Adaptive voltage regulation control method and system for 10kv long-distance overhead line fusing multi-source data

By constructing an overhead line operation status diagram network and integrating voltage and current time-series sampling data with geographic information data, an adaptive voltage regulation command sequence is generated. This solves the problem that existing technologies fail to effectively consider geographic environmental information, achieves globally optimal adaptive voltage regulation control, and improves voltage regulation accuracy and economy.

CN123144121APending Publication Date: 2026-11-20SICHUAN WATER ENVIRONMENTAL ENERGY TECHNOLOGY DEVELOPMENT GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611220594.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-12
Publication Date
2026-11-20

Smart Images

  • Figure CN123144121A_ABST
    Figure CN123144121A_ABST
Patent Text Reader

Abstract

The embodiment of the application provides a kind of fusion 10 kilovolt long distance overhead line adaptive voltage regulating control method and system of multi-source data, it is related to power system distribution line automatic control technical field, according to path geographic information data, construct overhead line operating state graph network with tower position coordinate sequence as node set, section between adjacent towers as edge set, node is mounted electrical quantity data, edge is mounted environmental quantity data;Through the voltage-current spatial interaction coding network of pre-constructed, the graph network is spatio-temporally coded, generates the operating state fusion feature vector that fuses voltage variation trend, current distribution, vegetation coverage and temperature influence spatial correlation characteristics;Based on the feature vector in voltage regulating strategy decision space search, generate adaptive voltage regulating instruction sequence for adjusting first end on-load voltage regulating device voltage output value.The application realizes long distance overhead line multi-source data driven global adaptive voltage regulating control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of automatic control technology for power system distribution lines, and more specifically, to an adaptive voltage regulation control method and system for 10 kV long-distance overhead lines that integrates multi-source data. Background Technology

[0002] In voltage regulation management of 10kV long-distance overhead lines, existing technologies typically install on-load tap changers at the line's inlet. Based on the deviation between the real-time monitored voltage at the line's outlet and a preset target value, a voltage regulation command is generated using a proportional-integral-derivative (PID) control algorithm or a preset voltage regulation rule table. This command drives the on-load tap changer to maintain the outlet voltage within the allowable range. However, the voltage regulation decisions in this method primarily rely on electrical quantity monitoring data from both the inlet and outlet of the line, namely voltage phase vector sequences and current amplitude sequences. This approach fails to consider the geographical environment along the line, making it difficult to detect the impact of non-electrical factors on line parameters, such as seasonal changes in vegetation cover or significant fluctuations in temperature. The current method still relies on purely electrical quantity deviations for regulation, which can easily lead to over- or under-regulation. Furthermore, existing technologies typically store and process voltage and current time-series sampling data and geographic information data collected by each monitoring node independently when processing multi-source monitoring data. They fail to establish structured correlation models between tower nodes and line sections, making it impossible to characterize the spatial coupling relationship between voltage change trends and local environmental factors in different sections. This results in voltage regulation strategy searches being based solely on a one-dimensional optimization objective of end-voltage deviation, neglecting the synergistic effects of parameter changes between sections. Consequently, achieving globally optimal adaptive voltage regulation control is difficult in long-distance line scenarios. Simultaneously, the decision space for voltage regulation strategies in existing technologies is usually constructed based on fixed rules or simplified models, failing to integrate the multi-dimensional spatial correlation characteristics between voltage amplitude change trends, current distribution characteristics, vegetation cover influence characteristics, and temperature influence characteristics. This leads to insufficient adaptability of the generated voltage regulation command sequences when facing complex operating conditions, making it difficult to balance voltage quality in different line sections and the operational lifespan of the voltage regulation device. Summary of the Invention

[0003] In view of this, the purpose of this application is to provide an adaptive voltage regulation control method and system for 10 kV long-distance overhead lines that integrates multi-source data.

[0004] In conjunction with the first aspect of this application, an adaptive voltage regulation control method for 10 kV long-distance overhead lines integrating multi-source data is provided, applied to an adaptive voltage regulation control system for 10 kV long-distance overhead lines integrating multi-source data, the method comprising: Receive voltage and current timing sampling data transmitted back from the overhead line monitoring node. The voltage and current timing sampling data includes the voltage phase vector sequence at the beginning of the overhead line, the voltage phase vector sequence at the end of the overhead line, and the current amplitude sequence distributed along the overhead line. Receive geographic information data of overhead line route, which includes the overhead line tower location coordinate sequence, the overhead line corridor vegetation coverage index sequence, and the overhead line meteorological temperature data sequence along the overhead line. Based on the geographical information data of the overhead line route, an overhead line operation status map network is constructed. The overhead line operation status map network uses the coordinate sequence of the overhead line tower positions as the node set and the overhead line section between adjacent towers as the edge set. Each node is attached with the voltage phase vector sequence at the end of the overhead line and the current amplitude sequence distributed along the overhead line. Each edge is attached with the vegetation coverage index sequence of the overhead line corridor in the corresponding section and the meteorological temperature data sequence along the overhead line. By using a pre-constructed overhead line voltage and current spatial interactive coding network, the overhead line operation status map network is subjected to spatiotemporal joint coding processing to generate an overhead line operation status fusion feature vector. The overhead line operation status fusion feature vector encodes the spatial correlation characteristics between the voltage amplitude change trend characteristics, current distribution characteristics, vegetation cover influence characteristics, and temperature influence characteristics of each overhead line section. Based on the fusion feature vector of the overhead line operating status, a voltage regulation strategy search is performed in the overhead line voltage regulation strategy decision space to generate an adaptive voltage regulation command sequence for the overhead line. The adaptive voltage regulation command sequence is used to adjust the voltage output value of the on-load tap changer at the head end of the overhead line.

[0005] In conjunction with the second aspect of this application, a 10 kV long-distance overhead line adaptive voltage regulation control system integrating multi-source data is provided. The 10 kV long-distance overhead line adaptive voltage regulation control system integrating multi-source data includes a machine-readable storage medium and a processor. The machine-readable storage medium stores machine-executable instructions. When the processor executes the machine-executable instructions, the 10 kV long-distance overhead line adaptive voltage regulation control system integrating multi-source data implements the aforementioned 10 kV long-distance overhead line adaptive voltage regulation control method integrating multi-source data.

[0006] In conjunction with a third aspect of this application, a computer-readable storage medium is provided, wherein computer-executable instructions are stored therein, and when the computer-executable instructions are executed, the aforementioned adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data is implemented.

[0007] Combining any of the above aspects, by structurally fusing the voltage and current time-series sampling data transmitted from overhead line monitoring nodes with the geographical information data of the overhead line path, an overhead line operation status graph network is constructed. This network uses the tower location coordinate sequence as the node set and the overhead line sections between adjacent towers as the edge set. Electrical and environmental data are then attached to the nodes and edges of this graph network. By modeling the entire long-distance overhead line as a graph network with a spatial topology, the electrical and environmental parameters between each tower node and each section of the line are uniformly incorporated into the same structured representation framework. The terminal voltage phase vector sequence and the current amplitude sequence distributed along the line attached to each node, together with the vegetation cover index sequence and meteorological temperature data sequence attached to each edge, constitute a complete description of the line's operation status. Based on this, a pre-constructed spatial interactive coding system for overhead line voltage and current is used. The coding network performs spatiotemporal joint coding on the graph network. The resulting fusion feature vector of overhead line operation status not only encodes the voltage amplitude change trend and current distribution characteristics of each section, but also simultaneously encodes the vegetation cover influence characteristics and temperature influence characteristics. Furthermore, the spatial correlation characteristics among the above four types of features are uniformly represented in the same feature vector. This allows the voltage regulation strategy search process to be carried out in a high-dimensional decision space that integrates the spatial coupling relationship between electrical quantities and environmental quantities, rather than searching only in the low-dimensional space of terminal voltage deviation. As a result, the generated adaptive voltage regulation command sequence for overhead lines can simultaneously respond to parameter drift caused by environmental factors in each section of the line. This achieves a leap from single-point electrical quantity feedback regulation to global multi-source data-driven adaptive voltage regulation control, significantly improving the voltage regulation accuracy and operating economy of voltage regulation devices for long-distance overhead lines under complex environmental conditions. Attached Figure Description

[0008] Figure 1 This application provides a flowchart illustrating the adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data. Detailed Implementation

[0009] To make the objectives, technical solutions, and advantages of this application clearer, the application will be further described in detail below with reference to the accompanying drawings. The described embodiments should not be regarded as limitations on this application. All other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0010] In the following description, the terms "first, second, third" are used merely to distinguish similar objects and do not represent a specific ordering of objects. It is understood that "first, second, third" may be interchanged in a specific order or sequence where permitted, so that the embodiments of this application described herein can be implemented in an order other than that illustrated or described herein.

[0011] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein is for the purpose of describing embodiments of this application only and is not intended to limit the scope of this application.

[0012] Figure 1 This document illustrates a flowchart of an adaptive voltage regulation control method for 10 kV long-distance overhead lines, merging multi-source data, provided in an embodiment of this application. It should be noted that the acquisition and transmission of all voltage and current time-series sampling data and overhead line route geographic information data in this embodiment are performed within the authorized scope of the power dispatching department, and the data acquisition device complies with relevant power industry technical standards. Synthetic aperture radar satellite remote sensing vegetation monitoring data in the overhead line route geographic information data is acquired through a legally authorized satellite data receiving channel. Data transmission from all wireless communication relay nodes is protected by encryption mechanisms using power-specific communication protocols. The acquisition of the overhead line corridor vegetation cover index sequence and the meteorological temperature data sequence along the overhead line does not involve personal privacy information.

[0013] This embodiment uses a 10 kV long-distance overhead distribution line as the application scenario. The overhead line is approximately tens of kilometers long, with hundreds of towers erected along its route. A load-changing transformer is installed in the substation at the beginning of the line, and multiple distribution transformers are connected at the end of the line to supply power to the loads. The terrain along the overhead line is complex, with some sections traversing densely vegetated areas, making the line's operation significantly affected by changes in ambient temperature and the vegetation growth cycle. Voltage transformers, current sensors, and meteorological environmental monitoring sensors are deployed at the beginning, end, and key towers along the line. Each sensor communicates with the line monitoring nodes through wireless communication relay nodes deployed on the towers.

[0014] Step S110: Receive voltage and current timing sampling data transmitted back from the overhead line monitoring node. The voltage and current timing sampling data includes the voltage phase vector sequence at the beginning of the overhead line, the voltage phase vector sequence at the end of the overhead line, and the current amplitude sequence distributed along the overhead line.

[0015] The computing environment receives data frames transmitted from overhead line monitoring nodes via an overhead line communication network. Each overhead line monitoring node is a data aggregation and processing device deployed in a substation at the beginning of the line, connected to the computing environment via a fiber optic Ethernet interface. The data structure of the voltage and current time-series sampling data is a JSON object containing three top-level fields: the beginning-of-line voltage phase vector sequence field, the end-of-line voltage phase vector sequence field, and the distributed current amplitude sequence field along the line.

