Photovoltaic low voltage ride through positive and negative sequence current limiting and energy coordination method and system
By separating the positive and negative sequence currents through a two-stage photovoltaic power generation unit and synchronous coordinate transformation, and combining the DC bus energy state to generate a photovoltaic power reference, the problems of excessive phase current synthesis of positive and negative sequence currents and DC bus voltage overvoltage in photovoltaic low voltage ride-through control are solved, and smooth power recovery of the photovoltaic system during grid faults is realized.
Patent Information
- Application Number
- CN202611293976.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-25
- Publication Date
- 2026-11-20
AI Technical Summary
Existing photovoltaic low-voltage ride-through control methods are difficult to effectively constrain the phase current exceeding the limit after the positive and negative sequence currents are combined, and do not fully consider the actual transmittable power on the AC side and the changes in DC bus energy during grid faults, resulting in DC bus voltage overvoltage or insufficient power pullback.
A two-stage photovoltaic power generation unit is adopted. The positive and negative sequence currents are separated by synchronous coordinate transformation. The photovoltaic power reference is dynamically generated by combining the DC bus energy state, the duty cycle of the DC-DC boost converter is adjusted, and fault data is memorized during the fault period to achieve joint current limiting and energy coordination of positive and negative sequence currents.
It effectively avoids phase current over-limit caused by the superposition of positive and negative sequence currents, maintains controllable priority of positive sequence reactive power support and negative sequence support, coordinates photovoltaic load reduction power and fault depth, achieves smooth power recovery after fault, and avoids DC bus overvoltage.
Smart Images

Figure CN123144205A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of grid-connected control technology for new energy power generation, and in particular to a method and system for photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination. Background Technology
[0002] With the large-scale integration of photovoltaic power generation into high-proportion renewable energy power systems, photovoltaic grid-connected converters need to operate continuously according to grid connection specifications during grid voltage dips and provide the required reactive current support to the grid. Under three-phase symmetrical faults, the grid voltage amplitude decreases, and the active power that the inverter can transmit under limited current capacity drops significantly. Under two-phase or single-phase asymmetrical faults, positive-sequence and negative-sequence voltages coexist. The negative-sequence current support will further consume the converter's current capacity, and the superposition of positive and negative-sequence currents may cause the instantaneous current of a certain phase to exceed the converter's safety limit.
[0003] Existing photovoltaic (PV) low-voltage ride-through control typically employs a method of prioritizing positive-sequence reactive current and individually limiting negative-sequence current or each sequence component separately. These methods struggle to directly constrain the worst-case phase current resulting from the combined positive and negative-sequence currents. When both positive-sequence reactive power support and negative-sequence compensation increase simultaneously, even if each sequence component individually does not exceed its limit, the combined phase current may still experience overcurrent. Furthermore, some control methods only adjust PV power cutoff by a fixed proportion based on fault indicators, failing to adequately consider the actual transmittable power on the AC side and changes in DC bus energy during grid faults. This can easily lead to problems such as a continuous increase in DC bus voltage, integral saturation of the DC voltage controller, or insufficient power cutoff on the PV side.
[0004] Existing technologies also commonly suffer from the problem of directly restoring maximum power point tracking (MPPT) after fault clearance. When the grid voltage recovers, the AC power capability may stabilize and recover before the phase-locked loop (PLL) and the DC bus energy state. If the Boost converter immediately returns to its pre-fault maximum power point, the DC bus may experience overvoltage again, and photovoltaic power and grid-connected current may also experience significant jumps. On the other hand, if only a fixed slope recovery is used, the recovery speed cannot be adaptively adjusted according to the remaining energy of the DC bus, resulting in a recovery process that is either too fast or too slow.
[0005] Therefore, it is necessary to propose a two-stage photovoltaic low-voltage ride-through control method that can simultaneously handle positive and negative sequence combined current constraints, AC side power capacity, DC bus energy balance, and smooth power recovery after a fault. Summary of the Invention
[0006] The purpose of this invention is to provide a method and system for photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination, which solves the problems in the prior art where positive and negative sequence current limiting causes phase current to exceed limits, photovoltaic load reduction power does not take into account AC transmission capacity and DC bus energy storage status, and power and duty cycle abrupt changes occur after the maximum power point recovers after fault clearance.
[0007] To achieve the above objectives, the present invention provides a photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method, comprising the following steps: S1. Establish a two-stage photovoltaic power generation unit and obtain operating data. Obtain voltage and current data through the operating data, and determine the standardization and energy calculation benchmark. S2. Generate positive sequence reactive current request, positive sequence active current request and negative sequence current request; S3. Using the upper limit of the safe current allowed by the transformer as a constraint, calculate the available capacity of the positive sequence active current, and calculate the maximum active power transmission capacity on the AC side through the available capacity of the positive sequence active current. S4. Dynamically generate a photovoltaic power reference based on the maximum active power transmission capacity of the AC side and the DC bus energy state characterized by the DC bus voltage. S5. Adjust the duty cycle of the DC-DC boost converter according to the photovoltaic power reference, and memorize fault data during the fault period; S6. After the fault is cleared and the stability is confirmed, the minimum coordinated power command is used as the recovery starting point. The recovery rate is adaptively generated according to the DC bus voltage. The photovoltaic power command is restored to the maximum power command before the fault according to the recovery rate. S7. During the recovery process, the duty cycle is limited by the slope and the power control integral is subjected to anti-saturation processing. When the photovoltaic power, DC bus voltage and recovery target meet the switchback conditions, the current duty cycle and the historical value of maximum power point tracking are synchronized to the maximum power point tracking controller to switch back to maximum power point tracking without disturbance.
[0008] Preferably, S1 includes: S11. Connect the photovoltaic array to the DC bus via the front-end Boost converter, and connect the DC bus to the AC grid via the grid-connected inverter to form a two-stage photovoltaic power generation unit. S12. Use operational parameters, including photovoltaic array terminal voltage. Photovoltaic array terminal current DC bus voltage Three-phase voltage and three-phase current at the grid connection point; S13. Obtain the positive sequence voltage amplitude through synchronous coordinate transformation and positive / negative sequence separation. Positive sequence current component and negative sequence current component, and rated power DC bus rated voltage and DC bus capacitor As a standard for standardization and energy calculation.
