A basin cascade power plant centralized control and dispatching system and method

By constructing a power plant monitoring system with a multi-layered communication network and a built-in centralized control and dispatching function module, the problem of dispatching paralysis caused by the failure of the fixed centralized control center was solved, and the rapid recovery and high-reliability dispatching of cascade power plants in the basin were realized.

CN123144401APending Publication Date: 2026-11-20HUBEI QINGJIANG HYDROPOWER DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611357550.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-03
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In the existing river basin cascade power plant dispatching system, when the fixed centralized control center fails, unified and coordinated control cannot be quickly restored, resulting in chaotic hydraulic connection of generator units and load coordination, which reduces the overall operational reliability of the river basin.

Method used

A first communication subnet is constructed to connect the centralized control center with the cascade power plants, and a second communication subnet is constructed to connect the cascade power plants. A centralized control and dispatching function module is built into the power plant monitoring system, and a dispatching permission management module is configured to enable the centralized control and dispatching permission to automatically switch to the cascade power plants in the event of a fault, and to perform centralized control through the second communication subnet.

Benefits of technology

It enables seamless transfer of scheduling functions in the event of a failure in the central control center, thereby improving the emergency recovery capability and overall operational reliability of the cascade power plants in the basin.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144401A_ABST
    Figure CN123144401A_ABST
Patent Text Reader

Abstract

The application provides a catchment area cascade power plant centralized control and scheduling system, and relates to the technical field of power plant scheduling, which comprises a centralized control center, a plurality of cascade power plants, a communication network and a scheduling authority management module; the centralized control center is configured with a centralized control center monitoring system, each cascade power plant is configured with a power plant monitoring system, the power plant monitoring system is internally provided with a centralized control and scheduling function module, the communication network comprises a first communication subnet and a second communication subnet, the scheduling authority management module monitors the running state of the centralized control center monitoring system and the connected state of the first communication subnet, when detecting an abnormal state, switches the centralized control and scheduling authority from the centralized control center to a certain cascade power plant monitoring system, activates the centralized control and scheduling function module thereof, and enables the centralized control and scheduling function module to perform centralized control and management on other cascade power plants; the problems that the unified coordinated control of the cascade power plants cannot be quickly recovered when the fixed centralized control center loses the scheduling and command function in the prior art, and the operation reliability of the whole catchment area is reduced are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power plant dispatching technology, and in particular to a centralized control and dispatching system and method for cascade power plants in a river basin. Background Technology

[0002] River basin cascade power plant scheduling refers to the process of unified power generation management and reservoir water level regulation of multiple interconnected hydropower plants on the same river. The water released by the upstream power plant will directly enter the reservoir of the downstream power plant. Therefore, it is necessary to coordinate the power generation plans and outflow of each power plant to achieve efficient cascade utilization of hydropower. The central control center uses a remote monitoring system to centrally control the start-up and shutdown of generator units, load distribution and reservoir water level of each power plant, thereby ensuring the safe operation of the reservoir while meeting the load demand of the power grid.

[0003] Existing cascade power plants in river basins generally adopt a centralized control center model with fixed locations. All dispatching instructions and operational data collection rely on the centralized control center for centralized processing. This operational architecture has obvious single-point vulnerability. When the centralized control center encounters sudden situations such as equipment hardware failure, communication network interruption, or natural disasters, the dispatching and command functions of the entire cascade power plant may be completely lost. At the same time, the local monitoring systems of each cascade power plant usually only have the ability to operate and monitor the equipment of their own plant and do not have the ability to temporarily take over cross-plant dispatching tasks. As a result, after the failure of the centralized control center, it is impossible to quickly restore unified coordination and control of the cascade power plants. The hydraulic connection and load coordination of the generator units fall into chaos, which not only affects the execution of the power generation plan, but may also cause reservoir water level exceedance or water wastage losses, reducing the overall operational reliability of the river basin. Summary of the Invention

[0004] To address the shortcomings of existing technologies, this invention provides a centralized control and dispatching system and method for cascade power plants in a river basin. This system solves the problem in existing technologies where, when a fixed centralized control center loses its dispatching and command functions, it is unable to quickly restore unified and coordinated control over cascade power plants, thus reducing the overall operational reliability of the river basin.