[0016] The value of the first-end voltage phase vector sequence field is a two-dimensional floating-point array. Each row of the array corresponds to a sampling time. Each row contains two floating-point numbers: the first is the A-phase voltage amplitude in kilovolts, and the second is the A-phase voltage phase angle in degrees. The time interval between sampling times is a preset sampling period. The total number of rows in the array equals the preset time window length divided by the sampling period. The data structure of the last-end voltage phase vector sequence field is the same as that of the first-end voltage phase vector sequence field, recording the voltage amplitude and voltage phase angle measured on the high-voltage side of the distribution transformer at the end of the overhead line.

[0017] The value of the distributed current amplitude sequence field is a two-dimensional floating-point array. The first dimension of the array corresponds to the current measuring points at each tower location along the overhead line, and the second dimension corresponds to each sampling time. The value of each element is the A-phase current amplitude at that measuring point at that sampling time, in amperes. The distributed current amplitude sequence field also contains a measuring point identifier array, which records the tower number corresponding to each current measuring point.

[0018] After receiving a data frame, the computing environment performs a cyclic redundancy check. If the check passes, the voltage and current timing data samples are parsed and stored in the timing data buffer in memory. The timing data buffer adopts a circular buffer structure indexed by the sampling time.

[0019] Step S120: Receive the geographic information data of the overhead line route. The geographic information data of the overhead line route includes the coordinate sequence of the overhead line tower locations, the vegetation coverage index sequence of the overhead line corridor, and the meteorological temperature data sequence along the overhead line.

[0020] The computing environment uses the descriptive state delivery application interface provided by the overhead line geographic information system to send query requests using the line identifier as a query parameter and receive the returned overhead line route geographic information data. The data structure of the overhead line route geographic information data is a JSON object containing three top-level fields: tower location coordinate sequence field, corridor vegetation cover index sequence field, and meteorological temperature data sequence field along the line.

[0021] The value of the tower location coordinate sequence field is a two-dimensional floating-point array. Each row of the array corresponds to one tower, and each row contains two floating-point numbers. The first floating-point number is the geographical longitude parameter of the tower, measured in degrees, and the second floating-point number is the geographical latitude parameter of the tower, measured in degrees. The rows of the array are arranged in the order of the towers from the beginning to the end of the line.

[0022] The value of the corridor vegetation cover index sequence field is a two-dimensional floating-point array. The first dimension of the array corresponds to each overhead line segment, i.e., the line corridor area between adjacent towers. The second dimension of the array corresponds to each time point, and the value of each element is the normalized vegetation index of that segment at that time point, with dimensionless dimensions. The normalized vegetation index ranges from -1 to +1, with higher values ​​indicating denser vegetation cover. The time interval between time points is the same as the sampling period in step S110.

[0023] The value of the meteorological temperature data sequence field along the route is a two-dimensional floating-point array. The first dimension of the array corresponds to the location of each tower, and the second dimension corresponds to each time point. The value of each element is the ambient temperature parameter at that tower location at that time point, in degrees Celsius.

[0024] After receiving the geographic information data of the overhead line route, the computing environment stores the data in the geographic information data cache in memory.

[0025] Step S130: Based on the geographical information data of the overhead line route, construct the overhead line operation status map network. The overhead line operation status map network uses the coordinate sequence of the overhead line tower positions as the node set and the overhead line section between adjacent towers as the edge set. Each node is equipped with the voltage phase vector sequence at the end of the overhead line and the distributed current amplitude sequence along the overhead line. Each edge is equipped with the vegetation coverage index sequence of the overhead line corridor in the corresponding section and the meteorological temperature data sequence along the overhead line.

[0026] Step S131: Parse the geographical information data of the overhead line route and extract the coordinate sequence of the overhead line tower locations. The coordinate sequence of the overhead line tower locations includes the geographical longitude and geographical latitude parameters of each tower.

[0027] The computing environment reads the overhead line route geographic information data object from the geographic information data cache stored in step S120, accesses the tower location coordinate sequence field of the object, and extracts a two-dimensional floating-point array of this field. The computing environment iterates through each row of this array, and for the k-th row, extracts the geographic longitude parameter lon(k) and geographic latitude parameter lat(k), and associates these two parameters with the tower number k to store a tower coordinate structure. The tower coordinate structure contains a tower number field, a geographic longitude parameter field, and a geographic latitude parameter field. All tower coordinate structures are arranged in ascending order of tower number to form a tower location coordinate sequence.

[0028] Step S132: Analyze the geographical information data of the overhead line route and extract the vegetation cover index sequence of the overhead line corridor. The vegetation cover index sequence of the overhead line corridor includes the normalized vegetation index of the overhead line section between each adjacent tower.

[0029] The computing environment accesses the corridor vegetation cover index sequence field from the overhead line route geographic information data object and extracts a two-dimensional floating-point array of this field. The computing environment iterates through each row of this array. For the j-th row, which corresponds to the overhead line segment between the j-th tower and the j+1-th tower, the normalized vegetation index values ​​for all time points in that row are combined into a time series vector NDVI(j). The data structure of the time series vector NDVI(j) is a one-dimensional floating-point array, with the array length equal to the total number of sampling points within the time window. The NDVI(j) vectors of all overhead line segments are sorted in ascending order by segment number to form the overhead line corridor vegetation cover index sequence.

[0030] Step S133: Analyze the geographical information data of the overhead line route and extract the meteorological temperature data sequence along the overhead line. The meteorological temperature data sequence along the overhead line includes the environmental temperature parameters at each tower location.

[0031] The computing environment accesses the meteorological temperature data sequence field along the overhead line from the geographic information data object of the overhead line route and extracts a two-dimensional floating-point array of this field. The computing environment iterates through each row of this array; for the k-th row, which corresponds to the k-th base tower location, it constructs a time series vector T(k) from the environmental temperature parameter values ​​of all time points in that row. The data structure of the time series vector T(k) is a one-dimensional floating-point array, with the array length equal to the total number of sampling points within the time window. The T(k) vectors at all tower locations are sorted in ascending order by tower number to form the meteorological temperature data sequence along the overhead line.

[0032] Step S134: Define the set of graph nodes for the overhead line operation status graph network. Each graph node in the graph node set corresponds to a tower. Assign the voltage phase vector sequence at the end of the overhead line and the current amplitude sequence distributed along the overhead line to the attribute fields of the corresponding graph node.

[0033] The computing environment initializes an empty undirected graph data structure. It then iterates through the tower numbers k from 1 to the total number of towers N, creating a graph node v(k) for each tower number, with the node identifier set to the tower number string.

[0034] For each graph node v(k), the computational environment extracts the line-distributed current amplitude sequence at that tower location from the time-series data buffer stored in step S110. For the first tower, the first-end voltage phase vector sequence is attached as a node attribute, containing the A-phase voltage amplitude U(1,t) and the A-phase voltage phase angle phi(1,t), where t represents the sampling time index. For the last tower, the last voltage phase vector sequence is attached as a node attribute, containing the A-phase voltage amplitude U(N,t) and the A-phase voltage phase angle phi(N,t). For the remaining towers, the line-distributed current amplitude sequence I(k,t) at that tower is attached as a node attribute. The attribute field of the graph node v(k) is a structure containing a voltage amplitude array field, a voltage phase angle array field, and a current amplitude array field.

[0035] Step S135: Define the edge set of the overhead line operation status graph network. Each edge in the edge set corresponds to an overhead line segment between adjacent towers. Assign the overhead line corridor vegetation cover index sequence and the meteorological temperature data sequence along the overhead line to the attribute fields of the corresponding edge.

[0036] The computational environment iterates through the tower numbers k from 1 to N, subtracting 1 each time. For each pair of adjacent towers k and k', it increments by 1, creating an undirected edge e(k,k+1) connecting graph nodes v(k) and v(k+1). For each graph edge e(k,k+1), the computational environment assigns the vegetation cover index sequence NDVI(k) extracted in step S132 and the meteorological temperature data sequences T(k) and T(k+1) along the overhead line extracted in step S133 to the attribute fields of that graph edge. The attribute fields of graph edge e(k,k+1) are a structure containing a vegetation cover index array field, a head temperature array field, and a tail temperature array field. The vegetation cover index array field stores the NDVI(k) vector, the head temperature array field stores the T(k) vector, and the tail temperature array field stores the T(k+1) vector.

[0037] Step S136: Combine the graph node set and graph edge set with the assigned attribute fields into an overhead line operation status graph network. The overhead line operation status graph network fully describes the topological relationship structure of voltage and current status and geographical environmental factors at each location of the overhead line.

[0038] The computing environment combines the set of N graph nodes created in step S134 and the set of N minus 1 graph edges created in step S135 to construct an overhead line operation status graph network. The data structure of the overhead line operation status graph network is an undirected graph, stored in the form of an adjacency list. Each entry in the adjacency list corresponds to a graph node, storing the node attribute structure, the list of adjacent graph nodes, and the edge attribute structure of the connecting edges. The topology of the overhead line operation status graph network is a chain graph, where the node sequence corresponds to the tower sequence from the beginning to the end of the line, and the edge sequence corresponds to each overhead line segment.

[0039] Step S140: Using the pre-constructed overhead line voltage and current spatial interactive coding network, the overhead line operation status map network is subjected to spatiotemporal joint coding processing to generate an overhead line operation status fusion feature vector. The overhead line operation status fusion feature vector encodes the spatial correlation characteristics between the voltage amplitude change trend characteristics, current distribution characteristics, vegetation cover influence characteristics, and temperature influence characteristics of each overhead line section.

[0040] Step S141: Construct an overhead line voltage and current spatial interactive coding network. The overhead line voltage and current spatial interactive coding network includes a graph convolutional feature propagation layer, a temporal dependency modeling layer, and a multi-source feature fusion layer.

[0041] The overhead line voltage and current spatial interactive coding network is a multi-layer neural network structure, which consists of three functional layers connected in series.

[0042] The graph convolutional feature propagation layer is a multi-layer graph convolutional module based on a graph attention network. It contains L graph convolutional sub-layers, each performing a neighborhood message aggregation operation on all nodes of the input graph. The number of graph convolutional sub-layers, L, is determined by the total number of overhead line towers, and L is taken as the floor of the logarithm of N (base 2). Each graph convolutional sub-layer maintains a learnable weight matrix and a learnable bias vector. The dimension of the weight matrix is ​​the product of the input feature dimension and the output feature dimension, and the dimension of the bias vector is the same as the output feature dimension.

[0043] The temporal dependency modeling layer is a time series encoding module based on a gated recurrent unit. The gated recurrent unit contains two gating mechanisms: an update gate and a reset gate. The hidden state dimension of the gated recurrent unit is preset to H_t. The gated recurrent unit performs cyclic encoding processing on the input time series step by step, outputting a hidden state vector at each time step. The hidden state vector of the last time step is used as the encoded representation of the time series.