[0009] Preferably, S2 includes: Generate positive-sequence reactive current requests based on low-voltage ride-through strategies and grid connection specifications. Positive sequence active current request And negative sequence current request , ; Positive-sequence reactive current is used to provide voltage support, while negative-sequence current requests are used to suppress the impact of unbalanced voltage on the grid connection point. When multiple support requests exist simultaneously, reactive power support is allocated according to a preset priority.
[0010] Preferably, S3 includes: Calculate the negative sequence current request vector magnitude and the total reactive power support request: ; ; In the formula, Request the amplitude for negative sequence current. The total reactive power support request represents the conservative current capacity occupied by the positive-sequence reactive power request and the negative-sequence current request. When reactive power supports total request Greater than the upper limit of the transformer's permissible safe current Calculate the reactive power support scaling factor: ; Multiply both the positive-sequence reactive current request and the negative-sequence current request by the reactive power support scaling factor to obtain the scaled result. , and ,in, , and These are the positive-sequence reactive current component, the negative-sequence active current component, and the negative-sequence reactive current component, respectively. Based on scaling , and Calculate the negative sequence current amplitude and the available capacity of positive sequence active current : ; ; The output of the positive-sequence active current controller is limited to [- Within the range; Calculate the maximum active power transmission capacity on the AC side: ; Capacity allocation is represented by the following constraints to ensure that the phase current under the worst-case scenario does not exceed the upper limit of the safe current: ; In the formula, This represents the positive-sequence active current component.
[0011] Preferably, S4 includes: The equivalent time constant of DC bus energy storage relative to rated power is defined as: ; In the formula, For DC bus capacitors, This is the rated voltage of the DC bus. Rated power; DC bus per unit voltage As input, construct DC bus energy deviation During a fault, the per-unit reference value for photovoltaic power is generated using the following formula: ; ; In the formula, This is the power memory value at the maximum power point. To avoid the controller completely losing the minimum power reference for energy transfer, The DC bus energy coordination time constant. This represents a saturation function.
[0012] Preferably, S5 includes: The front-end Boost converter uses the perturbation-observation method to perform low-pass filtering on the photovoltaic array voltage and photovoltaic array current, calculates the power change and voltage change according to the preset update cycle, and changes the duty cycle only when both the power change and voltage change exceed the corresponding dead zone; before switching back to maximum power point tracking, the current duty cycle, current filter voltage, current filter power and update time are synchronized to the initial state of the maximum power point tracking controller; During a low-voltage fault, continuously record the power command at the maximum power point before the fault, the duty cycle at the maximum power point before the fault, and the lowest value of the coordinated power reference. .
[0013] Preferably, the conditions for fault clearance and stabilization confirmation in S6 include: When the deviation between the positive sequence voltage amplitude and the rated value is continuously less than the preset voltage deviation threshold and reaches the preset confirmation time, the target power for recovery is allowed to be increased; if the deviation is detected to exceed the preset voltage deviation threshold again during the recovery period, the recovery is stopped and the fault is returned to load reduction.
[0014] Preferably, S6 includes: After detecting that the positive sequence voltage has recovered to the stable range and maintained for a set confirmation time, it enters the recovery state, with the recovery target being the lowest value of the coordinated power reference. Initially, the recovery rate is generated based on the DC bus voltage: ; The target power is gradually increased according to the following formula: ; The power command is obtained by combining the target power recovery with the DC bus energy correction term. Furthermore, a slope limit is set in the Boost duty cycle stage to make the duty cycle approach the power control target at a finite rate of change.
[0015] Preferably, the cutback conditions in S7 include: Photovoltaic measured power and maximum power point power memory value The error is less than the preset threshold, the DC bus voltage deviation is less than the preset threshold, and the recovery target reaches the maximum power point power memory value. The current duty cycle is saved as the initial duty cycle for maximum power point tracking, and historical voltage and power variables are synchronized, switching from the recovery state to the normal MPPT state.
[0016] A system for photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method includes: The data acquisition and sequence component acquisition module is used to acquire the positive and negative sequence voltages and currents at the grid connection point, the DC bus voltage, and the photovoltaic array voltage and current. The current request generation module is used to generate positive-sequence active current requests, positive-sequence reactive current requests, and negative-sequence current requests. The combined current limiting module is used to allocate positive and negative sequence currents within a unified safe current limit according to the principle of prioritizing reactive power support, and output the available capacity of positive sequence active current. The power reference generation module is used to generate a photovoltaic descent power reference based on the positive sequence voltage amplitude, the available capacity of the positive sequence active current, and the DC bus energy state. The status management module is used to switch between normal maximum power point tracking status, fault coordinated load reduction status and post-fault adaptive recovery status and manage power command memory. The duty cycle control module is used to perform power control integral anti-saturation, duty cycle slope limiting, and maximum power point tracking historical quantity synchronization.
[0017] Therefore, the present invention employs the above-mentioned photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method and system, which has the following beneficial effects: (1) The present invention puts the positive sequence current and the negative sequence current into the same worst-case phase current constraint, so as to avoid the phase current exceeding the limit caused by the superposition of positive and negative sequence after each sequence component is limited, and maintains the controllable priority of positive sequence reactive power support and negative sequence support when the current is insufficient.
[0018] (2) The present invention calculates the maximum active power transmission capacity of the AC side in real time based on the positive sequence voltage amplitude and the remaining positive sequence active current capacity, so that the photovoltaic load reduction power matches the fault depth, reactive power support requirements and negative sequence current requirements, avoiding the reduction of power utilization or the excess power on the DC side caused by fixed ratio load reduction.
[0019] (3) The present invention uses the square deviation of DC bus voltage as an approximation of DC bus energy deviation and directly participates in the generation of photovoltaic power reference, so that the input power on the photovoltaic side and the transmittable power on the grid-connected side are coordinated, which can suppress DC bus overvoltage during faults.
[0020] (4) The present invention takes the lowest coordinated power during the fault as the recovery starting point and adaptively adjusts the recovery speed according to the DC bus voltage. At the same time, it suppresses overshoot and sudden changes in the recovery process by limiting integral leakage and duty cycle slope, thus achieving smooth recovery from fault load reduction to MPPT.