[0005] According to an embodiment of the present invention, a centralized control and dispatching system for cascade power plants in a river basin includes a centralized control center and is equipped with a centralized control center monitoring system for performing centralized control and management of each cascade power plant under normal dispatching operation mode.

[0006] Multiple cascade power plants, each equipped with a power plant monitoring system. The power plant monitoring system has a built-in centralized control and dispatch function module, which can perform centralized control and management of each cascade power plant when activated.

[0007] The communication network includes a first communication subnet and a second communication subnet. The first communication subnet connects the central control center monitoring system with the monitoring systems of each cascade power plant, and the second communication subnet connects the monitoring systems of each cascade power plant. Both the first and second communication subnets are used to transmit dispatch instructions and data.

[0008] The dispatching authority management module is configured to monitor the operating status of the central control center monitoring system and the connectivity status of the first communication subnet. When a fault is detected in the central control center monitoring system or the first communication subnet is in an abnormal state, the central control dispatching authority is switched from the central control center to the monitoring system of a certain cascade power plant, and the central control dispatching function module of this cascade power plant is activated. The module then performs centralized control and management of other cascade power plants through the second communication subnet.

[0009] Furthermore, the first communication subnet is a tree network, and the central control center monitoring system is connected to the monitoring systems of each cascade power plant through at least two independent communication links; the second communication subnet is a ring network, and the monitoring systems of each cascade power plant are connected to form a ring network through at least two independent communication links.

[0010] Furthermore, the scheduling permission management module includes:

[0011] The manual switching subunit is configured to respond to the operations of the staff in the central control center, switching the central control and dispatch authority from the central control center monitoring system to a certain cascade power plant monitoring system, or from the cascade power plant monitoring system back to the central control center monitoring system;

[0012] The automatic fault switching subunit is configured to automatically switch the centralized control and dispatch authority to the preset cascade power plant monitoring system when a fault is detected in the centralized control center monitoring system or the first communication subnet is in an abnormal state.

[0013] Furthermore, it also includes telephone communication equipment, including centralized control and dispatch telephones and satellite telephones; the centralized control and dispatch telephones are used for routine dispatch business communication, and the satellite telephones are used for emergency dispatch business communication when the communication ring network fails.

[0014] Furthermore, the centralized control and scheduling function module includes at least:

[0015] The power generation equipment operation monitoring unit is used to monitor the operating status and operating parameters of all power generation equipment in the cascade power plant;

[0016] The generator set control and regulation unit is used to perform start-up and shutdown operations and load regulation for all generator sets in the cascade power plant.

[0017] Automatic generation control unit is used to automatically distribute load commands from the power grid system to each generator set;

[0018] Automatic voltage control unit is used to automatically adjust the reactive power of generator sets according to the voltage control requirements of the power grid system.

[0019] This invention also proposes a centralized control and scheduling method for cascade power plants in a river basin, comprising the following steps:

[0020] S1: Construct the first and second communication subnets, and pre-configure the centralized control and dispatch function module within the monitoring system of each cascade power plant;

[0021] S2: In the normal dispatch operation mode, the centralized control center monitoring system has centralized control and dispatch authority and uses the first communication subnet to perform centralized control and management of each cascade power plant. The monitoring system of each cascade power plant only performs the monitoring and control functions of its own power plant, and the centralized control and dispatch function module is in a dormant state.

[0022] S3: The dispatching authority management module monitors the operation status of the central control center monitoring system and the connectivity status of the first communication subnet in real time. When a fault is detected in the central control center monitoring system or the first communication subnet is in an abnormal state, the central control dispatching authority is switched from the central control center monitoring system to a selected cascade power plant monitoring system.

[0023] S4: The switched cascade power plant monitoring system activates its centralized control and dispatch function module, takes over the centralized control and dispatch management responsibilities, and uses the second communication subnet to replace the original centralized control center to perform centralized control and management of each cascade power plant.

[0024] Furthermore, the centralized control scheduling permission switching in step S3 includes manual switching and automatic fault switching:

[0025] The manual switching is performed by staff at the central control center through the central control center monitoring system interface to switch the central control dispatch authority to a designated cascade power plant monitoring system, or to switch back from the cascade power plant monitoring system to the central control center monitoring system.

[0026] The automatic fault switching is executed automatically by the scheduling permission management module without manual intervention.

