A cave energy storage power grid backup optimization method and system based on backup feasible region
By constructing a backup feasible domain for the optimization of the rock-hole energy storage grid, the problem of inaccurate reflection of backup capacity of the rock-hole energy storage system under different conditions is solved, and accurate backup capacity optimization and scheduling plan execution are achieved.
Patent Information
- Application Number
- CN202611348951.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-02
- Publication Date
- 2026-11-20
AI Technical Summary
Existing technologies fail to effectively reflect the true physical boundaries of cavern energy storage systems, leading to an overestimation of reserve capacity under low-pressure, low-heat, or full-pressure conditions, resulting in unexecutable scheduling plans.
By constructing a backup optimization method for cavern energy storage power grid based on the backup feasible domain, the energy storage state variables are obtained, pressure-SOC mapping and thermal side capacity mapping are established, power generation and compression capacity constraints are determined, a backup feasible domain is formed, and it is embedded into the power grid backup optimization scheduling model.
It enables accurate reflection of reserve capacity under different energy storage conditions, avoids overestimation or underestimation of reserve capacity, and ensures the feasibility and optimization of scheduling plans.
Smart Images

Figure CN123144162A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of power system optimization scheduling, long-term energy storage participation in backup services, and compressed air energy storage operation control technology, specifically to a method and system for optimizing grid backup based on cavern energy storage in a backup feasible domain. Background Technology
[0002] With a high proportion of renewable energy integrated into the grid, grid reserve demand is no longer just a fixed capacity demand caused by conventional unit failures or load forecast deviations, but is closely related to fluctuations in wind and solar power output and net load ramp-up. Energy storage resources can provide upscaling, downscaling, and contingency reserves, but the reserve capabilities of different energy storage technologies vary.
[0003] Advanced cavern-type insulated compressed air energy storage utilizes underground caverns to store compressed air and recovers and reuses the heat of compression through a thermal storage system. Its structure is shown in the attached diagram. Figure 1As shown, the system typically includes an electric motor, a compressor, a heat exchanger, a heat storage tank, an underground cavern for storing compressed air, an expander, a generator, and air and electrical circuits connecting the various devices. During compression energy storage, the electric motor drives the compressor to compress air, the heat exchanger recovers the heat generated during compression and stores it in the heat storage tank, and the compressed air is stored in the underground cavern. During expansion power generation, the underground cavern releases the compressed air, the heat storage tank releases its stored heat to heat the compressed air, and the heated compressed air drives the expander to perform work, which in turn drives the generator to produce electricity. The electrical side includes a compression side and a power generation side; the compression side consists of an electric motor and a compressor. The compression stage, the power generation side refers to the power generation stage consisting of an expander and a generator; the pressure side refers to the constraint side formed by the gas storage pressure and the amount of air that can be released or accepted in the underground cavern; the heat side refers to the constraint side formed by the available heat storage capacity and the remaining heat storage capacity of the thermal storage device; the available power generation capacity on the pressure side refers to the power generation capacity limited by the gas storage pressure or the amount of air that can be released; the compression acceptance capacity on the pressure side refers to the compression capacity limited by the remaining pressure space or the amount of air that can be accepted in the underground cavern; the available power generation capacity on the heat side refers to the power generation capacity limited by the currently available heat storage capacity of the thermal storage device; and the compression acceptance capacity on the heat side refers to the compression capacity limited by the remaining heat storage capacity of the thermal storage device. Backup capacity refers to the ability of a cavern-type advanced adiabatic compressed air energy storage system to adjust the active power exchanged with the grid within the backup response time relative to the planned operating point, and to maintain the power adjustment amount within the backup duration; backup capacity refers to the power adjustment amount allocated by the grid backup optimization scheduling model within the upper limit of the backup capacity; upward backup refers to the increase in net active power injected into the grid by the system, and downward backup refers to the decrease in net active power injected into the grid by the system; in this method, upward backup is achieved by increasing the generation power on the generation side based on the planned generation power, and downward backup is achieved by increasing the compression power on the compression side based on the planned compression power; contingency backup refers to the backup provided by the generation side by increasing the generation power during the contingency backup response time to cope with grid contingencies.
[0004] The standby capacity of a cavern-type advanced adiabatic compressed air energy storage system depends not only on the rated power of the electrical side, but also on the gas pressure, the remaining space in the cavern, the heat storage capacity, the compression or expansion conditions, and the sustainable support time. If it is simplified to ordinary electrical energy storage with fixed efficiency and fixed power boundaries, the available standby capacity may be overestimated under low pressure, low heat, or full pressure conditions, leading to the inability to execute dispatch plans.
[0005] The prior art application number CN2023116324527 discloses a system and method for integrated regulation of cavern compressed gas energy storage, which can perform peak shaving during peak electricity consumption periods and ensure the daily gas supply of the city; using cavern storage can save investment by storing large quantities of energy when prices are low; however, its peak shaving system and energy supply system have certain limitations.
