A load and energy storage collaborative operation method

By acquiring operational data from energy storage and flexible load circuits at the grid connection point, determining confidence information, selecting target excitation actions, and updating the operational plan, the problems of battery energy drift and flexible load response gaps are solved, achieving efficient coordinated operation of energy storage and load.

CN123144181APending Publication Date: 2026-11-20湖北国弘电力股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611419294.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-14
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In new power systems, the actual available energy and power of batteries drift with temperature and health status, causing energy storage operation plans to fail, and the response gap of flexible load adjustability is converted into assessment costs according to assessment rules, resulting in a waste of adjustability.

Method used

By acquiring operational data from the energy storage loop and the flexible load loop, confidence information on battery parameters and response parameters is determined, target excitation actions are selected, the confidence information is executed and updated, and the operation plan and energy storage regulation margin are adjusted, forming a closed loop in which the load and storage serve as each other's sources of observation and excitation.

Benefits of technology

This improves the feasibility of energy storage operation plans and the reliability of load adjustability, ensuring that the more comprehensive the observation, the more feasible the plan, the more accurate the margin, and the more credible the report, thus reducing resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144181A_ABST
    Figure CN123144181A_ABST
Patent Text Reader

Abstract

The application relates to the technical field of power system operation control, in particular to a load and energy storage collaborative operation method, which comprises the following steps: obtaining operation data of an energy storage loop and a flexible load loop under the same grid connection point, and determining first confidence information representing the reliability of battery parameters of the energy storage loop and second confidence information representing the reliability of response parameters of the flexible load loop based on the operation data; determining an information gap to be supplemented based on the first confidence information and the second confidence information; selecting a target excitation action from a candidate excitation action set; executing the target excitation action and collecting response data in the execution process; updating the first confidence information and the second confidence information based on the response data; and adjusting an operation plan of the energy storage loop and an energy storage regulation margin based on the updated first confidence information and the second confidence information. By using the above method, the executability of the energy storage operation plan and the reliability of the load adjustable capacity declaration can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power system operation and control technology, and in particular to a method for coordinated operation of load and energy storage. Background Technology

[0002] With the development of new power systems, distributed energy storage and flexible loads (such as HVAC clusters and movable production lines) are widely incorporated into power dispatch and demand response systems: energy storage circuits receive dispatch plans and execute charging and discharging, while flexible load circuits receive demand response invitations and adjust power consumption during event periods. Both typically operate at the same point of common coupling (PCC, i.e., the common connection point between the user-side power supply circuit and the power grid). The metered power at the PCC is the basis for the dispatching agency to assess performance.

[0003] Two problems exist in the above operating system: First, the actual available energy and power of the battery drift with temperature, health status and state of charge, and the energy storage capacity model used by the scheduling layer does not make online corrections, causing the energy storage operation plan to fail in actual execution; Second, the response gap of the load-side adjustable capacity will be converted into assessment fees according to the assessment rules. In order to avoid being penalized, the aggregation operator can only declare a large discount on the nominal adjustable capacity, resulting in a waste of adjustable capacity.

[0004] However, traditional techniques attribute the two problems to estimation error and prediction error, respectively, and try to mitigate them by using more sophisticated estimation algorithms or more conservative static reporting discounts, but the effect of the repair is limited. Summary of the Invention

[0005] Therefore, it is necessary to provide a method for coordinated operation of load and energy storage to address the aforementioned technical problems.

[0006] This application provides a method for coordinated operation of load and energy storage. The method includes: acquiring operational data of an energy storage circuit and a flexible load circuit under the same grid connection point, and based on the operational data, determining first confidence information characterizing the reliability of battery parameters of the energy storage circuit and second confidence information characterizing the reliability of response parameters of the flexible load circuit; determining the information gap to be supplemented based on the first and second confidence information; selecting a target incentive action from a set of candidate incentive actions; wherein each candidate incentive action in the set of candidate incentive actions is selected according to a unified ranking of the marginal information value and marginal compliance cost of each candidate incentive action for the information gap, and the execution of each candidate incentive action shares the flexible regulation resources corresponding to the flexible load circuit and the energy storage regulation margin corresponding to the energy storage circuit; executing the target incentive action and collecting response data during the execution process; updating the first and second confidence information based on the response data; and adjusting the operation plan of the energy storage circuit and the energy storage regulation margin based on the updated first and second confidence information.

[0007] The technical advantages of this application are as follows: The aforementioned load and energy storage coordinated operation method, by simultaneously maintaining the first confidence information of the battery parameters of the energy storage circuit and the second confidence information of the response parameters of the flexible load circuit at the same grid connection point, and thereby locating information gaps, ensures that subsequent information supplementation is no longer blind; furthermore, by selecting target incentive actions from the candidate incentive action set according to a unified ranking of marginal information value and marginal compliance cost, the energy storage circuit and the flexible load circuit become each other's incentive sources, and since the execution of each candidate incentive action shares the same flexible regulation resource and the same energy storage regulation margin, the resources used for observation and Resources used for performance guarantee are allocated uniformly, and no candidate incentive action will repeatedly occupy resources already consumed by other actions. Finally, the response data collected from the execution target incentive actions are used to update the bilateral confidence information, and the updated confidence information is used to adjust the operation plan and energy storage adjustment margin. This ensures that the operation plan is based on the current real and reliable battery capacity, and that the energy storage adjustment margin is automatically released as the bilateral confidence information tightens. This forms a closed loop of "the more sufficient the observation, the more executable the plan, the more accurate the margin, and the more credible the declaration," which is conducive to simultaneously improving the executability of the energy storage operation plan and the credibility of the load adjustment capacity declaration. Attached Figure Description

[0008] Figure 1 This is a schematic diagram of the application environment of the load and energy storage coordinated operation method in one embodiment of this application; Figure 2 This is a flowchart illustrating a load and energy storage coordinated operation method in one embodiment of this application; Figure 3 This is a schematic diagram of a load and energy storage coordinated operation device in one embodiment of this application; Explanation of reference numerals in the attached figures: 101. Control equipment; 102. Energy storage circuit; 103. Flexible load circuit; 104. Dispatch / market platform; 105. Power grid; 106. Rigid load; 107. Grid connection point. Detailed Implementation

[0009] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0010] It should be noted that the terms "first," "second," etc., used in this application can be used to describe various elements, but these elements are not limited by these terms; these terms are only used to distinguish one element from another. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more. The term "and / or" used in this application refers to one of the embodiments, or any combination of multiple embodiments.

[0011] The load and energy storage coordinated operation method provided in this application embodiment can be applied to, for example... Figure 1The application environment shown includes control equipment 101, energy storage circuit 102, flexible load circuit 103, dispatch / market platform 104, power grid 105, rigid load 106, and grid connection point 107. Grid connection point 107 is the common connection point between the user-side power supply circuit and the power grid 105. A metering device is installed at grid connection point 107 to measure the power flowing into or out of the power grid 105. The power measured by the metering device is the power at the metering point, as referred to below. Energy storage circuit 102 refers to the electrical circuit containing the battery energy storage system. Energy storage circuit 102 includes a battery pack, a battery management system (BMS, which collects and protects the battery pack's voltage, current, and temperature data), and a power conversion system (PCS, which performs AC / DC conversion and power control between the battery pack and the AC power grid). Flexible load circuit 103 refers to an electrical circuit containing loads whose power consumption can be adjusted within a certain range. Flexible load circuit 103 includes flexible loads and load controllers. Flexible loads can be, for example, HVAC clusters, production line equipment that can be shifted between production periods, etc. The load controller is used to adjust the power consumption of the flexible loads according to received instructions. Rigid load 106 refers to loads whose power consumption does not participate in regulation. The control device 101 can communicate with the PCS and BMS in the energy storage circuit 102, the load controller in the flexible load circuit 103, the metering device at the grid connection point 107, and the dispatch / market platform 104 via a communication network, which can be a wired network or a wireless network. The control device 101 can be a local controller deployed in a park or site, an edge computing device, or a cloud server; this application does not impose any restrictions on this. In addition, a high-speed recording device (such as a fault recording device) can be installed at grid connection point 107 to synchronously record electrical quantities such as voltage and current of each circuit at the millisecond level. Its function will be explained in detail later.

[0012] In the aforementioned application environment, the dispatch / market platform 104 issues power plans, demand limits, demand response invitations (DR, a business mechanism whereby the dispatching agency requests users to adjust their power consumption and provides compensation during a specific period), and assessment rule parameters to the control equipment 101. The control equipment 101 issues charging and discharging plans to the energy storage circuit 102 and adjustment commands to the flexible load circuit 103, and collects power data at the metering point through the gate metering device at the grid connection point 107 to verify the execution status of the energy storage circuit 102 and the flexible load circuit 103. The assessment rule parameters include the assessment threshold ratio, penalty factor, clearing price, and performance reliability. The assessment threshold ratio refers to the threshold at which insufficient performance is judged when the actual response volume is lower than the promised response volume. The penalty factor is the amplification factor used when converting the response gap into assessment costs. The clearing price is the unit electricity price used by the market when converting the response gap into assessment costs. Performance reliability refers to the probability level that the declared volume required by the assessment rules is actually fulfilled.

