Method for correcting voltage of weak grid based on joint evaluation of risk and regulation margin

By constructing a risk-adjustment margin joint assessment model in a weak power grid, a hierarchical collaborative control strategy is generated. This strategy prioritizes the use of equipment with larger available adjustment margins and faster response times for collaborative adjustment, thus solving the problems of voltage fluctuations and insufficient adjustment resources in weak power grids. This achieves dynamic voltage correction and improves equipment utilization efficiency.

CN123144292APending Publication Date: 2026-11-20CHINA THREE GORGES UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611206646.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-10
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing voltage regulation methods are unable to respond promptly to rapid voltage fluctuations in weak power grids, lack overall coordination of the voltage status of the entire grid, and have insufficient assessment of the remaining margin of regulation resources, resulting in over-utilization of equipment or insufficient control effect.

Method used

Based on the risk-adjustment margin joint assessment method, a state feature vector is constructed by collecting data from weak grid nodes, a risk-adjustment margin joint assessment model is established, a hierarchical collaborative control strategy is generated, and equipment with larger available adjustment margins, faster response speeds and lower costs is prioritized for collaborative adjustment, and the adjustment effect is monitored in real time for dynamic updates.

Benefits of technology

It avoids excessive and ineffective regulation of resources, improves equipment utilization efficiency, enhances the operational stability and coping ability of weak power grids in complex scenarios, and realizes dynamic correction of node voltage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144292A_ABST
    Figure CN123144292A_ABST
Patent Text Reader

Abstract

The weak power grid voltage correction method based on risk-regulation margin joint evaluation comprises the following steps: collecting multi-source data and preprocessing; constructing a risk-regulation margin joint evaluation model; establishing a voltage change trend prediction and regulation margin prediction mechanism; developing a risk-margin joint grading control strategy; establishing a multi-device collaborative optimization control mechanism; and performing closed-loop feedback and dynamic updating of the regulation margin. The weak power grid voltage correction method based on risk-regulation margin joint evaluation provided by the application can avoid overuse of devices, improve the utilization efficiency of regulation resources and the long-term stability of weak power grid voltage control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of voltage correction for weak power grids, and in particular to a voltage correction method for weak power grids based on a joint risk-adjustment margin assessment. Background Technology

[0002] With the transformation of rural power grids and the large-scale integration of distributed energy resources, distribution networks are gradually exhibiting characteristics of "weak grids," namely, high line impedance, long power supply radius, uneven load distribution, and insufficient voltage support capacity. In such grids, problems such as low voltage, voltage fluctuations, and three-phase imbalance are particularly prominent, seriously affecting power quality and the safe operation of electrical equipment. Especially after the integration of new energy sources such as distributed photovoltaics, the fluctuating and random nature of their power output easily causes reverse power flow and local voltage rises in the distribution network, making voltage exceeding limits more complex and difficult to effectively address using traditional voltage regulation methods.

[0003] (1) Traditional equipment pressure regulation method In existing technologies, voltage regulation in distribution networks is mainly achieved through equipment such as on-load tap changers (OLTCs), static var compensators (SVCs), capacitor banks, and reactive power regulation devices from distributed generation inverters. These methods control node voltage by adjusting transformer taps or changing reactive power output. However, these methods still have the following shortcomings: the regulation cycle is relatively long, making it difficult to respond promptly to rapid voltage fluctuations; most employ centralized control methods, making it difficult to consider the voltage quality at the end nodes of the distribution network; and they have poor adaptability to dynamic disturbances caused by the integration of distributed generation.

[0004] (2) Voltage control method based on reactive power optimization In recent years, researchers have proposed using reactive power optimization algorithms to regulate distribution network voltage, such as optimization scheduling methods based on power flow calculations. These methods typically aim to minimize voltage deviation or system losses, achieving voltage control through optimized reactive power allocation. However, these methods still have certain limitations: firstly, they rely heavily on static models, making it difficult to accurately reflect the real-time operating status of the power grid; secondly, their response to load fluctuations and changes in renewable energy output is not timely enough; and thirdly, the algorithm complexity is high, making it difficult to meet the real-time requirements of practical engineering projects.

[0005] (3) Active voltage control method based on distributed power source With the large-scale integration of new energy sources such as distributed photovoltaics, the use of inverters in voltage regulation has become a research hotspot. By controlling the reactive power output of the inverter, it is possible to support and regulate the voltage of local nodes. However, this type of method usually uses local voltage as the control basis and lacks overall coordination of the voltage state of the entire grid; there is a lack of a unified collaborative control mechanism between different regulation devices, which can easily lead to regulation conflicts; in addition, its regulation effect has poor stability in multi-source coupled operation scenarios.

[0006] In summary, existing voltage regulation methods often focus on voltage deviation, reactive power compensation, or predictive control results, but rarely conduct a unified assessment of voltage risk levels and remaining margin of regulation resources. This can easily lead to the continued issuance of control commands when regulation resources are close to saturation, resulting in excessive equipment usage or insufficient control effectiveness.

[0007] (4) Voltage control method based on intelligent algorithm Some studies have introduced intelligent methods such as machine learning and optimization algorithms to predict voltage change trends and optimize voltage regulation strategies to improve voltage control performance. However, these methods generally rely on a large amount of historical data, and their model generalization ability is prone to decline when data is insufficient or operating conditions change. At the same time, the lack of clear physical constraints may lead to regulation results deviating from actual operating patterns. In addition, most methods only target a single optimization objective and lack comprehensive consideration of multiple factors such as voltage deviation, change trends, and load fluctuations. Summary of the Invention

[0008] The technical problem to be solved by the present invention is to provide a voltage correction method for weak grids based on risk-adjustment margin joint assessment. While judging the node voltage risk, the remaining regulation capacity of the system is further evaluated, and a hierarchical collaborative control strategy is generated according to the voltage risk level and the regulation margin status, thereby realizing the dynamic correction of node voltage in weak grids.

[0009] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows: A voltage correction method for weak power grids based on risk-adjustment margin joint assessment includes the following steps: S1: Collect operational data of weak grid nodes, construct state feature vectors, and normalize the operational data; S2: Based on the state feature vector, a risk-adjustment margin joint assessment model is constructed to simultaneously determine the voltage risk level of weak grid nodes and the available adjustment margin of the system. S3: Based on the joint evaluation results, establish a voltage change trend prediction and regulation margin prediction mechanism to determine whether there is a risk of exceeding the limit at the next moment and whether the current available regulation margin meets the corresponding regulation requirements. S4: Generate a tiered and coordinated control strategy based on the joint risk-adjustment margin assessment results and the adjustment margin adequacy index; S5: When adjustment is required, perform margin-priority multi-device collaborative optimization control to determine the device calling order and adjustment power allocation scheme; S6: Real-time monitoring of node voltage, equipment output, and available adjustment margin after adjustment; closed-loop feedback and dynamic updates of adjustment margin based on adjustment effect.