[0006] Therefore, power grid dispatch requires a backup feasible domain assessment method oriented towards the physical boundary of cavern energy storage, so that the backup optimization model is computationally solvable and can reflect the real constraints of the electric, gas, and thermal sides in engineering. Summary of the Invention
[0007] 1. The technical problem to be solved:
[0008] To address the aforementioned technical problems, this invention provides a method and system for optimizing backup power grids based on the backup feasible domain of cavern energy storage.
[0009] 2. Technical Solution:
[0010] A backup optimization method for cavern energy storage power grids based on the backup feasible domain includes:
[0011] Step 1: Obtain the energy storage status parameters of the cavern-type advanced insulated compressed air energy storage system during the scheduling period; the energy storage status parameters include gas storage pressure, heat storage, planned compression power, planned power generation, compressor power boundary, expander power boundary, compression ramping capability, power generation ramping capability, upper and lower limits of gas storage pressure, upper and lower limits of heat storage, and standby response time.
[0012] Step 2: Establish a pressure-SOC mapping based on the gas storage pressure and the upper and lower limits of the gas storage pressure, and determine the available power generation capacity and the pressure-side compression acceptance capacity according to the pressure-SOC mapping.
[0013] Step 3: Based on the heat storage capacity, upper limit of heat storage capacity, and lower limit of heat storage capacity during the scheduling period, determine the available power generation capacity on the thermal side and the thermal compression acceptance capacity respectively;
[0014] The upper limit of the reserve requirement for the power supply side is determined based on the planned power generation capacity, the expander power boundary, the power generation ramping capability, and the upward reserve response time; the upper limit of the reserve requirement for the power supply side is determined based on the planned compressor power capacity, the compressor power boundary, the compressor ramping capability, and the downward reserve response time.
[0015] Step 4: Limit the increase in reserve capacity to the minimum value among the upper limit of the candidate upper limit for reserve increase on the power side, the available power generation capacity on the pressure side, the available power generation capacity on the thermal side, and the upper limit corresponding to the constraint on the duration of reserve increase;
[0016] Step 5: Limit the reduction of reserve capacity to no more than the minimum value among the upper limit of the candidate reserve reduction on the electric side, the compression acceptance capacity on the pressure side, the compression acceptance capacity on the thermal side, and the upper limit corresponding to the constraint of the duration of reserve reduction;
[0017] Step Six: Based on the increased reserve capacity determined in Step Four, the decreased reserve capacity determined in Step Five, and the common capacity constraints of the emergency reserve capacity and the increased reserve capacity, a feasible region for cavern energy storage reserve is formed. This feasible region is then embedded as a constraint into the power grid reserve optimization scheduling model, and the cavern energy storage compression power, power generation, gas storage pressure, heat storage, and reserve allocation results for each scheduling period are output.
[0018] Furthermore, in the cavern-type advanced insulated compressed air energy storage system, during the compression energy storage process, an electric motor drives a compressor to compress air, a heat exchanger recovers the heat generated during compression and stores the heat in a heat storage tank, and the compressed air is stored in an underground cavern; during the expansion power generation process, the underground cavern releases the compressed air, the heat storage tank releases its stored heat to heat the compressed air, the heated compressed air drives an expander to do work, and the expander drives a generator to generate electricity; the compression side and the power generation side constitute the electric side; the compression side refers to the compression stage consisting of an electric motor and a compressor; the power generation side refers to the power generation stage consisting of an expander and a generator; the pressure side refers to the constraints formed by the gas storage pressure of the underground cavern and the amount of air that can be released or accepted; the heat side refers to the constraints formed by the available heat storage capacity and the remaining heat storage capacity of the heat storage tank; the available power generation capacity on the pressure side refers to the power generation capacity limited by the gas storage pressure or the amount of air that can be released; the compression acceptance capacity on the pressure side refers to the compression capacity limited by the remaining pressure space or the amount of air that can be accepted in the underground cavern; the heat side... The available power generation capacity refers to the power generation capacity limited by the currently available heat storage capacity of the thermal storage device; the thermal-side compression acceptance capacity refers to the compression capacity limited by the remaining heat storage capacity of the thermal storage device; the reserve capacity refers to the ability of the cavern-type advanced adiabatic compressed air energy storage system to adjust the active power exchanged with the grid within the reserve response time relative to the planned operating point, and to maintain the power adjustment amount within the reserve duration; the reserve capacity refers to the power adjustment amount allocated by the grid reserve optimization scheduling model within the upper limit of the reserve capacity; the upward reserve refers to the reserve that increases the net active power injection of the system into the grid, and the downward reserve refers to the reserve that decreases the net active power injection of the system into the grid; in the method, the upward reserve is achieved by increasing the power generation capacity on the power generation side based on the planned power generation capacity, and the downward reserve is achieved by increasing the compression capacity on the compression side based on the planned compression capacity; the contingency reserve refers to the reserve provided by increasing the power generation capacity on the power generation side within the contingency reserve response time to cope with grid contingencies.