[0013] In some embodiments, a method for coordinated operation of load and energy storage is provided, which is executed by a control device 101. In this embodiment, as... Figure 2 As shown, the method includes the following steps: Step S202: Obtain the operating data of the energy storage circuit and the flexible load circuit under the same grid connection point, and based on the operating data, determine the first confidence information characterizing the reliability of the battery parameters of the energy storage circuit and the second confidence information characterizing the reliability of the response parameters of the flexible load circuit.

[0014] The operational data refers to the collectable data reflecting the current operating status of the circuit. The operational data of the energy storage circuit 102 may include the PCS AC side power, battery pack terminal voltage, circuit current, multi-point temperature, and state of charge; the operational data of the flexible load circuit 103 may include circuit power, adjustment commands received by the load controller, indoor temperature, and outdoor temperature. All of the above operational data can be directly collected by existing equipment such as the PCS, BMS, load controller, and metering device, and the control device 101 can obtain it via a communication network. The feasible method for obtaining the millisecond-level high-speed waveform data required during the excitation process will be described in detail later.

[0015] Here, battery parameters refer to the parameters in the battery model of energy storage circuit 102 that drift during operation and affect the actual usable capacity of the battery. The battery model can be an equivalent circuit model with one polarization branch (Thevenin model) or a reduced-order electrochemical-thermal model. Taking the equivalent circuit model with one polarization branch as an example, battery parameters may include ohmic internal resistance. Polarization internal resistance Polarized capacitors With available capacity Taking a reduced-order electrochemical-thermal model as an example, battery parameters can include the solid-phase diffusion coefficient, reaction rate constant, solid electrolyte interphase (SEI, i.e., the passivation film formed on the surface of the battery negative electrode) film resistance, and lithium plating reference current (the critical charging current at which the lithium plating safety margin of the negative electrode drops to the safety threshold; its relationship with the lithium plating overpotential criterion will be explained in detail later). Initial values ​​of battery parameters can be obtained from factory parameters and historical BMS data.

[0016] The response parameters refer to the parameters in the response model of the flexible load loop 103 that describe the load's response characteristics to the adjustment command. The response model can be a convolutional model with pure time delay and rebound, and the response parameters may include the response gain. (That is, the ratio of the actual response quantity to the command adjustment quantity; in the response model with rebound, the response gain describes the instantaneous gain at the moment of command transition, and the net gain after the event enters steady state is the difference between the response gain and the rebound strength), pure time delay. (i.e., the time interval between the issuance of the command and the start of the response) and rebound strength (That is, the magnitude of the load power backflush after the event ends). The initial values ​​of the response parameters can be obtained from historical command-response data or static inventory.

[0017] Confidence information refers to the joint description of the current value of a parameter and its confidence level, specifically including the current estimated value and confidence range of the parameter. The confidence range refers to the interval containing the true value of the parameter with a preset probability; the wider the confidence range, the lower the confidence level of the parameter. The first confidence information is the current estimated value of the battery parameter and its confidence range, and the second confidence information is the current estimated value of the response parameter and its confidence range. Mathematically, the confidence range can be given by the posterior distribution of the parameter (i.e., the probability distribution of the parameter value under existing data conditions) or the posterior covariance (i.e., the matrix describing the dispersion of parameter estimation errors); the narrower the width of the posterior distribution, the narrower the confidence range. After acquiring the operating data, the control device 101 substitutes the operating data into the battery model and the response model, and uses a recursive estimation method to solve for the current estimated value and confidence range of the parameter. Recursive estimation methods can include Recursive Least Squares (RLS, which is an estimation method that makes incremental corrections to the parameter estimates with each new data point), Extended Kalman Filter (EKF, which is a method that recursively estimates the state and parameters after locally linearizing the nonlinear model), or Recursive Bayesian Update (a method that incorporates the information provided by new data into the posterior distribution of the parameters according to Bayesian rules). All of these methods are well-known estimation methods in the field.

[0018] Step S204: Based on the first confidence information and the second confidence information, determine the information gap to be supplemented by observation.

[0019] Information gaps refer to the set of parameters and their corresponding operating ranges for which current observational data is insufficient to make the parameters reliable. These gaps arise because parameters can only be retrieved from observational data when they cause changes in observables: if a change in a parameter causes almost no change in observables, then no matter how much operational data is accumulated, that parameter cannot be distinguished from the data. Therefore, the essence of this step is to identify "which parameters the observational data is insensitive to" and "which parameters still have excessively wide confidence ranges," thus providing direction for targeted supplementary observations in the next step. It is understandable that without this step's identification, subsequent stimulus actions will degenerate into blind perturbations, consuming regulatory resources without necessarily supplementing the missing information.

[0020] Step S206: Select the target stimulus action from the candidate stimulus action set.

[0021] In this context, an incentive action refers to a power disturbance process, either actively or passively introduced, to cause a distinguishable change in the observable quantity of the parameter to be identified. The candidate incentive action set refers to the collection of multiple candidate incentive actions currently available; the specific composition of these candidate incentive actions will be explained in detail later. The reason for setting multiple candidate incentive actions instead of a single fixed incentive method is that the feasibility and cost of each incentive method differ depending on the time period and assessment status: for example, the permitted incentive methods differ between low-load margin periods at night and non-assessment periods, and a single incentive method cannot be implemented compliantly throughout all time periods.

[0022] Marginal information value characterizes the expected tightening of the confidence range of the identified parameters corresponding to the information gap after the execution of a candidate incentive action, i.e., how much missing information the candidate incentive action is expected to supplement. Marginal compliance cost characterizes the expected performance penalties, demand exceedance risks, and comfort losses caused by the execution of a candidate incentive action, i.e., how much compliance cost the candidate incentive action is expected to incur. Unified ranking refers to converting the marginal information value and marginal compliance cost of each candidate incentive action to the same benchmark (e.g., converting them to monetary units; the monetization conversion method for information value will be explained in detail later) and then comparing them, ranking the candidate incentive actions according to the relative level of marginal information value to marginal compliance cost. Because the information benefits and compliance costs of each candidate incentive action are compared under the same benchmark, the ranking results have a unified dimensional basis, thus avoiding the problem of each incentive method acting independently and being incomparable.

[0023] It is important to note that the execution of each candidate incentive action shares the flexible regulation resources corresponding to the flexible load loop 103 and the energy storage regulation margin corresponding to the energy storage loop 102. Flexible regulation resources refer to the power capacity pool available for regulation in the flexible load loop 103 under the premise of meeting comfort or process constraints; energy storage regulation margin refers to the available energy and power corresponding to the allowable fluctuation range of the state of charge of the energy storage loop 102 (hereinafter referred to as the state of charge corridor), the determination method of which will be explained in detail later. "Shared" means that if any candidate incentive action requires the use of flexible load for shielding or requires the use of energy storage for backup, it will be allocated from the same flexible regulation resource pool and the same energy storage regulation margin. The portion already occupied by one candidate incentive action will no longer be available for other candidate incentive actions. The reason for emphasizing sharing is that without sharing, the same portion of flexible capacity may be repeatedly committed to shielding and planned modification purposes, and the same portion of energy storage may be repeatedly committed to backup and arbitrage purposes, thus leading to the collapse of the economic authenticity of the closed loop. It is understandable that the shared constraints create a real resource competition relationship among the candidate incentive actions, making unified ranking meaningful.

[0024] After completing the unified sorting, the control device 101 selects the candidate incentive action that is ranked best and can be executed in compliance with regulations as the target incentive action. If the candidate incentive action ranked best cannot be executed in compliance with regulations in the current time period (for example, the required shielding capacity is not available in the current assessment time period), the candidate incentive action ranked second best is selected in turn, so that each candidate incentive action can serve as a fallback for the others.

[0025] Step S208: Execute the target stimulus action and collect response data during the execution process.

