Multi-time scale mutual aid dispatching method for integrated wind-solar-hydro-storage base

By constructing a multi-objective robust optimization model and a non-dominated sorting differential evolution algorithm to optimize the power generation plan of the integrated wind-solar-hydro-storage base, the problems of power curtailment and load shedding caused by the uncertainty of wind and solar power output were solved, and the system was able to operate stably and efficiently.

CN123144231APending Publication Date: 2026-11-20ANNING BUREAU OF ULTRA HIGH VOLTAGE TRANSMISSION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611120403.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-27
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The strong randomness and intermittent nature of wind and solar power output leads to prediction errors, resulting in power curtailment or load shedding. The flexible response capability of UHVDC converter equipment is limited, and the coordinated regulation strategy of cascade hydropower and energy storage is imperfect, affecting the safety, economy and transmission stability of multi-energy complementary systems.

Method used

Based on the fact that the wind-solar power output prediction error follows a normal distribution, a wind-solar power output error scenario is generated by Latin hypercube sampling. A multi-objective robust optimization model is constructed by combining synchronous back-substitution reduction method. Robust constraints are introduced to ensure the consistency between system output and power generation plan. The transmission power and hydropower storage load allocation are optimized by non-dominated sorting differential evolution algorithm to form the day-ahead power generation plan.

Benefits of technology

The system has achieved day-ahead multi-timescale mutual assistance dispatch of the integrated wind, solar, hydro and storage base, which has reduced the risk of power curtailment and load loss, improved the stability of power transmission and peak-shaving performance, and ensured the safe and economical operation of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144231A_ABST
    Figure CN123144231A_ABST
Patent Text Reader

Abstract

The application relates to the technical field of power system dispatching, and discloses a wind-solar-water-storage integrated base day-ahead multi-time scale mutual aid dispatching method, which comprises the following steps: based on the characteristic that wind-light output prediction error is subject to normal distribution, wind-light output error scenes are generated through Latin hypercube sampling, and representative wind-light combined output scene sets and corresponding probabilities of each scene are obtained by combining synchronous back substitution reduction; a multi-target robust optimization model is constructed, a robust constraint is introduced, and a constraint system is constructed; the outer layer of the model optimizes power transmission power through a non-dominated sorting differential evolution algorithm; the power transmission power output by the outer layer is taken as input, the load borne by cascade hydropower and energy storage is calculated, day-ahead power generation plans meeting power transmission stability requirements are obtained, and the obtained day-ahead power generation plans are used for guiding day-ahead dispatching operation of the water-wind-solar-storage integrated base. The application has the advantages of reasonably allocating the regulation capacity of hydropower and energy storage and improving the adaptability of the system to wind and light prediction deviation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power system dispatching technology, and in particular to a multi-timescale mutual dispatching method for integrated wind, solar, hydro, and storage bases. Background Technology

[0002] With the large-scale development of multi-energy complementary bases integrating wind, solar, hydro, and energy storage, bundled transmission has become an important model for improving the consumption of new energy. However, wind and solar power output exhibits strong random and intermittent characteristics, which can easily lead to prediction errors, resulting in power curtailment or load shedding and exacerbating power fluctuations in the system. Ultra-high voltage direct current (UHVDC) converter equipment is not easily adjusted frequently and requires a "smooth, stepped" transmission curve, limiting its flexible response capabilities. Furthermore, the coordinated regulation strategy between cascade hydropower and limited-scale energy storage is imperfect, and its flexibility is not fully utilized, making it difficult to compensate for wind and solar fluctuations in a timely and effective manner. These three types of problems are coupled together, jointly restricting the safety, economy, and transmission stability of multi-energy complementary systems. Summary of the Invention

[0003] The purpose of this invention is to overcome the shortcomings of the prior art and provide a day-ahead multi-timescale mutual scheduling method for integrated wind, solar, hydro, and storage bases.

[0004] The objective of this invention is achieved through the following technical solution: a day-ahead multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases, comprising the following steps:

[0005] S1. Based on the characteristic that the wind-solar power output prediction error follows a normal distribution, wind-solar power output error scenarios are generated by Latin hypercube sampling. Combined with the synchronous back-substitution reduction method, a representative set of wind-solar power output scenarios and the corresponding probabilities of each scenario are obtained at a 95% confidence level.