[0021] (5) In the normal MPPT state, the present invention reduces photovoltaic voltage spikes near MPP by using an independent dead zone, a small perturbation step size and filtering measurement, thereby reducing unnecessary Boost operating point reciprocating motion, while retaining the ability to track changes in irradiance.
[0022] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of the structure of a photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination system according to the present invention; Figure 2 This is a flowchart of a photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to the present invention; Figure 3 This is a reference generation block diagram for photovoltaic power generation based on the coordination of AC power capability and DC bus energy in this invention. Figure 4 This is a state transition diagram of normal MPPT, fault coordinated load reduction, and post-fault adaptive recovery according to the present invention. Figure 5The following are simulation waveforms of the combined current limiting, DC bus energy coordination and post-fault recovery under a two-phase asymmetrical 0.4pu low voltage fault of the present invention: (a) is the simulation waveform of voltage, (b) is the simulation waveform of command envelope, (c) is the simulation waveform of current, (d) is the simulation waveform of DC bus voltage, (e) is the simulation waveform of power, and (f) is the simulation waveform of control state recovery rate. Figure 6 The following are simulation waveforms of photovoltaic power pullback, DC bus voltage and post-fault recovery under a three-phase symmetrical 0.4pu low voltage fault according to the present invention. Among them, (a) is the simulation waveform of well grid point voltage, (b) is the simulation waveform of well grid current, (c) is the simulation waveform of photovoltaic array terminal voltage, (d) is the simulation waveform of power, (e) is the simulation waveform of DC bus voltage, and (f) is the simulation waveform of control state recovery rate. Figure 7 The diagram shows a comparison of the DC bus voltage, phase current, photovoltaic power, and Boost duty cycle between the original control method of this invention and the control method of this application. In the diagram, (a) is the simulated waveform of the DC bus voltage, (b) is the simulated waveform of the maximum phase current, (c) is the simulated waveform of the instantaneous signal, (d) is the simulated waveform of the recovery progress, and (e) is the simulated waveform of the Boost. Detailed Implementation
[0024] The technical solution of the present invention will be further described below with reference to the accompanying drawings and embodiments.
[0025] Unless otherwise defined, the technical or scientific terms used in this invention shall have the ordinary meaning understood by one of ordinary skill in the art to which this invention pertains. The terms "first," "second," and similar terms used in this invention do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Terms such as "comprising" or "including" mean that the element or object preceding the word encompasses the elements or objects listed following the word and their equivalents, without excluding other elements or objects. Terms such as "connected" or "linked" are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. Terms such as "upper," "lower," "left," and "right" are used only to indicate relative positional relationships; when the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0026] Example Please see Figures 1-7 This invention provides a photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method and system, including the following steps: S1. Establish a two-stage photovoltaic power generation unit and acquire operational data. Obtain voltage and current data from the operational data, and determine the standardization and energy calculation benchmark. This includes: S11. Connect the photovoltaic array to the DC bus via the front-end Boost converter, and connect the DC bus to the AC grid via the grid-connected inverter to form a two-stage photovoltaic power generation unit. S12. Use operational parameters, including photovoltaic array terminal voltage. Photovoltaic array terminal current DC bus voltage Three-phase voltage and three-phase current at the grid connection point; S13. Obtain the positive sequence voltage amplitude through synchronous coordinate transformation and positive / negative sequence separation. Positive sequence current component and negative sequence current component, and rated power DC bus rated voltage and DC bus capacitor As a standard for standardization and energy calculation.
[0027] in, , The positive-sequence fundamental voltage amplitude at the grid connection point. To correspond to the rated voltage amplitude, this embodiment uses a Clarke / Park transformation with constant amplitude, for both positive and negative sequences. The current is based on the same rated phase current amplitude. It is based on a per-unit standard; therefore, the sum of the magnitudes of the positive and negative sequence current vectors does not exceed [a certain value]. This is a conservative sufficient condition limiting the worst-case phase current. Positive-sequence active current available capacity. It indicates the upper limit of the non-negative amplitude, and the sign of the actual current command is determined according to the convention of the power generation direction.
[0028] S2. Generate positive-sequence reactive current requests, positive-sequence active current requests, and negative-sequence current requests. This includes: Generate positive-sequence reactive current requests based on low-voltage ride-through strategies and grid connection specifications. Positive sequence active current request And negative sequence current request , Among them, positive sequence reactive current is used to provide voltage support, and negative sequence current request is used to suppress the impact of unbalanced voltage on the grid connection point; when multiple support requests exist at the same time, reactive power support is allocated according to preset priority.
[0029] S3. Using the upper limit of the transformer's permissible safe current as a constraint, calculate the available capacity of the positive-sequence active current, and then calculate the maximum active power transmission capacity on the AC side using the available capacity of the positive-sequence active current. This includes: Calculate the negative sequence current request vector magnitude and the total reactive power support request: ; ; In the formula, Request the amplitude for negative sequence current. The total reactive power support request represents the conservative current capacity occupied by the positive-sequence reactive power request and the negative-sequence current request.
[0030] When reactive power supports total request Greater than the upper limit of the transformer's permissible safe current Calculate the reactive power support scaling factor: ; Multiply both the positive-sequence reactive current request and the negative-sequence current request by the reactive power support scaling factor to obtain the scaled result. , and ,in, , and These are the positive-sequence reactive current component, the negative-sequence active current component, and the negative-sequence reactive current component, respectively.
[0031] Based on scaling , and Then the magnitude of the negative sequence current was calculated. and the available capacity of positive sequence active current : ; ; The output of the positive-sequence active current controller is limited to [- Within the range. Regarding the power generation symbol convention in this embodiment, the positive-sequence d-axis current is negative when transmitting active power to the grid; therefore, the restricted positive-sequence current... The shaft current amplitude is used to calculate the maximum active power transmission capacity on the AC side: ; The above capacity allocation is expressed using the following constraints to ensure that the phase current under the worst-case scenario does not exceed the upper limit of the safe current: .
[0032] In the formula, This represents the positive-sequence active current component.
