Charging strategy dynamic management method based on end-cloud cooperation
By adopting a dynamic management method for charging strategies that combines edge-cloud collaboration with long-cycle scheduling in the cloud and short-cycle adjustment by the edge controller, the problems of transformer overload and bus voltage drop caused by electric vehicle access in low-voltage distribution substations have been solved, achieving flexible grid response and charging load optimization.
Patent Information
- Application Number
- CN202611287844.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-20
AI Technical Summary
In low-voltage distribution substations, the large-scale access of electric vehicles leads to transformer overload and a sudden drop in bus voltage. Existing charging scheduling methods are unable to cope with grid scheduling requirements and random disturbances, and cannot coordinate the grid-side peak shaving and valley filling needs with the multi-dimensional operation needs of the substations.
A dynamic management method for charging strategies based on edge-cloud collaboration is adopted. By combining long-cycle scheduling in the cloud with short-cycle adjustment by the edge controller of the charging station, the charging power is adjusted in real time. Power allocation is carried out using voltage drop suppression coefficient and charging urgency index to ensure that the charging load is within the allowable range of transformer capacity and bus voltage, thereby achieving flexible grid response.
It effectively reduces the risk of transient overload of transformers and voltage drop of busbars, improves the safe operation capability of the distribution area under load disturbance, optimizes the charging power distribution, and improves the utilization rate of distribution capacity and the rate of meeting charging needs.
Smart Images

Figure CN123144178A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of smart grid power distribution and load scheduling technology, and particularly relates to a dynamic management method for charging strategies based on end-to-cloud collaboration. Background Technology
[0002] Low-voltage distribution substations are the final link in power distribution and load regulation within the smart grid. Their power supply capacity is limited by transformer capacity, allowable fluctuation range of bus voltage, and feeder power flow carrying capacity. With the large-scale access of electric vehicles, vehicle charging time and charging locations tend to be concentrated, and there are also random concurrent charging situations. When a large number of vehicles charge in a disorderly manner, it can easily cause transformer overload and sudden drop in bus voltage. Existing charging scheduling methods mainly include two types: centralized cloud management and single-station local autonomy. The centralized method collects parameters from each charging terminal through the network, and the central platform uniformly calculates and distributes fixed power curves. The single-station local autonomy method performs static power distribution or current limiting according to fixed thresholds for charging terminals within the station based on transformer capacity monitoring results.
[0003] In actual power distribution, wireless communication networks suffer from transmission delays and channel jitter. When the output of distributed photovoltaic power in a distribution area suddenly decreases or the base load suddenly increases, centralized long-cycle scheduling cannot keep up with such high-frequency changes in time. The power commands that have been issued cannot reflect the current status of the distribution area in time, which can easily cause transient overload of transformers and voltage drop of the bus. When adopting a single-station local autonomy mode, the charging control in the station is disconnected from the upper-level grid scheduling, and it is impossible to respond to time-of-use pricing signals and peak shaving and valley filling needs in time. However, local improvements at the hardware structure level alone cannot cope with the complex and ever-changing operating conditions. Without a suitable control and optimization scheduling strategy, it is difficult to coordinate the peak shaving and valley filling needs of the grid side with the multi-dimensional operation needs of the station side. For example, Chinese invention patent application with publication number CN118418822A discloses an orderly charging optimization scheduling method for intelligent charging stations based on cloud-edge collaboration. The cloud side determines the orderly charging scheduling curve of the station's charging and discharging power changing with time, and the edge side determines the charging and discharging scheduling command by combining the current time data.
[0004] Therefore, the technical problem to be solved by this invention is how to use distributed charging loads as a flexible response resource for the power grid while ensuring the carrying capacity of low-voltage distribution transformers and the support capacity of bus voltage, so that charging dispatch can respond to the grid dispatch requirements of longer periods and handle short-period, high-frequency random disturbances in a timely manner. Summary of the Invention
[0005] To address the problems in the background technology, the technical solution of the present invention is as follows: A dynamic management method for charging strategies based on edge-cloud collaboration, comprising the following steps: Step S1: The cloud server obtains the day-ahead load forecast data, distributed power output forecast data, time-of-use electricity price vector and rated active capacity constraints of the distribution transformer for the target distribution area, solves and generates the day-ahead power scheduling envelope sequence and sends it to the charging station edge controller. In step S2, the charging station edge controller collects the effective value of the three-phase bus line voltage on the low-voltage side of the distribution transformer, the real-time base load power of the distribution area, the real-time output power of the distributed power source, and the status parameters of each connected electric vehicle, and calculates the upper limit of the real-time allocable charging power of the distribution area; when the effective value of the three-phase bus line voltage is lower than the preset voltage drop trigger threshold, the voltage drop suppression coefficient is calculated to reduce the upper limit of the real-time allocable charging power of the distribution area. Step S3: The charging station edge controller extracts the day-ahead power scheduling envelope value of the day-ahead power scheduling envelope sequence in the current time period, and takes the minimum value of the day-ahead power scheduling envelope value and the upper limit of the real-time allocable charging power of the substation after derating correction to establish the station-level total charging power command; calculates the charging urgency index based on the state of charge difference of each connected electric vehicle, the rated capacity of the power battery, the maximum physical output power of a single pile and the remaining charging time; initially assigns the station-level total charging power command based on the charging urgency index, and after the maximum physical output power of a single pile is truncated, redistributes the released residual power to the unsaturated electric vehicle tier for a second time, driving each charging terminal to adjust its output power; In step S4, when the absolute tracking deviation between the actual aggregated charging power of each charging terminal and the day-ahead power scheduling envelope value exceeds the preset tolerance threshold, the charging station edge controller generates an asynchronous status feedback message and reports it to the cloud server to correct the day-ahead power scheduling envelope sequence for the next rolling cycle.
[0006] Preferably, in step S1, the solution window for the day-ahead power dispatch envelope sequence is set to the next 4 hours, the dispatch period is divided into 16 periods, and the rolling planning step size is set to 15 minutes. The cloud server constructs a quadratic programming model with the optimization objective of smoothing the peak-valley difference of the comprehensive load in the distribution area and reducing the total operating cost. The algebraic sum of the rated active power capacity of the distribution transformer, the day-ahead load forecast data, the distributed power output forecast data, and the grid reserved safety margin is used as a rigid power upper limit constraint to solve and output the reference charging power envelope value corresponding to each dispatch period.
[0007] Preferably, in step S2, calculating the upper limit of the real-time allocable charging power of the distribution area includes the following steps: Step S21, obtaining the rated active capacity of the distribution transformer, subtracting the real-time collected base load power of the distribution area and the preset local dynamic safety margin, and accumulating the real-time output power of the distributed power source to calculate the uncorrected upper limit of the real-time allocable charging power of the distribution area; wherein, the local dynamic safety margin is used to smooth the transient power fluctuation of the distributed power source within the second-level sampling period.
[0008] Preferably, in step S2, calculating the voltage sag suppression coefficient to derating the upper limit of the real-time allocable charging power of the distribution area when the effective value of the three-phase bus line voltage is lower than the preset voltage sag trigger threshold includes the following steps: Step S22, setting the nominal line voltage of the low-voltage three-phase bus to 380.0V; when the collected effective value of the three-phase bus line voltage is in the range of 361.0V to 380.0V, setting the voltage sag suppression coefficient to 1.0; when the effective value of the three-phase bus line voltage is in the range of 342.0V to 361.0V, calculating the voltage sag suppression coefficient based on the linear decrease in the sag amplitude of the effective value of the three-phase bus line voltage from 361.0V; when the effective value of the three-phase bus line voltage is lower than 342.0V, setting the voltage sag suppression coefficient to 0.0; multiplying the calculated voltage sag suppression coefficient by the uncorrected upper limit of the real-time allocable charging power of the distribution area, and outputting the derating-corrected upper limit of the real-time allocable charging power of the distribution area.
[0009] Preferably, in step S3, the initial allocation of the station-level total charging power instruction based on the charging urgency index includes the following steps: Step S31, summing the charging urgency indices of all connected electric vehicles in the station to obtain the total urgency; calculating the proportion of the charging urgency index of each connected electric vehicle to the total urgency as the initial allocation weight of the corresponding vehicle; multiplying the initial allocation weight by the station-level total charging power instruction to obtain the initial allocation power of each connected electric vehicle.