[0027] Furthermore, step S5 is also included: after the monitoring system of the central control center recovers from the fault and the first communication subnet returns to normal, the staff of the central control center manually switch the central control and dispatch authority from the cascade power plant currently performing centralized control and management back to the central control center monitoring system, and restore the normal dispatch operation mode.

[0028] Furthermore, in step S3, the switching target for the centralized control and scheduling authority switching is determined according to the rotation rules. Each cascade power plant is marked, and the next unmarked cascade power plant in the next order is selected as the target during the switching. When all cascade power plants are marked, the marking record is cleared and the rotation restarts. If no cascade power plant is marked at present, the switch is made to the preset default cascade power plant.

[0029] Furthermore, in step S4, the switched cascade power plant monitoring system establishes a master-slave scheduling relationship with other cascade power plant monitoring systems through the second communication subnet, and all scheduling instructions are transmitted through the second communication subnet.

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] This invention constructs a first communication subnet connecting the central control center with each cascade power plant, and a second communication subnet connecting each cascade power plant. It also configures a power plant monitoring system with a built-in centralized control and dispatching function module and a dispatching authority management module. When the central control center monitoring system fails or the first communication subnet malfunctions, the dispatching authority management module automatically switches the centralized control and dispatching authority to a specific cascade power plant monitoring system and activates its centralized control and dispatching function module. This enables the power plant to perform centralized control and management of other cascade power plants through the second communication subnet, thereby avoiding dispatching paralysis caused by the failure of a single central control center. This achieves seamless transfer of dispatching functions and significantly improves the emergency recovery capability and overall operational reliability of the basin's cascade power plant dispatching system. Attached Figure Description

[0032] Figure 1 This is a schematic diagram of the system communication network architecture according to an embodiment of the present invention.

[0033] Figure 2 This is a schematic diagram of the method flow according to an embodiment of the present invention. Detailed Implementation

[0034] The technical solutions of the present invention will be further described below with reference to the accompanying drawings and embodiments.

[0035] like Figure 1 As shown in the figure, this invention proposes a centralized control and dispatching system for cascade power plants in a river basin, which specifically includes a centralized control center, multiple cascade power plants, a communication network, and a dispatching authority management module, wherein:

[0036] The centralized control center is generally responsible for the start-up and shutdown of generator units and load regulation of cascade power plants, maintenance of generator equipment, production information reporting, reservoir scheduling, and other related scheduling and management of cascade power plants in the river basin. It is equipped with a centralized control center monitoring system, which has complete functions such as monitoring the operation of generator equipment, controlling the start-up and shutdown of generator units, load regulation, automatic generation control, and automatic voltage control. In the normal scheduling operation mode, the centralized control center monitoring system serves as the main scheduling and command platform, responsible for the centralized control and management of all cascade power plants, including issuing load commands, start-up and shutdown commands, and reservoir scheduling commands to each cascade power plant, and receiving operational data from each cascade power plant in real time.

[0037] Each cascade power plant is equipped with an independent power plant monitoring system. The power plant monitoring system not only has the ability to monitor and control the generator units and auxiliary equipment within the power plant locally, but also has a built-in centralized control and dispatching function module. When not activated, the centralized control and dispatching function module is in a dormant state and does not participate in the dispatching and management of inter-power plants. When activated, the centralized control and dispatching function module can completely replace the functions of the centralized control center monitoring system and perform centralized control and management of each cascade power plant, including inter-plant load allocation, start-up and shutdown decisions, and operation data acquisition.

[0038] The communication network includes a first communication subnet and a second communication subnet. The first communication subnet connects the monitoring system of the central control center with the monitoring systems of each cascade power plant. It is mainly responsible for transmitting the dispatch instructions issued by the central control center and the status data and analog data sent by each cascade power plant in the normal dispatch mode. The second communication subnet connects the monitoring systems of each cascade power plant, forming a direct communication channel between power plants. It is mainly used to transmit the dispatch instructions and data requests from the taking-over power plant to other power plants in the emergency dispatch mode after the failure of the central control center. The two communication subnets are independent of each other and serve as backups for each other, jointly ensuring the reliable transmission of dispatch instructions and data.