[0006] S2. A multi-objective robust optimization model is constructed with the dual objectives of maximizing the average daily transmission power of the complementary system and minimizing the standard deviation of the remaining load of the receiving-end grid. Robust constraints are introduced to ensure that the deviation between the actual output of the system and the planned output of the day-ahead power generation is less than a preset threshold under all representative scenarios, and a constraint system is constructed.

[0007] S3. The outer layer of the multi-objective robust optimization model uses the segmented power values ​​and power change time points of the stepped transmission curve as decision variables and optimizes the transmission power through a non-dominated sorting differential evolution algorithm. The inner layer takes the transmission power output from the outer layer as input, calculates the load that the cascade hydropower and energy storage need to bear, and determines the water storage and release sequence and load allocation of the cascade hydropower stations by combining the discrimination coefficient and the relative water storage rate. The insufficient part is compensated by energy storage. The collaborative solution is achieved through parameter transfer between the inner and outer layers to obtain the day-ahead power generation plan that meets the requirements of transmission stability.

[0008] S4. The obtained day-ahead power generation plan will be used to guide the day-ahead scheduling and operation of the integrated hydro-wind-solar-storage base.

[0009] Specifically, S1 includes:

[0010] Determine the normal distribution parameters at the 95% confidence level for each time period based on the predicted wind and solar power output processes;

[0011] Latin hypercube sampling is used to sample wind power output error and photovoltaic output error separately to generate wind and solar power output scenarios, and then the wind-solar combined scenarios are randomly combined in pairs.

[0012] The synchronous back-substitution reduction method is used to eliminate redundant scenarios, and a predetermined number of representative wind-solar combination power output scenarios and their corresponding probabilities are retained.

[0013] Specifically, the objective function of the multi-objective robust optimization model is:

[0014] ;

[0015] ;

[0016] ;

[0017] In the formula, T represents the number of scheduling periods; To contribute power to the planned power generation for the day before time period t; The total load of the power grid during time period t; L and L represent the remaining load and total load of the power grid, respectively. This represents the average remaining load. This represents the standard deviation of the remaining load on the power grid.

[0018] Specifically, the robust constraint is:

[0019] ;

[0020] In the formula, , , , These represent the output / charging / discharging power of wind, solar, hydropower, and energy storage during time period t under scenario i.

[0021] Specifically, the constraint system includes power transmission stability constraints, transmission capacity constraints, water balance constraints, reservoir characteristic constraints, water level constraints, hydropower station output constraints, downstream flow constraints, cascade energy storage variation constraints, energy storage charging and discharging depth constraints, and energy storage power constraints.

[0022] Specifically, the outer layer optimization of the multi-objective robust optimization model adopts a two-dimensional encoding strategy. Based on the decision variables, the non-dominated sorting differential evolution algorithm is used to optimize the bi-objective function and generate a Pareto solution set, which reflects the competitive relationship between the average daily transmission power and peak-shaving performance.

[0023] Specifically, the inner-layer optimization of the multi-objective robust optimization model includes:

[0024] Substituting the day-ahead planned power output from the outer layer into the following formula, calculate the load that the cascade hydropower and energy storage need to bear in time period t under scenario i:

[0025] ;

[0026] In the formula, Contributing to the daytime power generation plan; The load that the cascade hydropower and energy storage need to bear in time period t under scenario i;

[0027] Calculate the hydroelectric power output under natural runoff ,like Then, cascade water storage is implemented; if Then, water is released in tiers; the calculation formula is:

[0028] ;

[0029] In the formula, 9.81 is the gravitational acceleration constant. The overall efficiency of cascade hydropower and energy storage, For power generation flow, For clean water head;

[0030] During water storage, the discrimination coefficient K for each reservoir is calculated, and the reservoir with the largest discrimination coefficient K is prioritized for storage; if the relative storage rate difference between a certain reservoir and the reservoir with the largest discrimination coefficient K is... Therefore, priority should be given to reservoirs with larger water storage capacity (rsr).