[0033] S4. Dynamically generate a photovoltaic power reference based on the maximum active power transmission capacity on the AC side and the DC bus energy state characterized by the DC bus voltage. This includes: The equivalent time constant of DC bus energy storage relative to rated power is defined as: ; In the formula, For DC bus capacitors, This is the rated voltage of the DC bus. Rated power; DC bus per unit voltage As input, construct DC bus energy deviation During a fault, the per-unit reference value for photovoltaic power is generated using the following formula: ; ; In the formula, This is the power memory value at the maximum power point before the fault. To avoid the controller completely losing the minimum power reference for energy transfer, The DC bus energy coordination time constant. This represents a saturation function.
[0034] S5. Adjust the duty cycle of the DC-DC boost converter according to the photovoltaic power reference, and memorize fault data during faults. This includes: The front-end Boost converter uses the perturbation-observation method to perform low-pass filtering on the photovoltaic array voltage and photovoltaic array current. It calculates the power change and voltage change according to the preset update cycle, and changes the duty cycle only when both the power change and voltage change exceed the corresponding dead zone. Before switching back to maximum power point tracking, it synchronizes the current duty cycle, current filter voltage, current filter power and update time to the initial state of the maximum power point tracking controller.
[0035] Specifically, under fault-free conditions, the front-end Boost converter employs the Perturb and Observe (P&O) method. First-order filtering is applied to the photovoltaic voltage and current to obtain the filtered voltage. and filter current And calculate the filter power. At set MPPT update intervals, the current power and voltage are compared with the power and voltage changes at the previous sampling time. The duty cycle direction is updated only when both the power and voltage changes exceed the corresponding dead zone. The duty cycle perturbation amplitude for each update does not exceed the preset step size. By extending the update interval, reducing the duty cycle perturbation step size, and setting a double dead zone, the reciprocating perturbation of the operating point near the MPP is reduced.
[0036] During a low-voltage fault, continuously record the power command at the maximum power point before the fault, the duty cycle at the maximum power point before the fault, and the lowest value of the coordinated power reference. .
[0037] S6. After the fault is cleared and the stability is confirmed, the minimum coordinated power command is used as the recovery starting point. The recovery rate is adaptively generated according to the DC bus voltage. The photovoltaic power command is restored to the maximum power command before the fault according to the recovery rate.
[0038] The conditions for fault clearance and stabilization confirmation include: when the deviation between the positive sequence voltage amplitude and the rated value is continuously less than the preset voltage deviation threshold and reaches the preset confirmation time, the target power for recovery is allowed to be increased; when the deviation is detected to exceed the preset voltage deviation threshold again during the recovery period, the recovery is stopped and the fault is returned to load reduction.
[0039] After detecting that the positive sequence voltage has recovered to the stable range and maintained for a set confirmation time, it enters the recovery state, with the recovery target being the lowest value of the coordinated power reference. Initially, the recovery rate is generated based on the DC bus voltage: ; The target power is gradually increased according to the following formula: ; The power command is obtained by combining the target power recovery with the DC bus energy correction term. Furthermore, a slope limit is set in the Boost duty cycle stage to ensure that the duty cycle approaches the power control target at a finite rate of change. During the recovery phase, the power regulation integrator employs a leakage-resistant anti-saturation structure to prevent the integral term from maintaining a prolonged negative bias when the measured photovoltaic power exceeds the power command in the initial stage of fault recovery.
[0040] S7. During the recovery process, the duty cycle is limited by the slope and the power control integral is subjected to anti-saturation processing. When the photovoltaic power, DC bus voltage and recovery target meet the switchback conditions, the current duty cycle and the historical value of maximum power point tracking are synchronized to the maximum power point tracking controller to switch back to maximum power point tracking without disturbance.
[0041] The anti-saturation treatment includes: setting upper and lower limits for the power control integral during fault descent; and introducing a leakage term proportional to the power control integral into the integral update during fault recovery to release the integral bias formed when the measured photovoltaic power is higher than the recovery power command.
[0042] When the measured photovoltaic power is compared with the maximum power point power memory value The error is less than the preset threshold, the DC bus voltage deviation is less than the preset threshold, and the recovery target reaches the maximum power point power memory value. When the system is near the point of origin, the current duty cycle is saved as the initial duty cycle for maximum power point tracking (MPPT), and historical voltage and power variables of the P&O system are synchronized. The system then switches from the recovery state to the normal MPPT state. The duty cycle command is not changed during the switch, thus avoiding duty cycle jumps between recovery control and P&O control.
[0043] A system for photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method includes: The acquisition and sequence component acquisition module is used to acquire the positive and negative sequence voltages and currents at the grid connection point, the DC bus voltage, and the voltage and current of the photovoltaic array.
[0044] The current request generation module is used to generate positive-sequence active current requests, positive-sequence reactive current requests, and negative-sequence current requests.
[0045] The combined current limiting module is used to allocate positive and negative sequence currents within a unified safe current limit according to the principle of prioritizing reactive power support, and output the available capacity of positive sequence active current.
[0046] The power reference generation module is used to generate a photovoltaic descent power reference based on the positive sequence voltage amplitude, the available capacity of the positive sequence active current, and the DC bus energy state.
[0047] The status management module is used to switch between normal maximum power point tracking status, fault coordinated load reduction status, and post-fault adaptive recovery status and manage power command memory.
[0048] The duty cycle control module is used to perform power control integral anti-saturation, duty cycle slope limiting, and maximum power point tracking historical quantity synchronization.
[0049] The invention is further illustrated by the following examples.
[0050] In one exemplary embodiment, the system topology and per-unit parameter settings of the two-stage photovoltaic power generation unit are as follows.
[0051] In this embodiment, a two-stage photovoltaic power generation unit with a rated power of 2MW is established. The output of the photovoltaic array is connected to the front-end Boost converter, the output of the Boost converter is connected to a DC bus with a rated voltage of 1200V, the DC bus is connected to a three-phase grid-connected inverter, and the AC side of the inverter is connected to the 110kV grid via a 690V collector side and a step-up transformer. Grid-connected control adopts grid-following current control, the phase-locked loop adopts DSOGI-PLL, and the positive and negative sequence separation stage is used to obtain the positive and negative sequence voltage and current components.
