Power supply safety protection method and system for low-voltage distribution system

By using distributed monitoring and acquisition units and three-dimensional sensing channels to extract and interact with multi-dimensional features, the problem of single monitoring dimensions and feature disconnection in traditional low-voltage power distribution safety monitoring has been solved. This enables accurate risk identification and timely early warning for low-voltage power distribution systems, ensuring the stability and reliability of the system.

CN123144404APending Publication Date: 2026-11-20HUBEI ENERGY GRP JIANGLING POWER GENERATION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611511968.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-28
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Traditional low-voltage power distribution safety monitoring suffers from limited monitoring dimensions and disconnected features, leading to false alarms and missed alarms in anomaly identification, making it difficult to meet the needs of smart grids for accurate assessment and intelligent control of low-voltage power distribution systems.

Method used

A distributed monitoring and acquisition unit is used for power supply perception monitoring. A perception monitoring dataset under time sequence identification is established. Multi-dimensional feature extraction and cross-channel collaborative attention are performed through three-dimensional perception channels. Feature reconstruction is performed by combining the initialization parameters of collaborative interaction to accurately locate the safety risk sections of the power distribution system.

Benefits of technology

It achieves accurate and reliable risk identification and early warning for power supply safety protection of low-voltage power distribution systems, ensuring the stable and reliable operation of power distribution systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144404A_ABST
    Figure CN123144404A_ABST
Patent Text Reader

Abstract

The application discloses a power supply safety protection method and system for a low-voltage power distribution system, and relates to the technical field of power distribution safety. The method comprises the following steps: when the low-voltage power distribution network is powered, starting a distributed monitoring and collecting unit to carry out power supply awareness monitoring, and constructing an awareness monitoring data set with a time sequence identifier. The data set is input into a three-dimensional awareness channel containing behavior trajectory modeling, electrical parameter monitoring and collaborative interaction attention. The first round of monitoring and identification is completed by the first two monitoring sub-channels, and then the channel attention initialization is completed by the collaborative interaction attention sub-channel. The second round of monitoring and identification result is obtained by relying on the two initialized sub-channels, and the power supply safety protection early warning is generated accordingly. The application solves the technical problems of single monitoring dimension, disconnection of features, false alarm and missed alarm of abnormal identification in the traditional low-voltage power distribution safety monitoring, achieves the technical effects of accurate risk positioning and timely early warning, and guarantees the stable and reliable operation of the power distribution system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power distribution safety technology, and in particular to a power supply safety protection method and system for low-voltage power distribution systems. Background Technology

[0002] In smart grids, low-voltage distribution systems, as the core link in terminal power supply, directly affect the stable operation of the grid, the safety of user electricity consumption, and the reliable operation of equipment. Therefore, accurate safety protection and risk monitoring are crucial. Existing low-voltage distribution safety protection methods mostly employ single electrical parameter monitoring and traditional threshold judgment, which are widely used in stable distribution scenarios. However, in smart grid scenarios, low-voltage distribution loads are complex and operating conditions are dynamically changing. Traditional technologies only focus on monitoring instantaneous electrical states, ignoring the temporal evolution characteristics of load electricity consumption behavior. Traditional detection methods cannot accurately identify anomalies in the matching between load behavior and electrical parameter states, resulting in incomplete data acquisition, vague risk positioning, and significant false alarms and missed alarms. This makes it difficult to meet the needs of smart grids for accurate assessment, intelligent control, and proactive safety protection of low-voltage distribution systems. Summary of the Invention

[0003] This application provides a power supply safety protection method and system for low-voltage power distribution systems, which solves the technical problems of traditional low-voltage power distribution safety monitoring, such as single monitoring dimensions, disconnected features, and false alarms and missed alarms in anomaly identification.

[0004] The first aspect of this application provides a power supply safety protection method for low-voltage power distribution systems. The method includes: during the power supply process of a low-voltage power distribution network, activating a distributed monitoring and acquisition unit to perform power supply perception monitoring and establishing a perception monitoring dataset under a time-series identifier; inputting the perception monitoring dataset into a three-dimensional perception channel, the three-dimensional perception channel including a behavior trajectory modeling sub-channel for characterizing the evolution characteristics of load power consumption behavior, an electrical parameter monitoring sub-channel for characterizing the instantaneous operating state of the electrical system, and a collaborative interactive attention sub-channel; performing a first round of monitoring and identification using the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel in the three-dimensional perception channel, sending the first round of monitoring and identification results to the collaborative interactive attention sub-channel, and performing attention initialization of the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel using the collaborative interactive attention sub-channel; establishing a second round of monitoring and identification results based on the attention-initialized behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel; and generating a power supply safety protection early warning based on the second round of monitoring and identification results.

[0005] A second aspect of this application provides a power supply safety protection system for low-voltage power distribution systems. The system includes: a sensing and monitoring dataset construction module, used to activate distributed monitoring and acquisition units to perform power supply sensing and monitoring during the power supply process of a low-voltage power distribution network, and establish a sensing and monitoring dataset under a time-series identifier; a three-dimensional sensing channel construction module, used to input the sensing and monitoring dataset into a three-dimensional sensing channel, the three-dimensional sensing channel including a behavior trajectory modeling sub-channel for characterizing the evolution characteristics of load power consumption behavior, an electrical parameter monitoring sub-channel for characterizing the instantaneous operating state of the electrical system, and a collaborative interactive attention sub-channel; a first-round monitoring and identification result acquisition module, which, after performing a first-round monitoring and identification using the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel in the three-dimensional sensing channel, sends the first-round monitoring and identification results to the collaborative interactive attention sub-channel, and performs attention initialization of the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel using the collaborative interactive attention sub-channel; a second-round monitoring and identification result construction module, used to establish a second-round monitoring and identification result based on the attention-initialized behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel; and a power supply safety protection early warning acquisition module, which generates a power supply safety protection early warning based on the second-round monitoring and identification results.

[0006] One or more technical solutions provided in this application have at least the following technical effects or advantages: This application obtains load power consumption behavior and electrical operation characteristics by distributing power supply time-series data in a low-voltage power distribution network, and then performing multi-dimensional feature extraction and cross-channel collaborative attention optimization. It calculates the matching correlation between behavior evolution and electrical parameter changes, and combines the initialization parameters of collaborative interaction to reconstruct and adjust the features, thereby accurately locating the safety risk sections of the power distribution system. This makes the risk identification and early warning control of the power supply safety protection of the low-voltage power distribution system more accurate and reliable, achieving the technical effect of accurate risk location and timely early warning, and ensuring the stable and reliable operation of the power distribution system. Attached Figure Description

[0007] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0008] Figure 1 This is a schematic flowchart of a power supply safety protection method for low-voltage power distribution systems provided in an embodiment of this application.

[0009] Figure 2 This is a schematic diagram of the power supply safety protection system for low-voltage power distribution systems provided in the embodiments of this application.

[0010] Figure labeling: Perception monitoring dataset construction module 1, 3D perception channel construction module 2, first round monitoring and identification result acquisition module 3, second round monitoring and identification result construction module 4, power supply safety protection early warning acquisition module 5. Detailed Implementation

[0011] This application provides a power supply safety protection method and system for low-voltage power distribution systems, which solves the technical problems of traditional low-voltage power distribution safety monitoring, such as single monitoring dimensions, disconnected features, and false alarms and missed alarms in anomaly identification.

[0012] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application.

[0013] It should be noted that the terms "first," "second," etc., in the specification and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this application described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules not explicitly listed or inherent to such processes, methods, products, or devices.

[0014] Example 1, as Figure 1 As shown, a power supply safety protection method for a low-voltage power distribution system includes: During the power supply process of low-voltage distribution network, the distributed monitoring and acquisition units are activated to perform power supply perception monitoring and establish a perception monitoring dataset under time sequence identifier.

