A liquid-cooled intelligent computing center diesel generator set networking linkage control method

By constructing a dual-dimensional data base to separate common disturbances and circulating current components, calculating and adjusting the saturation coefficient, and issuing control quantities in a staggered manner, the problem of circulating current oscillation caused by the under-execution residual gap of diesel generator sets under high-power load step was solved, ensuring the stable power supply of the liquid-cooled intelligent computing center.

CN123144288APending Publication Date: 2026-11-20TIANJIN JIANGTIAN DATA TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611635502.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-22
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing diesel generator set network control technology cannot effectively verify the active power ramping capability of the units under high-power load step changes in the liquid-cooled intelligent computing center, resulting in under-execution residual gaps, causing inter-unit circulating current oscillations and triggering reverse power protection tripping, which in turn leads to the collapse of the parallel system.

Method used

By collecting heterogeneous data from multiple sources to construct a two-dimensional data foundation, the active power change sequence is extracted, common disturbances and circulating current components are separated, the adjustment saturation coefficient is calculated and multi-unit splitting is performed, control quantities are issued in a staggered manner, the adjustment residue is reviewed and soft decoupling is performed to ensure that the control quantities are executed within the physical capacity boundary of the unit.

Benefits of technology

It effectively suppressed power convection between units, reduced the risk of reverse power tripping, ensured the continuous operation of emergency power supply for the liquid-cooled intelligent computing center, and improved the continuity of intelligent computing services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144288A_ABST
    Figure CN123144288A_ABST
Patent Text Reader

Abstract

The application relates to the technical field of diesel generator set control, in particular to a liquid-cooled intelligent calculation center diesel generator set networking linkage control method, which comprises the following steps: collecting electrical quantities and auxiliary system state quantities of each diesel generator set to construct a data base and extract an active variation sequence; extracting a common disturbance component based on the active variation sequence, separating a circulating flow component and calibrating a deviation band boundary to identify circulating flow unit pairs; decomposing the common disturbance component into a slowly-varying base value and a fast-varying component, calculating an adjustment saturation coefficient to perform multi-unit splitting on the fast-varying component, and performing peak shaving issuing on the circulating flow unit pairs; rechecking an adjustment residual, and if the adjustment residual exceeds the deviation band boundary and the circulating flow component diverges, performing soft decoupling and re-distribution. The application effectively eliminates the generation condition of under-execution residual gaps, and cuts off the formation link of gap compensation-induced power convection between units.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of diesel generator set control technology, specifically to a network linkage control method for liquid-cooled intelligent computing center diesel generator sets. Background Technology

[0002] Diesel generator sets, serving as emergency backup power for liquid-cooled intelligent computing centers, typically employ a multi-unit network in parallel and multi-power supply segment operation architecture to match the power redundancy requirements of megawatt-level loads. In emergency situations involving mains power outages, the diesel generator network must complete startup, voltage build-up, synchronous grid connection, and stable takeover of all IT loads within a very short time. The level of its network linkage control directly determines the continuity of intelligent computing services.

[0003] In existing diesel generator grid control technology, the electrical side achieves synchronous grid connection and load distribution through parallel control units. When the bus power fluctuates, the control end instantaneously distributes the power regulation control amount to all grid-connected units according to the rated capacity ratio of each unit. The speed controllers of each unit synchronously execute load increase and decrease actions according to the control amount. The monitoring side realizes fault location by collecting PLC fault signals and mapping fault codes, and supports scheduling judgment with cluster parameter comparison and alarm linkage.

