A ship hybrid power station energy management method, device, equipment and medium
By constructing a set of navigation condition control constraints and identifying ship operating conditions in real time, dynamic power allocation between generator sets and power sources is achieved. This solves the problems of power allocation and adaptive adjustment of operating conditions in existing technologies, improves energy management efficiency and grid stability, and reduces fuel consumption and pollutant emissions.
Patent Information
- Application Number
- CN202611578212.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-12
- Publication Date
- 2026-11-20
AI Technical Summary
Existing ship power plant systems lack the ability to identify and respond to varying navigation conditions in real time, making it difficult to achieve power distribution and adaptive adjustment between generator sets and energy storage devices, thus failing to effectively improve energy efficiency and reduce pollutant emissions.
By constructing control constraint sets corresponding to different navigation conditions, the current operating condition of the ship can be identified in real time. Based on the identified operating condition, control constraints are selected from the constraint set for dynamic power allocation, realizing precise coordinated control of generator sets and power supply, including safety boundary constraints and optimization control constraints, to ensure the safety and efficiency of power allocation under various operating conditions.
It has improved energy management efficiency and response flexibility under complex and variable ship operating conditions, ensured grid stability and power supply quality, and reduced fuel consumption and pollutant emissions.
Smart Images

Figure CN123144271A_ABST
Abstract
Description
Technical Field
[0001] This application mainly relates to the application of energy management and control technology for ship power plants, and in particular to a method, device, equipment and medium for energy management of ship hybrid power plants. Background Technology
[0002] With the accelerated green and low-carbon transformation of the shipping industry, new energy storage technologies such as lithium batteries and supercapacitors, as well as ship microgrid technologies, are gradually being applied to ship power stations, making hybrid power station systems an important development direction. Existing operational ship power station systems generally adopt a traditional AC power station architecture, with diesel generator sets supplying centralized power to all ship loads via an AC main switchboard. In terms of new energy applications, some ships are improving overall energy efficiency and reducing pollutant emissions by integrating energy storage devices such as lithium batteries or supercapacitors into their power station systems, and using energy management strategies to achieve power distribution between generator sets and energy storage units.
[0003] However, existing technologies typically employ power allocation strategies based on fixed rules, lacking the ability to identify and respond differently to varying navigation conditions in real time. The switching of operating modes and power regulation between energy storage devices and generator sets rely on preset thresholds and cannot be adaptively adjusted according to changes in operating conditions and power fluctuations in the power grid. Therefore, it is difficult to effectively achieve dynamic power allocation and adaptive adjustment of operating conditions between two heterogeneous power sources in a hybrid power plant. Summary of the Invention
[0004] One objective of this application is to provide a method, apparatus, equipment, and medium for energy management of a ship hybrid power station, which solves the problem that existing technologies cannot effectively achieve dynamic power distribution and adaptive adjustment of operating conditions between generator sets and power sources in hybrid power stations.
[0005] According to one aspect of this application, a method for energy management of a ship hybrid power station is provided, the method comprising: Establish control constraint sets corresponding to different navigation conditions based on the ship's operating data and power allocation targets; The current navigation conditions of the vessel are identified, and corresponding control constraints are selected from the set of control constraints based on the identified navigation conditions. Dynamic power allocation is then performed on the vessel's generator set and power supply based on the selected constraints.
[0006] This application pre-constructs corresponding control constraint sets based on different navigation conditions, and accurately matches the control constraints required for the current navigation condition from the constraint set through real-time navigation condition identification. Based on this, dynamic power allocation is performed on the generator set and the power supply, so that the power allocation strategy can automatically switch to the appropriate constraint boundary for adjustment as the navigation conditions change. This achieves dynamic power allocation that is adaptive to the navigation conditions, enabling real-time and precise coordinated control of the power allocation between the generator set and the power supply under the corresponding optimized constraints in different navigation scenarios such as berthing, cruising, and anchoring. This avoids the allocation mismatch problem caused by a single fixed strategy being unable to take into account the differences in multiple navigation conditions, effectively improving the energy management efficiency and response flexibility of the hybrid power station under complex and ever-changing ship operating conditions. Therefore, it can solve the problem that existing technologies cannot effectively achieve dynamic power allocation and adaptive adjustment of the generator set and the power supply in hybrid power stations.
[0007] As a preferred embodiment, the navigation conditions include cruising, berthing / unberthing, anchorage, and shore power charging; the control constraint set includes safety boundary constraints and optimization control constraints. The safety boundary constraints are used to define the safe operating boundaries of the generator set and the power source, and the optimization control constraints are used to optimize the operating efficiency of the generator set and the power source. During the cruise operation, the power supply is controlled to adjust the magnitude and direction of its output current according to the power distribution command. Under the conditions of berthing away from the platform and anchorage, the power supply is controlled to provide voltage and frequency references for the ship's electrical network; Under the shore power charging condition, the power source is controlled to receive shore power charging power.
[0008] This preferred solution subdivides navigation conditions into four categories: cruising, berthing / unberthing, anchorage, and shore power charging, and sets power control modes for each condition. During cruising, the power supply regulates output current in current source mode, working with generators to achieve peak shaving and valley filling. During berthing / unberthing and anchorage, the power supply provides a voltage and frequency reference in voltage source mode, ensuring stable grid operation. During shore power charging, the power supply operates in current source mode and receives shore power, achieving low-cost energy replenishment. Because the same power supply switches control modes according to the operating conditions, grid instability or reduced power regulation flexibility caused by mismatches between control modes and electrical requirements are avoided. This ensures precise matching of power control modes to each operating condition, improving power quality and safety across all conditions. Furthermore, this preferred solution divides the control constraint set into two levels: safety boundary constraints and optimal control constraints. This allows power allocation to be optimized within the feasible region defined by safety constraints, avoiding the risk of exceeding limits due to conflicts between optimization objectives and safety boundaries, and achieving layered management of safety and economy.
[0009] As a preferred embodiment, the cruise condition corresponds to the cruise condition safety boundary constraint and the cruise condition optimal control constraint. The cruise condition safety boundary constraints include: A preset power threshold is determined based on the rated power of the generator set, and the peak shaving and valley filling power of the power source is controlled within the preset power threshold. A preset rate of change threshold is determined based on the operating data of the generator set, and the rate of change of the charging power of the power supply is controlled within the preset rate of change threshold. When the state of charge of the power supply is lower than the preset discharge lower limit, the power supply is controlled not to discharge; When the state of charge of the power supply is higher than the preset charging limit, the power supply is controlled not to charge; The optimal control constraints for cruise conditions include determining a preset high-efficiency load rate range based on the load data of the generator set, and controlling the load rate of the generator set within the preset high-efficiency load rate range.
[0010] This preferred scheme sets specific safety boundary constraints and optimal control constraints for cruise operation. Regarding safety boundaries, it limits peak-shaving and valley-filling power to prevent generator set reverse power operation, limits the rate of change of charging power to avoid battery impact damage, and sets upper and lower limits for state of charge to prevent overcharging and over-discharging. In terms of optimization, it controls the generator set load rate within the high-efficiency zone. Since the safety boundary constraints are insurmountable rigid constraints, the range of searchable control schemes for model predictive control is directly limited to the safe and feasible region. The optimal control constraints guide the generator set to operate efficiently within this safe region, thus achieving the dual objectives of power supply safety protection and economical generator set operation under cruise conditions.
[0011] As a preferred embodiment, controlling the load rate of the generator set within the preset high-efficiency load rate range includes: When the real-time load rate of the generator set is higher than the upper limit of the preset high-efficiency load rate range, the power supply is controlled to discharge in order to reduce the load rate of the generator set. When the real-time load rate of the generator set is lower than the lower limit of the preset high-efficiency load rate range, the power supply is controlled to charge in order to increase the load rate of the generator set.
