Optical storage and charging system daily scheduling decision method, device, equipment, medium and product
By constructing scheduling risk indicators and power elasticity execution ranges for photovoltaic-storage-charging systems, the problem of the lack of feedback mechanism in the day-ahead scheduling method of photovoltaic-storage-charging systems is solved, realizing flexible scheduling of photovoltaic, energy storage and electric vehicle charging loads, and improving the system's operational flexibility and economy.
Patent Information
- Application Number
- CN202611287208.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-20
AI Technical Summary
The existing day-ahead scheduling methods for photovoltaic-storage-charging systems lack a feedback mechanism, resulting in large deviations between planned schemes and operating conditions and insufficient flexibility. They cannot effectively cope with the uncertainty of photovoltaic output, the dynamic changes in the state of charge of energy storage, and the randomness of electric vehicle charging demand, making it difficult to balance the economic efficiency and regulation capacity of system operation.
By generating scheduling risk indicators for each scheduling resource, a power elastic execution interval is constructed. Under preset constraints, the solution is obtained with the goal of minimizing scheduling risk and operating cost. This generates a power allocation scheme for each time period, establishes an adaptive closed-loop correction link, and adjusts the elastic execution interval to adapt to actual operating deviations.
It effectively reduced the deviation between the planned scheme and the actual operating conditions, improved the flexibility and economy of the system in actual operation, and enabled dynamic response to uncertainties.
Smart Images

Figure CN123144253A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of smart grid dispatching technology, and in particular to a day-ahead dispatching decision-making method, apparatus, equipment, medium and product for a photovoltaic-storage-charging system. Background Technology
[0002] With the increasing penetration of distributed photovoltaic (PV) power in low-voltage distribution networks and the rapid growth of electric vehicle ownership, integrated PV-storage-charging pile (PV-storage-charging) systems on the low-voltage distribution side have become an important form of new power distribution systems. However, PV output is highly uncertain due to weather conditions, and there is a natural time mismatch between the daytime output curve and the peak charging load period (evening to night). The state of charge (SOC) of energy storage batteries changes dynamically with the charging and discharging process, and the available up / down power margin is not asymmetrical. The access time and charging demand of electric vehicle users are highly random, and the V2G (vehicle-to-grid) mode also faces a trade-off between battery degradation costs and depth of discharge. These multiple uncertainties are coupled together in the same low-voltage distribution area, making day-ahead dispatching decisions extremely challenging.
[0003] Existing day-ahead scheduling solutions for photovoltaic-storage-charging systems typically rely on day-ahead forecasts, aiming to minimize operating costs by solving for fixed power allocation schemes for each time period of the following day and then implementing them. This method treats photovoltaic output as a fixed power source, with energy storage and charging loads acting as supporting components. These three resource types exist in a fragmented hierarchical relationship rather than a unified, collaborative framework in scheduling decisions. Furthermore, once the day-ahead plan is formulated, there is no feedback correction link. When actual photovoltaic output and load deviate from the forecast values, the discrepancy between the plan and the actual operating conditions accumulates, resulting in insufficient flexibility in actual system operation and a difficulty in simultaneously achieving operational economy and adjustment capabilities. Therefore, how to describe the adjustability of each of the three resource types—photovoltaics, energy storage, and charging—within a unified quantitative system, and how to achieve closed-loop adaptive correction from day-ahead planning to intraday execution through a feedback mechanism, has become a pressing issue for the industry. Summary of the Invention
[0004] This invention provides a day-ahead scheduling decision-making method, apparatus, equipment, medium, and product for a photovoltaic, energy storage, and charging system. It can solve the problem that existing day-ahead scheduling methods for photovoltaic, energy storage, and charging systems lack a feedback mechanism for closed-loop adaptive correction of the scheduling scheme based on actual operational deviations, resulting in large deviations between the planned scheme and the operating conditions and insufficient flexibility.
[0005] In a first aspect, embodiments of the present invention provide a day-ahead scheduling decision method for a photovoltaic storage and charging system, comprising: Acquire the source-storage-load operation data of the target photovoltaic-storage-charging system within a preset scheduling period; wherein, the source-storage-load operation data includes photovoltaic system output data, energy storage system operation parameters, and electric vehicle charging demand data; Based on the source-storage-load operation data, scheduling risk indicators are generated for each scheduling resource; wherein, the scheduling resources include photovoltaic systems, energy storage systems, and electric vehicle charging loads; Based on the source-storage-load operation data, the first power elastic execution interval of each scheduling resource is determined, and based on the scheduling risk index, the interval width of the first power elastic execution interval of the corresponding scheduling resource is adjusted to obtain the second power elastic execution interval of each scheduling resource. Under the constraints of preset operating conditions and the second power elastic execution interval, the solution is performed with the dual objectives of minimizing scheduling risk and minimizing system operating cost to generate the day-ahead scheduling scheme of the target optical storage and charging system. The day-ahead scheduling scheme includes the power allocation scheme of each scheduling resource in each scheduling period. When executing the day-ahead scheduling scheme, the second power elastic execution interval is adaptively shrunk or widened according to the deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period.
[0006] This invention generates scheduling risk indicators for photovoltaic systems, energy storage systems, and electric vehicle charging loads respectively. Based on source-storage-load operation data, it constructs an initial power elastic execution range and then adaptively adjusts the range width using the risk indicators. Finally, under constraints, it solves for scheduling risk and operating cost as dual objectives to generate a day-ahead scheduling scheme containing power allocation plans for each time period. Since the power allocation results in the scheduling scheme are not fixed values but fall within an elastic range, once the scheme is implemented, the system can shrink or widen the elastic execution range based on the deviation between the real-time operating power and the corresponding time-period power allocation plan. This establishes an adaptive closed-loop correction link from actual operating deviation to the scheduling scheme, effectively reducing the deviation between the planned scheme and the operating condition, and improving the system's flexibility in actual operation.
[0007] In some preferred embodiments of the first aspect, the photovoltaic system output data includes photovoltaic predicted output data and historical prediction error range; the energy storage system operating parameters include SOC data and SOC safety margin; and the electric vehicle charging demand data includes the ratio of actual charging amount to minimum charging demand. Specifically, based on the source and storage load operation data, scheduling risk indicators for each scheduling resource are generated, as follows: Based on the photovoltaic power output data and historical prediction error range, a photovoltaic prediction error risk index is generated. Based on the SOC data and SOC safety margin, an energy storage SOC fluctuation risk index is generated. An electric vehicle charging default risk index is generated based on the ratio of the actual charging amount to the minimum charging demand. Based on adaptive dynamic weights, the photovoltaic prediction error risk index, the energy storage SOC fluctuation risk index, and the electric vehicle charging default risk index are respectively weighted to obtain the scheduling risk index of each scheduling resource; wherein, the adaptive dynamic weights are determined based on the initial weights and initial risk indicators corresponding to each scheduling resource; the initial risk indicators include the photovoltaic prediction error risk index, the energy storage SOC fluctuation risk index, and the electric vehicle charging default risk index.