[0031] When releasing water, priority is given to identifying the reservoir with the smallest coefficient K; if a certain reservoir is different from the reservoir with the smallest K... If the water level is high, then the reservoir with the largest RSR will be released first.

[0032] The formula for calculating the reservoir discrimination coefficient K is:

[0033] ;

[0034] In the formula, The increased power generation from reservoir storage The increased storage capacity of the reservoir;

[0035] When the load demand cannot be met after the cascade hydropower regulation, the energy storage charging and discharging will compensate: when the output is insufficient, the energy storage will discharge; when the output is excessive, the energy storage will charge.

[0036] If a power generation plan fails to meet robust constraints in all representative scenarios, it is deemed an invalid solution and re-enters the outer optimization layer.

[0037] The present invention has the following advantages:

[0038] 1. This invention assumes that wind / solar prediction errors approximately follow a normal distribution. It first uses Latin hypercube sampling (LHS) to generate a large sample of error scenarios, then combines this with simultaneous back-substitution reduction (SBR) at a 95% confidence level to obtain a small number of "representative wind-solar combination scenarios" and their probabilities, which are used as unified input for robust optimization. This process avoids scenario explosion while ensuring statistical representativeness.

[0039] 2. This invention sets the dual objectives of maximizing the average daily transmission power of the complementary system and minimizing the standard deviation of the remaining load of the receiving-end grid, and sets robust feasibility constraints: under all representative scenarios, the hourly deviation between the actual system output (wind + solar + hydro + energy storage) and the power generation plan must be < 1 MW. This constraint internalizes the consistency between planning and execution as a hard boundary, directly targeting the reduction of curtailment / load loss risk and the suppression of receiving-end fluctuations; the standard deviation index is used to quantify the peak-shaving pressure at the receiving end, ensuring the consistency between the objective function and the engineering pain points.

[0040] 3. The double-layer nested framework of this invention directly parameterizes the day-ahead transmission curve with 5 stepped power segments and 4 power change time points (a total of 9 variables) in the outer layer, and forces the duration of each segment to be ≥4 hours, ensuring the "smooth stepped" operation requirement of UHVDC from the source. This reduces the complexity of the traditional "large number of output variables on the unit side" to an optimization problem of "a few curve parameters on the system side." Furthermore, non-dominated sorting differential evolution (NSDE) is used to obtain a Pareto solution set reflecting the trade-off between "daily average transmission and peak-shaving performance." This combination of "transmission curve parameterization + hard duration constraints + NSDE" addresses the point to be protected, combining engineering feasibility with solution efficiency.

[0041] 4. The inner layer of this invention uses the stepped power transmission given by the outer layer as a constraint, and calculates the equivalent load to be borne by "cascade hydropower + energy storage" for each scenario: first, the "storage / release" state is determined based on natural runoff; then, the storage / release sequence and allocation ratio of the cascade reservoirs are determined using the discrimination coefficient K and the relative storage rate sr, with the shortfall compensated by energy storage charging / discharging; the energy storage side follows boundaries such as "charge / discharge depth ≤ 95%, power not exceeding rated capacity, initial SOC = 50%" to balance lifespan and regulation capacity. Parallel integrated operational constraints include: power transmission stability and transmission capacity, water balance, reservoir capacity-water level / discharge-tailwater level relationship, and hydropower output limits caused by head-flow coupling, making the solution "physically feasible on a time-by-time basis." Attached Figure Description

[0042] Figure 1 This is a schematic diagram of the scheduling method of the present invention;

[0043] Figure 2 This is a schematic diagram of the double-layer nested optimization framework of the present invention. Detailed Implementation

[0044] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only for explaining the invention and are not intended to limit the invention; that is, the described embodiments are merely some embodiments of the invention, and not all embodiments. The components of the embodiments of the invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0045] Therefore, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the invention.

[0046] It should be noted that relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0047] The present invention will be further described below with reference to the accompanying drawings, but the scope of protection of the present invention is not limited to the following description.