[0010] S1 includes: S1.1: Collect voltage data from weak current network nodes Current, active power reactive power and load fluctuation information; S1.2: Construct a state feature vector based on the collected data: ; in, , representing the amount of voltage change; This indicates the amount of load fluctuation; S1.3: Normalize the data of each dimension in the state feature vector to eliminate the influence of different dimensions on subsequent calculations.

[0011] S2 includes: Based on node voltage deviation, voltage change rate, and load fluctuation, a basic voltage risk index is constructed: ; in, This is the rated reference voltage; The rate of change of voltage; The standard deviation of load fluctuation; , , These are the weighting coefficients.

[0012] S2 also includes: Assess the available adjustment margin of each adjustment resource involved in the system: For the first... The available adjustment margin for each adjustment resource is: ; in, For the first The available adjustment margin of each adjustment resource; For the first The maximum regulating capacity of each regulating resource; For the first The existing adjustment capacity of each adjustment resource; Calculate the total system regulation margin: ; in, The amount of resources involved in the adjustment; For the first The weight coefficients corresponding to each adjustment resource; This represents the total system regulation margin.

[0013] S2 also includes: Based on the baseline voltage risk index and the total system regulation margin, a joint risk-regulation margin assessment index is constructed: ; in, For risk-adjustment margin joint assessment indicators; It is a base voltage risk indicator; This represents the total system regulation margin. Voltage risk weighting coefficient; To adjust the margin weighting coefficient; To prevent extremely small positive numbers with a denominator of zero; Based on the risk-adjustment margin joint assessment indicators Divide the system states: when At that time, it was determined to be a state of low risk with sufficient margin; when At that time, it is determined to be in a medium-risk margin availability state; when At that time, it was determined to be a high-risk situation; in, The first risk threshold, As the second risk threshold, and .

[0014] S3 includes: Based on the current node voltage, voltage change, active power change, and reactive power change, a short-time voltage prediction model is established: ; in, The predicted voltage at the next moment when no new adjustment measures are taken; for The voltage at a given moment; This refers to the change in node voltage. This represents the change in active power. This represents the change in reactive power. , , These are the coefficients of the prediction model; When predicting voltage With the rated reference voltage When the deviation exceeds a preset threshold, the node is determined to have a potential risk of voltage exceeding the limit.

[0015] S3 also includes: Estimate the required adjustment margin for the next time step based on the predicted voltage deviation: ; in, This represents the adjustment margin required to eliminate the predicted voltage deviation at the next moment. This is the equivalent voltage regulation sensitivity coefficient, used to represent the degree of influence of unit regulation power on node voltage; Constructing a sufficiency index for adjustment margin: ; in, To adjust the margin sufficiency index; This represents the total system regulation margin. To prevent extremely small positive numbers with a denominator of zero; Judgment based on the sufficiency of adjustment margin: when At that time, it enters the active adjustment process; when When this occurs, the system enters a margin-pressure control mode, prioritizing multi-device collaborative scheduling or resource optimization.

[0016] The hierarchical and coordinated regulation strategy in S4 includes: When the system is in a low-risk, high-margin state, maintain the current operating state and only perform real-time monitoring. When the system is in a state of medium risk margin availability, the reactive power compensation device or distributed power inverter should be used first to regulate the local voltage. When the system is in a high-risk state and the adjustment margin is sufficient indicator At that time, the reactive power compensation device, distributed power inverter and energy storage system are activated for joint regulation; When the system is in a high-risk state and the adjustment margin is sufficient indicator In such cases, priority should be given to adjusting resource reconfiguration and power allocation optimization to avoid overloading or ineffective adjustment of a single device.

[0017] S5 includes: For reactive power compensation devices, distributed power inverters, and energy storage systems, obtain the available regulation margin, response speed, and regulation cost of each device; Taking into account available adjustment margin, response speed, and adjustment cost, the priority of equipment deployment is determined: priority is given to equipment with larger available adjustment margin, faster response speed, and lower adjustment cost; When a single device cannot meet the adjustment requirements, other devices are called in sequence according to their priority for coordinated adjustment, and the adjustment power is allocated proportionally according to the available adjustment margin of each device.

[0018] S6 includes: Real-time acquisition of node voltage after voltage regulation, actual output of each device, and available regulation margin; When the node voltage returns to the allowable range, gradually reduce the output of the regulating equipment; When node voltage still has deviation or the system's total regulation margin When the rate of decline exceeds a preset threshold, the device call sequence and power allocation scheme are readjusted, and the risk-adjustment margin joint assessment index is dynamically updated. And available adjustment margin status.

[0019] This invention provides a voltage correction method for weak power grids based on joint risk-adjustment margin assessment, which has the following technical advantages: 1) Avoid excessive and ineffective regulation of control resources and improve equipment utilization efficiency: In response to the problems in the background technology that control is based solely on voltage deviation, resulting in regulation lag or excessive resource usage, and the problem of continuing to issue control commands when the control resources are close to saturation, leading to excessive equipment usage or insufficient control effect, this invention uses a risk-control margin joint assessment. When it is predicted that the node voltage may exceed the limit, the required control margin is first calculated and compared with the current total available control margin of the system. When the available margin is insufficient, the system enters the margin tension control mode instead of forcibly using the equipment, thereby effectively avoiding excessive and ineffective regulation of control resources.

[0020] 2) Improve the accuracy and comprehensiveness of weak grid operation status identification: In view of the shortcomings of existing methods in the background technology that rarely conduct unified assessment of voltage risk level and remaining margin of regulation resources, this invention constructs a risk-regulation margin joint assessment index that includes both voltage risk index and regulation margin index. It can not only reflect the current voltage risk level of nodes, but also assess the remaining regulation capacity of the system, realizing a multi-dimensional comprehensive judgment of the operation status of weak grids, and avoiding the one-sidedness of traditional methods that only rely on voltage deviation for judgment.

[0021] 3) Improve the rationality and reliability of multi-device collaborative control: In view of the problems in the background technology, such as the lack of a unified collaborative control mechanism among different regulating devices, which easily leads to regulation conflicts and poor stability of regulation effect in multi-source coupled operation scenarios, this invention establishes a margin-first multi-device collaborative optimization control mechanism. It comprehensively considers the remaining regulation margin, response speed and regulation cost of each device to determine the calling order and power allocation scheme. When a single device cannot meet the regulation requirements, other devices are called in sequence for collaborative regulation, thereby avoiding overload of a single device and regulation conflicts, and improving the collaborative utilization efficiency of multiple types of regulation resources.

[0022] 4) Enhance the system's ability to cope with tight margin conditions: In response to the problem in the background technology of blindly controlling when the regulating resources are close to saturation, the present invention judges whether the remaining regulating capacity of the system meets the regulation requirements of the predicted voltage deviation by using the regulating margin sufficiency index. When the margin is insufficient, the system prioritizes the reconfiguration of regulating resources and optimization of power allocation instead of continuing to issue conventional control commands. This enables the system to have differentiated emergency handling capabilities under extreme conditions of tight regulating resources, and can ensure voltage safety to the greatest extent under limited resource conditions.