[0008] This invention introduces adaptive dynamic weights, which allow the weights of each risk indicator to be adaptively adjusted based on its initial weight and initial risk value. This results in higher weights for the prediction error risk indicator when photovoltaic power output fluctuates drastically, and higher weights for the fluctuation risk indicator when the energy storage SOC approaches the safety boundary. This provides an accurate and dynamic risk quantification basis for risk-driven adjustments with a flexible range.
[0009] In some preferred embodiments of the first aspect, based on the source-storage-load operation data, a first power elastic execution interval for each scheduling resource is determined, and based on the scheduling risk index, the interval width of the first power elastic execution interval for the corresponding scheduling resource is adjusted to obtain a second power elastic execution interval for each scheduling resource, specifically as follows: Based on the photovoltaic predicted output data and the historical prediction error range, the first power elasticity execution range of the photovoltaic system is determined; Based on the operating parameters of the energy storage system and a preset first mapping table, a first power elastic execution range of the energy storage system is determined; wherein, the first mapping table includes the mapping relationship between the operating parameters of the energy storage system and the boundary of the charge and discharge power range; Based on electric vehicle charging demand data and a pre-stored second mapping table, a first power elastic execution range for electric vehicle charging load is determined; wherein, the second mapping table includes the mapping relationship between charging stages and the boundaries of charging power ranges; Based on the scheduling risk indicators of each scheduling resource, the width of the first power elastic execution interval of the corresponding scheduling resource is adjusted to obtain the second power elastic execution interval of each scheduling resource; wherein, the width of each interval is positively correlated with the corresponding scheduling risk indicator.
[0010] This invention determines the initial interval of the photovoltaic system based on predicted power output data and historical prediction error ranges. It then maps operating parameters to the boundaries of the charging and discharging power intervals using a preset first mapping table to obtain the initial interval of the energy storage system. Finally, it maps the charging phase to the boundaries of the charging power interval using a preset second mapping table to obtain the initial interval of the electric vehicle charging load. After obtaining the initial interval, the interval width is adjusted based on the scheduling risk indicators of various resources, making the interval width positively correlated with the risk indicators. This allows resources with higher risks to obtain wider elastic intervals, providing greater adjustment space for subsequent optimization solutions. Through this two-stage construction mechanism, the final elastic execution interval reflects both the inherent operating characteristics of each resource and dynamically incorporates the current risk state, providing a reasonable initial adjustment margin for subsequent adaptive closed-loop correction.
[0011] In some preferred embodiments of the first aspect, under the constraints of preset operating conditions and the second power elastic execution interval, the day-ahead scheduling scheme of the target optical storage and charging system is generated by solving the problem with the dual objectives of minimizing scheduling risk and minimizing system operating cost, specifically as follows: Based on preset safety and economic weight coefficients, the comprehensive risk index and the pre-acquired operating cost prediction data are weighted to construct a comprehensive optimization target; wherein, the comprehensive risk index is obtained by weighted fusion of the scheduling risk indexes of each scheduling resource; Under the constraints of preset operating conditions and the second power elastic execution interval, iterative optimization is performed with the goal of minimizing the comprehensive optimization objective to obtain the power allocation scheme of each scheduling resource in each scheduling period, and the day-ahead scheduling scheme of the target optical storage and charging system is generated based on the power allocation scheme.
[0012] This invention employs preset safety and economic weighting coefficients to weight and fuse the scheduling risk indicators of each scheduling resource into a comprehensive risk index. This comprehensive risk index is then weighted with pre-acquired operational cost prediction data to construct a comprehensive optimization objective. Under preset operational constraints and the constraints of a second power elastic execution interval, iterative optimization is performed with the goal of minimizing the comprehensive optimization objective, resulting in power allocation schemes for each scheduling resource in each scheduling period. Since the comprehensive optimization objective includes both safety and economic dimensions, and these dimensions are flexibly adjusted through weighting coefficients, the final power allocation scheme balances operational flexibility and economic efficiency while satisfying constraints. This provides an initial benchmark scheme that balances safety margin and cost efficiency for deviation-driven correction in the subsequent execution phase of the elastic interval.
[0013] In some preferred embodiments of the first aspect, when executing the day-ahead scheduling scheme, the second power elastic execution interval adaptively shrinks or widens based on the deviation between the actual operating power and the power allocation scheme for the corresponding scheduling period, specifically: Using a preset number of scheduling periods as a rolling time window, within the rolling time window, the average absolute deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period is calculated; When the average absolute deviation exceeds a preset first threshold, the second power elastic execution range is shrunk. When the average absolute deviation is lower than a preset second threshold, the second power elastic execution range is widened; wherein the preset second threshold is less than the preset first threshold; A hysteresis control mechanism is provided between the contraction and the relaxation.
[0014] This invention uses a preset number of scheduling periods as a rolling time window. Within this window, the average absolute deviation between the actual operating power and the corresponding power allocation scheme is continuously calculated. When the deviation exceeds a preset first threshold, it indicates a significant deviation between the actual operating conditions and the scheme, requiring a tightening of the adjustment margin to avoid runaway. When the deviation is below a preset second threshold, it indicates stable system operation, allowing for a wider adjustment range to improve economy. Simultaneously, a hysteresis control mechanism is implemented between contraction and relaxation to prevent frequent oscillations around the threshold. Through this closed-loop correction mechanism based on rolling window deviation calculation, dual-threshold discrimination, and hysteresis control, the adaptive adjustment of the interval during the execution phase is stably achieved, thus ensuring timely adjustment response while avoiding system jitter caused by frequent switching.
[0015] In some preferred embodiments of the first aspect, after obtaining the power allocation scheme for each scheduling resource in each scheduling period, the method further includes: Based on a preset set of feasibility thresholds, the feasibility of each power allocation scheme is checked. If the executability check fails, adjust the second power elastic execution interval data and regenerate a new power allocation scheme until the executability check passes.