[0015] In this embodiment of the application, the low-voltage power distribution network is a low-voltage power distribution network that distributes the low-voltage electrical energy output from the distribution transformer to the user end through facilities such as power distribution lines and distribution boxes, and supplies power to various electrical devices.

[0016] Specifically, at key locations such as the incoming ports of the low-voltage power distribution network, the power supply circuits of each branch circuit, and various load access nodes, monitoring and acquisition units are distributed using a DIN rail mounting method. These units consist of voltage, current, and power acquisition modules. Each unit is directly electrically coupled to the power distribution line without altering the existing line structure. Each unit is pre-assigned a unique location code to ensure distinguishable locations. After system startup, all distributed monitoring and acquisition units are activated via communication trigger commands. After each unit completes its power-on self-test, power line synchronization clock technology is used to unify the time base of all acquisition units, eliminating time discrepancies between different units.

[0017] Next, each monitoring and acquisition unit continuously collects electrical operating parameters such as voltage, current, active power, and reactive power at the corresponding points at preset fixed time intervals of 20 to 50 milliseconds. After each acquisition action, the collected parameter data is immediately bound to time information under a unified time base. This acquisition process is continuously executed in a loop to obtain power supply operation data without interruption. The acquisition unit uploads the parameter data bound to the time information to the main control processing unit in real time via 433MHz wireless radio frequency, LoRa, or power line communication. After receiving the data, the main control processing unit verifies the uploaded data using a parity check method with even parity: first, it counts the number of binary 1s in the 8 data bits of each data byte, and then checks the value of the parity bit attached to the data to ensure that the total number of 1s in the data bits and parity bits is even. If the total count meets the even requirement, the data transmission is considered valid; if the total count does not meet the even requirement, the data transmission is considered incorrect, and the incorrect data is directly discarded, retaining only the valid acquisition data that has passed the verification.

[0018] Finally, the main control processing unit classifies and sorts the verified valid data according to the location code and time information of the acquisition units. It integrates the data collected from different locations at the same time point, arranging them sequentially to form a sensing and monitoring dataset with time as the core index, containing information from all acquisition points. This dataset completely records the power supply operation status information at different locations and times in the power distribution network. The main control processing unit, deployed in a low-voltage distribution cabinet or distribution room, is an embedded industrial controller with a microcontroller as its core, used to receive, verify, analyze, and process low-voltage power distribution monitoring data.

[0019] Through a series of steps including distributed deployment, clock synchronization, timed acquisition, data verification, and time-series integration, accurate acquisition and standardized storage of power supply data across the entire low-voltage distribution network were achieved, providing complete and reliable time-series data support for subsequent safety monitoring and analysis.

[0020] The sensing and monitoring dataset is input into the three-dimensional sensing channel, which includes a behavior trajectory modeling sub-channel for characterizing the evolution characteristics of load power consumption behavior, an electrical parameter monitoring sub-channel for characterizing the instantaneous operating state of the electrical system, and a collaborative interactive attention sub-channel.

[0021] Optionally, the main control processing unit will input the verified and normalized time-series sensing monitoring dataset into a preset three-dimensional sensing channel. The three-dimensional sensing channel is a preset multi-dimensional feature processing framework in the low-voltage power distribution system, used to perform multi-dimensional feature representation on the time-series data in the sensing monitoring dataset, providing structured feature support for subsequent safety risk identification.

[0022] The 3D sensing channel comprises three independent yet collaborative sub-channels. The behavior trajectory modeling sub-channel characterizes the evolution of load power consumption behavior, extracting feature information related to changes in load power consumption behavior from the sensing and monitoring dataset. The electrical parameter monitoring sub-channel characterizes the instantaneous operating state of the electrical equipment, extracting feature information related to the real-time operating state of the electrical equipment from the sensing and monitoring dataset. The collaborative interaction focus sub-channel correlates the feature information from the first two sub-channels, enabling collaborative interaction of features across different dimensions. This provides multi-dimensional feature association evidence for subsequent safety risk identification. The specific construction process of these three sub-channels will be detailed later.

[0023] After performing the first round of monitoring and identification using the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel in the 3D perception channel, the results of the first round of monitoring and identification are sent to the collaborative interaction attention sub-channel. The collaborative interaction attention sub-channel is then used to perform attention initialization for the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel.

[0024] In one embodiment of this application, firstly, the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel process the perception monitoring dataset separately according to the same preset time sliding window. After differential operation, Fourier spectrum decomposition and extreme value extraction, the corresponding basic feature matrix is ​​generated. Then, the time index is recalibrated to form an aligned feature unit sequence, which is output as the first round of monitoring and recognition results.

[0025] Next, the collaborative interaction focuses on the sub-channel to construct a cross-channel temporal corresponding unit set based on the aligned feature unit sequence, establish two types of local structure adjacency subgraphs and calculate the structural difference mapping relationship, generate the corresponding attention initialization parameter matrix and feed it back to the sub-channel, and reconstruct the local feature response intensity distribution of the sub-channel for subsequent monitoring and identification. The above two steps will be explained in detail in the following content.

[0026] The second round of monitoring and identification results is established based on the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel after initialization.

[0027] Specifically, the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel, after initialization, respectively weightedly reconstruct the basic feature matrix to generate a reconstructed feature sequence. After calculating the change identifier sequence, window-by-window matching is used to obtain the window-level interactive authentication identifier. After segment aggregation, the interactive mismatched segments are marked and output as the second round of monitoring and identification results. This step will also be explained in detail in the following content.

[0028] Power supply safety protection early warning is generated based on the results of the second round of monitoring and identification.

[0029] Specifically, risk levels are matched based on the distribution location and density in the second round of monitoring and identification results, and risk warning and dispatch management are carried out based on the risk level matching results. The specific implementation process of this step will be described in detail in the following content.

[0030] Furthermore, the method provided in this application embodiment includes: The sensor monitoring dataset is subjected to self-sensing monitoring anomaly verification, and a sensor anomaly early warning is established; based on the sensor anomaly early warning, the backup acquisition sensor is activated to perform supplementary acquisition management of verification data.

[0031] Specifically, the main control processing unit continuously verifies the sensing and monitoring dataset under the time sequence identifier in real time. It uses a data continuity detection method to check the collected data of adjacent time nodes one by one to determine whether there is any data interruption or missing data. At the same time, it uses a numerical reasonableness threshold for verification, comparing the electrical parameters such as voltage, current, and power in the dataset with the normal operating value range of low-voltage power distribution systems specified in the national standard. This normal operating value range is set as ±15% fluctuation range of rated voltage 220V, preset rated current and rated power of each circuit, and abnormal data that exceeds the reasonable range is filtered out.

[0032] When data interruption or missing data is detected, or when parameter values ​​exceed the preset reasonable range, the main control processing unit immediately determines that the corresponding monitoring and acquisition unit has malfunctioned. Based on preset rules, it generates a perception anomaly warning information and associates and binds this warning information with the time and location information of the abnormal data to complete the establishment of the perception anomaly warning.

[0033] Based on the location information corresponding to the abnormality warning, the main control processing unit sends a start control command to the preset backup acquisition sensor at that location. The backup acquisition sensor is installed in parallel with the main acquisition unit on the same rail at the same location, and uses the same model and range of the same device. After receiving the command, it completes power-on self-test and initialization, and performs verification data acquisition according to the same acquisition interval and parameter type as the main acquisition unit. After the acquisition is completed, the verification data is uploaded to the main control processing unit in real time. The main control processing unit uses the verification data to replace and supplement the missing or erroneous data during the abnormal period, and completes the supplementary acquisition management of verification data.