[0023] 5) Improve the long-term operational stability of weak grids in complex scenarios: In view of the problems that the background technology relies on static models, which makes it difficult to accurately reflect the real-time operating status of the grid and respond to load fluctuations and changes in renewable energy output in a timely manner, this invention monitors the node voltage, equipment output and remaining regulation margin in real time after voltage regulation through a closed-loop feedback and dynamic update mechanism for regulation margin. It also dynamically updates the risk assessment results and margin status according to the regulation effect, so that the system can continuously adapt to load fluctuations and changes in renewable energy output, reduce frequent equipment operation, and improve the long-term operational stability and engineering applicability of voltage control in weak grids. Attached Figure Description

[0024] The present invention will be further described below with reference to the accompanying drawings and embodiments: Figure 1 This is the overall flowchart of the present invention.

[0025] Figure 2 This is a schematic diagram of the risk-adjustment margin joint assessment model in this invention.

[0026] Figure 3 This is the logic diagram of the risk-adjustment margin joint hierarchical control in this invention.

[0027] Figure 4 This is a schematic diagram of the internal structure of the weak grid voltage correction device in this invention.

[0028] Figure 5 This is a graph showing the voltage variation at the end nodes of a weak power grid under different control strategies.

[0029] Figure 6 The curves show the changes in the system's residual control margin under different control strategies. Detailed Implementation

[0030] Example 1 A voltage correction device for weak power grids, used to execute the voltage correction method for weak power grids based on risk-adjustment margin joint assessment of the present invention, such as... Figure 4As shown, the device includes a movable cabinet 1, and an inverter 2, a voltage management module 3, a power management module 4, a control panel 5, a monitoring panel 6, an operation panel 7, a communication module 8, an air switch 9, and a circuit breaker 10 installed in the movable cabinet.

[0031] The movable cabinet 1 serves as the load-bearing structure of the device, used to install and fix the aforementioned functional units. Its bottom can be equipped with casters or a movable base, facilitating mobile deployment and on-site maintenance in different field environments such as rural weak power grids, long feeder end areas, and distributed photovoltaic access points.

[0032] The voltage management module 3 is used to realize data acquisition and preprocessing, joint risk-adjustment margin assessment, voltage change trend prediction, and adjustment margin prediction functions. Specifically, the input of the voltage management module 3 collects voltage and current signals from the weak grid access nodes through voltage transformers and current transformers, respectively, and simultaneously receives operating status data from distributed power inverters, reactive power compensation devices, or the upper-level dispatch platform through the communication module 8. Based on the collected node voltage, current, active power, reactive power, and load fluctuation information, the voltage management module 3 constructs a state feature vector and normalizes it to eliminate the influence of different dimensions on subsequent calculations.

[0033] Based on this, voltage management module 3 performs a joint risk-adjustment margin assessment function. This module first calculates the base voltage risk index based on node voltage deviation, voltage change rate, and load fluctuation. Furthermore, the voltage management module combines the basic voltage risk index with the total system regulation margin to construct a joint risk-regulation margin assessment index. The voltage management module 3 also performs voltage change trend prediction and regulation margin assessment functions. Based on the current node voltage, voltage change, active power change, and reactive power change, this module uses a short-time voltage prediction model to calculate the predicted voltage for the next moment without any new regulation measures. When the deviation between the predicted voltage and the rated reference voltage exceeds a preset threshold, it determines that the node has a potential voltage over-limit risk. Based on this, the voltage management module 3 estimates the required regulation margin for the next moment according to the predicted voltage deviation and the equivalent voltage regulation sensitivity coefficient, and constructs a regulation margin sufficiency index to determine whether the currently available regulation margin meets the regulation requirements. The voltage management module outputs the above evaluation results, prediction information, and regulation margin sufficiency index to the control panel 5.

[0034] Control panel 5 is connected to the output of voltage management module 3 and is used to run control decision program. Based on the risk assessment results and regulation margin status output by voltage management module 3, it generates hierarchical coordinated control strategy and issues control commands to inverter 2 and external adjustable resources.

[0035] When adjustment needs to be initiated, control panel 5 performs multi-device collaborative optimization control with a margin-first approach. Control panel 5 comprehensively considers the available adjustment margin, response speed, and adjustment cost of each adjustment device to determine the device call priority, prioritizing devices with larger available adjustment margins, faster response speeds, and lower adjustment costs. When a single device cannot meet the adjustment requirements, other devices are called in sequence according to their call priority for collaborative adjustment, and the adjustment power is allocated proportionally based on the available adjustment margin of each device.

[0036] The control terminal of inverter 2 is connected to the output terminal of control panel 5, and its AC output terminal is connected to the busbar of the weak grid node via air switch 9 and circuit breaker 10. In response to the control commands issued by control panel 5, inverter 2 injects or absorbs corresponding power into the connected node by adjusting its own output active power and / or reactive power, thereby providing voltage support for the weak grid node.

[0037] Communication module 8 is used to realize data interaction between the device and external equipment. The first data interface of communication module 8 is connected to the control panel, and the second data interface is connected to at least one of the distributed power inverter, energy storage system, reactive power compensation device, distribution network monitoring terminal and upper-level dispatch platform via wired or wireless means. The communication module sends the external coordinated adjustment commands generated by the control panel to the corresponding external adjustable resources, and at the same time, sends the operating status and response feedback of the external adjustable resources back to the voltage management module.

[0038] Control panel 5 and voltage management module 3 also work together to perform closed-loop feedback and dynamic update of regulation margin. After regulation is executed, voltage management module 3 collects the node voltage, actual output of each device, and available regulation margin in real time. When the node voltage recovers to the allowable range, control panel 5 gradually reduces the output of the regulated devices. When the node voltage still has a deviation or the rate of decrease of the total system regulation margin exceeds the preset threshold, control panel readjusts the device call sequence and power allocation scheme, and voltage management module 3 dynamically updates the risk-regulation margin joint evaluation index and the status of available regulation margin.

[0039] The monitoring panel 6 is connected to the control panel 5 and the voltage management module 3, respectively, to display information such as node voltage, equipment output, system remaining regulation margin, risk level, and operating status in real time, allowing maintenance personnel to intuitively grasp the operating status of the equipment and the voltage status of the distribution area. The operation panel is connected to the control panel and is used to realize parameter setting, mode switching, start / stop control, and manual intervention.

[0040] The input terminal of the power management module 4 is connected to an external power supply or an internal backup power supply. The output terminal is connected to the power supply terminals of the inverter, voltage management module, control panel, monitoring panel, operation panel and communication module, respectively. It is used to provide a stable working power supply for each functional module inside the device and to monitor and manage the power supply status.

[0041] Air switch 9 and circuit breaker 10 are connected in series between the AC output terminal of inverter 2 and the weak current grid access node, forming the protection unit of the device. Air switch 9 is used to realize the overall on / off control of the device, and circuit breaker 10 is used to provide short circuit protection, overcurrent protection and rapid isolation under abnormal operating conditions. When a fault occurs in the device or external line, it will safely disconnect the device from the power grid and ensure the safety of the device and maintenance personnel.