[0012] This preferred solution controls the charging and discharging direction of the power supply based on a comparison between the real-time load rate of the generator set and the upper and lower limits of the high-efficiency zone. When the load rate is higher than the upper limit, the power supply is controlled to discharge to share the load and bring the load rate back to the high-efficiency zone. When the load rate is lower than the lower limit, the power supply is controlled to charge to raise the load rate back to the high-efficiency zone, forming a closed-loop feedback regulation logic of discharging when the load is too high and charging when the load is too low. This ensures that the generator set load rate is always constrained within the high-efficiency zone, maximizing fuel economy, while utilizing the power supply's throughput capacity to smooth out the disturbances caused by load fluctuations to the generator set's operating conditions.
[0013] As a preferred embodiment, the docking / departure condition corresponds to the docking / departure condition safety boundary constraints and the docking / departure condition optimization control constraints. The docking / departure condition safety boundary constraints include: The power supply is controlled to be in a static state where it is neither charging nor discharging; When the power load of the ship's electrical grid fluctuates, the output power of the power supply is adjusted according to the frequency difference between the AC bus frequency of the ship and the output frequency of the power supply, so that the power supply returns to the stationary state.
[0014] This preferred solution sets safety boundary constraints for docking and undocking operations, controlling the power supply to remain neither charging nor discharging under steady-state conditions. When grid power fluctuates, the power supply output power is adjusted based on the frequency difference between the AC bus frequency and the power supply output frequency, returning the power supply to the neither charging nor discharging state. Since the frequency difference is used as a real-time detection quantity for active power imbalance and to drive the power supply output power adjustment, rapid active power compensation for grid power fluctuations is achieved, thereby maintaining grid frequency stability during docking and undocking and ensuring the power supply quality for critical loads such as the positioning thruster.
[0015] As a preferred embodiment, the optimal control constraints for the docking / departure conditions include: When the absolute value of the power grid fluctuation is greater than the first fluctuation threshold, the output power adjustment rate of the power source is set to the first adjustment rate so as to reduce the power grid fluctuation to within the first fluctuation threshold. When the absolute value of the power grid fluctuation is between the second fluctuation threshold and the first fluctuation threshold, the output power adjustment rate is set to the second adjustment rate to reduce the power grid fluctuation to within the second fluctuation threshold. When the absolute value of the power grid fluctuation is between the third fluctuation threshold and the second fluctuation threshold, the output power adjustment rate is set to the third adjustment rate to reduce the power grid fluctuation to within the third fluctuation threshold. When the absolute value of the power grid fluctuation is less than the third fluctuation threshold, the output power of the power supply is not adjusted.
[0016] This preferred scheme sets the power output adjustment rate according to the absolute value of grid power fluctuations. Large fluctuations are suppressed quickly with a fast rate, medium fluctuations are gradually converged with a medium rate, small fluctuations are fine-tuned with a slow rate, and extremely small fluctuations are not adjusted. Since the adjustment rate decreases step by step with the fluctuation amplitude, a graded adjustment strategy is formed. This ensures the ability to quickly suppress large power fluctuations while reducing the frequency of power adjustment under small fluctuation conditions. This reduces the switching stress and heat loss of the power supply devices, and improves the regulation quality and power supply operation reliability.
[0017] As a preferred embodiment, the anchorage berthing condition corresponds to both anchorage berthing condition safety boundary constraints and anchorage berthing condition optimization control constraints. The anchorage berthing condition safety boundary constraints include: The power source is configured as the ship's sole power source. When the power supply's charge state drops to a preset warning threshold, an alarm is issued; When the state of charge of the power supply is lower than the preset discharge lower limit, the power supply is controlled to stop discharging, and the generator set is started to charge the power supply, so as to control the charging power of the generator set to the power supply within the preset charging power threshold. When the power source reaches a fully charged state, the generator set is disconnected.
[0018] This preferred solution sets safety boundary constraints for anchorage berthing conditions, designates the power supply as the sole power source to reduce generator operating time, issues an alarm when the charge level drops to a warning threshold, and controls the power supply to stop discharging and start the generator to charge when the charge level falls below a preset discharge limit, limiting charging power to prevent high current surges. Because different charge level thresholds correspond to a layered, progressive management logic of warning, protective charging, and automatic shutdown, fuel consumption and emissions during berthing are minimized, while ensuring power supply safety and available power.
[0019] As a preferred embodiment, the optimal control constraints for the anchorage berthing conditions include: A preset optimal range is determined based on the individual cell voltage and health status data of the power supply, and the state of charge of the power supply is controlled within the preset optimal range. When the generator set starts to charge the power source, the load rate of the generator set is controlled within a preset high-efficiency load rate range.
[0020] This preferred solution sets optimal control constraints for anchorage conditions, keeping the power supply's state of charge (SOC) within a preset optimal range determined based on individual battery voltage and health data. This maintains the SOC within the range most beneficial to battery life and discharge capacity. During generator charging, the load rate is controlled within the high-efficiency zone. Because the optimal range is dynamically adapted to the actual battery condition rather than using a fixed value, the adaptability of SOC management to individual battery differences and aging conditions is improved, achieving joint optimization of power supply lifespan extension and generator charging economy.
[0021] As a preferred embodiment, the shore power charging condition corresponds to a shore power charging condition safety boundary constraint, which includes: Control the port shore power resources to charge the power source, and control the shore power charging power within a preset shore power charging power threshold. When the state of charge of the power source reaches a preset full charge threshold, charging stops and the shore power connection is disconnected, switching to the anchorage mooring mode.
[0022] This preferred solution sets safety boundary constraints for shore power charging, controlling shore power to charge the power source and keeping the charging power within a preset threshold to prevent the charging power from exceeding the capacity of the shore power system or the power source charging circuit, thus avoiding equipment damage and safety hazards caused by overcurrent. When the power source's state of charge reaches the preset full charge threshold, charging stops and the shore power connection is disconnected to prevent overcharging damage. Simultaneously, the shore power charging mode is switched to anchorage berthing mode, allowing the ship to automatically switch to an energy management mode primarily powered by the shore power source after charging is complete, achieving a transition from charging to normal berthing power supply without manual intervention. Since the full charge threshold serves as the charging termination condition and triggers automatic mode switching, the safety of the shore power charging process is ensured while maintaining the continuity of the ship's energy management mode.
[0023] According to another aspect of this application, a ship hybrid power station energy management device is also provided, the device comprising a constraint construction module and an energy control module; The constraint construction module is used to establish control constraint sets corresponding to different navigation conditions based on the ship's operating data and power allocation targets. The energy management module is used to identify the current navigation conditions of the ship, select the corresponding control constraints from the control constraint set according to the identified navigation conditions, and perform dynamic power allocation to the ship's generator set and power supply based on the selected constraints.
[0024] According to another aspect of this application, an electronic device is also provided, the electronic device comprising: A memory, on which computer programs are stored; And a processor, which, when executing the computer program, implements the ship hybrid power station energy management method as described above.
[0025] According to another aspect of this application, a computer-readable storage medium is also provided, having stored thereon computer-readable instructions that can be executed by a processor to implement the ship hybrid power station energy management method as described above. Attached Figure Description
[0026] To make the above-mentioned objectives, features and advantages of this application more apparent and understandable, the specific embodiments of this application will be described in detail below with reference to the accompanying drawings, wherein: Figure 1 A schematic diagram of a method for energy management of a ship hybrid power station according to one aspect of this application is shown. Figure 2 An exemplary schematic diagram of a power system for an AC substation and a containerized power supply according to one aspect of this application is shown. Figure 3 An exemplary schematic diagram of navigation condition switching control according to one aspect of this application is shown; Figure 4 A schematic diagram of a framework of a ship hybrid power station energy management device according to yet another aspect of this application is shown. Figure 5 A schematic diagram of the frame of an electronic device provided according to yet another aspect of this application is shown.