[0034] Through a series of steps including data verification, anomaly warning generation, and backup sensor-triggered re-data collection, the system achieves automatic identification of monitoring data anomalies and data integrity restoration, ensuring that the sensing and monitoring dataset remains stable and reliable at all times.

[0035] Furthermore, the method provided in this application embodiment includes: The behavior trajectory modeling sub-channel segments the sensing and monitoring dataset according to a preset time sliding window, constructing multiple sets of behavior segments. First-order and second-order difference operations are performed on the power change sequence in each behavior segment set to generate a basic feature matrix of the behavior trajectory, which includes a change increment vector and an acceleration vector. The electrical parameter monitoring sub-channel segments the sensing and monitoring dataset according to the same preset time sliding window, constructing a multidimensional electrical parameter state vector within each time sliding window. Fourier spectral decomposition and local extremum extraction are performed on the multidimensional electrical parameter state vector to generate a basic feature matrix of electrical parameters including a frequency domain energy distribution vector and a transient peak vector. The behavior trajectory basic feature matrix and the electrical parameter basic feature matrix are recalibrated using a time index, forming an aligned feature unit sequence under a unified time reference. This aligned feature unit sequence is output as the first round of monitoring and identification results.

[0036] Optionally, the behavior trajectory modeling sub-channel is first initialized and configured by setting the parameters of a preset time sliding window. For example, the sliding window duration is set to 100 milliseconds and the sliding step size is set to 50 milliseconds. These parameters can adapt to the normal rate of change of electricity consumption behavior in low-voltage power distribution systems, facilitating the accurate capture of subtle changes in load electricity consumption behavior. After configuration, the behavior trajectory modeling sub-channel extracts all power-related time-series data from the sensing and monitoring dataset, and processes it in segments according to the set time sliding window. Starting from the beginning of the dataset, a 100-millisecond segment of power data is extracted every 50 milliseconds, forming multiple continuous and partially overlapping sets of behavior segments to ensure that no power data is missed.

[0037] For the power change sequence in each behavioral segment set, first-order and second-order difference operations are performed using a difference operation method. Before the operation, the beginning and end boundaries of the power change sequence are preprocessed by repeatedly padding with boundary values ​​to avoid the reduction of the sequence length after the difference operation and to ensure that the output vector length of each behavioral segment set is consistent. The first-order difference operation calculates the power difference between two adjacent sampling points to obtain the change increment vector representing the rate of power change; the second-order difference operation calculates the difference between two adjacent increment values ​​to obtain the acceleration vector representing the rate of power change. The change increment vector and the acceleration vector are arranged in rows to generate the basic feature matrix of the behavioral trajectory. The basic feature matrix of the behavioral trajectory is the feature set of the entire time window. The combination of the change increment vector and the acceleration vector corresponding to each time sliding window in the matrix is ​​a behavioral trajectory feature unit, which is the smallest time dimension feature unit of the matrix.

[0038] Next, the electrical parameter monitoring sub-channel adopts the same preset time sliding window parameters as the behavior trajectory modeling sub-channel, namely the 100-millisecond window duration and 50-millisecond sliding step size in the example above, to ensure that the segmentation rhythm of the two sub-channels is consistent. The electrical parameter monitoring sub-channel extracts four types of core electrical parameter time-series data—voltage, current, active power, and reactive power—from the sensing and monitoring dataset. It synchronously segments the four types of electrical parameter data according to the aforementioned sliding window. Within each time sliding window, the average values ​​of voltage, current, active power, and reactive power data at all sampling points within that window are taken to construct a multi-dimensional electrical parameter state vector composed of the four parameters. Each window corresponds to one multi-dimensional electrical parameter state vector.

[0039] Next, the Fast Fourier Transform (FFT) method is used to perform Fourier spectral decomposition on each multidimensional electrical parameter state vector, converting the time-domain electrical parameter data into frequency-domain data. For the 50Hz fundamental frequency of the low-voltage power distribution system, a harmonic analysis range from the 2nd to the 50th harmonics is set, and the energy values ​​of each frequency component within this range are extracted to form a frequency-domain energy distribution vector. Simultaneously, extreme point extraction is performed, traversing the electrical parameter data within each time sliding window to find the maximum and minimum values ​​of voltage and current, forming a transient peak vector. The frequency-domain energy distribution vector and the transient peak vector are combined to generate the electrical parameter basic feature matrix. The electrical parameter basic feature matrix is ​​a feature set for the entire time window. The combination of the frequency-domain energy distribution vector and the transient peak vector corresponding to the same time sliding window as the behavior trajectory in the matrix constitutes an electrical parameter feature unit, maintaining a one-to-one time window correspondence with the aforementioned behavior trajectory feature units.

[0040] Finally, the behavior trajectory basic feature matrix and the electrical parameter basic feature matrix are recalibrated using time indexes. With the unified time reference of the main control processing unit as a reference, the timestamps corresponding to each feature unit in the two feature matrices are checked, and time indices with deviations exceeding 1 millisecond are corrected to ensure that each feature unit in the two feature matrices corresponds completely in the time dimension. An aligned feature unit sequence is formed under the unified time reference, and the aligned feature unit sequence is finally output as the first round of monitoring and identification results to the collaborative interactive attention sub-channel.

[0041] By employing methods such as sliding window segmentation, boundary preprocessing, differential operation, Fourier decomposition, extreme value extraction, and time index calibration, we achieved accurate extraction and time alignment of behavioral trajectories with basic electrical parameter features, providing complete and reliable basic feature support for further identification of power supply safety risks.

[0042] Furthermore, the method provided in this application embodiment includes: When processing the perception and monitoring dataset in segments, the behavior trajectory modeling sub-channel identifies periodic and non-periodic loads. Periodic loads are processed in segments of fixed length, while non-periodic loads have their window length dynamically adjusted according to the power change rate.

[0043] Optionally, when the behavior trajectory modeling sub-channel retrieves the power operation data of the continuous time-series distribution in the sensing and monitoring dataset, it first performs zero-mean preprocessing on the retrieved power time-series sequence, calculates the power average value of all sampling points in the entire power time-series sequence, and subtracts the average value from the power value of each sampling point to obtain a zero-mean power time-series sequence that eliminates the DC component, thus avoiding interference from the autocorrelation analysis results caused by the fixed power bias.

[0044] Next, time-series autocorrelation analysis was used to analyze the patterns of the preprocessed zero-mean power time series. The time delay range was set to zero to half the total sequence length. All time delay values ​​were traversed with a fixed step size. For each time delay value, the time-series autocorrelation coefficient was calculated. The calculation process of the autocorrelation coefficient is as follows: first, the sum of the products of the zero-mean power time series and the corresponding sampling points of the time series after its own time delay shift is calculated; then, the sum of the products is divided by the autocorrelation calculation result at the zero-time-delay position of the sequence to obtain the normalized autocorrelation coefficient. The values ​​of all autocorrelation coefficients are mapped to the range of -1 to +1, thus completing the calculation of the autocorrelation coefficient at different time delay positions.

[0045] Subsequently, the autocorrelation coefficient threshold was set to 0.7. The autocorrelation coefficients corresponding to all time delay positions were iterated. When the autocorrelation coefficient at the time delay position continuously exceeded 0.7 and the peak interval remained stable, the power load corresponding to the power data was determined to be a periodic load. Loads that did not meet the above determination conditions were determined to be non-periodic loads, thus completing the accurate distinction between the two types of power loads.

[0046] The behavior trajectory modeling sub-channel targets the identified periodic loads and sets a fixed-length sliding window to match the inherent operating cycle of the load. The fixed window length is an integer multiple of the 50Hz fundamental frequency period of the low-voltage power distribution system, which is 20 milliseconds. The baseline fixed length is set to 100 milliseconds. The power time series data corresponding to the periodic load is divided into segments evenly according to the constant 100-millisecond window length, forming load behavior segments with equal durations, which are adapted to the repetitive and stable power consumption change characteristics of the periodic load.