[0039] The dispatch authority management module is connected to the centralized control center monitoring system, the monitoring systems of each cascade power plant, and the first communication subnet. It monitors the operational status of the centralized control center monitoring system in real time, including whether system processes are normal and core functions are available. Simultaneously, it monitors the connectivity of the first communication subnet, including whether the links between the centralized control center and each cascade power plant are unobstructed. When a fault is detected in the centralized control center monitoring system, such as a system crash, hardware damage, or functional failure, or when the first communication subnet is detected to be in an abnormal state, such as a critical link interruption or severely degraded communication quality, the dispatch authority management module automatically triggers a switching process, transferring the centralized control dispatch authority from the centralized control center to a pre-selected or dynamically determined cascade power plant monitoring system, and immediately activating the centralized control dispatch function module of that power plant. After the authority switch is completed, the switched cascade power plant monitoring system establishes dispatch relationships with other cascade power plants through the second communication subnet, issuing load adjustment commands, start / stop commands, and operational data requests to other power plants, thus achieving centralized control and management of all cascade power plants in the entire basin.

[0040] During the specific scheduling process, the system operates as follows: In the normal scheduling operation mode, the central control center monitoring system has centralized control and scheduling authority. All scheduling instructions are issued by the central control center to each cascade power plant through the first communication subnet. The monitoring system of each cascade power plant only performs the monitoring and control tasks of its own power plant, and its built-in centralized control and scheduling function module remains dormant and does not participate in cross-plant scheduling. When the scheduling authority management module detects a fault in the central control center monitoring system or an anomaly in the first communication subnet, it automatically switches the centralized control and scheduling authority to the monitoring system of a certain cascade power plant and activates its centralized control and scheduling function module. This cascade power plant then takes over the centralized control and management of other cascade power plants through the second communication subnet, including obtaining real-time operating data of other power plants, issuing scheduling instructions to other power plants, and coordinating the power generation plans of each power plant with the reservoir water level. After the central control center monitoring system returns to normal and the first communication subnet is reconnected, the staff can manually switch the scheduling authority back to the central control center monitoring system. The centralized control and scheduling function modules of each cascade power plant monitoring system re-enter the dormant state, and the system resumes the normal scheduling operation mode.

[0041] Furthermore, the first communication subnet adopts a tree network topology, with the central control center monitoring system as the root node and the monitoring systems of each cascade power plant as leaf nodes. The central control center monitoring system is connected to each cascade power plant monitoring system through at least two independent communication links, which serve as backups for each other. When one link is interrupted, dispatch instructions and data can be automatically switched to the other link for transmission, ensuring that communication between the central control center and each power plant is not interrupted due to a single point of failure.

[0042] The second communication subnet adopts a ring network topology. The monitoring systems of each cascade power plant are connected through at least two independent communication links to form a closed ring network. In the ring network structure, data can be transmitted in both clockwise and counterclockwise directions. When any link or node on the ring network fails, the data can be transmitted in the other direction to ensure that communication between any two power plants is always unimpeded.

[0043] Furthermore, the scheduling permission management module includes a manual switching subunit and an automatic fault switching subunit, wherein:

[0044] The manual switching subunit provides a graphical user interface for central control center staff to perform permission switching operations on the monitoring system. When the central control center monitoring system is functioning normally and the first communication subnet is connected, staff can use the manual switching subunit to switch the central control dispatching permission from the central control center monitoring system to a designated cascade power plant monitoring system for system maintenance, drills, or temporary transfer of dispatching tasks. Alternatively, they can switch the dispatching permission from the currently executing cascade power plant monitoring system back to the central control center monitoring system.

[0045] The automatic fault switching subunit continuously monitors the operation status of the central control center monitoring system and the connectivity status of the first communication subnet. Once a fault is detected in the central control center monitoring system or an anomaly is detected in the first communication subnet, the central control dispatch authority will be automatically switched to the pre-configured cascade power plant monitoring system without manual intervention. The pre-configured cascade power plants can be selected by staff during system initialization based on factors such as the geographical location, communication conditions, and operation and maintenance capabilities of each power plant.

[0046] Furthermore, to further improve dispatch reliability under extreme conditions, this system is also equipped with telephone communication equipment, including centralized control and dispatch telephones and satellite telephones, wherein:

[0047] The centralized control and dispatch telephone serves as a routine communication tool for dispatch operations, used for verbal confirmation of daily dispatch instructions, emergency notifications, and business communication between staff.