[0010] Preferably, in step S3, the secondary redistribution of the released residual power to the unsaturated electric vehicle cascade after the maximum physical output power of a single charging pile is cut off includes the following steps: Step S32, comparing the initial allocated power of each connected electric vehicle with the corresponding maximum physical output power of a single charging pile; for electric vehicles whose initial allocated power exceeds the corresponding maximum physical output power of a single charging pile, cutting off and locking their output power to the maximum physical output power of a single charging pile, and accumulating the excess portion to form the total residual power; classifying electric vehicles whose initial allocated power does not reach the maximum physical output power of a single charging pile into an unsaturated electric vehicle set, and redistributing the total residual power a second time according to the charging urgency index ratio of each electric vehicle within the unsaturated electric vehicle set; when a new saturated electric vehicle is generated in the secondary distribution, continuing to iteratively distribute the overflowing residual power to the remaining unsaturated electric vehicles until the actual aggregated charging power of each charging terminal in the station converges to the station-level total charging power command, or all connected electric vehicles reach the corresponding maximum physical output power of a single charging pile.
[0011] Preferably, in step S4, generating an asynchronous status feedback message and reporting it to the cloud server includes the following steps: Step S41, in each control cycle, the absolute power difference between the actual aggregated charging power of each charging terminal at the station and the day-ahead power scheduling envelope value of the current time period is statistically analyzed; when the integral amount of the absolute power difference exceeds the preset tolerance threshold and reaches the set trigger threshold, an asynchronous status feedback message containing the actual load dispersion of the transformer area and the bus voltage fluctuation characteristics is generated and uploaded to the cloud server; the cloud server parses the asynchronous status feedback message and corrects the basic load forecast benchmark and scheduling constraint boundary in the quadratic planning model of the next rolling planning cycle.
[0012] Preferably, the method further includes an offline autonomous protection step: when the communication link between the charging station edge controller and the cloud server is interrupted for a duration exceeding a preset communication timeout threshold of 60 seconds, the charging station edge controller automatically switches to the offline safety protection mode; in the offline safety protection mode, the day-ahead power scheduling envelope value is replaced with the offline minimum baseline power calculated based on the rated active capacity of the distribution transformer at a ratio of 0.50, and the closed-loop autonomous operation is maintained locally under the constraints of transformer overload and bus voltage support.
[0013] Preferably, the method further includes a communication restoration and calibration step: after the communication link is restored, the charging station edge controller resends the time-series load integral messages recorded during offline operation to the cloud server; the cloud server calculates the offline cumulative power consumption based on the time-series load integral messages, and recalibrates the equivalent average load benchmark value of the distribution area for the next rolling planning cycle and the day-ahead optimization status of the power grid.
[0014] Compared with existing technologies, the dynamic management method for charging strategies based on edge-cloud collaboration in this invention has the following advantages: 1. In the dynamic management of charging strategies through end-to-cloud collaboration, the long-cycle scheduling in the cloud and the short-cycle adjustment of the charging station edge controller work together to ensure that the charging power can be arranged according to the scheduling requirements of the upper-level power grid, and can also be adjusted in a timely manner according to the current transformer load, distributed power output and bus voltage of the distribution area. The day-ahead power scheduling envelope value and the upper limit of the real-time allocable charging power in the distribution area jointly limit the total charging power in the station, which can keep the charging load within the allowable range of transformer capacity and bus voltage. When there is a delay in communication or short-term fluctuations in the output of distributed power sources, the station can still directly adjust the power, reducing the dependence on the continuous and stable connection of wide area communication, reducing the risk of transformer transient overload and bus voltage drop, and enabling the upper-level power grid scheduling and the safe operation of the distribution area to be taken into account.
[0015] 2. By using the voltage drop suppression coefficient to derating the upper limit of the real-time allocable charging power in the distribution area, the charging load can be actively reduced as the bus voltage drops. When multiple electric vehicles charge at high power at the same time, causing the bus voltage to drop, the charging power that continues to increase can be limited in time to avoid further voltage drop and reduce the risk of protection tripping. This maintains the bus voltage support capacity of the low-voltage distribution area, keeps the charging power supply in balance with the actual power supply capacity of the distribution area, and improves the safe operation capability of the distribution area under large load disturbances.
[0016] 3. Power allocation is based on the charging urgency index, and the residual power is redistributed a second time under the physical maximum output power limit of a single pile. This can reduce the idle available power distribution capacity caused by static equalization or fixed current limiting. When the available charging power in the substation is limited, it can prioritize vehicles with more urgent charging needs. At the same time, it can make the total charging power in the station as close as possible to the safe power supply level allowed by the substation, improve the utilization of limited power distribution capacity, and reduce the probability that vehicles do not reach the target power level when leaving the station, thus better taking into account the charging needs of different vehicles. Attached Figure Description
[0017] Figure 1 This is a flowchart of the charging power tiered distribution and closed-loop feedback adjustment of the present invention; Figure 2 This is a diagram of the multi-source data interaction and station-edge collaborative control architecture of the present invention. Detailed Implementation
[0018] The technical solutions of the embodiments of this application will be clearly described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of this application are within the scope of protection of this application.
[0019] A dynamic management method for charging strategies based on edge-cloud collaboration includes the following steps: Step S1: The cloud server obtains the day-ahead load forecast data, distributed power output forecast data, time-of-use electricity price vector and rated active capacity constraints of the distribution transformer for the target distribution area, solves and generates the day-ahead power scheduling envelope sequence and sends it to the charging station edge controller. In step S2, the charging station edge controller collects the effective value of the three-phase bus line voltage on the low-voltage side of the distribution transformer, the real-time base load power of the distribution area, the real-time output power of the distributed power source, and the status parameters of each connected electric vehicle, and calculates the upper limit of the real-time allocable charging power of the distribution area; when the effective value of the three-phase bus line voltage is lower than the preset voltage drop trigger threshold, the voltage drop suppression coefficient is calculated to reduce the upper limit of the real-time allocable charging power of the distribution area. Step S3: The charging station edge controller extracts the day-ahead power scheduling envelope value of the day-ahead power scheduling envelope sequence in the current time period, and takes the minimum value of the day-ahead power scheduling envelope value and the upper limit of the real-time allocable charging power of the substation after derating correction to establish the station-level total charging power command; calculates the charging urgency index based on the state of charge difference of each connected electric vehicle, the rated capacity of the power battery, the maximum physical output power of a single pile and the remaining charging time; initially assigns the station-level total charging power command based on the charging urgency index, and after the maximum physical output power of a single pile is truncated, redistributes the released residual power to the unsaturated electric vehicle tier for a second time, driving each charging terminal to adjust its output power; In step S4, when the absolute tracking deviation between the actual aggregated charging power of each charging terminal and the day-ahead power scheduling envelope value exceeds the preset tolerance threshold, the charging station edge controller generates an asynchronous status feedback message and reports it to the cloud server to correct the day-ahead power scheduling envelope sequence for the next rolling cycle.
[0020] Preferably, in step S1, the solution window for the day-ahead power dispatch envelope sequence is set to the next 4 hours, the dispatch period is divided into 16 periods, and the rolling planning step size is set to 15 minutes. The cloud server constructs a quadratic programming model with the optimization objective of smoothing the peak-valley difference of the comprehensive load in the distribution area and reducing the total operating cost. The algebraic sum of the rated active power capacity of the distribution transformer, the day-ahead load forecast data, the distributed power output forecast data, and the grid reserved safety margin is used as a rigid power upper limit constraint to solve and output the reference charging power envelope value corresponding to each dispatch period.
[0021] Preferably, in step S2, calculating the upper limit of the real-time allocable charging power of the distribution area includes the following steps: Step S21, obtaining the rated active capacity of the distribution transformer, subtracting the real-time collected base load power of the distribution area and the preset local dynamic safety margin, and accumulating the real-time output power of the distributed power source to calculate the uncorrected upper limit of the real-time allocable charging power of the distribution area; wherein, the local dynamic safety margin is used to smooth the transient power fluctuation of the distributed power source within the second-level sampling period.
[0022] Preferably, in step S2, calculating the voltage sag suppression coefficient to derating the upper limit of the real-time allocable charging power of the distribution area when the effective value of the three-phase bus line voltage is lower than the preset voltage sag trigger threshold includes the following steps: Step S22, setting the nominal line voltage of the low-voltage three-phase bus to 380.0V; when the collected effective value of the three-phase bus line voltage is in the range of 361.0V to 380.0V, setting the voltage sag suppression coefficient to 1.0; when the effective value of the three-phase bus line voltage is in the range of 342.0V to 361.0V, calculating the voltage sag suppression coefficient based on the linear decrease in the sag amplitude of the effective value of the three-phase bus line voltage from 361.0V; when the effective value of the three-phase bus line voltage is lower than 342.0V, setting the voltage sag suppression coefficient to 0.0; multiplying the calculated voltage sag suppression coefficient by the uncorrected upper limit of the real-time allocable charging power of the distribution area, and outputting the derating-corrected upper limit of the real-time allocable charging power of the distribution area.