[0048] like Figures 1 to 2 As shown, the multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases is characterized by the following steps:

[0049] S1. Based on the characteristic that the wind-solar power output prediction error follows a normal distribution, 500 wind-solar power output error scenarios are generated by Latin hypercube sampling. Then, wind-solar combined scenarios are obtained by randomly combining them in pairs. Combined with the synchronous back-substitution reduction method, redundant scenarios are eliminated at a 95% confidence level, and 10 representative wind-solar combined power output scenario sets and the corresponding probabilities of each scenario are retained. In this way, the uncertainty of wind and solar power output is transformed from unpredictable to a calculable and coverable scenario set, providing a data foundation for subsequent models to cope with uncertainty risks.

[0050] In this embodiment, based on the predicted wind and solar power output processes... , Determine the normal distribution parameters at a 95% confidence level for each time period (mean is the predicted value, standard deviation corresponds to ±10% error);

[0051] Latin hypercube sampling was used to assess wind power output error. And photovoltaic output error Sampling separately, combined with the following formula:

[0052] ;

[0053] In the formula, in the formula and These refer to the actual output of wind power and solar power, respectively.

[0054] Generate scenes where wind and light exert their effects individually, and then randomly combine them in pairs to obtain a combined wind-light scene.

[0055] The synchronous back-substitution reduction method is used to eliminate redundant scenarios, and a predetermined number (e.g., 10) of representative wind-solar power output scenarios and their corresponding probabilities are retained, which ensures uncertainty coverage and reduces the computational burden of the model.

[0056] S2. A multi-objective robust optimization model is constructed with the dual objectives of maximizing the average daily transmission power of the complementary system and minimizing the standard deviation of the remaining load of the receiving-end grid. Maximizing the average daily transmission power aims to improve transmission efficiency, while minimizing the standard deviation of the remaining load reduces the grid's peak-shaving pressure by minimizing the fluctuation of the remaining load of the receiving-end grid, thus guiding the power generation plan towards stability from the objective level. At the same time, robust constraints are introduced to ensure that the deviation between the actual output of the system and the day-ahead power generation plan is less than 1MW in all representative scenarios, thus eliminating the risk of power curtailment and load loss from the institutional design. A complete constraint system is also constructed.

[0057] In this embodiment, the objective function of the multi-objective robust optimization model is:

[0058] Objective function 1: Maximize the average daily transmission power of the complementary system, with the goal of maximizing the average daily planned power output for each period within the dispatch cycle (24h).

[0059] ;

[0060] Objective function 2: Minimize the standard deviation of the remaining load in the receiving-end power grid;

[0061] ;

[0062] ;

[0063] In the formula, T represents the number of scheduling periods; To contribute power to the planned power generation for the day before time period t; The total load of the power grid during time period t; L and L represent the remaining load and total load of the power grid, respectively. This represents the average remaining load. This represents the standard deviation of the remaining load on the power grid.

[0064] The robust constraints ensure that, in all 10 representative wind-solar scenarios, the deviation between the actual system output (wind + solar + hydropower + energy storage) and the power generation plan is less than 1MW, i.e.:

[0065] ;

[0066] In the formula, , , , These represent the output / charging / discharging power of wind, solar, hydropower, and energy storage during time period t under scenario i.

[0067] Operational constraints strictly adhere to the physical operational boundaries of UHVDC, cascade hydropower, and energy storage. Core constraints include:

[0068] Transmission stability constraints: The transmission curve is divided into 5 steps, each with a power... Maintain stability, power change timing Ensure that each segment is at least 4 hours long, that is:

[0069] ;

[0070] In the formula, s is the segment number of the transmission step curve. At this time, the day-ahead power generation plan of the complementary system is expressed as:

[0071] ;

[0072] The constraint system includes:

[0073] Transmission stability constraints are imposed, and the transmission curve is divided into 5 steps, with each step having a power output of [missing information]. Maintain stability, power change timing Ensure that each segment is at least 4 hours long, that is:

[0074] ;

[0075] In the formula, P represents the power output of the planned day-ahead power generation during time period t. s The transmission power of the complementary system during the s-th stable operating period; t c The time points at which the output of the stepped power transmission curve changes;

[0076] Conveying capacity constraints:

[0077] ;

[0078] In the formula, This represents the maximum transmission capacity of the power transmission channel.