[0042] Through the coordinated operation of the above functional units, this device realizes the integrated operation of weak grid operation data acquisition, risk-adjustment margin joint assessment, hierarchical coordinated control, power regulation execution, and closed-loop feedback update. It can assess the available adjustment margin of the system while judging the node voltage risk level, and generate hierarchical coordinated control strategies based on the voltage risk level and adjustment margin status, avoiding excessive use of regulation resources and ineffective regulation, and realizing dynamic correction of node voltage in weak grids.

[0043] Example 2 With the transformation of rural power grids and the large-scale integration of distributed energy resources, distribution networks are gradually exhibiting characteristics of "weak grids," namely, high line impedance, long power supply radius, uneven load distribution, and insufficient voltage support capacity. In such grids, problems such as low voltage, voltage fluctuations, and three-phase imbalance are particularly prominent, seriously affecting power quality and the safe operation of electrical equipment. Especially after the integration of new energy sources such as distributed photovoltaics, the fluctuating and random nature of their power output easily causes reverse power flow and local voltage rises in the distribution network, making voltage exceeding limits more complex and difficult to effectively address using traditional voltage regulation methods.

[0044] In existing technologies, voltage regulation methods often focus on voltage deviation, reactive power compensation, or predictive control results, but rarely conduct a unified assessment of voltage risk levels and available regulation margins of regulation resources. This can easily lead to the continued issuance of control commands when regulation resources are close to saturation, resulting in excessive equipment usage or insufficient control effectiveness.

[0045] To address the aforementioned issues, this invention provides a voltage correction method for weak power grids based on a joint risk-adjustment margin assessment. This method assesses the available adjustment margin of the system while determining the node voltage risk level, and generates a hierarchical coordinated control strategy based on the voltage risk level and available adjustment margin, thereby achieving dynamic correction of node voltages in weak power grids.

[0046] Figure 1The diagram shown is an overall flowchart of the weak grid voltage correction method of the present invention. (Refer to...) Figure 1 The method includes the following steps: S1: Multi-source data acquisition and preprocessing: Acquire operational data of weak grid nodes, construct state feature vectors, and normalize the operational data; S2: Construction of Risk-Adjustment Margin Joint Assessment Model: Based on the aforementioned state feature vector, a risk-adjustment margin joint assessment model is constructed to simultaneously determine the voltage risk level of weak grid nodes and the available adjustment margin of the system. S3: Voltage change trend prediction and regulation margin prediction: Based on the joint evaluation results, a voltage change trend prediction and regulation margin prediction mechanism is established to determine whether there is a risk of exceeding the limit at the next moment and whether the current available regulation margin meets the corresponding regulation requirements. S4: Generation of risk-margin joint hierarchical control strategy: Generate hierarchical coordinated control strategy based on the joint assessment results of risk-margin and the adequacy index of margin. S5: Margin-first multi-device collaborative optimization control: When adjustment is required, margin-first multi-device collaborative optimization control is executed to determine the device calling order and adjustment power allocation scheme; S6: Closed-loop feedback and dynamic update of regulation margin: Real-time monitoring of node voltage, equipment output and available regulation margin after regulation, and dynamic update of closed-loop feedback and regulation margin based on regulation effect.

[0047] Through the complete working process described above—including "operational status acquisition, risk assessment, margin assessment, trend prediction, hierarchical control, coordinated adjustment, and feedback update"—this invention enables dynamic correction of node voltages in complex operating scenarios of weak power grids. Compared to traditional methods that adjust solely based on voltage deviation, this invention further considers the available adjustment margin of regulation resources, avoiding excessive equipment utilization and improving the efficiency of regulation resource utilization and the long-term stability of voltage control in weak power grids.

[0048] The following sections provide a detailed explanation of each step.

[0049] The method specifically includes: S1: Multi-source data acquisition and preprocessing: This step involves acquiring real-time operational data of target nodes in the weak grid using a data acquisition module. The acquired data is then preprocessed to form a characteristic vector of the weak grid's operational status, providing foundational data for subsequent risk assessment and control decisions. Through multi-source data fusion, the system can simultaneously monitor node voltage status, load fluctuations, and power change trends.

[0050] 1.1: Collect operational data from weak grid nodes.

[0051] Specifically, the voltage of weak grid nodes is collected. Current, active power reactive power And load fluctuation information. Among them, This indicates the current sampling time. The above data can be obtained synchronously through voltage transformers, current transformers, and power measurement devices deployed at key nodes of the weak power grid. Load fluctuation information can be obtained through statistical analysis of the active power sequence.

[0052] 1.2: Constructing a state feature vector based on the collected data. : ; in: , represents the voltage change, used to reflect the fluctuation of node voltage between adjacent sampling times; , represents the change in active power, used to reflect the fluctuation range of load between adjacent sampling times.

[0053] Based on the above state feature vectors The system can simultaneously grasp the node voltage status, load fluctuations, and power change trends, achieving a comprehensive characterization of the weak power grid's operating status and providing a unified data foundation for subsequent calculations of basic voltage risk indicators and predictions of voltage change trends.

[0054] 1.3: On the state feature vector The data in each dimension are normalized to eliminate the influence of different units on subsequent calculations.

[0055] Specifically, normalization can be achieved using the min-max normalization method, mapping each dimension of data to the [0,1] interval: ; in, State feature vector The Dimensional raw data; and These represent the maximum and minimum values ​​of the data in this dimension within the historical statistical window; This is the normalized data.

[0056] Normalization avoids the problem of certain features being submerged in subsequent calculations due to the significant difference in the dimensions of voltage and power, thus improving the numerical stability of the evaluation model and the comparability between various features. It should be noted that normalization is the preferred step; if the dimensions of the original data are consistent or of similar magnitude, the original data can also be used directly for subsequent calculations.

[0057] S2: Construction of the joint assessment model for risk and adjustment margin: To avoid the lag or excessive resource utilization caused by traditional voltage regulation methods that rely solely on voltage deviation for control, this invention further introduces an available regulation margin index on the basis of voltage risk assessment, and constructs a risk-regulation margin joint assessment model to simultaneously determine the voltage risk level of weak grid nodes and the available regulation margin of the system.

[0058] Figure 2 The diagram shown illustrates the risk-adjustment margin joint assessment model of this invention. (Refer to...) Figure 2 The model consists of four parts: a basic voltage risk index calculation module, a regulation margin assessment module, a joint assessment index synthesis module, and a state division module.

[0059] (I) Construction of Base Voltage Risk Indicators 2.1: Construct a basic voltage risk index based on node voltage deviation, voltage change rate, and load fluctuation. .

[0060] Traditional voltage deviation control methods rely solely on a single voltage deviation quantity, failing to comprehensively reflect the risk status of the power grid operation. This invention, building upon voltage deviation, further introduces two dimensions: voltage change rate and load fluctuation degree, to more comprehensively characterize the voltage risk level of weak grid nodes. Specifically, the basic voltage risk index... The expression is: ; in: This is the rated reference voltage, set according to the voltage level of the weak grid node; The voltage change rate can be approximated using a difference method, i.e. , The sampling time interval; The standard deviation of load fluctuation is determined by analyzing the active power series. In length The standard deviation is calculated within the sliding window. , , For the weighting coefficients, satisfying It can be determined based on the actual power grid operating characteristics through the analytic hierarchy process or expert experience.

