Transmission line monitoring optimal configuration system and method based on improved genetic algorithm

By improving the genetic algorithm optimization configuration system and combining it with safety assessment and load assessment units, the optimal monitoring configuration scheme is generated, which solves the problems of low resource utilization and data processing overload in the existing technology and achieves a balance between transmission line safety and monitoring center load.

CN123144409APending Publication Date: 2026-11-20STATE GRID TIANJIN ELECTRIC POWER COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611628194.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-21
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The existing overhead transmission line monitoring system configuration scheme fails to effectively combine the physical upper limit of the number of physical monitoring devices and the maximum concurrent workload of the system, resulting in low resource utilization and data processing overload, making it difficult to achieve the optimal balance between line safety and monitoring center load.

Method used

A monitoring and optimization configuration system based on an improved genetic algorithm is adopted. The system determines the overall importance, construction probability, and failure probability through a safety assessment unit and a load assessment unit. The overall fitness of chromosomes is calculated by combining weight factors. The optimal monitoring configuration scheme is generated by performing selection, crossover, and mutation operations through a genetic operation unit.

Benefits of technology

This approach ensures the safety of power transmission lines while avoiding data processing overload in the monitoring center, improves the resource utilization rate of monitoring equipment and overall deployment efficiency, and reduces the time cost of manual planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123144409A_ABST
    Figure CN123144409A_ABST
Patent Text Reader

Abstract

The application relates to the field of overhead transmission line operation and maintenance management, and discloses a transmission line monitoring optimization configuration system and method based on an improved genetic algorithm, which comprises an overhead transmission line safety load evaluation model and a transmission line optimization configuration system, is used for determining comprehensive importance degree, construction probability, fault probability, monitoring frequency and maximum working load, and comprises a population initialization unit, a fitness evaluation unit and a genetic operation unit; the number of population individuals and the maximum number of iterations are set, an initial population containing chromosomes is generated, the comprehensive fitness of the chromosomes is calculated, selection, crossover and mutation operations are executed, and a monitoring configuration scheme is output when the maximum number of iterations is reached. The application takes into account the number limitation of entity monitoring devices and the maximum working load of background data processing, and realizes the optimal balance of transmission line operation safety and resource allocation of the monitoring system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of operation and maintenance management of overhead transmission lines, specifically to a transmission line monitoring and optimization configuration system and method based on an improved genetic algorithm. Background Technology

[0002] Overhead transmission lines are a crucial component of the power system, with a wide distribution. As the power grid expands, the length of lines and the number of towers continue to increase, and the safety hazards posed by external forces such as urban construction to transmission channels are becoming increasingly prominent. Traditional manual inspection methods suffer from low inspection frequency and long intervals, making it difficult to detect potential hazards before construction damage occurs, and the overall operation and maintenance costs are high. Therefore, deploying overhead transmission line monitoring systems to understand the line's operational status has become a primary management tool for grassroots equipment maintenance units.

[0003] With the continuous increase in the mileage of transmission lines and the ongoing changes in the underground corridor environment, the existing configuration schemes for overhead transmission line monitoring systems have revealed significant shortcomings. Current equipment deployment typically employs a fixed-point installation method based on established experience, failing to fully consider the objective limitation of the physical number of monitoring devices. Faced with an ever-expanding line network and changing corridors, this fixed configuration method makes it difficult to flexibly adjust the location of monitoring equipment, resulting in limited monitoring resources failing to achieve their maximum effectiveness.

[0004] Meanwhile, existing monitoring systems often set the monitoring frequency solely from a security perspective, focusing on preventing external construction damage and attempting to reduce the probability of line failures by unilaterally increasing the monitoring frequency. However, shorter monitoring intervals and higher frequencies inevitably generate massive streams of image and video data, placing a huge data processing load on the backend monitoring center. When the concurrent communication and image processing demands of all nodes exceed the maximum workload of the monitoring center, it can easily lead to system congestion or even paralysis.