[0048] Satellite phones do not rely on terrestrial communication networks. When the first and second communication subnets fail simultaneously, such as when a severe natural disaster causes all fiber optic links to be interrupted, staff can use satellite phones to transmit emergency dispatch instructions and confirm operations, ensuring that basic dispatch and command functions can still be maintained even under extreme conditions where the communication network is completely paralyzed.

[0049] Furthermore, the centralized control and dispatching function module is a collection of software functions embedded in the monitoring system of each cascade power plant, which includes at least a power generation equipment operation monitoring unit, a generator set control and regulation unit, an automatic generation control unit, and an automatic voltage control unit.

[0050] The power generation equipment operation monitoring unit is used to collect and display the operating status of all power generation equipment in the entire basin in real time, including the grid connection status of generator sets, active power, reactive power, circuit breaker position, temperature, vibration and other key parameters, and present them in a graphical manner to facilitate dispatchers to fully understand the system operation.

[0051] The generator set control and regulation unit is used to issue start-up and shutdown commands and load regulation commands to the generator sets of each cascade power plant. It supports both single-unit control and group control modes and can quickly respond to dispatch operations.

[0052] The automatic generation control unit receives the total load command for the entire plant or the entire river basin from the power grid system. Based on the current number of grid-connected units, the operating conditions of each unit, and vibration range limits, it automatically distributes the total load command to each generator unit, thereby achieving closed-loop load regulation.

[0053] The automatic voltage control unit automatically adjusts the excitation system of each generator set and changes the reactive power output according to the voltage control target or reactive power command given by the power grid system in order to maintain the voltage at the grid connection point within the specified range.

[0054] The four units work together to enable the activated cascade power plant monitoring system to fully perform all the scheduling and management tasks originally undertaken by the central control center.

[0055] This invention constructs a first communication subnet connecting the central control center with each cascade power plant, and a second communication subnet connecting each cascade power plant. It also configures a power plant monitoring system with a built-in centralized control and dispatching function module and a dispatching authority management module. When the central control center monitoring system fails or the first communication subnet malfunctions, the dispatching authority management module automatically switches the centralized control and dispatching authority to a specific cascade power plant monitoring system and activates its centralized control and dispatching function module. This enables the power plant to perform centralized control and management of other cascade power plants through the second communication subnet, thereby avoiding dispatching paralysis caused by the failure of a single central control center. This achieves seamless transfer of dispatching functions and significantly improves the emergency recovery capability and overall operational reliability of the basin's cascade power plant dispatching system.

[0056] like Figure 2 As shown, this invention also proposes a centralized control and scheduling method for cascade power plants in a river basin, comprising the following steps:

[0057] S1: Construct the first and second communication subnets, and pre-configure the centralized control and dispatch function module within the monitoring system of each cascade power plant;

[0058] S2: In the normal dispatch operation mode, the centralized control center monitoring system has centralized control and dispatch authority and uses the first communication subnet to perform centralized control and management of each cascade power plant. The monitoring system of each cascade power plant only performs the monitoring and control functions of its own power plant, and the centralized control and dispatch function module is in a dormant state.

[0059] S3: The dispatching authority management module monitors the operation status of the central control center monitoring system and the connectivity status of the first communication subnet in real time. When a fault is detected in the central control center monitoring system or the first communication subnet is in an abnormal state, the central control dispatching authority is switched from the central control center monitoring system to a selected cascade power plant monitoring system.

[0060] S4: The switched cascade power plant monitoring system activates its centralized control and dispatch function module, takes over the centralized control and dispatch management responsibilities, and uses the second communication subnet to replace the original centralized control center to perform centralized control and management of each cascade power plant.

[0061] Furthermore, the centralized control scheduling permission switching in step S3 includes manual switching and automatic fault switching. In specific implementation:

[0062] The manual switching operation interface is set on the human-machine interaction page of the central control center monitoring system. After the staff selects the target cascade power plant and confirms, the system will execute the permission transfer and generate an operation log to record the switching time, operator and switching target. During the manual switching process, the scheduling permission management module does not interfere with the switching decision, but is only responsible for execution and status synchronization.