[0061] The above-mentioned basic voltage risk indicators In the middle, the first item The absolute degree to which the node voltage deviates from its rated value is reflected, serving as the fundamental basis for assessing voltage risk; the second item The rate of voltage change reflects the speed at which voltage deteriorates or recovers; the third item... This reflects the severity of load fluctuations; the greater the load fluctuation, the higher the risk of voltage instability. The weighted sum of the three factors gives the base voltage risk index. Compared to the traditional method of judging solely based on a single voltage deviation, this method can more comprehensively characterize the voltage risk level of weak grid nodes.

[0062] (ii) Assessment of adjustment margin 2.2: Assess the available adjustment margin of each adjustment resource involved in the system.

[0063] Resources involved in regulation include, but are not limited to: reactive power compensation devices (such as static var compensators, SVCs), distributed generation inverters (such as photovoltaic inverters), and energy storage systems. These regulation resources are the physical execution units for voltage correction in weak power grids, and their available regulation margin directly determines the voltage support capability that the system can provide.

[0064] For the A set of adjustment resources, whose available adjustment margin is defined as: ; in: For the first The available regulation margin of a regulation resource represents the regulation power that the resource can still provide at the current moment; For the first The maximum regulating capacity of a single regulating resource is determined by the rated capacity of the equipment and the current operating conditions. For the first The used regulation capacity of a regulation resource, that is, the regulation power that the resource is currently outputting.

[0065] Taking reactive power compensation devices as an example, For its rated reactive power capacity, This represents the reactive power currently generated. This refers to the reactive power that can be generated. For energy storage systems, the impact of their charging and discharging power limits and residual state of charge (SOC) on regulation capability must be considered simultaneously; for distributed power inverters, the impact of current active power output on reactive power regulation capability must be considered, meaning that available reactive capacity is constrained by both the inverter's apparent power and current active power output.

[0066] 2.3: Calculate the total system regulation margin .

[0067] After obtaining the available adjustment margins of each adjustment resource, the total system adjustment margin is obtained by weighted summation: ; in: The amount of resources involved in the adjustment; For the first The weighting coefficient corresponding to each regulating resource can be determined based on factors such as the importance of the resource in voltage regulation and the voltage sensitivity of the access location to the target node, and must satisfy the following conditions: .

[0068] By weighted summation, the system's total regulation margin This comprehensively reflects the remaining voltage support capacity of all regulating resources across the entire network. Weighting coefficients. The appropriate settings are crucial: for regulating resources that are electrically close and highly sensitive to the voltage of the target node, a larger weight can be assigned; for resources with slow response speed or high regulation cost, their weight can be appropriately reduced.

[0069] (III) Joint assessment of risk and adjustment margin: 2.4: Risk Indicators Based on Base Voltage and total system control margin Construct a joint assessment index for risk-adjustment margin : ; in: For risk-adjustment margin joint assessment indicators; It is a base voltage risk indicator; This represents the total system regulation margin. Voltage risk weighting coefficient; To adjust the margin weighting coefficient; To prevent extremely small positive numbers with a denominator of zero, the typical value is [value missing]. .

[0070] Risk-Adjustment Margin Joint Assessment Indicators The design principle is that when the node voltage risk level is high, i.e. Larger and the system's total regulation margin is smaller. Smaller, that is When it is large, A significant increase indicates that the system not only faces the risk of voltage exceeding limits but also that the available regulation margin is becoming strained, necessitating appropriate control measures. Conversely, if the voltage risk level is low and the available regulation margin is sufficient, then... The system is relatively small and can maintain its current operating state.

[0071] This design, which jointly assesses voltage risk level and regulation margin, has the following significant advantages over the traditional method that relies solely on voltage deviation: when regulation resources are near saturation, even if the voltage deviation is small, Item will also make This increases the resource availability, prompting the system to pay attention to resource shortages in advance and avoid a passive situation where no resources are available when adjustments are truly needed.

[0072] 2.5: Based on the joint assessment indicators of risk and adjustment margin Divide the system states: when At that time, it was determined to be a state of low risk with sufficient margin; when At that time, it is determined to be in a medium-risk margin availability state; when At that time, it was determined to be a high-risk state.

[0073] in, The first risk threshold, As the second risk threshold, and .

[0074] and The specific value can be determined comprehensively based on power grid operation regulations, historical operation data statistical analysis, and expert experience. For example, it can be determined by analyzing historical normal operating conditions. To conduct statistical analysis, The 85th percentile as Using the 95th percentile as .

[0075] Figure 2 The structure of the aforementioned risk-adjustment margin joint assessment model is illustrated in schematic form: the node operation data and equipment status data collected by the system are respectively input into the base voltage risk index calculation module and the adjustment margin assessment module to obtain... and Then, the joint evaluation index synthesis module is used according to... Calculated And finally, through the state division module and threshold , The comparison is performed, and the system state determination result is output.

[0076] The risk-adjustment margin joint assessment model described above can not only reflect the current voltage risk level of nodes, but also assess the available adjustment margin of the system, providing a basis for subsequent optimization of adjustment resources and coordinated control, thereby avoiding the problem of blind control when adjustment resources are close to saturation in traditional methods.

[0077] S3: Voltage Change Trend Prediction and Regulation Margin Forecasting To enhance the proactiveness of voltage correction in weak power grids, this invention, based on the evaluation results of the risk-adjustment margin joint assessment model, further establishes a voltage change trend prediction and adjustment margin prediction mechanism. This mechanism is used to determine whether there is a risk of the node voltage exceeding the limit at the next moment, and further determine whether the currently available adjustment margin can meet the corresponding adjustment requirements. This avoids the problem of excessive resource allocation or insufficient control effect caused by traditional methods that directly activate the regulating device based solely on the predicted voltage limit exceedance results.

[0078] (I) Voltage Change Trend Prediction 3.1: Establish a short-time voltage prediction model based on the current node voltage, voltage change, active power change, and reactive power change.

[0079] In weak power grids, node voltage variations are influenced by both active and reactive power fluctuations. This invention comprehensively considers both the inherent voltage variation trend and the impact of power variations on voltage, establishing the following short-time voltage prediction model: ; in: The predicted voltage at the next moment when no new adjustment measures are taken; for The voltage at a given moment; , which represents the change in node voltage; , which represents the change in active power; , which is the change in reactive power; , , These are the coefficients of the prediction model.

[0080] The above prediction model coefficients , , Parameters can be obtained through online identification using historical operating data. Preferably, the recursive least squares (RLS) method can be used to update each coefficient on a rolling basis, enabling the prediction model to adaptively track changes in the operating characteristics of the power grid. This reflects the effect of the voltage's own inertia on the voltage's continuity at the next moment. It reflects the sensitivity of active power changes to voltage (active power-voltage coupling characteristics). It reflects the sensitivity of reactive power changes to voltage (reactive-voltage coupling characteristics).

[0081] 3.2: Voltage over-limit risk assessment.