[0023] Preferably, in step S3, the initial allocation of the station-level total charging power instruction based on the charging urgency index includes the following steps: Step S31, summing the charging urgency indices of all connected electric vehicles in the station to obtain the total urgency; calculating the proportion of the charging urgency index of each connected electric vehicle to the total urgency as the initial allocation weight of the corresponding vehicle; multiplying the initial allocation weight by the station-level total charging power instruction to obtain the initial allocation power of each connected electric vehicle.
[0024] Preferably, in step S3, the secondary redistribution of the released residual power to the unsaturated electric vehicle cascade after the maximum physical output power of a single charging pile is cut off includes the following steps: Step S32, comparing the initial allocated power of each connected electric vehicle with the corresponding maximum physical output power of a single charging pile; for electric vehicles whose initial allocated power exceeds the corresponding maximum physical output power of a single charging pile, cutting off and locking their output power to the maximum physical output power of a single charging pile, and accumulating the excess portion to form the total residual power; classifying electric vehicles whose initial allocated power does not reach the maximum physical output power of a single charging pile into an unsaturated electric vehicle set, and redistributing the total residual power a second time according to the charging urgency index ratio of each electric vehicle within the unsaturated electric vehicle set; when a new saturated electric vehicle is generated in the secondary distribution, continuing to iteratively distribute the overflowing residual power to the remaining unsaturated electric vehicles until the actual aggregated charging power of each charging terminal in the station converges to the station-level total charging power command, or all connected electric vehicles reach the corresponding maximum physical output power of a single charging pile.
[0025] Preferably, in step S4, generating an asynchronous status feedback message and reporting it to the cloud server includes the following steps: Step S41, in each control cycle, the absolute power difference between the actual aggregated charging power of each charging terminal at the station and the day-ahead power scheduling envelope value of the current time period is statistically analyzed; when the integral amount of the absolute power difference exceeds the preset tolerance threshold and reaches the set trigger threshold, an asynchronous status feedback message containing the actual load dispersion of the transformer area and the bus voltage fluctuation characteristics is generated and uploaded to the cloud server; the cloud server parses the asynchronous status feedback message and corrects the basic load forecast benchmark and scheduling constraint boundary in the quadratic planning model of the next rolling planning cycle.
[0026] Preferably, the method further includes an offline autonomous protection step: when the communication link between the charging station edge controller and the cloud server is interrupted for a duration exceeding a preset communication timeout threshold of 60 seconds, the charging station edge controller automatically switches to the offline safety protection mode; in the offline safety protection mode, the day-ahead power scheduling envelope value is replaced with the offline minimum baseline power calculated based on the rated active capacity of the distribution transformer at a ratio of 0.50, and the closed-loop autonomous operation is maintained locally under the constraints of transformer overload and bus voltage support.
[0027] Preferably, the method further includes a communication restoration and calibration step: after the communication link is restored, the charging station edge controller resends the time-series load integral messages recorded during offline operation to the cloud server; the cloud server calculates the offline cumulative power consumption based on the time-series load integral messages, and recalibrates the equivalent average load benchmark value of the distribution area for the next rolling planning cycle and the day-ahead optimization status of the power grid.
[0028] Example 1: The current smart charging station in the low-voltage distribution transformer area of the industrial park is equipped with a distribution transformer with a rated capacity of 630kVA and a rated power factor of [value missing]. Maximum permissible active power The rated voltage is 598.5kW, and the nominal line voltage of the three-phase busbar on the low-voltage side is [not specified]. Set to 380V; cloud server will start in 15 minutes. To accommodate rolling planning steps, each planning window includes 16 scheduling periods over the next 4 hours. A charging station edge controller with a sampling control cycle of 1 second is configured between the low-voltage outgoing line of the distribution transformer and each charging terminal within the station. A safety reserve margin is preset on the grid side. The station edge side is pre-configured with a local dynamic safety margin to mitigate high-frequency disturbances on the order of seconds. This establishes the operational benchmark for long-term scheduling across the entire network and the local physical security boundaries at the station end.
[0029] At the beginning of the planning period, the cloud server obtains the target distribution area for each future scheduling period. Daily base load forecast Forecast values of distributed photovoltaic power output and time-of-use electricity pricing coefficient A quadratic programming scheduling model is constructed with the goal of smoothing the peak-valley difference in the overall load of the distribution area and reducing the total operating cost. Its objective function is expressed as: ,in, For time period The day-ahead power scheduling envelope value, For the duration of the scheduling period, The load fluctuation penalty coefficient is set to 0.05. The baseline value of the equivalent average load for the entire day in the transformer area is used to optimize variables. To satisfy the rigid power upper limit constraint defined by the algebraic sum of the rated active power capacity of the distribution transformer, the day-ahead base load forecast, the distributed photovoltaic power output forecast, and the grid's reserved safety margin, the cloud server completes the quadratic programming solution and then rolls down the resulting day-ahead power scheduling envelope sequence for 16 time periods to the edge controller. The day-ahead power scheduling envelope value for the current scheduling period... The power output is set at 480kW.
[0030] During control time The edge controller collects real-time base load power of the distribution area through the station-end electricity meters and the monitoring and control device. Real-time output power of distributed photovoltaic power and the effective value of the three-phase bus line voltage on the low-voltage side of the distribution transformer. Based on the rated active capacity of the distribution transformer, the real-time base load power of the distribution area and the local dynamic safety margin are deducted, and the real-time output power of the distributed photovoltaic system is added to obtain the uncorrected upper limit of the real-time allocable charging power of the distribution area. The system presets 95% of the nominal line voltage, i.e., 361V, as the first preset percentage threshold, and uses this threshold as the high-voltage trigger boundary for the preset voltage drop trigger threshold. Simultaneously, it uses 90% of the nominal line voltage, i.e., 342V, as the cut-off and blocking boundary for the second preset percentage threshold. Due to the current sampling voltage... Within the normal voltage range, the edge controller will reduce the voltage sag suppression factor. The calibration is set to 1, which then outputs the upper limit of the real-time allocable charging power for the distribution area after derating correction. The selection of the above voltage range is based on the fact that the national low-voltage power supply voltage deviation qualification standard is usually -7% to +7% of the nominal voltage. Setting 361V, i.e. -5%, as the preset voltage drop trigger threshold allows for a 2% adjustment margin before the bus voltage reaches 93% of the nominal line voltage, avoiding over-limit due to control delay. Setting 342V, i.e. -10%, as the cut-off boundary is because when the bus line voltage is below this value, the low-voltage disconnection protection threshold of the charging pile inverter module and the on-board charger is reached. At this time, setting the voltage drop suppression coefficient to 0 can achieve complete disconnection of the charging load. Within the 19V voltage drop range of 342V to 361V, the voltage drop suppression coefficient decreases linearly from 1 to 0, and it decreases linearly at a slope of 0.0526 for every 1V, in order to maintain the continuity of power regulation and reduce the impact on the power grid.
[0031] The edge controller will send the day-ahead power scheduling envelope value from the cloud. Compared with the adjusted real-time allocable charging power limit for the substation area Arbitration is conducted using the minimum value to determine the station-level total charging power command for the current control cycle. Currently, three electric vehicles are connected and charging at the station. Each charging terminal establishes its parameters based on the status reported by the power battery management system. The rated capacity of the power battery of vehicle 1 is... Current state of charge Desired target state of charge Remaining charging time Maximum physical output power of a single pile The rated capacity of the power battery of vehicle 2 Current state of charge Desired target state of charge Remaining charging time Maximum physical output power of a single pile The rated capacity of the power battery of vehicle 3 Current state of charge Desired target state of charge Remaining charging time Maximum physical output power of a single pile Set anti-singularity time constant The relationship is calculated based on the charging urgency index: ,in, For vehicles At any moment The charging urgency index For the desired target state of charge, For real-time state of charge, The rated capacity of the power battery This represents the maximum physical output power of a single pile. Based on the remaining charging time, the required additional electricity for vehicle 1 is calculated. And the charging urgency index Vehicle 2 requires additional power. And the charging urgency index Vehicle 3 requires additional power. And the charging urgency index Summing yields the total urgency. .