[0005] Therefore, existing technologies lack a comprehensive computational mechanism that can simultaneously consider both the physical safety assessment of the transmission line and the data processing capacity of the back-end system. Because the upper limit on the number of physical monitoring devices and the maximum concurrent workload of the system are not transformed into quantifiable constraints and subjected to global optimization calculations, existing configuration methods cannot achieve an optimal balance between the operational safety of overhead transmission lines, the resource utilization rate of monitoring equipment, and the system load of the data processing center, making it difficult to output a reasonable optimized configuration scheme for the monitoring system. Summary of the Invention

[0006] To address the shortcomings of existing technologies, this invention provides a transmission line monitoring optimization configuration system and method based on an improved genetic algorithm. It aims to solve the technical problems in existing technologies, such as the low resource utilization rate caused by the fixed deployment of monitoring equipment without considering the limitation of the number of physical hardware, and the failure to take into account the overload of background data processing caused by high-frequency monitoring. As a result, it is impossible to achieve the optimal balance between the safe operation of transmission lines and the maximum carrying capacity of the monitoring center.

[0007] To achieve the above objectives, the present invention provides the following technical solution: The first aspect of this invention provides a transmission line monitoring and optimization configuration system based on an improved genetic algorithm, comprising: An overhead transmission line safety load assessment model includes a safety assessment unit and a load assessment unit; the safety assessment unit determines the overall importance, construction probability, and failure probability, while the load assessment unit determines the monitoring frequency and maximum operating load. The transmission line optimization configuration system includes a population initialization unit, a fitness evaluation unit, and a genetic operation unit. The population initialization unit sets the number of individuals and the maximum number of iterations and generates an initial population containing chromosomes. The fitness evaluation unit calculates the overall fitness of the chromosomes. The genetic operation unit performs selection, crossover, and mutation operations. The transmission line optimization configuration system outputs a monitoring configuration scheme when the maximum number of iterations is reached.

[0008] Preferably, the load assessment unit receives evaluation feature values ​​to establish an initial evaluation data set, and calculates the monitoring frequency by performing arithmetic mean processing on the evaluation feature values ​​in the initial evaluation data set.

[0009] In one specific embodiment, when establishing the initial evaluation data set, the load assessment unit performs numerical mapping based on the actual time interval requirement for installing monitoring devices on discrete candidate nodes, and generates corresponding evaluation feature values.

[0010] Preferably, the fitness assessment unit calculates the safety fitness of the chromosome installation monitoring device and the load fitness corresponding to the workload, and calculates the comprehensive fitness of each chromosome by combining the safety fitness and the load fitness with weighting factors.

[0011] In one specific embodiment, the safety assessment unit combines the voltage level of the transmission line, the type of important load, and the degree of fault risk to assign corresponding weight factors, and converts various evaluation indicators into a unified data format for the comprehensive fitness calculation.

[0012] The system provided in the first aspect above has the following technical effects: by constructing a system architecture that includes a safety assessment unit and a load assessment unit, it transforms empirical data from transmission line operation and maintenance into quantitative parameters that can be calculated by a genetic algorithm. The system incorporates the objective physical fault risks caused by the field environment and introduces the maximum processing capacity of the data processing platform into the optimization constraints, forming an equipment deployment architecture that can balance the safety benefits of power grid operation with the system's operating load.

[0013] The second aspect of this invention provides a transmission line monitoring optimization configuration method based on an improved genetic algorithm, applied to the system provided in the first aspect above, comprising the following steps: Determine the overall importance, construction probability, and failure probability, and determine the monitoring frequency and maximum workload; Receive the overall importance, the construction probability, the failure probability, the monitoring frequency, and the maximum workload; set the population size and the maximum number of iterations; and generate an initial population containing chromosomes. A fitness assessment is performed to calculate the safety fitness and load fitness of the chromosome, and the overall fitness of the chromosome is calculated by combining weighting factors. A new population is generated by performing selection, crossover, and mutation operations, and the safety fitness and load fitness are recalculated for the new population. Determine whether the maximum number of iterations has been reached. If the maximum number of iterations has not been reached, proceed to the step of performing selection, crossover, and mutation operations to generate a new population. When the maximum number of iterations is reached, output the monitoring configuration scheme.

[0014] Preferably, determining the overall importance, construction probability, and failure probability includes: calculating the average score of each line segment under a single evaluation influencing factor; multiplying the average score by the corresponding weighting factor and summing the results to output the overall importance; counting the frequency of external force construction occurring at various time spans within a day; calculating and generating the construction probability for each different time period based on the frequency distribution; and performing data matching based on geographical features to assign corresponding failure probability parameters and output the failure probability.

[0015] In one specific embodiment, the average score is the arithmetic mean of the score data input by multiple experts for a single evaluation influencing factor of the transmission line according to a set quantitative score range.

