Cross-zone power market clearing system and method considering dynamic revision of cross-zone power flow limits
By identifying the operating status of key generating units and dividing the operation mode, dynamic cross-sectional limits are generated, which solves the problem of fixed cross-sectional limits in the market clearing model and improves the security and economy of cross-regional transactions.
Patent Information
- Application Number
- CN202610954336.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-30
- Publication Date
- 2026-11-20
AI Technical Summary
The existing market clearing model has a fixed cross-sectional limit, which leads to a mismatch between the scale of cross-regional transactions and the actual operating mode. This may result in reduced safety and economy, and the unit combination results are out of sync with the cross-sectional limit.
By identifying the operating status of key generating units, classifying operating modes, and generating dynamic cross-sectional limits, a multi-regional integrated market clearing model is constructed, and cross-sectional limits are iteratively corrected to match the actual power grid safety boundaries.
To improve the security, economy, and enforceability of cross-regional market clearing results, ensure consistency between cross-sectional quotas and actual power grid safety boundaries, and avoid mismatches between cross-regional transaction scale and operation mode.
Smart Images

Figure SMS_1 
Figure SMS_10 
Figure SMS_11
Abstract
Description
Technical Field
[0001] This invention belongs to the field of power system operation optimization and power market clearing technology, and in particular to a cross-regional power market clearing system and method that considers dynamic adjustment of cross-sectional quotas. Background Technology
[0002] With the large-scale development of new energy sources and the accelerated construction of inter-provincial and inter-regional power transmission channels, inter-regional power trading plays a crucial role in promoting optimal resource allocation, improving the absorption capacity of new energy sources, and alleviating power supply pressure at the receiving end. Clearing the inter-regional power market typically requires simultaneous consideration of factors such as power output at the sending end, load demand at the receiving end, the capacity of inter-regional transmission channels, and the security constraints of the sending and receiving end power grids. Especially in the sending and receiving end power grids, inter-regional power transmission alters the power flow distribution of critical lines and sections at both ends; therefore, the scale of inter-regional transactions is usually constrained by the transmission capacity of these critical sections.
[0003] In existing market clearing models, the cross-sectional limit is usually used as an externally given parameter in the optimization, that is, the following constraint is set in the clearing model: In the formula, Indicates the area code. Indicates the key section number within the area. Indicates the time period number. Indicates the region Internal key section During the period The trend This indicates the quota for that section during that time period.
[0004] However, in actual power grid operation, the capacity limit for a given section is not entirely fixed. The start-up and shutdown status, output level, and reactive power support capacity of some key supporting units in the receiving-end power grid significantly affect local voltage support, short-circuit capacity, stability margin, and the transmission capacity of the section. When all key supporting units are running, the receiving-end system has strong safety support capabilities and a high allowable transmission capacity per section. When many key supporting units are shut down, the system's synchronous machine operating level is low, or the proportion of renewable energy output is high, the stability margin of the section decreases, and the actual available section limit may be reduced.
[0005] Therefore, if a fixed quota is still used to participate in cross-regional market clearing, the following problems may arise: First, the cross-sectional limits are disconnected from the unit combination results. The unit operating status determined during the market clearing process will affect the system safety boundary, but the cross-sectional limits in traditional models are usually not affected by changes in the unit combination status.
[0006] Second, the scale of cross-regional transactions may not match the actual operating mode. When the number of local generating units starting up after market clearing is low and the proportion of external power is high, the system's support capacity may decrease, and the originally given section limit may be too high, making the clearing results unenforceable in subsequent safety verification.
[0007] Therefore, it is necessary to propose a dynamic cross-regional market clearing method that considers the impact of unit combination, establishes a mapping relationship between the operating status of key units and cross-regional quotas, and improves the safety, economy and feasibility of cross-regional market clearing results by iteratively correcting the cross-regional quotas. Summary of the Invention
[0008] The purpose of this invention is to overcome the shortcomings of existing technologies and propose a cross-regional power market clearing system and method that considers dynamic correction of cross-sectional quotas. This involves identifying a set of key generating units affecting the transmission capacity of a target cross-section, classifying the system operation modes into several types based on the operating status of these key units, and matching corresponding cross-sectional quotas to different operation modes. Furthermore, the operation mode classification variables are embedded into the cross-regional market clearing model, allowing unit combination, cross-regional trading power, and cross-sectional quotas to be solved coupled within the same optimization model. Simultaneously, the cross-sectional quotas can be corrected based on the market pre-clearing results, and iterative clearing yields market clearing results that meet the cross-sectional quota requirements. Moreover, this invention enables the transformation of cross-sectional quotas from fixed external parameters to a dynamic safety boundary driven by operation modes, improving the consistency between cross-regional market clearing results and the actual power grid safety operation boundary.