[0052] The main parameters of this embodiment are shown in Table 1.
[0053] Table 1 Parameters of a Two-Stage Photovoltaic Low Voltage Ride-Through Control Example
[0054] In one exemplary embodiment, the positive and negative sequence combined current limiting process is as follows.
[0055] During normal grid operation, the positive-sequence active current controller outputs active current requests based on the DC voltage outer loop and the power controller, while the positive-sequence reactive current request is zero or generated according to the reactive power command. Upon the occurrence of an asymmetrical fault, the DSOGI-PLL and the positive / negative sequence separation module output the positive-sequence voltage amplitude U and the negative-sequence voltage component. The low-voltage ride-through logic generates a negative-sequence compensation current request based on the negative-sequence voltage amplitude.
[0056] The combined current limiting module first calculates the required capacity for positive-sequence reactive power and negative-sequence current, and then limits the positive-sequence active current within the remaining capacity. Taking 1.2 pu as an example, when positive-sequence reactive power requests and negative-sequence requests share the current capacity, the upper limit of positive-sequence active current is less than 1.2 pu; when the negative-sequence current request increases, Further reduction. This process does not employ independent saturation for each sequence, but directly ensures that the sum of the magnitudes of the positive and negative sequence current vectors does not exceed [a certain value]. .
[0057] Using negative power generation Under the sign convention of direction, positive sequence active power capability Calculations show that, under ideal conditions without considering reactive power support, negative sequence support, control errors, and safety margins, when the fault voltage drops to 0.4 pu, even if the converter current still reaches 1.2 pu, the AC-side active power capacity is only about 0.48 pu; corresponding to a theoretical maximum active power transmission capacity of approximately 0.96 MW for a 2MW photovoltaic unit. However, actual controllers need to reserve capacity for reactive power support, negative sequence support, control errors, and safety margins; therefore, the average photovoltaic power during a fault is lower than or close to 0.96 MW.
[0058] In one exemplary embodiment, the AC power capability and DC bus energy coordinated load reduction process is as follows.
[0059] In this embodiment, the equivalent time constant of DC bus energy is: =0.036s; Pick 0.03s, obtained =1.2. During a fault, the controller updates every power control cycle. and and calculate When the DC bus per-unit voltage is greater than 1, it indicates that the stored energy on the DC bus is too high, and the power reference is further reduced from the AC side capability base value. When the DC bus per-unit voltage is less than 1, the photovoltaic input power is allowed to be moderately increased relative to the AC side capability base value, and the power reference is still based on the AC side capability base value during fault periods. As the AC side capability baseline, and limited by the saturation circuit to between the minimum power limit and the power memory value at the maximum power point before the fault, the inverter current safety constraint still takes effect independently.
[0060] The power regulation of the Boost converter employs a structure combining feedforward duty cycle and power error feedback. The feedforward duty cycle is based on... Duty cycle during load reduction Duty cycle of the maximum power point before the fault Interpolation is performed between the reference and reference power, and the feedback term is used to compensate for the deviation between the photovoltaic array power and the reference power. The power integrator has upper and lower limits, and a leakage term is added during the fault recovery phase to prevent the power loop from forming a long-term integral bias when the reference power continues to change.
[0061] In one exemplary embodiment, the adaptive recovery and disturbance-free handover process after a fault is as follows.
[0062] When the positive sequence voltage amplitude is detected to recover to near the rated value and remain thereafter... After a certain period, the controller transitions from the fault-coordinated load reduction state to the recovery state. To prevent a rapid increase in AC power capacity during voltage recovery that could cause a jump in the power reference, the controller maintains the fault state continuously. The initial target power for the recovery state is set to... Instead of directly setting it to the current measured photovoltaic power.
[0063] The recovery rate is adaptively determined by the DC bus voltage. When the value is below 1, increase the recovery rate to avoid excessively low DC bus energy; when When the value is higher than 1, the recovery rate is reduced to avoid re-generating DC overvoltage. The recovery target power increases in each power control cycle. Until the maximum power point memory value before the fault is reached. During the recovery process, the duty cycle change rate is limited by RD, and the power integrator is updated according to the leakage anti-saturation equation.
[0064] When the measured photovoltaic power is The error between them is less than 0.5%, the DC bus voltage deviation is less than 5%, and the target power reaches... When the current rate is above 99.5%, the controller will... , Pold and Vold are synchronized to the initial MPPT state, and then switched to the P&O state. Since the same process is used before and after the switch... The transition from state 2 to state 0 will not cause a change in duty cycle.
[0065] In one exemplary embodiment, the spike suppression control process for normal maximum power point tracking is as follows.
[0066] In this embodiment, the normal MPPT control uses a 10ms update cycle, a 0.00005 duty cycle perturbation step size, a 0.5V voltage dead zone, and a 300W power dead zone. The photovoltaic terminal voltage and current first pass through a first-order filter with a 1ms time constant. The P&O algorithm only updates the perturbation direction when the change in filtered power and the change in filtered voltage exceed the corresponding dead zone.
[0067] Specifically, let This represents the change in filter power between two consecutive MPPT updates. This represents the change in the filtered voltage. When... Not greater than the power dead zone or When the voltage dead zone is not greater than the duty cycle, the duty cycle remains unchanged; when both exceed the corresponding dead zone, if and If the signs are the same, then reduce the Boost duty cycle; if and If the sign is opposite, the Boost duty cycle is increased. This directional rule is based on the polarity convention that increasing the Boost duty cycle reduces the photovoltaic voltage; when the opposite duty cycle polarity is used, the corresponding increase / decrease directions are reversed.
[0068] Near the MPP (Maximum Power Point), the slope of the photovoltaic array power curve is relatively small, and excessive duty cycle disturbances can cause the photovoltaic voltage to fluctuate back and forth between the operating point and the working point. This embodiment reduces the operating point movement speed by decreasing the disturbance step size and extending the update cycle, thus ensuring that the photovoltaic voltage remains continuously changing near the MPP. The parameters can be adjusted within a preset range according to the photovoltaic array power level, input capacitance, and boost inductor parameters. This spike suppression processing only applies to the normal MPPT state and does not change the power coordination, positive and negative sequence current limiting, and adaptive recovery logic during fault periods.