[0016] Preferably, generating an initial population containing chromosomes includes: extracting the total number of physical surveillance cameras and defining it as the actual number of surveillance cameras installed; summing the gene values ​​representing the installation status within a single chromosome; comparing the sum of the gene values ​​with the actual number of surveillance cameras installed; storing a single chromosome in an effective population pool when it meets the constraint on the number of surveillance cameras; and continuing until the number of chromosomes accumulated in the effective population pool reaches the number of individuals in the population, thus completing the construction of the initial population.

[0017] In one specific embodiment, the gene positions within the chromosome are expressed using binary encoding rules to represent the installation status of each node device, and the sequence length corresponds to the total number of candidate nodes.

[0018] Preferably, the fitness assessment calculation of the chromosome's safety fitness and load fitness includes: extracting the cumulative failure count of the same node under the configured monitoring scheme and the no-monitoring scheme; performing a ratio operation to quantify the safety fitness; summing the network communication and image processing requirements of all nodes to obtain the total system workload; and performing a division normalization operation between the total system workload and the maximum workload to evaluate the load fitness.

[0019] In one specific embodiment, the process of extracting the cumulative fault occurrence count includes: establishing a baseline scenario without monitoring constraints and accumulating the number of basic faults; calculating the time difference between the intervention of the monitoring device and the discovery of the construction scene and the arrival of the monitoring personnel on site; recalculating the fault occurrence probability within this time difference; and obtaining the fault occurrence count under the configured monitoring scheme.

[0020] Preferably, the selection operation includes: reading the comprehensive fitness index of a single chromosome and calculating its reciprocal parameter; reading the current number of immune iterations and the maximum number of iterations to calculate an adaptive factor; using the adaptive factor as an exponent to power the reciprocal parameter to calculate the probability density of each chromosome being selected; continuously calculating the upper and lower limit thresholds of the allocation interval based on the probability density of each chromosome being selected to construct the selection wheel interval boundary; generating a single random floating-point number and comparing its value with the selection wheel interval boundary to determine the selected chromosome.

[0021] Preferably, the execution of crossover and mutation operations includes: calculating the crossover range width based on a preset candidate node network size and defining the data replacement interval; exchanging binary gene data of paired chromosomes within the data replacement interval to generate new offspring chromosomes; locking the specific mutation location index within the mutated new offspring chromosome; performing a logical inversion operation on the binary gene data corresponding to the mutation location index; and performing real-time verification of the number of monitoring devices on the new offspring chromosome and the new offspring chromosome after performing the logical inversion operation.

[0022] In one specific embodiment, after performing crossover and mutation operations, if it is determined that the number of monitoring devices contained in the mutated chromosome exceeds the actual number of monitoring devices installed, the new offspring chromosome is discarded, and the original chromosome data before the operation is directly called for replacement.

[0023] Preferably, when the maximum number of iterations is reached, outputting the monitoring configuration scheme includes: selecting the single chromosome with the highest comprehensive fitness from the finally generated population and marking it as the globally optimal chromosome; reading the one-dimensional binary gene sequence of the globally optimal chromosome and converting it into specific physical coordinates; binding the specific physical coordinates with the monitoring frequency to construct a single-point configuration dataset; and aggregating all the single-point configuration datasets to form the monitoring configuration scheme execution output.

[0024] The method provided in the second aspect above has the following technical effects: This method adjusts the evolution rate of the genetic algorithm by introducing an adaptive factor associated with the current number of immune iterations and using it as an exponential term in the calculation of selection probability. It expands the search space in the early stages of computation and accelerates algorithm convergence in the later stages. Furthermore, it performs a constraint check on the number of monitoring devices after the crossover and mutation steps, avoiding invalid computations. This method combines dual evaluation of safety fitness and load fitness, ensuring that the output monitoring configuration scheme meets the limitation on the number of monitoring devices while balancing the line monitoring requirements and the system data processing load.

[0025] This invention provides a transmission line monitoring and optimization configuration system and method based on an improved genetic algorithm. It has the following beneficial effects: 1. This invention constructs an assessment structure comprising a safety assessment unit and a load assessment unit. By determining the overall importance, construction probability, failure probability, monitoring frequency, and maximum workload, it simultaneously considers the physical operational risks faced by the transmission line and the system's own data processing capacity as preconditions for assessment. This setup combines external objective safety hazards with internal system operational bottlenecks, enabling the subsequent output monitoring configuration scheme to ensure the safety of the transmission line while avoiding data processing overload at the monitoring center.