[0019] Furthermore, step two specifically includes:
[0020] S21: The constructed pressure-SOC mapping is shown in the following formula:
[0021] (1);
[0022] Among them, SOC tp represents the equivalent state of charge of the cavern energy storage during the t-th scheduling period; t p represents the gas storage pressure in the cavern energy storage chamber during the t-th scheduling period; min and p max These represent the lower limit and upper limit of the allowable gas storage pressure, respectively; t represents the scheduling period number;
[0023] S22: According to equation (1), the gas storage pressure p during the t-th scheduling period is... t The equivalent state of charge (ENC) of the cavern energy storage is converted, and the maximum power generation and maximum compression power under the corresponding pressure state are determined based on the ENC of the cavern energy storage. The available power generation capacity on the pressure side is determined based on the current gas storage pressure or the amount of air that can be released, and the compression acceptance capacity on the pressure side is determined based on the remaining pressure space or the amount of air that can be accepted in the underground cavern. The available power generation capacity and the compression acceptance capacity on the pressure side are represented by a pre-established linear function, a piecewise linear function, a lookup table function, or a thermodynamic calculation function, respectively. Within the allowable gas storage pressure range, the available power generation capacity on the pressure side increases rather than decreases with increasing gas storage pressure, and the compression acceptance capacity on the pressure side increases rather than increases with increasing gas storage pressure.
[0024] Furthermore, the available thermal-side power generation capacity described in step three... Hot-side compression acceptance capability Determine them respectively using the following formulas:
[0025] (2);
[0026] (3);
[0027] Among them, H t H represents the heat storage during the t-th scheduling period; min and H ma x represents the lower limit and upper limit of heat storage for the corresponding scheduling period, respectively; q g q represents the amount of heat required to generate one unit of electrical energy through expansion power generation; c T represents the heat recovered per unit of electrical energy consumed during the compression process. up and T down These represent increasing and decreasing the reserve duration, respectively.
[0028] Furthermore, in step four, the constraint for increasing the reserve capacity is as follows: (4);
[0029] in, This represents the available reserve capacity over t scheduling periods; Indicates in SOC t The maximum power generation under corresponding pressure conditions; Pg,t V represents the planned power generation during the t-th scheduling period; g Indicates the power generation side's ramp-up capability; This indicates an increase in the standby response time; This indicates the available power generation capacity on the pressure side, determined by the gas storage pressure or the amount of air that can be released. This indicates the available power generation capacity on the thermal side, determined by the amount of heat stored. This represents the heat storage during the t-th scheduling period; T represents the releaseable energy available for power generation during the t-th scheduling period; up This indicates an increase in the standby duration; This indicates taking the minimum value among all candidate upper limits.
[0030] Furthermore, in step five, the constraint for reducing the reserve capacity is as follows:
[0031] (5);
[0032] in, This represents the reduced reserve capacity available during the t-th scheduling period; Indicates in SOC t The maximum compression power under corresponding pressure conditions; P c,t This represents the planned power reduction during the t-th scheduling period; Indicates the ability to climb slopes on the compression side; This indicates a reduction in the standby response time; This indicates the pressure-side compression capacity, determined by the remaining pressure space or the amount of air that can be accommodated in the cavity. This indicates the hot-side compression acceptance capacity, determined by the remaining capacity of the thermal storage tank. T represents the energy available for compression absorption during the t-th scheduling period; down This indicates a reduction in the standby duration; This indicates taking the minimum value among all candidate upper limits.
[0033] Furthermore, in step six, the reduced reserve capacity defined by equation (5) is taken as one dimension of the reserve feasible domain; when the contingency reserve capacity and the increased reserve capacity share the total capacity of the generation side, the common capacity constraint is as follows:
[0034] (6);
[0035] in, This represents the emergency reserve capacity during the t-th scheduling period; This indicates that the reserve capacity is increased during the t-th scheduling period; The formula represents the emergency backup response time; this formula is used to limit the total capacity limit when the increased backup and emergency backup jointly occupy the power margin of the generation side; the reduced backup capacity is limited by formula (5), and together with the increased backup capacity and emergency backup capacity, it constitutes the feasible domain of cavern energy storage backup.
[0036] Furthermore, it also includes: during intraday rolling scheduling, when updated gas storage pressure, heat storage, new energy forecasts or load forecasts are obtained, the above steps are re-executed with the updated gas storage pressure and heat storage as the initial state to correct the cavern energy storage backup feasible domain and backup allocation results.
[0037] A backup optimization system for cavern energy storage grids based on the backup feasible domain includes:
[0038] The status acquisition module is used to acquire the gas storage pressure, heat storage capacity, planned compression power, planned power generation power, and equipment boundaries of the cavern energy storage system.
[0039] The pressure mapping module is used to establish a pressure-SOC mapping and determine the available power generation capacity on the pressure side and the compression acceptance capacity on the pressure side.
[0040] Thermal storage verification module is used to determine the thermal-side power generation capacity and thermal-side compression acceptance capacity;
[0041] The backup feasible domain construction module is used to construct the up-adjustment backup, down-adjustment backup, and emergency backup feasible domains based on the electric power margin, ramping capability, pressure side capability, thermal side capability, and duration constraints.
[0042] The scheduling solution module is used to embed the backup feasible domain into the power grid backup optimization scheduling model and output the scheduling results.