[0079] Water balance constraints:

[0080] ;

[0081] In the formula, m is the number of the cascade reservoir; and These represent the initial and final reservoir capacities of reservoir m at time t, respectively. and These represent the inflow and outflow of reservoir m during time period t, respectively. The water inflow between reservoir m and reservoir m+1;

[0082] Reservoir characteristic constraints:

[0083] ;

[0084] In the formula, and These represent the water levels in front of and behind the dam of reservoir m at time t. and These represent the water level-reservoir capacity relationship and the discharge-tailwater level relationship of reservoir m, respectively.

[0085] Water level constraints:

[0086] ;

[0087] In the formula, and These represent the upper and lower limits of the reservoir water level at time t, respectively.

[0088] Hydropower station output constraints:

[0089] ;

[0090] In the formula, k m QE is the power output coefficient of the m-type hydropower station. t,m Let m be the power generation flow rate of reservoir m during time period t; ΔH t,m Let QE be the head of reservoir m at time t, and let QE be the flow rate used for power generation. , This represents the average water level in front of the dam.

[0091] Downflow constraint:

[0092] ;

[0093] In the formula, , These represent the upper and lower limits of the discharge flow of reservoir m during time period t;

[0094] Constraints on cascade energy storage variation:

[0095] ;

[0096] In the formula, and These represent the energy storage of the cascade reservoirs at the beginning and end of the scheduling period, respectively; α is the maximum acceptable rate of change in energy storage, taken as 0.03 in spring, summer and autumn and 0.15 in winter; Let m be the reservoir capacity corresponding to the dead water level; ρ is the density of water. It is the sum of the average head of reservoir m and all reservoirs located downstream of reservoir m;

[0097] Energy storage charge / discharge depth constraints:

[0098] ;

[0099] In the formula, DOC t DOD t Depth of charge and depth of discharge, respectively

[0100] Energy storage power constraints:

[0101] ;

[0102] In the formula, , These are the maximum charging and discharging power, respectively.

[0103] S3. A double-layer nested optimization framework is adopted for solving the problem. The outer layer of the multi-objective robust optimization model uses the segmented power values ​​and power change time points of the stepped transmission curve as decision variables, and optimizes the transmission power through a non-dominated sorting differential evolution algorithm. This design ensures from the source that the output power generation plan is inherently a "smooth stepped curve". The inner layer takes the transmission power output from the outer layer as input, calculates the load to be borne by cascade hydropower and energy storage for each representative wind and solar scenario, and determines the water storage and release order and load allocation of cascade hydropower stations by combining the discrimination coefficient and relative water storage rate. The insufficient part is compensated by energy storage. The collaborative solution is achieved through parameter transfer between the inner and outer layers to obtain a day-ahead power generation plan that meets the requirements of power transmission stability.

[0104] In this embodiment, the outer layer optimization of the multi-objective robust optimization model adopts a two-dimensional encoding strategy, based on decision variables, which are "5-segment stepped power". "and 4 power change time points" ",Right now:

[0105] (A total of 9 decision variables);

[0106] The non-dominated sorting differential evolution algorithm (NSDE) is used to optimize the bi-objective function and generate a Pareto solution set, which reflects the competitive relationship between the average daily transmission power and peak-shaving performance (e.g., the competition is more significant in winter when runoff is small).

[0107] The inner-layer optimization of the multi-objective robust optimization model specifically includes:

[0108] Load calculation:

[0109] Substituting the day-ahead planned power output from the outer layer into the following formula, calculate the load that the cascade hydropower and energy storage need to bear in time period t under scenario i:

[0110] ;

[0111] In the formula, Contributing to the daytime power generation plan; The load that the cascade hydropower and energy storage need to bear in time period t under scenario i;

[0112] Water storage and release judgment:

[0113] Calculate the hydroelectric power output under natural runoff ,like Then, cascade water storage is implemented; if Then, water is released in tiers; the calculation formula is:

[0114] ;

[0115] In the formula, 9.81 is the gravitational acceleration constant. The overall efficiency of cascade hydropower and energy storage, For power generation flow, For clean water head;

[0116] The order of water storage and release is determined as follows:

[0117] During water storage, the discrimination coefficient K for each reservoir is calculated, and the reservoir with the largest discrimination coefficient K is prioritized for storage; if the relative storage rate difference between a certain reservoir and the reservoir with the largest discrimination coefficient K is... Therefore, priority should be given to reservoirs with larger water storage capacity (rsr).