[0026] 2. This invention sets the number of individuals and the maximum number of iterations in the population through a population initialization unit, and generates an initial population containing chromosomes, mapping the configuration state of discrete monitoring nodes along the transmission line to the basic computational structure of a genetic algorithm. This mechanism can flexibly construct basic computational data based on changes in the actual line corridor and the upper limit of the number of on-site physical monitoring devices, solving the problem of unreasonable equipment allocation caused by the continuous increase in line mileage and the limited availability of physical monitoring devices.

[0027] 3. This invention utilizes a fitness evaluation unit to calculate the overall fitness of chromosomes, and a genetic operation unit performs selection, crossover, and mutation operations. Upon reaching the maximum number of iterations, it automatically outputs a monitoring configuration scheme. By performing multiple generations of population iteration and comparing fitness metrics, this invention can autonomously calculate and obtain the optimal equipment distribution result that balances resource consumption and operational maintenance, reducing the time cost of manual planning and improving the overall deployment efficiency of the power transmission network monitoring system. Attached Figure Description

[0028] Figure 1 This is a block diagram of a transmission line monitoring and optimization configuration system based on an improved genetic algorithm according to an embodiment of the present invention.

[0029] Figure 2 This is a flowchart of a transmission line monitoring and optimization configuration method based on an improved genetic algorithm according to an embodiment of the present invention. Detailed Implementation

[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0031] See attached document Figure 1 This invention provides a transmission line monitoring and optimization configuration system based on an improved genetic algorithm, which may include: an overhead transmission line safety load assessment model and a transmission line optimization configuration system.

[0032] The overhead transmission line safety load assessment model is used to perform expert evaluation, quantitatively assess various parameters of the overhead line, and send the assessment results as feedback data to the transmission line optimization configuration system. This model further includes a safety assessment unit and a load assessment unit.

[0033] The transmission line optimization configuration system is used to execute an improved genetic algorithm, receive the aforementioned feedback data, perform iterative optimization calculations, and send updated optimization parameters to the overhead transmission line safety load assessment model. The system further includes a population initialization unit, a fitness evaluation unit, and a genetic operation unit.

[0034] See attached document Figure 2 This invention provides a transmission line monitoring optimization configuration method based on an improved genetic algorithm, executed by the aforementioned monitoring optimization configuration system, and includes the following steps: Step S1: The safety assessment model of the overhead transmission line is established by the safety assessment unit in the safety load assessment model of the overhead transmission line, the importance of each section of the overhead line is determined, and the construction probability and the probability of line failure caused by construction are determined in combination with historical operating experience.

[0035] Step S2: The load assessment unit determines the load assessment model for the overhead transmission line, and determines the required monitoring frequency and maximum operating load for each location.

[0036] Step S3: The population initialization unit in the power transmission line optimization configuration system determines the number of monitoring devices to be installed and the actual number of monitoring devices installed, and initializes the genetic algorithm population parameters, setting the population size and maximum number of iterations.

[0037] In step S4, the population initialization unit randomly generates an initial population based on the constraint range of the monitoring frequency variable at each location, generates chromosomes in binary code form, and ensures that the chromosomes in the population meet the constraint of the number of monitoring devices.

[0038] Step S5: The fitness assessment unit in the transmission line optimization configuration system performs fitness assessment, calculates the safety fitness of each chromosome for installing monitoring devices and the load fitness corresponding to the working load, and then calculates the comprehensive fitness of each chromosome by combining the weighting factors.

[0039] Step S6: The genetic operation unit within the transmission line optimization configuration system performs the selection operation, using an improved roulette wheel method with an adaptive factor to calculate the probability density of each chromosome, and then selecting a specified number of chromosome individuals based on the probability interval.

[0040] In step S7, the genetic operation unit performs a crossover operation, determines whether to perform crossover, and after determining the crossover range width and crossover point position, replaces the corresponding position data of the two pairs of chromosomes. Then, it determines whether the offspring after crossover meet the number constraints of the monitoring device, thereby deciding whether to store the offspring in the new population.