[0032] During the initial power allocation process, the initial allocation weights for each vehicle are as follows: , , The initial power allocation corresponds to vehicle 1. Vehicle 2 Vehicle 3 The initial power allocation of vehicle 1 exceeded the maximum physical output power of a single pile (120kW), so the edge controller cut off and locked the output power of vehicle 1 to [a certain value]. Simultaneously release residual power Vehicles 2 and 3 form an unsaturated electric vehicle cluster. The sum of the charging urgency indices within the cluster is 0.160179. The released residual power is redistributed according to the charging urgency index ratio. Vehicle 2 receives a power increment of 149.58kW, bringing its cumulative power to 264.14kW. Because this exceeds the maximum physical output power of a single charging pile (180kW), the output is locked. The residual power overflowed again by 84.14kW, and the remaining residual power was redistributed to vehicle 3. The cumulative power of vehicle 3 reached 124.41kW, which also triggered the cutoff of the maximum physical output power of a single pile, locking it to [value missing]. The output power of all charging terminals at the station is distributed as follows: , , The actual aggregated charging power converged to 420kW, which is within the safe envelope of the power supply capacity of the transformer area of 477kW.
[0033] The edge controller calculates the absolute tracking deviation between the actual aggregated charging power of 420kW and the day-ahead power dispatch envelope value of 480kW within each control cycle. When the integral of this absolute tracking deviation exceeds the preset tolerance threshold and reaches the set trigger threshold, it generates an asynchronous state feedback message containing the actual load dispersion of the distribution area and the bus voltage fluctuation characteristics and uploads it to the cloud server. This drives the cloud-based quadratic programming model to calibrate the day-ahead power reference in the next rolling cycle. Specifically, when the edge controller generates the asynchronous state feedback message, it multiplies the difference between the actual base load power and the day-ahead load prediction value obtained from each sampling in the continuous statistical cycle by a 1-second control cycle and performs discrete accumulation to obtain a characterizing load prediction accumulation. The actual load dispersion of the distribution area is calculated. Simultaneously, the instantaneous minimum, average, and voltage RMS drop rate of the three-phase bus line voltage within the past 60-second time window are extracted as bus voltage fluctuation characteristics. The actual load dispersion of the distribution area, the bus voltage fluctuation characteristic array, and the trigger time's timestamp are encapsulated into an asynchronous status feedback message in the form of a structured binary data frame and uploaded to the cloud server. When the wide-area communication link between the edge controller and the cloud server is interrupted and the interruption duration exceeds the preset communication timeout threshold of 60 seconds, the edge controller automatically switches to offline safety protection mode, replacing the day-ahead power scheduling envelope value with an offline baseline power calculated at a 0.5 ratio. Based on local electrical sampling at the station, the system maintains closed-loop autonomous operation to prevent transformer overload and ensure bus voltage support. After the communication link is restored, it resends the time-series load integral messages recorded during offline operation to the cloud server to recalibrate the equivalent average load benchmark value of the entire day for the distribution area. Under the disturbance conditions of distributed photovoltaic power output fluctuations and second-level jumps in basic power load, long-series grid optimization and short-series physical safety rigid constraints are decoupled and coordinated, eliminating control lag caused by communication link delay and the hidden danger of transformer transient overload. At the same time, when multiple vehicles are charging concurrently, the power distribution capacity is prioritized to vehicles with high charging urgency based on the weighted average of charging urgency indicators and residual power reallocation, taking into account both the safe operation of the distribution network and the charging demand.
[0034] Example 2: In the power distribution load dispatching test system, a semi-physical-in-the-loop test platform was built, encompassing a 10kV distribution transformer, a distributed rooftop photovoltaic simulated generator, a park basic power load simulation system, and a multi-channel DC charging terminal array. The test system is equipped with a power quality monitor and a digital power analyzer. The AC voltage measurement accuracy is better than 0.1V, and the active power measurement sampling frequency is set to 1kHz. The charging station edge controller performs downsampling and discretization filtering on the measurement and control data with a control cycle of 1s. Random measurement noise with an amplitude of 3% of the rated value is injected into the photovoltaic and basic power load input terminals, and a 50Hz power frequency harmonic disturbance is superimposed. The rated active capacity of the distribution transformer is calibrated to be 598.5kW, and the nominal line voltage of the three-phase bus on the low-voltage side is... The day-ahead power dispatch envelope value is calibrated to 380V and issued by the cloud server. The test baseline was set at 480kW, with local dynamic safety margin. The rated capacity is 15kW, with a safety reserve margin reserved for the power grid. It is rated at 20kW.
[0035] The experiment included the following groups: the present invention sample group, control sample group 1, control sample group 2, control sample group 3, out-of-range control group A, and out-of-range control group B. The present invention sample group adopted the full-process control logic of the present invention. Control sample group 1 removed the voltage drop suppression link and operated only based on the uncorrected real-time allocable charging power limit of the transformer area. Control sample group 2 removed the weighted redistribution of charging urgency index and residual power, and adopted the average power allocation per pile. Control sample group 3 removed the dynamic arbitration at the station edge and relied entirely on the fixed power curve control issued by the cloud server every 15 minutes. Out-of-range control groups A and B set the preset voltage drop trigger thresholds to 375V and 340V, respectively. During the test, disturbance conditions such as sudden increase in base load, sudden drop in photovoltaic output, bus voltage drop, and communication interruption were applied sequentially. The effective value of bus sampling voltage, base load and net photovoltaic output, voltage drop suppression coefficient, corrected real-time allocable charging power limit of the transformer area, actual aggregated charging power, transformer total load rate, and achievement rate of key vehicle energy replenishment targets were continuously recorded for each sample group.
[0036] Under steady-state operating conditions, the effective value of the bus sampling voltage is 380V, the base load and net photovoltaic output are 106.5kW, the voltage drop suppression coefficient is 1, and the upper limit of the real-time allocable charging power of the transformer area after derating correction is 477kW. The actual aggregate charging power of the sample group of this invention is 420kW, the total transformer load rate is 87.97%, and the critical vehicle energy replenishment target achievement rate is 98.2%. After applying a load step, the effective value of the bus sampling voltage drops to 371.2V, the base load and net photovoltaic output increase to 168.4kW, the voltage drop suppression coefficient remains at 1, and after correction, the upper limit of the real-time allocable charging power of the transformer area and the actual aggregate charging power are both 415.1kW, the total transformer load rate is 97.49%, and the critical vehicle energy replenishment target achievement rate is 97.5%.
[0037] Under photovoltaic sudden disturbance conditions The photovoltaic output suddenly dropped from 38.7kW to 5.2kW, while the base load surged to 285.4kW. The corresponding base load and net photovoltaic output were 280.2kW. The effective value of the bus voltage dropped to 351.5V. The edge controller responded based on the measured bus voltage. Calculate the voltage sag suppression coefficient: This reduces the uncorrected real-time allocable charging power limit for the distribution area from 303.3kW to [a lower limit]. The actual aggregated charging power was then controlled to this value; the total transformer load was 431.85kW, the total load rate was 72.15%, the key vehicle energy replenishment target achievement rate was 96.1%, and the bus voltage subsequently rose to 358.2V.
[0038] Under the condition of no voltage suppression, control group 1 did not implement voltage drop suppression. The effective value of the bus sampling voltage in this group was 346.8V, the base load and net photovoltaic output were 280.2kW, the voltage drop suppression coefficient was recorded as 1, and the upper limit of the real-time allocable charging power in the corrected background area and the actual aggregated charging power were both 303.3kW. The total transformer load reached 583.5kW, the total load rate was 97.49%, the key vehicle energy replenishment target achievement rate was 94.8%, and the bus voltage continued to drop. Under the condition of centralized control hysteresis, control group 3 still operated according to the set fixed power curve. The effective value of the bus sampling voltage was 338.4V, the base load and net photovoltaic output were 280.2kW, the voltage drop suppression coefficient was recorded as 1, and the upper limit of the real-time allocable charging power in the corrected background area and the actual aggregated charging power were both recorded as 480kW. The transient load of the transformer reached 760.2kW, the total load rate was 127.02%, and the key vehicle energy replenishment target achievement rate was 91.2%.
[0039] In the oversensitive threshold boundary test, the out-of-range control group A set the preset voltage drop trigger threshold to 375V. Under the conditions of a bus sampling voltage effective value of 351.5V, a base load and a net photovoltaic output of 280.2kW, the voltage drop suppression coefficient was 0.29. The upper limit of the real-time allocable charging power in the corrected background area and the actual aggregated charging power were both 87.96kW, the total transformer load rate was 61.51%, and the key vehicle energy replenishment target achievement rate was 81.5%. In the undersensitive threshold boundary test, the out-of-range control group B set the preset voltage drop threshold to 375V. The voltage drop trigger threshold is set to 340V. When the effective value of the bus sampling voltage is 345V, the base load and the net output of photovoltaic power are still 280.2kW, the voltage drop suppression coefficient remains at 1. The upper limit of the real-time allocable charging power in the corrected background area and the actual aggregated charging power are both 303.3kW. The total load rate of the transformer is 97.49%, and the key vehicle energy replenishment target achievement rate is 93.6%. This group did not start derating when the bus voltage dropped to 345V. The sample group of this invention performs segmented derating according to the voltage threshold range formed by 361V and 342V.