[0118] When releasing water, priority is given to identifying the reservoir with the smallest coefficient K; if a certain reservoir is different from the reservoir with the smallest K... If the water level is high, then the reservoir with the largest RSR will be released first.

[0119] The formula for calculating the reservoir discrimination coefficient K is:

[0120] ;

[0121] In the formula, The increased power generation from reservoir storage The increased storage capacity of the reservoir;

[0122] Energy storage compensation:

[0123] Even after the cascade hydropower regulation, the load demand still cannot be met. When the output is insufficient, the energy storage is discharged; when the output is excessive, the energy storage is charged.

[0124] Invalid solution determination:

[0125] If a power generation plan fails to meet robust constraints in all representative scenarios, it is deemed an invalid solution and the process re-enters the outer optimization layer.

[0126] Solution algorithm and timeliness:

[0127] For algorithm selection, the Non-Dominated Sorting Differential Evolution Algorithm (NSDE) is adopted, which has better robustness and search ability than the traditional NSGA II algorithm and can efficiently generate Pareto solution sets.

[0128] Parameter settings: Population size 50, number of iterations 800, program written in Matlab 2018a;

[0129] Timeliness Verification: Under an Intel(R) Core(TM) i7-9750H@2.60GHz and 16GB memory environment, the typical daily solution time for each season is: 183.8 min in spring, 194.6 min in summer, 182.9 min in autumn, and 203.3 min in winter, all meeting the requirement of reporting the power generation plan 4-6 hours before the next day. The double-layer nested optimization framework consists of an outer layer of "transmission power optimization" and an inner layer of "load allocation and energy storage state of charge (SOC) determination," achieving collaborative solution through parameter passing.

[0130] Outer layer optimization: A two-dimensional coding strategy is adopted to achieve "tiered transmission power". "and "power change time point" "UHVDC transmission power is optimized by using the non-dominated sorting differential evolution algorithm (NSDE) to ensure the smooth step-like transmission demand of UHVDC, while reducing the number of decision variables (e.g., 9 decision variables under 5 transmission curves for 3 cascade hydropower stations, which is a significant dimensionality reduction compared to the traditional model of 72).

[0131] Inner layer optimization: outer layer output As input, calculate the load that the cascade hydropower and energy storage need to bear in scenario i. The order of water storage and release and load distribution of cascade hydropower stations are determined by combining the "discrimination coefficient K" and the "relative storage rate sr". The insufficient part is compensated by energy storage. The specific formula is as follows:

[0132] ;

[0133] In the formula, The inflow of water into reservoir m during time period t; This refers to the storage capacity of the upstream reservoir. Let m be the surface area of ​​the reservoir; The average head of the downstream reservoir; , These represent the reservoir capacity corresponding to the dead water level and normal water level of reservoir m, respectively. This is the relative water storage rate control value;

[0134] The model was solved using the NSDE algorithm (population size 50, iterations 800), and the program was written in Matlab 2018a and implemented in Intel(R) Co. The solution time is ≤203.3 min under the re(TM)i7-9750H@2.60GHz and 16G memory environment, which meets the timeliness requirement of reporting the power generation plan 4~6 hours before the next day. Through the Qinghai-Henan DC project example (cascade hydropower stations: Cihaxia 2600MW, Bando 360MW, Yangqu 1200MW; wind power 2000MW; photovoltaic 4000MW; energy storage 600MW·h), the system peak-shaving performance is improved by 13.3%~46%. The robust optimization model has a curtailment and load shedding probability of 0, which is better than the deterministic optimization model.

[0135] S4. The obtained day-ahead power generation plan will be used to guide the day-ahead scheduling and operation of the integrated hydro-wind-solar-storage base.