[0016] In this embodiment of the invention, after obtaining a power allocation scheme, an executability check is performed on each scheme using a preset set of feasibility thresholds. If the check fails, it indicates that the current scheme does not meet the requirements in terms of engineering margin for certain indicators. In this case, the data of the second power elastic execution interval is adjusted and a new power allocation scheme is regenerated until all checks pass. This check and feedback re-resolution mechanism ensures that the final output day-ahead scheduling scheme is not only mathematically feasible but also engineeringally executable, reducing the actual deviation caused by the unexecutability of the scheme from the source. It complements the closed-loop adaptive correction in the execution phase, jointly ensuring the reliability of the closed-loop feedback from both the day-ahead plan generation and execution process correction levels.
[0017] Secondly, embodiments of the present invention provide a day-ahead scheduling decision-making device for a photovoltaic-storage-charging system, comprising a data acquisition module, a risk assessment module, a flexibility interval determination module, and a scheduling scheme generation module, wherein... The data acquisition module is used to acquire the source-storage-load operation data of the target photovoltaic-storage-charging system within a preset scheduling period; wherein, the source-storage-load operation data includes photovoltaic system output data, energy storage system operation parameters, and electric vehicle charging demand data; The risk assessment module is used to generate scheduling risk indicators for each scheduling resource based on the source-storage-load operation data; wherein, the scheduling resources include photovoltaic systems, energy storage systems and electric vehicle charging loads; The elastic range determination module is used to determine the first power elastic execution range of each scheduling resource based on the source and storage load operation data, and to adjust the range width of the first power elastic execution range of the corresponding scheduling resource according to the scheduling risk index, so as to obtain the second power elastic execution range of each scheduling resource. The scheduling scheme generation module is used to solve, under the constraints of preset operating constraints and the second power elastic execution interval, with the dual objectives of minimizing scheduling risk and minimizing system operating cost, to generate the day-ahead scheduling scheme of the target optical storage and charging system; wherein, the day-ahead scheduling scheme includes the power allocation scheme of each scheduling resource in each scheduling period; when executing the day-ahead scheduling scheme, the second power elastic execution interval is adaptively shrunk or widened according to the deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period.
[0018] This invention generates scheduling risk indicators for photovoltaic systems, energy storage systems, and electric vehicle charging loads respectively. Based on source-storage-load operation data, it constructs an initial power elastic execution range and then adaptively adjusts the range width using the risk indicators. Finally, under constraints, it solves for scheduling risk and operating cost as dual objectives to generate a day-ahead scheduling scheme containing power allocation plans for each time period. Since the power allocation results in the scheduling scheme are not fixed values but fall within an elastic range, once the scheme is implemented, the system can shrink or widen the elastic execution range based on the deviation between the real-time operating power and the corresponding time-period power allocation plan. This establishes an adaptive closed-loop correction link from actual operating deviation to the scheduling scheme, effectively reducing the deviation between the planned scheme and the operating condition, and improving the system's flexibility in actual operation.
[0019] Thirdly, embodiments of the present invention provide a terminal device, including: a processor, a memory, a communication interface, and a communication bus, wherein the processor, the memory, and the communication interface communicate with each other through the communication bus; The memory is used to store at least one executable instruction that causes the processor to perform the operation of the day-ahead scheduling decision method for the optical storage and charging system as described in any of the above.
[0020] Fourthly, embodiments of the present invention provide a computer-readable storage medium, the computer-readable storage medium including a stored computer program, wherein, when the computer program is executed, it controls the device or apparatus where the computer-readable storage medium is located to perform the day-ahead scheduling decision method for an optical storage and charging system as described in any of the above.
[0021] Fifthly, embodiments of the present invention provide a computer program product, including a computer program or instructions, wherein the computer program or instructions execute the day-ahead scheduling decision method for a photovoltaic storage and charging system as described in any of the above embodiments.
[0022] The above description is merely an overview of the technical solutions of the embodiments of the present invention. In order to better understand the technical means of the embodiments of the present invention and to implement them in accordance with the contents of the specification, and to make the above and other objects, features and advantages of the embodiments of the present invention more apparent and understandable, specific embodiments of the present invention are described below. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of a day-ahead scheduling decision method for a photovoltaic storage and charging system provided in an embodiment of the present invention; Figure 2 A flowchart illustrating the PSO algorithm optimization process, as exemplified in an embodiment of the present invention; Figure 3 A flowchart illustrating the calculation of a power elastic execution range, as exemplified by an embodiment of the present invention; Figure 4 This is a structural diagram of a day-ahead scheduling decision device for a photovoltaic storage and charging system provided in an embodiment of the present invention. Detailed Implementation
[0024] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0025] Example 1: like Figure 1 As shown, an embodiment of the present invention provides a day-ahead scheduling decision method for a photovoltaic storage and charging system, comprising the following steps: S101, acquire the source-storage-load operation data of the target photovoltaic-storage-charging system within a preset scheduling period; wherein, the source-storage-load operation data includes photovoltaic system output data, energy storage system operation parameters, and electric vehicle charging demand data; In one specific embodiment, before the start of the day-ahead scheduling cycle, the photovoltaic power output forecast, energy storage system operating parameters, electric vehicle charging demand data, and low-voltage distribution network operation constraint data for the scheduling cycle are acquired through a data acquisition system, and standardized preprocessing is completed.
[0026] Optionally, the photovoltaic power output forecast data includes the forecast power for each time period. and the corresponding prediction error ,in It is the error range that is optimized and adjusted through a machine learning model based on the results of historical error deviation analysis.
[0027] Optionally, the operating parameters of the energy storage system include the total capacity of the energy storage devices. Maximum charging and discharging power , Charge and discharge efficiency , and initial charge state Security upper and lower limits of SOC , .
[0028] Optionally, electric vehicle charging demand data includes vehicle arrival / departure time, maximum charging power, and minimum charging capacity. And charging priority.
[0029] Optionally, distribution network constraints include maximum transformer load, line carrying capacity, and maximum allowable reverse power injection. Standardization preprocessing includes discretization at a uniform time scale, unit standardization, and outlier removal. Standardization preprocessing: all collected data are discretized at a uniform time scale and standardized by units, and outliers are removed during data collection to ensure data consistency and validity.