[0082] When predicting voltage With the rated reference voltage The deviation exceeds the preset threshold When, that is, the following condition is met: ; The node was determined to have a potential risk of exceeding voltage limits. The preset voltage deviation safety threshold can be determined according to the voltage level and operating procedures, for example, for a 10kV distribution network. It can be ±7% of the rated voltage.

[0083] (II) Adjustment margin prediction 3.3: Estimate the required regulation margin for the next moment based on the predicted voltage deviation. .

[0084] When a potential risk of voltage exceeding the limit is determined, this invention does not directly activate the regulating device, but first calculates the regulation margin required to eliminate the predicted voltage deviation: ; in: This represents the adjustment margin required to eliminate the predicted voltage deviation at the next moment. The predicted voltage at the next moment when no new adjustment measures are taken; This is the rated reference voltage; This is the equivalent voltage regulation sensitivity coefficient, used to represent the degree of influence of unit regulation power on node voltage.

[0085] Equivalent voltage regulation sensitivity coefficient This can be obtained through power flow sensitivity analysis, which calculates the incremental impact of a unit reactive power injection at a node (or adjusting a transformer tap position) on the target node voltage. For different regulating devices and connection locations, They may differ; in practical applications, their equivalent average value or the value based on the most unfavorable working condition can be taken to retain a certain safety margin.

[0086] 3.4: Constructing an indicator of adjustment margin sufficiency .

[0087] The total system margin is compared with the required margin to construct a margin adequacy index: ; in: To adjust the margin sufficiency index; This represents the total system regulation margin. For the adjustment margin required in the next moment; To prevent extremely small positive numbers with a denominator of zero, the typical value is [value missing]. .

[0088] 3.5: Judgment based on the adequacy of the adjustment margin index: when When this occurs, it indicates that the total system regulation margin can meet the regulation requirements of the predicted voltage deviation, and the system can enter the active regulation process. when When this occurs, it indicates that the system's available adjustment margin is insufficient, and the system enters a margin-tight control mode. Priority should be given to multi-device collaborative scheduling or resource optimization to avoid excessive use of a single device or ineffective adjustment.

[0089] Through the aforementioned voltage change trend prediction and regulation margin prediction mechanism, this invention can not only identify voltage over-limit risks in advance, but also determine whether existing regulation resources have sufficient regulation capacity before initiating regulation. Compared to traditional methods that directly activate the regulation device based solely on the predicted voltage over-limit result, this invention adds a comparison logic between the required regulation margin and the available regulation margin in the regulation margin prediction stage. This effectively avoids the problem of excessive resource consumption and decreased control effect caused by blindly calling upon equipment when the available regulation margin is insufficient. This mechanism embodies the proactive defense concept of assessing capabilities first and then determining the strategy, and is one of the important features that distinguishes this invention from existing technologies.

[0090] S4: Risk-Margin Joint Tiered Control Strategy This step generates a tiered coordinated control strategy based on the system state (S2) and the adequacy index of the control margin (S3) derived from the risk-control margin joint assessment model. This strategy considers both the voltage risk level and the available control margin of the system, avoiding the blind activation of equipment when the available control margin is insufficient.

[0091] Figure 3 The diagram shown is a joint risk-margin hierarchical control logic diagram of this invention. (Refer to...) Figure 3 The system first based on Determine the status of the joint risk-adjustment margin assessment, and then combine it with... Determine the specific control strategy. The specific hierarchical strategy is as follows: 4.1: When the system is in a state of low risk and sufficient margin (i.e.) When the node voltage is within a safe range and has sufficient adjustment margin, the system maintains its current operating state, performing only real-time monitoring and data updates. In this state, no adjustment equipment needs to be activated, thus avoiding unnecessary equipment operation and reducing equipment wear.

[0092] 4.2: When the system is in a state of medium risk margin availability (i.e. When the voltage at a certain level (e.g., a deviation or fluctuation) occurs, it indicates that the node voltage has a certain degree of deviation or fluctuation, but the available adjustment margin is still acceptable. The system prioritizes the use of reactive power compensation devices or distributed power inverters for local voltage regulation. This stage focuses on rapid response from individual devices to avoid unnecessary multi-device linkage and reduce control complexity.

[0093] 4.3: When the system is in a high-risk state (i.e. And the adjustment margin sufficiency index When the voltage risk level at a node is high, but the system's available adjustment margin is still sufficient to meet demand, the system activates reactive power compensation devices, distributed power inverters, and energy storage systems for joint regulation. Through the coordinated output of multiple devices, the voltage is quickly restored to the allowable range. The advantage of multi-device joint regulation lies in its ability to complement the regulation capabilities at different time scales: reactive power compensation devices have a fast response speed (milliseconds to seconds), suitable for handling rapid voltage fluctuations; energy storage systems have both charging and discharging capabilities, suitable for short-term power support; and distributed power inverters have a large adjustment range, suitable for continuous voltage support.

[0094] 4.4: When the system is in a high-risk state (i.e. And the adjustment margin sufficiency index When the voltage risk level at a node is high and the system's available regulation margin is becoming strained, blindly deploying equipment at this point will not only have limited effect but may also lead to equipment overload or exhaustion of available regulation margin. Therefore, the system prioritizes regulation resource reconfiguration and power allocation optimization, including but not limited to: adjusting the power allocation ratio of each device, transferring some regulation tasks from devices with limited margin to devices with relatively ample margin; activating backup regulation resources (if available); reducing unnecessary loads to lower regulation requirements; or requesting support from higher-level scheduling. Through resource reconfiguration, overload or ineffective regulation of a single device is avoided, achieving optimal voltage correction within the limited available regulation margin.

[0095] Through the aforementioned hierarchical and coordinated control strategy, this invention can dynamically select the optimal control method based on the voltage risk level and available adjustment margin. This ensures voltage correction effectiveness while improving the efficiency of regulation resource utilization, reducing frequent equipment operation, and enhancing the stability of weak power grids. The core logic of hierarchical control is that the lower the risk and the greater the margin, the lighter the control action; the higher the risk and the tighter the margin, the more refined the multi-equipment coordination and resource optimization scheduling is required.

[0096] S5: Margin-Priority Multi-Device Collaborative Optimization Control When S4 determines that regulation needs to be initiated, this step executes margin-priority multi-device collaborative optimization control to determine the device call sequence and regulation power allocation scheme. This mechanism targets regulation resources such as reactive power compensation devices, distributed power inverters, and energy storage systems, comprehensively considering the available regulation margin, response speed, and regulation cost of each device. By optimizing the device call sequence and power allocation, it avoids excessive use of a single device, thereby improving the utilization efficiency of regulation resources and the reliability of voltage correction.

[0097] 5.1: Obtain the operating parameters of each device.

[0098] For reactive power compensation devices, distributed power inverters, and energy storage systems, obtain the available regulation margin of each device. Response speed and adjustment costs Among them, response speed The reciprocal of the time required for the device to go from receiving a control command to outputting the command value (in units of 1000 m / s). The faster the response speed, The larger; adjustment costs The determination can be made by comprehensively considering factors such as equipment operating losses, energy costs, and equipment depreciation.