[0040] Under multi-vehicle concurrent arbitration conditions, the effective value of the bus sampling voltage is 378.5V, the base load and net photovoltaic output are 106.5kW, the voltage drop suppression coefficient is 1, and the upper limit of the real-time allocable charging power in the corrected background area is 477kW. Three electric vehicles with different charging needs were connected at the same time. The present invention's sample group calculated the charging urgency index based on the state of charge difference, the rated capacity of the power battery, the maximum physical output power of a single charging pile, and the remaining charging time. The initial power allocation for vehicle 1 reached 322.17kW, which was cut off after exceeding the maximum physical output power of a single charging pile of 120kW, releasing 202.17kW of residual power. The residual power was then redistributed according to the charging urgency index ratio of the unsaturated electric vehicles. After vehicle 2 reached the maximum physical output power of a single charging pile of 180kW, another 84.14kW of residual power was released. The remaining residual power was further allocated to vehicle 3, enabling vehicle 3 to reach an output power of 120kW. The actual aggregated charging power of the entire station was 420kW, the total transformer load rate was 87.97%, and the state of charge of vehicle 1 when leaving the station was 0.798, close to the target value of 0.8. The key vehicle charging target achievement rate was 97.8%.
[0041] Under the static equal distribution comparison condition, the control sample group 2, with the same bus sampling voltage effective value of 378.5V, base load and photovoltaic net output of 106.5kW and voltage drop suppression coefficient of 1, corrected the real-time allocable charging power limit of the background area to 477kW; after adopting the single pile static equal distribution method, the actual aggregated charging power is 360kW, the total transformer load rate is 77.94%, the vehicle 1 with a remaining charging time of 0.75h has an off-site charge status of 0.612, the key vehicle energy replenishment target achievement rate is 71.4%, and there is 60kW of idle capacity in the transformer area.
[0042] Under the condition of communication interruption as a backup, the communication interruption lasts for 75 seconds; When the interruption duration exceeds the preset communication timeout threshold of 60 seconds, the edge controller switches to offline safety protection mode and replaces the day-ahead power scheduling envelope value with the offline baseline power. At this time, the effective value of the bus sampling voltage is 376.4V, the base load and net photovoltaic output are 125kW, and the voltage drop suppression coefficient is 1. The real-time allocable charging power limit and the actual aggregated charging power in the corrected background area are both taken from the offline guaranteed baseline power. The total transformer load rate is 70.89%, the key vehicle energy replenishment target achievement rate is 95.4%, and after communication is restored, the edge controller resends the time-series load integral message recorded during offline operation, which is used by the cloud server to calibrate the scheduling baseline for the next rolling cycle.
[0043] In the above records, the cloud server provides the day-ahead power scheduling envelope value on a long-term basis, and the edge controller makes short-term adjustments based on the bus voltage and the upper limit of the real-time allocable charging power in the distribution area. Under load disturbances, it limits transformer overload and further decreases in bus voltage. When multiple vehicles are running concurrently, the weighted average of the charging urgency index and the secondary redistribution of residual power reduce the idle available power distribution capacity and meet the energy replenishment needs of different vehicles.
[0044] Example 3: In the intelligent charging station of the low-voltage distribution transformer area in the industrial park, the rated capacity of the distribution transformer is 630.0 kVA, and the rated power factor is calibrated as follows: The corresponding maximum allowable active power The nominal line voltage of the three-phase busbar on the low-voltage side is 598.5kW. The voltage is 380.0V, and the cloud server deployment takes 15 minutes. A rolling planning step size is used for the scheduling model, covering 16 scheduling periods over the next 4 hours; a charging station edge controller with a sampling control cycle of 1 second is configured between the output end of the distribution transformer and the charging terminal in the station; and a safety margin is reserved on the grid side. Set local dynamic safety margin at the station edge. It is used to mitigate the power surge caused by second-level disturbances in distributed photovoltaic output and basic power load.
[0045] During the construction of the day-ahead power scheduling envelope sequence in the cloud, the cloud server obtains the future scheduling periods for the target distribution area. Daily base load forecast Forecast values of distributed photovoltaic power output and time-of-use electricity pricing coefficient Establish a quadratic programming objective function and a load fluctuation penalty coefficient. Used to balance electricity costs and peak-valley load differences in the transformer area, when When the value is below 0.01, the optimization results are excessively biased towards periods with low electricity prices, leading to secondary load spikes in the distribution area; when... When the value is higher than 0.20, the optimization result responds less to the electricity price guidance signal, and the charging economy decreases. In this embodiment... The calibration value is 0.05, which is the baseline value of the equivalent average load for the entire day in the transformer area. Based on the historical net load data of 96 time periods within the preceding 24-hour sliding window, a real-time weighted average update is performed to calculate the result. The output thus includes the day-ahead power scheduling envelope value for the current scheduling period. The power sequences for 16 time periods, including the charging station edge controller, were analyzed and distributed. The range of the load fluctuation penalty coefficient was determined through multi-objective Pareto front sensitivity analysis of historical operating data. In the test sample, when the coefficient was 0.005 or lower than 0.01, the charging load calculated by the model was concentrated in the off-peak period, and the peak load in the off-peak period reached 98.6% of the rated capacity. When the coefficient was 0.25 or higher than 0.20, the variance penalty term of the load curve accounted for more than 80% of the total objective weight, and the charging period could not respond to the time-of-use pricing signal, increasing the total electricity purchase cost by 18.4%. When the coefficient was 0.05 in the range of 0.01 to 0.20, the peak-valley difference smoothing rate of the comprehensive load of the distribution area reached 36.5%, and the comprehensive electricity cost of charging reached the preset optimization target.
[0046] The charging station edge controller collects real-time base load power of the charging area. Real-time output power of distributed photovoltaic power and the effective value of the three-phase bus line voltage on the low-voltage side of the distribution transformer. The uncorrected real-time allocable charging power limit for the transformer area is calculated using the following formula: To suppress bus voltage dips, 95% of the nominal bus voltage (361.0V) is defined as the first preset percentage threshold and used as the preset voltage dip trigger threshold; 90% of the nominal bus voltage (342.0V) is defined as the second preset percentage threshold, and when... At that time, voltage sag suppression coefficient ;when hour, ;when hour, The adjusted maximum real-time allocatable charging power for the distribution area is: The voltage drop suppression coefficient in the range of 361.0V to 342.0V decreases linearly with a slope of 0.0526 per volt. The equivalent resistance of the feeder in the low-voltage distribution network is usually greater than the equivalent reactance. The bus voltage drop is mainly affected by the voltage drop caused by the active power of the line on the feeder resistance. When the bus voltage drops due to the concurrent charging load of multiple vehicles, reducing the active charging power of the charging pile can reduce the current and active voltage drop in the winding of the distribution transformer and the outgoing feeder, so that the bus voltage can recover within the millisecond electrical response scale.
[0047] The charging station edge controller will display the day-ahead power scheduling envelope value for the current time period. Compared with the adjusted real-time allocable charging power limit for the substation area Take the minimum value to determine the total charging power command at the station level. For devices that are connected and charging within the station Taiwanese electric vehicles, each vehicle numbered as follows: The charging station edge controller collects the rated capacity of the vehicle's power battery. Current state of charge Desired target state of charge Maximum physical output power of a single pile and remaining charging time Configure anti-singularity time constant The charging urgency index for each vehicle is calculated as follows: The initial power allocation for each vehicle is calculated according to its weight. Subsequently, the maximum physical output power of a single pile is truncated and the residual power is redistributed twice. At that time, lock the output power. And calculate the released residual power. The total residual power released from the entire station will be iteratively allocated to all unsaturated electric vehicles that have not reached the maximum physical output power of a single charging pile, according to their respective charging urgency indicators, until the actual aggregate charging power of the entire station reaches [the required level]. All of them can reach the corresponding maximum physical output power of a single charging pile when connected to electric vehicles.