[0047] The behavior trajectory modeling sub-channel, for the identified non-periodic load, calculates the power change rate within adjacent sampling intervals based on the rated power of the load. The power change rate is the ratio of the power difference between adjacent sampling points to the rated power. A three-level classification criterion for the power change rate is preset, and the corresponding window length value is matched synchronously. When the power change rate is less than 5%, a sliding window length of 200 milliseconds is matched; when the power change rate is between 5% and 20%, a sliding window length of 100 milliseconds is matched; and when the power change rate exceeds 20%, a sliding window length of 50 milliseconds is matched. The sliding window length is dynamically adjusted according to the power fluctuation state throughout the process, completing the adaptive segmentation processing of non-periodic load power data.

[0048] Accurate load type identification is achieved through time-series autocorrelation analysis. Combined with a dynamic window adaptive segmentation method that matches the power change rate with fixed-length uniform segmentation, adaptive segmentation of different types of load data is realized, which effectively improves the accuracy and scenario applicability of subsequent electricity consumption behavior feature extraction.

[0049] Furthermore, the method provided in this application embodiment includes: Based on the temporal index relationship in the alignment feature unit sequence, feature corresponding unit pairs of the behavior trajectory basic feature matrix and the electrical parameter basic feature matrix under the same time window are extracted to construct a cross-channel temporal corresponding unit set. Local structural neighborhood expansion is performed on the behavior trajectory feature units and electrical parameter feature units in the cross-channel temporal corresponding unit set to establish a behavior trajectory local structural adjacency subgraph and an electrical parameter local structural adjacency subgraph. The structural difference mapping relationship between the behavior trajectory local structural adjacency subgraph and the electrical parameter local structural adjacency subgraph is calculated, including the adjacency connection strength difference distribution and the structural topology offset distribution. Based on the structural difference mapping relationship, attention initialization parameter matrices for the behavior trajectory modeling sub-channel and attention initialization parameter matrices for the electrical parameter monitoring sub-channel are generated respectively. The attention initialization parameter matrices for the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel are fed back to the corresponding sub-channels to reconstruct the local feature response intensity distribution in the subsequent monitoring and identification process of the corresponding sub-channels.

[0050] Specifically, the collaborative interaction focuses on receiving the aligned feature unit sequence output from the first round of monitoring and identification in the sub-channel. Using the uniformly calibrated time index in the sequence as a reference, it traverses all time windows of the aligned feature unit sequence, extracts the behavior trajectory feature unit corresponding to the behavior trajectory basic feature matrix and the electrical parameter feature unit corresponding to the electrical parameter basic feature matrix under each same time window, pairs the two feature units under the same time window to form a feature corresponding unit pair, and arranges all feature corresponding unit pairs in time order within the entire time window range to construct a cross-channel time sequence corresponding unit set.

[0051] For each pair of feature-corresponding units in the cross-channel time-series corresponding unit set, the collaborative interactive focus sub-channel performs local structure neighborhood expansion on the behavioral trajectory feature units and electrical parameter feature units respectively. Specifically, a fixed neighborhood window expansion method is adopted, taking the current feature unit as the center node, and selecting the same type of feature units in the two adjacent time windows before and after the current node as neighboring nodes to complete the construction of the local structure neighborhood. Then, the Euclidean distance calculation method is used to calculate the feature distance between the center node and each neighboring node respectively. The reciprocal of the feature distance is used as the connection weight between nodes. Based on the center node, neighboring nodes and corresponding connection weights, undirected attribute behavioral trajectory local structure adjacency subgraphs and electrical parameter local structure adjacency subgraphs are established respectively, and undirected adjacency weight matrices corresponding to the two adjacency subgraphs are generated simultaneously.

[0052] Next, based on the two generated undirected adjacency weight matrices, the structural difference mapping relationship between the behavioral trajectory local structure adjacency subgraph and the electrical parameter local structure adjacency subgraph is calculated. First, element-wise difference calculation is performed to calculate the connection weight difference at corresponding positions in the two adjacency weight matrices, and the distribution of weight difference across the entire node range is statistically analyzed to generate the adjacency connection strength difference distribution. Then, the method of first-order node degree statistics and cosine similarity calculation is adopted. First, the first-order node degree of an undirected graph is defined as the total number of directly connected neighboring nodes of a single node. The first-order node degree of each node in the two adjacency subgraphs is statistically analyzed, and the first-order node degree distribution of the corresponding subgraphs is formed according to the node arrangement order. At the same time, the two undirected adjacency weight matrices are flattened into one-dimensional vectors in row-major order. Using the two one-dimensional vectors as calculation inputs, the overall topological similarity of the two adjacency subgraphs is calculated. Based on the difference in first-order node degree distribution and the topological similarity value between the two subgraphs, the structural topological offset between the two subgraphs is calculated. The topological offset of the corresponding unit pairs of all features is statistically analyzed to generate the structural topological offset distribution. The distribution of adjacency connection strength difference and the structural topological offset distribution are combined to form a complete structural difference mapping relationship.

[0053] Subsequently, the collaborative interaction focus sub-channel, based on the structural difference mapping relationship, uses min-max normalization to normalize the distribution of adjacent connection strength differences and structural topology offset, respectively, mapping the values ​​of both distributions to the range of 0 to 1. The normalized distribution values ​​are then subjected to equal-weighted summation, with the weight coefficients for both distributions set to 0.5. The weighted summation yields the focus weight coefficient corresponding to each feature unit. The focus weight coefficient is positively correlated with the degree of structural difference; the greater the structural difference, the higher the focus weight coefficient. Following the temporal order of the cross-channel time-series corresponding unit sets, the focus weight coefficients corresponding to all behavioral trajectory feature units are arranged into a two-dimensional matrix to generate the focus initialization parameter matrix for the behavioral trajectory modeling sub-channel. Similarly, the focus weight coefficients corresponding to all electrical parameter feature units are arranged into a two-dimensional matrix to generate the focus initialization parameter matrix for the electrical parameter monitoring sub-channel.

[0054] Finally, the attention initialization parameter matrix generated by the behavior trajectory modeling sub-channel is fed back to the behavior trajectory modeling sub-channel, and the attention initialization parameter matrix of the electrical parameter monitoring sub-channel is fed back to the electrical parameter monitoring sub-channel simultaneously. In the subsequent monitoring and recognition process, the two sub-channels perform element-wise multiplication of their respective generated feature matrices with the received attention initialization parameter matrices, and adjust the output values ​​of the corresponding feature positions according to the positive correlation rule of the attention weight coefficients. This increases the feature response intensity of high-difference, high-offset positions and decreases the feature response intensity of low-difference, low-offset positions, thus completing the reconstruction of the local feature response intensity distribution of the corresponding sub-channels.

[0055] Through the above-mentioned sequential steps, the coordinated correlation between the two dimensions of behavioral trajectory and electrical parameters, as well as the adaptive optimization of sub-channel feature responses, are realized, effectively improving the accuracy and anti-interference capability of power supply safety risk identification in low-voltage power distribution systems.