[0027] The same or similar reference numerals in the accompanying drawings represent the same or similar parts. Detailed Implementation
[0028] To make the above-mentioned objectives, features and advantages of this application more apparent and understandable, the specific embodiments of this application will be described in detail below with reference to the accompanying drawings.
[0029] Many specific details are set forth in the following description in order to provide a full understanding of this application. However, this application may also be implemented in other ways different from those described herein, and therefore this application is not limited to the specific embodiments disclosed below.
[0030] As indicated in this application and claims, unless the context clearly indicates otherwise, the words "a," "an," "an," and / or "the" are not specifically singular and may include plural forms. Generally speaking, the terms "comprising" and "including" only indicate the inclusion of explicitly identified steps and elements, which do not constitute an exclusive list, and the method or apparatus may also include other steps or elements.
[0031] This application provides a method for energy management of a hybrid power station on a ship. It aims to identify the ship's current navigation conditions in real time and adaptively match corresponding safety boundary constraints and optimal control constraints from a pre-built set of control constraints. Based on this, it dynamically allocates power between traditional AC generator sets and containerized power supplies, enabling safe and efficient collaborative operation of these two heterogeneous power sources under different navigation scenarios. This modular approach promotes the transition of existing operating ships to low-carbon / zero-carbon operations. The specific solution is as follows: Figure 1 The diagram illustrates a process flow of a ship hybrid power station energy management method according to one aspect of this application, the method comprising: steps S1 to S2.
[0032] S1. Establish control constraint sets corresponding to different navigation conditions based on the ship's operating data and power allocation targets.
[0033] Step S1 in this embodiment includes S1.1 to S1.2, specifically as follows: S1.1 Define several navigation conditions for the vessel, including cruising condition, berthing / unberthing condition, anchorage condition, and shore power charging condition.
[0034] It should be noted that, in this application embodiment, "ship" refers to a hybrid-powered vessel equipped with an AC power station and a containerized power supply. The AC power station uses a diesel generator set as the primary power source, supplying power to all ship loads via the AC main switchboard. The containerized power supply is a new energy storage device integrated within a standard container, operating in parallel with the AC main switchboard via a containerized access control cabinet, forming a hybrid power station system together with the diesel generator set. In this hybrid power station system, the diesel generator set and the containerized power supply are two heterogeneous power sources. The core of this application lies in achieving dynamic power distribution and adaptive adjustment of operating conditions between these two heterogeneous power sources.
[0035] "Navigation Condition" forms the upper-level framework of the energy management and control method in this application. Its function is to determine the current operating condition type based on the actual operating scenario of the ship, and accordingly define the operating mode, functional objectives, power station combination method, and basic operating parameters of the containerized power supply under that condition. It also specifies the switching paths and transfer logic between different operating conditions. The above operating condition definitions are not merely descriptive; they are static configurations that must be pre-set before establishing safety boundary constraints and calculating optimal control constraints. These configurations serve as prerequisite inputs for the subsequent constraint set construction and are pre-fixed into the control system. This allows the control system to identify the current operating condition in real time during actual ship operation and then invoke the corresponding preset configuration and constraint set to perform dynamic power allocation. The specific settings for each operating condition are as follows: (1) Cruise operating condition: During cruise operation, the AC power station generator set and the containerized power supply operate simultaneously, with the containerized power supply operating in current source mode. The control power supply adjusts the magnitude and direction of its output current according to the power distribution command, and the frequency converter operates accordingly in current mode. This drives the battery to perform peak shaving and valley filling, stabilizing the actual load rate of the generator set near the high-efficiency zone (set at 85% of the load rate), thereby significantly improving the overall energy efficiency of the energy management system.
[0036] In one implementation, the power station combination employs a flexible configuration of one, two, or three generator sets with one or two sets of batteries. Under the aforementioned control method, the containerized power supply operates in current source mode, the frequency converter runs in current mode, the peak shaving and valley filling power of the battery is controlled within 300kW, the charging power change rate is controlled within 30kW / s, and the discharge power is unrestricted, in order to provide timely energy support during sudden load increases. Simultaneously, a protection boundary for the battery's State of Charge (SOC) is set: discharging is prohibited when the SOC is below 20%, and charging is prohibited when the SOC is above 90%, to ensure that the battery operates within a safe range and extends its service life.
[0037] (2) Platform docking / departure conditions: During berthing and unberthing operations, the control power supply provides voltage and frequency references to the ship's electrical grid, operating in voltage source mode to act as a "backup unit" and enable rapid response to grid power fluctuations. In this scenario, ships typically perform critical operations such as berthing or departure, resulting in drastic and transient load changes. Containerized power supplies compensate for the lag in response of traditional generator sets by providing instantaneous power support, ensuring the continuity and reliability of power supply during critical operations. Simultaneously, they effectively reduce the number of standby units in traditional power plants, lowering operating energy consumption.
[0038] In one implementation, a power station combination of 2 generator units + 2 batteries is used during berthing and unberthing operations. The batteries serve as hot backup, and the frequency converter operates in voltage mode. To maintain the batteries in hot standby mode, the battery charging current is controlled below 10A to ensure that the batteries always have sufficient energy reserves. When the grid frequency is low, the batteries automatically discharge to make up for the power gap. When one or two generator units fail, the batteries instantly receive the power transfer from the failed unit to continuously supply power to the grid to avoid a complete power outage on the ship. At the same time, the propulsion power is limited to 20% to ensure priority power supply to non-propulsion loads and the safety of ship operation.
[0039] (3) Anchorage berthing conditions: When anchored, the control power supply provides voltage and frequency references for the ship's electrical network, operating in voltage source mode. This shuts down all AC generators, allowing the containerized power supply to independently handle the power supply during anchorage, achieving fully green electricity supply. In this mode, the containerized power supply must meet all load demands during anchorage, maintaining the continuous operation of auxiliary machinery and living facilities with zero emissions and low noise, creating a quiet berth. This operating mode is particularly suitable for waters with strict emission control requirements, avoiding the continuous pollutant emissions associated with traditional generator sets during anchorage.
[0040] In one implementation, during anchorage, all generator units are shut down, two sets of batteries discharge online, and the frequency converter operates in voltage mode, with the batteries independently maintaining grid voltage and frequency stability. As the discharge process continues, when the battery SOC drops to 30%, the energy management system triggers an alarm, reminding the crew to prepare for standby operation and ensuring sufficient time to start the generator units later. When the battery SOC further drops below 20%, the energy management system automatically starts the grid-connected generator units to replenish the battery's energy, controlling the charging power to within 500kW to avoid excessive impact on the grid while balancing charging efficiency and generator unit operational stability.
[0041] (4) Shore power charging conditions: In shore power charging mode, the control power supply operates in current source mode and receives shore power charging power, utilizing the port's shore power resources to replenish the energy of the containerized power supply. This mode makes full use of low-cost electricity during off-peak hours for charging, significantly reducing ship operating costs. At the same time, by participating in the port's power grid load balancing through off-peak charging, it alleviates the power supply pressure during peak hours at the port.
[0042] In one implementation, during shore power charging, the generator sets operate in parallel to supply power to the ship's loads, while the shore power simultaneously charges the containerized power supply. The energy management system controls the AC shore power charging power to within 100kW to match the power supply capacity of the port's shore power facilities and ensure the safety and stability of the charging process. As the charging process continues, when the battery SOC reaches above 95%, the energy management system stops charging and automatically disconnects the AC shore power. Subsequently, the operating mode automatically switches to anchorage berthing mode, where the containerized power supply provides independent power in voltage source mode, achieving a seamless transition from shore power replenishment to green berthing.