[0009] The technical problem solved by this invention is achieved through the following technical solution: A cross-regional power market clearing system considering dynamic correction of cross-sectional quotas includes a data acquisition module, a multi-regional topology association module, an operation mode identification module, a dynamic cross-sectional quota generation module, a multi-regional joint clearing module, a feedback correction module, and a result output module connected in sequence. The data acquisition module is used to acquire the basic data required for the joint clearing of the multi-regional power market. The multi-region topology association module is used to establish the association between regions and cross-regional channels; The operation mode identification module is used to identify the operation mode of each region at different times based on the number of key supporting units in operation, the proportion of new energy power output in the bid, and the number of synchronous machines in operation. The dynamic section quota generation module is used to generate dynamic quotas for key sections within each region based on the identified operating mode. The multi-regional joint clearing module is used to construct and solve a multi-regional integrated market clearing model that integrates unit combination, inter-regional channel power, and dynamic cross-sectional limits; The feedback correction module is used to iteratively correct the dynamic cross-sectional limit based on the clearing results and to determine the convergence of the iteration. The results output module is used to output the final market clearing results.
[0010] Moreover, the specific working method of the operation mode identification module is as follows: the normal operation mode is identified based on the preset range in which the number of key support units starts falls; the special operation mode is identified based on the combination of the proportion of new energy winning bids reaching a preset threshold and the number of synchronous machines starting being lower than a preset threshold.
[0011] Moreover, the specific working method of the dynamic cross-section limit generation module is as follows: based on the pre-established mapping relationship between the operating mode and the cross-section limit, the preset limit corresponding to the identified operating mode is output as the dynamic cross-section limit to the multi-region joint clearing module.
[0012] Moreover, the specific working method of the feedback correction module is as follows: receiving the output result of the multi-region joint clearing module; triggering the operation mode identification module and the dynamic section limit generation module to update the dynamic section limit according to the current clearing result; returning the updated dynamic section limit to the multi-region joint clearing module for a new round of clearing calculation; and terminating the iteration when the operation mode no longer changes or the maximum number of iterations is reached.
[0013] A clearing method for an inter-regional electricity market clearing system that considers dynamic adjustment of cross-sectional quotas includes the following steps: Step 1: Obtain the basic data required for the joint clearing of the multi-regional electricity market; Step 2: Based on the basic data, establish the relationship between the cross-regional channel power and the power balance of each region; Step 3: Construct a set of operating modes for each region, which includes at least one operating mode. The operating modes are used to characterize the power grid characteristics of the region under different security support states. Step 4: Establish constraints for identifying operating modes. These constraints include those for identifying regular operating modes based on the number of key supporting units in operation, and those for identifying special operating modes based on the proportion of new energy power output and the number of synchronous machines in operation. Step 5: Construct a mapping model between operation mode variables and regional dynamic cross-sectional limits, so that each type of operation mode corresponds to a set of preset dynamic cross-sectional limits; Step 6: Integrate the operation mode identification constraints, mapping model, and dynamic cross-section quota as components of cross-section power flow constraints into a multi-region integrated market clearing model; Step 7: Solve the multi-regional integrated market clearing model to obtain the initial clearing results; Step 8: Based on the initial clearing results, perform an iterative correction process of operation mode identification and section limit update until the convergence condition is met, and obtain the final market clearing results.
[0014] Furthermore, the constraint for identifying the normal operating mode based on the number of key support units in step 4 is as follows: define an expression for the number of key support units in operation within the region; preset a corresponding range of key support units in operation for each normal operating mode; introduce a binary operating mode variable, and constrain it with a linear inequality so that when the binary operating mode variable takes a specific value, the number of key support units in operation is forcibly constrained within the corresponding range of operating numbers.