[0030] Preferably, a power scheduling model and operational constraints are established for photovoltaic (PV), energy storage, and electric vehicle (EV) charging loads. Specifically, the PV grid-connected power does not exceed the predicted output and reverse power flow limits; energy storage charging and discharging satisfy mutual exclusion constraints, and the charging and discharging power of energy storage in time period t is defined. , This ensures that its charging and discharging operations are within the maximum charging and discharging power range, and that the State of Charge (SOC) is always kept within the preset safety upper and lower limits. Energy storage is only allowed to be in charging or discharging state during any given scheduling period, and the charging and discharging power meets mutual exclusion constraints. This indicates the operating state of energy storage in time period t. When the value is 1, the upper limit of discharge is reduced to 0, and charging is the only option. When the SOC is 0, the charging limit is reduced to 0, and only discharging is possible; the SOC is calculated according to the formula. Dynamic updates The scheduling time interval is defined as follows: The electric vehicle charging load scheduling model is based on the charging demand of electric vehicles and combines the arrival and departure times of vehicles to calculate the charging power and timing. The charging power is only valid within the vehicle's time window, and the accumulated charging amount within the window meets the requirements. ,in Let be the charging power of the i-th electric vehicle during time period t. The charging period for this vehicle. The minimum charging requirement for this electric vehicle. As a scheduling interval, the charging power is only valid within the vehicle's time window.
[0031] S102, Based on the source-storage-load operation data, generate scheduling risk indicators for each scheduling resource; wherein, the scheduling resources include photovoltaic systems, energy storage systems, and electric vehicle charging loads; In this embodiment, the photovoltaic system output data includes photovoltaic predicted output data and historical prediction error range; the energy storage system operating parameters include SOC data and SOC safety margin; the electric vehicle charging demand data includes the ratio of actual charging amount to minimum charging demand; wherein, based on the source-storage-load operating data, scheduling risk indicators for each scheduling resource are generated, specifically: a photovoltaic prediction error risk indicator is generated based on the photovoltaic predicted output data and historical prediction error range; an energy storage SOC fluctuation risk indicator is generated based on the SOC data and SOC safety margin; an electric vehicle charging default risk indicator is generated based on the ratio of actual charging amount to minimum charging demand; and weights are assigned to the photovoltaic prediction error risk indicator, the energy storage SOC fluctuation risk indicator, and the electric vehicle charging default risk indicator based on adaptive dynamic weights to obtain the scheduling risk indicators for each scheduling resource; wherein, the adaptive dynamic weights are determined based on the initial weights and initial risk indicators corresponding to each scheduling resource; the initial risk indicators include the photovoltaic prediction error risk indicator, the energy storage SOC fluctuation risk indicator, and the electric vehicle charging default risk indicator.
[0032] In one specific embodiment, a photovoltaic prediction error risk index is generated based on the photovoltaic power prediction output data and historical prediction error range. Specifically, the input data includes a photovoltaic power prediction sequence. Photovoltaic power forecast sequence, where T is the total number of scheduling periods, historical forecast error statistics, and real-time meteorological monitoring data.
[0033] Furthermore, a statistical model for prediction errors is first constructed based on historical operational data. Let the historical prediction error sequence be... ,in , The j-th historical prediction error, where N is the number of historical data samples. Actual power during the j-th time period; Predicted power for time period j. Historical mean error: Historical error standard deviation: The computer reads meteorological monitoring data (irradiance, temperature, cloud cover) in real time, and dynamically corrects the standard deviation of the error when a sudden change in meteorological conditions is detected. ,in Let be the corrected standard deviation of error (kW) for time period t. This is the meteorological sensitivity coefficient. The actual irradiance (W / t) during time period t ), Predict the irradiance (W / t) for time period t. ).
[0034] Furthermore, the standard deviation of photovoltaic output error is calculated by comparing the actual fluctuations with historical or real-time data of predicted fluctuations. ,by Quantify risk.
[0035] In one specific embodiment, based on the SOC data and SOC safety margin, an energy storage SOC fluctuation risk index is generated, specifically: energy storage SOC fluctuation risk. This refers to the possibility of dispatch failure when the SOC of an energy storage system deviates from the real-time safety margin. This risk takes into account the charge / discharge state of the energy storage system and the battery health condition. Specifically, the calculation of the real-time safety margin involves reading the real-time SOC data uploaded by the energy storage BMS system every 15 minutes (daily scheduling granularity) and calculating the remaining SOC safety margin. . Let SOC be the remaining safety margin (%) in time period t. The real-time state of charge (%) of the energy storage in time period t. These are the upper and lower safety limits for SOC. When SOC deviates from the median value, asymmetric range adjustment is performed.
[0036] In one specific embodiment, an electric vehicle charging default risk index is generated based on the ratio of the actual charging amount to the minimum charging demand, specifically: electric vehicle charging default risk. This primarily considers situations where users do not charge as planned, such as leaving early or changes in charging demand. The risk model calculates the degree to which electric vehicle charging demand is met. Quantitatively, if charging demand is not fully met, the risk increases. This represents the cumulative charging amount of the vehicle up to time period t, in kWh. Minimum charging power requirement for the i-th electric vehicle, in kWh, where i is the electric vehicle number.
[0037] In one specific embodiment, the power elastic execution interval is represented using an interval vector data structure: for the t-th scheduling period, the power elastic execution interval is defined as: . This represents the lower limit of power (kW) for that period. The power limit for time period t is determined by system safety constraints and the current risk state. Interval width. This reflects the scheduling flexibility during that period. In computer memory, this interval is stored as a structure array.
[0038] In one specific embodiment, all three types of risk indicators are quantified as values between 0 and 1, and a comprehensive scheduling risk indicator is generated by dynamically weighting them. , Risk value of type x in time period t. The weights are dynamically updated after time period t, and satisfy the following conditions: Dynamic weights are calculated based on... calculate, The initial weights for each risk. These represent photovoltaics, energy storage, and electric vehicles, respectively.
[0039] S103, based on the source-storage-load operation data, determine the first power elastic execution interval of each scheduling resource, and based on the scheduling risk index, adjust the interval width of the first power elastic execution interval of the corresponding scheduling resource to obtain the second power elastic execution interval of each scheduling resource; In this embodiment, based on the source-storage-load operation data, a first power elastic execution range for each scheduling resource is determined. Then, based on the scheduling risk index, the width of the first power elastic execution range for each scheduling resource is adjusted to obtain a second power elastic execution range for each scheduling resource. Specifically: a first power elastic execution range for the photovoltaic system is determined based on the photovoltaic predicted output data and historical prediction error range; a first power elastic execution range for the energy storage system is determined based on the energy storage system operating parameters and a preset first mapping table; wherein the first mapping table includes the mapping relationship between the energy storage system operating parameters and the boundary of the charging / discharging power range; a first power elastic execution range for the electric vehicle charging load is determined based on the electric vehicle charging demand data and a pre-stored second mapping table; wherein the second mapping table includes the mapping relationship between the charging stage and the boundary of the charging power range; and the width of the first power elastic execution range for each scheduling resource is adjusted based on the scheduling risk index for each scheduling resource to obtain a second power elastic execution range for each scheduling resource; wherein each range width is positively correlated with the corresponding scheduling risk index.