[0041] In step S8, the genetic operation unit performs a mutation operation, randomly selects a sub-chromosome from the generated population, determines the mutation location, and inverts the gene value. Then, it determines whether the newly generated sub-chromosome meets the number constraint of the monitoring device, thereby deciding whether to update the corresponding sub-chromosome.

[0042] Step S9: The fitness assessment unit performs another fitness assessment on the new population generated after the above crossover and mutation operations, and calculates the safety fitness and load fitness.

[0043] In step S10, the genetic operation unit determines whether the current iteration process has reached the maximum number of iterations. If the maximum number of iterations has not been reached, the process jumps to step S6 to continue the selection operation.

[0044] Step S11: When the maximum number of iterations is reached, the transmission line optimization configuration system outputs the chromosome with the best fitness and its corresponding monitoring configuration scheme.

[0045] In the above-mentioned optimized configuration method for transmission line monitoring systems based on improved genetic algorithms, to accurately quantify the safety baseline parameters of overhead transmission lines, the safety assessment unit within the overhead transmission line safety load assessment model executes step S1 to establish the overhead transmission line safety assessment model. This step involves the safety assessment unit performing data aggregation and probability quantification operations, specifically including the following sub-steps: Step S101 involves the safety assessment unit determining the evaluation influencing factors for each segment of the overhead line and obtaining quantitative scores from experts for each segment under each influencing factor. The evaluation influencing factors include the line voltage level, the type of important load, and the degree of grid risk caused by the fault. The safety assessment unit receives scoring data input by multiple line operation and maintenance management experts based on the actual corridor conditions under each evaluation influencing factor. The scoring data is set to an integer range of 0 to 10 to establish a data matrix for subsequent calculations.

[0046] Step S102: The safety assessment unit calculates the average score for each line segment under a single evaluation influencing factor. For each evaluation influencing factor for each line segment, the safety assessment unit summarizes the scoring data of all participating experts and calculates the arithmetic mean. The formula for calculating the average score is as follows: ; In the formula, Indicates the first The expert addressed the first The first section of the line The scores given for each evaluation factor; This represents the total number of line operation and maintenance management experts who participated in the scoring. Indicates the first Section of the line in The average score is calculated by aggregating scores from multiple experts under various evaluation factors.

[0047] Step S103: The safety assessment unit calculates the overall importance of each line segment. The safety assessment unit pre-assigns corresponding weighting factors to each evaluation factor based on the actual impact of factors such as line voltage level and important load type on the safe operation of the line. The safety assessment unit multiplies the average score calculated above by the corresponding weighting factor and then sums them to output the importance data of each line segment. The formula for calculating the importance of each line segment is as follows: In the formula, This indicates a pre-set target for the first Section 1 Weighting factors for each evaluation influencing factor; This indicates the total number of evaluation influencing factors involved in each section of the line; This represents the first value calculated based on the expert evaluation method. The overall importance of the section of the line.

[0048] Step S104: The safety assessment unit, combining historical operational experience data of the transmission lines, determines the main time periods for construction under the line and the corresponding construction probability for each time period. The safety assessment unit retrieves historical line inspection logs and past construction records as historical operational experience data, and calculates the frequency of external force construction occurring at various time spans within a day. Based on the statistical frequency distribution, the safety assessment unit calculates and generates the construction probability for each line segment during different time periods. In the formula, Indicates the first The time slots set for the route throughout the day The probability of an offline construction incident occurring within the premises.

[0049] Step S105: The safety assessment unit determines the probability of line failure caused by construction work on each section of the line, based on the specific type of offline construction and the terrain conditions of the passageway. The safety assessment unit subdivides offline construction operations into physical operation types such as mechanical excavation, large crane operations, and building construction, and performs data matching based on the geographical features of each line section, assigning corresponding failure probability parameters to each construction operation type and terrain combination. Accordingly, the safety assessment unit outputs the probability of line failure caused by the aforementioned physical construction work on each line section. In the formula, Indicates the first The probability of physical damage or power grid malfunction caused by underground construction on a section of the line. Through the above calculations, the safety assessment unit uses the generated comprehensive importance, construction probability, and failure probability as safety baseline parameters to provide data support for subsequent system adaptability assessments.