[0015] Furthermore, the constraints for identifying special operating modes based on the proportion of new energy power output in the bidding and the number of synchronous machines in operation in step 4 are as follows: a first discriminant variable is introduced, and a logical relationship between the proportion of new energy power output in the bidding and the first discriminant variable is established through a large M constraint; a second discriminant variable is introduced, and a logical relationship between the number of synchronous machines in operation and the second discriminant variable is established through a large M constraint; a binary operating mode variable is introduced to identify special operating modes, and a linear inequality constraint is used to ensure that the binary operating mode variable is activated only when both the first and second discriminant variables are true.
[0016] Moreover, the mapping model between the operation mode variables and the regional dynamic cross-sectional limit constructed in step 5 is as follows: In the formula, and Representing regions inner section In operation mode The forward and reverse limits are below. r For regional indexes, l Index of key sections within the region. t For time period index, m Index for runtime mode, For the region r A set of operating modes For identifying the area r During the period t Is it in running mode? m binary variables, and In operation mode m lower section l The preset positive and negative limits, and The limit for the generated dynamic cross-section.
[0017] Furthermore, step 8 includes the following steps: Step 8.1: Set the initial cross-sectional limit and initialize the number of iterations; Step 8.2: Under the current quota limit, solve the multi-regional integrated market clearing model to obtain the clearing results for this round; Step 8.3: Based on the unit start-up status and new energy winning bid output in this round of clearing results, use the method in Step 4 to identify the operating mode of each region in each time period; Step 8.4: Determine whether the identified operating mode is consistent with the result of the previous round, or whether the maximum number of iterations has been reached; if yes, proceed to step 8.6; if no, proceed to step 8.5. Step 8.5: Based on the operating mode identified in this round, query the corresponding preset cross-sectional quota, update the cross-sectional quota for the next iteration, and return to step 8.2; Step 8.6: Output the current clearing result as the final result.
[0018] A computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a clearing method for an inter-regional electricity market clearing system that takes into account dynamic adjustments to cross-sectional quotas.
[0019] The advantages and positive effects of this invention are: 1. Achieve integrated clearing across multiple regions. This invention integrates the sending region, receiving region, and cross-regional channels into the market clearing model, avoiding the simplistic use of cross-regional transactions as external boundary inputs and improving the overall economic efficiency of cross-regional transaction results.
[0020] 2. Implement dynamic cross-sectional quota modeling driven by operating mode. This invention identifies the operating mode based on the number of key supporting units in operation in each region, the proportion of new energy power output won in bids, and the number of synchronous machines in operation, and generates dynamic cross-sectional quotas based on the operating mode.
[0021] 3. Considering the impact of renewable energy curtailment on operation mode identification. This invention uses the winning bid output of renewable energy as a clearing variable. The high output state of renewable energy is determined by the proportion of winning bid output, rather than directly by the predicted value of available renewable energy output. This can reflect the impact of curtailment on system operation mode and cross-sectional quota.
[0022] 4. Establish a closed-loop feedback mechanism for cross-sectional quotas. By correcting the cross-sectional quotas corresponding to the operating mode through feedback of clearing results, the dynamic cross-sectional quotas in the market clearing model are kept consistent with the actual safety boundary, thereby improving the executability of cross-regional trading plans.
[0023] 5. The model has good engineering applicability. The operational mode classification variables, regional-channel correlations, and dynamic cross-sectional quota mappings can all be implemented using linear or mixed-integer linear models, making it easy to embed into existing safety-constrained unit combinations or spot market clearing systems. Detailed Implementation
[0024] A cross-regional power market clearing system considering dynamic correction of cross-sectional quotas includes a data acquisition module, a multi-regional topology association module, an operation mode identification module, a dynamic cross-sectional quota generation module, a multi-regional joint clearing module, a feedback correction module, and a result output module connected in sequence. The data acquisition module is used to acquire the basic data required for the joint clearing of the multi-regional power market. The multi-region topology association module is used to establish the association between regions and cross-regional channels.
[0025] The operation mode identification module is used to identify the operation mode of each region at different times based on the number of key supporting units in operation, the proportion of new energy power output in the bidding, and the number of synchronous machines in operation. The specific working method of the operation mode identification module is as follows: It identifies the normal operation mode based on the number of key supporting units in operation falling within a preset range; and it identifies special operation modes based on the combination of the proportion of new energy power output in the bidding reaching a preset threshold and the number of synchronous machines in operation being lower than a preset threshold.