[0043] The four navigation modes described above form a fully connected state transition topology, meaning that bidirectional switching is possible between any two of the following modes: cruising, berthing / unberthing, anchorage, and shore charging. This results in a total of twelve mode transition paths, covering all typical scenario transition needs throughout the entire ship operation process. During the execution of each mode transition path, the operating mode of the control power supply, power allocation strategy, and corresponding safety boundary constraints and optimization control constraints adaptively switch according to the target mode, achieving a smooth transition between different operating scenarios. The aforementioned twelve mode transition paths are as follows: (1) Cruise mode → Platform docking / undocking mode; (2) Platform docking / undocking mode → Cruise mode; (3) Cruise mode → Anchorage mode; (4) Anchorage mode → Cruise mode; (5) Cruise operation mode → Shore power charging operation mode; (6) Shore power charging operation mode → Cruise operation mode; (7) Platform berthing condition → Anchorage berthing condition; (8) Anchorage berthing condition → Platform berthing condition; (9) Dock-to-platform operation → Shore power charging operation; (10) Shore power charging operation → Dock-to-platform operation; (11) Anchorage berthing condition → Shore power charging condition; (12) Shore power charging condition → Anchorage berthing condition.
[0044] It should be noted that the "energy management system" in this application embodiment refers to a ship hybrid power station energy management system, which is configured to coordinate and control the dynamic power distribution between the generator sets of the AC power station and the containerized power supply. Specifically, the energy management system has at least the following functions: identifying the ship's current navigation conditions; matching corresponding safety boundary constraints and optimal control constraints from a pre-established set of control constraints based on the identified navigation conditions; and issuing power distribution commands to the generator sets and the containerized power supply based on the matched control constraints, so as to realize dynamic power distribution and adaptive adjustment of operating conditions between the two heterogeneous power sources.
[0045] In this embodiment, S1.1, the navigation conditions are subdivided into four categories: cruising, berthing / unberthing, anchorage, and shore power charging. A power control mode is set for each of these conditions. During cruising, the power supply adjusts the output current in current source mode, working with the generator set to achieve peak shaving and valley filling. During berthing / unberthing and anchorage, the power supply provides a voltage and frequency reference in voltage source mode, ensuring stable grid operation. During shore power charging, the power supply operates in current source mode and receives shore power charging power, achieving low-cost energy replenishment. Because the same power supply switches control modes according to the operating conditions, grid instability or reduced power regulation flexibility caused by mismatch between the control mode and the electrical requirements of the operating conditions is avoided. This ensures precise matching of the power supply control mode with each operating condition, improving the power supply quality and safety across all operating conditions. Simultaneously, this embodiment divides the control constraint set into two levels: safety boundary constraints and optimization control constraints. This allows power allocation to be optimized within the feasible region defined by the safety constraints, avoiding the risk of exceeding limits due to conflicts between the optimization objective and the safety boundary, and achieving layered management of safety and economy.
[0046] S1.2. The ship's operational data is collected in real time through the ship's power station monitoring system, battery management system, and frequency converter. This data includes the real-time load rate of the generator sets, grid frequency and power fluctuation values, the state of charge of the power supply, individual battery voltage and health status, and charging / discharging power and its rate of change. Simultaneously, power allocation targets are determined based on the functional positioning of the generator sets and power supply under various navigation conditions. For example, under cruising conditions, the generator set load rate is stabilized in the high-efficiency zone; under berthing and unberthing conditions, the power supply is kept neither charged nor discharged and power fluctuations are quickly suppressed; under anchorage conditions, independent green electricity supply is achieved; and under shore charging conditions, energy replenishment is completed at low cost. Based on this, and combining the operational data and power allocation targets, control constraint sets corresponding to different navigation conditions are established. These control constraint sets include safety boundary constraints and optimization control constraints. Safety boundary constraints are used to limit the safe operating boundaries of the generator sets and power supply, while optimization control constraints are used to optimize the operating efficiency of the generator sets and power supply.
[0047] The constraints corresponding to each navigation condition are explained in detail below: (a) Cruise operating condition: The cruise condition corresponds to the cruise condition safety boundary constraints and the cruise condition optimal control constraints. (1) Safety boundary constraints for cruise conditions include: A preset power threshold is determined based on the rated power of the generator sets configured in the AC substation, controlling the peak-shaving and valley-filling power of the containerized power supply within this threshold. If the charging power (valley-filling power) exceeds the preset power threshold, it will lead to excessively high generator load or even overload shutdown; if the discharging power (peak-shaving power) exceeds the preset power threshold, it will cause reverse power overspeed of the generator sets. This preset power threshold is strongly correlated with the rated power of the generator sets, and the core objective of the energy management system is to ensure that the generator sets always operate in a high-efficiency range through peak-shaving and valley-filling. Preferably, the preset power threshold is 300kW.
[0048] Based on the generator set's operating data, a preset rate of change threshold is determined to control the charging power change rate of the containerized power supply within this threshold, preventing rapid changes in charging power that could cause the unit to stall. The discharging power change rate, however, is not limited to ensure the power supply's ability to quickly fill off-peak loads during periods of low grid demand. This preset rate of change threshold is strongly correlated with the generator set's characteristics. Preferably, the preset rate of change threshold is 30 kW / s.
[0049] When the state of charge (SOC) of the containerized power supply falls below a preset lower discharge limit, the power supply is forcibly stopped discharging to protect the battery equipment from deep discharge damage. When the SOC of the containerized power supply rises above a preset upper charge limit, the power supply is forcibly stopped charging to reserve battery charging capacity to cope with instantaneous power surges in the grid. Preferably, the preset lower discharge limit is 20% of the SOC, and the preset upper charge limit is 90% of the SOC.
[0050] (2) The optimal control constraints for cruise conditions include: Based on the generator set's load data, a preset high-efficiency load rate range is determined, and the generator set's load rate is controlled within this range, ensuring continuous operation in the optimal energy efficiency zone. The preset high-efficiency load rate range is strongly correlated with the generator set's load characteristics, which include the generator set's service life, ensuring both improved energy efficiency and long-term reliable operation. Preferably, the preset high-efficiency load rate range corresponds to a load rate of 85%.
[0051] Controlling the load rate of the generator set within a preset high-efficiency load rate range includes: When the real-time load rate of the generator set is higher than the upper limit of the preset high-efficiency load rate range, the containerized power supply is controlled to discharge to share the load of the generator set, so that the load rate of the generator set falls back to within the preset high-efficiency load rate range; when the real-time load rate of the generator set is lower than the lower limit of the preset high-efficiency load rate range, the containerized power supply is controlled to charge to increase the load of the generator set, so that the load rate of the generator set rises to within the preset high-efficiency load rate range.
[0052] Furthermore, under the optimal control constraints of cruise operation, the peak shaving and valley filling power of the containerized power supply is also constrained. The peak shaving and valley filling power is strongly correlated with the load-carrying characteristics of the generator set, so as to achieve optimal energy efficiency while ensuring the safe operation of the generator set. Preferably, the peak shaving and valley filling power is set to 300kW.
[0053] Furthermore, the state of charge (SOC) of the containerized power supply is controlled within a preset optimal SOC range. This optimal SOC range is strongly correlated with parameters such as the individual cell voltage and battery health status, ensuring that the battery always operates within a healthy and safe SOC range, extending battery life and maintaining charge / discharge performance. Preferably, the preset optimal SOC range is 20%–90% of the SOC.