[0004] However, the GPU training workload carried by the liquid-cooled intelligent computing center will generate large power jumps on the order of seconds or even sub-seconds during tasks such as task scheduling, checkpoint writing, and batch inference switching. The existing proportional instantaneous power allocation control method exposes a little-noticed deep instability mechanism in this scenario: the active power ramping capability of the diesel generator set is subject to hard physical constraints of the fuel rack travel rate and the governor response time constant. There is an upper limit to the amount of power change that can be executed per unit time, and the existing control terminal never checks this upper limit when allocating the control quantity. After a high-power step change is instantaneously decomposed, the required power change rate for each unit generally exceeds its ramp-up capability boundary. Even if the fuel rack operates at full speed throughout the entire disturbance cycle, units exceeding the boundary cannot complete the required operation within the disturbance cycle, resulting in a residual power gap due to underperformance. Furthermore, the degree of underperformance varies among units due to differences in load factor and fuel supply status. This gap is passively compensated by adjacent units, creating a power convection, or circulating current, between units. When this circulating current signal is superimposed on the bus power deviation, it induces a larger reverse regulation, amplifying the oscillation round by round, ultimately triggering reverse power protection tripping, unit disconnection from the grid, and even the collapse of the parallel system. The root cause of this problem lies in the mismatch between control quantity allocation and unit ramp-up capability. Simply increasing the sampling rate or shortening the regulation cycle actually makes exceeding the limit more frequent; existing technologies lack verification and adaptation methods for this. Summary of the Invention

[0005] To address the existing technical problems of high-power load step-down regulation control quantity distributing the unchecked active power ramping capacity of the generator set and the under-execution residual gap inducing inter-generator circulating oscillations leading to the collapse of the parallel system, this application provides a network linkage control method for liquid-cooled intelligent computing center diesel generator sets.

[0006] This application provides a network linkage control method for liquid-cooled intelligent computing center diesel generator sets, including: collecting electrical quantities and auxiliary system status quantities of each diesel generator set; resampling and aligning multi-source heterogeneous data along the same time axis to construct a two-dimensional data base; and extracting the active power change sequence; wherein, the multi-source heterogeneous data consists of electrical quantity data and auxiliary system status quantity data, the electrical quantities including the three-phase voltage, three-phase current, active power, reactive power, speed, frequency, and total active power of the parallel bus of each diesel generator set; the auxiliary system status quantities include louver opening signal, fuel level, starting battery voltage, cooling... Liquid temperature; common disturbance components are extracted based on the active power change sequence, and the circulating components undertaken by each unit are separated by directional consistency judgment, and the deviation band boundary is calibrated to identify circulating unit pairs; the common disturbance components are decomposed into slow-varying base values ​​and fast-varying components, and the regulation saturation coefficient is calculated based on the fast-varying components and the upper limit of the active power ramp rate of the unit. According to the regulation saturation coefficient, the fast-varying components are split into multiple units, and the circulating unit pairs are staggered. The regulation residual of each unit is reviewed. If the regulation residual exceeds the deviation band boundary and the circulating components show a divergent trend, the corresponding unit is soft-disconnected, and the fast-varying components and slow-varying base values ​​are redistributed.

[0007] By introducing a ramp capability check of the adjustment saturation coefficient before the adjustment control quantity is issued, the execution requirements of the rapid change component are directly compared with the physical execution upper limit of the unit's fuel rack and speed control mechanism under the same dimension. This eliminates the conditions for the generation of under-execution residual gaps from the source of control quantity generation and cuts off the formation link of power convection between units caused by gap compensation.

[0008] Preferably, the electrical quantities and auxiliary system status quantities of each diesel generator unit are collected, and the multi-source heterogeneous data are resampled and aligned along the same time axis to construct a two-dimensional data base. The active power change sequence is extracted, including: acquiring the electrical quantities and auxiliary system status quantities of each diesel generator unit, wherein the total active power of the bus is taken from the bus section circuit as a direct observation of load-side disturbance; aligning clock stamps through a unified time synchronization protocol, resampling and aligning the multi-source heterogeneous data along the same time axis to construct a two-dimensional data base from the perspective of the generator unit and the perspective of the bus; preprocessing the aligned active power sequence of each unit to filter out power frequency ripple, extracting the active power at the current moment minus the active power before a sliding time window, and finally obtaining the active power change sequence.

[0009] Preferably, common disturbance components are extracted based on the active power change sequence, and the circulating current components borne by each unit are separated by combining directional consistency. This includes: taking the arithmetic mean of the active power change sequences of all grid-connected units to obtain the common disturbance components; when the active power change sequences of each unit have the same sign and the amplitude deviation is small, it is determined that the current fluctuation is dominated by load-side disturbances; when some units have positive changes and some have negative changes, the common disturbance components are subtracted from the changes of individual units to obtain the circulating current components borne by each unit.