[0026] The dynamic section quota generation module is used to generate dynamic quotas for key sections within each region based on the identified operating mode.
[0027] The multi-regional joint clearing module is used to construct and solve a multi-regional integrated market clearing model that integrates unit combination, cross-regional channel power, and dynamic cross-sectional limits.
[0028] The feedback correction module is used to iteratively correct the dynamic cross-sectional limits based on the clearing results and to determine the convergence of the iteration. The specific working method of the feedback correction module is as follows: it receives the output results from the multi-region joint clearing module; it triggers the operation mode identification module and the dynamic cross-sectional limit generation module to update the dynamic cross-sectional limits based on the current clearing results; it returns the updated dynamic cross-sectional limits to the multi-region joint clearing module for a new round of clearing calculations; and it terminates the iteration when the operation mode no longer changes or the maximum number of iterations is reached.
[0029] The results output module is used to output the final market clearing results.
[0030] A clearing method for an inter-regional electricity market clearing system that considers dynamic adjustment of cross-sectional quotas includes the following steps: Step 1: Obtain the basic data required for the joint clearing of the multi-regional electricity market.
[0031] The basic data includes unit parameters for each region, load forecasts for each region, forecasts of available renewable energy output for each region, inter-regional corridor parameters, key section data for each region, and the connection relationship between regions and corridors. Unit parameters for each region include minimum output, maximum output, ramp-up capability, start-up cost, shutdown cost, no-load cost, pricing curves, minimum start-up time, and minimum shutdown time. Inter-regional corridor parameters include corridor rated capacity, maintenance status, operating mode, available capacity, ramp-up capability, minimum operating power, regulation frequency limits, and power flow duration requirements. Key section data for each region includes the set of key sections, section power flow sensitivity, section basic limits, and the correlation between sections and key supporting units.
[0032] Step 2: Based on the basic data, establish the relationship between the cross-regional channel power and the power balance of each region.
[0033] set up Represents a set of regions. Indicates the area code; let Indicates a set of cross-regional channels. Indicates the cross-regional channel or cross-regional transaction path number; set Indicates cross-regional passage During the period The cross-regional power is defined, and its positive direction is specified as a pre-set power transmission direction. To describe the impact of cross-regional channel power on the power balance of each region, a region-channel correlation coefficient is introduced. Its definition is: In the formula, Indicates channel Positive directional power for the region Forming a positive injection, Indicates channel Positive directional power from the region Outflow, Indicates channel Non-participating areas Power balance. Assume... Indicates the region The collection of units within, Indicates the region Indoor unit numbering; set Indicates the region Indoor unit During the period The output of force; set Indicates the region During the period The power output of the new energy projects that have won bids or are planned to be connected to the grid; Indicates the region During the period The load forecast value, then the area During the period The power balance constraint is: In the formula, This represents a time period set. The constraint indicates that the output of conventional generating units within the region, the output of newly acquired renewable energy sources, and the net power injected through inter-regional transmission channels collectively meet the region's load demand.
[0034] Step 3: Construct a set of operating modes for each region, which includes at least one operating mode. The operating modes are used to characterize the power grid characteristics of the region under different security support states.
[0035] For the region ,set up Indicates the region A set of operating modes Indicates the region The operating mode number. The operating mode is used to describe the region. During the period The safety support status. Each type of operation corresponds to a set of critical section limits within the region. In one implementation method, the region... The operating modes include the following types: 1. Operating Mode 1: High number of key supporting units in operation; 2. Operating Mode 2: Medium number of key supporting units in operation; 3. Operating Mode 3: Low number of key supporting units in operation; 4. Operating Mode 4: High proportion of output from new energy projects and low operation of local synchronous generators. Different regions can set different sets of operating modes according to their own grid structure, unit type, and safety verification rules.
[0036] To identify the region During the period The operating mode introduces binary variables. .in, Indicates the region During the period In operation mode ,otherwise Each region corresponds to only one operating mode per time period; therefore, a uniqueness constraint for the operating mode is set: In the formula, Indicates the region A set of operating modes.