[0048] The charging station edge controller counts the actual aggregated charging power in each 1-second control cycle. Compared with the day-ahead power dispatch envelope value of the current period absolute tracking deviation Preset tolerance threshold ,when When the integral accumulator is activated, the integral accumulator is started; when the integral deviation reaches the set trigger threshold. At that time, an asynchronous status feedback message containing the actual load dispersion of the transformer area and the bus voltage fluctuation characteristics is generated and uploaded to the cloud server. After receiving and parsing the asynchronous status feedback message, the cloud server extracts the actual load dispersion of the transformer area, divides it by the duration of the corresponding trigger period, converts it into the average load deviation power, and then uses a first-order exponential smoothing filter to progressively accumulate and correct the basic load forecast values for the first four scheduling periods in the next rolling planning window. The correction weight decreases progressively by 0.8 as the forecast period progresses. At the same time, the bus voltage fluctuation characteristics are analyzed. When the effective value of the bus voltage drops by more than 5% of the nominal line voltage, the grid reserved safety margin within the rigid power upper limit constraint is increased from 20kW to 35kW in the quadratic planning model of the next rolling planning cycle, tightening the upper limit of the power search, and generating a corrected day-ahead power scheduling envelope sequence.
[0049] When the wide area network communication interruption between the charging station edge controller and the cloud server lasts for more than the preset communication timeout threshold of 60 seconds, the charging station edge controller switches to offline safety protection mode and replaces the daytime power scheduling envelope value with the offline minimum baseline power calculated at a ratio of 0.50. During offline operation, a 1-second sampling control cycle is maintained to continuously collect the real-time base load power of the distribution transformer low-voltage side and the real-time output power of distributed photovoltaics. The uncorrected real-time allocable charging power upper limit of the distribution area is dynamically calculated and derating is applied using the voltage drop suppression coefficient. Subsequently, the offline minimum reference power and the derating-corrected real-time allocable charging power upper limit of the distribution area are minimized again to establish the station-level total charging power command. When the real-time base load power of the distribution area increases, causing the derating-corrected real-time allocable charging power upper limit of the distribution area to be lower than the offline minimum reference power, the power allocation of multiple vehicles is performed according to the lower real-time allocable charging power upper limit of the distribution area. After communication is restored, the charging station edge controller resends the time-series load integration message recorded during offline operation to recalibrate the equivalent average load reference value of the distribution area throughout the day.
[0050] During control time Basic power load of the transformer area Distributed photovoltaic output power The bus sampling voltage dropped to The uncorrected maximum real-time allocable charging power for a distribution area is... The voltage sag suppression coefficient is calculated based on the piecewise function. The real-time allocatable charging power limit for the substation after the derating correction The total charging power command at the station level is .
[0051] Three electric vehicles are connected to the station. Vehicle 1 has a power requirement of 30.0 kWh and a remaining charging time. Maximum physical output power of a single pile Vehicle 2 requires 32.0 kWh of electricity and has remaining charging time. Maximum physical output power of a single pile Vehicle 3 requires 10.0 kWh of electricity and has remaining charging time. Maximum physical output power of a single pile The calculated charging urgency indices for the three vehicles are as follows: , , The total urgency level was 0.493475, corresponding to initial power allocations of 102.42kW, 36.42kW, and 12.81kW respectively. Since the initial power allocations for the three vehicles did not exceed their respective maximum physical output power of a single charging pile, each charging terminal issued 102.42kW, 36.42kW, and 12.81kW respectively. The actual aggregated charging power converged to 151.65kW, the total transformer load was limited to 431.85kW, the load rate was 72.15%, and the bus voltage did not continue to decrease.
[0052] During the above operation, the cloud server corrects the basic load forecast benchmark and scheduling constraint boundary for the next rolling planning cycle based on asynchronous status feedback messages. The charging station edge controller performs second-level power adjustment based on the bus voltage and the real-time power supply status of the transformer area. When multiple vehicles are connected, the initial allocation is performed according to the charging urgency index, and the residual power released after the maximum physical output power of a single pile is truncated is redistributed. If the communication interruption exceeds the preset communication timeout threshold, the offline minimum benchmark power continues to participate in local power arbitration, thereby realizing the coordinated connection between the day-ahead scheduling instructions, the station's real-time power limit, and the power allocation of multiple vehicles.
[0053] Example 4: This example combines Figures 1 to 2 This paper explains the dynamic management method of charging strategy based on edge-cloud collaboration, such as... Figure 1 As shown, in step S1, the cloud server obtains the day-ahead load forecast data, distributed power output forecast data, time-of-use price vector, and rated active power capacity constraints of the distribution transformer for the target distribution area, solves and generates the day-ahead power scheduling envelope sequence, and sends it to the charging station edge controller; in step S2, the charging station edge controller collects the effective value of the three-phase bus line voltage on the low-voltage side of the distribution transformer, the real-time base load power of the distribution area, the real-time output power of the distributed power source, and the status parameters of each connected electric vehicle, calculates the upper limit of the real-time allocable charging power of the distribution area, and calculates the voltage drop suppression coefficient to derating the upper limit of the real-time allocable charging power of the distribution area when the effective value of the three-phase bus line voltage is lower than the preset voltage drop trigger threshold; in step S3, the charging station edge controller extracts the day-ahead power scheduling envelope sequence for the current time period. The system calculates the charging urgency index based on the state of charge difference of each connected electric vehicle, the rated capacity of the power battery, the maximum physical output power of a single charging pile, and the remaining charging time. It then initially assigns the station-level total charging power command based on the charging urgency index. After the maximum physical output power of a single charging pile is truncated, the released residual power is redistributed to the unsaturated electric vehicle tiers, driving each charging terminal to adjust its output power. In step S4, when the absolute tracking deviation between the actual aggregated charging power of each charging terminal and the state of charge of the day-ahead power scheduling envelope value exceeds a preset tolerance threshold, the charging station edge controller generates an asynchronous status feedback message and reports it to the cloud server to correct the state-ahead power scheduling envelope sequence for the next rolling cycle.
[0054] like Figure 2As shown, the cloud server generates the day-ahead power scheduling envelope sequence and inputs it to the charging station edge controller. The distribution transformer outputs its rated active capacity, the real-time base load of the distribution area outputs its real-time base load power, and the distributed power source outputs its real-time output power to the upper limit of the real-time allocable charging power of the distribution area. The upper limit of the real-time allocable charging power of the distribution area is transmitted to the charging station edge controller, and the station-level total charging power command is established. The three-phase bus on the low-voltage side transmits the effective value of the three-phase bus line voltage to the voltage drop suppression coefficient. The voltage drop suppression coefficient is input to the charging station edge controller and derating correction is implemented. The charging station edge controller generates a charging urgency index based on the initial station-level total charging power command. The charging urgency index is applied to each connected electric vehicle through the residual power cascade secondary redistribution. Each connected electric vehicle feeds back its status parameters to the charging station edge controller. The charging station edge controller reports asynchronous status feedback messages to the cloud server.
[0055] Example 5: After deploying the charging station edge controller at the distribution transformer area, baseline calibration of the transformer area's electrical parameters is performed before scheduling operation to accommodate differences in feeder impedance and sudden changes in distributed power output between different transformer areas. The measurement and control unit collects the low-voltage three-phase bus voltage response curves under no-load and load step conditions, respectively. The equivalent internal impedance of the transformer area is determined based on the ratio of the bus voltage drop to the load current increment. When the measured equivalent internal impedance is between 0.02 and 0.05... When the interval is reached, the local dynamic safety margin will be used. The rated power is 15kW, but the equivalent internal impedance exceeds 0.05 kW. At the same time, the local dynamic safety margin is increased to 20kW to suppress power disturbances caused by line impedance voltage drop. Simultaneously, 95% of the nominal bus line voltage of 380V (361V) is set as the preset voltage drop trigger threshold, and 90% of the nominal bus line voltage (342V) is set as the low-voltage cutoff boundary. Based on this, the voltage drop suppression coefficient is determined. To determine the piecewise linear response boundary, during the measurement of the equivalent internal impedance of the transformer area, the measurement and control unit first records the three-phase reference voltage under the no-load state of the system, and then controls the test load to generate a pure resistive step current increment of 50A and maintain it for 3s, while simultaneously acquiring the transient waveform of the three-phase voltage drop; then, the mean value of the effective value drop of the three-phase voltage is extracted, and this mean value is divided by the arithmetic sum of the three-phase fundamental active current increments, and then multiplied by the measured power factor to perform phase decoupling, thereby calculating the pure resistive component of the equivalent internal impedance of the transformer area, and calibrating the local dynamic safety margin accordingly.