[0069] In one exemplary embodiment, the controller state machine and its software implementation are as follows.
[0070] The controller of this invention can be implemented using a real-time controller, a digital signal processor, a field-programmable gate array (FPGA), an industrial computer, or a control device running Simulink-generated code. The controller reads the input value in each basic sampling cycle, but only updates the filter, power loop, and MPPT states when the corresponding control cycle is met, thereby avoiding timing errors caused by variable-step simulation or repeated calls.
[0071] The controller's software flow includes: initializing rated power, DC bus parameters, MPPT status, and historical sample values; reading and filtering. , , and positive sequence voltage amplitude Determine the fault status; perform peak suppression (P&O) in state 0, and calculate in state 1. and It performs coordinated load reduction, and in state 2 performs voltage stability confirmation, adaptive recovery, integral leakage and duty cycle slope limiting; after the recovery conditions are met, it synchronizes historical values and returns to state 0.
[0072] Those skilled in the art can implement the above state machine as one or more software modules, or they can implement the positive and negative sequence joint current limiting, power reference calculation, MPPT state management, and duty cycle output as separate hardware logic modules. As long as the same input processing, joint constraints, energy coordination, and disturbance-free recovery functions can be achieved, they should be considered as equivalent implementations of this application.
[0073] In one exemplary embodiment, the fault criteria, stability confirmation logic, and re-fault handling method are as follows.
[0074] The low-voltage fault criterion can be composed of a fault flag from the power grid protection device, a positive-sequence voltage amplitude criterion, or a combination of both. To avoid false state switching caused by fault flag delays, inconsistencies in the positive-sequence voltage transition process, and controller calculation cycles, this embodiment employs dual criteria: in state 0, a fault flag is used to trigger initial load reduction; in states 1 and 2, the positive-sequence voltage amplitude deviation is used to determine whether the fault still exists. If the positive-sequence voltage amplitude deviation exceeds 5%, the fault coordination state is maintained or returned; if the positive-sequence voltage amplitude deviation does not exceed 5%, the fault coordination state is maintained continuously. Only then will the recovery phase be permitted.
[0075] If a positive-sequence voltage drop is detected again during the recovery process, the controller immediately stops the recovery process, saves the current duty cycle, and returns to state 1. The recovery target is recalculated based on the current AC power capacity and DC bus energy, and the minimum coordinated power memory during the fault is not overwritten by unconfirmed instantaneous power rebound. This logic is applicable to scenarios involving continuous low-voltage faults or multiple low-voltage faults with short intervals.
[0076] For measuring the impact in the initial stage of a fault, the positive sequence voltage amplitude can be measured. DC bus per unit voltage and photovoltaic power Limited bandwidth filtering is performed, but the fault protection and current limiting channels can use unfiltered or fast-filtered signals to ensure that the converter current does not exceed the safe limit due to measurement delay.
[0077] In an exemplary embodiment, the control parameter range and parameter tuning method are as follows.
[0078] The control parameters in this application can be per-unit tuned based on the rated capacity of the photovoltaic array, Boost converter, DC bus capacitor, and grid-connected converter. For a photovoltaic unit with a rated power of Pb, the DC bus energy time constant is determined by... calculate. Preferred selection 0.5 to 2 times; when the DC bus capacitance is small or the DC voltage rises rapidly during a fault, it can be reduced. To improve energy coordination response speed; when the system has a large DC bus capacitance or allows for slower power drawdown, the capacity can be increased. .
[0079] Joint rate limiting module The rated current of the converter can be 1.0 to 1.2 times. The priorities of positive-sequence reactive power requests, negative-sequence current requests, and positive-sequence active power requests can be configured according to grid specifications. When voltage support priority is higher than active power transmission priority, The priority decreases as reactive power demand increases; when the system prioritizes negative sequence suppression, the negative sequence current component can be scaled first, and then positive sequence reactive and active power can be allocated according to the remaining capacity. Regardless of the priority used, the sum of the magnitudes of the positive and negative sequence current vectors should ultimately not exceed [a certain value]. .
[0080] Adaptive recovery rate Preferably, it is 0.5 to 2.0 pu / s. Preferably, it is 0.1 to 0.5 pu / s. The preferred value is 2 to 5 pu / s. and These settings are used to adjust the recovery speed under DC bus undervoltage and overvoltage conditions, and can be adjusted according to the allowable deviation of DC bus voltage and the rate of change of photovoltaic array power. The minimum hold time for the recovery state can be set to 0.1 to 0.5 seconds to avoid repeated triggering of the recovery condition under noise or transient fluctuations.
[0081] The preferred perturbation observation period for a normal MPPT is 5 to 20 ms, and the preferred perturbation step size is 0.01% to 0.1% of the rated duty cycle. The voltage dead zone and power dead zone are set independently: the voltage dead zone is used to suppress erroneous direction judgments caused by input capacitance and Boost switch ripple, while the power dead zone is used to suppress invalid duty cycle repetitions in the flat region of the power curve near the MPP. For scenarios requiring faster tracking of irradiance changes, an adaptive perturbation step size can be used, but the upper limit of the step size is still constrained by the duty cycle slope limiter.
[0082] In one exemplary embodiment, the measurement output and experimental evaluation method are as follows.
[0083] To differentiate between the instantaneous switching power of the photovoltaic array, the second harmonic power fluctuation under low-voltage faults, and the average power response of the controller, this embodiment retains the instantaneous power response within the controller. The signal is then processed, and a moving average or low-pass filter is added to the observation module for output. . It does not participate in current limiting and fault protection; it is only used to display, record, and calculate the average photovoltaic power during a fault.
[0084] Low-voltage ride-through performance can be evaluated using the following metrics: peak DC bus overvoltage, peak instantaneous three-phase current, maximum combined positive and negative sequence current command envelope, average photovoltaic power during the fault period, recovery time to rated power after fault clearance, maximum power overshoot during recovery, and duty cycle jump when switching from state 2 to state 0. This is achieved by simultaneously recording... , , , , , , , , and This allows for the verification of every control element in this application.