[0043] 3. Beneficial effects:
[0044] This invention provides a method and system for optimizing the standby capacity of cavern energy storage grids based on the standby feasible domain. It can distinguish cavern energy storage from ordinary fixed-efficiency energy storage models, making the standby capacity reflect the combined effects of gas pressure and thermal storage status. It can avoid overestimating the standby capacity when the gas pressure is insufficient, the thermal storage is insufficient, the cavern is close to full pressure, or the thermal storage device is close to its upper limit. It can simultaneously describe the upward adjustment of standby, the downward adjustment of standby, and the emergency standby, and avoid the standby repeatedly occupying the same equipment margin through common capacity constraints. Attached Figure Description
[0045] Figure 1 This is a schematic diagram of the cave-type advanced insulated compressed air energy storage system involved in this invention;
[0046] Figure 2 This is an overall flowchart of the backup optimization method for cavern energy storage power grid based on the backup feasible domain of the present invention;
[0047] Figure 3 This is a flowchart of the calculation of the feasible region for cavern energy storage backup in this invention;
[0048] Figure 4 This is a schematic diagram of the pressure-SOC mapping and pressure-side reserve capacity changes obtained in the embodiment;
[0049] Figure 5 This is a schematic diagram illustrating the changes in state variables and reserve capacity during intraday rolling scheduling in the example. Detailed Implementation
[0050] The present invention will now be described in detail with reference to the accompanying drawings.
[0051] As attached Figure 2 To be continued Figure 3 As shown; a backup optimization method for cavern energy storage power grids based on the backup feasible domain includes:
[0052] Step 1: Obtain the energy storage status parameters of the cavern-type advanced insulated compressed air energy storage system during the scheduling period; the energy storage status parameters include gas storage pressure, heat storage, planned compression power, planned power generation, compressor power boundary, expander power boundary, compression ramping capability, power generation ramping capability, upper and lower limits of gas storage pressure, upper and lower limits of heat storage, and standby response time.
[0053] Step 2: Establish a pressure-SOC mapping based on the gas storage pressure and the upper and lower limits of the gas storage pressure, and determine the available power generation capacity and the pressure-side compression acceptance capacity according to the pressure-SOC mapping.
[0054] Step 3: Based on the heat storage capacity, upper limit of heat storage capacity, and lower limit of heat storage capacity during the scheduling period, determine the available power generation capacity on the thermal side and the thermal compression acceptance capacity respectively;
[0055] The upper limit of the reserve requirement for the power supply side is determined based on the planned power generation capacity, the expander power boundary, the power generation ramping capability, and the upward reserve response time; the upper limit of the reserve requirement for the power supply side is determined based on the planned compressor power capacity, the compressor power boundary, the compressor ramping capability, and the downward reserve response time.
[0056] Step 4: Limit the increase in reserve capacity to the minimum value among the upper limit of the candidate upper limit for reserve increase on the power side, the available power generation capacity on the pressure side, the available power generation capacity on the thermal side, and the upper limit corresponding to the constraint on the duration of reserve increase;
[0057] Step 5: Limit the reduction of reserve capacity to no more than the minimum value among the upper limit of the candidate reserve reduction on the electric side, the compression acceptance capacity on the pressure side, the compression acceptance capacity on the thermal side, and the upper limit corresponding to the constraint of the duration of reserve reduction;
[0058] Step Six: Based on the increased reserve capacity determined in Step Four, the decreased reserve capacity determined in Step Five, and the common capacity constraints of the emergency reserve capacity and the increased reserve capacity, a feasible region for cavern energy storage reserve is formed. This feasible region is then embedded as a constraint into the power grid reserve optimization scheduling model, and the cavern energy storage compression power, power generation, gas storage pressure, heat storage, and reserve allocation results for each scheduling period are output.
[0059] Furthermore, in the cavern-type advanced insulated compressed air energy storage system, during the compression energy storage process, an electric motor drives a compressor to compress air, a heat exchanger recovers the heat generated during compression and stores the heat in a heat storage tank, and the compressed air is stored in an underground cavern; during the expansion power generation process, the underground cavern releases the compressed air, the heat storage tank releases its stored heat to heat the compressed air, the heated compressed air drives an expander to do work, and the expander drives a generator to generate electricity; the compression side and the power generation side constitute the electric side; the compression side refers to the compression stage consisting of an electric motor and a compressor; the power generation side refers to the power generation stage consisting of an expander and a generator; the pressure side refers to the constraints formed by the gas storage pressure of the underground cavern and the amount of air that can be released or accepted; the heat side refers to the constraints formed by the available heat storage capacity and the remaining heat storage capacity of the heat storage tank; the available power generation capacity on the pressure side refers to the power generation capacity limited by the gas storage pressure or the amount of air that can be released; the compression acceptance capacity on the pressure side refers to the compression capacity limited by the remaining pressure space or the amount of air that can be accepted in the underground cavern; the heat side... The available power generation capacity refers to the power generation capacity limited by the currently available heat storage capacity of the thermal storage device; the thermal-side compression acceptance capacity refers to the compression capacity limited by the remaining heat storage capacity of the thermal storage device; the reserve capacity refers to the ability of the cavern-type advanced adiabatic compressed air energy storage system to adjust the active power exchanged with the grid within the reserve response time relative to the planned operating point, and to maintain the power adjustment amount within the reserve duration; the reserve capacity refers to the power adjustment amount allocated by the grid reserve optimization scheduling model within the upper limit of the reserve capacity; the upward reserve refers to the reserve that increases the net active power injection of the system into the grid, and the downward reserve refers to the reserve that decreases the net active power injection of the system into the grid; in the method, the upward reserve is achieved by increasing the power generation capacity on the power generation side based on the planned power generation capacity, and the downward reserve is achieved by increasing the compression capacity on the compression side based on the planned compression capacity; the contingency reserve refers to the reserve provided by increasing the power generation capacity on the power generation side within the contingency reserve response time to cope with grid contingencies.