[0010] By decomposing the bus power fluctuation into common disturbance components and circulating current components, accurate inputs are provided for subsequent allocation of regulation and control quantities according to the nature of the components, thus avoiding the oscillation amplification problem caused by mixing the two types of causes.

[0011] Preferably, the deviation band boundary is calibrated to identify circulating unit pairs, including: continuously collecting the active power sequence of each unit under the steady-state condition of light-load parallel operation of the system; calculating the peak-to-peak value of the active power deviation sequence of each unit within the collection window, and using the peak-to-peak value as the deviation band boundary for identifying the circulating component of the unit; and combining units with positive and negative polarities according to the positive and negative polarities of the circulating components undertaken by each unit, and finally obtaining circulating unit pairs.

[0012] Preferably, the calculation of the regulation saturation coefficient based on the rapidly changing component and the upper limit of the unit's active power ramp rate includes: issuing a step test signal under load conditions, recording the time required for the active power to ramp up from the initial value to the target proportion of the steady state value, and calculating the upper limit of the unit's active power ramp rate; obtaining the governor response time constant, calculating the product of the unit's active power ramp rate upper limit and the governor response time constant; dividing the amplitude of the rapidly changing component by the product, and finally obtaining the regulation saturation coefficient.

[0013] Preferably, the rapid variable component is split into multiple units based on the adjustment saturation coefficient, including: selecting a candidate set from healthy units with normal auxiliary system state variables; if the adjustment saturation coefficient is greater than 1, then the healthy units are included in the selected unit set in descending order of ramp rate; calculating the sum of ramp rates of all selected units in the selected unit set; and splitting the rapid variable component based on the proportion of the ramp rate of each selected unit to the sum of the ramp rates of all selected units, finally obtaining the rapid variable component after multi-unit splitting.

[0014] By splitting the ramp rate into multiple units, it is ensured that the portion obtained by each unit during high-power step-over is within its capacity boundary, and the execution rate of each unit tends to be consistent, thus suppressing the cyclical pattern of one unit gaining at the expense of another.

[0015] Preferably, the staggered peak-shifting of the circulating turbine pair includes: acquiring the regulation control quantities of each unit in the circulating turbine pair; staggering the issuance times of the regulation control quantities of each unit in the circulating turbine pair by at least one governor response time constant; ensuring that the regulation actions of the first and the last units do not overlap in the same response cycle, and finally completing the staggered peak-shifting of the circulating turbine pair.

[0016] Preferably, the process of verifying the regulation residual of each unit includes: waiting for the end of a response cycle after the rapid variable component allocation is executed; obtaining the actual active power increment and the issued control quantity for each selected unit; calculating the deviation between the actual active power increment and the issued control quantity, and finally obtaining the regulation residual.

[0017] Preferably, if the regulation residue exceeds the boundary of the deviation band and the circulating current component shows a divergent trend, then soft disconnection is performed on the corresponding unit, including: monitoring the evolution trend of the circulating current component of each unit within the observation window; if the corresponding unit continues to have regulation residue exceeding the boundary of the deviation band and the circulating current component shows a divergent trend within the observation window, then the active power it undertakes is gradually transferred to the other grid-connected units according to the slow-changing base value channel; after the output power of the corresponding unit drops to near zero, the paralleling switch is disconnected, and finally the soft disconnection of the corresponding unit is completed.

[0018] Preferably, the reallocation of the fast-changing component and the slow-changing base value includes: removing the corresponding unit from the candidate set after the disconnection is completed; recalculating the adjustment saturation coefficient based on the updated candidate set; and finally completing the reallocation of the fast-changing component and the slow-changing base value based on the recalculated adjustment saturation coefficient.

[0019] This application further attenuates residual power convection by attributing common disturbances and circulating components and staggering peak power delivery to circulating units, significantly reducing the risk of reverse power tripping and unit disconnection. Simultaneously, during the control quantity generation phase, the execution requirements of rapidly changing components are constrained within the physical capacity boundaries of each unit, effectively severing the generation link of power convection between units induced by under-execution gaps.