[0026] The response data refers to the data collected during and before and after the execution of the target excitation action, which reflects the dynamic behavior of the excited object. This includes the PCS AC side power, battery pack terminal voltage, loop current, multi-point temperature, metering point power, and the loop power of the flexible load loop 103. The control device 101 sends a control sequence corresponding to the target excitation action to the energy storage loop 102 or the flexible load loop 103, and synchronously collects the electrical quantities of each loop at a millisecond sampling period. The millisecond sampling rate is higher than the minimum sampling rate required for the model's dynamics; its function is to fully capture the instantaneous voltage change at the moment of current jump. This instantaneous change contains information about the ohmic internal resistance in the battery parameters, the principle of which will be explained in detail later. It should be noted that the objects synchronously collected at the millisecond level are limited to electrical quantities such as voltage, current, and power; the time constant for temperature is... to For data acquisition at the second level, conventional slow sampling is sufficient; millisecond-level acquisition provides no informational benefit for temperature measurements. The engineering implementation for millisecond-level synchronous acquisition can be as follows: the PCS and BMS locally cache waveforms within a set window before and after the transition edge at a control-level sampling rate, then transmit the cached waveform segments back to the control device 101 via a communication network; and / or, a high-speed recording device located at the grid connection point 107 synchronously records the voltage and current of each circuit at the millisecond level and provides this data to the control device 101; multiple devices use a Precision Time Protocol (PTP) or similar timing mechanism to ensure sampling timestamp alignment. When using the data, the value window for the transition edge should avoid the inductance caused by the lead wires. For the spike and electromagnetic transient segment, the difference between the voltage plateau before and after the jump is taken as the instantaneous change in the terminal voltage.

[0027] Step S210: Update the first confidence information and the second confidence information based on the response data.

[0028] Specifically, control device 101 substitutes the response data into the battery model and the response model respectively, and uses the recursive estimation method in step S202 to update the current estimated values ​​and confidence ranges of the battery parameters and the response parameters. Since the response data is collected after the target excitation action is performed in response to the information gap, it contains records of observable changes caused by the parameters to be identified corresponding to the information gap. Therefore, this update can selectively tighten the confidence range of the parameters to be identified, rather than uniformly but inefficiently consuming data. The specific timing arrangement of the update (i.e., why the two-sided confidence information needs to be updated alternately rather than simultaneously) will be explained in detail later.

[0029] Step S212: Based on the updated first confidence information and second confidence information, adjust the operation plan of the energy storage loop and the energy storage regulation margin.

[0030] It is understandable that the update of confidence information must translate into adjustments at the operational level; otherwise, the closed loop stops at "knowing more accurately" without "taking any actual action." In this step, adjusting the operational plan means: reassessing the actual executable power and energy range of the energy storage loop 102 in the future based on the updated first confidence information, and correcting the time periods in the scheduling plan that exceed this range to fall within it. The missing portion is covered by the remaining capacity of the flexible regulation resources and the rescheduling of the energy storage loop 102's plan. The specific process will be explained in detail later. Adjusting the energy storage regulation margin means that: after the second confidence information tightens, the uncertainty range of the response gap of the flexible load loop 103 narrows accordingly, and the reserve energy required to cover the response gap decreases accordingly. The reserve portion of the energy storage regulation margin can then be released as dispatchable capacity. The specific process will be explained in detail later.

[0031] In the aforementioned load and energy storage coordinated operation method, the information gap guides the selection direction of the excitation action. The response data generated by the excitation action, in turn, updates the confidence information. The updated confidence information then tightens the energy storage adjustment margin and corrects the operation plan. The capacity released after tightening and the corrected plan change the feasibility space of the next round of excitation actions. This interconnected process forms a load-storage mutual inductance closed loop. In this closed loop, the energy storage loop 102 is both the actuator and the observation channel and catch-all for the flexible load loop 103. The flexible load loop 103 is both the controlled object and the excitation source of the energy storage loop 102. The two "unreliable" loops are each other's solutions.

[0032] In an optional embodiment, during a real response event, the control device 101 can also collect the compensation power trajectory generated by the energy storage loop 102 to compensate for the deviation between the actual response and the performance target of the flexible load loop 103, and use the compensation power trajectory as response data to update the first confidence information and the second confidence information, and tighten the energy storage regulation margin based on the updated second confidence information. Here, a real response event refers to the actual demand response performance or scheduling execution process; the performance target refers to the response power curve promised in the demand response invitation; and the compensation power trajectory refers to the record of the compensation power output by the energy storage loop 102 in real time over time to ensure that the metering point power meets the performance target. It can be understood that the compensation power trajectory in a real response event is precisely a mirror record of "performance target minus actual response," equivalent to the data corresponding to a full-scale excitation test covering real operating conditions. Using this data for updates is equivalent to each real performance providing a free full-scale calibration, the specific process of which will be explained in detail later.

[0033] In some embodiments, determining the information gap to be supplemented based on the first confidence information and the second confidence information in step S204 may include: determining the first sensitivity of the observable electrical quantity change of the energy storage circuit caused by the change of each battery parameter, and the second sensitivity of the observable power change of the flexible load circuit caused by the change of each response parameter; and determining the parameters whose first sensitivity or second sensitivity is lower than a preset sensitivity threshold, and the parameters whose confidence range width is greater than a preset width threshold, as the parameters to be identified corresponding to the information gap.

[0034] Sensitivity refers to the observable change in a parameter when the parameter undergoes a unit change. The greater the sensitivity, the easier it is for the parameter to be retrieved from the observed data. Observable electrical quantities refer to the directly measurable electrical quantities in the energy storage circuit 102, including terminal voltage and circuit current; observable power refers to the directly measurable power in the flexible load circuit 103, i.e., the circuit power. The calculation of the first sensitivity is based on the battery model: taking an equivalent circuit model containing one polarized branch as an example, the terminal voltage... With Ohm internal resistance Polarization internal resistance Polarized capacitors Available capacity The relationship between them is

[0035]

[0036] In the formula, The open-circuit voltage (i.e., the terminal voltage after the battery has been fully rested and reached equilibrium) represents the state of charge. The function; This refers to the loop current (in this article, the discharge direction is taken as the positive current direction, and this is consistent throughout the text). The polarization voltage (i.e., the voltage that changes slowly with time generated by the current flowing through the parallel branch formed by the polarization internal resistance and the polarization capacitance) satisfies the state equation.

[0037]

[0038] As can be seen from the above equation, the sensitivity of the terminal voltage to the ohmic internal resistance is: That is, as long as the loop current is non-zero, the sensitivity is non-zero; however, under quasi-constant operating conditions, The voltage drop is mixed with the slowly changing open-circuit voltage and polarization voltage terms, making them indistinguishable. Only the instantaneous change in terminal voltage at the moment the loop current jumps is visible. Only the contribution of ohmic internal resistance is included (where, This is the current jump variable, which is the difference between the loop current before and after the jump. The information about the ohmic internal resistance (the difference between the voltage plateau before and after the voltage jump) can only be separated with a high signal-to-noise ratio. This analysis shows that, for quasi-constant operating conditions, what is truly lacking is not sensitivity itself, but the separability of parameter information, and this separability can only be provided by excitations such as current jumps—this is the fundamental reason for introducing excitation actions in this application. Similarly, the sensitivity of terminal voltage to available capacity requires a long-range shift in the state of charge to distinguish it from short-range dynamics.

[0039] In mathematics, the identifiability of parameters can be quantitatively characterized by the Fisher Information Matrix (FIM, which is a matrix describing the amount of parameter information contained in observed data). Taking response parameters as an example, let the response parameter vector be... (corresponding to response gain respectively) Pure delay With rebound strength The response model of flexible load loop 103 is as follows:

[0040]

[0041] In the formula, This represents the actual response power. For adjustment instructions; ( ) is the normalized rebound kernel function. The springback time constant; To observe noise. Dimensional verification: Dimensionless Dimensionless For power, therefore Power; The dimension of is the reciprocal of time, and the integral is... The dimension of is power, therefore the dimensions on both sides of the equation are consistent. It should be noted that the rebound term in the above equation does not include pure time delay (i.e., the time delay acting on the rebound nucleus). Instead This simplification allows the pure time delay information to be carried entirely by the command transition edge, and may cause structural mixing of pure time delay and rebound strength in the early stages of a step jump; a more physically general model would allow the rebound term to act similarly on... Under this selection, the discriminability conclusions regarding gain and rebound strength remain unchanged. It should also be noted that under the step command... For impulse function (Dirac) The sensitivity in continuous time is a distributed value object. In discrete implementation, it can be processed by difference according to the sampling period, which does not affect the numerical calculation of the Fisher information matrix in the following text.