[0056] Furthermore, the method provided in this application embodiment includes: The behavior trajectory modeling sub-channel utilizes the attention initialization parameter matrix to perform weighted reconstruction processing on the behavior trajectory basic feature matrix according to the time window dimension, so that the behavior feature units of each time window form attention-constrained associated response sequences between adjacent windows, generating a behavior trajectory reconstruction feature sequence. Similarly, the electrical parameter monitoring sub-channel utilizes the attention initialization parameter matrix to perform weighted reconstruction processing on the electrical parameter basic feature matrix according to the same time window dimension, so that the electrical parameter feature units of each time window form attention-constrained associated response sequences between adjacent windows, generating an electrical parameter reconstruction feature sequence. The change trend identifier and change magnitude identifier between adjacent time windows are calculated along the time direction for both the behavior trajectory reconstruction feature sequence and the electrical parameter reconstruction feature sequence, constructing a behavior change identifier sequence and an electrical parameter change identifier sequence. Under a unified time index, the behavior change identifier sequence and the electrical parameter change identifier sequence are mapped window-by-window, and the directional consistency degree and magnitude matching dispersion degree between the two types of change identifiers are calculated for each time window, generating a window-level interactive authentication identifier. The window-level interactive authentication identifiers are aggregated into segments according to time continuity, marking interactive mismatch segments. The interactive mismatch segments are output as the second round of monitoring and identification results.

[0057] Specifically, the behavior trajectory modeling sub-channel receives its own generated behavior trajectory basic feature matrix and the attention initialization parameter matrix of the behavior trajectory modeling sub-channel fed back by the collaborative interaction attention sub-channel. Using time windows as the basic unit, it performs element-wise multiplication of the behavior trajectory feature unit corresponding to each time window with the attention weight coefficient of the corresponding time window in the attention initialization parameter matrix to complete the weighted adjustment of single-window features. After completing the weighted adjustment of the entire window, it uses min-max normalization to normalize the weighted full sequence feature values, mapping the values ​​uniformly to the range of 0 to 1, eliminating the fluctuations in the value range caused by the weighting operation. Then, according to the order of the time windows, the normalized feature units of each time window are spliced ​​temporally, so that the feature units of adjacent time windows form a temporal correlation relationship constrained by the attention weight, and finally generate the behavior trajectory reconstruction feature sequence.

[0058] The electrical parameter monitoring subchannel synchronously receives its own generated electrical parameter basic feature matrix and the attention initialization parameter matrix of the electrical parameter monitoring subchannel fed back by the collaborative interaction attention subchannel. Using a time window dimension completely consistent with the behavior trajectory modeling subchannel, the electrical parameter feature unit corresponding to each time window is multiplied element-wise with the attention weight coefficient of the corresponding time window in the attention initialization parameter matrix to complete the weighted adjustment of the electrical parameter features of a single window. After the weighted adjustment of the entire window is completed, the weighted electrical parameter feature values ​​are normalized using the same min-max normalization method as the behavior trajectory reconstruction feature sequence, mapping the values ​​uniformly to the range of 0 to 1. Then, according to the time window order completely aligned with the behavior trajectory reconstruction feature sequence, the electrical parameter feature units of each normalized time window are spliced ​​in time sequence, so that the electrical parameter feature units of adjacent time windows form a time sequence relationship constrained by attention weights. Finally, an electrical parameter reconstruction feature sequence completely consistent with the time base of the behavior trajectory reconstruction feature sequence is generated.

[0059] Next, the main control processing unit traverses all adjacent time window pairs along the time sequence for the behavior trajectory reconstruction feature sequence and the electrical parameter reconstruction feature sequence. For each pair of adjacent time windows, a first-order difference operation method is used to calculate the difference between the mean of the features of the next window and the mean of the features of the previous window. Based on the sign of the difference and the result of zero, a trend indicator for the corresponding window is generated. A positive difference corresponds to an upward trend, a negative difference corresponds to a downward trend, and a zero difference corresponds to a stable trend. At the same time, the absolute value of the difference is calculated as the initial change amplitude indicator for the corresponding window. The maximum characteristic amplitude corresponding to the rated power of the load is used as the amplitude limit threshold. The initial change amplitude indicator is subjected to upper limit amplitude limiting processing. Amplitude indicators exceeding the amplitude limit threshold are uniformly corrected to the amplitude limit threshold to eliminate the interference of abnormal jump values ​​on subsequent matching calculations. The trend indicators and amplitude indicators after amplitude limiting of all time windows are arranged in chronological order to construct the behavior change indicator sequence and the electrical parameter change indicator sequence, respectively.

[0060] Next, using a unified time index as a benchmark, the behavior change identifier sequence and the electrical parameter change identifier sequence are mapped one-to-one across time windows to ensure that identifiers at the same index position in the two sequences correspond to the same time window. For each time window, the change trend identifiers at corresponding positions in the behavior change identifier sequence and the electrical parameter change identifier sequence are compared. When the two change trend identifiers are exactly the same, the directional consistency degree is set to 1; when the two change trend identifiers are different, the directional consistency degree is set to 0. The directional consistency degree is calculated. Then, the relative deviation calculation method is used to calculate the absolute difference between the behavior change amplitude identifier and the electrical parameter change amplitude identifier in the window. The absolute difference is divided by the maximum value of the two amplitude identifiers to obtain the amplitude matching dispersion. The larger the dispersion value, the lower the matching degree of the two amplitudes. The directional consistency degree and the amplitude matching dispersion degree of the same window are combined to generate the window-level interactive authentication identifier corresponding to the window.

[0061] Finally, the main control processing unit pre-sets window mismatch judgment rules and continuous segment aggregation thresholds, traverses the window-level interaction authentication identifiers corresponding to all time windows, completes the interaction matching status judgment for a single window, and then performs a full sequence traversal of the judgment results for all windows in chronological order. Based on temporal continuity, it completes segment aggregation of mismatched windows and marks the interaction mismatched segments that meet the conditions. The specific implementation process of this step will be described in detail later. After marking all interaction mismatched segments that meet the conditions, the interaction mismatched segments are output as the second round of monitoring and identification results.

[0062] Through the above-mentioned sequential steps, the coordinated matching and verification of power consumption behavior and electrical operation status of the low-voltage power distribution system is realized, accurately locating the interactive mismatch section corresponding to power supply safety anomalies, and effectively improving the positioning accuracy and reliability of power supply safety risk identification.

[0063] Furthermore, the method provided in this application embodiment includes: When the directional consistency within a continuous time window is lower than a preset ratio and the amplitude matching dispersion exceeds a preset range, the corresponding time segment is marked as an interactive mismatch segment.

[0064] In one embodiment, firstly, the main control processing unit receives the window-level interactive authentication identifiers of the full time series generated in the aforementioned steps, as well as the time index sequence corresponding to each identifier, and completes the time-series alignment preprocessing of the input data. At the same time, it pre-sets the core parameters for mismatch segment determination, sets the length of the continuous detection window to 5 time windows, the sliding traversal step size to 1 time window, sets the preset qualified percentage of directional consistency within the continuous detection window to 40%, sets the preset qualified range upper limit of amplitude matching dispersion within a single time window to 0.3, and simultaneously sets the sequence boundary processing rules. When the sliding window traverses to the end of the sequence and the number of remaining windows is less than the preset 5, the segment with insufficient length is directly discarded and does not participate in the mismatch segment determination. All parameters can be adapted and adjusted according to the on-site load operation scenario.

[0065] Next, a sliding traversal with a step size of 1 time window is performed. Along the time axis, the continuous detection window of the preset length slides bit by bit on the window-level interactive authentication identifier of the whole time series. Each time the sliding step is completed, the interactive authentication identifiers corresponding to the 5 continuous time windows covered by the current continuous detection window are locked, thus completing the extraction of valid data within the current detection window.

[0066] For the valid data within the currently locked continuous detection window, the main control processing unit first performs a statistical calculation of the directional consistency degree, counts the number of valid windows with a directional consistency degree value of 1, divides the number of valid windows by the total number of detection windows to obtain the actual proportion of directional consistency within the current continuous detection window, and then performs a statistical calculation of the amplitude matching dispersion degree, counts the number of windows within the window whose amplitude matching dispersion degree exceeds the preset acceptable range upper limit of 0.3, calculates the proportion of such windows in the total number of windows, and obtains the proportion of amplitude dispersion exceeding the standard within the current continuous detection window.