[0054] This embodiment sets specific safety boundary constraints and optimal control constraints for cruise operation. Regarding safety boundaries, peak shaving and valley filling power is limited to prevent generator set from operating with reverse power, the rate of change in charging power is limited to avoid battery impact damage, and upper and lower limits for state of charge are set to prevent overcharging and over-discharging. For optimization, the generator set load rate is controlled within the high-efficiency zone. Since the safety boundary constraints are insurmountable rigid constraints, the range of searchable control schemes for model predictive control is directly limited to the safe and feasible region. The optimal control constraints guide the generator set to operate efficiently within this safe region, thereby achieving the dual objectives of power supply safety protection and economical generator set operation under cruise conditions.
[0055] Furthermore, this embodiment controls the charging and discharging direction of the power supply based on the comparison between the real-time load rate of the generator set and the upper and lower limits of the high-efficiency zone. When the load rate is higher than the upper limit, the power supply is controlled to discharge to share the load and bring the load rate back to the high-efficiency zone; when it is lower than the lower limit, the power supply is controlled to charge to increase the load rate to the high-efficiency zone, forming a closed-loop feedback regulation logic of discharging when the load is too high and charging when the load is too low. This ensures that the generator set load rate is always constrained within the high-efficiency zone, maximizing fuel economy, while utilizing the power supply's throughput capacity to smooth out the disturbances of load fluctuations on the generator set's operating conditions.
[0056] (ii) Platform docking / departure conditions: The docking and undocking conditions correspond to the safety boundary constraints and the optimization control constraints for docking and undocking.
[0057] (1) Safety boundary constraints for docking / departure from the platform include: When docked or undocking from the platform, the containerized power supply operates as a "backup unit" connected to the AC power station. The energy management system maintains the containerized power supply in a "neither charging nor discharging" static state, meaning the power supply neither draws charging power from the grid nor discharges power to the grid. In this state, the power supply is always on standby to provide instantaneous power support when the grid load experiences large power fluctuations.
[0058] When the ship's electrical grid load experiences large power fluctuations, the energy management system collects the AC bus frequency and the containerized power supply output frequency in real time and calculates the frequency difference between them. Based on this frequency difference, the energy management system quickly adjusts the output power of the containerized power supply in real time, driving it to quickly return to a stationary state of "neither charging nor discharging". Through this closed-loop frequency difference regulation, the generator set is prevented from experiencing reverse power shutdown or overspeed due to power backfeed, ensuring the safe and stable operation of the generator set during critical operations such as berthing and unberthing from the platform.
[0059] This embodiment sets safety boundary constraints for docking and undocking operations, controlling the power supply to remain neither charging nor discharging under steady-state conditions. When grid power fluctuates, the power supply output power is adjusted based on the frequency difference between the AC bus frequency and the power supply output frequency, returning the power supply to the neither charging nor discharging state. By using the frequency difference as a real-time detection quantity for active power imbalance and driving the power supply output power adjustment, rapid active power compensation for grid power fluctuations is achieved, thereby maintaining grid frequency stability during docking and undocking and ensuring the power supply quality for critical loads such as the positioning thruster.
[0060] (2) The optimal control constraints for the docking / departure conditions include: When docked or off the platform, the containerized power supply is connected to the AC power station as a "backup unit," and the energy management system aims to keep it in a "no charging, no discharging" static state.
[0061] When the absolute value of the power fluctuation in the power grid is greater than the first fluctuation threshold, it indicates that the power grid is experiencing a large power disturbance. The energy management system sets the output power adjustment rate of the containerized power supply to the first adjustment rate in order to quickly reduce the power fluctuation in the power grid to within the first fluctuation threshold. When the absolute value of the power fluctuation in the power grid is between the second fluctuation threshold and the first fluctuation threshold, the disturbance has entered the medium range. The energy management system sets the output power adjustment rate to the second adjustment rate to further reduce the power fluctuation in the power grid to within the second fluctuation threshold. When the absolute value of the power fluctuation in the power grid is between the third fluctuation threshold and the second fluctuation threshold, the disturbance is relatively small. The energy management system sets the output power adjustment rate to the third adjustment rate in order to finely converge the power fluctuation in the power grid to within the third fluctuation threshold. When the absolute value of the power fluctuation is less than the third fluctuation threshold, the power fluctuation is within an acceptable range. The energy management system does not adjust the output power of the containerized power supply to avoid frequent adjustments and system oscillations under small fluctuation conditions.
[0062] Preferably, the first fluctuation threshold is 200kW, the second fluctuation threshold is 100kW, and the third fluctuation threshold is 10kW; the first adjustment rate is 100kW / s, the second adjustment rate is 50kW / s, and the third adjustment rate is 20kW / s.
[0063] More preferably, when the absolute value of the power fluctuation is greater than 300kW, or between 200kW and 300kW, the first adjustment rate (100kW / s) is used to reduce the power fluctuation to less than 200kW. That is, the above-mentioned range greater than the first fluctuation threshold can be further subdivided into two sub-ranges, and the two sub-ranges adopt the same adjustment rate and control target.
[0064] This embodiment sets the power output adjustment rate according to the absolute value of grid power fluctuations. Large fluctuations are suppressed quickly with a fast rate, medium fluctuations are gradually converged with a medium rate, small fluctuations are fine-tuned with a slow rate, and extremely small fluctuations are not adjusted. Since the adjustment rate decreases step by step with the fluctuation amplitude, a graded adjustment strategy is formed. This ensures the ability to quickly suppress large power fluctuations while reducing the frequency of power adjustment under small fluctuation conditions. This reduces the switching stress and heat loss of the power supply devices, and improves the regulation quality and power supply operation reliability.
[0065] (III) Anchorage berthing conditions: The anchorage berthing condition corresponds to the anchorage berthing condition safety boundary constraints and the anchorage berthing condition optimization control constraints. (1) Safety boundary constraints for anchorage berthing conditions include: When anchored, the containerized power supply serves as the ship's sole power source, achieving fully green electricity supply. This means that the containerized power supply independently meets all the ship's load requirements during anchorage, with all generator sets shut down, resulting in a zero-emission, quiet berth.
[0066] When the state of charge (SOC) of the containerized power source decreases to a preset warning threshold due to continuous discharge, the energy management system issues an alarm to remind the crew to prepare for standby operation so that the power source can be switched to generator power supply mode in time before the power is further depleted. Preferably, the preset warning threshold is 30% of the SOC.
[0067] When the state of charge (SOC) of the containerized power supply further decreases to a preset lower discharge limit, the power supply is forcibly stopped discharging to protect the battery equipment from deep discharge damage. Simultaneously, the energy management system automatically starts the grid-connected generator set to charge the power supply, controlling the charging power within a preset charging power threshold to prevent overloading of the generator set due to excessive charging power. Preferably, the preset lower discharge limit is 20% of the SOC, and the preset charging power threshold is 500kW. The preset charging power threshold is strongly correlated with the rated power of the generator set and the capacity of the containerized power supply to achieve reasonable charging while ensuring the safe operation of the generator set.
[0068] When the containerized power unit reaches full charge, the energy management system automatically disconnects and shuts down the generator sets, allowing the containerized power unit to continue providing green and quiet power, restoring the fully green power supply mode. "Green and quiet power supply" refers to the complete shutdown of all generator sets, with the containerized power unit independently supplying power to the ship, achieving a zero-emission, low-noise power supply mode.
[0069] This embodiment sets safety boundary constraints for anchorage berthing conditions, designating the power supply as the sole power source to reduce generator operating time; an alarm is triggered when the charge level drops to a warning threshold; when the charge level falls below a preset discharge limit, the power supply is controlled to prevent discharge and the generator set is started to charge, limiting charging power to prevent high current surges. Because different charge level thresholds correspond to a layered, progressive management logic of warning, protective charging, and automatic shutdown, fuel consumption and emissions during berthing are minimized, while ensuring power supply safety and available power.