[0040] Optionally, the mechanism for determining the initial power elasticity range of photovoltaic power is: based on a ±15% prediction error range, set to 85%~100% of the predicted output, i.e. [ , [and the upper limit is ≤80kW;] Optionally, the initial power elasticity range determination mechanism for energy storage is as follows: when SOC=50%, the discharge range is 0~60kW and the charging range is 0~50kW; when SOC rises to 70%, the charging range shrinks to 0~30kW and the discharge range expands to 0~60kW; when SOC drops to 30%, the discharge range shrinks to 0~20kW and the charging range expands to 0~50kW. Optionally, the mechanism for determining the initial power range of electric vehicle charging is as follows: during the initial charging phase (18:00~22:00), when there is sufficient remaining time, the range is set to 0~7kW; during the middle charging phase (23:00~4:00 the next day), the range is set to 2~7kW; and during the final charging phase (5:00~7:00 the next day), when there is ≤4 hours remaining time, the range is relaxed to 3~7kW to ensure that the minimum charging demand is met.
[0041] In one specific embodiment, the elastic range of the energy storage system is dynamically adjusted according to the changes in the energy storage SOC and the remaining margin. The closer the SOC is to the safety upper limit, the more the charging range shrinks and the more the discharging range widens, and vice versa.
[0042] In one specific embodiment, the elastic range of the electric vehicle charging load is dynamically adjusted according to the vehicle's charging priority, remaining charging time, and uncharged amount of electricity. The shorter the remaining charging time and the more uncharged amount of electricity, the wider the range is towards the maximum charging power side.
[0043] Specifically, the charging stage is automatically identified based on the current time t and the vehicle's charging time window, and the remaining charging time is defined: Define the remaining charging capacity. Define charging urgency indicators: ,in It represents the charging urgency (dimensionless) of the i-th vehicle during time period t. It is the remaining charging time (h). It is the remaining charging capacity (kWh). This is the vehicle's maximum charging power.
[0044] Furthermore, based on the urgency of charging Dynamically adjust the charging power range: ,in This is a margin of flexibility, determined based on the charging stage.
[0045] In one specific embodiment, the interval width is based on Quantification involves calculating the average operating deviation using a rolling window of three scheduling periods as the adjustment coefficient, and calculating the average deviation using a rolling time window of three scheduling periods as the bias. In the formula: The average operating deviation within the rolling window, in kW; Actual power in time period j, kW; The predicted power for time period j, in kW. When the average absolute deviation exceeds the 95% confidence interval threshold for historical deviations, i.e. (For the 95% confidence interval threshold) the interval is contracted by 10%. When the mean absolute deviation is below 50% of the threshold, i.e., if... The interval is widened to 1.2 times the original width, and hysteresis control is used to prevent frequent oscillations within the interval.
[0046] In one specific embodiment, the photovoltaic elasticity range is adjusted as follows: ,in , The width of the photovoltaic power elasticity range after adjustment in time period t. The width of the photovoltaic power elastic range before adjustment in time period t, and the boundary of the range after adjustment: , This represents the lower limit of the adjusted grid-connected photovoltaic power in time period t. This represents the upper limit of the grid-connected photovoltaic power after adjustment in time period t; adjustments to the energy storage range must simultaneously consider both the SOC status and operational deviations. ,in This is the SOC correction factor; the adjustment of the electric vehicle's flexible range needs to be considered in conjunction with the urgency of charging. , This is a correction factor for urgency. The width of the energy storage power elastic range after adjustment in time period t. This represents the width of the energy storage power elastic range before adjustment in time period t.
[0047] S104, under the constraints of preset operating conditions and the second power elastic execution interval, the solution is performed with the dual objectives of minimizing scheduling risk and minimizing system operating cost to generate the day-ahead scheduling scheme of the target optical storage and charging system; wherein, the day-ahead scheduling scheme includes the power allocation scheme of each scheduling resource in each scheduling period; when executing the day-ahead scheduling scheme, the second power elastic execution interval is adaptively shrunk or widened according to the deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period.
[0048] In this embodiment, under the constraints of preset operating conditions and the second power elastic execution interval, the day-ahead scheduling scheme of the target optical storage and charging system is generated by solving the dual objectives of minimizing scheduling risk and minimizing system operating cost. Specifically, the comprehensive risk index and the pre-acquired operating cost prediction data are weighted according to preset safety weight coefficients and economic weight coefficients to construct a comprehensive optimization objective. The comprehensive risk index is obtained by weighted fusion of the scheduling risk indexes of each scheduling resource. Under the constraints of preset operating conditions and the second power elastic execution interval, iterative optimization is performed with the minimization of the comprehensive optimization objective as the direction to obtain the power allocation scheme of each scheduling resource in each scheduling period. Based on the power allocation scheme, the day-ahead scheduling scheme of the target optical storage and charging system is generated.
[0049] Optionally, the constraints during the solution process include distribution network security constraints, integrated dispatch risk constraints, and power elastic execution interval constraints.
[0050] In one specific embodiment, the dual objective function is defined as: ,in To manage risk indicators, For system operating costs, and The weighting coefficients support three optimization preferences: economy priority, safety priority, and balance mode. System operating costs include grid power purchase costs, energy storage charging and discharging losses, and, when V2G is supported, electric vehicle battery degradation costs are included.
[0051] Optional, such as Figure 2 As shown, an improved particle swarm optimization algorithm (improved PSO) is used to solve the dual-objective optimization problem. The improved PSO introduces an adaptive inertia weight and a constraint penalty mechanism, supporting three optimization preferences: economy priority, safety priority, and balance mode.
[0052] In this embodiment, after obtaining the power allocation schemes for each scheduling resource in each scheduling period, the method further includes: performing executability checks on the power allocation schemes according to a preset set of feasibility thresholds; when the executability check fails, adjusting the second power elastic execution interval data and regenerating a new power allocation scheme until the executability check passes.
