inertial power proportional to the rate of frequency change and in the opposite direction into the reduced-order partitioned swing frequency dynamic model: Moving this term to the left side of the equation yields: The virtual inertia symmetrically suppresses the rate of change of the bus frequency in both the decreasing and increasing directions, wherein the virtual inertia gain is taken as... .

8. The method according to claim 1, characterized in that, The process of updating the frequency deviation of each bus based on the fast power command and the reduced-order partitioned swing frequency dynamic model in a closed loop, and generating transient frequency support indicators based on the updated frequency deviations, includes: Substituting the power deficit, the aggregated fast power support, and the effective inertia into the reduced-order partitioned swing frequency dynamic model, the bus frequency deviation is progressively updated using time-domain integration. Let the coherence frequency be... In the formula, t0 is the time when the disturbance occurs, and T is the end point of the simulation window; The transient frequency support indicators include: the lowest frequency point. Maximum frequency change rate Low frequency violation duration Unauthorized area Frequency deviation integral Regulate energy Recovery time Deviation from quasi-steady-state frequency The recovery time is the time after the disturbance. First entry and continued stay in the recovery zone Within a given time period, the quasi-steady-state frequency deviation is the end of the window. The mean.

9. The method according to claim 1, characterized in that, The process of configuring a corresponding local agent for each of the aforementioned fast power support resources includes: Each of the local intelligent agents resides in the local controller associated with the resource it controls, and corresponds one-to-one with the resource it controls, in order to make decisions on the rapid power command of the local resource.

10. A physical information multi-agent frequency automatic control system, comprising: The first modeling module is configured to model the target power grid as a graph structure, and based on the effective inertia of each bus, the power deficit allocated to the bus, and the aggregated fast power support, establish a reduced-order partitioned swing frequency dynamic model described by the evolution of bus frequency deviation. The second physical look-ahead module is configured to uniformly represent power disturbance events as the total power deficit of the power grid, allocate the total power deficit to each bus according to the electrical distance attenuation of the graph structure and the stress distribution that satisfies power conservation, and extract physical information look-ahead risk signals that do not depend on bus frequency measurements based on the stress distribution. The third collaborative decision-making module is configured to configure a local intelligent agent corresponding to each of the fast power support resources. Each local intelligent agent makes collaborative decisions based on the frequency feedback channel formed by the bus frequency deviation and the forward-looking risk signal of the physical information, and generates a fast power command formed by the fast power support aggregated by each bus after the electrical distance support allocation. The fourth frequency deviation update module is configured to determine the equivalent additional inertia provided by each of the fast power supports within its electrical coverage area, implicitly incorporate the equivalent additional inertia into the effective inertia, update the frequency deviation of each of the buses in a closed loop based on the fast power command and the reduced-order partitioned swing frequency dynamic model, and generate transient frequency support indicators based on the updated frequency deviations to evaluate the performance of automatic frequency control.