[0070] (2) The optimal control constraints for anchorage berthing conditions include: Based on the individual cell voltage and State of Health (SOH) of the containerized power supply, a preset optimal charge range is determined. The SOH of the containerized power supply is controlled within this preset optimal charge range to ensure that the battery always operates within a healthy and safe charge range, extending battery life and maintaining charge / discharge performance. Preferably, the preset optimal charge range is 20%–90% of the SOC. Furthermore, the upper limit of the preset optimal charge range is the maximum SOC value, which can be modified on the Human-Machine Interface (HMI) to adapt to different ship operation requirements and battery state differences, improving the flexibility of the control strategy.
[0071] When the containerized power supply's state of charge is low and the generator set automatically starts to charge the power source, the generator set's load rate is controlled within a preset high-efficiency load rate range, ensuring the generator set continuously operates in its optimal energy efficiency zone. This preset high-efficiency load rate range is strongly correlated with the generator set's load-carrying characteristics, which include the generator set's service life, ensuring both improved charging efficiency and long-term reliable operation of the unit. Preferably, the preset high-efficiency load rate range corresponds to a load rate of 85%.
[0072] This embodiment sets optimal control constraints for anchorage berthing conditions, controlling the power supply's state of charge (SOC) within a preset optimal range determined based on individual battery voltage and health data. This maintains the SOC within the range most beneficial to battery life and discharge capacity. During generator charging, the load rate is controlled within the high-efficiency zone. Because the optimal range is dynamically adapted to the actual battery condition rather than using a fixed value, the adaptability of SOC management to individual battery differences and aging conditions is improved, achieving joint optimization of power supply life extension and generator charging economy.
[0073] (iv) Shore power charging conditions: The shore power charging operating condition corresponds to the shore power charging operating condition safety boundary constraints, which include: Under shore power charging conditions, the containerized power supply is controlled to operate as an energy storage device in current source mode, utilizing port shore power resources for energy replenishment. The port shore power is controlled to charge the containerized power supply, and the shore power charging power is kept within a preset shore power charging power threshold to avoid excessive charging power impacting the shore power grid and the containerized power supply equipment. Preferably, the preset shore power charging power threshold is 100kW. Furthermore, the energy management system prioritizes initiating shore power charging during periods of low electricity prices to significantly reduce operating costs and optimize the port power grid load balance.
[0074] When the containerized power source reaches a preset full charge threshold, the energy management system automatically stops charging, disconnects the shore power connection, disconnects and stops the generator set, and switches to green and quiet power supply from the containerized power source. The operating mode automatically switches to anchorage mode, achieving seamless transition after energy replenishment. Preferably, the preset full charge threshold is 95% of the SOC.
[0075] This embodiment sets safety boundary constraints for shore power charging, controlling the shore power to charge the power source and keeping the charging power within a preset threshold to prevent the charging power from exceeding the capacity of the shore power system or the power source charging circuit, thus avoiding equipment damage and safety hazards caused by overcurrent. When the power source's state of charge reaches the preset full charge threshold, charging stops and the shore power connection is disconnected to prevent overcharging damage. Simultaneously, the shore power charging mode is switched to anchorage berthing mode, allowing the ship to automatically switch to an energy management mode primarily powered by the shore power source after charging is complete, achieving a transition from charging to normal berthing power supply without manual intervention. Since the full charge threshold serves as the charging termination condition and triggers automatic mode switching, the safety of the shore power charging process is ensured while maintaining the continuity of the ship's energy management mode.
[0076] For examples of this application, please refer to [link / reference]. Figure 2 , Figure 2 This is an exemplary schematic diagram of the power system of the AC power station and containerized power supply provided in this application. As shown in the figure, the AC main distribution board of the AC power station and the AC shore power are respectively connected to the containerized power supply via a containerized access control cabinet; the containerized power supply is equipped with energy storage batteries or supercapacitors, and is equipped with corresponding control circuits and fire protection systems; the containerized access control cabinet is equipped with fast-acting fuses, DC / AC inverters, filters, inverter main switches, shore charging switches, isolation transformers, main switches of the distribution board and shore power main switches, wherein the inverter main switches and shore charging switches are mechanically self-locking.
[0077] S2. Identify the ship's current navigation conditions, select the corresponding control constraints from the control constraint set based on the identified navigation conditions, and dynamically allocate power to the ship's generator sets and power supply based on the selected constraints.
[0078] Step S2 in this embodiment includes S2.1 to S2.2, specifically as follows: S2.1. Collect real-time operational status data of the ship, including but not limited to generator grid connection status, propulsion power demand, grid load level, container power supply charge status, and ship geographical location and berthing status, and identify the ship's current navigation condition based on the above operational status data.
[0079] S2.2. Based on the current navigation condition identified in S2.1, match and load the safety boundary constraints and optimal control constraints corresponding to the navigation condition from the control constraint set pre-established in step S1, and perform dynamic power allocation on the ship's generator set and containerized power supply based on the selected safety boundary constraints and optimal control constraints.
[0080] Specifically, under cruise operation conditions, the energy management system applies cruise operation condition safety boundary constraints and cruise operation condition optimization control constraints, controlling the containerized power supply to operate in current source mode. It adjusts the magnitude and direction of its output current according to power distribution commands, playing a peak-shaving and valley-filling role, ensuring the generator set always operates in the high-efficiency zone. Under berthing / departure operation conditions, the energy management system applies berthing / departure operation condition safety boundary constraints and berthing / departure operation condition optimization control constraints, controlling the containerized power supply to operate in voltage source mode, serving as a "backup unit" to quickly respond to grid power fluctuations and provide instantaneous power support. Under anchorage berthing operation conditions, the energy management system applies anchorage berthing operation condition safety boundary constraints and anchorage berthing operation condition optimization control constraints, controlling all generator sets to shut down, with the containerized power supply operating in voltage source mode as the sole power source, achieving fully green electricity supply. Under shore power charging operation conditions, the energy management system applies shore power charging operation condition safety boundary constraints, controlling the containerized power supply to operate in current source mode and receive shore power charging power, utilizing port shore power resources to complete energy replenishment.
[0081] Furthermore, when the operating status data meets the preset operating condition switching conditions, the energy management system switches the current navigation operating condition to the target navigation operating condition, synchronously loads the safety boundary constraints and optimization control constraints corresponding to the target navigation operating condition, and adjusts the working mode and power distribution strategy of the containerized power supply accordingly, so as to achieve seamless connection and smooth transition of power distribution strategies between different operating conditions.
[0082] The "preset operating condition switching conditions" are determined based on the ship's geographical location and berthing status, propulsion power requirements, generator grid connection status, and shore power connection status in the operating status data. Specifically, these conditions include: when the ship transitions from navigation to berthing or departure operations, it is identified as switching from cruising operating condition to berthing / departure platform operating condition; when berthing / departure operations are completed and propulsion power tends to stabilize, it is identified as switching from berthing / departure platform operating condition to cruising operating condition; when the ship arrives at the anchorage and the propulsion system stops and all generators are disconnected, it is identified as switching to anchorage berthing operating condition; when the ship connects to port shore power, it is identified as switching to shore power charging operating condition; and when shore power is disconnected and the corresponding operating conditions are met, it is identified as switching from shore power charging operating condition to anchorage berthing operating condition or cruising operating condition.
[0083] Since the safety boundary constraint is an insurmountable rigid constraint, the range of power distribution control schemes is limited to the safe and feasible domain. The optimal control constraint guides the generator set and containerized power supply to operate efficiently within this safe domain, thereby achieving hierarchical management of safety and economy, and avoiding the power distribution mismatch problem caused by the inability of a single fixed strategy to take into account the differences in multiple operating conditions.