[0053] In one specific embodiment, the total power elasticity execution range constraint is: in, denoted as the upper and lower limits of the grid-connected photovoltaic power in time period t. The upper and lower limits of the energy storage charging power in time period t. For the upper and lower limits of the charging power of the i-th vehicle in time period t, the elastic range is used as the verification benchmark in the feasibility verification: (1) Verification 1: Transformer load verification If the verification fails, the computer will adjust the flexible range in reverse.
[0054] (2) Verification 2: Energy Storage SOC Verification If the SOC exceeds the limit, the computer will adjust the energy storage elasticity range.
[0055] (3) Verification 3: Charging demand satisfaction rate verification If the conditions are not met, the computer will forcibly relax the electric vehicle's flexibility range at the end of the charging period to ensure that the minimum charging requirement is met.
[0056] To more clearly illustrate the implementation principle and steps of the flexible execution range determination method of this invention, please refer to [link / reference needed]. Figure 3 .
[0057] In this embodiment, when executing the day-ahead scheduling scheme, the second power elastic execution interval adaptively shrinks or widens based on the deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period. Specifically, a preset number of scheduling periods are used as a rolling time window. Within the rolling time window, the average absolute deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period is calculated. When the average absolute deviation exceeds a preset first threshold, the second power elastic execution interval is shrunk. When the average absolute deviation is lower than a preset second threshold, the second power elastic execution interval is widened. The preset second threshold is less than the preset first threshold. A hysteresis control mechanism is provided between the shrinkage and the widening.
[0058] In one specific embodiment, the flexible execution interval supports dynamic contraction or expansion within a day based on the actual execution deviation. The actual execution deviation is the absolute error between the real-time running data and the predicted data, and the average deviation is calculated using three scheduling periods as rolling time windows. In the formula: The average operating deviation within the rolling window, in kW; Actual power in time period j, kW; The predicted power for time period j, in kW. When the average absolute deviation exceeds the 95% confidence interval threshold for historical deviations, i.e. (Intervals exceeding the 95% confidence interval threshold) are contracted by 10%. When the mean absolute deviation is below 50% of the threshold, i.e., if... The interval is widened to 1.2 times the original width, and hysteresis control is used to prevent frequent oscillations within the interval.
[0059] Preferably, to avoid frequent oscillations around the threshold in the interval, the computer introduces a hysteresis control mechanism: defining state variables. : It is in a contracted state. To relax the restrictions, This is the normal state.
[0060] It should be noted that the present invention adopts the following layered architecture: the day-ahead layer outputs hourly elastic ranges; the intraday layer performs rolling corrections at 15-minute granularities; and the real-time layer outputs second-level power commands.
[0061] It should be noted that this invention supports V2G operation, with the discharge power not exceeding 80% of the maximum charging power and the depth of discharge not exceeding 50%. That is, the discharge power meets the following requirements: ;in Let be the V2G discharge power of the electric vehicle in time period t. This refers to the maximum charging power for electric vehicles. When V2G is supported, the battery degradation cost is included in the calculation, with the battery degradation cost calculated as follows: The calculation is as follows: k is the unit cycle degradation cost, DOD is the depth of discharge, and N is the number of charge-discharge cycles.
[0062] This invention generates scheduling risk indicators for photovoltaic systems, energy storage systems, and electric vehicle charging loads respectively. Based on source-storage-load operation data, it constructs an initial power elastic execution range and then adaptively adjusts the range width using the risk indicators. Finally, under constraints, it solves for scheduling risk and operating cost as dual objectives to generate a day-ahead scheduling scheme containing power allocation plans for each time period. Since the power allocation results in the scheduling scheme are not fixed values but fall within an elastic range, once the scheme is implemented, the system can shrink or widen the elastic execution range based on the deviation between the real-time operating power and the corresponding time-period power allocation plan. This establishes an adaptive closed-loop correction link from actual operating deviation to the scheduling scheme, effectively reducing the deviation between the planned scheme and the operating condition, and improving the system's flexibility in actual operation.
[0063] Example 2: like Figure 4 As shown, this embodiment provides a day-ahead scheduling decision-making device for a photovoltaic-storage-charging system, including a data acquisition module 201, a risk assessment module 202, a flexibility range determination module 203, and a scheduling scheme generation module 204. The data acquisition module 201 is used to acquire the source-storage-load operation data of the target photovoltaic-storage-charging system within a preset scheduling period; wherein, the source-storage-load operation data includes photovoltaic system output data, energy storage system operation parameters, and electric vehicle charging demand data; The risk assessment module 202 is used to generate scheduling risk indicators for each scheduling resource based on the source-storage-load operation data; wherein, the scheduling resources include photovoltaic systems, energy storage systems and electric vehicle charging loads; In this embodiment, the photovoltaic system output data includes photovoltaic predicted output data and historical prediction error range; the energy storage system operating parameters include SOC data and SOC safety margin; the electric vehicle charging demand data includes the ratio of actual charging amount to minimum charging demand; wherein, the risk assessment module 202 generates scheduling risk indicators for each scheduling resource based on the source-storage-load operating data, specifically: the risk assessment module 202 generates a photovoltaic prediction error risk indicator based on the photovoltaic predicted output data and historical prediction error range; generates an energy storage SOC fluctuation risk indicator based on the SOC data and SOC safety margin; generates an electric vehicle charging default risk indicator based on the ratio of actual charging amount to minimum charging demand; and assigns weights to the photovoltaic prediction error risk indicator, the energy storage SOC fluctuation risk indicator, and the electric vehicle charging default risk indicator based on adaptive dynamic weights to obtain the scheduling risk indicators for each scheduling resource; wherein, the adaptive dynamic weights are determined based on the initial weights and initial risk indicators corresponding to each scheduling resource; the initial risk indicators include the photovoltaic prediction error risk indicator, the energy storage SOC fluctuation risk indicator, and the electric vehicle charging default risk indicator.
[0064] The elastic range determination module 203 is used to determine the first power elastic execution range of each scheduling resource based on the source and storage load operation data, and to adjust the range width of the first power elastic execution range of the corresponding scheduling resource according to the scheduling risk index, so as to obtain the second power elastic execution range of each scheduling resource. In this embodiment, the elastic range determination module 203 determines the first power elastic execution range of each scheduling resource based on the source-storage-load operation data, and adjusts the range width of the first power elastic execution range of the corresponding scheduling resource according to the scheduling risk index to obtain the second power elastic execution range of each scheduling resource. Specifically, the elastic range determination module 203 determines the first power elastic execution range of the photovoltaic system based on the photovoltaic predicted output data and historical prediction error range; determines the first power elastic execution range of the energy storage system based on the energy storage system operation parameters and a preset first mapping table; wherein, the first mapping table includes the mapping relationship between the energy storage system operation parameters and the boundary of the charging and discharging power range; determines the first power elastic execution range of the electric vehicle charging load based on the electric vehicle charging demand data and a pre-stored second mapping table; wherein, the second mapping table includes the mapping relationship between the charging stage and the boundary of the charging power range; and adjusts the range width of the first power elastic execution range of the corresponding scheduling resource according to the scheduling risk index of each scheduling resource to obtain the second power elastic execution range of each scheduling resource; wherein, the range width is positively correlated with the corresponding scheduling risk index.