[0037] Step 4: Establish constraints for identifying operating modes. These constraints include those for identifying regular operating modes based on the number of key supporting units in operation, and those for identifying special operating modes based on the proportion of new energy power output and the number of synchronous machines in operation.
[0038] The constraint for identifying the normal operating mode based on the number of key support units in operation is as follows: set up Indicates the region Indoor unit During the period The boot state variables, This indicates that the generator unit has been started. This indicates that the generator unit is shut down. (Area) During the period Number of key support units in operation Defined as: In the formula, Indicates the region The key supporting unit set. For conventional operation... ,set up Indicates the region Operating mode The minimum number of corresponding key support units to be in operation is set as follows: Indicates the region Operating mode The maximum number of key support units that can be operated. The relationship between the operating mode variable and the number of key support units in operation is established using the following constraints: In the formula, It is a sufficiently large constant. When When the above constraints represent the region During the period The number of key supporting units in operation falls into the operating mode Corresponding interval: when At that time, constraints are passed through large Relax restrictions and do not impose limitations on the identification of operating modes during this period. To avoid overlapping operating modes, the number of devices that should be started for each operating mode should ideally be set to be non-overlapping.
[0039] Constraints for identifying special operating modes based on the proportion of new energy power output in winning bids and the number of synchronous machines in operation: Define region During the period Total new energy power output share : in: In the formula, Indicates the region A collection of domestic new energy generating units, Indicates the region Internal new energy unit numbering; Indicates the region Internal load collection, Indicates the region Internal load number; Indicates the region During the period New energy projects won bids and contributed their power; Indicates the region Internal load During the period The predicted value. When the following conditions are met: At that time, the region was considered During the period It is in a high-output state from new energy sources. Due to Given the parameters, the above equation can be equivalently written as: Introducing a high-output discriminant variable for new energy sources ,in Indicates the region During the period The proportion of new energy power generation in winning bids has reached the high output threshold. This indicates that the threshold has not been reached. This logic can be implemented through the following... Constraint Implementation: In the formula, This is a very small positive number, used to distinguish between states where the threshold has been reached and those where it has not. Further, let... Indicates the region The set of local synchronization machines, and .area During the period Number of synchronous machines turned on Defined as: set up Indicates the region The low startup threshold of the synchronous machine. When the following conditions are met: At that time, the region was considered During the period The synchronous machine is in a low-start state. A low-start detection variable for the synchronous machine is introduced. ,in This indicates that the number of synchronizers turned on is not higher than the threshold. This indicates that the number of synchronizers powered on exceeds a threshold. This logic can be implemented using the following constraints: For the region The new energy source operates in a high-output mode with a low start-up time for the synchronous machine. Let this operating mode be numbered as follows: Its operating mode variable is The logical relationship between this operating mode and the high output of new energy sources and the low start-up state of the local synchronous machine is achieved through the following constraints: The above constraint means that the region During the period When both the proportion of new energy power output from winning bids and the low start-up of local synchronous machines are met, operation mode 4 is activated.
[0040] Step 5: Construct a mapping model between operation mode variables and regional dynamic cross-sectional limits, so that each type of operation mode corresponds to a set of preset dynamic cross-sectional limits.
[0041] The mapping model between the constructed operation mode variables and the regional dynamic cross-sectional limit is as follows; In the formula, and Representing regions inner section In operation mode The forward and reverse limits are below. r For regional indexes, l Index of key sections within the region. t For time period index, m Index for runtime mode, For the region r A set of operating modes For identifying the area r During the period t Is it in running mode? m binary variables, and In operation mode m lower sectionl The preset positive and negative limits, and The limit for the generated dynamic cross-section.
[0042] Step 6: Integrate the operation mode identification constraints, mapping model, and dynamic cross-section quota as components of cross-section power flow constraints into a multi-region integrated market clearing model.
[0043] The objective function of the model is: under the condition of rigid demand-side load, this invention aims to minimize the total power supply cost across multiple regions. This objective function represents minimizing the sum of generation costs, start-up and shutdown costs, renewable energy curtailment costs, and inter-regional transmission-related costs in each region, while satisfying multi-regional power balance, unit operation, inter-regional transmission corridor, and regional security constraints.