[0056] After the charging terminal establishes a communication connection with the electric vehicle's power battery management system, the charging station edge controller acquires the battery status parameters that have been anonymized and desensitized during the vehicle access phase, filters out the identification data, and calibrates the anti-singularity time constant based on the maximum physical output power of a single charging pile and the continuous adjustment step size. During the power closed-loop tracking process, a preset tolerance threshold is set at 5% of the rated active power capacity of the distribution transformer, which is 598.5kW. The calibrated power is 30kW, and the trigger threshold will be set. The power consumption is set to 15 kWh. When the absolute tracking deviation continuously exceeds the preset tolerance threshold and its integral reaches 15 kWh, the charging station edge controller generates an asynchronous status feedback message and reports it to the cloud server. When the communication link between the charging station edge controller and the cloud server is interrupted for more than 60 seconds, it automatically switches to the offline safety protection mode and replaces the day-ahead power scheduling envelope value with the offline minimum reference power calculated at a ratio of 0.5. It maintains closed-loop autonomous operation of the distribution transformer locally to prevent overloading.
[0057] Example 6: Under long-term continuous operation of the intelligent charging station in the low-voltage distribution transformer area of the industrial park, the rated capacity of the distribution transformer is calibrated as 630.0 kVA, and the rated power factor is calibrated as follows: The corresponding rated active capacity of the distribution transformer The nominal line voltage of the three-phase busbar on the low-voltage side is 598.5kW. Set to 380.0V, cloud server deployment takes 15 minutes. A secondary planning model with rolling planning step size covering 16 scheduling periods over the next 4 hours is used; a charging station edge controller with a sampling control cycle of 1 second is deployed between the output end of the distribution transformer and the charging terminal in the station; and a safety margin is reserved on the grid side. Set local dynamic safety margin at the station edge. When high ambient temperature and continuous heavy load on the transformer cause a temperature rise in the windings, the monitoring and control unit collects the top oil temperature and winding measuring point temperature of the transformer, and reduces the upper limit of the allowable active power for thermal protection to 540.0kW based on the thermal balance relationship. This upper limit of the allowable active power for thermal protection is used for equipment protection verification under high temperature operating conditions and does not replace the rated active power capacity of the distribution transformer. The system participates in calculating the upper limit of the real-time allocable charging power in the charging area. Simultaneously, the charging station edge controller uses a sliding window filter to extract the fundamental effective value to address high-frequency harmonic interference from the bus voltage. When the effective value of the bus voltage is below 361.0V, the voltage drop suppression coefficient is adjusted based on the segmented intervals determined by 95% of the nominal line voltage (361.0V) and 90% of the nominal line voltage (342.0V). .
[0058] During thermal protection, the normal upper limit of the transformer top oil temperature is set to 85℃, and the normal upper limit of the winding measuring point temperature is set to 95℃. When the top oil temperature is between 85℃ and 95℃, or the winding temperature is between 95℃ and 105℃, the monitoring and control unit determines that the transformer has entered a slightly overheated state. It performs linear derating at a rate of 5.85kW lower for every 1℃ increase in top oil temperature. When the top oil temperature reaches 95℃ and the winding temperature reaches 105℃, the maximum allowable active power of the equipment's thermal protection is reduced to 540.0kW. If the temperature continues to exceed the above upper limit, severe thermal protection is triggered, and the power is further reduced by 10kW for every 1℃ increase to limit the transformer's active load under high temperature conditions.
[0059] During control time Real-time base load power of the transformer area Real-time output power of distributed photovoltaic power Effective value of the three-phase bus line voltage after filtering The charging station edge controller calculates the uncorrected upper limit of the real-time allocable charging power for the distribution station based on the rated active power capacity of the distribution transformer, the local dynamic safety margin, the real-time base load power of the distribution area, and the real-time output power of the distributed photovoltaic system. Under the same high-temperature operating conditions, when checking the thermal protection side using the upper limit of the allowable active power for equipment thermal protection of 540.0kW, the corresponding available power margin is: The 330.0kW is only used to verify whether the current operating point meets the equipment's thermal protection boundary and does not replace it. The calculation results.
[0060] The voltage sag suppression coefficient is calculated based on the bus voltage. Therefore, the upper limit of the real-time allocable charging power for the substation after the derating correction is obtained: The charging station edge controller will use the day-ahead power scheduling envelope value for the current time period. Taking the minimum value, the total charging power command at the station level is set at 271.95kW. When performing synchronous verification based on the upper limit of the allowable active power for equipment thermal protection of 540.0kW, the available power margin on the thermal protection side of 330.0kW is converted to 231.0kW by a voltage drop suppression coefficient of 0.70, which is used to characterize the additional thermal protection boundary under this high temperature condition.
[0061] Three electric vehicles are connected to the charging station. Vehicle 1 has a rated battery capacity of 60.0 kWh, a current state of charge (SOC) of 0.30, a desired SOC of 0.80, and a remaining charging time of 0.75 hours. Its maximum physical output power per charging pile is 120.0 kW. Vehicle 2 has a rated battery capacity of 80.0 kWh, a current SOC of 0.50, a desired SOC of 0.90, and a remaining charging time of 1.50 hours. Its maximum physical output power per charging pile is 180.0 kW. Vehicle 3 has a rated battery capacity of 50.0 kWh, a current SOC of 0.70, a desired SOC of 0.90, and a remaining charging time of 2.00 hours. Its maximum physical output power per charging pile is 120.0 kW. (Substituting the anti-singularity time constant...) Afterwards, the charging urgency indicators for the three electric vehicles were as follows: , and The total urgency level is 0.493475.
[0062] Based on the charging urgency index, the initial allocation of the station-level total charging power command of 271.95kW was performed. The initial allocated power for vehicles 1, 2, and 3 was 183.68kW, 65.31kW, and 22.96kW, respectively. The initial allocated power for vehicle 1 exceeded the maximum physical output power of 120.0kW for a single charging pile; therefore, its output power was truncated and locked at 120.0kW, and 63.68kW of residual power was released. Vehicles 2 and 3 constituted an unsaturated electric vehicle group. The 63.68kW residual power was then re-allocated according to the ratio of the charging urgency index between the two vehicles. Vehicle 2 received 47.11kW of residual power, updating its output power to 112.42kW, while vehicle 3 received 16.5kW. With a residual power of 7kW, the output power was updated to 39.53kW. Neither vehicle's updated power reached the corresponding maximum physical output power of a single charging pile. The actual aggregated charging power of the entire station converged to 271.95kW. When the original high-temperature thermal protection side used 231.0kW as the verification power, the corresponding initial allocation values were 156.02kW, 55.48kW, and 19.50kW. After vehicle 1 was cut off to 120.0kW, it released 36.02kW of residual power. Among them, vehicle 2 obtained 26.65kW, updated to 82.13kW, and vehicle 3 obtained 9.37kW, updated to 28.87kW. This set of values was used to verify the power allocation boundary under the upper limit of the allowable active power of the 540.0kW equipment thermal protection.
[0063] When the actual aggregated charging power of the entire station is 271.95kW and the day-ahead power scheduling envelope value of 480.0kW is tracked for the current period, the absolute tracking deviation is 208.05kW. When this absolute tracking deviation continues to exceed the preset tolerance threshold and the integral amount reaches the set trigger threshold of 15.0kWh, the charging station edge controller generates an asynchronous status feedback message and uploads it to the cloud server. The cloud server then corrects the basic load forecast benchmark and scheduling constraint boundary in the next rolling planning cycle.
[0064] When the communication link between the charging station edge controller and the cloud server is interrupted for a duration exceeding the preset communication timeout threshold of 60 seconds, the charging station edge controller switches to offline safety protection mode and replaces the day-ahead power dispatch envelope value with the offline baseline power calculated based on the rated active capacity of the distribution transformer of 598.5kW at a ratio of 0.50. When performing protection verification at a high temperature using the upper limit of the allowable active power for equipment thermal protection of 540.0kW, its 0.50 ratio corresponds to 270.0kW. This value is used as the equipment thermal condition verification value and does not replace the offline baseline power. During offline operation, the charging station edge controller continues to maintain closed-loop autonomous operation under the constraints of transformer overload and bus voltage support, based on the real-time base load power of the transformer area, the real-time output power of distributed photovoltaics, and the effective value of the three-phase bus voltage.