[0042] The Fisher information matrix of the response parameters is

[0043]

[0044] In the formula, This is the row vector of partial derivatives of the actual response power with respect to the response parameter vector; This is the weight matrix. The covariance of the observed noise is determined by the accuracy index of the metering device or estimated online from the recursively estimated information sequence. It should be noted that the time-by-time summation form of the above formula assumes that the observed noise is temporally uncorrelated (white noise); if the observed noise is temporally correlated, the sensitivity at each time point should be stacked to construct a quadratic form using the overall noise covariance. The direction of the smallest eigenvalue of the Fisher information matrix is ​​the direction of the parameter containing the least information in the data. If the operator adopts a full-capacity conservative instruction, i.e. (constantly equal to the rated adjustment amount), then It is a constant. It is always zero, and and Since the linearity is independent, the zero eigendirection of the Fisher information matrix is ​​precisely the pure delay direction, resulting in a rank deficiency (rank 2): the pure delay is unidentifiable, while the response gain and rebound strength are still discernible. If the instruction is only a single step to full capacity without further switching, the pure delay information only appears once at the moment of the transition, the Fisher information matrix is ​​severely ill-conditioned, and the accuracy of pure delay identification is extremely poor. The engineering conclusion is consistent for both cases: without instructions that switch between multiple non-trivial levels, pure delay cannot be reliably identified. It should be noted that the rebound time constant... For response parameter vectors not included in the identification process, their values ​​are determined by post-hoc fitting of historical response data or by taking typical values ​​according to load type. The impact of misclassification on the identification results can be assessed by offline sensitivity analysis. It should also be noted that the probability of default (i.e., the probability that the actual response is below the assessment threshold) is not used as an independent response parameter in the identification process, but is a derived quantity derived from the posterior distribution of the response parameters through forward propagation of the response model.

[0045]

[0046] In the formula For the assessment threshold ratio, The reported response volume (based on the assessment criteria, the reported electricity or reported power within the event window) and Same caliber value: under the electric power caliber Take the response power in the event window, under the power caliber. (The response power is taken). The sensitivity of the battery parameters and the Fisher information matrix are calculated based on the battery model in the same way, and will not be described again. The control device 101 determines the parameter direction corresponding to the minimum eigenvalue of the Fisher information matrix and the parameters whose confidence range width is greater than the preset width threshold as the parameters to be identified corresponding to the information gap, and records their corresponding operating condition range (e.g., state of charge range, temperature range, load condition compartment), forming an information gap in the form of a "parameter-frequency band-operating condition" triple. In the above embodiment, by locating the information gap through both sensitivity and confidence range, both the structural gap of "data is not sensitive to parameters" and the statistical gap of "parameters are observed but the accuracy is insufficient" are covered, so that the excitation action has a clear target.

[0047] In some embodiments, the candidate stimulus action set may include at least two of the following candidate stimulus actions: Candidate excitation action 1: Passive excitation action to absorb the natural power fluctuations of the flexible load circuit 103; Candidate excitation action 2: Diagnostic excitation action executed by energy storage circuit 102, wherein the power change at grid connection point 107 is shielded by the reverse regulation of flexible load circuit 103. Candidate incentive action three: an under-cut detection action embedded in the performance instruction for flexible load circuit 103, the response gap corresponding to the under-cut detection action is covered by the energy storage regulation margin; Candidate incentive action four: a setpoint incentive action executed by the flexible load circuit 103, wherein the power change at the grid connection point 107 is compensated by the energy storage circuit 102, or the setpoint incentive action is executed during non-assessment periods.

[0048] Among them, the passive excitation action does not change any established operation schedule, but only uses the inherent power fluctuations of the flexible load (such as the second-level fluctuations of motor starting, the minute-level fluctuations of production line cycle, and the ten-minute-level fluctuations of HVAC start-up and shutdown) as excitation, and the energy storage circuit 102 absorbs and buffers these fluctuations; since the natural fluctuations of the load are approximately balanced in terms of absorption and replenishment within the event scale, and the net energy is approximately zero, this action does not consume the energy storage adjustment margin and is an excitation method with zero compliance cost. The diagnostic excitation action refers to the energy storage circuit 102 generating and executing a charge / discharge power waveform according to the criterion of maximizing the determinant of the Fisher information matrix (i.e., the D-optimal criterion, a well-known experimental design criterion in the art) to actively excite the battery parameters. To prevent this waveform from appearing at the grid connection point 107, the flexible load circuit 103 performs an adjustment in the opposite phase of the waveform, causing the power performance of the two at the grid connection point 107 to cancel each other out. This cancellation process is called masking. The diagnostic excitation action can use a bipolar net-zero waveform (i.e., a waveform where the charge and discharge amounts are equal, and the net energy is zero), so as not to erode the reserve energy in the energy storage regulation margin. The under-limit detection action refers to the planned embedding of a detection component below the full response in the performance instruction to observe the true response of the flexible load at different response depths. Since under-limit may trigger assessment penalties, this action uses the reserve energy in the energy storage regulation margin to provide a safety net for the response gap, thus cutting off the downside risk of the detection. The setpoint incentive action refers to the load controller applying a step change or a pseudo-random binary sequence (PRBS, i.e., a test signal that switches between two values ​​according to a pseudo-random pattern) change to the setpoint of the flexible load to incentivize the load's dynamic response. The power change at grid connection point 107 caused by this action is compensated by the energy storage loop 102, or it can be scheduled for execution during non-assessment periods. The above four categories of candidate incentive actions cover different levels from zero cost to high information value, enabling unified ranking to select the currently compliant and cost-effective target incentive action throughout the entire time period.

[0049] In some embodiments, the unified ranking in step S206 may include: determining the marginal information value and marginal compliance cost for each candidate incentive action; and ranking each candidate incentive action according to the comparison results of the marginal information value and marginal compliance cost.

[0050] Specifically, the marginal information value can be quantified by the change in the determinant of the Bayesian posterior information matrix corresponding to the candidate incentive actions, i.e.

[0051]

[0052] In the formula, Given the current Bayesian posterior information matrix, Let be the prior information matrix given by the prior distribution of parameters (or the posterior distribution of accumulated historical data), which is positive definite; This is the Fisher information matrix for the current data; For candidate incentive actions The expected increase in information matrix; This represents taking the logarithm of the matrix determinant, and measures the overall tightening of the parameter confidence range. The reason for using a posterior information matrix instead of a naked Fisher information matrix is ​​that the prior terms guarantee... It is always positive definite, even when the Fisher information matrix of the current data is rank deficient (such as the aforementioned constant instruction condition). This still maintains a good definition, thus avoiding the failure of information value measurement in situations where information is scarcest and ranking guidance is most needed; equivalently, a regularized Fisher information matrix (i.e., ...) can also be used. , The regularization coefficient is positive. The identity matrix is ​​used instead of the posterior information matrix. The marginal compliance cost can be quantified by the sum of the expected performance penalty, the discounted value of demand exceedance risk, and the discounted value of comfort loss caused by the candidate incentive action; among which the expected performance penalty... Depth of under-litigation The relationship (i.e., the depth below the full response during the undercut detection action) is as follows:

[0053]

[0054] In the formula, As a penalty factor, To clear out the price, As a threshold ratio for assessment, The declared capacity (defined as the declared electricity volume within the event window). for the depth of the under-litigation The actual response, Represents the mathematical expectation. This refers to the response gap. The formula distinguishes dimensions according to the assessment criteria: when the assessment is based on the response electrical quantity, and All data are taken from the power level within the event window (the integral of response power over the event window). The clearing price per unit of electricity (yuan / kWh). The dimension is element; when the assessment is based on instantaneous power, and All power is taken, at this time The power assessment unit price (yuan / kW) stipulated in the assessment rules is applied, or the power gap is converted into an energy gap based on the event window duration, and the applicable clearing price per unit of energy is applied. Both methods result in... The dimension of is element. The meaning of this formula is: the assessment cost equals the response gap multiplied by the clearing price and then multiplied by the expected value of the penalty factor, which is consistent with the billing caliber of the assessment rules.

[0055] Regarding the selection of the undercut depth: Under the linear response model of this application, the actual response for the depth of the under-litigation The affine decreasing function, response gap for affine increasing function; Since it is a convex non-decreasing function, its composition with an affine increasing function also results in a convex increasing function. Therefore, it is expected that the operation will maintain convexity. for The convex increasing function; if a nonlinear response model is used, then explicit assumptions are required. for The above conclusion on convexity holds only if the function is a concave decreasing function. Let the marginal value of the information value derived from the detection, converted into currency, be... The net benefit of the depth of undercutting is .condition The accessibility conditions for detection, which means: It is not optimal to start from zero depth and increase the depth of exploration; if the optimal undercut depth is the in-point... ,but Satisfying the first-order condition In other words, the marginal benefit of information value equals the marginal cost of the penalty. Without a safety net, the downside risks of detection are fully exposed, the marginal cost of the penalty is high, the entry conditions are usually not met, and the optimal under-punishment depth is zero, meaning operators dare not detect. When there is a safety net of energy storage adjustment capacity, the expected assessment penalty is adjusted to...