[0085] In asymmetrical fault experiments, it is recommended to set two-phase voltage dips, single-phase voltage dips, and different negative sequence voltage amplitudes, and observe the effect of increasing negative sequence voltage demand. The variation. In symmetrical fault experiments, it is recommended to set different voltage drop depths of 0.2, 0.4, and 0.6 pu to verify. It changes approximately linearly with the positive sequence voltage amplitude. In a series of fault experiments, it is verified whether current constraint and DC bus voltage safety are prioritized after the recovery state is interrupted again.
[0086] In one exemplary embodiment, the present application is compared with existing control methods as follows.
[0087] Without using combined positive and negative sequence current limiting, the positive and negative sequence current components can be limited by 1.2 pu respectively. In this case, when positive sequence reactive power support and negative sequence current exist simultaneously, the current of a certain phase after the positive and negative sequence components are combined may exceed 1.2 pu. After adopting the combined current limiting method of this application, all sequence components are distributed under the same unified conservative capacity constraint, which can directly limit the worst-case phase current.
[0088] Without DC bus energy coordination, the photovoltaic power can be fixedly reduced to a preset ratio based solely on fault indicators. This method cannot adjust the photovoltaic input power according to changes in the actual power capacity of the AC side, nor can it adjust the photovoltaic input power based on DC bus overvoltage or undervoltage. With this application, and They jointly participate in the power reference calculation, so the fault depth, reactive power support, and DC energy status can be simultaneously reflected in the Boost power command.
[0089] Without fault minimum power memory and leakage anti-saturation, premature recovery of AC power capability during grid voltage recovery transition may cause the power reference to jump directly to the fault threshold. Meanwhile, the power loop integrator may develop a negative integral bias due to the measured power being higher than the reference power. By adopting this application, the bias is restored from... Initially, the power target was set according to... As the integral bias gradually increases, it is released through the leakage term, and the duty cycle slope limiter makes the power and voltage recovery process smoother.
[0090] In one exemplary embodiment, the system, control device, and storage medium may be implemented as follows.
[0091] This embodiment also provides a control device, including a processor, a memory, an input interface, an output interface, and an optional communication interface. The memory stores a control program; when the processor executes the control program, it implements the positive and negative sequence joint current limiting, AC power capacity calculation, DC bus energy coordinated load reduction, peak suppression MPPT, and post-fault adaptive recovery steps found in any of the above embodiments.
[0092] This embodiment also provides a computer-readable storage medium storing a computer program. When the computer program is run on a processor, it causes the processor to perform all or part of the steps of the above-described method. The storage medium may include a read-only memory, random access memory, flash memory, magnetic disk, optical disk, or other media capable of storing program code.
[0093] In one exemplary embodiment, the control method can be verified using the following simulation and testing methods.
[0094] Three-phase symmetrical voltage sag, two-phase voltage sag, and single-phase voltage sag conditions can be set and recorded in Simulink or a real-time control platform. , , , , , , , Three-phase grid-connected current, control status, recovery rate, and Boost duty cycle. When verifying the combined current limiting function, compare the sum of the positive and negative sequence current vector magnitudes with... And observe when the reactive power support request increases. Whether it decreases accordingly; when verifying the energy coordination function, compare , and The relationship between changes; when verifying the recovery function, check whether the recovery has changed from... start, Whether or not Whether the duty cycle slope is limited and whether the duty cycle is continuous when switching back to maximum power point tracking.
[0095] In a set of two-phase asymmetrical fault simulations, the voltages of phases A and B drop to 0.4 pu during the period from 2.5 s to 3.0 s, while phase C remains at 1.0 pu. The simulation results are as follows. Figure 5 As shown: the maximum value of the positive and negative sequence joint current command envelope is 1.20000 pu, the actual phase current peak value is 1.09552 pu, the DC bus voltage peak value is 1.03842 pu, and the average photovoltaic power during the fault is 1.01622 MW; the recovery time after the fault is cleared is 0.57413 s, the adaptive recovery rate is 1.02962 pu / s to 1.37050 pu / s, the duty cycle jump variable is 0 when switching from state 2 to state 0, and the final average photovoltaic power recovers to 2.00108 MW.
[0096] In a three-phase symmetrical 0.4 pu low-voltage fault simulation, the voltage and current at the three-phase grid connection point, the photovoltaic array voltage, the photovoltaic power reference and measured power, the DC bus voltage, and the control status were recorded simultaneously. The resulting waveforms were used to verify the power pullback under symmetrical fault conditions and the smooth recovery process after the fault. Figure 6 As shown.
[0097] To verify the combined effect of each coordinating component, the original control method and the control method of this application were compared under the same fault parameters. The peak DC bus voltage, maximum phase current, photovoltaic power during the fault, recovery time, and the continuity of the Boost duty cycle during state switching were compared. The results are as follows: Figure 7 As shown.
[0098] Therefore, the present invention adopts the above-mentioned photovoltaic low voltage ride-through positive and negative sequence current limiting and energy coordination method and system, which puts the positive sequence current and the negative sequence current into the same worst-case phase current constraint, avoids the phase current exceeding the limit caused by the superposition of positive and negative sequence after each sequence component is limited separately, and maintains the controllable priority of positive sequence reactive power support and negative sequence support when the current is insufficient.
[0099] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solutions of the present invention, and these modifications or equivalent substitutions cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.
Claims
1. A photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method, characterized in that, Includes the following steps: S1. Establish a two-stage photovoltaic power generation unit and obtain operating data. Obtain voltage and current data through the operating data, and determine the standardization and energy calculation benchmark. S2. Generate positive sequence reactive current request, positive sequence active current request and negative sequence current request; S3. Using the upper limit of the safe current allowed by the transformer as a constraint, calculate the available capacity of the positive sequence active current, and calculate the maximum active power transmission capacity on the AC side through the available capacity of the positive sequence active current. S4. Dynamically generate a photovoltaic power reference based on the maximum active power transmission capacity of the AC side and the DC bus energy state characterized by the DC bus voltage. S5. Adjust the duty cycle of the DC-DC boost converter according to the photovoltaic power reference, and memorize fault data during the fault period; S6. After the fault is cleared and the stability is confirmed, the minimum coordinated power command is used as the recovery starting point. The recovery rate is adaptively generated according to the DC bus voltage. The photovoltaic power command is restored to the maximum power command before the fault according to the recovery rate. S7. During the recovery process, the duty cycle is limited by the slope and the power control integral is subjected to anti-saturation processing. When the photovoltaic power, DC bus voltage and recovery target meet the switchback conditions, the current duty cycle and the historical value of maximum power point tracking are synchronized to the maximum power point tracking controller to switch back to maximum power point tracking without disturbance.