[0065] After communication is restored, the charging station edge controller resends the time-series load integral message recorded during offline operation to the cloud server. The cloud server parses the message to obtain the actual power consumption of each 15-minute scheduling period during offline operation and accumulates it to obtain the offline cumulative power consumption. Then, it updates the corresponding prediction data in the historical database with the actual power consumption of each period, recalculates the arithmetic mean of net load within a sliding window of 96 scheduling periods in the past 24 hours, and updates the equivalent average load benchmark value of the entire day for the distribution area. At the same time, the cloud server uses the real-time charge state of each connected electric vehicle at the time of communication restoration as the initial state of the quadratic programming model, and performs a hot start solution with the optimal solution before the communication interruption as the initial value to redetermine the day-ahead power scheduling envelope sequence for subsequent scheduling periods, thereby completing the day-ahead optimization state calibration of the power grid for the next rolling planning cycle.
[0066] The embodiments of this application have been described above with reference to the accompanying drawings. Unless otherwise specified, the embodiments and features in the embodiments of this application can be combined with each other. This application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of this application without departing from the spirit of this application and the scope of protection of this invention, and all of these forms are within the protection scope of this application.
Claims
1. A dynamic management method for charging strategies based on edge-cloud collaboration, characterized in that, Includes the following steps: Step S1: The cloud server obtains the day-ahead load forecast data, distributed power output forecast data, time-of-use electricity price vector and rated active capacity constraints of the distribution transformer for the target distribution area, solves and generates the day-ahead power scheduling envelope sequence and sends it to the charging station edge controller. In step S2, the charging station edge controller collects the effective value of the three-phase bus line voltage on the low-voltage side of the distribution transformer, the real-time base load power of the distribution area, the real-time output power of the distributed power source, and the status parameters of each connected electric vehicle, and calculates the upper limit of the real-time allocable charging power of the distribution area; when the effective value of the three-phase bus line voltage is lower than the preset voltage drop trigger threshold, the voltage drop suppression coefficient is calculated to reduce the upper limit of the real-time allocable charging power of the distribution area. Step S3: The charging station edge controller extracts the day-ahead power scheduling envelope value of the day-ahead power scheduling envelope sequence in the current time period, and takes the minimum value of the day-ahead power scheduling envelope value and the upper limit of the real-time allocable charging power of the substation after derating correction to establish the station-level total charging power command; calculates the charging urgency index based on the state of charge difference of each connected electric vehicle, the rated capacity of the power battery, the maximum physical output power of a single pile and the remaining charging time; initially assigns the station-level total charging power command based on the charging urgency index, and after the maximum physical output power of a single pile is truncated, redistributes the released residual power to the unsaturated electric vehicle tier for a second time, driving each charging terminal to adjust its output power; In step S4, when the absolute tracking deviation between the actual aggregated charging power of each charging terminal and the day-ahead power scheduling envelope value exceeds the preset tolerance threshold, the charging station edge controller generates an asynchronous status feedback message and reports it to the cloud server to correct the day-ahead power scheduling envelope sequence for the next rolling cycle.
2. The dynamic management method for charging strategy based on edge-cloud collaboration according to claim 1, characterized in that, In step S1, the solution window for the day-ahead power dispatch envelope sequence is set to the next 4 hours, the dispatch period is divided into 16 periods, and the rolling planning step size is set to 15 minutes. The cloud server constructs a quadratic programming model with the optimization objective of smoothing the peak-valley difference of the comprehensive load in the distribution area and reducing the total operating cost. The algebraic sum of the rated active power capacity of the distribution transformer, the day-ahead load forecast data, the distributed power output forecast data, and the grid reserved safety margin is used as a rigid power upper limit constraint to solve and output the reference charging power envelope value corresponding to each dispatch period.
3. The dynamic management method for charging strategy based on edge-cloud collaboration according to claim 1, characterized in that, In step S2, calculating the upper limit of the real-time allocable charging power of the distribution area includes the following steps: Step S21, obtain the rated active capacity of the distribution transformer, subtract the real-time collected base load power of the distribution area and the preset local dynamic safety margin, and accumulate the real-time output power of the distributed power source to calculate the uncorrected upper limit of the real-time allocable charging power of the distribution area; wherein, the local dynamic safety margin is used to smooth the transient power fluctuation of the distributed power source within the second-level sampling period.
4. The dynamic management method for charging strategy based on edge-cloud collaboration according to claim 1, characterized in that, In step S2, when the effective value of the three-phase bus line voltage is lower than the preset voltage drop trigger threshold, the voltage drop suppression coefficient is calculated to derating the upper limit of the real-time allocable charging power of the distribution area. This includes the following steps: Step S22, the nominal line voltage of the low-voltage three-phase bus is set to 380.0V; when the effective value of the collected three-phase bus line voltage is in the range of 361.0V to 380.0V, the voltage drop suppression coefficient is set to 1.0; when the effective value of the three-phase bus line voltage is in the range of 342.0V to 361.0V, the voltage drop suppression coefficient is calculated by linearly decreasing the drop amplitude of the effective value of the three-phase bus line voltage from 361.0V; when the effective value of the three-phase bus line voltage is lower than 342.0V, the voltage drop suppression coefficient is set to 0.0; the calculated voltage drop suppression coefficient is multiplied by the uncorrected upper limit of the real-time allocable charging power of the distribution area, and the derating-corrected upper limit of the real-time allocable charging power of the distribution area is output.
5. The dynamic management method for charging strategy based on edge-cloud collaboration according to claim 1, characterized in that, In step S3, the initial allocation of the station-level total charging power instruction based on the charging urgency index includes the following steps: Step S31, summing the charging urgency indices of all connected electric vehicles in the station to obtain the total urgency; calculating the proportion of the charging urgency index of each connected electric vehicle to the total urgency as the initial allocation weight of the corresponding vehicle; multiplying the initial allocation weight by the station-level total charging power instruction to obtain the initial allocation power of each connected electric vehicle.
6. The dynamic management method for charging strategy based on edge-cloud collaboration according to claim 1, characterized in that, In step S3, the secondary redistribution of the released residual power to the unsaturated electric vehicle cascade after the maximum physical output power of a single charging pile is cut off includes the following steps: Step S32, compare the initial allocated power of each connected electric vehicle with the corresponding maximum physical output power of a single charging pile; for electric vehicles whose initial allocated power exceeds the corresponding maximum physical output power of a single charging pile, cut off and lock their output power to the maximum physical output power of the single charging pile, and accumulate the excess to form the total residual power; divide the electric vehicles whose initial allocated power does not reach the maximum physical output power of a single charging pile into an unsaturated electric vehicle set, and redistribute the total residual power a second time according to the charging urgency index ratio of each electric vehicle in the unsaturated electric vehicle set; when a new saturated electric vehicle is generated in the secondary redistribution, continue to iteratively redistribute the overflowing residual power to the remaining unsaturated electric vehicles until the actual aggregated charging power of each charging terminal in the station converges to the station-level total charging power command, or all connected electric vehicles reach the corresponding maximum physical output power of a single charging pile.
7. The dynamic management method for charging strategy based on edge-cloud collaboration according to claim 1, characterized in that, In step S4, generating an asynchronous status feedback message and reporting it to the cloud server includes the following steps: Step S41, in each control cycle, the absolute power difference between the actual aggregated charging power of each charging terminal at the station and the day-ahead power scheduling envelope value of the current time period is statistically analyzed; when the integral amount of the absolute power difference exceeds the preset tolerance threshold and reaches the set trigger threshold, an asynchronous status feedback message containing the actual load dispersion of the transformer area and the bus voltage fluctuation characteristics is generated and uploaded to the cloud server; the cloud server parses the asynchronous status feedback message and corrects the basic load forecast benchmark and scheduling constraint boundary in the quadratic planning model of the next rolling planning cycle.
8. The dynamic management method for charging strategy based on edge-cloud collaboration according to claim 1, characterized in that, The method also includes an offline autonomous protection step: when the communication link between the charging station edge controller and the cloud server is interrupted for a duration exceeding the preset communication timeout threshold of 60 seconds, the charging station edge controller automatically switches to offline safety protection mode. In offline safety protection mode, the day-ahead power dispatch envelope value is replaced with the offline baseline power calculated based on the rated active capacity of the distribution transformer at a ratio of 0.50, and closed-loop autonomous operation is maintained locally under the constraints of transformer overload and bus voltage support.
9. The dynamic management method for charging strategy based on edge-cloud collaboration according to claim 8, characterized in that, The method also includes a communication recovery calibration step: after the communication link is restored, the charging station edge controller resends the time-series load integration messages recorded during offline operation to the cloud server; The cloud server calculates the offline cumulative power consumption based on the time-series load integral message and recalibrates the equivalent average load benchmark value of the distribution area and the day-ahead optimization status of the power grid for the next rolling planning cycle.
Citation Information
Patent Citations
Intelligent charging station ordered charging optimization scheduling method based on cloud-side cooperation
CN118418822A