[0056]

[0057] In the formula As a safety net, the upper limit of the safety power is taken under the power assessment caliber. Under the power consumption assessment criteria, the insured power consumption is taken. , The duration of the response event; at this point, the downward tail of the response gap is truncated, the marginal cost of the penalty decreases, the entry conditions are easily met, and the depth of under-litigation is greater than zero. Therefore, it can be understood that the energy storage adjustment margin is the "license" for under-litigation detection actions: the more sufficient the safety net, the deeper the detection is allowed. The monetization conversion of information value involves: converting the expected tightening of the parameter confidence range caused by the candidate incentive action, through the increase in the lower bound of the credible reporting capacity confidence (described later), into the expected increment of market returns, or using the expected decrease in assessment penalties caused by the tightening of the confidence range as the monetary measure of information value; both approaches reuse the existing monetization channels of reporting and penalties, thus making the marginal information value and marginal compliance costs comparable under the same monetary benchmark. Each candidate incentive action is then calculated according to... The ranking is completed by sorting the candidates from highest to lowest based on the difference between the marginal compliance cost and the cost (or the net benefit after monetization of the difference). In the above embodiment, since the information benefits and compliance costs of each candidate incentive action are converted to the same benchmark, the ranking results can be directly used for resource allocation decisions, avoiding the problem of having multiple incentive methods in parallel but being unable to choose.

[0058] In some embodiments, the energy storage regulation margin can be determined by: determining the uncertainty range of the response gap of the flexible load loop 103 based on the second confidence information; determining the quantile width of the uncertainty range at the target confidence level as the reserve energy; raising the state of charge limit of the energy storage loop 102 to increase the proportion of the reserve energy to the rated energy of the energy storage loop 102, thereby obtaining the energy storage regulation margin (i.e., the state of charge corridor) with the raised state of charge limit and the state of charge upper limit as the boundary.

[0059] Specifically, the uncertainty range of the response gap is given by the posterior distribution of the response gap random variable. Its distribution is obtained by forward propagation of the response model from the second confidence information (the posterior distribution of the response parameters). It should be noted that... and , Using the same caliber of values: Under the caliber of assessing based on the response electricity, For the random variable of electricity; under the criterion of assessing instantaneous power, The power is a random variable. The specific implementation of forward propagation can be linear covariance propagation (that is, mapping the posterior covariance of the response parameters to the Jacobian matrix of the response parameters through the response model as the variance of the response gap), or it can be a Monte Carlo method that randomly samples from the posterior distribution of the response parameters, substitutes each sample into the response model for forward simulation, and then statistically analyzes the distribution of the response gap. Those skilled in the art can choose one to implement based on accuracy and computational power requirements. The stored energy is taken as the quantile width of the posterior distribution of the response gap:

[0060]

[0061] In the formula, Representing distribution Quantiles (i.e., the cumulative probability of a distribution reaching a certain threshold) (The corresponding value at that time). and These are the upper and lower quantile levels, respectively, both of which are design parameters. Under the current electrical quantity caliber, The quantile width directly has the dimension of energy; under the power aperture, The quantile width is in the power dimension and needs to be multiplied by the event window duration. (Or, the reserve energy is converted to energy units by integrating over the event window.) This means that the reserve energy equals the distance between the high-confidence upper quantile and the low-confidence lower quantile in the response gap distribution. The more uncertain the response gap (the wider the distribution), the thicker the reserve energy. After the second confidence information tightens, the distribution narrows, and the reserve energy automatically thins, releasing capacity that can be used for arbitrage or incentives. It should be noted that the quantile width measures the degree of uncertainty dispersion of the response gap, not its systematic level. This definition is related to the reporting side: credible reporting capacity is reported according to the lower confidence bound of adjustable capacity (see below), and the systematic part of the response gap is absorbed by the reporting side, compressing the center of the response gap distribution to near zero. The reserve energy only needs to cover the residual dispersion after deducting the systematic part. Under this relationship, defining the reserve energy with quantile width neither overlooks systematic gaps nor is overly conservative. If the reporting side does not absorb systematic gaps according to the lower confidence bound, the reserve energy should be determined by adding the lower tail correction to the upper quantile, i.e. This could be further compounded by adjustments to the lower tail. Furthermore, the dispatchable capacity released by tightening reserve energy should be managed uniformly: prioritized for arbitrage and subsequent incentive allocations, and dynamically backfilled within the state-of-charge corridor to avoid duplicate commitments.

[0062] The setting of the charged state corridor is

[0063]

[0064] In the formula, and These are the original state of charge limit and upper limit of the energy storage circuit 102 (determined by the battery safety operation requirements). The rated energy of energy storage circuit 102, The percentage of reserved energy to rated energy (dimensionless). Raising the state of charge (SCC) lower limit means that during normal dispatch, the SCC is not allowed to fall below the raised lower limit, thus ensuring that there is always dischargeable energy equal to the reserved energy at the bottom of the SCC corridor, which is used as a backup for discharging when the flexible load response is insufficient.

[0065] The upper limit of the safety power is defined separately according to the power caliber and the energy caliber: the upper envelope of the response gap power process within the event window at the target confidence level is taken as the upper limit of the safety power, i.e.

[0066]

[0067] In the formula, This means taking the supremum within the event window (in implementation, the event window is discretized according to the control cycle and the maximum value of the gap power at each moment is taken). Design parameters for quantile levels (related to the quantile levels of the stored energy mentioned earlier) , (The meanings are independent of each other). It should be noted that the stored energy cannot be evenly distributed within the event window (i.e., taking...). As a safety power limit: given a total energy, a uniform distribution of the gap power throughout the entire process is precisely the case where the peak power is minimized; if the gap is concentrated in a certain period of time (e.g., concentrated in half an event window, with an amplitude of...), then... If the required power capacity is twice that of the mean-converted result, then the mean-converted result does not constitute a conservative upper bound, and using it as the upper limit of the safety power would overestimate the coverage capacity. Only after the reserves of power and energy are determined according to their respective quantiles can the upper limit of the safety power be used as the reliable power boundary in the opportunity constraints discussed later.

[0068] Furthermore, credible reporting capacity and reserve energy are coupled: the larger the credible reporting capacity, the higher the response requirements corresponding to the assessment threshold, and the greater the required reserve energy; the greater the reserve energy, the larger the reporting capacity that can be supported. Therefore, this application solves the two simultaneously:

[0069]

[0070] In the formula, The credible reporting capacity (this formula is based on electricity volume, i.e., the reporting electricity volume that can be fulfilled within the event window). For the moment within the event window The equivalent energy of thermal energy storage available in flexible load loop 103 (given by the thermal energy storage model below, uniformly converted to kilowatt-hours); This refers to the tolerance for the probability of violation allowed by the performance constraints (design parameters). Because... rely ,and Response gap distribution dependence The two constitute a fixed-point equation. It should be noted that this coupling is predicated on the flexible load's response scaling with the declared load: under the linear response model of this application, the actual response... ( (for the stochastic implementation of response gain), response gap Its distribution width and application capacity The reserve energy is proportional to the declared capacity, and therefore changes monotonically and boundedly. If the response does not scale with the declared amount, the response gap distribution only shifts deterministically with the declared amount while its width remains unchanged. The reserve energy and the declared capacity are decoupled and do not need to be solved simultaneously. The control device 101 solves iteratively as follows: calculate the reserve energy with the current declared capacity (initial value is the feasible lower bound), and then recalculate the credible declared capacity with the updated reserve energy, and so on. Under the above linear scaling premise, the mappings in both directions are monotonically bounded mappings. Due to the monotonically convergent property, the iteration converges to the minimum fixed point from the feasible lower bound. In engineering, the stopping criterion is that the relative change between 3 to 5 iterations or between two adjacent results is less than 1% (this criterion controls the difference between adjacent iterations, and the residual error from the fixed point is determined by the compression ratio of the mapping). In the above embodiment, both the reserve energy and the declared capacity are intrinsically determined by the posterior distribution of the response gap, without the need to manually set the discount coefficient, thereby replacing the static declaration discount given by experience in the traditional technology with a defensible statistical lower bound.

[0071] In some embodiments, the underperformance detection action satisfies the constraint of unchanged performance obligations under the assessment criteria: when the assessment is based on the response electricity volume, the underperformance detection action keeps the total performance electricity volume constant and adjusts the distribution of the response at different times; when the assessment is based on instantaneous power, the power deviation caused by the underperformance detection action is within the allowable deviation band of the assessment, and the portion exceeding the deviation band is compensated by the energy storage circuit 102. It can be understood that the reason for setting this constraint is that the purpose of detection is to rearrange the time and depth structure of the response to obtain information, not to evade response obligations; if the assessment is based on the response electricity volume, keeping the total electricity volume constant ensures that the detection does not result in a substantial default; if the assessment is based on instantaneous power, electricity neutrality does not necessarily exempt from assessment, therefore the power deviation caused by the detection must be limited to the allowable deviation band of the assessment, and the residual risk is borne by the compensation of the energy storage circuit 102. Thus, the underperformance detection action is a compliant action under both assessment criteria.