[0065] The scheduling scheme generation module 204 is used to solve the day-ahead scheduling scheme of the target optical storage and charging system under the constraints of preset operating constraints and the second power elastic execution interval, with the dual objectives of minimizing scheduling risk and minimizing system operating cost; wherein, the day-ahead scheduling scheme includes the power allocation scheme of each scheduling resource in each scheduling period; when executing the day-ahead scheduling scheme, the second power elastic execution interval is adaptively shrunk or widened according to the deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period.
[0066] In this embodiment, the scheduling scheme generation module 204, under the constraints of preset operating conditions and the second power elastic execution interval, solves the problem with the dual objectives of minimizing scheduling risk and minimizing system operating cost to generate the day-ahead scheduling scheme of the target optical storage and charging system. Specifically, the scheduling scheme generation module 204 weights the comprehensive risk index and the pre-acquired operating cost prediction data according to preset safety weight coefficients and economic weight coefficients to construct a comprehensive optimization objective. The comprehensive risk index is obtained by weighted fusion of the scheduling risk indices of each scheduling resource. Under the constraints of preset operating conditions and the second power elastic execution interval, iterative optimization is performed with the minimization of the comprehensive optimization objective as the direction to obtain the power allocation scheme of each scheduling resource in each scheduling period, and the day-ahead scheduling scheme of the target optical storage and charging system is generated according to the power allocation scheme.
[0067] In this embodiment, after obtaining the power allocation schemes for each scheduling resource in each scheduling period, the method further includes: performing executability checks on the power allocation schemes according to a preset set of feasibility thresholds; when the executability check fails, adjusting the second power elastic execution interval data and regenerating a new power allocation scheme until the executability check passes.
[0068] In this embodiment, when executing the day-ahead scheduling scheme, the second power elastic execution interval adaptively shrinks or widens based on the deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period. Specifically, a preset number of scheduling periods are used as a rolling time window. Within the rolling time window, the average absolute deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period is calculated. When the average absolute deviation exceeds a preset first threshold, the second power elastic execution interval is shrunk. When the average absolute deviation is lower than a preset second threshold, the second power elastic execution interval is widened. The preset second threshold is less than the preset first threshold. A hysteresis control mechanism is provided between the shrinkage and the widening.
[0069] For a more detailed explanation of the working principle and procedures of this embodiment, please refer to the relevant description in Embodiment 1.
[0070] This invention generates scheduling risk indicators for photovoltaic systems, energy storage systems, and electric vehicle charging loads respectively. Based on source-storage-load operation data, it constructs an initial power elastic execution range and then adaptively adjusts the range width using the risk indicators. Finally, under constraints, it solves for scheduling risk and operating cost as dual objectives to generate a day-ahead scheduling scheme containing power allocation plans for each time period. Since the power allocation results in the scheduling scheme are not fixed values but fall within an elastic range, once the scheme is implemented, the system can shrink or widen the elastic execution range based on the deviation between the real-time operating power and the corresponding time-period power allocation plan. This establishes an adaptive closed-loop correction link from actual operating deviation to the scheduling scheme, effectively reducing the deviation between the planned scheme and the operating condition, and improving the system's flexibility in actual operation.
[0071] Example 3: This embodiment provides a terminal device, including: a processor, a memory, a communication interface, and a communication bus, wherein the processor, the memory, and the communication interface communicate with each other through the communication bus; The memory is used to store at least one executable instruction that causes the processor to perform the operation of the day-ahead scheduling decision method for the optical storage and charging system as described in any of the above.
[0072] Example 4: This invention provides a computer-readable storage medium including a stored computer program, wherein, when the computer program is executed, it controls the device or apparatus where the computer-readable storage medium is located to perform the day-ahead scheduling decision method for an optical storage and charging system as described above.
[0073] Example 5: This invention provides a computer program product, including a computer program or instructions, wherein the computer program or instructions execute the day-ahead scheduling decision method for a photovoltaic storage and charging system as described in any of the above embodiments.
[0074] Those skilled in the art will understand that all or part of the processes in the above embodiments can be implemented by a computer program instructing related hardware. The program can be stored in a computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. The storage medium can be a magnetic disk, optical disk, read-only memory (ROM), or random access memory (RAM), etc.
[0075] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above descriptions are merely specific embodiments of the present invention and are not intended to limit the scope of protection of the present invention. In particular, it should be noted that any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention for those skilled in the art.
Claims
1. A day-ahead scheduling decision-making method for a photovoltaic-storage-charging system, characterized in that, include: Acquire the source-storage-load operation data of the target photovoltaic-storage-charging system within a preset scheduling period; wherein, the source-storage-load operation data includes photovoltaic system output data, energy storage system operation parameters, and electric vehicle charging demand data; Based on the source-storage-load operation data, scheduling risk indicators are generated for each scheduling resource; wherein, the scheduling resources include photovoltaic systems, energy storage systems, and electric vehicle charging loads; Based on the source-storage-load operation data, the first power elastic execution interval of each scheduling resource is determined, and based on the scheduling risk index, the interval width of the first power elastic execution interval of the corresponding scheduling resource is adjusted to obtain the second power elastic execution interval of each scheduling resource. Under the constraints of preset operating conditions and the second power elastic execution interval, the solution is performed with the dual objectives of minimizing scheduling risk and minimizing system operating cost to generate the day-ahead scheduling scheme of the target optical storage and charging system. The day-ahead scheduling scheme includes the power allocation scheme of each scheduling resource in each scheduling period. When executing the day-ahead scheduling scheme, the second power elastic execution interval is adaptively shrunk or widened according to the deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period.