2. The photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to claim 1, characterized in that, S1 includes: S11. Connect the photovoltaic array to the DC bus via the front-end Boost converter, and connect the DC bus to the AC grid via the grid-connected inverter to form a two-stage photovoltaic power generation unit. S12. Use operational parameters, including photovoltaic array terminal voltage. Photovoltaic array terminal current DC bus voltage Three-phase voltage and three-phase current at the grid connection point; S13. Obtain the positive sequence voltage amplitude through synchronous coordinate transformation and positive / negative sequence separation. Positive sequence current component and negative sequence current component, and rated power DC bus rated voltage and DC bus capacitor As a standard for standardization and energy calculation.
3. The photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to claim 2, characterized in that, S2 includes: Generate positive-sequence reactive current requests based on low-voltage ride-through strategies and grid connection specifications. Positive sequence active current request And negative sequence current request , ; Positive-sequence reactive current is used to provide voltage support, while negative-sequence current requests are used to suppress the impact of unbalanced voltage on the grid connection point. When multiple support requests exist simultaneously, reactive power support is allocated according to a preset priority.
4. The photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to claim 3, characterized in that, S3 includes: Calculate the negative sequence current request vector magnitude and the total reactive power support request: ; ; In the formula, Request the amplitude for negative sequence current. The total reactive power support request represents the conservative current capacity occupied by the positive-sequence reactive power request and the negative-sequence current request. When reactive power supports total request Greater than the upper limit of the transformer's permissible safe current Calculate the reactive power support scaling factor: ; Multiply both the positive-sequence reactive current request and the negative-sequence current request by the reactive power support scaling factor to obtain the scaled result. , and ,in, , and These are the positive-sequence reactive current component, the negative-sequence active current component, and the negative-sequence reactive current component, respectively. Based on scaling , and Calculate the negative sequence current amplitude and the available capacity of positive sequence active current : ; ; The output of the positive-sequence active current controller is limited to [- Within the range; Calculate the maximum active power transmission capacity on the AC side: ; Capacity allocation is represented by the following constraints to ensure that the phase current under the worst-case scenario does not exceed the upper limit of the safe current: ; In the formula, This represents the positive-sequence active current component.
5. The photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to claim 4, characterized in that, S4 includes: The equivalent time constant of DC bus energy storage relative to rated power is defined as: ; In the formula, For DC bus capacitors, This is the rated voltage of the DC bus. Rated power; DC bus per unit voltage As input, construct DC bus energy deviation During a fault, the per-unit reference value for photovoltaic power is generated using the following formula: ; ; In the formula, This is the power memory value at the maximum power point. To avoid the controller completely losing the minimum power reference for energy transfer, The DC bus energy coordination time constant. This represents a saturation function.
6. The photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to claim 5, characterized in that, S5 includes: The front-end Boost converter uses the perturbation-observation method to perform low-pass filtering on the photovoltaic array voltage and photovoltaic array current, calculates the power change and voltage change according to the preset update cycle, and changes the duty cycle only when both the power change and voltage change exceed the corresponding dead zone; before switching back to maximum power point tracking, the current duty cycle, current filter voltage, current filter power and update time are synchronized to the initial state of the maximum power point tracking controller. During a low-voltage fault, continuously record the power command at the maximum power point before the fault, the duty cycle at the maximum power point before the fault, and the lowest value of the coordinated power reference. .
7. A photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to claim 6, characterized in that, The conditions for fault clearing and stabilization confirmation in S6 include: When the deviation between the positive sequence voltage amplitude and the rated value is continuously less than the preset voltage deviation threshold and reaches the preset confirmation time, the target power for recovery is allowed to be increased; if the deviation is detected to exceed the preset voltage deviation threshold again during the recovery period, the recovery is stopped and the fault is returned to load reduction.
8. The photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to claim 7, characterized in that, S6 includes: After detecting that the positive sequence voltage has recovered to the stable range and maintained for a set confirmation time, it enters the recovery state, with the recovery target being the lowest value of the coordinated power reference. Initially, the recovery rate is generated based on the DC bus voltage: ; The target power is gradually increased according to the following formula: ; The power command is obtained by combining the target power recovery with the DC bus energy correction term. Furthermore, a slope limit is set in the Boost duty cycle stage to make the duty cycle approach the power control target at a finite rate of change.
9. A photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to claim 8, characterized in that, The cutback conditions in S7 include: Photovoltaic measured power and maximum power point power memory value The error is less than the preset threshold, the DC bus voltage deviation is less than the preset threshold, and the recovery target reaches the maximum power point power memory value. The current duty cycle is saved as the initial duty cycle for maximum power point tracking, and historical voltage and power variables are synchronized, switching from the recovery state to the normal MPPT state.
10. A system applying the photovoltaic low-voltage ride-through positive and negative sequence current limiting and energy coordination method according to any one of claims 1-9, characterized in that, include: The acquisition and sequence component acquisition module is used to acquire the positive and negative sequence voltages and currents at the grid connection point, the DC bus voltage, and the voltage and current of the photovoltaic array; The current request generation module is used to generate positive-sequence active current requests, positive-sequence reactive current requests, and negative-sequence current requests. The combined current limiting module is used to allocate positive and negative sequence currents within a unified safe current limit according to the principle of prioritizing reactive power support, and output the available capacity of positive sequence active current. The power reference generation module is used to generate a photovoltaic descent power reference based on the positive sequence voltage amplitude, the available capacity of the positive sequence active current, and the DC bus energy state. The status management module is used to switch between normal maximum power point tracking status, fault coordinated load reduction status and post-fault adaptive recovery status and manage power command memory. The duty cycle control module is used to perform power control integral anti-saturation, duty cycle slope limiting, and maximum power point tracking historical quantity synchronization.