[0044] The multi-source feature fusion layer is a feature fusion module based on a multi-head cross-attention mechanism. The number of attention heads in the multi-head cross-attention mechanism is preset to M_a. Each attention head maps the input feature vector to a query vector, key vector, and value vector through linear projection. It calculates the scaling dot product attention weights of the query vector and key vector, and then uses these attention weights to weighted aggregate the value vector. The outputs of all attention heads are concatenated along the feature dimension, and then passed through a linear output projection layer to obtain the fused feature vector.

[0045] Step S142: Through the graph convolutional feature propagation layer, the overhead line operation status graph network is processed by message passing layer by layer, and the voltage and current attribute information of adjacent nodes of each graph node is aggregated to generate the overhead line spatial feature representation matrix. The overhead line spatial feature representation matrix encodes the spatial correlation pattern of voltage and current data between different sections of the overhead line.

[0046] The computing environment inputs the overhead line operation status graph network constructed in step S136 into the graph convolutional feature propagation layer. The graph convolutional feature propagation layer first constructs an initial node feature vector h(k,0) for each graph node v(k). The initial node feature vector is constructed by flattening all sampled values ​​in the voltage amplitude array field, voltage phase angle array field, and current amplitude array field of the graph node into a one-dimensional vector in chronological order.

[0047] The graph convolutional feature propagation layer performs a neighborhood message aggregation operation on graph node v(k) in the l-th graph convolutional sub-layer. The neighborhood message aggregation operation first calculates the message passing weight alpha(k,m,l) between graph node v(k) and its neighboring graph nodes v(m). The message passing weight alpha(k,m,l) is calculated by multiplying the current feature vector h(k,l-1) of graph node v(k) by the query projection weight matrix W_q(l) of the l-th graph convolutional sub-layer to obtain the query vector q(k,l); multiplying the current feature vector h(m,l-1) of neighboring graph node v(m) by the key projection weight matrix W_k(l) of the l-th graph convolutional sub-layer to obtain the key vector k(m,l); calculating the dot product of the query vector q(k,l) and the key vector k(m,l), dividing by the square root of the dimension of each attention head, and inputting the result into a linear unit activation function with leakage correction to obtain the message passing weight alpha(k,m,l).

[0048] Then, the current feature vector h(m,l-1) of the adjacent graph node v(m) is multiplied by the value projection weight matrix W_v(l) of the l-th graph convolutional sub-layer to obtain the value vector v(m,l). The value vector v(m,l) is multiplied by the message passing weight alpha(k,m,l) and then summed to obtain the aggregated message vector m(k,l).

[0049] Multiply the aggregated message vector m(k,l) by the output projection weight matrix W_o(l) of the l-th graph convolutional sub-layer, add the output projection bias vector b_o(l), and then add it element-wise with the current feature vector h(k,l-1) of the graph node v(k). After layer normalization, the output feature vector h(k,l) of the l-th graph convolutional sub-layer is obtained.

[0050] After processing through all L graph convolutional sub-layers, the output feature vectors h(k,L) of all graph nodes are stacked row-wise to form the overhead line spatial feature representation matrix H_space. The overhead line spatial feature representation matrix is ​​a two-dimensional floating-point matrix, with the number of rows equal to the total number of towers N and the number of columns equal to the output feature dimension.

[0051] Step S143: Through the temporal dependency modeling layer, perform temporal convolution operation on the time series of each graph node in the spatial feature representation matrix of the overhead line to extract the changing trend features of voltage and current data in the time dimension and generate the spatiotemporal feature tensor of the overhead line.

[0052] The computational environment inputs the overhead line spatial feature representation matrix H_space into the temporal dependency modeling layer. The temporal dependency modeling layer performs gated cyclic unit encoding on the feature vector sequence of each graph node in the overhead line spatial feature representation matrix in the time dimension.

[0053] The gated recurrent unit receives the feature vector sequence of graph node v(k) across all T time steps as input. The feature vector sequence consists of the initial features of the graph node at each sampling time within the time window, stored in the time-series data buffer in step S110, with each sampling time corresponding to a feature vector. The gated recurrent unit initializes the hidden state vector to zero. For the t-th time step, the gated recurrent unit calculates the update gate activation vector z(t) and the reset gate activation vector r(t). The update gate activation vector is calculated by multiplying the current input feature vector by the update gate input weight matrix, multiplying the hidden state vector of the previous time step by the update gate hidden state weight matrix, and then summing the two and applying the result to the Sigmoid activation function. The reset gate activation vector is calculated by multiplying the current input feature vector by the reset gate input weight matrix, multiplying the hidden state vector of the previous time step by the reset gate hidden state weight matrix, and then summing the two and applying the result to the Sigmoid activation function. The candidate hidden state vector is calculated by multiplying the current input feature vector by the candidate input weight matrix, multiplying the previous time step hidden state vector element-wise with the reset gate activation vector, and then multiplying by the candidate hidden state weight matrix. The sum of these two products is then passed through a hyperbolic tangent activation function. The current time step hidden state vector is 1 minus the element-wise product of the update gate activation vector and the previous time step hidden state vector, plus the element-wise product of the update gate activation vector and the candidate hidden state vector.

[0054] The hidden state vector of the last time step is taken as the temporal encoding vector of graph node v(k). The temporal encoding vectors of all graph nodes are stacked row by row to form the overhead line spatiotemporal feature tensor T_st. The data structure of the overhead line spatiotemporal feature tensor is a two-dimensional floating-point matrix, where the number of rows is the total number of towers N, and the number of columns is the hidden state dimension H_t of the gated cyclic unit.

[0055] Step S144: Through the multi-source feature fusion layer, the spatiotemporal feature tensor of the overhead line is fused with the vegetation cover index sequence of the overhead line corridor and the meteorological temperature data sequence along the overhead line in the graph edge attributes based on the attention mechanism to generate the fusion feature vector of the overhead line operation status.

[0056] The computing environment uses the spatiotemporal feature tensor T_st of the overhead line as the query input of the multi-source feature fusion layer, and the vegetation cover index sequence of the overhead line corridor and the meteorological temperature data sequence along the overhead line in the graph edge attributes as the key and value input.

[0057] The computational environment first encodes the vegetation cover index sequence NDVI(k) and temperature data sequences T(k) and T(k+1) for each graph edge e(k,k+1). The vegetation cover index sequence NDVI(k) is encoded using a one-dimensional convolutional neural network containing three one-dimensional convolutional layers with a preset kernel size of 3 and a stride of 1. Each convolutional layer is followed by a linear activation function with leakage correction. The output of the last convolutional layer is then subjected to global average pooling to obtain a vegetation impact encoding vector. The temperature data sequences T(k) and T(k+1) are encoded using the same one-dimensional convolutional neural network with shared weights to obtain the first-end temperature encoding vector and the last-end temperature encoding vector, respectively. The vegetation impact encoding vector, the first-end temperature encoding vector, and the last-end temperature encoding vector are concatenated along the feature dimension to obtain the environmental factor encoding vector env(k) for graph edge e(k,k+1).

[0058] Then, the cross-source fusion of environmental factor encoding vectors for each graph node and its adjacent graph edges in the spatiotemporal feature tensor T_st of the overhead line environment construction is calculated. For graph node v(k), the environmental factor encoding vectors env(k-1) and env(k) of its adjacent graph edges e(k-1,k) are extracted. The spatiotemporal feature vector of graph node v(k) is used as the query vector, and the concatenation result of the two adjacent environmental factor encoding vectors is used as the key vector and value vector. The fusion is calculated through a multi-head attention mechanism. The multi-head attention mechanism is calculated by passing the query vector, key vector, and value vector through M_a groups of linear projections respectively. After each group of projections, the scaled dot product attention is calculated. The outputs of each group of attention are concatenated and then linearly projected to obtain the fused cross-source feature vector of graph node v(k).

[0059] The cross-source feature vectors of all graph nodes are stacked row-wise and then compressed using a fully connected dimensionality reduction layer. This compression process reduces the dimension of the cross-source feature vectors to a preset fusion feature dimension D_f, generating a fusion feature vector F for the overhead line operation status. The fusion feature vector F for the overhead line operation status is a one-dimensional floating-point vector with dimension D_f.

[0060] Step S150: Based on the fusion feature vector of the overhead line operation status, perform voltage regulation strategy search processing in the overhead line voltage regulation strategy decision space to generate an overhead line adaptive voltage regulation command sequence. The overhead line adaptive voltage regulation command sequence is used to adjust the voltage output value of the on-load tap changer at the head end of the overhead line.

[0061] Step S151: Construct the decision space for the voltage regulation strategy of overhead lines. The decision space for the voltage regulation strategy of overhead lines includes a set of adjustable range parameters of the on-load voltage regulating device. Each range parameter corresponds to a voltage output value adjustment ratio.

[0062] The computing environment reads the equipment parameter configuration file of the on-load tap changer at the head end of the overhead line, extracts the tap changer range of the on-load tap changer, and the range extends from the lowest tap number T_min to the highest tap number T_max, with the total number of taps being T_max minus T_min plus 1. Each tap number corresponds to a voltage output value adjustment ratio r_tap, which represents the ratio of the output voltage to the reference voltage at that tap. The correspondence between the tap number and the voltage output value adjustment ratio is a lookup table, with the tap number as the key and the voltage output value adjustment ratio as the value.

[0063] The computing environment constructs the decision space for overhead line voltage regulation strategy. The decision space for overhead line voltage regulation strategy is a finite discrete set. Each element in the set is a candidate tap number. The value of the candidate tap number traverses all integers from T_min to T_max.

[0064] Step S152: Map the fusion feature vector of overhead line operation status to the decision space of overhead line voltage regulation strategy, and calculate the degree of matching between the fusion feature vector of overhead line operation status and the expected end voltage improvement features corresponding to each tap parameter.

[0065] The computational environment obtains the expected end-voltage improvement characteristics for each candidate tap position number in the overhead line voltage regulation strategy decision space. The expected end-voltage improvement characteristics are obtained by querying a pre-constructed voltage response mapping table, which records the mapping relationship between different tap positions and their corresponding voltage response coefficients. The voltage response coefficients are constructed by extracting the ratio of the change in the first-end voltage amplitude delta_U_s to the change in the end voltage amplitude delta_U_e under that tap position number from historical overhead line operation data. That is, the voltage response coefficient c equals delta_U_e divided by delta_U_s, and this ratio is a dimensionless proportionality coefficient.

[0066] The computing environment fuses the overhead line operating status feature vector F through a fully connected matching degree evaluation network. This network is a feedforward neural network with two fully connected layers. The first fully connected layer maps the overhead line operating status feature vector F to an intermediate matching degree vector, and the second fully connected layer maps this intermediate vector to a scalar matching degree score. For each candidate tap number, the concatenated vector of the overhead line operating status feature vector F and the expected end-voltage improvement feature for that tap number is input into the matching degree evaluation network, which outputs a matching degree score for that candidate tap number. The matching degree score is a floating-point number; a higher score indicates a better expected voltage regulation effect for that tap under the current operating conditions.