[0020] Furthermore, this application, by adjusting residual verification and soft disconnection as a fallback, smoothly disconnects faulty units at the actuator level from the parallel system, ensuring the overall continuous operation capability of the diesel generator network under emergency power supply conditions for the liquid-cooled intelligent computing center. While ensuring the overall continuous operation capability of the parallel system, it also ensures that the fault disconnection process does not introduce new power disturbances to the bus, greatly improving the continuity of intelligent computing services. Attached Figure Description

[0021] The above and other objects, features, and advantages of exemplary embodiments of the present invention will become readily apparent upon reading the following detailed description with reference to the accompanying drawings. In the drawings, several embodiments of the invention are illustrated by way of example and not limitation, and like or corresponding reference numerals denote like or corresponding parts, wherein: Figure 1 This is a flowchart illustrating a network linkage control method for a liquid-cooled intelligent computing center diesel generator set according to the present invention.

[0022] Figure 2 This is a comparison diagram of the active power change response between the existing method and the method of the present invention under a step jump of the bus target in the embodiments of the present invention. Detailed Implementation

[0023] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0024] The specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings.

[0025] This invention discloses a network linkage control method for a liquid-cooled intelligent computing center diesel generator set, referring to... Figure 1 This includes steps S1-S4: S1. Collect data to construct a sequence of active power changes.

[0026] In an optional embodiment, the parallel control unit, PLC controller, relay protection device, and dynamic environment monitoring system of each diesel generator unit are connected to collect two types of data: electrical quantities, including three-phase voltage, three-phase current, active power, reactive power, speed, frequency, and total active power of the parallel bus for each unit; and auxiliary system status quantities, including louver opening signal, fuel level, starting battery voltage, and coolant temperature. The total active power of the bus is taken from the PT / CT circuit of the bus section, serving as a direct observation of the load-side disturbance shared by all units. Separating the bus perspective from the individual unit perspective is crucial to distinguishing between the common load-side disturbance and the power convection between units—two components with completely different physical causes—in subsequent steps.

[0027] In this optional embodiment, electrical quantities are sampled at high frequency with a sampling period of no more than one power frequency cycle to ensure the capture of the complete dynamic process of sub-second power step changes in GPU load. Each acquisition node aligns its clock stamp using a unified time synchronization protocol, resampling and aligning multi-source heterogeneous data along the same time axis to construct a dual-dimensional data foundation from both the unit's and bus's perspectives. Auxiliary system status variables change slowly and are collected at low frequency, serving as inputs to subsequent processes as unit health criteria. They do not participate in calculations within the high-frequency control loop, avoiding unnecessary computational overhead introduced by low-frequency auxiliary quantities.

[0028] Furthermore, the aligned active power sequences of each unit can be preprocessed to filter out power frequency ripple and extract the active power change sequence. That is, the first The active power of the generator unit at the current moment is reduced by the active power before a sliding time window.

[0029] The sliding window is derived based on physical constraints: the typical power fluctuation period of a GPU training load is on the order of seconds, and the response time constant of a diesel generator governor is also on the order of seconds. The window size is 2 to 3 times the governor's response time constant. The larger the value, the more completely the change sequence covers the disturbance process, but the higher the risk of introducing load trend drift interference; the smaller the value, the worse the coverage integrity, and it may truncate the complete response process of a single step. Taking 2 to 3 times the response time constant can achieve a balance between completely covering a disturbance process and suppressing trend drift interference. Those skilled in the art can choose different window multiples according to the actual governor characteristics.

[0030] Thus, by constructing a dual-dimensional data base and extracting the active power change sequence, data input with time axis alignment and unified physical dimensions is provided for subsequent disturbance attribution decomposition and ramp-up capability verification, avoiding the problem of miscalculation of change caused by asynchronous clocks from multiple sources.

[0031] S2. Extract common disturbance components, calibrate the boundary of the deviation band, and identify circulating unit pairs.

[0032] In an alternative embodiment, the bus power fluctuation is mixed with two components with completely different physical causes: one originates from the power step of the GPU load itself, which is borne in the same direction by all units, and is called the common disturbance component; the other originates from the mutual compensation of the under-execution gap between units, which manifests as the power convection between units with one increasing and the other decreasing, and is called the circulating component.