[0099] 5.2: Taking into account available adjustment margin, response speed and adjustment cost, determine the equipment call priority.

[0100] Specifically, construct equipment priority evaluation indicators. : ; in, For the first The overall priority score of each device; , , These are the margin weight, speed weight, and cost weight, respectively. .

[0101] The design philosophy behind the above priority evaluation indicators is as follows: equipment with a larger available adjustment margin (i.e., the equipment still has more spare capacity), faster response speed (i.e., it can quickly respond to control commands), and lower adjustment cost (i.e., the better economic efficiency) will have a higher overall priority score. The higher. Press Sort by size from largest to smallest, prioritizing devices with larger available adjustment margins, faster response times, and lower adjustment costs.

[0102] 5.3: Multi-device coordinated adjustment and power distribution.

[0103] When the highest priority single device cannot meet the regulation demand (i.e., its available regulation margin is less than the required regulation margin) When this occurs, other devices are invoked sequentially according to their invocation priority for coordinated adjustment, and the available adjustment margin of each device is considered. Power is adjusted proportionally. ; in, To be assigned to the Power adjustment commands for individual devices; This refers to the set of equipment involved in this adjustment.

[0104] The physical meaning of this power allocation strategy is as follows: each participating device shares the required regulation power according to the proportion of its available regulation margin in the total available regulation margin of the participating devices. At the same time, a saturation constraint is applied with the available regulation margin of each device as the upper limit to ensure that the regulation power command allocated to any device does not exceed its actual available regulation capacity.

[0105] By using the aforementioned margin-priority multi-device collaborative optimization control mechanism, excessive use of a single device can be effectively avoided, enabling the orderly coordination and optimized utilization of multiple types of regulation resources, thereby improving the reliability and economy of voltage correction in weak power grids.

[0106] S6: Closed-loop feedback and dynamic update of adjustment margin After the adjustment is implemented, the system continuously monitors the adjustment effect through a closed-loop feedback mechanism, and dynamically updates the evaluation results and available adjustment margin information according to the actual operating status, forming a complete closed loop of "collection, evaluation, prediction, regulation, feedback and update". This enables the system to continuously adapt to load fluctuations and changes in new energy output, and improves the stability and long-term operational reliability of voltage correction in weak power grids.

[0107] 6.1: Real-time acquisition of node voltages after voltage regulation Actual output of each piece of equipment and available adjustment margin after adjustment .

[0108] The data acquisition method after adjustment is the same as in S1.1, obtained synchronously through sensors deployed at key nodes of the weak current grid. Comparing the adjusted data with the data before adjustment allows for the evaluation of the actual effect of this adjustment and provides a basis for subsequent dynamic updates.

[0109] 6.2: When the node voltage recovers to the allowable range (i.e. When this happens, gradually reduce the output of the regulating equipment.

[0110] Specifically, it can be based on the preset slope coefficient. ( Gradually reduce the regulating power output of each device to avoid secondary voltage fluctuations caused by sudden discontinuation of regulation. ; in, This is the adjusted power command after the reduction. This is the power adjustment command before the reduction. (Reduction coefficient) Typical values ​​can be 0.85 to 0.95, and the slope reduction interval can be set to be executed once per control cycle until the equipment adjustment power drops to zero or enters the normal monitoring range.

[0111] 6.3: When there is still a deviation in the node voltage (i.e. or total system regulation margin The rate of decline exceeds the preset threshold When this occurs, it indicates that the current control scheme is ineffective or the available regulation margin is being consumed too quickly. The system then readjusts the equipment call sequence and power allocation scheme, and dynamically updates the risk-regulation margin joint evaluation index based on the S2 and S3 methods. And available adjustment margin status.

[0112] Specifically, The rate of descent can be approximated by the following formula: ; when When this occurs, it indicates that the available adjustment margin is being rapidly depleted, and the system needs to reassess the rationality of the current control strategy, switching to a margin-tight control mode if necessary.

[0113] Through the aforementioned closed-loop feedback and dynamic update mechanism for adjustment margin, the system can continuously adapt to load fluctuations and changes in renewable energy output, ensuring the long-term stability and operational reliability of voltage correction in weak power grids. The existence of the closed-loop feedback mechanism distinguishes the method of this invention from open-loop or single-step optimization control methods, giving it adaptive dynamic adjustment capabilities.

[0114] Simulation verification To verify the effectiveness of the method of this invention, a simulation scenario for voltage correction at the end of a weak power grid was constructed. This scenario includes power nodes, long feeder lines, end loads, distributed photovoltaic (PV) systems, and voltage correction devices. Reactive power compensation devices, distributed power inverters, and energy storage systems are set as adjustable resources to simulate typical application scenarios such as rural weak power grids, long feeder power supply, low voltage at the end, and high proportion of distributed PV integration. The simulation compares the following three control strategies: Strategy 1: No voltage regulation measures are applied, serving as a blank control.

[0115] Strategy 2: Initiating regulation solely based on node voltage deviation, without considering available regulation margin, represents the existing technical solution.

[0116] Strategy 3: Adopt a hierarchical and coordinated control approach based on joint risk and adjustment margin assessment.

[0117] Figure 5 The figures show voltage variation curves at the end nodes of weak power grids under different control strategies. Figure 5 It is known that under uncontrolled conditions, the voltage fluctuations at the end nodes of weak power grids are significant, with low voltage exceeding limits occurring at certain times. Traditional voltage deviation control can improve node voltage to some extent, but it still suffers from insufficient recovery and large fluctuations. The method of this invention can perform coordinated control based on the voltage risk level and available adjustment margin, keeping the node voltage within the allowable range and significantly reducing voltage fluctuations. This indicates that the method of this invention is superior to traditional methods in terms of voltage correction effect and stability.

[0118] Figure 6 The curves show the changes in the total system control margin under different control strategies. Figure 6 It is known that traditional voltage deviation control methods cause a rapid decline in the total system regulation margin during peak load periods, with the minimum margin approaching the strain zone. The method of this invention, through joint risk-regulation margin assessment and multi-device coordinated regulation, maintains the total system regulation margin at a high level. Simulation results show that this invention can avoid excessive consumption of regulation resources and improve the continuous voltage regulation capability and operational reliability of weak power grids.

[0119] Comprehensive analysis Figure 5 and Figure 6 It is known that although traditional voltage deviation control can improve voltage to a certain extent, it often comes at the cost of rapidly consuming regulation resources, resulting in the system lacking sufficient regulation capability when facing subsequent disturbances. However, the method of this invention incorporates voltage risk level and regulation margin into a unified evaluation framework, which effectively protects regulation resources while ensuring voltage correction effect, and achieves a dynamic balance between "voltage quality" and "sustainability of regulation resources".

[0120] This invention proposes a voltage correction method for weak power grids based on joint risk-adjustment margin assessment. By comprehensively considering the node voltage risk level and the available adjustment margin of the system, it realizes a complete technical solution of "operation status acquisition, joint risk-adjustment margin assessment, voltage change trend prediction and adjustment margin prediction, hierarchical collaborative control, multi-device collaborative optimization control, and closed-loop feedback dynamic update".