[0136] Numerical Examples and Performance Analysis:

[0137] Taking the Qinghai-Henan ultra-high voltage direct current transmission project in the upper reaches of the Yellow River as an example, the project parameters are as follows:

[0138] Cascade hydropower station: Cihaxia (seasonal regulation, regulating reservoir capacity 18.54 × 10⁻⁶) 8 m³, installed capacity 2600MW), Bando (daily regulation, regulation reservoir capacity 0.02×10 m³), ​​and other facilities (daily regulation, regulation reservoir capacity 0.02×10 m³). 8 m³, installed capacity 360MW), Yangqu (daily regulation, regulation reservoir capacity 2.39×10 m³), 8 m³, installed capacity 1200MW);

[0139] New energy: Qieji Wind Power Station 1500MW, Ertala Wind Power Station 500MW (total wind power 2000MW); Yitala Photovoltaic Power Station 1000MW, Santala Photovoltaic Power Station 3000MW (total photovoltaic 4000MW);

[0140] Energy storage: 600MW·h (10% new energy installed capacity, charge and discharge efficiency 0.9).

[0141] Verification results:

[0142] Power transmission stability: The optimized power generation plan curve is "smooth five-segment stepped shape", with zero power fluctuation in each time period, which meets the operation requirements of UHVDC equipment;

[0143] Peak-shaving performance: After complementary operation, the standard deviation of the residual load on typical days in each season is reduced by 44% (spring), 13.3% (summer), 25% (autumn), and 46% (winter) respectively compared with direct wind-solar grid connection, and the peak-shaving performance is significantly improved;

[0144] Risk control: The robust optimization model showed no power curtailment or load loss in all 10 wind-solar scenarios, while the deterministic model had a power curtailment / load loss probability of 0.34% to 0.77%.

[0145] Impact of energy storage: When the energy storage ratio is increased from 0% to 20%, the fluctuation of the remaining load decreases by 6.38% to 4.26%, verifying the positive effect of energy storage on peak-shaving performance.

[0146] Strategies for the joint operation of cascade hydropower and energy storage:

[0147] Spring / Summer / Autumn (sufficient runoff): During the off-peak period from 0:00 to 6:00, the cascade hydropower water storage regulation meets the power transmission demand and maintains the energy storage SOC; During the period from 7:00 to 24:00, when wind and solar power fluctuate greatly or the load is at its peak, the energy storage discharges to compensate and avoid the risk of load loss.

[0148] In winter (when runoff is scarce): during periods of high wind and solar power output from 0:00 to 6:00 and from 11:00 to 16:00, energy storage charging avoids power curtailment; during peak evening load periods, energy storage discharges to alleviate hydropower pressure and ensure system stability.

[0149] The above description is merely a preferred embodiment of the present invention and does not constitute any limitation on the present invention. Any person skilled in the art can make many possible variations and modifications to the technical solution of the present invention, or modify it into equivalent embodiments, without departing from the scope of the present invention. Therefore, any modifications, equivalent changes, and alterations made to the above embodiments based on the technology of the present invention without departing from the scope of the present invention are within the protection scope of the present invention.

Claims

1. A multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases, characterized by: The method includes the following steps: S1. Based on the characteristic that the wind-solar power output prediction error follows a normal distribution, wind-solar power output error scenarios are generated by Latin hypercube sampling. Combined with the synchronous back-substitution reduction method, a representative set of wind-solar power output scenarios and the corresponding probabilities of each scenario are obtained at a 95% confidence level. S2. A multi-objective robust optimization model is constructed with the dual objectives of maximizing the average daily transmission power of the complementary system and minimizing the standard deviation of the remaining load of the receiving-end grid. Robust constraints are introduced to ensure that the deviation between the actual output of the system and the planned output of the day-ahead power generation is less than a preset threshold under all representative scenarios, and a constraint system is constructed. S3. The outer layer of the multi-objective robust optimization model uses the segmented power values ​​and power change time points of the stepped transmission curve as decision variables and optimizes the transmission power through a non-dominated sorting differential evolution algorithm. The inner layer takes the transmission power output from the outer layer as input, calculates the load that the cascade hydropower and energy storage need to bear, and determines the water storage and release sequence and load allocation of the cascade hydropower stations by combining the discrimination coefficient and the relative water storage rate. The insufficient part is compensated by energy storage. The collaborative solution is achieved through parameter transfer between the inner and outer layers to obtain the day-ahead power generation plan that meets the requirements of transmission stability. S4. The obtained day-ahead power generation plan will be used to guide the day-ahead scheduling and operation of the integrated hydro-wind-solar-storage base.