[0063] Automatic fault switching is handled independently by the dispatch authority management module. The module can be configured with a watchdog timer and a heartbeat detection mechanism to periodically receive the operation signals from the central control center monitoring system and the connectivity feedback from each link of the first communication subnet. If no valid signal is received for several consecutive times or a link timeout is detected, it is determined to be a fault or anomaly. Then, the dispatch authority is automatically switched to the preset cascade power plant monitoring system. The entire switching process is completed within a few seconds without manual intervention.

[0064] Furthermore, step S5 is also included: after the monitoring system of the central control center recovers from the fault and the first communication subnet returns to normal, the staff of the central control center manually switch the central control and dispatch authority from the cascade power plant currently performing centralized control and management back to the central control center monitoring system, and restore the normal dispatch operation mode.

[0065] In this step, manual switching avoids automatic accidental switching due to instability during fault recovery, while also giving staff ample time to check the system and restore normal operation mode only after confirming that everything is in order. During the switchback process, the monitoring system of the cascade power plant currently performing dispatch management will synchronize all operating data and operation records generated during the takeover period to the central control center monitoring system to ensure the integrity of the dispatch history.

[0066] Furthermore, the switching target for the centralized control and dispatching authority switching in step S3 is determined according to the rotation rule. Specifically, the system has a rotation identifier table that records the cascade power plants selected for each switching. When a switching operation is required, the system first queries the rotation identifier table and selects the cascade power plant that is not recorded in the table and has the highest priority as the switching target. After the switching is completed, this cascade power plant is recorded in the table. When the identifier table records all cascade power plants, the system clears the entire identifier table and restarts the rotation. If the identifier table is empty and no historical records can be determined, such as when the system is running for the first time or the identifier table data is lost, the system directly switches to the default cascade power plant set by the staff. The rotation rule allows each cascade power plant to take turns undertaking the dispatching backup task, avoiding additional equipment wear or maintenance pressure caused by a single power plant being used as a preset target for a long time.

[0067] Furthermore, after the switched cascade power plant monitoring system activates the centralized control and dispatch function module in step S4, it establishes a master-slave dispatch relationship with other cascade power plant monitoring systems through the second communication subnet. In this master-slave relationship, the power plant taking over the dispatch is the master node, and the other power plants are slave nodes. All dispatch instructions, including load allocation instructions, start-up and shutdown instructions, data acquisition instructions, etc., are directly issued by the master node to each slave node through the second communication subnet. After execution, the slave nodes return the result status and data to the master node through the same subnet. The second communication subnet adopts a ring redundancy structure. When a certain path is interrupted, the communication between the master node and the slave node automatically switches to the other direction of the ring network to ensure that the dispatch instructions are not interrupted due to single-point link failure. After the master-slave relationship is established, the original centralized control center monitoring system no longer participates in the transmission of any cross-plant dispatch instructions until manually switched back.

[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.

Claims

1. A centralized control and dispatching system for cascade power plants in a river basin, characterized in that, include: The central control center is equipped with a central control center monitoring system, which is used to perform centralized control and management of each cascade power plant under the normal dispatch operation mode; Multiple cascade power plants, each equipped with a power plant monitoring system. The power plant monitoring system has a built-in centralized control and dispatch function module, which can perform centralized control and management of each cascade power plant when activated. The communication network includes a first communication subnet and a second communication subnet. The first communication subnet connects the central control center monitoring system with the monitoring systems of each cascade power plant, and the second communication subnet connects the monitoring systems of each cascade power plant. Both the first and second communication subnets are used to transmit dispatch instructions and data. The dispatching authority management module is configured to monitor the operating status of the central control center monitoring system and the connectivity status of the first communication subnet. When a fault is detected in the central control center monitoring system or the first communication subnet is in an abnormal state, the central control dispatching authority is switched from the central control center to the monitoring system of a certain cascade power plant, and the central control dispatching function module of this cascade power plant is activated. The module then performs centralized control and management of other cascade power plants through the second communication subnet.

2. The centralized control and dispatching system for cascade power plants in a river basin as described in claim 1, characterized in that: The first communication subnet is a tree network, and the monitoring system of the central control center is connected to the monitoring systems of each cascade power plant through at least two independent communication links; the second communication subnet is a ring network, and the monitoring systems of each cascade power plant are connected to form a ring network through at least two independent communication links.