[0072] In some embodiments, updating the first confidence information and the second confidence information based on the response data in step S210 may include: freezing the first confidence information and updating the second confidence information based on the power fluctuation and response data of the flexible load circuit 103 during the first identification period; freezing the updated second confidence information and updating the first confidence information based on the injection current and response data of the energy storage circuit 102 during the second identification period; wherein the first identification period and the second identification period are set alternately.

[0073] The reason for using alternating updates instead of simultaneous updates is that the power at the metering point is the sum of the load-side response and the energy storage-side injection:

[0074]

[0075] In the formula In response to the model operator (which converts natural power fluctuations) With adjustment instructions Mapped to load-side power (for response parameter vectors) For battery model operators (injecting current) This is mapped to the contribution of the energy storage side to the power at the metering point. (This refers to the battery parameter vector). It should be noted that the assertion that simultaneous dual-side inversion is ill-posed is based on the premise that identification can only rely on the summative observation of the metering point power: when branch metering of the PCS AC side power of the energy storage loop 102 and the loop power of the flexible load loop 103 is missing, insufficient in accuracy to support parameter-level inversion, or has not been synchronously calibrated, and the gate metering device is the only calibrated and reliable metering point, if the response parameters and battery parameters are simultaneously unknown and drift simultaneously, the same metering point power curve cannot distinguish whether the change originates from the load side or the energy storage side, and the joint inversion is mathematically ill-posed (i.e., the solution is not unique); if the branch metering is reliable, the parameters on both sides can be directly identified separately, without relying on the following alternation mechanism. The basis for the alternation update is the dynamic time-domain separation of both sides: defining the time scale separation ratio...

[0076]

[0077] In the formula The drift time constant of battery parameters (typically under pure aging drive). to Seconds, or even weeks to months; when considering faster drift components such as temperature-driven factors, the lower limit can reach... (seconds, i.e., daily volume) The dominant time constant for load-side dynamics should be considered in different tiers: typical values ​​for electrical / mechanical transients (motor start / stop, production line cycle time) are... to Seconds; the dominant time constant of building thermal response is the thermal time constant of the building envelope, with a typical value of to Seconds. For electrical / mechanical transients, It can be directly compared with the preset separation threshold; for building thermal response scenarios, the pure aging drift time constant should be used. to (seconds) The separation ratio can be demonstrated by scheduling the identification of thermal response parameters within a longer, independent window, rather than relying on instantaneous freezing. When χ ≥ χmin (χmin is a preset separation threshold, typically 20 to 50 in engineering), the relative drift of battery parameters during a load response transition process does not exceed [a certain value]. ( When the value is between 20 and 50, the relative drift does not exceed 5% to 2%. If the width of the parameter confidence range is comparable to the magnitude of the parameter value, the relative drift also does not exceed 2% to 5% of the confidence range and can be considered constant. Therefore, freezing the first confidence information during the first identification period will not introduce substantial error, and the inversion of the second confidence information is well-established; conversely, the same applies during the second identification period. In the frequency domain, load electrical / mechanical power fluctuations are concentrated in... to Hertz band, building thermal response spectrum distribution to Hertz band (dominant spectral band located in) to (near Hertz), while the aging drift spectrum is concentrated in Below Hertz; for electrical transient scenarios, the load fluctuation spectrum and aging drift spectrum hardly overlap, and the information from both sides can be naturally separated and extracted within different time windows; for thermal response scenarios, the thermal response spectrum is wedged between the electrical transient spectrum and the aging drift spectrum, and the thermal response identification window and the aging drift window should be further separated at the aforementioned lower frequency bands.

[0078] Furthermore, the error introduced by freezing will not accumulate and amplify with each round. Let the... The estimation error of the round freezing parameters is Then the parameter estimation error in this round satisfies

[0079]

[0080] In the formula For the parameter's true value, To estimate the upper bound of noise (determined by the observed noise level and data volume according to standard estimation theory, or estimated online from the innovation sequence). and This represents the model sensitivity constant (calibrated by offline sensitivity analysis). As can be seen from the above equation, the freeze-up error is... The factor is passed into the current round of estimation; when the preset separation threshold simultaneously satisfies the compression condition C1 / χmin ≤γ<1( To design a compression factor (e.g., 0.5), the error sequence satisfies... Through successive rounds of geometric compression, it eventually stabilizes at a value not exceeding [a certain value]. Within a bounded range. Therefore, the tuning rule for the preset separation threshold is: take a value between 20 and 50, and not less than... ;like If the tuning rule has no feasible solution, it indicates that the time scale separation of the current object is insufficient to verify the validity of the alternating identification, and the control device 101 directly executes the degradation path described below. In the above embodiment, the alternating update transforms the originally ill-posed joint inversion into two alternating well-posed one-sided inversions, and the error propagation has an explicit upper bound, ensuring the reliability of the recursive process.

[0081] In some embodiments, the validity condition for freezing the first confidence information includes: the ratio of the drift timescale of the battery parameters to the response timescale of the response parameters is not less than a preset separation threshold. If the validity condition is not met (e.g., a sudden drop in battery temperature due to a cold snap, causing internal resistance and available capacity to drift rapidly with temperature, and the drift timescale to collapse to...), the validity condition is not met. to (On the order of seconds), control device 101 stops updating the first and second confidence information, tightens the energy storage regulation margin to a conservative margin determined based on the factory parameters of energy storage loop 102 and the worst historical operating conditions, and maintains the existing declaration quantity as a safety net until the validity conditions are restored. It can be understood that this degradation path transforms "condition failure" into a conservative decision rather than an erroneous declaration: during the condition failure period, no new identification results are trusted, but the capacity is not overestimated due to erroneous identification results, thus ensuring the safety of declaration and fulfillment under any operating condition.

[0082] In some embodiments, the backflow processing of the compensated power trajectory in a real response event may include the following steps: First, separating the rigid load baseline: The power of the rigid load 106 does not participate in regulation, and its baseline trajectory is obtained by statistical analysis of metering data from the same historical period (same calendar type and similar meteorological conditions), or by independent metering of the rigid load loop; Second, inverting the actual response trajectory of the flexible load: Within the event window, according to the power balance relationship of the metering point power caliber, the actual response trajectory is...

[0083]

[0084] In the formula, The trajectory of the power target at the metering point corresponding to the performance target. The baseline power trajectory (including rigid load baseline and flexible load baseline) under no-response conditions. The compensation power trajectory output by the energy storage loop 102 (recorded by the AC side power of the PCS) has its symbols uniformly agreed upon according to the power caliber of the metering point. Finally, the return flow data is assigned to the alternating update sequence on both sides: the actual response trajectory obtained by inversion is assigned to the first identification period, and together with the power fluctuation of the flexible load loop 103, it is used to update the second confidence information; the current jump edges and corresponding voltage responses in the compensation power trajectory are assigned to the second identification period, and are used to update the first confidence information. It can be understood that this process enables each actual performance to be accompanied by a full-scale calibration covering the actual operating conditions, and the return flow data and the response data collected by the aforementioned excitation actions share the same set of recursive estimation and alternating update channels.

[0085] In some embodiments, the method may further include: verifying the excitation sufficiency of the target excitation action in the direction of the parameter to be identified corresponding to the information gap; if the excitation sufficiency does not meet the preset sufficiency condition, recording the parameters and frequency bands that have not been sufficiently excited for use in determining the information gap in the next round; if the excitation sufficiency continues to fail to meet the preset sufficiency condition and all candidate excitation actions in the candidate excitation action set cannot be executed in compliance with regulations, freezing the first confidence information and applying for a reduction in the energy storage loop 102 according to the lower bound of the confidence of the first confidence information.

[0086] Among them, the excitation sufficiency is used to test whether the excitation signal provides sufficient excitation in all directions of the parameter to be identified. Mathematically, it can be tested by the condition of persistent excitation (PE, i.e., the condition that the excitation signal has non-zero components in all directions of the parameter space within a sufficiently long time window): constructing a regression vector. (by natural power fluctuations) Adjustment instructions (and its filtered components), if a window length exists With constant ,make

[0087]

[0088] In the formula If the identity matrix is ​​denoted by , then the excitation signal satisfies the continuous excitation condition. The above equation means that the smallest eigenvalue of the time-averaged second-order moment matrix of the regression vector is greater than zero, i.e., there is excitation energy in each parameter direction. When the continuous excitation condition is satisfied, the covariance of the recursively estimated parameter error is denoted by . The magnitude is the upper bound ( To observe the noise variance, the confidence range is controlled to shrink. It should be noted that the residual (the difference between the model prediction and the measured value, also known as innovation) carries the directional information of model mismatch and enters the recursive update term in the form of gain multiplied by innovation; it is not an excitation itself. The decrease in residual amplitude after the system reaches steady state does not mean the information has disappeared; as long as the excitation signal continues, the update process remains effective. When the excitation sufficiency does not meet the preset sufficiency conditions (e.g., the minimum eigenvalue is below a threshold), the parameters and frequency bands that are not sufficiently excited are recorded and fed back to the information gap location, allowing the next round of excitation actions to specifically fill in the missing frequency bands. When the standard is continuously not met and no candidate excitation actions can be executed compliantly, the first confidence information is frozen and the declaration is reduced according to its lower confidence bound, thus transforming insufficient information into a conservative declaration decision rather than a default risk. The above-mentioned guardrail mechanism ensures the safe degradation of the closed loop in scenarios of insufficient excitation.