[0067] Step S153: Sort and filter the tap parameters in the overhead line voltage regulation strategy decision space based on the matching degree to generate a set of candidate voltage regulation strategies.

[0068] The computing environment sorts the matching scores of all candidate gear positions calculated in step S152 in descending order. The computing environment sets the size of the candidate voltage regulation strategy set to a preset value K_s, and extracts the first K_s gear positions from the descendingly sorted results to form the candidate voltage regulation strategy set. The candidate voltage regulation strategy set is a list of gear positions, with the gear positions in the list sorted in descending order of matching score.

[0069] Step S154: Evaluate the voltage fluctuation suppression effect of each candidate voltage regulation strategy in the candidate voltage regulation strategy set, and generate the terminal voltage fluctuation suppression score of each candidate voltage regulation strategy.

[0070] The computing environment performs a voltage fluctuation suppression effect evaluation for each candidate tap number in the candidate voltage regulation strategy set. The voltage fluctuation suppression effect evaluation utilizes historical data from overhead line operation data on the use of that tap number under similar operating conditions.

[0071] The computational environment filters historical operating data to identify records where the cosine similarity to the current overhead line's operating feature vector F exceeds a preset similarity threshold. It then extracts the time series of the terminal voltage amplitude after voltage adjustment at the candidate tap number from these historical records. The ratio of the standard deviation to the mean of this terminal voltage amplitude time series is calculated; this ratio represents the terminal voltage fluctuation rate. The terminal voltage fluctuation suppression score is defined as the reciprocal of the terminal voltage fluctuation rate; a higher score indicates a better suppression effect on voltage fluctuations at that tap.

[0072] Step S155: Select the target voltage regulation strategy from the candidate voltage regulation strategy set according to the end voltage fluctuation suppression score, and convert the target voltage regulation strategy into an overhead line adaptive voltage regulation command sequence. The overhead line adaptive voltage regulation command sequence includes the target tap parameter and the voltage output value adjustment ratio corresponding to the target tap parameter.

[0073] The computational environment selects the candidate voltage regulation strategy set with the highest end voltage fluctuation suppression score as the target voltage regulation parameter. The computational environment then queries the lookup table in step S151 to obtain the voltage output value adjustment ratio corresponding to the target voltage regulation parameter.

[0074] The computing environment constructs an adaptive voltage regulation command sequence for overhead lines. This sequence is a JSON object containing a target range parameter field and a voltage output value adjustment ratio field. The target range parameter field contains an integer value representing the target range number. The voltage output value adjustment ratio field contains a floating-point value representing the target voltage output value adjustment ratio.

[0075] Step S156: Output the adaptive voltage regulation command sequence of the overhead line to the voltage regulation controller of the on-load tap changer at the beginning of the overhead line. The voltage regulation controller drives the tap changer of the on-load tap changer to perform voltage regulation action according to the adaptive voltage regulation command sequence of the overhead line.

[0076] The computing environment encodes the JSON object of the adaptive voltage regulation command sequence for the overhead line into binary data frames via the overhead line communication network, and sends them to the voltage regulator controller of the on-load tap changer at the head end of the overhead line via the TCP / IP protocol. After receiving the data frame, the voltage regulator controller parses the target tap position parameter, reads the current tap position parameter of the on-load tap changer, calculates the tap position difference, generates a tap changer switching command, drives the tap changer to perform the switching operation, and completes the adjustment of the voltage output value at the head end of the overhead line.

[0077] Step S160: This method also includes a current data acquisition and transmission step.

[0078] Step S210: The distributed current sensors deployed at the towers along the overhead line are open-type current transformers. The open-type current transformers obtain the distributed current amplitude sequence along the overhead line by sensing the changes in the magnetic field around the overhead line.

[0079] Open-type current transformers are installed at each tower location along the overhead line. Each open-type current transformer consists of two semi-toroidal iron cores and a secondary winding. The iron cores are made of cold-rolled silicon steel sheets with high magnetic permeability. The open-type current transformer is clamped onto the A-phase conductor of the overhead line. The load current of the A-phase conductor generates an alternating magnetic field around the conductor. This alternating magnetic field produces magnetic flux in the iron core. The change in magnetic flux induces a secondary current proportional to the primary current at both ends of the secondary winding.

[0080] The ratio of the primary rated current to the secondary rated current of an open-type current transformer is determined by the transformer's transformation ratio parameter. A precision sampling resistor is connected in parallel across the secondary winding. This sampling resistor converts the secondary current signal into an analog voltage signal, the amplitude of which is linearly proportional to the amplitude of the A-phase current of the overhead line.

[0081] Step S220: The output terminal of the open-type current transformer is connected to the current data acquisition terminal deployed along the overhead line. The current data acquisition terminal performs analog-to-digital conversion processing on the analog current signal output by the open-type current transformer to generate a digital sequence of distributed current amplitudes along the overhead line.

[0082] The current data acquisition terminal is an integrated device combining a microcontroller and an analog-to-digital converter (ADC). The analog input channel of the terminal receives the analog voltage signal output from an open-type current transformer. This signal first passes through an anti-aliasing low-pass filter, with its cutoff frequency set to half the sampling frequency. The ADC samples the filtered analog voltage signal at a preset sampling frequency that satisfies the Nyquist sampling theorem. The ADC's resolution is a preset number of bits, quantizing the analog voltage signal into digital encoded values.

[0083] The microcontroller converts the digital encoded value into the actual current amplitude based on the transformer ratio parameters and the sampling resistor value. The conversion method is: digital encoded value multiplied by the full-scale voltage of the analog-to-digital converter, divided by the maximum encoded value of the analog-to-digital converter, multiplied by the reciprocal of the sampling resistor value, and multiplied by the transformer ratio. The microcontroller stores the converted current amplitude values ​​in chronological order into an internal circular buffer, forming a digitized sequence of current amplitude values ​​distributed along the overhead line.

[0084] Step S230: The current data acquisition terminal transmits the digitized sequence of current amplitude along the overhead line to the overhead line monitoring node through the overhead line communication network.

[0085] The current data acquisition terminal integrates a wireless communication module that conforms to the IEEE 802.11 or IEEE 802.15.4 standard. The terminal packages the current amplitude data in the ring buffer into data frames according to a preset reporting period. Each data frame includes a current acquisition terminal identifier field, a tower number field, a timestamp field, and a current amplitude array field. The data frames are then transmitted via the wireless communication module to the nearest wireless communication relay node.

[0086] Step S240: After receiving the digitized sequence of distributed current amplitude along the overhead line, the overhead line monitoring node timestamps and encapsulates the digitized sequence of distributed current amplitude along the overhead line with the voltage phase vector sequence at the beginning and end of the overhead line to generate voltage and current timing sampling data.

[0087] The overhead line monitoring node receives current amplitude data frames from various current data acquisition terminals, and simultaneously receives voltage phase vector data frames from the head-end and tail-end voltage transformers. The node extracts the timestamp field from each data frame, using the timestamp of the head-end voltage data frame as the reference time. It then aligns the timestamps of the tail-end voltage and current data frames with this reference time, selecting data frames whose timestamp differences are within a preset allowable deviation range as data from the same sampling moment. The node encapsulates the head-end voltage amplitude, head-end voltage phase angle, tail-end voltage amplitude, tail-end voltage phase angle, and current amplitude at each tower at the same sampling moment into a single time-aligned data record. All time-aligned data records are then arranged in chronological order to form the voltage and current time-series sampling data.

[0088] Step S250: The overhead line communication network uses wireless communication relay nodes deployed on the towers along the overhead line. The wireless communication relay nodes receive the current amplitude sequence distributed along the overhead line sent by the current data acquisition terminal at the adjacent tower and forward it to the next level wireless communication relay node until the data reaches the overhead line monitoring node.

[0089] Wireless communication relay nodes are deployed on the towers along the overhead line at predetermined intervals. The spacing between the wireless communication relay nodes is determined based on the maximum transmission distance of the wireless communication module and the spacing between the overhead line towers. Each wireless communication relay node maintains a routing table that records the identifier of the next-hop relay node reaching the overhead line monitoring node. The wireless communication relay nodes use a listen-before-speak carrier sense multiple access (SMMA) mechanism to access the wireless channel. After receiving a data frame, the relay node checks the destination address of the data frame. If the destination address is its own address, the data frame is forwarded to the microcontroller for processing via the serial peripheral interface. If the destination address is the address of the overhead line monitoring node, the relay node queries the routing table to obtain the address of the next-hop relay node, re-encapsulates the data frame, and forwards it.

[0090] Step S260: When the wireless communication relay node forwards the current amplitude sequence distributed along the overhead line, it adds a relay node identifier and a forwarding timestamp to the data frame. The overhead line monitoring node reconstructs the transmission path and transmission delay parameters of the current amplitude sequence distributed along the overhead line based on the relay node identifier and the forwarding timestamp.

[0091] Each wireless communication relay node appends its own node identifier and the current system timestamp to the relay record field of the data frame when forwarding it. The relay record field of the data frame is a variable-length array, and each element of the array contains two subfields: a relay node identifier and a forwarding timestamp. After receiving the data frame, the overhead line monitoring node extracts all records from the relay record field, sorts them in ascending order of timestamp, and obtains the transmission path sequence of the data frame. The transmission delay parameter is the difference between the forwarding timestamp of the last hop and the original transmission timestamp. The overhead line monitoring node associates and stores the transmission path and transmission delay parameter with the corresponding current amplitude data.

[0092] Step S170: This method also includes steps for acquiring vegetation cover and meteorological data.

[0093] Step S310: The vegetation cover index sequence of the overhead line corridor is obtained through the synthetic aperture radar satellite remote sensing vegetation monitoring module. The synthetic aperture radar satellite remote sensing vegetation monitoring module transmits microwave signals and receives ground object echo signals in the overhead line corridor area.

[0094] The synthetic aperture radar (SAR) satellite remote sensing vegetation monitoring module is a C-band SAR radar mounted on a polar-orbiting satellite, operating at approximately 5.4 GHz. The SAR radar employs a strip imaging mode, with the antenna beam illuminating the overhead power line corridor area from a fixed angle. During its flight along its orbit, the SAR radar transmits linear frequency modulated microwave pulse signals at a preset pulse repetition frequency. These microwave pulse signals illuminate the ground surface, generating backscattered echoes. The SAR antenna receives these echo signals, and the amplitude and phase information of the echo signals are sampled by an onboard analog-to-digital converter and stored as raw echo data.

[0095] Step S320: The synthetic aperture radar satellite remote sensing vegetation monitoring module calculates the normalized vegetation index based on the ground object echo signal intensity. The normalized vegetation index reflects the vegetation cover density in the overhead line corridor area.