[0033] The existing distributed control system treats both disturbances indiscriminately, which is the cause of oscillation amplification. Therefore, this step first decomposes the disturbances by attribution, and then treats them differently. The common disturbance component is extracted using the existing arithmetic averaging method, taking the arithmetic mean of the active power change sequences of all grid-connected units to obtain the common disturbance component. Meanwhile, a directional consistency criterion is introduced to assist in qualitative analysis. When the active power change sequences of each unit have the same sign and the amplitude deviation is small, it is determined that the current fluctuation is dominated by load-side disturbances; when some units show positive changes and others show negative changes, it is determined that the circulating current component is significant.

[0034] Furthermore, to separate the circulating flow components borne by each unit, the common disturbance components can be subtracted from the individual unit's variation to expose the differences in its deviation from the group behavior, ultimately yielding the circulating flow components borne by each unit:

[0035] In the formula, For the first Taiwanese crew The circulating components at time, This represents the change in active power of the unit. This represents the common disturbance component. If a unit behaves exactly like the average behavior of the group, its circulating current component is zero, indicating that the unit is only passively bearing the load disturbance; if the circulating current component is positive, it indicates that the unit is compensating for the underperformance gap of other units and outputting more power to the bus; if the circulating current component is negative, it indicates that the unit itself is underperforming and is passively absorbing power.

[0036] Next, the threshold for judging the over-limit of the circulating current component can be calibrated based on the actual physical characteristics of the speed governor of each unit. Under the steady-state condition of light-load parallel operation of the system, that is, when the output power of each unit does not exceed the preset light-load ratio of the rated power, the active power sequence of each unit is continuously collected for a duration of not less than a preset multiple of the speed governor response time constant. For example, the preset light-load ratio can be 20%, and the preset multiple can be 5.

[0037] The peak-to-peak value of the active power deviation sequence for each unit within the acquisition window is calculated, which is the difference between the maximum and minimum values ​​of the sequence. The peak-to-peak value is used as the boundary of the deviation band for identifying the circulating current component of that unit. The peak-to-peak value only reflects the maximum amplitude fluctuation generated by the governor's inherent dead zone under light load steady state and is strongly bound to the actual speed regulation characteristics of each unit. Based on the positive and negative polarities of the circulating current components undertaken by each unit, units with paired positive and negative polarities are combined to obtain circulating current unit pairs. The identification results are directly used for peak-shifting distribution processing in subsequent steps.

[0038] In this way, by decomposing the bus power fluctuation into common disturbance components and circulating current components, and calibrating the deviation band boundary based on the physical characteristics of each unit's governor, accurate input is provided for subsequent allocation of regulation and control quantities according to the components, thus avoiding the oscillation amplification problem caused by mixing the two types of causes.

[0039] S3. Calculate and adjust the saturation coefficient to perform multi-machine splitting and staggered distribution.

[0040] In an optional embodiment, the common disturbance component is decomposed into a slow-varying base value and a fast-varying component via a low-pass circuit. The low-pass time constant is taken as the governor response time constant, which can be directly measured through the unit's step response test and has a calibration basis. The slow-varying base value is allocated to all grid-connected units according to the rated capacity ratio of each unit; the fast-varying component has a large amplitude and tight time frame, and is the core object of verification and allocation in this step. Before issuance, it is verified whether it is within the unit's physical execution capability.

[0041] The ramp-up capability verification uses an adjustment saturation coefficient that only includes multiplication and division, directly comparing the execution requirements of the rapidly changing components with the unit's physical ramp-up limit under the same dimension:

[0042] In the formula, For the first The adjustment saturation coefficient of the Taiwanese unit For the amplitude of the fast variable component, This is the upper limit of the active power ramp rate for this unit. The speed governor response time constant is obtained by multiplying the upper limit of the computer group's active ramp rate by the speed governor response time constant, dividing the amplitude of the fast variable component by the product, and finally obtaining the regulation saturation coefficient. When the value is not greater than 1, it indicates that the fast variable component can be fully executed within the response period without generating any residual gaps. When the value is greater than 1, it means that even if the rack operates at full speed throughout the entire process, it cannot complete the operation. An under-execution gap will inevitably occur, and the fast-change component must be split and handled by multiple machines.