[0089] In some embodiments, adjusting the operation plan of the energy storage loop 102 in step S212 may include: performing forward simulation based on the updated first confidence information to obtain the executable power boundary and executable energy boundary of the energy storage loop 102 in future time periods; intersecting the scheduling plan with the executable power boundary and executable energy boundary; and rearranging the remaining capacity of the flexible adjustment resources and the plan of the energy storage loop 102 for the unexecutable time periods obtained from the intersection, and accepting the corresponding correction amount.

[0090] Forward simulation involves inputting updated battery parameters into a battery model and performing a time-series simulation of the charging and discharging process in future periods under given initial states of charge and temperatures. This yields the upper and lower limits of achievable charging and discharging power (executable power boundaries) and the upper and lower limits of chargeable and dischargeable energy (executable energy boundaries) at each future moment. Forward simulation can also incorporate lithium plating safety constraints: defining the lithium plating overpotential.

[0091]

[0092] In the formula, and These are the negative electrode solid-phase potential and liquid-phase potential, respectively. The molar flux density of the lithium intercalation reaction is given. The area resistivity of the SEI film. Faraday constant ( That is, the reaction current density. (The dimension is volt). The solid-liquid phase potential difference at the negative electrode surface (after deducting the SEI film resistive voltage drop) is relative to the lithium metal deposition equilibrium potential (0V, relative to Li / Li). + The overpotential of the reference (when) At this point, the surface potential of the negative electrode is lower than the lithium deposition equilibrium potential, and lithium deposition occurs at the negative electrode. Equivalently, if the equilibrium potential of the lithium intercalation reaction at the negative electrode is considered... (Lithium concentration on the negative electrode surface) The function of V, typically 0.065 to 0.2 V for graphite anodes, is relative to Li / Li + Define the lithium intercalation overpotential.

[0093]

[0094] The lithium plating criterion is equivalent to It should be noted that, according to Butler-Volmer kinetics, the normal lithium intercalation charging process precisely requires... To drive the restoration current, the deeper the charge. The more negative, the less likely it is to be included. It serves as a criterion for lithium plating. The safety margin for lithium plating is taken as...

[0095]

[0096] In the formula, This represents the minimum lithium plating overpotential within the event window obtained from simulation. The standard deviation of the lithium plating overpotential is estimated (obtained by covariance propagation of the observer, which can be the aforementioned extended Kalman filter). For standard normal distribution quantiles ( (These are quantile level design parameters, and their meanings differ from those of the quantile level used for energy storage mentioned earlier.) Since a more positive lithium plating overpotential indicates greater safety, this margin definition first takes the most dangerous point (minimum value) within the event window and then subtracts the uncertainty downwards. This establishes a conservative safety margin, consistent with the principle that "the larger the margin, the safer." The safety margin should not be less than the safety threshold. ( When the design threshold is used, the corresponding upper limit of the charging current is a component of the executable power boundary after taking into account the lithium plating constraint. The upper limit of the charging current is taken as... The maximum current required for establishment; the lithium plating reference current in the battery parameters mentioned above is the current obtained from offline calibration. The established critical charging current can be used as the initial value of the fast safety boundary during online operation. Intersection refers to comparing the scheduling plan with two boundaries at each time step: comparing the planned power curve with the executable power boundary, and comparing the planned cumulative charge curve with the executable energy boundary. Any time period where the comparison result exceeds the corresponding boundary is considered an unexecutable period, and the excess amount is the correction amount. The correction amount is preferentially taken over by the remaining capacity of the flexible adjustment resources (i.e., temporarily adjusting the flexible load during unexecutable periods to offset the energy storage gap), and the insufficient portion is taken over by the plan rearrangement of the energy storage circuit 102 (i.e., charging and discharging earlier or later). Since the portion of the flexible adjustment resources that has been occupied by shielded uses is no longer available, the takeover of the correction amount must be solved in conjunction with the resource occupation of the excitation actions. This is precisely why all candidate excitation actions share the same flexible adjustment resources. In the above embodiment, the identification result is realized as the executable capability boundary through forward simulation, ensuring that the operation plan is based on the current realistic and reliable battery capacity, eliminating the possibility of plan failure from the source.

[0097] In some embodiments, the method may further include: determining a lower confidence bound of the declareable adjustable capacity of the flexible load loop 103 based on updated first confidence information and second confidence information; and declaring the lower confidence bound as the credible declareable capacity. Specifically, let the performance reliability required by the assessment rules be... (That is, the probability that the declared capacity will be actually fulfilled is not less than) If so, the posterior distribution of the adjustment capacity can be declared. The quantile is the lower confidence bound that satisfies this requirement, i.e.

[0098]

[0099] In the formula For the posterior distribution of the adjustable capacity, Power or electricity consumption should be taken according to the assessment criteria. and Using the same caliber. This formula means that the probability of the reported quantity being at such a level—where the actual adjustable capacity is lower than the reported quantity—is precisely [a certain percentage]. This ensures that the declared capacity is submitted with a reliability that precisely meets the assessment rules, avoiding both inflated figures and excessive conservatism. It should be noted that this embodiment and the previous embodiment of "Solving the Problem of Simultaneous Solving of Credible Declared Capacity and Reserve Energy" represent two optional methods for determining the declared capacity: the former explicitly solves the coupling relationship between declared capacity and reserve energy (in terms of electricity volume); in this embodiment, the posterior distribution of the declared adjustable capacity can be used. The energy storage capacity already includes a capacity to support contract fulfillment (i.e., To account for the net adjustable capacity distribution after energy storage as a safety net, the lower bound of the confidence level can be directly taken; either of the two implementation methods can be chosen, both following the principle of reporting based on the lower bound of the confidence level. The reporting, energy storage capacity, and performance reliability are all uniformly anchored by opportunity constraints.

[0100]

[0101] In the formula, Actual performance rate To submit the power profile, This is the upper limit of the insured power (determined according to the quantile definition of power caliber mentioned above). The meaning of this constraint is: at any moment within the event window, the probability that the deviation between the actual performance power and the declared power profile does not exceed the upper limit of the insured power is not less than the performance reliability; that is, the reserve energy is sufficient to cover the performance gap with the probability required by the assessment. It should be noted that this constraint is a joint opportunity constraint for the entire window (i.e., the tail probability of the process underfimum). In implementation, the event window is discretized according to the control cycle, the deviation is checked moment by moment, and the overall performance probability is calculated using a joint distribution, or an approximation using extreme value theory is used.

[0102] In some embodiments, when the flexible load loop 103 includes loads with thermal energy storage properties (such as HVAC clusters), the response model of the flexible load loop 103 can adopt a first-order equivalent thermal parameter (ETP) model:

[0103]

[0104] In the formula, Indoor temperature, Equivalent heat capacity of a building (unit: kJ / Kelvin). The equivalent thermal resistance of the building envelope (unit: Kelvin / kW) is given by COP, which is the energy efficiency ratio of HVAC equipment (i.e., the ratio of heating or cooling capacity to power consumption, dimensionless). For the electrical power of HVAC equipment (positive for heating mode, negative for cooling mode), make The item represents the net heat gain of the HVAC equipment in the room. Outdoor temperature The indoor heat gain power; the left side of the equation is in kilowatts, and the three terms on the right side are all in kilowatts, consistent on both sides. Identified from excitation-response data. , After adjusting for COP, the effective thermal energy storage capacity is:

[0105]

[0106] (in the formula) Temperature bandwidth permissible for comfort; Converting to kilojoules per Kelvin by dividing by 3600 yields the equivalent kilojoules in kilowatt-hours. (Consistent with the energy units in the full text), the response time constant is The control device 101 repeats the above identification according to the operating condition compartment (i.e., the operating condition category divided according to outdoor temperature, humidity, occupancy mode, and pre-event state), forming a conditional distribution family of effective thermal energy storage capacity under each operating condition compartment, as described above. This means that the distribution corresponding to the current operating condition of the storage unit is taken from the conditional distribution family. Therefore, the adjustable capacity declaration of thermal energy storage load is also given using the confidence lower bound of the conditional distribution, sharing the same confidence system as the identification results of the response parameters.