[0096] The ground data processing center receives the raw echo data transmitted via satellite downlink and generates a single-view complex image after range compression and azimuth compression. Each pixel in the single-view complex image contains two components: a real component and an imaginary component. The amplitude value of the pixel is the square root of the sum of the squares of the real and imaginary components. The ground data processing center obtains the cross-polarization backscattering coefficient sigma_VH and the co-polarization backscattering coefficient sigma_VV for the overhead line corridor area within the same orbital period.

[0097] The Normalized Difference Vegetation Index (NDVI) is calculated by dividing the difference between the cross-polarized backscattering coefficient sigma_VH and the co-polarized backscattering coefficient sigma_VV by the sum of the two. In other words, NDVI equals the difference between sigma_VH and sigma_VV, divided by the sum of sigma_VH and sigma_VV. This ratio is dimensionless and ranges from -1 to +1.

[0098] Step S330: The synthetic aperture radar satellite remote sensing vegetation monitoring module organizes the calculated normalized vegetation index into an overhead line corridor vegetation cover index sequence according to the time series, and sends the overhead line corridor vegetation cover index sequence to the overhead line geographic information system through the satellite data downlink.

[0099] The ground data processing center georegisters the geographic coordinates of the overhead power line path with the pixel coordinates of the synthetic aperture radar image. It then extracts the normalized vegetation index (NVI) values ​​of all pixels within the overhead power line section between adjacent towers along the path, taking the arithmetic mean as the NVI value for that section at the time of the satellite pass. The NVI values ​​from multiple observations are organized into an overhead power line corridor vegetation cover index sequence according to the chronological order of satellite pass times. The ground data processing center then pushes this sequence to the overhead power line geographic information system via a dedicated data communication link.

[0100] Step S340: After receiving the vegetation cover index sequence of the overhead line corridor, the overhead line geographic information system performs spatial registration processing on the vegetation cover index sequence of the overhead line corridor with the coordinate sequence of the overhead line towers and the meteorological temperature data sequence along the overhead line to generate spatially registered overhead line route geographic information data.

[0101] After receiving the vegetation cover index sequence data of the overhead line corridor, the overhead line geographic information system spatially registers the index of each overhead line segment in the vegetation cover index sequence with the adjacent tower pairs in the tower location coordinate sequence. The spatial registration method is to establish an association mapping between the identifier of the overhead line segment and the tower number of the adjacent tower pair, and the mapping relationship is stored as a registration lookup table.

[0102] The overhead power line geographic information system (GIS) associates and maps the tower numbers of each temperature data point in the meteorological temperature data sequence along the route with the tower numbers in the tower location coordinate sequence. After completing all spatial registrations, the GIS generates a JSON object containing the registered tower location coordinate sequence, the corridor vegetation cover index sequence, and the meteorological temperature data sequence along the route. This object is the spatially registered geographic information data of the overhead power line route.

[0103] Step S180: This method also includes multi-source data mounting and message passing attenuation steps.

[0104] Step S410: The overhead line end voltage phase vector sequence attached to the graph node in the overhead line operation status diagram network comes from the voltage transformer on the high-voltage side of the distribution transformer at the end of the overhead line. The voltage transformer on the high-voltage side of the distribution transformer at the end of the overhead line measures the voltage amplitude parameters and voltage phase angle parameters at the end of the overhead line.

[0105] A voltage transformer is installed on the high-voltage side of the distribution transformer at the end of the overhead line. The primary winding of the voltage transformer is connected in parallel between the A-phase conductor of the overhead line and ground, and its primary rated voltage matches the rated voltage of the overhead line. The voltage signal output from the secondary winding of the voltage transformer is filtered and amplified by a signal conditioning circuit before being input to a voltage data acquisition terminal. The voltage data acquisition terminal calculates the voltage amplitude parameter, which is the effective value of the voltage signal within one power frequency cycle, in kilovolts. The voltage data acquisition terminal also calculates the voltage phase angle parameter, which is the phase offset of the voltage signal's zero-crossing point relative to a reference time base, in degrees.

[0106] Step S420: The sequence of current amplitude along the overhead line attached to the graph node in the overhead line operation status diagram network comes from the current sensor deployed at the tower. The current sensor measures the transmission line current amplitude parameters at each tower location along the overhead line.

[0107] The current sensors deployed at the towers are the open-type current transformers and their matching current data acquisition terminals described in step S210. The current amplitude parameter data at each tower location are collected to the overhead line monitoring node through the wireless communication relay network and then organized into a current amplitude sequence distributed along the overhead line according to the tower number and timestamp.

[0108] Step S430: The vegetation cover index sequence of the overhead line corridor attached to the graph edge in the overhead line operation status diagram network comes from the synthetic aperture radar satellite remote sensing vegetation monitoring module. The vegetation cover index sequence of the overhead line corridor describes the temporal change of surface vegetation cover density in the overhead line section between adjacent towers.

[0109] The data source for the vegetation cover index sequence of the overhead line corridor is as described in steps S310 to S340. It is obtained by synthetic aperture radar satellite remote sensing and spatially registered by the overhead line geographic information system before being mounted into the map edge attribute field of the corresponding overhead line section.

[0110] Step S440: The meteorological temperature data sequence along the overhead line attached to the graph edge in the overhead line operation status diagram network comes from the meteorological environment monitoring sensors deployed at the towers. The meteorological temperature data sequence along the overhead line describes the time change of the environmental temperature parameters at each tower location.

[0111] The meteorological environmental monitoring sensor deployed at the tower is a digital temperature sensor integrating a platinum resistance temperature detector and an analog-to-digital converter circuit. This sensor communicates with the data acquisition terminal at the tower via an RS-485 bus. The data acquisition terminal reads the ambient temperature parameters output by the temperature sensor at a preset acquisition cycle, in degrees Celsius, and organizes the ambient temperature parameters in chronological order into a meteorological temperature data sequence along the overhead line.

[0112] Step S450: The graph edges between the graph nodes of the overhead line operation status graph network carry the message passing operation of the graph convolution feature propagation layer. The message passing operation of the graph convolution feature propagation layer transmits the voltage and current attribute information of adjacent graph nodes to the current graph node along the graph edges.

[0113] The implementation details of step S450 are consistent with the message passing operation of the graph convolutional feature propagation layer in step S142. Graph edges serve as channels for message passing, connecting source graph nodes and target graph nodes.

[0114] Step S460: When transmitting voltage and current attribute information, the message passing operation of the graph convolution feature propagation layer calculates the message passing attenuation coefficient based on the vegetation cover index sequence of the overhead line corridor attached to the graph edge and the meteorological temperature data sequence along the overhead line. The attenuation coefficient reflects the degree of influence of vegetation cover density and environmental temperature parameters on the voltage and current coupling strength of the overhead line section.

[0115] When performing message passing operations in the graph convolutional feature propagation layer, for each graph edge e(k,k+1), the computing environment extracts the normalized vegetation index value NDVI(k,t) of the graph edge at the current sampling time, as well as the first environmental temperature parameter T(k,t) and the last environmental temperature parameter T(k+1,t) from the graph edge attribute field.

[0116] The message transmission attenuation coefficient gamma(k,t) is calculated by multiplying the absolute value of the Normalized Difference Vegetation Index (NDVI) (k,t) by a preset vegetation attenuation factor alpha_v, adding the arithmetic mean of the initial and final ambient temperature parameters T(k,t) by a preset temperature attenuation factor alpha_t, inputting the sum of these two terms into the Sigmoid activation function, and then subtracting the Sigmoid function output value from 1 to obtain the attenuation coefficient gamma(k,t). The attenuation coefficient gamma(k,t) ranges from 0 to 1; a smaller value indicates stronger attenuation, meaning that the voltage-current coupling strength in that section is more significantly affected by vegetation cover and ambient temperature.

[0117] During message transmission, the message transmission weight alpha(k,m,l) calculated in step S142 is multiplied by the attenuation coefficient gamma(k,t) before subsequent weighted aggregation operations are performed. This results in a greater attenuation of voltage and current information transmission between adjacent towers in areas with dense vegetation cover or harsh temperature conditions. The graph convolution feature propagation layer adaptively adjusts the modeling of spatial correlation strength between different line sections accordingly.

[0118] Step S190: This method also includes the steps of executing and confirming the voltage regulation command.

[0119] Step S510: The overhead line adaptive voltage regulation command sequence is sent to the voltage regulation controller of the on-load voltage regulating device at the head end of the overhead line through the overhead line communication network.

[0120] The computing environment encodes the overhead line adaptive voltage regulation command sequence JSON object generated in step S156 into a binary data frame. The data frame header contains a destination address field, the value of which is the address of the voltage regulator controller of the on-load tap changer at the head end of the overhead line. The data frame is transmitted through the overhead line communication network, and the head-end access switch of the overhead line communication network forwards the data frame to the voltage regulator controller via the local area network within the station.

[0121] Step S520: After receiving the adaptive voltage regulation command sequence of the overhead line, the voltage regulator controller parses the target gear parameter carried in the adaptive voltage regulation command sequence of the overhead line.

[0122] The voltage regulator controller is a dedicated control device based on a programmable logic controller (PLC) architecture. After receiving a data frame, the voltage regulator controller deserializes and parses the JSON object, extracts the integer value of the target gear parameter field, and stores the integer value in the control register.

[0123] Step S530: The voltage regulator reads the current gear parameter of the on-load tap changer, calculates the gear difference between the current gear parameter and the target gear parameter, and generates a tap changer switching direction command and a tap changer switching number command based on the gear difference.

[0124] The voltage regulator reads the integer value of the current gear position parameter from the electric operating mechanism of the on-load tap changer via the IEC 61850 manufacturing message specification protocol. The voltage regulator calculates the gear position difference, delta_Tap, which is equal to the difference between the target gear position parameter and the current gear position parameter. If the gear position difference is greater than 0, the tap changer switching direction command is an upshift direction identifier. If the gear position difference is less than 0, the tap changer switching direction command is a downshift direction identifier. If the gear position difference is equal to 0, no switching is required, and a voltage regulation execution confirmation message is generated directly. The tap changer switching count command is equal to the absolute value of the gear position difference.

[0125] Step S540: The voltage regulator sends the tap changer switching direction command and the tap changer switching count command to the electric operating mechanism of the on-load tap changer. The electric operating mechanism determines the rotation direction of the tap changer according to the tap changer switching direction command and determines the number of tap changer switching steps according to the tap changer switching count command.

[0126] The voltage regulator sends tap changer direction and tap changer count commands to the control input terminals of the electric operating mechanism via a digital output module. The electric operating mechanism includes a three-phase asynchronous motor, a reduction gearbox, and a position encoder. The electric operating mechanism controls the rotation direction of the three-phase asynchronous motor according to the tap changer direction command. It controls the number of rotations of the three-phase asynchronous motor shaft according to the tap changer count command, with each switching step corresponding to a preset rotation angle of the reduction gearbox output shaft.

[0127] Step S550: The electric operating mechanism drives the tap changer of the on-load tap changer to perform tap switching operation according to the rotation direction and the number of switching steps. The tap switching operation changes the voltage output value at the beginning of the overhead line.