[0043] Furthermore, the upper limit of the climbing rate Calibration can be achieved through a step test under load: a step test signal is sent under load conditions, and the time required for the active power to rise from the initial value to the target steady-state value is recorded. The upper limit of the unit's active power ramp rate is calculated, where the step amplitude is taken as a preset proportion of the rated power, and is calculated according to the following formula:

[0044] In the formula, For the first Rated power of the unit This is a preset ratio of the step amplitude to the rated power. This is the time required for the active power to rise from its initial value to the corresponding steady-state amplitude. For example, 0.1 is acceptable. Corresponding to 90% step response time .

[0045] Next, based on the verification results, a tiered allocation is performed. A candidate set is selected from healthy units with normal auxiliary system status variables. Health criteria include proper louver opening, fuel level above the lower load limit, normal starting battery voltage, and coolant temperature within the allowable load range. If the candidate set is empty, the allocation is downgraded to the traditional allocation mode based on the rated capacity ratio of all on-grid units. Simultaneously, alarms are triggered and events are recorded to prevent logical circuit breaks in extreme scenarios. When the candidate set is not empty, if the rapid variable component satisfies the condition of the single unit with the highest ramp rate in the candidate set… If the value is not greater than 1 and the component does not exceed the difference between its rated power and current active power, then the unit is designated as the main regulating unit to centrally handle the fast-changing component, while the other units only track the slow-changing base value. Their regulating bandwidth is limited by the low-pass circuit and they no longer respond to high-frequency step changes.

[0046] If the saturation coefficient is greater than 1, healthy units are included in the selected unit set in descending order of ramp rate, until the sum of the total executable capacity of the selected units within one response cycle is not less than the amplitude of the fast variable component, i.e., the following condition is met:

[0047] In the formula, The selected units are defined as a set of units. The sum of the ramp rates of all selected units in the set is then calculated. Based on the proportion of each selected unit's ramp rate to the sum of the ramp rates of all selected units, the rapid converter component is decomposed, ultimately yielding the multi-unit decomposed rapid converter component. The rapidly changing components undertaken by the selected units are:

[0048] In the formula, The sum of the ramp rates of all selected units, i.e. Since the allocation ratio is directly derived from the proportion of each unit's ramp rate relative to the total rate of all selected units, units with stronger ramp capabilities receive a larger rapid change component, while units with weaker ramp capabilities receive a smaller rapid change component. The component received by each unit is within its ramp capability boundary, and the execution rate of each unit tends to be consistent. The control quantities of the circulating turbines relative to each other are obtained, and the issuance times of these control quantities are staggered by at least one governor response time constant. This ensures that the control actions of the first and subsequent units do not overlap within the same response cycle, ultimately completing the staggered issuance of control quantities to the circulating turbines, and the residual power convection is gradually attenuated.

[0049] In this way, by adjusting the prior verification of the saturation coefficient and the multi-machine splitting of the ramp rate ratio, the execution requirements of the rapidly changing components are constrained within the physical capacity boundaries of each unit during the control quantity generation stage, effectively cutting off the generation link of power convection between units induced by the under-execution gap.

[0050] S4. Review the adjustment residues and perform soft unpacking.

[0051] In an optional embodiment, after the rapid variable component allocation is executed, a response cycle is waited for the end of the cycle. The actual active power increment and the issued control quantity for each selected unit are obtained, and the deviation between the actual active power increment and the issued control quantity is calculated to obtain the regulation residual. Under normal circumstances, the control quantity after the ramp-up capability check should be fully executed, and the regulation residual should fall within the calibrated deviation band. At the same time, the evolution trend of the circulating current component of each unit within the observation window is monitored. The length of the observation window is taken as several times the governor response time constant, maintaining the same physical scale as the sliding time window in step S1, so that the two criteria are comparable on the time scale.

[0052] Since the ramp-up capability verification has ensured that the issued control quantities are within the physical capability boundaries of each unit, if the corresponding unit continues to exhibit residual regulation exceeding the deviation band boundary, and the circulating current component shows a divergent trend within the observation window, it indicates that the root cause of the underperformance lies in a fault at the actuator level of that unit, rather than due to unreasonable control quantity allocation. Such faults cannot be resolved through any control quantity allocation adjustment; continuing to maintain their on-grid status will only continue to output disturbances to adjacent units. Soft disconnection is required to smoothly remove them from the parallel system.