[0044] In the formula, Indicates the region Internal conventional unit assembly, Indicates the region Internal conventional unit number; Indicates the region Indoor unit During the period The output of force. Then assume... Indicates the region Indoor unit The cost of the quoted price This indicates the unit startup cost. Indicates the unit's no-load cost. Indicates the starting variable, Indicates runtime variables, Indicates cross-regional passage During the period The channel usage cost, network loss cost, or transmission fee function.
[0045] The constraints include: (1) Regional power balance constraints area During the period The power balance constraint is: In the formula, the first term represents the output of conventional generating units within the region, the second term represents the output of new energy units won in the region, and the third term represents the output of inter-regional transmission corridors to the region. The net injected power, with the right-hand term representing the regional load demand.
[0046] (2) Power output constraints for winning bids in new energy projects In the formula, Indicates the region New energy units During the period The predicted value of available power output from new energy sources.
[0047] (3) Upper and lower limits of unit output constraints In the formula, and Representing regions Indoor unit The minimum and maximum output.
[0048] (4) Unit combination logic constraints In the formula, Indicates the region Indoor unit During the period The shutdown variable.
[0049] (5) Unit ramping constraints In the formula, and Representing regions Indoor unit Its climbing ability and landslide ability.
[0050] (6) Minimum running time constraint In the formula, Indicates the region Indoor unit Minimum runtime.
[0051] (7) Minimum downtime constraint In the formula, Indicates the region Indoor unit Minimum downtime.
[0052] (8) Quota constraints for cross-regional channels In the formula, Indicates cross-regional passage During the period Its own dynamic availability capability.
[0053] (9) Cross-regional passage climbing constraints In the formula, and These represent cross-regional channels. Its upregulation and downregulation capabilities.
[0054] (10) Regional key section tidal current constraints In the formula, , , and These represent the transfer factor for conventional generating units, the transfer factor for new energy generating units, the load transfer factor, and the channel transfer factor, respectively.
[0055] (11) Uniqueness constraint of operation mode (12) Operation mode identification constraints based on the number of key support units in operation (13) Constraints for identifying high-output states of new energy sources (14) Constraints for recognizing low start-up status of synchronous machine (15) Constraints for identifying special operating modes (16) Dynamic section limit generation constraints (17) Dynamic cross-section power flow constraint Step 7: Solve the multi-regional integrated market clearing model to obtain the initial clearing results.
[0056] Step 8: Based on the initial clearing results, perform an iterative correction process of operation mode identification and section limit update until the convergence condition is met, and obtain the final market clearing results.
[0057] Considering the numerous operational modes in a multi-regional system, directly embedding all operational mode classification variables and their corresponding cross-sectional quota mapping relationships into the multi-regional integrated market clearing model would significantly increase the number of binary variables and logical constraints, leading to a larger model size and increased solution difficulty. Therefore, this invention employs an alternating iterative approach of "market clearing—operation mode identification—cross-sectional quota update—re-clearing" to correct the dynamic cross-sectional quotas.
[0058] Step 8.1: Set the initial cross-section limit and initialize the number of iterations.
[0059] Set area Internal key section During the period The initial forward dynamic limit and the reverse dynamic limit are as follows: And set the number of iterations: In the formula, superscript This indicates the initial iteration round.
[0060] Step 8.2: Under the current cross-sectional quota, solve the multi-regional integrated market clearing model to obtain the clearing results for this round.
[0061] In the wheel During the iteration, the current section limit will be set as follows: As the cross-sectional constraint parameter in the multi-regional integrated market clearing model, solving the market clearing model yields the first... The results of the multi-regional pre-clearing round include: In the formula, Indicates the first Wheel area Indoor unit During the period The power-on status, Indicates the unit's output. This indicates that the new energy project has won the bid and will contribute its resources. Indicates the cross-regional channel power. This indicates the tidal current at key cross-sections within the region.
[0062] Step 8.3: Based on the unit start-up status and new energy power output in this round of clearing results, use the method in Step 4 to identify the operating mode of each region in each time period.
[0063] According to the Unit startup status obtained from the round-trip clearing He won the bid for new energy and contributed his strength The region is calculated according to the aforementioned operation mode and identification method. During the period The operating mode is determined, and the corresponding forward and reverse cross-sectional limits are further identified. Specifically, the regional limits are first calculated. During the period Number of key supporting units in operation: And calculate the proportion of power output won by new energy sources: Then, according to and The range to which it belongs, the area to be identified During the period Operating mode .