[0060] Furthermore, step two specifically includes:
[0061] S21: The constructed pressure-SOC mapping is shown in the following formula:
[0062] (1);
[0063] Among them, SOC tp represents the equivalent state of charge of the cavern energy storage during the t-th scheduling period; t p represents the gas storage pressure in the cavern energy storage chamber during the t-th scheduling period; min and p max These represent the lower limit and upper limit of the allowable gas storage pressure, respectively; t represents the scheduling period number;
[0064] S22: According to equation (1), the gas storage pressure p during the t-th scheduling period is... t The equivalent state of charge (ENC) of the cavern energy storage is converted, and the maximum power generation and maximum compression power under the corresponding pressure state are determined based on the ENC of the cavern energy storage. The available power generation capacity on the pressure side is determined based on the current gas storage pressure or the amount of air that can be released, and the compression acceptance capacity on the pressure side is determined based on the remaining pressure space or the amount of air that can be accepted in the underground cavern. The available power generation capacity and the compression acceptance capacity on the pressure side are represented by a pre-established linear function, a piecewise linear function, a lookup table function, or a thermodynamic calculation function, respectively. Within the allowable gas storage pressure range, the available power generation capacity on the pressure side increases rather than decreases with increasing gas storage pressure, and the compression acceptance capacity on the pressure side increases rather than increases with increasing gas storage pressure.
[0065] Furthermore, the available thermal-side power generation capacity described in step three... Hot-side compression acceptance capability Determine them respectively using the following formulas:
[0066] (2);
[0067] (3);
[0068] Among them, H t H represents the heat storage during the t-th scheduling period; min and H ma x represents the lower limit and upper limit of heat storage for the corresponding scheduling period, respectively; q g q represents the amount of heat required to generate one unit of electrical energy through expansion power generation; c T represents the heat recovered per unit of electrical energy consumed during the compression process. up and T down These represent increasing and decreasing the reserve duration, respectively.
[0069] Furthermore, in step four, the constraint for increasing the reserve capacity is as follows: (4);
[0070] in, This represents the available reserve capacity during the t-th scheduling period; Indicates in SOC t The maximum power generation under corresponding pressure conditions; Pg,t V represents the planned power generation during the t-th scheduling period; g Indicates the power generation side's ramp-up capability; This indicates an increase in the standby response time; This indicates the available power generation capacity on the pressure side, determined by the gas storage pressure or the amount of air that can be released. This indicates the available power generation capacity on the thermal side, determined by the amount of heat stored. This represents the heat storage during the t-th scheduling period; T represents the releaseable energy available for power generation during the t-th scheduling period; up This indicates an increase in the standby duration. This indicates taking the minimum value among all candidate upper limits.
[0071] Furthermore, in step five, the constraint for reducing the reserve capacity is as follows:
[0072] (5);
[0073] in, This represents the reduced reserve capacity available during the t-th scheduling period; Indicates in SOC t The maximum compression power under corresponding pressure conditions; P c,t This represents the planned power reduction during the t-th scheduling period; Indicates the ability to climb slopes on the compression side; This indicates a reduction in the standby response time; This indicates the pressure-side compression capacity, determined by the remaining pressure space or the amount of air that can be accommodated in the cavity. This indicates the hot-side compression acceptance capacity, determined by the remaining capacity of the thermal storage tank. T represents the energy available for compression absorption during the t-th scheduling period; down This indicates a reduction in the standby duration; This indicates taking the minimum value among all candidate upper limits.
[0074] Furthermore, in step six, the reduced reserve capacity defined by equation (5) is taken as one dimension of the reserve feasible domain; when the contingency reserve capacity and the increased reserve capacity share the total capacity of the generation side, the common capacity constraint is as follows:
[0075] (6);
[0076] in, This represents the emergency reserve capacity during the t-th scheduling period; This indicates that the reserve capacity is increased during the t-th scheduling period; The formula represents the emergency backup response time; this formula is used to limit the total capacity limit when the increased backup and emergency backup jointly occupy the power margin of the generation side; the reduced backup capacity is limited by formula (5), and together with the increased backup capacity and emergency backup capacity, it constitutes the feasible domain of cavern energy storage backup.
[0077] Furthermore, it also includes: during intraday rolling scheduling, when updated gas storage pressure, heat storage, new energy forecasts or load forecasts are obtained, the above steps are re-executed with the updated gas storage pressure and heat storage as the initial state to correct the cavern energy storage backup feasible domain and backup allocation results.