[0067] Subsequently, an AND gate logic judgment rule is used to simultaneously verify the two statistical results of the current continuous detection window. If and only if the actual proportion of directional consistency in the current window is less than the preset 40% qualified proportion, and the proportion of amplitude dispersion exceeding the standard is not less than 60%, the time segment corresponding to the continuous detection window is determined to be a candidate interaction mismatch segment. Detection windows that do not meet both conditions are determined to be normal matching segments. After completing the full time series traversal, all candidate interaction mismatch segments are obtained.

[0068] Finally, overlap merging is performed on all candidate interaction mismatch segments. For candidate interaction mismatch segments with time overlap or adjacent intervals of less than one time window, they are merged into a continuous time segment. The merged segment takes the start time index of the first candidate interaction mismatch segment as the segment start boundary and the end time index of the last candidate interaction mismatch segment as the segment end boundary. After merging, all merged segments are fully traversed and verified in the order of time index, and duplicate segments that are completely contained in other segments are removed to ensure that the final segments have no time overlap and no duplicate coverage. After verification, all continuous segments are finally labeled and marked as formal interaction mismatch segments.

[0069] By employing a fixed-length sliding window traversal with boundary processing rules, synchronous statistical verification of dual-dimensional indicators, and time-series processing methods involving overlapping merging and deduplication verification, accurate determination and marking of interactive mismatch sections are achieved. This effectively filters out misjudgments caused by occasional fluctuations in single windows and abnormal boundary segments, thereby improving the anti-interference capability and reliability of identifying abnormal power supply safety sections in low-voltage power distribution systems.

[0070] Furthermore, the method provided in this application embodiment includes: Risk levels are matched based on the distribution location and density in the second round of monitoring and identification results to establish risk level matching results; risk warning and alert management is then carried out based on the risk level matching results.

[0071] Optionally, the main control processing unit receives the set of interactive mismatch segments output by the second round of monitoring and identification, traverses each interactive mismatch segment in the set, extracts the time location and duration of the segment, and presets a unit monitoring cycle of 1 minute. Using this unit monitoring cycle as a statistical window, the total number of interactive mismatch segments within the statistical window is counted, and the distribution density of the interactive mismatch segments is calculated.

[0072] The main control processing unit pre-divides critical operating periods and non-critical operating periods according to the operating load characteristics and production operation plan of the low-voltage power distribution system. For example, the peak electricity consumption period from 8:00 to 22:00 every day and the period when important loads are continuously put into operation are set as critical operating periods, and the remaining periods are set as non-critical operating periods. The period division rules can be adapted and adjusted by those skilled in the art according to the actual on-site operating needs. The time position of each interactive mismatch section is compared with the preset period to determine the positional importance of the section. The mismatch section in the critical operating period is marked as a high-importance position, and the mismatch section in the non-critical operating period is marked as a low-importance position.

[0073] Next, a three-level risk level classification rule is preset, using the distribution density and location importance of the interactive mismatch segments as the matching basis. At the same time, when multiple mismatch segments with different risk levels appear within the same unit monitoring period, a priority rule of choosing the higher risk level is adopted to perform the final risk level matching. When the number of interactive mismatch segments within a unit monitoring period reaches 5 or more and the segments are located in high-importance positions, the matching is high-risk level. When the number of interactive mismatch segments within a unit monitoring period is between 2 and 4, the matching is medium-risk level. In other cases, the matching is low-risk level, thus completing the establishment of the risk level matching results.

[0074] Finally, based on the established risk level matching results, the corresponding risk warning and alert issuance operations are executed. High-risk level matching results trigger immediate audible and visual alarms and power distribution circuit linkage protection commands. Medium-risk level matching results trigger early warning pushes from the monitoring platform and notifications to maintenance personnel. Low-risk level matching results only complete local operation log recording, thus realizing hierarchical risk warning and alert issuance management.

[0075] Furthermore, the method provided in this application embodiment includes: Using the risk level matching results, distribution location, and distribution density as strategy matching features, the power supply safety protection strategy is matched, and the strategy matching results are established; the power supply safety protection management is carried out using the strategy matching results.

[0076] In one embodiment, the main control processing unit obtains the risk level matching results generated in the aforementioned steps, as well as the distribution location and distribution density corresponding to the interactive mismatch segments in the second round of monitoring and identification results. It then performs standardized encoding processing on the three types of features. Specifically, the classification features of risk level and distribution location are standardized using one-hot encoding, and the numerical features of distribution density are mapped to a unified numerical range using the min-max normalization method. This forms a unified format of strategy matching features, completing the input data preprocessing before strategy matching.

[0077] A standardized power supply safety protection strategy library is pre-built. The strategy library contains multiple sets of directly executable power supply safety protection strategy entries, which are pre-stored according to the combination of risk level, distribution location, and distribution density. Each strategy entry is clearly marked with matching feature threshold, execution object, execution action, and execution sequence. At the same time, priority rules are preset when multiple strategy entries are matched at the same time. Priority is given to sorting by risk level from high to low. Under the same risk level, priority is given to sorting by the number of feature matching dimensions from many to few. Entries with complete feature matching take precedence over entries with partial feature matching. All strategy entries are compatible with conventional monitoring and control equipment of low-voltage power distribution systems and support the updating and adjustment of entries according to the on-site operation scenario.

[0078] Then, the main control processing unit matches the pre-processed strategy matching features with the strategy entries in the power supply safety protection strategy library level by level. The matching process first verifies the risk level features, and then verifies the distribution location features and distribution density features in turn. When the input strategy matching features completely match the preset feature combination of the strategy entry, the corresponding power supply safety protection strategy that meets the conditions is locked. After completing the full sequence traversal matching, the final strategy screening is completed in combination with the preset priority rules to establish the final strategy matching result.

[0079] Finally, based on the established strategy matching results, the main control processing unit synchronously executes risk warning and power supply safety protection control. It uses Modbus-RTU and IEC61850 standard communication protocols commonly used in low-voltage power distribution to send execution commands to the field control equipment corresponding to the low-voltage power distribution system. The preset command execution timeout threshold is 500ms. If no equipment execution status feedback is received within the timeout period, it will retry twice. If the retry fails, a communication abnormality alarm will be triggered immediately. For high-risk levels, the strategy matching results simultaneously trigger immediate audible and visual alarms, issue control commands for emergency current limiting and non-critical load disconnection protection of circuits, and simultaneously initiate millisecond-level real-time acquisition of the entire system's operating status. For medium-risk levels, the strategy matching results simultaneously trigger early warning pushes from the monitoring platform, issue control commands for reduced capacity operation of distribution circuits and high-frequency continuous monitoring of mismatched sections, and simultaneously generate standardized operation and maintenance work orders to push to the corresponding management personnel. For low-risk levels, the strategy matching results only complete local operation log recording and mismatched section data tracking, simultaneously generate regular inspection reminders, and after all commands are executed, receive execution status feedback from field equipment, update the system operation ledger, and complete the entire process of power supply safety protection management.

[0080] In summary, the power supply safety protection method for low-voltage power distribution systems provided in this application has the following technical effects: This application collects electricity consumption behavior and electrical parameter data from low-voltage power distribution systems. Through feature weighted reconstruction, time-series change identifier calculation, window interaction authentication, and mismatch section aggregation, it matches risk levels based on distribution location and density, and then matches corresponding safety protection strategies to achieve collaborative monitoring of power distribution operation status, accurately identify power supply safety anomalies, provide graded early warnings, and link protection and control. This achieves the technical effect of accurate risk positioning and timely early warning, ensuring the stable and reliable operation of the power distribution system.