[0053] Furthermore, after confirming instability, the active power borne by the affected unit is gradually transferred to other grid-connected units according to the slow-varying base value channel. Once the output power of the corresponding unit drops to near zero, the paralleling switch is disconnected, ultimately completing the soft disconnection of the corresponding unit and avoiding the impact of load-bearing tripping. Compared to the hard disconnection method of direct tripping, soft disconnection provides a gradual load transition for other grid-connected units during the power transfer process, avoiding the problem of instantaneous power gaps on the bus caused by the sudden withdrawal of the disconnected unit, which could induce a new round of step disturbances. After disconnection, the corresponding unit is removed from the candidate set, and the adjustment saturation coefficient is recalculated based on the updated candidate set. Based on the recalculated adjustment saturation coefficient, the fast-varying component and the slow-varying base value are finally redistributed.

[0054] It is worth noting that soft disconnection refers to the process of removing a grid-connected / parallel-operated unit (generator set, power module, inverter, etc.) from the power grid or parallel system. Instead of directly disconnecting the circuit breaker under load, the active / reactive output of the unit is gradually reduced through control strategies, and the load it bears is smoothly transferred to other grid-connected units. When the output power of the unit drops to a near-zero no-load state, the parallel switch / grid-connected circuit breaker is then disconnected, thus completing the disconnection.

[0055] Next, for multi-power supply segment operation scenarios, the processes of data acquisition, decomposition, verification, allocation, and disconnection are executed independently within each segment, without crosstalk between segments. This prevents the fault handling process of one segment from interfering with the normal adjustment of other segments. The disturbance waveforms, verification results, allocation control quantities, and disconnection events throughout the entire process are synchronously archived and transmitted back to the monitoring terminal, forming a traceable event record and providing data support for subsequent operation and maintenance analysis.

[0056] like Figure 2 As shown, this is a comparison of the active power change response of the existing method and the method of the present invention under the target step jump of the bus in the embodiment of the present invention. It can be seen that the existing method exhibits continuous back-and-forth swinging and overshoot after the step jump, while the curve of the method of the present invention is smooth and close to the target step jump and the swinging decays rapidly. This indicates that the ramp-up capability verification, multi-machine splitting and staggered peak distribution suppress the power convection induced by under-execution residue.

[0057] In this way, by adjusting the residual verification and soft disconnection as a backup, the faulty units at the actuator level and the over-limit adjustments at the control quantity allocation level can be distinguished and classified for handling. While ensuring the overall continuous operation capability of the parallel system, it is ensured that the fault removal process does not introduce new power disturbances to the bus.

Claims

1. A method for network linkage control of liquid-cooled intelligent computing center diesel generator sets, characterized in that, include: Electrical quantities and auxiliary system status quantities of each diesel generator unit are collected. The multi-source heterogeneous data are resampled and aligned along the same time axis to construct a two-dimensional data base, and the active power change sequence is extracted. The multi-source heterogeneous data consists of electrical quantity data and auxiliary system status quantity data. The electrical quantities include the three-phase voltage, three-phase current, active power, reactive power, speed, frequency, and total active power of the parallel bus of each diesel generator unit. The auxiliary system status quantities include the louver opening signal, fuel level, starting battery voltage, and coolant temperature. Based on the active power change sequence, common disturbance components are extracted, and the circulating components undertaken by each unit are separated by directional consistency discrimination. The deviation band boundary is then calibrated to identify circulating unit pairs. The common disturbance component is decomposed into a slow-varying base value and a fast-varying component. The adjustment saturation coefficient is calculated based on the fast-varying component and the upper limit of the unit's active power ramp rate. The fast-varying component is split into multiple units according to the adjustment saturation coefficient, and the peak shift is implemented for the circulating units. The regulation residuals of each unit are reviewed. If the regulation residuals exceed the boundary of the deviation band and the circulating component shows a divergent trend, then the corresponding unit is soft-decoupled and the fast variable component and the slow variable base value are redistributed.

2. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, The process involves collecting electrical quantities and auxiliary system status quantities from each diesel generator unit, resampling and aligning multi-source heterogeneous data along the same time axis to construct a two-dimensional data foundation, and extracting the active power change sequence, including: The electrical quantities and auxiliary system status quantities of each diesel generator unit are obtained, where the total active power of the bus is taken from the bus section circuit as a direct observation of load-side disturbances. By aligning clock stamps using a unified time synchronization protocol, multi-source heterogeneous data are resampled and aligned along the same time axis to construct a data foundation with two dimensions: the unit perspective and the bus perspective. The active power sequence of each unit after alignment is preprocessed to filter out power frequency ripple, and the active power at the current moment is extracted by subtracting the active power before a sliding time window, and finally the active power change sequence is obtained.

3. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, The step of extracting common disturbance components based on the active power change sequence and separating the circulating current components borne by each unit by combining directional consistency discrimination includes: The arithmetic mean of the active power change sequence of all grid-connected generating units is taken to finally obtain the common disturbance component; When the signs of the active power change sequences of each unit are consistent and the amplitude deviation is small, it is determined that the current fluctuation is dominated by load-side disturbances. When some units exhibit positive changes and others negative changes, the common disturbance component is subtracted from the changes of individual units to obtain the circulating current component borne by each unit.

4. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, The process of calibrating the deviation band boundary to identify circulating unit pairs includes: Under the steady-state operating conditions of light-load parallel operation of the system, the active power sequence of each unit is continuously collected; Calculate the peak-to-peak value of the active power deviation sequence of each unit within the acquisition window, and use the peak-to-peak value as the boundary of the deviation band for the circulation component of the unit; Based on the positive and negative polarities of the circulating components undertaken by each unit, the units that appear in positive and negative pairs are combined to finally obtain the circulating unit pairs.

5. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, The calculation of the adjustment saturation coefficient based on the rapidly changing component and the upper limit of the unit's active power ramp rate includes: Under load conditions, a step test signal is sent out, and the time required for the active power to climb from the initial value to the target proportion of the steady state value is recorded. The upper limit of the active power ramp rate of the unit is then calculated. Obtain the governor response time constant and calculate the product of the upper limit of the active power ramp rate of the unit and the governor response time constant; Dividing the amplitude of the rapidly changing component by the product yields the adjustment saturation coefficient.

6. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, The step of performing multi-machine splitting on the rapidly changing component based on the adjusted saturation coefficient includes: From healthy units with normal auxiliary system status variables, a candidate set is selected. If the adjustment saturation coefficient is greater than 1, healthy units are included in the selected set in descending order of ramp rate. Calculate the sum of the ramp rates of all selected units in the selected unit set; Based on the proportion of the ramp rate of each selected unit to the sum of the ramp rates of all selected units, the rapid conversion component is split, and finally the rapid conversion component after multi-unit split is obtained.

7. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, The process of issuing staggered peak load control orders to the circulating turbine units includes: Obtain the adjustment and control quantities of each unit in the circulating turbine unit; The timing of issuing the regulation and control quantities of each unit in the circulating turbine unit is staggered by a speed governor response time constant of not less than one speed governor response time constant. This ensures that the adjustment actions of the first and subsequent units do not overlap within the same response cycle, ultimately completing the staggered peak delivery to the circulating unit.

8. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, The review of the regulation residuals of each unit includes: After the fast-change component allocation is executed, wait for one response cycle to end; Obtain the actual active power increment and control quantity issued for each selected unit; The deviation between the actual active power increment and the issued control quantity is calculated to obtain the adjustment residual.

9. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, If the regulation residual exceeds the boundary of the deviation band and the circulating component shows a divergent trend, then soft disconnection is performed on the corresponding unit, including: Monitor the evolution trend of the circulating components of each unit within the observation window; If the corresponding unit continues to have adjustment residues exceeding the boundary of the deviation band, and the circulating current component shows a divergent trend within the observation window, then the active power it undertakes will be gradually transferred to the other grid-connected units according to the slow-variable base value channel. Once the output power of the corresponding unit drops to near zero, the parallel operation switch is disconnected, thus completing the soft disconnection of the corresponding unit.

10. The method for network linkage control of a liquid-cooled intelligent computing center diesel generator set according to claim 1, characterized in that, The reallocation of the rapidly varying component and the slowly varying base value includes: After the delisting is completed, the corresponding unit will be removed from the candidate set; The adjustment saturation coefficient is recalculated based on the updated candidate set; Based on the recalculated adjustment saturation coefficient, the redistribution of the fast-changing component and the slow-changing base value is finally completed.