[0084] For examples of this application, please refer to [link / reference]. Figure 3 , Figure 3This is an exemplary schematic diagram of the navigation operating condition switching control provided in this application, which shows the fully connected state transition topology between four navigation operating conditions: cruise, berthing / unberthing, anchorage, and shore power charging. That is, bidirectional switching is possible between any two operating conditions, with a total of twelve operating condition switching paths, as well as the switching relationship between the working mode and control constraints of the containerized power supply under each operating condition.
[0085] Overall, this application has the following beneficial effects: This application pre-constructs corresponding control constraint sets based on different navigation conditions, and accurately matches the control constraints required for the current navigation condition from the constraint set through real-time navigation condition identification. Based on this, dynamic power allocation is performed on the generator set and the power supply, so that the power allocation strategy can automatically switch to the appropriate constraint boundary for adjustment as the navigation conditions change. This achieves dynamic power allocation that is adaptive to the navigation conditions, enabling real-time and precise coordinated control of the power allocation between the generator set and the power supply under the corresponding optimized constraints in different navigation scenarios such as berthing, cruising, and anchoring. This avoids the allocation mismatch problem caused by a single fixed strategy being unable to take into account the differences in multiple navigation conditions, effectively improving the energy management efficiency and response flexibility of the hybrid power station under complex and ever-changing ship operating conditions. Therefore, it can solve the problem that existing technologies cannot effectively achieve dynamic power allocation and adaptive adjustment of the generator set and the power supply in hybrid power stations.
[0086] In summary, this application pre-constructs a set of control constraints indexed by navigation conditions, identifies the ship's current navigation conditions in real time, and matches corresponding safety boundary constraints and optimal control constraints from the control constraint set. Based on this, dynamic power allocation is performed on the generator set and containerized power supply, realizing adaptive switching and hierarchical management of power allocation strategies between the two heterogeneous power sources as the operating conditions change. Under the premise of ensuring operational safety through safety boundary constraints, the generator set is driven to continuously operate in the high-efficiency zone through optimal control constraints, effectively improving the energy management efficiency, power supply reliability, and economy of the hybrid power station under complex and variable navigation conditions. At the same time, the containerized power supply adopts a modular design and is integrated into a standard container, significantly reducing the difficulty and time cost of converting existing ships to new energy sources. It provides a technically and economically feasible path for ships to transition from traditional fossil fuels to low-carbon / zero-carbon operations, fully leveraging the emission reduction potential of new energy storage, helping shipping companies cope with the challenges of carbon pricing mechanisms and fuel transition, and promoting the industry to steadily move towards its emission reduction strategic goals.
[0087] According to another aspect of this application, a ship hybrid power station energy management device is also provided. Figure 4 A schematic diagram of the device is shown, which includes a constraint construction module 10 and an energy management module 20; Among them, the constraint construction module 10 is used to establish control constraint sets corresponding to different navigation conditions based on the ship's operating data and power allocation targets; The energy management module 20 is used to identify the ship's current navigation conditions, select the corresponding control constraints from the control constraint set based on the identified navigation conditions, and dynamically allocate power to the ship's generator set and power supply based on the selected constraints.
[0088] It should be noted that the technical concept of this device is completely consistent with the aforementioned energy management method for a hybrid ship power station. The two are highly coordinated at the level of technical logic. For specific technical details, please refer to the relevant description of the energy management method for a hybrid ship power station, which will not be repeated here.
[0089] Another aspect of this application provides an electronic device including a processor, a memory, a display, and a computer program stored in the memory and capable of running on the processor. When the processor executes the computer program, it implements the aforementioned shipboard hybrid power station energy management method. This electronic device can be an industrial computer, an edge computing device, an embedded controller, a server, a workstation, a mobile terminal, or a cloud computing platform. The display is used to visualize the calculation results after rendering. The visualization interface can display navigation condition identification results, the power distribution status of the generator set and the power supply, the power supply state of charge, the grid frequency and power fluctuation values, and alarm information.
[0090] Figure 5 The diagram shows a schematic frame of an electronic device according to another aspect of this application, which can be a ship hybrid power station energy management device, and includes at least a processor 501 and a memory 502.
[0091] Processor 501 may include one or more processing cores, such as a quad-core processor or an octa-core processor. Processor 501 may be implemented using at least one hardware form selected from DSP (Digital Signal Processing), FPGA (Field-Programmable Gate Array), and PLA (Programmable Logic Array). Processor 501 may also include a main processor and a coprocessor. The main processor, also known as a CPU (Central Processing Unit), is used to process data in the wake-up state; the coprocessor is a low-power processor used to process data in the standby state. In some embodiments, processor 501 may also integrate a GPU (Graphics Processing Unit), which is responsible for rendering and drawing the content to be displayed on the screen. In some embodiments, processor 501 may also include an AI (Artificial Intelligence) processor, which is used to handle computational operations related to machine learning.
[0092] Memory 502 may include one or more computer-readable storage media, which may be non-transitory. Memory 502 may also include high-speed random access memory and non-volatile memory, such as one or more disk storage devices or flash memory devices.
[0093] In some embodiments, the electronic device may also optionally include: a peripheral device interface and at least one peripheral device. The processor 501, memory 502, and peripheral device interface can be connected via a bus or signal line. Each peripheral device can be connected to the peripheral device interface via a bus, signal line, or circuit board. Indicatively, peripheral devices include, but are not limited to: radio frequency circuits, touch displays, audio circuits, and power supplies.
[0094] Of course, the electronic device may also include fewer or more components, and this embodiment does not limit this.
[0095] In some embodiments, the non-transitory computer-readable storage medium in memory 502 is used to store at least one instruction, which is executed by processor 501 to implement a ship hybrid power station energy management method provided in the method embodiments of this application.
[0096] This application also provides a computer-readable medium having computer-readable instructions stored thereon, which can be executed by a processor to implement a ship hybrid power station energy management method as described above.
[0097] When a shipboard hybrid power station energy management method is implemented as a computer program, it can also be stored as an article of manufacture in a computer-readable storage medium. For example, a computer-readable storage medium may include, but is not limited to, magnetic storage devices (e.g., hard disks, floppy disks, magnetic stripes), optical discs (e.g., compact discs (CDs), digital multifunction discs (DVDs)), smart cards, and flash memory devices (e.g., electrically erasable programmable read-only memory (EEPROM), cards, sticks, key drives). Furthermore, the various storage media described herein can represent one or more devices and / or other machine-readable media used for storing information. The term "machine-readable medium" may include, but is not limited to, wireless channels and various other media (and / or storage media) capable of storing, containing, and / or carrying code and / or instructions and / or data.
[0098] It should be understood that the embodiments described above are merely illustrative. The embodiments described herein may be implemented in hardware, software, firmware, middleware, microcode, or any combination thereof. For hardware implementation, the processor may be implemented within one or more application-specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field-programmable gate arrays (FPGAs), processors, controllers, microcontrollers, microprocessors, and / or other electronic units designed to perform the functions described herein, or combinations thereof.
[0099] Some aspects of this application can be executed entirely by hardware, entirely by software (including firmware, resident software, microcode, etc.), or by a combination of hardware and software. The aforementioned hardware or software may be referred to as a "data block," "module," "engine," "unit," "component," or "system." The processor may be one or more application-specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field-programmable gate arrays (FPGAs), processors, controllers, microcontrollers, microprocessors, or combinations thereof. Furthermore, aspects of this application may manifest as computer products residing in one or more computer-readable media, including computer-readable program code. For example, computer-readable media may include, but are not limited to, magnetic storage devices (e.g., hard disks, floppy disks, magnetic tapes, etc.), optical discs (e.g., compressed CDs, digital multifunction DVDs, etc.), smart cards, and flash memory devices (e.g., cards, sticks, key drives, etc.).