[0081] Example 2, as Figure 2 As shown, based on the same inventive concept as in Embodiment 1 above, this application provides a power supply safety protection system for low-voltage power distribution systems, the system comprising: The sensing and monitoring dataset construction module 1 is used to activate the distributed monitoring and acquisition units to perform power supply sensing and monitoring during the power supply process of the low-voltage power distribution network, and to establish a sensing and monitoring dataset under the time sequence identifier.

[0082] The three-dimensional perception channel construction module 2 is used to input the perception monitoring dataset into the three-dimensional perception channel. The three-dimensional perception channel includes a behavior trajectory modeling sub-channel for characterizing the evolution characteristics of load power consumption behavior, an electrical parameter monitoring sub-channel for characterizing the instantaneous operating state of the electrical system, and a collaborative interactive attention sub-channel.

[0083] The first round of monitoring and identification result acquisition module 3, after performing the first round of monitoring and identification using the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel in the three-dimensional perception channel, sends the first round of monitoring and identification results to the collaborative interaction attention sub-channel, and performs attention initialization of the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel using the collaborative interaction attention sub-channel.

[0084] The second-round monitoring and identification result construction module 4 is used to establish the second-round monitoring and identification results based on the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel after the initialization of attention.

[0085] Power supply safety protection early warning acquisition module 5 generates power supply safety protection early warning based on the second round of monitoring and identification results.

[0086] Furthermore, the first round of monitoring and identification result acquisition module 3 is used to perform the following steps: The behavior trajectory modeling sub-channel segments the sensing and monitoring dataset according to a preset time sliding window, constructing multiple sets of behavior segments. First-order and second-order difference operations are performed on the power change sequence in each behavior segment set to generate a basic feature matrix of the behavior trajectory, which includes a change increment vector and an acceleration vector. The electrical parameter monitoring sub-channel segments the sensing and monitoring dataset according to the same preset time sliding window, constructing a multidimensional electrical parameter state vector within each time sliding window. Fourier spectral decomposition and local extremum extraction are performed on the multidimensional electrical parameter state vector to generate a basic feature matrix of electrical parameters including a frequency domain energy distribution vector and a transient peak vector. The behavior trajectory basic feature matrix and the electrical parameter basic feature matrix are recalibrated using a time index, forming an aligned feature unit sequence under a unified time reference. This aligned feature unit sequence is output as the first round of monitoring and identification results.

[0087] Furthermore, the first round of monitoring and identification result acquisition module 3 is used to perform the following steps: Based on the temporal index relationship in the alignment feature unit sequence, feature corresponding unit pairs of the behavior trajectory basic feature matrix and the electrical parameter basic feature matrix under the same time window are extracted to construct a cross-channel temporal corresponding unit set. Local structural neighborhood expansion is performed on the behavior trajectory feature units and electrical parameter feature units in the cross-channel temporal corresponding unit set to establish a behavior trajectory local structural adjacency subgraph and an electrical parameter local structural adjacency subgraph. The structural difference mapping relationship between the behavior trajectory local structural adjacency subgraph and the electrical parameter local structural adjacency subgraph is calculated, including the adjacency connection strength difference distribution and the structural topology offset distribution. Based on the structural difference mapping relationship, attention initialization parameter matrices for the behavior trajectory modeling sub-channel and attention initialization parameter matrices for the electrical parameter monitoring sub-channel are generated respectively. The attention initialization parameter matrices for the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel are fed back to the corresponding sub-channels to reconstruct the local feature response intensity distribution in the subsequent monitoring and identification process of the corresponding sub-channels.

[0088] Furthermore, the second round of monitoring and identification result construction module 4 is used to perform the following steps: The behavior trajectory modeling sub-channel utilizes the attention initialization parameter matrix to perform weighted reconstruction processing on the behavior trajectory basic feature matrix according to the time window dimension, so that the behavior feature units of each time window form attention-constrained associated response sequences between adjacent windows, generating a behavior trajectory reconstruction feature sequence. Similarly, the electrical parameter monitoring sub-channel utilizes the attention initialization parameter matrix to perform weighted reconstruction processing on the electrical parameter basic feature matrix according to the same time window dimension, so that the electrical parameter feature units of each time window form attention-constrained associated response sequences between adjacent windows, generating an electrical parameter reconstruction feature sequence. The change trend identifier and change magnitude identifier between adjacent time windows are calculated along the time direction for both the behavior trajectory reconstruction feature sequence and the electrical parameter reconstruction feature sequence, constructing a behavior change identifier sequence and an electrical parameter change identifier sequence. Under a unified time index, the behavior change identifier sequence and the electrical parameter change identifier sequence are mapped window-by-window, and the directional consistency degree and magnitude matching dispersion degree between the two types of change identifiers are calculated for each time window, generating a window-level interactive authentication identifier. The window-level interactive authentication identifiers are aggregated into segments according to time continuity, marking interactive mismatch segments. The interactive mismatch segments are output as the second round of monitoring and identification results.

[0089] Furthermore, the second round of monitoring and identification result construction module 4 is used to perform the following steps: When the directional consistency within a continuous time window is lower than a preset ratio and the amplitude matching dispersion exceeds a preset range, the corresponding time segment is marked as an interactive mismatch segment.

[0090] Furthermore, the power supply safety protection early warning acquisition module 5 is used to perform the following steps: Risk levels are matched based on the distribution location and density in the second round of monitoring and identification results to establish risk level matching results; risk warning and alert management is then carried out based on the risk level matching results.

[0091] Furthermore, the power supply safety protection early warning acquisition module 5 is used to perform the following steps: Using the risk level matching results, distribution location, and distribution density as strategy matching features, the power supply safety protection strategy is matched, and the strategy matching results are established; the power supply safety protection management is carried out using the strategy matching results.

[0092] Furthermore, the sensing and monitoring dataset construction module 1 is used to perform the following steps: The sensor monitoring dataset is subjected to self-sensing monitoring anomaly verification, and a sensor anomaly early warning is established; based on the sensor anomaly early warning, the backup acquisition sensor is activated to perform supplementary acquisition management of verification data.

[0093] Furthermore, the first round of monitoring and identification result acquisition module 3 is used to perform the following steps: When processing the perception and monitoring dataset in segments, the behavior trajectory modeling sub-channel identifies periodic and non-periodic loads. Periodic loads are processed in segments of fixed length, while non-periodic loads have their window length dynamically adjusted according to the power change rate.

[0094] The power supply safety protection system for low-voltage power distribution systems provided in the embodiments of the present invention can execute the power supply safety protection method for low-voltage power distribution systems provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the method.

[0095] Although this application makes various references to certain modules in the system according to the embodiments of this application, any number of different modules can be used and run on user terminals and / or servers. The various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of each functional unit are only for easy distinction between each other and are not used to limit the scope of protection of this invention.

[0096] The specific embodiments described above do not constitute a limitation on the scope of protection of this application. Those skilled in the art should understand that various modifications, combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this application should be included within the scope of protection of this application. In some cases, the actions or steps described in this application can be performed in a different order than that shown in the embodiments and still achieve the desired results. Furthermore, the processes depicted in the accompanying drawings do not necessarily require a specific or sequential order to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

Claims

1. A power supply safety protection method for low-voltage power distribution systems, characterized in that, The method includes: During the power supply process of low-voltage power distribution network, the distributed monitoring and acquisition units are activated to perform power supply perception monitoring and establish a perception monitoring dataset under time sequence identifier. The sensing and monitoring dataset is input into the three-dimensional sensing channel, which includes a behavior trajectory modeling sub-channel for characterizing the evolution characteristics of load power consumption behavior, an electrical parameter monitoring sub-channel for characterizing the instantaneous operating state of the electrical system, and a collaborative interactive attention sub-channel. After performing the first round of monitoring and identification using the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel in the 3D perception channel, the results of the first round of monitoring and identification are sent to the collaborative interaction attention sub-channel. The collaborative interaction attention sub-channel is then used to perform attention initialization for the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel. The second round of monitoring and identification results is established based on the behavioral trajectory modeling sub-channel and the electrical parameter monitoring sub-channel after initialization. Power supply safety protection early warning is generated based on the results of the second round of monitoring and identification.