[0128] The on-load tap changer uses a fast resistance transition tap changer, which consists of a selector switch and a switching switch. An electric operating mechanism drives the selector switch to pre-connect the tap to be connected to the transition resistor, and then drives the switching switch to quickly switch from the current tap to the target tap while the circuit is energized. During the switching process, the transition resistor limits the circulating current. After the tap change is completed, the number of turns in the high-voltage winding of the transformer changes, thereby changing the transformer's turns ratio and consequently altering the voltage output value at the secondary side, i.e., the beginning of the overhead line.

[0129] Step S560: After the tap changer of the on-load tap changer completes the tap switching operation, the tap controller collects the actual tap position parameters of the on-load tap changer, compares the actual tap position parameters with the target tap position parameters, generates tap change execution confirmation information, and transmits the tap change execution confirmation information back to the overhead line monitoring node through the overhead line communication network.

[0130] After the tap changer operation is completed, the voltage regulator controller reads the actual position of the tap switch through the position encoder and converts the actual position into an integer value of the actual gear parameter. The voltage regulator controller compares the actual gear parameter with the target gear parameter. If they are equal, the status field of the voltage regulation execution confirmation information is set to the execution success identifier, and the actual gear parameter field is set to the actual gear parameter value. If they are not equal, the status field of the voltage regulation execution confirmation information is set to the execution error identifier, with an error reason code appended. The voltage regulator controller encapsulates the voltage regulation execution confirmation information into a JSON object and sends it to the overhead line monitoring node through the overhead line communication network, completing the closed-loop confirmation of the voltage regulation command execution.

[0131] Step S1100: This method also includes a multi-head attention message passing mechanism step for voltage-current spatial interactive coding networks.

[0132] Step S610: The graph convolutional feature propagation layer of the overhead line voltage and current spatial interactive coding network adopts a multi-head attention message passing mechanism. The multi-head attention message passing mechanism calculates the message passing weights between graph nodes in parallel through multiple attention heads.

[0133] The graph convolutional feature propagation layer of the overhead line voltage-current spatial interactive coding network employs a multi-head attention message passing mechanism based on a graph attention network. During the message passing operation in step S142, the graph convolutional feature propagation layer uses multiple independent attention heads for parallel processing, each with its own learnable parameter matrix. The parallel computation of multiple attention heads involves dividing the initial node feature vectors of the graph nodes into multiple groups along the feature dimension. Each group is processed independently by one attention head, and each attention head calculates the message passing weights within its own feature subspace. The total number of attention heads is denoted as Mhead, and the feature dimension of each attention head is denoted as Dhead, where Dhead is the quotient of the input feature dimension divided by Mhead.

[0134] Step S620: Each attention head performs a linear transformation on the voltage and current attribute information of the graph node to generate a query vector, a key vector, and a value vector. The query vector, key vector, and value vector represent the query role, key role, and value role of the graph node in the attention calculation, respectively.

[0135] For the r-th attention head, it maintains three independent linear projection weight matrices: the query projection weight matrix WQr, the key projection weight matrix WKr, and the value projection weight matrix WVr. All three projection weight matrices have a dimension of Din rows and Dhead columns, where Din represents the input feature dimension and Dhead represents the feature dimension of each attention head. The query projection weight matrix WQr linearly projects the input feature vector hkin of graph node vk into the query vector qrk through matrix multiplication; the projection operation is represented as qrk equal to the matrix product of hkin and WQr. The key projection weight matrix WKr linearly projects the input feature vector hmin of adjacent graph node vm into the key vector krm through matrix multiplication; the projection operation is represented as krm equal to the matrix product of hmin and WKr. The value projection weight matrix WVr linearly projects the input feature vector hmin of adjacent graph node vm into the value vector vrm through matrix multiplication; the projection operation is represented as vrm equal to the matrix product of hmin and WVr. Where vk represents the k-th graph node, vm represents the m-th graph node and vm belongs to the set of adjacent nodes of vk, the query vector qrk plays the role of query from the perspective of graph node vk, the key vector krm plays the role of key from the perspective of adjacent graph node vm, and the value vector vrm plays the role of value from the perspective of adjacent graph node vm.

[0136] Step S630: Each attention head calculates the similarity parameter between the query vector of the current graph node and the key vector of the adjacent graph nodes, and performs weighted aggregation on the value vectors of the adjacent graph nodes based on the similarity parameter to generate a single-head attention output.

[0137] For the r-th attention head, the similarity parameter srkm between the query vector qrk of graph node vk and the key vector krm of each adjacent graph node vm is calculated. The similarity parameter srkm is calculated by taking the dot product of the query vector qrk and the key vector krm. The result of the dot product is a scalar, which is then divided by the square root of Dhead to obtain the similarity parameter srkm. The similarity parameters srkm of graph node vk and all its adjacent graph nodes vm are input into the softmax function for normalization, generating the attention weight alpharkm. The softmax normalization process involves calculating an exponential function with the natural constant as the base. The input to the exponential function is the similarity parameter srkm. The calculated exponential function value is divided by the sum of the exponential function values ​​of the similarity parameters of all adjacent graph nodes of graph node vk; the quotient is the attention weight alpharkm. Multiply the value vector vrm of each adjacency graph node vm by the attention weight alpharkm corresponding to that node to obtain a weighted vector. Then, sum the weighted vectors of all adjacency graph nodes element by element. The summation result is the single-head attention output vector ork of the r-th attention head. The dimension of the single-head attention output vector ork is Dhead.

[0138] Step S640: Concatenate the single-head attention outputs of multiple attention heads to generate multi-head attention outputs, which serve as the aggregated messages of graph nodes in the current graph convolutional feature propagation layer.

[0139] The single-head attention output vectors ork from all Mhead attention heads are concatenated end-to-end along the feature dimension according to the attention head indices from 1 to Mhead. The resulting vector is denoted as omultik, and its dimension is the product of Mhead and Dhead, which equals Din. The concatenated vector omultik is the aggregated message vector obtained by graph node vk from all its neighboring graph nodes in the current graph convolutional feature propagation layer. This aggregated message vector omultik is linearly transformed through an output linear projection weight matrix WO, where WO has dimensions of Din rows and Dout columns, and Dout represents the output feature dimension. The linear transformation result is element-wise added to the input feature vector hkin of graph node vk. After layer normalization, the result is the output feature vector hkout of the current graph convolutional feature propagation layer.

[0140] Step S650: The aggregated message is fused with the voltage and current attribute information of the graph node itself to generate updated graph node voltage and current attribute information. The updated graph node voltage and current attribute information is used as the input of the next graph convolutional feature propagation layer.

[0141] The aggregated message vector omultik obtained in step S640, after linear projection of the output, is fused with the input feature vector hkin of the graph node vk. The fusion process involves element-wise addition of the linear projection result and the graph node's input feature vector hkin. The resulting vector is then passed through a linear unit activation function with leakage correction. The output of the activation function is further normalized to obtain the updated graph node voltage and current attribute information hkupdated. The linear unit activation function with leakage correction is defined as follows: when the input value is greater than 0, the output equals the input value; when the input value is less than or equal to 0, the output equals the input value multiplied by a preset leakage coefficient. The updated graph node voltage and current attribute information hkupdated is used as the input feature vector for the next graph convolutional feature propagation layer. If the current layer is the last graph convolutional feature propagation layer, then the updated graph node voltage and current attribute information hkupdated is the final overhead line spatial feature representation vector for that graph node.

[0142] Step S660: The number of graph convolutional feature propagation layers is determined based on the number of overhead line towers. Each graph convolutional feature propagation layer corresponds to one message transmission range expansion. Increasing the number of layers allows each graph node to aggregate voltage and current attribute information of towers at greater distances.

[0143] The total number of graph convolutional sublayers in the graph convolutional feature propagation layer is denoted as L. The value of L is determined based on the total number of overhead line towers N, and L is the result of rounding up the logarithm of N to the nearest integer (base 2). As the depth of the graph convolutional sublayer increases from 1 to L, the effective reception domain of message passing expands layer by layer along the tower topology chain. The message passing range of the first graph convolutional sublayer covers a 1-hop neighborhood, i.e., directly adjacent tower nodes. The message passing range of the second graph convolutional sublayer covers a 2-hop neighborhood, i.e., indirectly adjacent tower nodes separated by 1 tower. The message passing range of the first graph convolutional sublayer covers a 2^(l-1) hop neighborhood. This layer-by-layer expansion mechanism allows deeper graph convolutional sublayers to aggregate voltage and current state information from towers at greater distances, encoding long-distance spatial correlation features of electrical quantities along the overhead line in the spatial feature representation.

[0144] Step S1200: This method also includes steps for constructing voltage response mapping relationships and calculating matching degree.

[0145] For example, in step S710: the expected end voltage improvement characteristics corresponding to each tap parameter in the overhead line voltage regulation strategy decision space are obtained by constructing a voltage response mapping relationship based on the historical operation data of the overhead line. The voltage response mapping relationship describes the correspondence between the change of the head voltage of the overhead line and the change of the end voltage of the overhead line under different tap parameters.

[0146] The construction of the voltage response mapping relationship in the decision space of overhead line voltage regulation strategy relies on the historical operating data of the overhead line, which is stored in the historical database storage area of ​​the overhead line monitoring node. The historical operating data includes the voltage amplitude at the beginning and end of the line at each sampling time, as well as the tap position parameter value of the on-load tap changer at the corresponding time.

[0147] Step S720: The process of constructing the voltage response mapping relationship includes: extracting the voltage phase vector sequence of the overhead line head end and the voltage phase vector sequence of the overhead line tail end corresponding to different tap parameters in the historical operation data of the overhead line, and calculating the ratio of the voltage amplitude change at the overhead line head end to the voltage amplitude change at the overhead line tail end as the voltage response coefficient under that tap parameter.

[0148] For each voltage level parameter numbered Tap from Tmin to Tmax, data records before and after the voltage regulation operation are extracted from the historical operation data of the overhead line. The data record before the voltage regulation operation includes the initial voltage amplitude Usb and the final voltage amplitude Ueb. The data record after the voltage regulation operation includes the initial voltage amplitude Usa and the final voltage amplitude Uea. The change in the initial voltage amplitude during this voltage regulation operation is calculated; this change is equal to the difference between Usa and Usb. The change in the final voltage amplitude during this voltage regulation operation is also calculated; this change is equal to the difference between Uea and Ueb. If the absolute value of the change in the initial voltage amplitude is greater than a preset minimum voltage change threshold, then the voltage response coefficient CTapSingle for this voltage regulation operation is equal to the quotient of the final voltage amplitude change divided by the initial voltage amplitude change. The arithmetic mean of the voltage response coefficients CTapSingle for all valid voltage regulation operation records under the parameter number Tap is calculated. The arithmetic mean is the sum of all CTapSingles divided by the total number of valid records. This arithmetic mean is the voltage response coefficient CTap corresponding to that parameter. The voltage response coefficient CTap is a dimensionless proportionality coefficient.