[0107] In some embodiments, such as Figure 3 As shown, a load and energy storage coordinated operation device is provided, the device comprising: The acquisition module 301 is used to acquire the operating data of the energy storage circuit and the flexible load circuit under the same grid connection point, and based on the operating data, determine the first confidence information characterizing the reliability of the battery parameters of the energy storage circuit and the second confidence information characterizing the reliability of the response parameters of the flexible load circuit. The gap determination module 302 is used to determine the information gap to be supplemented based on the first confidence information and the second confidence information; The incentive selection module 303 is used to select a target incentive action from the candidate incentive action set. The candidate incentive actions in the candidate incentive action set are selected according to the unified ranking of the marginal information value and marginal compliance cost of each candidate incentive action for the information gap. The execution of each candidate incentive action shares the flexible regulation resources corresponding to the flexible load loop and the energy storage regulation margin corresponding to the energy storage loop. The data acquisition module 304 is used to execute the target stimulus action and acquire response data during the execution process; Update module 305 is used to update the first confidence information and the second confidence information based on the response data; The adjustment module 306 is used to adjust the operation plan of the energy storage loop and the energy storage regulation margin based on the updated first confidence information and second confidence information.

[0108] The functions of each module in the above device correspond one-to-one with the steps in the aforementioned method embodiments. The specific implementation of each module can be referred to the description in the aforementioned method embodiments, and will not be repeated here. Among them, the excitation selection module 303 is the core module for realizing the core concept of this application. Its unified sorting of candidate excitation actions and unified allocation of shared resources ensure the global optimal allocation of observation resources and performance resources.

[0109] In one embodiment, a computer device is provided, comprising a processor, a memory, and a communication interface connected via a bus. The memory stores a computer program, which the processor executes to implement the steps described in the above method embodiments. The communication interface is used to communicate with energy storage loops, flexible load loops, gateway metering devices, and dispatch / market platforms. The processor can be implemented using a general-purpose processor, a digital signal processor, an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices; the memory can include at least one of volatile memory and non-volatile memory; the bus can be an industry-standard architecture bus, a peripheral component interconnection standard bus, etc., and this application does not impose any limitations on this.

[0110] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps in the above method embodiments. The computer-readable storage medium may include, for example, at least one of a read-only memory, a random access memory, a magnetic disk, an optical disk, and flash memory.

[0111] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps in the above method embodiments. This computer program product can be downloaded and installed to a control device through a software distribution channel, or it can be pre-programmed into the memory of the control device.

[0112] The technical features of the above embodiments can be combined arbitrarily. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as the combination of these technical features does not contradict each other, it should be considered within the scope of this specification. The above embodiments only illustrate several implementation methods of this application, and their descriptions are relatively specific and detailed, but they should not be construed as limiting the scope of the patent application. It should be noted that for those skilled in the art, several modifications and improvements can be made without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this patent application should be determined by the appended claims.

Claims

1. A method for coordinated operation of load and energy storage, characterized in that, The method includes: Obtain the operating data of the energy storage circuit and the flexible load circuit under the same grid connection point, and based on the operating data, determine the first confidence information characterizing the reliability of the battery parameters of the energy storage circuit and the second confidence information characterizing the reliability of the response parameters of the flexible load circuit. Based on the first confidence information and the second confidence information, the information gap to be supplemented by observations is determined; Select a target incentive action from the set of candidate incentive actions; wherein, each candidate incentive action in the set of candidate incentive actions is selected according to a unified ranking of the marginal information value and marginal compliance cost of each candidate incentive action for the information gap, and the execution of each candidate incentive action shares the flexible regulation resources corresponding to the flexible load loop and the energy storage regulation margin corresponding to the energy storage loop. Execute the target stimulus action and collect response data during the execution process; Based on the response data, update the first confidence information and the second confidence information; Based on the updated first confidence information and second confidence information, the operation plan of the energy storage circuit and the energy storage regulation margin are adjusted.

2. The method according to claim 1, characterized in that, The step of determining the information gap to be supplemented based on the first confidence information and the second confidence information includes: Determine a first sensitivity of the observable electrical quantity change in the energy storage circuit caused by the change of each of the battery parameters, and a second sensitivity of the observable power change in the flexible load circuit caused by the change of each of the response parameters; The parameters whose first or second sensitivity is lower than a preset sensitivity threshold, and the parameters whose confidence range width is greater than a preset width threshold, are determined as the parameters to be identified corresponding to the information gap.

3. The method according to claim 1, characterized in that, The candidate incentive action set includes at least two of the following candidate incentive actions: The passive excitation action absorbs the natural power fluctuations of the flexible load circuit. The diagnostic excitation action performed by the energy storage circuit, wherein the power change at the grid connection point is shielded by the reverse adjustment of the flexible load circuit; The undercut detection action is embedded in the performance instruction for the flexible load circuit, and the response gap corresponding to the undercut detection action is covered by the energy storage adjustment margin; The setpoint excitation action is performed by the flexible load circuit, wherein the power change at the grid connection point is compensated by the energy storage circuit, or the setpoint excitation action is performed during non-assessment periods.

4. The method according to claim 1, characterized in that, The unified sorting includes: For each of the candidate incentive actions, the marginal information value and the marginal compliance cost are determined respectively; the marginal information value represents the expected tightening of the confidence range of the identified parameter corresponding to the information gap after the execution of the candidate incentive action; the marginal compliance cost represents the expected assessment penalty, demand exceedance risk, and comfort loss caused by the execution of the candidate incentive action. The candidate incentive actions are ranked according to the comparison results between the marginal information value and the marginal compliance cost.

5. The method according to claim 1, characterized in that, The energy storage regulation margin is determined in the following way: Based on the second confidence information, the uncertainty range of the response gap of the flexible load loop is determined; The quantile width of the uncertainty range at the target confidence level is determined as the reserve energy; The energy storage circuit's state of charge limit is increased by raising the proportion of the stored energy to the rated energy of the energy storage circuit, thus obtaining the energy storage regulation margin with the increased state of charge limit and the upper limit of the state of charge as the boundary.

6. The method according to claim 3, characterized in that, The undercut detection action satisfies the constraint of unchanged performance obligations under the assessment criteria: When the assessment is based on the response power, the under-cut detection action keeps the total fulfillment power constant and adjusts the distribution of the response at each time. When the assessment is based on instantaneous power, the power deviation caused by the undercut detection action is within the allowable deviation band of the assessment, and the portion exceeding the deviation band is compensated by the energy storage circuit.

7. The method according to claim 1, characterized in that, The step of updating the first confidence information and the second confidence information based on the response data includes: During the first identification period, the first confidence information is frozen, and the second confidence information is updated based on the power fluctuation of the flexible load circuit and the response data; During the second identification period, the updated second confidence information is frozen, and the first confidence information is updated based on the injection current of the energy storage circuit and the response data. The first identification period and the second identification period are set alternately. The validity condition for freezing the first confidence information includes: the ratio of the drift time scale of the battery parameter to the response time scale of the response parameter is not less than a preset separation threshold. The method further includes: if the validity conditions are not met, stopping the updating of the first confidence information and the second confidence information, tightening the energy storage adjustment margin to a conservative margin determined based on the factory parameters of the energy storage circuit and the worst historical operating conditions, and maintaining the existing declared quantity as a safety net until the validity conditions are met again.

8. The method according to claim 1, characterized in that, The method further includes: Examine the excitation sufficiency of the target excitation action in the direction of the parameter to be identified corresponding to the information gap; If the excitation sufficiency does not meet the preset sufficiency condition, the parameters and frequency bands that are not sufficiently excited are recorded for use in determining the information gap in the next round. If the incentive sufficiency does not meet the preset sufficiency condition and all candidate incentive actions in the candidate incentive action set cannot be executed in compliance with regulations, the first confidence information is frozen, and the energy storage circuit is declared for de-rating according to the confidence lower bound of the first confidence information.

9. The method according to claim 1, characterized in that, The adjustment of the operation plan of the energy storage circuit includes: Based on the updated first confidence information, forward simulation is performed to obtain the executable power boundary and executable energy boundary of the energy storage circuit in the future time period; Find the intersection of the scheduling plan with the executable power boundary and the executable energy boundary; For the unexecutable periods obtained from the intersection, the remaining capacity of the flexible adjustment resources and the planned rearrangement of the energy storage circuit are used to accommodate the corresponding correction amount.

10. The method according to claim 1, characterized in that, The method further includes: In a real response event, the compensation power trajectory generated by the energy storage circuit to compensate for the deviation between the actual response of the flexible load circuit and the performance target is collected; The compensated power trajectory is used as response data and fed back to update the first confidence information and the second confidence information, and the energy storage regulation margin is tightened based on the updated second confidence information.