3. The centralized control and dispatching system for cascade power plants in a river basin as described in claim 1, characterized in that, The scheduling permission management module includes: The manual switching subunit is configured to respond to the operations of the staff in the central control center, switching the central control and dispatch authority from the central control center monitoring system to a certain cascade power plant monitoring system, or from the cascade power plant monitoring system back to the central control center monitoring system; The automatic fault switching subunit is configured to automatically switch the centralized control and dispatch authority to the preset cascade power plant monitoring system when a fault is detected in the centralized control center monitoring system or the first communication subnet is in an abnormal state.

4. A centralized control and dispatching system for cascade power plants in a river basin as described in claim 1, characterized in that: It also includes telephone communication equipment, including centralized control and dispatch telephones and satellite telephones; the centralized control and dispatch telephones are used for routine dispatch business communication, and the satellite telephones are used for emergency dispatch business communication when the communication ring network fails.

5. A centralized control and dispatching system for cascade power plants in a river basin as described in claim 1, characterized in that, The centralized control and scheduling function module includes at least: The power generation equipment operation monitoring unit is used to monitor the operating status and operating parameters of all power generation equipment in the cascade power plant; The generator set control and regulation unit is used to perform start-up and shutdown operations and load regulation for all generator sets in the cascade power plant. Automatic generation control unit is used to automatically distribute load commands from the power grid system to each generator set; Automatic voltage control unit is used to automatically adjust the reactive power of generator sets according to the voltage control requirements of the power grid system.

6. A method for centralized control and dispatching of cascade power plants in a river basin, characterized in that, Includes the following steps: S1: Construct the first and second communication subnets, and pre-configure the centralized control and dispatch function module within the monitoring system of each cascade power plant; S2: In the normal dispatch operation mode, the centralized control center monitoring system has centralized control and dispatch authority and uses the first communication subnet to perform centralized control and management of each cascade power plant. The monitoring system of each cascade power plant only performs the monitoring and control functions of its own power plant, and the centralized control and dispatch function module is in a dormant state. S3: The dispatching authority management module monitors the operation status of the central control center monitoring system and the connectivity status of the first communication subnet in real time. When a fault is detected in the central control center monitoring system or the first communication subnet is in an abnormal state, the central control dispatching authority is switched from the central control center monitoring system to a selected cascade power plant monitoring system. S4: The switched cascade power plant monitoring system activates its centralized control and dispatch function module, takes over the centralized control and dispatch management responsibilities, and uses the second communication subnet to replace the original centralized control center to perform centralized control and management of each cascade power plant.

7. The method for centralized control and dispatching of cascade power plants in a river basin as described in claim 6, characterized in that: The centralized control and scheduling permission switching in step S3 includes manual switching and automatic fault switching: The manual switching is performed by staff at the central control center through the central control center monitoring system interface to switch the central control dispatch authority to a designated cascade power plant monitoring system, or to switch back from the cascade power plant monitoring system to the central control center monitoring system. The automatic fault switching is executed automatically by the scheduling permission management module without manual intervention.

8. The method for centralized control and dispatching of cascade power plants in a river basin as described in claim 7, characterized in that, It also includes step S5: After the monitoring system of the central control center recovers from the fault and the first communication subnet returns to normal, the staff of the central control center manually switch the central control and dispatch authority from the cascade power plant currently performing centralized control and management back to the central control center monitoring system, and restore the normal dispatch operation mode.

9. A method for centralized control and dispatching of cascade power plants in a river basin as described in claim 6, characterized in that: The switching target for the centralized control and scheduling authority switching in step S3 is determined according to the rotation rule. The cascade power plants that are switched each time are marked, and the next unmarked cascade power plant in the next order is selected as the target when switching. Once all cascade power plants have been identified, the identification record is cleared and the rotation restarts. If no cascade power plant is currently identified, the system switches to the preset default cascade power plant.

10. A method for centralized control and dispatching of cascade power plants in a river basin as described in claim 6, characterized in that: In step S4, the switched cascade power plant monitoring system establishes a master-slave scheduling relationship with other cascade power plant monitoring systems through the second communication subnet, and all scheduling instructions are transmitted through the second communication subnet.