[0149] Step S730: Store the parameters of each tap position and their corresponding voltage response coefficients as a voltage response mapping relationship. The voltage response mapping relationship serves as the mapping basis between the tap position parameters and the expected end voltage improvement characteristics in the overhead line voltage regulation strategy decision space.

[0150] Each tap parameter number (Tmin to Tmax) and its corresponding voltage response coefficient (CTap) are stored in a voltage response mapping table as key-value pairs. The voltage response mapping table is structured as an associative array. The keys of the associative array are integers, and the values ​​are tap parameter numbers (Tap). The values ​​are floating-point numbers, and the values ​​are voltage response coefficients (CTap). The voltage response mapping table is resident in the computing environment's memory and is used for querying during the matching degree calculation in step S152. The expected end-voltage improvement characteristic is defined as the relationship between the expected change in the voltage amplitude at the end of the overhead line and the change in the voltage amplitude at the beginning of the line under the given tap parameter. This relationship is quantified by the voltage response coefficient (CTap).

[0151] Step S740: The process of calculating the matching degree between the fusion feature vector of overhead line operation status and the expected end voltage improvement features corresponding to each tap parameter includes: inputting the fusion feature vector of overhead line operation status into the matching degree calculation function; the matching degree calculation function corrects the voltage response coefficient according to the vegetation cover influence feature and temperature influence feature encoded in the fusion feature vector of overhead line operation status, generating the corrected voltage response coefficient; and calculating the matching degree score based on the corrected voltage response coefficient and the voltage amplitude parameter of the voltage phase vector sequence of the end voltage of the overhead line.

[0152] The detailed steps of the matching degree calculation process are as follows: From the overhead line operation status fusion feature vector F, extract the vegetation cover impact feature vector Fv and the temperature impact feature vector Ft through a preset feature dimension index range. The vegetation cover impact feature vector Fv corresponds to the feature representation part of the vegetation impact encoding vector after dimensionality reduction and compression in step S144. The temperature impact feature vector Ft corresponds to the feature representation part of the temperature encoding vector after dimensionality reduction and compression in step S144. Input the vegetation cover impact feature vector Fv into a fully connected linear layer. The fully connected linear layer contains a learnable weight vector Wv and a bias scalar bv, and outputs a vegetation correction factor scalar betav, which is equal to the vector dot product of Fv and Wv plus bv. Input the temperature impact feature vector Ft into another fully connected linear layer. The fully connected linear layer contains a learnable weight vector Wt and a bias scalar bt, and outputs a temperature correction factor scalar betat, which is equal to the vector dot product of Ft and Wt plus bt.

[0153] For each candidate tap position parameter Tap, its original voltage response coefficient CTap is retrieved from the voltage response mapping table. The corrected voltage response coefficient CadjTap is calculated as CTap multiplied by the sum of 1 plus betav and betat (in parentheses). The introduction of the vegetation correction factor betav and the temperature correction factor betat enables the matching degree calculation function to adaptively adjust the expected end-voltage improvement effect assessment of each tap position parameter based on the current vegetation cover and meteorological temperature conditions along the overhead line.

[0154] The current terminal voltage amplitude encoding feature Ueenc is extracted from the overhead line operation status fusion feature vector F. The extraction method involves truncating the corresponding sub-vector from F according to a preset feature dimension index range. Ueenc and the corrected voltage response coefficient CadjTap are concatenated along the feature dimension, and the concatenated vector is input into a matching evaluation network. The matching evaluation network is a feedforward neural network containing two fully connected layers. The input dimension of the first fully connected layer is equal to the dimension of Ueenc plus 1, and the output dimension is the preset hidden layer dimension Hmatch. The activation function is a linear unit with leakage correction. The input dimension of the second fully connected layer is Hmatch, and the output dimension is 1, without using an activation function. The second fully connected layer outputs a scalar value, which is the matching degree score SmatchTap for the candidate tap position parameter Tap. The matching degree score SmatchTap comprehensively considers the current terminal voltage state of the overhead line, the historical voltage response characteristics of each tap position, and the correction effects of current vegetation cover and ambient temperature conditions on the voltage response characteristics.

[0155] In some embodiments, the 10 kV long-distance overhead line adaptive voltage regulation control system that integrates multi-source data for performing the above method can be any electronic device with data calculation, processing, and storage functions. This 10 kV long-distance overhead line adaptive voltage regulation control system that integrates multi-source data can be used to implement the 10 kV long-distance overhead line adaptive voltage regulation control method that integrates multi-source data provided in the above embodiments.

[0156] Typically, an adaptive voltage regulation control system for 10 kV long-distance overhead lines that integrates multi-source data includes a processor and a memory. The processor may include one or more processing cores, such as a 4-core processor or an 8-core processor. The processor can be implemented using at least one hardware form of DSP (Digital Signal Processing), FPGA (Field Programmable Gate Array), or PLA (Programmable Logic Array). The processor may also include a main processor and a coprocessor. The main processor, also known as a CPU (Central Processing Unit), is used to process data in the wake-up state; the coprocessor is a low-power processor used to process data in the standby state. In some embodiments, the processor may integrate a GPU (Graphics Processing Unit), which is responsible for rendering and drawing the content to be displayed on the screen. In some embodiments, the processor may also include an AI (Artificial Intelligence) processor, which handles computational operations related to machine learning.

[0157] The memory may include one or more computer-readable storage media, which may be non-transitory. The memory may also include high-speed random access memory and non-volatile memory, such as one or more disk storage devices or flash memory devices. In some embodiments, the non-transitory computer-readable storage media in the memory is used to store a computer program configured to be executed by one or more processors to implement the aforementioned adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data.

[0158] In an illustrative embodiment, a computer-readable storage medium is also provided, which stores a computer program that, when executed by a processor of a computer device, implements the aforementioned adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data. Optionally, the aforementioned computer-readable storage medium may be a ROM (Read-Only Memory), RAM (Random Access Memory), CD-ROM (CompactDisc Read-Only Memory), magnetic tape, floppy disk, or optical data storage device, etc.

[0159] This application provides a computer program product, which includes computer-executable instructions or a computer program. When the computer-executable instructions or the computer program are executed by a processor, the processor will execute the adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data provided in this application.

[0160] This application provides a computer-readable storage medium storing computer-executable instructions or computer programs. When the computer-executable instructions or computer programs are executed by a processor, the processor will execute the adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data provided in this application.

[0161] In some embodiments, the computer-readable storage medium may be a read-only memory (ROM), random access memory (RAM), erasable programmable read-only memory (EPROM), electrically erasable programmable read-only memory (EEPROM), flash memory, magnetic surface memory, optical disk, or CD-ROM, etc.; or it may be a device that includes one or any combination of the above-mentioned memories.

[0162] In some embodiments, computer-executable instructions may take the form of programs, software, software modules, scripts, or code, written in any form of programming language (including compiled or interpreted languages, or declarative or procedural languages), and may be deployed in any form, including as stand-alone programs or as modules, components, subroutines, or other units suitable for use in a computing environment.

[0163] As an example, computer-executable instructions may, but do not necessarily, correspond to files in a file system. They may be stored as part of a file that holds other programs or data, for example, in one or more scripts in a HyperText Markup Language (HTML) document, in a single file dedicated to the program in question, or in multiple co-located files (e.g., files that store one or more modules, subroutines, or code sections).

[0164] As an example, computer-executable instructions can be deployed to execute on a single electronic device, or on multiple electronic devices located at one location, or on multiple electronic devices distributed across multiple locations and interconnected via a communication network.

[0165] Finally, it should be noted that the above-disclosed embodiments are merely preferred embodiments of the present invention and are only used to illustrate the technical solutions of the present invention, not to limit them. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. An adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data, characterized in that, The method includes: Receive voltage and current timing sampling data transmitted back from the overhead line monitoring node. The voltage and current timing sampling data includes the voltage phase vector sequence at the beginning of the overhead line, the voltage phase vector sequence at the end of the overhead line, and the current amplitude sequence distributed along the overhead line. Receive geographic information data of overhead line route, which includes the overhead line tower location coordinate sequence, the overhead line corridor vegetation coverage index sequence, and the overhead line meteorological temperature data sequence along the overhead line. Based on the geographical information data of the overhead line route, an overhead line operation status map network is constructed. The overhead line operation status map network uses the coordinate sequence of the overhead line tower positions as the node set and the overhead line section between adjacent towers as the edge set. Each node is attached with the voltage phase vector sequence at the end of the overhead line and the current amplitude sequence distributed along the overhead line. Each edge is attached with the vegetation coverage index sequence of the overhead line corridor in the corresponding section and the meteorological temperature data sequence along the overhead line. By using a pre-constructed overhead line voltage and current spatial interactive coding network, the overhead line operation status map network is subjected to spatiotemporal joint coding processing to generate an overhead line operation status fusion feature vector. The overhead line operation status fusion feature vector encodes the spatial correlation characteristics between the voltage amplitude change trend characteristics, current distribution characteristics, vegetation cover influence characteristics, and temperature influence characteristics of each overhead line section. Based on the fusion feature vector of the overhead line operating status, a voltage regulation strategy search is performed in the overhead line voltage regulation strategy decision space to generate an adaptive voltage regulation command sequence for the overhead line. The adaptive voltage regulation command sequence is used to adjust the voltage output value of the on-load tap changer at the head end of the overhead line.

2. The adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data according to claim 1, characterized in that, The step of constructing an overhead line operation status map network based on the geographical information data of the overhead line route includes: The geographic information data of the overhead line route is analyzed, and the coordinate sequence of the overhead line tower locations is extracted. The coordinate sequence of the overhead line tower locations includes the geographic longitude and geographic latitude parameters of each tower. The geographical information data of the overhead line route is analyzed, and the vegetation cover index sequence of the overhead line corridor is extracted. The vegetation cover index sequence of the overhead line corridor includes the normalized vegetation index of the overhead line section between each adjacent tower. The geographical information data of the overhead line route is analyzed, and the meteorological temperature data sequence along the overhead line is extracted. The meteorological temperature data sequence along the overhead line includes the ambient temperature parameters at each tower location. Define a set of graph nodes for the overhead line operation status graph network. Each graph node in the graph node set corresponds to a tower. Assign the voltage phase vector sequence at the end of the overhead line and the current amplitude sequence distributed along the overhead line to the attribute fields of the corresponding graph node. Define the graph edge set of the overhead line operation status graph network. Each graph edge in the graph edge set corresponds to an overhead line segment between adjacent towers. The vegetation cover index sequence of the overhead line corridor and the meteorological temperature data sequence along the overhead line are assigned to the attribute fields of the corresponding graph edge. The set of graph nodes and the set of graph edges with assigned attribute fields are combined to form the overhead line operation status graph network. The overhead line operation status graph network fully describes the topological relationship between the voltage and current status of each location of the overhead line and geographical environmental factors.