[0121] The core innovation of this invention lies in: (1) no longer using node voltage deviation as the basis for adjustment, but constructing a risk-adjustment margin joint evaluation index that simultaneously includes voltage risk level and adjustment margin. (1) It can simultaneously determine whether the voltage risk is high and whether the system still has the ability to regulate; (2) When the predicted node voltage may exceed the limit, the regulating equipment is not started directly, but the margin sufficiency index is adjusted. (2) Pre-determine whether the available adjustment margin meets the adjustment requirements to avoid excessive resource usage; (3) Generate a hierarchical collaborative control strategy based on the voltage risk level and available adjustment margin to achieve dynamic matching between the control mode and the system state; (4) Comprehensively consider the available adjustment margin, response speed and adjustment cost of each device to achieve margin-priority multi-device collaborative optimization control.

[0122] Compared with traditional methods that rely solely on voltage deviation for regulation, this invention avoids excessive use of a single regulating device, improves the synergistic utilization efficiency of multiple regulating resources, and enhances the voltage support capability of weak power grids in scenarios involving long feeders, low voltage at the end of the grid, and distributed renewable energy access. It is applicable to engineering scenarios such as rural weak power grid renovation and high-penetration distributed photovoltaic distribution networks, and has significant engineering application value.

Claims

1. A voltage correction method for weak power grids based on joint risk-adjustment margin assessment, characterized in that... This includes the following steps: S1: Collect operational data of weak grid nodes, construct state feature vectors, and normalize the operational data; S2: Based on the state feature vector, a risk-adjustment margin joint assessment model is constructed to simultaneously determine the voltage risk level of weak grid nodes and the available adjustment margin of the system. S3: Based on the joint evaluation results, establish a voltage change trend prediction and regulation margin prediction mechanism to determine whether there is a risk of exceeding the limit at the next moment and whether the current available regulation margin meets the corresponding regulation requirements. S4: Generate a tiered and coordinated control strategy based on the joint risk-adjustment margin assessment results and the adjustment margin adequacy index; S5: When adjustment is required, perform margin-priority multi-device collaborative optimization control to determine the device calling order and adjustment power allocation scheme; S6: Real-time monitoring of node voltage, equipment output, and available adjustment margin after adjustment; closed-loop feedback and dynamic updates of adjustment margin based on adjustment effect.

2. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 1, characterized in that: S1 includes: S1.1: Collect voltage data from weak current network nodes Current, active power reactive power and load fluctuation information; S1.2: Construct a state feature vector based on the collected data: ; in, , representing the amount of voltage change; This indicates the amount of load fluctuation; S1.3: Normalize the data of each dimension in the state feature vector to eliminate the influence of different dimensions on subsequent calculations.

3. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 1, characterized in that: S2 includes: Based on node voltage deviation, voltage change rate, and load fluctuation, a basic voltage risk index is constructed: ; in, This is the rated reference voltage; The rate of change of voltage; The standard deviation of load fluctuation; , , These are the weighting coefficients.

4. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 3, characterized in that: S2 also includes: Assess the available adjustment margin of each adjustment resource participating in the system: For the first... The available adjustment margin for each adjustment resource is: ; in, For the first The available adjustment margin of each adjustment resource; For the first The maximum regulating capacity of each regulating resource; For the first The used adjustment capacity of each adjustment resource; Calculate the total system regulation margin: ; in, The amount of resources involved in the adjustment; For the first The weight coefficients corresponding to each adjustment resource; This represents the total system regulation margin.

5. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 4, characterized in that: S2 also includes: Based on the baseline voltage risk index and the total system regulation margin, a joint risk-regulation margin assessment index is constructed: ; in, For risk-adjustment margin joint assessment indicators; It is a base voltage risk indicator; This represents the total system regulation margin. Voltage risk weighting coefficient; To adjust the margin weighting coefficient; To prevent extremely small positive numbers with a denominator of zero; Based on the risk-adjustment margin joint assessment indicators Divide the system states: when At that time, it was determined to be a state of low risk with sufficient margin; when At that time, it is determined to be in a medium-risk margin availability state; when At that time, it was determined to be a high-risk situation; in, The first risk threshold, As the second risk threshold, and .

6. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 1, characterized in that: S3 includes: Based on the current node voltage, voltage change, active power change, and reactive power change, a short-time voltage prediction model is established: ; in, The predicted voltage at the next moment when no new adjustment measures are taken; for The voltage at a given moment; This refers to the change in node voltage. This represents the change in active power. This represents the change in reactive power. , , These are the coefficients of the prediction model; When predicting voltage With the rated reference voltage When the deviation exceeds a preset threshold, the node is determined to have a potential risk of voltage exceeding the limit.

7. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 6, characterized in that: S3 also includes: Estimate the required adjustment margin for the next time step based on the predicted voltage deviation: ; in, This represents the adjustment margin required to eliminate the predicted voltage deviation at the next moment. This is the equivalent voltage regulation sensitivity coefficient, used to represent the degree of influence of unit regulation power on node voltage; Constructing a sufficiency index for adjustment margin: ; in, To adjust the margin sufficiency index; This represents the total system regulation margin. To prevent extremely small positive numbers with a denominator of zero; Judgment based on the sufficiency of adjustment margin: when At that time, it enters the active adjustment process; when When this occurs, the system enters a margin-pressure control mode, prioritizing multi-device collaborative scheduling or resource optimization.

8. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 1, characterized in that: The hierarchical and coordinated regulation strategy in S4 includes: When the system is in a low-risk, high-margin state, maintain the current operating state and only perform real-time monitoring. When the system is in a state of medium risk margin availability, the reactive power compensation device or distributed power inverter should be used first to regulate the local voltage. When the system is in a high-risk state and the adjustment margin is sufficient indicator At that time, the reactive power compensation device, distributed power inverter and energy storage system are activated for joint regulation; When the system is in a high-risk state and the adjustment margin is sufficient indicator In such cases, priority should be given to adjusting resource reconfiguration and power allocation optimization to avoid overloading or ineffective adjustment of a single device.

9. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 1, characterized in that: S5 includes: For reactive power compensation devices, distributed power inverters, and energy storage systems, obtain the available regulation margin, response speed, and regulation cost of each device; Taking into account available adjustment margin, response speed, and adjustment cost, the priority of equipment deployment is determined: priority is given to equipment with larger available adjustment margin, faster response speed, and lower adjustment cost; When a single device cannot meet the adjustment requirements, other devices are called in sequence according to their priority for coordinated adjustment, and the adjustment power is allocated proportionally according to the available adjustment margin of each device.

10. The weak grid voltage correction method based on risk-adjustment margin joint assessment according to claim 1, characterized in that: S6 includes: Real-time acquisition of node voltage after voltage regulation, actual output of each device, and available regulation margin; When the node voltage returns to the allowable range, gradually reduce the output of the regulating equipment; When node voltage still has deviation or the system's total regulation margin When the rate of decline exceeds a preset threshold, the device call sequence and power allocation scheme are readjusted, and the risk-adjustment margin joint assessment index is dynamically updated. And available adjustment margin status.