[0100] A computer-readable medium may contain a propagated data signal containing computer program code, for example, on baseband or as part of a carrier wave. This propagated signal may take various forms, including electromagnetic, optical, and so on, or suitable combinations thereof. A computer-readable medium can be any computer-readable medium other than a computer-readable storage medium, which can be connected to an instruction execution system, apparatus, or device to enable communication, propagation, or transmission of a program for use. The program code located on the computer-readable medium can be propagated through any suitable medium, including radio, cable, fiber optic cable, radio frequency signals, or similar media, or any combination of the foregoing.
[0101] The basic concepts have been described above. It is clear that the foregoing disclosures are merely examples and do not constitute a limitation of this application. Although not explicitly stated herein, various modifications, improvements, and corrections may be made to this application by those skilled in the art. Such modifications, improvements, and corrections are suggested in this application and therefore remain within the spirit and scope of the exemplary embodiments of this application.
[0102] Furthermore, this application uses specific terms to describe embodiments of the application. For example, "an embodiment," "one embodiment," and / or "some embodiments" refer to a particular feature, structure, or characteristic related to at least one embodiment of the application. Therefore, it should be emphasized and noted that "an embodiment," "one embodiment," or "an alternative embodiment" mentioned twice or more in different locations in this specification do not necessarily refer to the same embodiment. In addition, certain features, structures, or characteristics in one or more embodiments of the application can be appropriately combined.
[0103] In some embodiments, numbers describing the quantity of components and attributes are used. It should be understood that such numbers used in the description of embodiments are modified in some examples with the terms "approximately," "approximately," or "generally." Unless otherwise stated, "approximately," "approximately," or "generally" indicates that the numbers are allowed to vary by ±20%. Accordingly, in some embodiments, the numerical parameters used in the specification and claims are approximate values, which may be changed depending on the characteristics required by individual embodiments. In some embodiments, numerical parameters should take into account specified significant digits and employ a general method of digit reservation. Although the numerical ranges and parameters used to confirm their breadth of scope in some embodiments of this application are approximate values, in specific embodiments, such values are set as precisely as feasible.
Claims
1. A method for energy management of a ship hybrid power station, characterized in that, The method includes: Establish control constraint sets corresponding to different navigation conditions based on the ship's operating data and power allocation targets; The current navigation conditions of the vessel are identified, and corresponding control constraints are selected from the set of control constraints based on the identified navigation conditions. Dynamic power allocation is then performed on the vessel's generator set and power supply based on the selected constraints.
2. The method according to claim 1, characterized in that, The navigation conditions include cruising, berthing / unberthing, anchorage, and shore power charging; the control constraint set includes safety boundary constraints and optimization control constraints. The safety boundary constraints are used to define the safe operating boundaries of the generator set and the power source, and the optimization control constraints are used to optimize the operating efficiency of the generator set and the power source. During the cruise operation, the power supply is controlled to adjust the magnitude and direction of its output current according to the power distribution command. Under the conditions of berthing away from the platform and anchorage, the power supply is controlled to provide voltage and frequency references for the ship's electrical network; Under the shore power charging condition, the power source is controlled to receive shore power charging power.
3. The method according to claim 2, characterized in that, The cruise condition corresponds to the cruise condition safety boundary constraints and the cruise condition optimal control constraints. The cruise condition safety boundary constraints include: A preset power threshold is determined based on the rated power of the generator set, and the peak shaving and valley filling power of the power source is controlled within the preset power threshold. A preset rate of change threshold is determined based on the operating data of the generator set, and the rate of change of the charging power of the power supply is controlled within the preset rate of change threshold. When the state of charge of the power supply is lower than the preset discharge lower limit, the power supply is controlled not to discharge; When the state of charge of the power supply is higher than the preset charging limit, the power supply is controlled not to charge; The optimal control constraints for cruise conditions include determining a preset high-efficiency load rate range based on the load data of the generator set, and controlling the load rate of the generator set within the preset high-efficiency load rate range.
4. The method according to claim 3, characterized in that, Controlling the load rate of the generator set within the preset high-efficiency load rate range includes: When the real-time load rate of the generator set is higher than the upper limit of the preset high-efficiency load rate range, the power supply is controlled to discharge in order to reduce the load rate of the generator set. When the real-time load rate of the generator set is lower than the lower limit of the preset high-efficiency load rate range, the power supply is controlled to charge in order to increase the load rate of the generator set.
5. The method according to claim 2, characterized in that, The docking / departure condition corresponds to the docking / departure condition safety boundary constraints and the docking / departure condition optimization control constraints. The docking / departure condition safety boundary constraints include: The power supply is controlled to be in a static state where it is neither charging nor discharging; When the power load of the ship's electrical grid fluctuates, the output power of the power supply is adjusted according to the frequency difference between the AC bus frequency of the ship and the output frequency of the power supply, so that the power supply returns to the stationary state.
6. The method according to claim 5, characterized in that, The optimal control constraints for the docking / departure platform operation include: When the absolute value of the power grid fluctuation is greater than the first fluctuation threshold, the output power adjustment rate of the power source is set to the first adjustment rate so as to reduce the power grid fluctuation to within the first fluctuation threshold. When the absolute value of the power grid fluctuation is between the second fluctuation threshold and the first fluctuation threshold, the output power adjustment rate is set to the second adjustment rate to reduce the power grid fluctuation to within the second fluctuation threshold. When the absolute value of the power grid fluctuation is between the third fluctuation threshold and the second fluctuation threshold, the output power adjustment rate is set to the third adjustment rate to reduce the power grid fluctuation to within the third fluctuation threshold. When the absolute value of the power grid fluctuation is less than the third fluctuation threshold, the output power of the power supply is not adjusted.
7. The method according to claim 2, characterized in that, The anchorage berthing condition corresponds to the anchorage berthing condition safety boundary constraints and the anchorage berthing condition optimization control constraints. The anchorage berthing condition safety boundary constraints include: The power source is configured as the ship's sole power source. An alarm is issued when the power supply's charge level drops to a preset warning threshold. When the state of charge of the power supply is lower than the preset discharge lower limit, the power supply is controlled to stop discharging, and the generator set is started to charge the power supply, so as to control the charging power of the generator set to the power supply within the preset charging power threshold. When the power source reaches a fully charged state, the generator set is disconnected.
8. The method according to claim 7, characterized in that, The optimal control constraints for the anchorage berthing conditions include: A preset optimal range is determined based on the individual battery voltage and health status data of the power supply, and the state of charge of the power supply is controlled within the preset optimal range. When the generator set starts to charge the power source, the load rate of the generator set is controlled within a preset high-efficiency load rate range.
9. The method according to claim 2, characterized in that, The shore power charging condition corresponds to the shore power charging condition safety boundary constraints, which include: Control the port shore power resources to charge the power source, and control the shore power charging power within a preset shore power charging power threshold. When the state of charge of the power source reaches a preset full charge threshold, charging stops and the shore power connection is disconnected, switching to the anchorage mooring mode.
10. A shipboard hybrid power station energy management device, characterized in that, The device includes a constraint construction module and an energy management module; The constraint construction module is used to establish control constraint sets corresponding to different navigation conditions based on the ship's operating data and power allocation targets. The energy management module is used to identify the current navigation conditions of the ship, select the corresponding control constraints from the control constraint set according to the identified navigation conditions, and perform dynamic power allocation to the ship's generator set and power supply based on the selected constraints.
11. An electronic device, characterized in that, The electronic device includes: A memory, on which computer programs are stored; And a processor, which, when executing the computer program, implements the steps of the method as claimed in any one of claims 1 to 9.
12. A computer-readable storage medium storing computer-readable instructions thereon, characterized in that, The computer-readable instructions can be executed by a processor to implement the method as described in any one of claims 1 to 9.