2. The power supply safety protection method for low-voltage power distribution systems as described in claim 1, characterized in that, The first round of monitoring and identification is performed using the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel in the 3D sensing channel, including: The sensing and monitoring dataset is segmented according to a preset time sliding window using the behavior trajectory modeling sub-channel to construct multiple behavior segment sets. First-order and second-order difference operations are performed on the power change sequence in each behavior segment set to generate a behavior trajectory basic feature matrix, which includes a change increment vector and an acceleration vector. The sensing and monitoring dataset is divided into segments according to the same preset time sliding window using the electrical parameter monitoring sub-channel, and a multidimensional electrical parameter state vector is constructed within each time sliding window. Fourier spectrum decomposition and local extremum point extraction are performed on the multidimensional electrical parameter state vector to generate an electrical parameter basic feature matrix including frequency domain energy distribution vector and transient peak vector. The behavior trajectory basic feature matrix and the electrical parameter basic feature matrix are respectively subjected to time index recalibration processing to form an aligned feature unit sequence under a unified time reference. The aligned feature unit sequence is output as the first round of monitoring and identification results.

3. The power supply safety protection method for low-voltage power distribution systems as described in claim 2, characterized in that, The first round of monitoring and identification results are sent to the collaborative interaction attention sub-channel. The collaborative interaction attention sub-channel is then used to perform attention initialization for the behavior trajectory modeling sub-channel and the electrical parameter monitoring sub-channel, including: Based on the time index relationship in the alignment feature unit sequence, feature corresponding unit pairs of the behavior trajectory basic feature matrix and the electrical parameter basic feature matrix under the same time window are extracted respectively, and a cross-channel time sequence corresponding unit set is constructed. Local structural neighborhood expansion is performed on the behavioral trajectory feature units and electrical parameter feature units in the cross-channel timing correspondence unit set to establish a behavioral trajectory local structural adjacency subgraph and an electrical parameter local structural adjacency subgraph. Calculate the structural difference mapping relationship between the local structural adjacency subgraph of the behavior trajectory and the local structural adjacency subgraph of the electrical parameters, wherein the structural difference mapping relationship includes the distribution of adjacency connection strength difference and the distribution of structural topology offset; Based on the structural difference mapping relationship, the attention initialization parameter matrix of the behavior trajectory modeling sub-channel and the attention initialization parameter matrix of the electrical parameter monitoring sub-channel are generated respectively. The attention initialization parameter matrix of the behavior trajectory modeling sub-channel and the attention initialization parameter matrix of the electrical parameter monitoring sub-channel are fed back to the corresponding sub-channels to reconstruct the local feature response intensity distribution in the subsequent monitoring and identification process of the corresponding sub-channels.

4. The power supply safety protection method for low-voltage power distribution systems as described in claim 3, characterized in that, Based on the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel after initialization, a second round of monitoring and identification results is established, including: By using the attention initialization parameter matrix of the behavior trajectory modeling sub-channel, the basic feature matrix of the behavior trajectory is weighted and reconstructed according to the time window dimension, so that the behavior feature units of each time window form an attention-constrained associated response sequence between adjacent windows, and the behavior trajectory reconstruction feature sequence is generated. By using the attention initialization parameter matrix of the electrical parameter monitoring sub-channel, the basic feature matrix of electrical parameters is weighted and reconstructed according to the same time window dimension, so that the electrical parameter feature units of each time window form a correlation response sequence constrained by attention between adjacent windows, and generate an electrical parameter reconstruction feature sequence. Calculate the trend and magnitude indicators of change between adjacent time windows for the reconstructed behavior trajectory feature sequence and the reconstructed electrical parameter feature sequence along the time direction, and construct the behavior change indicator sequence and the electrical parameter change indicator sequence; Under a unified time index, the behavior change identifier sequence and the electrical parameter change identifier sequence are mapped window by window, and the degree of directional consistency and amplitude matching dispersion between the two types of change identifiers are calculated for each time window to generate a window-level interactive authentication identifier. The window-level interaction authentication identifiers are aggregated into segments according to time continuity, and interaction mismatch segments are marked. The interactive mismatch segment is output as the result of the second round of monitoring and identification.

5. The power supply safety protection method for low-voltage power distribution systems as described in claim 4, characterized in that, Mark the interaction mismatch sections, including: When the directional consistency within a continuous time window is lower than a preset ratio and the amplitude matching dispersion exceeds a preset range, the corresponding time segment is marked as an interactive mismatch segment.

6. The power supply safety protection method for low-voltage power distribution systems as described in claim 1, characterized in that, Based on the results of the second round of monitoring and identification, a power supply safety protection early warning is generated, including: Based on the distribution location and distribution density in the second round of monitoring and identification results, risk levels are matched to establish risk level matching results; Risk warning and alert management will be carried out based on the risk level matching results.

7. The power supply safety protection method for low-voltage power distribution systems as described in claim 6, characterized in that, Risk warning and alert management based on the risk level matching results also includes: Using the risk level matching results, distribution location, and distribution density as strategy matching features, the power supply safety protection strategy is matched, and the strategy matching results are established. The matching results of the aforementioned strategy are used for power supply safety protection management.

8. The power supply safety protection method for low-voltage power distribution systems as described in claim 1, characterized in that, Establishing a sensing and monitoring dataset under time-series identifiers also includes: The sensor monitoring dataset is used to verify self-sensing monitoring anomalies and establish a sensor anomaly early warning system. Based on the aforementioned abnormality warning, the backup acquisition sensor is activated to perform supplementary acquisition management of verification data.

9. The power supply safety protection method for low-voltage power distribution systems as described in claim 1, characterized in that, When processing the perception and monitoring dataset in segments, the behavior trajectory modeling sub-channel identifies periodic and non-periodic loads. Periodic loads are processed in segments of fixed length, while non-periodic loads have their window length dynamically adjusted according to the power change rate.

10. A power supply safety protection system for low-voltage power distribution systems, characterized in that, A power supply safety protection method for a low-voltage power distribution system according to any one of claims 1-9, the system comprising: The sensing and monitoring dataset construction module is used to activate the distributed monitoring and acquisition units to perform power supply sensing and monitoring during the power supply process of low-voltage power distribution networks, and to establish a sensing and monitoring dataset under the time sequence identifier. A three-dimensional perception channel construction module is used to input the perception monitoring dataset into the three-dimensional perception channel. The three-dimensional perception channel includes a behavior trajectory modeling sub-channel for characterizing the evolution characteristics of load power consumption behavior, an electrical parameter monitoring sub-channel for characterizing the instantaneous operating state of the electrical system, and a collaborative interactive attention sub-channel. The first-round monitoring and identification result acquisition module uses the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel in the three-dimensional perception channel to perform the first round of monitoring and identification. After that, the first round of monitoring and identification results are sent to the collaborative interaction attention sub-channel. The collaborative interaction attention sub-channel is used to perform attention initialization of the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel. The second-round monitoring and identification result construction module is used to establish the second-round monitoring and identification results based on the behavior trajectory modeling sub-channel and electrical parameter monitoring sub-channel after the initialization of attention. The power supply safety protection early warning acquisition module generates power supply safety protection early warnings based on the results of the second round of monitoring and identification.