[0064] Step 8.4: Determine whether the identified operating mode is consistent with the result of the previous round, or whether the maximum number of iterations has been reached; if yes, proceed to step 8.6; if no, proceed to step 8.5.
[0065] like Determine whether the operating methods are consistent in two consecutive rounds: Alternatively, check if the number of iterations exceeds the maximum number of iterations: in, This indicates the maximum number of iterations.
[0066] If any of the above conditions are met, proceed to step 8.6; otherwise, proceed to step 8.5.
[0067] Step 8.5: Based on the operating mode identified in this round, query the corresponding preset cross-sectional quota, update the cross-sectional quota for the next iteration, and return to step 8.2.
[0068] according to Generate regional dynamic cross-sectional limits and update the dynamic cross-sectional limits for the next iteration.
[0069] Step 8.6: Output the current clearing result as the final result.
[0070] Based on the aforementioned inter-regional electricity market clearing system and method considering dynamic adjustment of cross-sectional quotas, through two regions... , Through an inter-regional passage The effectiveness of the present invention is demonstrated by taking joint clearing as an example.
[0071] Set up a channel The positive direction is from the region Flow to area According to the definition of the region-channel correlation coefficient, we have: In the formula, Indicates channel Positive directional power from the region Outflow, Indicates channel Positive power inflow region Area and region The power balances are as follows: Set up a region The key supporting units are: Set up a region The set of synchronizers is: Set up a region The set of operating modes is as follows: Among them, Operation Mode 1 indicates that 4 to 5 key supporting units are in operation; Operation Mode 2 indicates that 2 to 3 key supporting units are in operation; Operation Mode 3 indicates that 0 to 1 key supporting units are in operation; and Operation Mode 4 indicates that the proportion of output from new energy projects is relatively high and the synchronous generators are operating at low capacity. (Regional area is defined.) inner section The limits for the four operating modes are as follows: If a certain period of time In the middle, region If the number of key support units in operation is 3 and operation mode 4 has not been triggered, then the model identifies it as operation mode 2. area inner section The dynamic limit is: If another period of time In this case, the proportion of new energy power generation in the winning bids meets the following requirements: And the number of synchronous machines turned on meets the following requirements: but , And obtained from logical constraints: During this period, operating mode 4 is adopted, corresponding to the cross-sectional limit: It should be emphasized that the embodiments described in this invention are illustrative rather than limiting. Therefore, this invention includes, but is not limited to, the embodiments described in the specific implementation. Any other implementations derived by those skilled in the art based on the technical solutions of this invention are also within the scope of protection of this invention.
Claims
1. A cross-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas, characterized in that: It includes a data acquisition module, a multi-region topology association module, an operation mode identification module, a dynamic section quota generation module, a multi-region joint clearing module, a feedback correction module, and a result output module connected in sequence. The data acquisition module is used to acquire the basic data required for the joint clearing of the multi-region electricity market. The multi-region topology association module is used to establish the association between regions and cross-regional channels; The operation mode identification module is used to identify the operation mode of each region at different times based on the number of key supporting units in operation, the proportion of new energy power output in the bid, and the number of synchronous machines in operation. The dynamic section quota generation module is used to generate dynamic quotas for key sections within each region based on the identified operating mode. The multi-regional joint clearing module is used to construct and solve a multi-regional integrated market clearing model that integrates unit combination, inter-regional channel power, and dynamic cross-sectional limits; The feedback correction module is used to iteratively correct the dynamic cross-sectional limit based on the clearing results and to determine the convergence of the iteration. The results output module is used to output the final market clearing results.
2. The inter-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas as described in claim 1, characterized in that: The specific working method of the operation mode identification module is as follows: the normal operation mode is identified based on the preset range in which the number of key supporting units starts falls; the special operation mode is identified based on the combination of the proportion of new energy winning bids reaching a preset threshold and the number of synchronous machines starting being lower than a preset threshold.
3. The inter-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas as described in claim 1, characterized in that: The specific working method of the dynamic cross-section quota generation module is as follows: based on the pre-established mapping relationship between the operating mode and the cross-section quota, the preset quota corresponding to the identified operating mode is output as the dynamic cross-section quota to the multi-region joint clearing module.