2. The day-ahead scheduling decision method for a photovoltaic-storage-charging system as described in claim 1, characterized in that, The photovoltaic system output data includes photovoltaic predicted output data and historical prediction error range; the energy storage system operating parameters include SOC data and SOC safety margin; the electric vehicle charging demand data includes the ratio of actual charging amount to minimum charging demand. Specifically, based on the source and storage load operation data, scheduling risk indicators for each scheduling resource are generated, as follows: Based on the photovoltaic power output data and historical prediction error range, a photovoltaic prediction error risk index is generated. Based on the SOC data and SOC safety margin, an energy storage SOC fluctuation risk index is generated. An electric vehicle charging default risk index is generated based on the ratio of the actual charging amount to the minimum charging demand. Based on adaptive dynamic weights, the photovoltaic prediction error risk index, the energy storage SOC fluctuation risk index, and the electric vehicle charging default risk index are respectively weighted to obtain the scheduling risk index of each scheduling resource; wherein, the adaptive dynamic weights are determined based on the initial weights and initial risk indicators corresponding to each scheduling resource; the initial risk indicators include the photovoltaic prediction error risk index, the energy storage SOC fluctuation risk index, and the electric vehicle charging default risk index.
3. The day-ahead scheduling decision method for a photovoltaic-storage-charging system as described in claim 2, characterized in that, Based on the source-storage-load operation data, the first power elastic execution interval for each scheduling resource is determined. Then, based on the scheduling risk index, the width of the first power elastic execution interval for each corresponding scheduling resource is adjusted to obtain the second power elastic execution interval for each scheduling resource. Specifically: Based on the photovoltaic predicted output data and the historical prediction error range, the first power elasticity execution range of the photovoltaic system is determined; Based on the operating parameters of the energy storage system and a preset first mapping table, a first power elastic execution range of the energy storage system is determined; wherein, the first mapping table includes the mapping relationship between the operating parameters of the energy storage system and the boundary of the charge and discharge power range; Based on electric vehicle charging demand data and a pre-stored second mapping table, a first power elastic execution range for electric vehicle charging load is determined; wherein, the second mapping table includes the mapping relationship between charging stages and the boundaries of charging power ranges; Based on the scheduling risk indicators of each scheduling resource, the width of the first power elastic execution interval of the corresponding scheduling resource is adjusted to obtain the second power elastic execution interval of each scheduling resource; wherein, the width of each interval is positively correlated with the corresponding scheduling risk indicator.
4. The day-ahead scheduling decision method for a photovoltaic-storage-charging system as described in claim 2, characterized in that, Under the constraints of preset operating conditions and the second power elastic execution range, the day-ahead scheduling scheme of the target optical storage and charging system is generated by solving the problem with the dual objectives of minimizing scheduling risk and minimizing system operating cost. Specifically: Based on preset safety and economic weight coefficients, the comprehensive risk index and the pre-acquired operating cost prediction data are weighted to construct a comprehensive optimization target; wherein, the comprehensive risk index is obtained by weighted fusion of the scheduling risk indexes of each scheduling resource; Under the constraints of preset operating conditions and the second power elastic execution interval, iterative optimization is performed with the goal of minimizing the comprehensive optimization objective to obtain the power allocation scheme of each scheduling resource in each scheduling period, and the day-ahead scheduling scheme of the target optical storage and charging system is generated based on the power allocation scheme.
5. The day-ahead scheduling decision method for a photovoltaic-storage-charging system as described in claim 4, characterized in that, When executing the day-ahead scheduling scheme, the second power elastic execution interval adaptively shrinks or widens based on the deviation between the actual operating power and the power allocation scheme for the corresponding scheduling period, specifically: Using a preset number of scheduling periods as a rolling time window, within the rolling time window, the average absolute deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period is calculated; When the average absolute deviation exceeds a preset first threshold, the second power elastic execution range is shrunk. When the average absolute deviation is lower than a preset second threshold, the second power elastic execution range is widened; wherein the preset second threshold is less than the preset first threshold; A hysteresis control mechanism is provided between the contraction and the relaxation.
6. The day-ahead scheduling decision method for a photovoltaic-storage-charging system as described in claim 4, characterized in that, After obtaining the power allocation scheme for each scheduling resource in each scheduling period, the following is also included: Based on a preset set of feasibility thresholds, the feasibility of each power allocation scheme is checked. If the executability check fails, adjust the second power elastic execution interval data and regenerate a new power allocation scheme until the executability check passes.
7. A day-ahead scheduling decision-making device for a photovoltaic-storage-charging system, characterized in that, It includes a data acquisition module, a risk assessment module, a resilience range determination module, and a scheduling scheme generation module. The data acquisition module is used to acquire the source-storage-load operation data of the target photovoltaic-storage-charging system within a preset scheduling period; wherein, the source-storage-load operation data includes photovoltaic system output data, energy storage system operation parameters, and electric vehicle charging demand data; The risk assessment module is used to generate scheduling risk indicators for each scheduling resource based on the source-storage-load operation data; wherein, the scheduling resources include photovoltaic systems, energy storage systems and electric vehicle charging loads; The elastic range determination module is used to determine the first power elastic execution range of each scheduling resource based on the source and storage load operation data, and to adjust the range width of the first power elastic execution range of the corresponding scheduling resource according to the scheduling risk index, so as to obtain the second power elastic execution range of each scheduling resource. The scheduling scheme generation module is used to solve, under the constraints of preset operating constraints and the second power elastic execution interval, with the dual objectives of minimizing scheduling risk and minimizing system operating cost, to generate a day-ahead scheduling scheme for the target optical storage and charging system; wherein, the day-ahead scheduling scheme includes the power allocation scheme of each scheduling resource in each scheduling period; when executing the day-ahead scheduling scheme, the second power elastic execution interval is adaptively shrunk or widened according to the deviation between the actual operating power and the power allocation scheme of the corresponding scheduling period.
8. A terminal device, characterized in that, include: The processor, memory, communication interface, and communication bus are provided, wherein the processor, memory, and communication interface communicate with each other via the communication bus. The memory is used to store at least one executable instruction that causes the processor to perform the operation of the day-ahead scheduling decision method for the optical storage and charging system as described in any one of claims 1 to 6.
9. A computer-readable storage medium, characterized in that, The computer-readable storage medium includes a stored computer program, wherein, when the computer program is executed, it controls the device or apparatus containing the computer-readable storage medium to perform the day-ahead scheduling decision method for a photovoltaic storage and charging system as described in any one of claims 1 to 6.
10. A computer program product, comprising a computer program or instructions, characterized in that, The computer program or instructions execute the day-ahead scheduling decision method for a photovoltaic storage and charging system as described in any one of claims 1 to 6.