[0078] A backup optimization system for cavern energy storage grids based on the backup feasible domain includes:
[0079] The status acquisition module is used to acquire the gas storage pressure, heat storage capacity, planned compression power, planned power generation power, and equipment boundaries of the cavern energy storage system.
[0080] The pressure mapping module is used to establish a pressure-SOC mapping and determine the available power generation capacity on the pressure side and the compression acceptance capacity on the pressure side.
[0081] Thermal storage verification module is used to determine the thermal-side power generation capacity and thermal-side compression acceptance capacity;
[0082] The backup feasible domain construction module is used to construct the up-adjustment backup, down-adjustment backup, and emergency backup feasible domains based on the electric power margin, ramping capability, pressure side capability, thermal side capability, and duration constraints.
[0083] The scheduling solution module is used to embed the backup feasible domain into the power grid backup optimization scheduling model and output the scheduling results.
[0084] Example:
[0085] This embodiment uses numerical examples to illustrate the pressure-SOC mapping, cavern energy storage backup feasible domain construction, and intraday rolling update process in this invention. An intraday scheduling cycle is set to 24 hours and divided into 24 1-hour scheduling periods. In each scheduling period, the gas storage pressure, heat storage, planned compression power, planned power generation, compressor power boundary, expander power boundary, compression-side ramp-up capability, power generation-side ramp-up capability, upper and lower limits of gas storage pressure, upper and lower limits of heat storage, backup response time, and backup duration are obtained. The equivalent state of charge (SOCt) is calculated according to equation (1), and the available power generation capacity and hot-side compression acceptance capacity are calculated according to equations (2) and (3). The upward reserve capacity, downward reserve capacity, and emergency reserve capacity for each scheduling period are determined according to equations (4) to (6). The minimum value constraints in equations (4) to (6) can be expanded into a set of inequalities that the reserve capacity does not exceed each candidate upper limit, so that they can be solved by the scheduling solution module.
[0086] In this embodiment, the reserve pressure-side capacity is increased, i.e., the pressure-side power generation capacity is increased, and the reserve pressure-side capacity is decreased, i.e., the pressure-side compression and reception capacity is decreased. Both are adopted. Figure 4 The diagram shows a piecewise linear lookup table format. The equivalent SOC ranges from 0 to 1, and the pressure-side reserve capacity ranges from 0 to 200 MW. Figure 4 It can be seen that when the equivalent SOC is approximately no greater than 0.10, the capacity to increase the reserve pressure side is 0; when the equivalent SOC increases from approximately 0.10 to 1, the capacity to increase the reserve pressure side increases non-decreasingly from 0 MW to 200 MW. When the equivalent SOC increases from 0 to approximately 0.95, the capacity to decrease the reserve pressure side decreases non-increasingly from 200 MW to 0 MW; when the equivalent SOC is approximately no less than 0.95, the capacity to decrease the reserve pressure side is 0. Therefore, when the gas storage pressure is close to the lower limit, the capacity to increase reserve is limited by the amount of air that can be released; when the gas storage pressure is close to the upper limit, the capacity to decrease reserve is limited by the remaining pressure space or the amount of air that can be accepted in the underground caverns.
[0087] During each scheduling period, the pressure-side capacity, the upper limit of the candidate electric side, the thermal side capacity, and the standby duration constraint are checked one by one, and the minimum value of the corresponding upper limit is taken to form the standby feasible region for that period. After obtaining the updated gas storage pressure and heat storage for the next scheduling period, the standby feasible region is recalculated. Figure 5 The rolling scheduling results for the next 24 hours are provided. Figure 5 As can be seen, the gas storage pressure in the first period is approximately 7.00 MPa, with an available upward reserve capacity of approximately 30 MW and an available downward reserve capacity of approximately 139 MW; the gas storage pressure in the 13th period is approximately 8.11 MPa, with an available upward reserve capacity of approximately 154 MW and an available downward reserve capacity of approximately 45 MW; and the gas storage pressure in the 21st period is approximately 6.86 MPa, with an available upward reserve capacity of approximately 36 MW and an available downward reserve capacity of approximately 134 MW. From the first to the 13th period, as the gas storage pressure increases, the available upward reserve capacity generally increases, while the available downward reserve capacity generally decreases; conversely, from the 13th to the 21st period, as the gas storage pressure decreases, the available upward reserve capacity generally decreases, while the available downward reserve capacity generally increases. The reserve capacity in each period is simultaneously constrained by the electrical side, pressure side, thermal side, and duration, therefore it does not need to maintain a single linear relationship with the gas storage pressure.
[0088] If only the 200MW power ceiling shown in the diagram is used as the fixed reserve capacity, the available upward reserve may be overestimated under low SOC conditions, and the available downward reserve may be overestimated under near-high SOC conditions. This embodiment makes the pressure-side capacity vary with SOC and takes the minimum value from other candidate ceilings, so that the reserve capacity in the corresponding direction is automatically tightened at the pressure boundary, thereby avoiding reserve allocation results that exceed the physical boundary of cavern energy storage.