4. The inter-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas as described in claim 1, characterized in that: The specific working method of the feedback correction module is as follows: receiving the output result of the multi-region joint clearing module; triggering the operation mode identification module and the dynamic section limit generation module to update the dynamic section limit according to the current clearing result; returning the updated dynamic section limit to the multi-region joint clearing module for a new round of clearing calculation; and terminating the iteration when the operation mode no longer changes or the maximum number of iterations is reached.
5. A clearing method for an inter-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas as described in any one of claims 1 to 4, characterized in that: Includes the following steps: Step 1: Obtain the basic data required for the joint clearing of the multi-regional electricity market; Step 2: Based on the basic data, establish the relationship between the cross-regional channel power and the power balance of each region; Step 3: Construct a set of operating modes for each region, which includes at least one operating mode. The operating modes are used to characterize the power grid characteristics of the region under different security support states. Step 4: Establish constraints for identifying operating modes. These constraints include those for identifying regular operating modes based on the number of key supporting units in operation, and those for identifying special operating modes based on the proportion of new energy power output and the number of synchronous machines in operation. Step 5: Construct a mapping model between operation mode variables and regional dynamic cross-sectional limits, so that each type of operation mode corresponds to a set of preset dynamic cross-sectional limits; Step 6: Integrate the operation mode identification constraints, mapping model, and dynamic cross-section quota as components of cross-section power flow constraints into a multi-region integrated market clearing model; Step 7: Solve the multi-regional integrated market clearing model to obtain the initial clearing results; Step 8: Based on the initial clearing results, perform an iterative correction process of operation mode identification and section limit update until the convergence condition is met, and obtain the final market clearing results.
6. The clearing method for the inter-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas as described in claim 5, characterized in that: In step 4, the constraint for identifying the normal operating mode based on the number of key support units in operation is as follows: define an expression for the number of key support units in operation within the region; preset a corresponding range for the number of key support units in operation for each normal operating mode; introduce a binary operating mode variable, and constrain it with a linear inequality so that when the binary operating mode variable takes a specific value, the number of key support units in operation is forcibly constrained within the corresponding range.
7. The clearing method for the inter-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas as described in claim 5, characterized in that: In step 4, the constraints for identifying special operating modes based on the proportion of new energy power output in the bidding and the number of synchronous machines in operation are as follows: a first discriminant variable is introduced, and a logical relationship between the proportion of new energy power output in the bidding and the first discriminant variable is established through a big M constraint; a second discriminant variable is introduced, and a logical relationship between the number of synchronous machines in operation and the second discriminant variable is established through a big M constraint; a binary operating mode variable is introduced to identify special operating modes, and a linear inequality constraint is used to ensure that the binary operating mode variable is activated only when both the first and second discriminant variables are true.
8. The clearing method for the inter-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas according to claim 5, characterized in that: The mapping model between the operation mode variables and the regional dynamic cross-sectional limit constructed in step 5 is as follows: In the formula, and Representing regions inner section In operation mode The forward and reverse limits are below. r For regional indexes, l Index of key sections within the region. t For time period index, m Index for runtime mode, For the region r A set of operating modes For identifying the area r During the period t Is it in running mode? m binary variables, and In operation mode m lower section l The preset positive and negative limits, and The limit for the generated dynamic cross-section.
9. The clearing method for the inter-regional electricity market clearing system considering dynamic adjustment of cross-sectional quotas as described in claim 5, characterized in that: Step 8 includes the following steps: Step 8.1: Set the initial cross-sectional limit and initialize the number of iterations; Step 8.2: Under the current quota limit, solve the multi-regional integrated market clearing model to obtain the clearing results for this round; Step 8.3: Based on the unit start-up status and new energy winning bid output in this round of clearing results, use the method in Step 4 to identify the operating mode of each region in each time period; Step 8.4: Determine whether the identified operating mode is consistent with the result of the previous round, or whether the maximum number of iterations has been reached; if yes, proceed to step 8.6; if no, proceed to step 8.
5. Step 8.5: Based on the operating mode identified in this round, query the corresponding preset cross-sectional quota, update the cross-sectional quota for the next iteration, and return to step 8.2; Step 8.6: Output the current clearing result as the final result.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When executed by a processor, the program implements the steps of the method according to any one of claims 6 to 9.