2. The day-ahead multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases according to claim 1, characterized in that: S1 specifically includes: Determine the normal distribution parameters at the 95% confidence level for each time period based on the predicted wind and solar power output processes; Latin hypercube sampling is used to sample wind power output error and photovoltaic output error separately to generate wind and solar power output scenarios, and then the wind-solar combined scenarios are randomly combined in pairs. The synchronous back-substitution reduction method is used to eliminate redundant scenarios, and a predetermined number of representative wind-solar combination power output scenarios and their corresponding probabilities are retained.

3. The day-ahead multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases according to claim 1, characterized in that: The objective function of the multi-objective robust optimization model is: ; ; ; In the formula, T represents the number of scheduling periods; To contribute power to the planned power generation for the day before time period t; The total load of the power grid during time period t; L and L represent the remaining load and total load of the power grid, respectively. This represents the average remaining load. This represents the standard deviation of the remaining load on the power grid.

4. The day-ahead multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases according to claim 1, characterized in that: The robust constraint is: ; In the formula, , , , These represent the output / charging / discharging power of wind, solar, hydropower, and energy storage during time period t under scenario i.

5. The day-ahead multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases according to claim 1, characterized in that: The constraint system includes power transmission stability constraints, transmission capacity constraints, water balance constraints, reservoir characteristic constraints, water level constraints, hydropower station output constraints, downstream flow constraints, cascade energy storage variation constraints, energy storage charging and discharging depth constraints, and energy storage power constraints.

6. The day-ahead multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases according to claim 1, characterized in that: The outer optimization of the multi-objective robust optimization model adopts a two-dimensional encoding strategy. Based on the decision variables, the non-dominated sorting differential evolution algorithm is used to optimize the bi-objective function and generate a Pareto solution set, which reflects the competitive relationship between the average daily transmission power and peak-shaving performance.

7. The day-ahead multi-timescale mutual assistance scheduling method for integrated wind-solar-hydro-storage bases according to claim 1, characterized in that: The inner-layer optimization of the multi-objective robust optimization model specifically includes: Substituting the day-ahead planned power output from the outer layer into the following formula, calculate the load that the cascade hydropower and energy storage need to bear in time period t under scenario i: ; In the formula, To contribute to the day-ahead power generation plan; The load that the cascade hydropower and energy storage need to bear in time period t under scenario i; Calculate the hydropower output under natural runoff ,like Then, cascade water storage is implemented; if Then, water is released in tiers; the calculation formula is: ; In the formula, 9.81 is the gravitational acceleration constant; The overall efficiency of cascade hydropower and energy storage; For power generation flow; For clean water head; During water storage, the discrimination coefficient K for each reservoir is calculated, and the reservoir with the largest discrimination coefficient K is prioritized for storage; if the relative storage rate difference between a certain reservoir and the reservoir with the largest discrimination coefficient K is... The reservoir with the largest water storage capacity (rsr) will be prioritized for water storage. This is the relative water storage rate control value; When releasing water, priority is given to identifying the reservoir with the smallest coefficient K; if a certain reservoir is different from the reservoir with the smallest K... The reservoir with the highest RSR will be prioritized for water release; the formula for calculating the reservoir discrimination coefficient K is: ; In the formula, The increased power generation from reservoir storage The increased storage capacity of the reservoir; When the load demand cannot be met after the cascade hydropower regulation, the energy storage charging and discharging will compensate: when the output is insufficient, the energy storage will discharge; when the output is excessive, the energy storage will charge. If a power generation plan fails to meet robust constraints in all representative scenarios, it is deemed an invalid solution and re-enters the outer optimization layer.