[0089] Although the present invention has been disclosed above with reference to preferred embodiments, these are not intended to limit the invention. Any person skilled in the art can make various changes or modifications without departing from the spirit and scope of the invention. Therefore, the scope of protection of the present invention should be defined by the scope of the claims of this application.
Claims
1. A backup optimization method for cavern energy storage power grids based on the backup feasible domain, characterized in that: include: Step 1: Obtain the energy storage status of the cavern-type advanced adiabatic compressed air energy storage system during the scheduling period; The energy storage state parameters include gas storage pressure, heat storage heat, planned compression power, planned power generation power, compressor power boundary, expander power boundary, compression ramping capability, power generation ramping capability, upper and lower limits of gas storage pressure, upper and lower limits of heat storage heat, and standby response time. Step 2: Establish a pressure-SOC mapping based on the gas storage pressure and the upper and lower limits of the gas storage pressure, and determine the available power generation capacity and the pressure-side compression acceptance capacity according to the pressure-SOC mapping. Step 3: Based on the heat storage capacity, upper limit of heat storage capacity, and lower limit of heat storage capacity during the scheduling period, determine the available power generation capacity on the thermal side and the thermal compression acceptance capacity respectively; The upper limit of the candidate for increasing the reserve on the power side is determined based on the planned power generation capacity, the power expander power boundary, the power generation ramping capacity, and the response time for increasing the reserve. The upper limit of the candidate for reducing the reserve on the electric side is determined based on the planned compression power, compressor power boundary, compressor ramp-up capability, and reserve reduction response time. Step 4: Limit the increase in reserve capacity to the minimum value among the upper limit of the candidate upper limit for reserve increase on the power side, the available power generation capacity on the pressure side, the available power generation capacity on the thermal side, and the upper limit corresponding to the constraint on the duration of reserve increase; Step 5: Limit the reduction of reserve capacity to no more than the minimum value among the upper limit of the candidate reserve reduction on the electric side, the compression acceptance capacity on the pressure side, the compression acceptance capacity on the thermal side, and the upper limit corresponding to the constraint of the duration of reserve reduction; Step Six: Based on the increased reserve capacity determined in Step Four, the decreased reserve capacity determined in Step Five, and the common capacity constraints of the emergency reserve capacity and the increased reserve capacity, a feasible region for cavern energy storage reserve is formed. This feasible region is then embedded as a constraint into the power grid reserve optimization scheduling model, and the cavern energy storage compression power, power generation, gas storage pressure, heat storage, and reserve allocation results for each scheduling period are output.
2. The method for optimizing backup power grids based on the backup feasible domain according to claim 1, characterized in that: In the compressed air energy storage system of the cavern type, the electric motor drives the compressor to compress air during the compression energy storage process, the heat exchanger recovers the heat generated during the compression process and stores the heat in the heat storage tank, and the compressed air is stored in the underground cavern. In the expansion power generation process, compressed air is released from the underground cavern, and the thermal storage device releases its stored heat to heat the compressed air. The heated compressed air drives the expander to do work, and the expander drives the generator to generate electricity. The compression side and the power generation side constitute the electrical side. The compression side refers to the compression stage consisting of an electric motor and a compressor. The power generation side refers to the power generation stage consisting of an expander and a generator. The pressure side refers to the constraints formed by the gas storage pressure of the underground cavern and the amount of air that can be released or accepted. The heat side refers to the constraints formed by the available heat storage capacity and the remaining heat storage capacity of the thermal storage device. The available power generation capacity on the pressure side refers to the power generation capacity limited by the gas storage pressure or the amount of air that can be released. The compression acceptance capacity on the pressure side refers to the compression capacity limited by the remaining pressure space or the amount of air that can be accepted in the underground cavern. The available power generation capacity on the heat side refers to the power generation capacity limited by the currently available heat storage capacity of the thermal storage device. The compression acceptance capacity on the heat side refers to the power generation capacity limited by the thermal storage device. The remaining thermal storage capacity limits the compression capacity; the reserve capacity refers to the ability of the cavern-type advanced adiabatic compressed air energy storage system to adjust the active power exchanged with the grid within the reserve response time relative to the planned operating point, and to maintain the power adjustment amount within the reserve duration; the reserve capacity refers to the power adjustment amount allocated by the grid reserve optimization scheduling model within the upper limit of the reserve capacity; the upward adjustment of reserve refers to the reserve that increases the net active power injection of the system into the grid, and the downward adjustment of reserve refers to the reserve that decreases the net active power injection of the system into the grid; in the method, the upward adjustment of reserve is achieved by the generation side increasing the generation power based on the planned generation power, and the downward adjustment of reserve is achieved by the compression side increasing the compression power based on the planned compression power; the contingency reserve refers to the reserve provided by the generation side by increasing the generation power within the contingency reserve response time to cope with grid contingencies.