3. The adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data according to claim 1, characterized in that, The method involves using a pre-constructed spatial interactive coding network for overhead line voltage and current to perform spatiotemporal joint coding on the overhead line operation status map network, generating a fused feature vector of overhead line operation status, including: The overhead line voltage and current spatial interactive coding network is constructed, which includes a graph convolutional feature propagation layer, a temporal dependency modeling layer, and a multi-source feature fusion layer. Through the graph convolutional feature propagation layer, the overhead line operation status graph network is processed by message passing layer by layer, and the voltage and current attribute information of adjacent nodes of each graph node is aggregated to generate an overhead line spatial feature representation matrix. The overhead line spatial feature representation matrix encodes the spatial correlation pattern of voltage and current data between different sections of the overhead line. Through the time-series dependency modeling layer, a time-series convolution operation is performed on the time series of each graph node in the spatial feature representation matrix of the overhead line to extract the changing trend features of voltage and current data in the time dimension and generate the spatiotemporal feature tensor of the overhead line. Through the multi-source feature fusion layer, the spatiotemporal feature tensor of the overhead line is fused with the vegetation cover index sequence of the overhead line corridor and the meteorological temperature data sequence along the overhead line in the graph edge attributes based on the attention mechanism to generate the fusion feature vector of the overhead line operation status. The overhead line operation status fusion feature vector is compressed by the multi-source feature fusion layer, and the overhead line operation status fusion feature vector is mapped to a low-dimensional feature space of a preset dimension to generate a compressed overhead line operation status fusion feature vector.

4. The adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data according to claim 1, characterized in that, The step of fusing feature vectors based on the operating status of the overhead line, performing voltage regulation strategy search processing in the overhead line voltage regulation strategy decision space, and generating an adaptive voltage regulation command sequence for the overhead line includes: Construct an overhead line voltage regulation strategy decision space, which includes a set of adjustable range parameters of the on-load voltage regulating device, with each range parameter corresponding to a voltage output value adjustment ratio. The fusion feature vector of the overhead line operation status is mapped to the decision space of the overhead line voltage regulation strategy, and the degree of matching between the fusion feature vector of the overhead line operation status and the expected end voltage improvement features corresponding to each tap parameter is calculated. Based on the matching degree, the tap parameters in the decision space of the overhead line voltage regulation strategy are sorted and filtered to generate a set of candidate voltage regulation strategies. The voltage fluctuation suppression effect of each candidate voltage regulation strategy in the candidate voltage regulation strategy set is evaluated, and a terminal voltage fluctuation suppression score is generated for each candidate voltage regulation strategy. Based on the end voltage fluctuation suppression score, a target voltage regulation strategy is selected from the candidate voltage regulation strategy set, and the target voltage regulation strategy is converted into the overhead line adaptive voltage regulation command sequence. The overhead line adaptive voltage regulation command sequence includes the target tap parameter and the voltage output value adjustment ratio corresponding to the target tap parameter. The adaptive voltage regulation command sequence of the overhead line is output to the voltage regulation controller of the on-load tap changer at the beginning of the overhead line. The voltage regulation controller drives the tap changer of the on-load tap changer to perform voltage regulation action according to the adaptive voltage regulation command sequence of the overhead line.

5. The adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data according to claim 1, characterized in that, The method further includes: The distributed current sensors deployed at the towers along the overhead line are open-type current transformers. The open-type current transformers obtain the distributed current amplitude sequence along the overhead line by sensing the changes in the magnetic field around the overhead line. The output terminal of the open-type current transformer is connected to a current data acquisition terminal deployed along the overhead line. The current data acquisition terminal performs analog-to-digital conversion processing on the analog current signal output by the open-type current transformer to generate a digital sequence of current amplitude values ​​distributed along the overhead line. The current data acquisition terminal transmits the digitized sequence of current amplitude along the overhead line to the overhead line monitoring node through the overhead line communication network. After receiving the digitized sequence of distributed current amplitude along the overhead line, the overhead line monitoring node timestamps and encapsulates the digitized sequence of distributed current amplitude along the overhead line with the voltage phase vector sequence at the beginning and end of the overhead line to generate the voltage and current timing sampling data. The overhead line communication network uses wireless communication relay nodes deployed on the towers along the overhead line. The wireless communication relay nodes receive the current amplitude sequence distributed along the overhead line sent by the current data acquisition terminal at the adjacent tower and forward it to the next level wireless communication relay node until the data reaches the overhead line monitoring node. When the wireless communication relay node forwards the current amplitude sequence distributed along the overhead line, it adds a relay node identifier and a forwarding timestamp to the data frame. The overhead line monitoring node reconstructs the transmission path and transmission delay parameters of the current amplitude sequence distributed along the overhead line based on the relay node identifier and the forwarding timestamp.

6. The adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data according to claim 1, characterized in that, The method further includes: The vegetation cover index sequence of the overhead line corridor is obtained by the synthetic aperture radar satellite remote sensing vegetation monitoring module, which transmits microwave signals and receives ground object echo signals in the overhead line corridor area. The synthetic aperture radar satellite remote sensing vegetation monitoring module calculates the normalized vegetation index based on the intensity of ground object echo signals. The normalized vegetation index reflects the vegetation cover density in the overhead line corridor area. The synthetic aperture radar satellite remote sensing vegetation monitoring module organizes the calculated normalized vegetation index into the overhead line corridor vegetation coverage index sequence according to the time series, and sends the overhead line corridor vegetation coverage index sequence to the overhead line geographic information system through the satellite data downlink. After receiving the vegetation cover index sequence of the overhead line corridor, the overhead line geographic information system performs spatial registration processing on the vegetation cover index sequence of the overhead line corridor with the overhead line tower location coordinate sequence and the meteorological temperature data sequence along the overhead line to generate spatially registered overhead line route geographic information data. The spatial registration process maps each vegetation cover index value in the vegetation cover index sequence of the overhead line corridor to the corresponding overhead line section between adjacent towers, and maps each ambient temperature parameter in the meteorological temperature data sequence along the overhead line to the corresponding tower location. The overhead line geographic information system sends the spatially registered overhead line path geographic information data to the overhead line monitoring node, and the overhead line monitoring node receives the spatially registered overhead line path geographic information data as the overhead line path geographic information data.

7. The adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data according to claim 1, characterized in that, The method further includes: The overhead line operation status diagram network's graph node-attached overhead line end voltage phase vector sequence comes from the high-voltage side voltage transformer of the overhead line end distribution transformer. The high-voltage side voltage transformer of the overhead line end distribution transformer measures the voltage amplitude parameters and voltage phase angle parameters at the end of the overhead line. The sequence of current amplitude along the overhead line, which is attached to the graph node in the overhead line operation status diagram network, comes from the current sensor deployed at the tower. The current sensor measures the transmission line current amplitude parameters at each tower location along the overhead line. The vegetation cover index sequence of the overhead line corridor attached to the edge of the overhead line operation status diagram network comes from the synthetic aperture radar satellite remote sensing vegetation monitoring module. The vegetation cover index sequence of the overhead line corridor describes the temporal change of surface vegetation cover density in the overhead line section between adjacent towers. The meteorological temperature data sequence along the overhead line attached to the edge of the overhead line operation status diagram network comes from the meteorological environment monitoring sensors deployed at the towers. The meteorological temperature data sequence along the overhead line describes the time change of the environmental temperature parameters at each tower location. The graph edges between the graph nodes of the overhead line operation status graph network carry the message passing operation of the graph convolution feature propagation layer. The message passing operation of the graph convolution feature propagation layer transmits the voltage and current attribute information of adjacent graph nodes to the current graph node along the graph edges. When transmitting voltage and current attribute information, the message passing operation of the graph convolution feature propagation layer calculates the message passing attenuation coefficient based on the vegetation cover index sequence of the overhead line corridor attached to the graph edge and the meteorological temperature data sequence along the overhead line. The attenuation coefficient reflects the degree of influence of vegetation cover density and environmental temperature parameters on the voltage and current coupling strength of the overhead line section.

8. The adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data according to claim 1, characterized in that, The method further includes: The overhead line adaptive voltage regulation command sequence is sent to the voltage regulation controller of the on-load voltage regulation device at the head end of the overhead line through the overhead line communication network. After receiving the adaptive voltage regulation command sequence of the overhead line, the voltage regulator controller parses the target gear parameter carried in the adaptive voltage regulation command sequence of the overhead line. The voltage regulator reads the current gear parameter of the on-load voltage regulator, calculates the gear difference between the current gear parameter and the target gear parameter, and generates a tap changer switching direction command and a tap changer switching number command based on the gear difference. The voltage regulator sends the tap changer switching direction command and the tap changer switching count command to the electric operating mechanism of the on-load tap changer. The electric operating mechanism determines the rotation direction of the tap changer according to the tap changer switching direction command and determines the number of switching steps of the tap changer according to the tap changer switching count command. The electric operating mechanism drives the tap changer of the on-load tap changer to perform tap switching operation according to the rotation direction and the number of switching steps. The tap switching operation changes the voltage output value at the beginning of the overhead line. After the tap changer of the on-load tap changer completes the tap switching operation, the tap controller collects the actual tap position parameters of the on-load tap changer, compares the actual tap position parameters with the target tap position parameters, generates tap change execution confirmation information, and transmits the tap change execution confirmation information back to the overhead line monitoring node through the overhead line communication network.

9. The adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data according to claim 1, characterized in that, The method further includes: The graph convolutional feature propagation layer of the overhead line voltage and current spatial interactive coding network adopts a multi-head attention message passing mechanism, which calculates the message passing weights between graph nodes in parallel through multiple attention heads. Each attention head performs a linear transformation on the voltage and current attribute information of the graph node to generate a query vector, a key vector, and a value vector. The query vector, key vector, and value vector represent the query role, key role, and value role of the graph node in the attention calculation, respectively. Each attention head calculates the similarity parameter between the query vector of the current graph node and the key vector of the adjacent graph nodes, and performs weighted aggregation on the value vectors of the adjacent graph nodes based on the similarity parameter to generate a single-head attention output; The single-head attention outputs of multiple attention heads are concatenated to generate multi-head attention outputs, which serve as the aggregated messages of graph nodes in the current graph convolutional feature propagation layer. The aggregated message is fused with the voltage and current attribute information of the graph node itself to generate updated graph node voltage and current attribute information, which is then used as the input to the next graph convolutional feature propagation layer. The number of graph convolutional feature propagation layers is determined based on the number of overhead line towers. Each graph convolutional feature propagation layer corresponds to one message transmission range expansion. Increasing the number of layers allows each graph node to aggregate voltage and current attribute information of towers at greater distances.

10. An adaptive voltage regulation control system for a 10 kV long-distance overhead line that integrates multi-source data, characterized in that, The method includes a processor and a computer-readable storage medium storing machine-executable instructions, which, when executed by a computer, implement the adaptive voltage regulation control method for 10 kV long-distance overhead lines that integrates multi-source data as described in any one of claims 1-9.