3. The method for optimizing backup power grids based on the backup feasible domain according to claim 2, characterized in that: Step two specifically includes: S21: The constructed pressure-SOC mapping is shown in the following formula: (1); Among them, SOC t p represents the equivalent state of charge of the cavern energy storage during the t-th scheduling period; t p represents the gas storage pressure in the cavern energy storage chamber during the t-th scheduling period; min and p max These represent the lower limit and upper limit of the allowable gas storage pressure, respectively; t represents the scheduling period number; S22: According to equation (1), the gas storage pressure p during the t-th scheduling period is... t The equivalent state of charge (ENC) of the cavern energy storage is converted, and the maximum power generation and maximum compression power under the corresponding pressure state are determined based on the ENC of the cavern energy storage. The available power generation capacity on the pressure side is determined based on the current gas storage pressure or the amount of air that can be released, and the compression acceptance capacity on the pressure side is determined based on the remaining pressure space or the amount of air that can be accepted in the underground cavern. The available power generation capacity and the compression acceptance capacity on the pressure side are represented by a pre-established linear function, a piecewise linear function, a lookup table function, or a thermodynamic calculation function, respectively. Within the allowable gas storage pressure range, the available power generation capacity on the pressure side increases rather than decreases with increasing gas storage pressure, and the compression acceptance capacity on the pressure side increases rather than increases with increasing gas storage pressure.
4. The method for optimizing backup power grids based on the backup feasible domain according to claim 3, characterized in that: The available thermal power generation capacity mentioned in step three Hot-side compression acceptance capability Determine them respectively using the following formulas: (2); (3); in, H represents the heat storage during the t-th scheduling period; min and H max These represent the lower and upper limits of heat storage for the corresponding scheduling period, respectively; q g q represents the amount of heat required to generate one unit of electrical energy through expansion power generation; c T represents the heat recovered per unit of electrical energy consumed during the compression process. up and T down These represent increasing and decreasing the reserve duration, respectively.
5. The method for optimizing backup power grids based on the backup feasible domain according to claim 4, characterized in that: In step four, the constraint for increasing the reserve capacity is as follows: (4); in, This represents the available reserve capacity during the t-th scheduling period; Indicates in SOC t The maximum power generation under corresponding pressure conditions; P g,t V represents the planned power generation during the t-th scheduling period; g Indicates the power generation side's ramp-climbing capability; This indicates an increase in the standby response time; This indicates the available power generation capacity on the pressure side, determined by the gas storage pressure or the amount of air that can be released. H represents the available power generation capacity on the thermal side, determined by the amount of heat stored; t This represents the heat storage during the t-th scheduling period; T represents the releaseable energy available for power generation during the t-th scheduling period; up This indicates an increase in the standby duration; This indicates taking the minimum value among all candidate upper limits.
6. The method for optimizing backup power grids based on the backup feasible domain according to claim 5, characterized in that: In step five, the constraint for reducing the reserve capacity is as follows: (5); in, This represents the reduced reserve capacity available during the t-th scheduling period; Indicates in SOC t The maximum compression power under corresponding pressure conditions; P c,t This represents the planned power reduction during the t-th scheduling period; Indicates the ability to climb slopes on the compression side; This indicates a reduction in the standby response time; This indicates the pressure-side compression capacity, determined by the remaining pressure space or the amount of air that can be accommodated in the cavity. This indicates the hot-side compression acceptance capacity, determined by the remaining capacity of the thermal storage tank. T represents the energy available for compression absorption during the t-th scheduling period; down This indicates a reduction in the standby duration; This indicates taking the minimum value among all candidate upper limits.
7. The method for optimizing backup power grids based on the backup feasible domain according to claim 6, characterized in that: In step six, the reduced reserve capacity defined by equation (5) is taken as one dimension of the reserve feasible region; when the contingency reserve capacity and the increased reserve capacity share the total capacity of the generation side, the common capacity constraint is as follows: (6); in, This represents the emergency reserve capacity during the t-th scheduling period; This indicates that the reserve capacity is increased during the t-th scheduling period; The formula represents the emergency backup response time; this formula is used to limit the total capacity limit when the increased backup and emergency backup jointly occupy the power margin of the generation side; the reduced backup capacity is limited by formula (5), and together with the increased backup capacity and emergency backup capacity, it constitutes the feasible domain of cavern energy storage backup.
8. The method for optimizing backup power grids based on the backup feasible domain according to claim 1, characterized in that: Also includes: In intraday rolling scheduling, when updated gas storage pressure, heat storage, new energy forecast or load forecast is obtained, the steps of claim 1 are re-executed with the updated gas storage pressure and heat storage as the initial state to correct the cavern energy storage backup feasible domain and backup allocation results.
9. A rock-cavity energy storage grid backup optimization system utilizing the optimization method as described in any one of claims 1-8, characterized in that: include: The status acquisition module is used to acquire the gas storage pressure, heat storage capacity, planned compression power, planned power generation power, and equipment boundaries of the cavern energy storage system. The pressure mapping module is used to establish a pressure-SOC mapping and determine the available power generation capacity on the pressure side and the compression acceptance capacity on the pressure side. Thermal storage verification module is used to determine the thermal-side power generation capacity and thermal-side compression acceptance capacity; The backup feasible domain construction module is used to construct the up-adjustment backup, down-adjustment backup, and emergency backup feasible domains based on the electric power margin, ramping capability, pressure side capability, thermal side capability, and duration constraints. The scheduling solution module is used to embed the backup feasible domain into the power grid backup optimization scheduling model and output the scheduling results.