[0050] After quantifying the safety baseline parameters of overhead transmission lines using the aforementioned steps, it is necessary to further clarify the business processing requirements and data carrying boundaries of the monitoring system. (See Appendix) Figure 2 Step S2 is executed by the load assessment unit within the overhead transmission line safety load assessment model to establish an overhead transmission line load assessment mechanism, thereby determining the monitoring frequency requirements of each candidate node and the total system processing load. This step is specifically executed by the load assessment unit in the following sub-steps: Step S201: The load assessment unit establishes a mapping relationship between the monitoring device installation requirements and monitoring time intervals for each candidate node, and obtains evaluation data on the monitoring frequency of each node. To transform the time interval requirements in actual business scenarios into characteristic parameters that can be directly calculated by a computer, the load assessment unit sets fixed numerical mapping rules. Specifically, the mapping rules are as follows: when the input characteristic value is 0, it indicates that no monitoring device needs to be installed at that node location; when the characteristic value is 1, it indicates that the monitoring time interval requirement for that node location is once every 60 minutes; when the characteristic value is 2, it indicates that the monitoring time interval requirement is once every 30 minutes; when the characteristic value is 3, it indicates that the monitoring time interval requirement is once every 20 minutes; and when the characteristic value is 6, it indicates that the monitoring time interval requirement is once every 10 minutes. The load assessment unit receives evaluation characteristic values ​​entered by multiple experts for each node based on the on-site corridor conditions and following the above mapping rules, and establishes an initial evaluation data set.

[0051] Step S202: The load assessment unit configures the maximum workload of the system monitoring center. The load assessment unit reads the actual physical hardware parameters, such as the concurrent request processing limit of the monitoring center server, the computing power of the image analysis process, and the downlink data throughput bandwidth of the communication network. By comprehensively comparing these hardware performance thresholds, the load assessment unit quantifies and sets the maximum workload that the system can stably withstand within a single standard time period. This maximum workload is defined as parameter L0 and will serve as the benchmark parameter for subsequent system verification of whether the data processing pressure of the configuration scheme exceeds the limit.

[0052] Step S203: The load assessment unit aggregates and calculates the final actual demand monitoring frequency for each candidate node. The load assessment unit retrieves the initial evaluation data set from memory and, for each discrete candidate node on the transmission line, performs an arithmetic average of the feature values ​​input by multiple experts to eliminate evaluation bias from a single individual. The formula for calculating the actual demand monitoring frequency for each node is as follows: ; In the formula, Indicates the first The expert addressed the first Evaluation feature values ​​of the monitoring frequency entered by each candidate node; This indicates the total number of experts who participated in this monitoring frequency evaluation; This represents the result obtained after data aggregation and calculation. The actual monitoring frequency required for each candidate node location.

[0053] Through the above execution process, the load assessment unit completed the quantitative extraction of the monitoring frequency requirements for each discrete node and the definition of the overall data processing upper limit of the system. The maximum operating load L0 is synchronously transmitted to the transmission line optimization configuration system, serving as underlying constraint data to support the iterative optimization calculation of the subsequent genetic algorithm to find the optimal deployment strategy for the equipment.

[0054] After step S2 quantifies the monitoring frequency of each candidate node and the overall system workload, the underlying basic data has been constructed. The transmission line optimization configuration system retrieves the above parameters and initiates the initial environment deployment for the optimization algorithm. (See Appendix) Figure 2 , Figure 2 This is a flowchart of a transmission line monitoring system optimization configuration system and method based on an improved genetic algorithm according to an embodiment of the present invention. Step S3, executed by the transmission line optimization configuration system, completes the definition of hardware physical boundary constraint parameters and the initialization of the basic global variables of the genetic algorithm, specifically including the following sub-steps: Step S301: The transmission line optimization configuration system sorts out and determines the number of candidate locations requiring monitoring devices and the physical upper limit of the actual number of deployable devices. The transmission line optimization configuration system iterates through the node monitoring frequency data output by the aforementioned load assessment model, counts the total number of line towers or corridor sections with monitoring requirements in the assessment results, sets this value as the number of monitoring devices required, and records it as a parameter. Simultaneously, the transmission line optimization configuration system reads the equipment asset management ledger of the power operation and maintenance unit, extracts the total number of physical monitoring camera devices currently available for on-site deployment in the warehouse, defines this inventory constraint as the actual number of monitoring devices installed, and records it as a parameter. The above parameters This reflects the objectively existing total physical equipment limit and will be written into the system's underlying layer as a hard constraint on the number of equipment generated in subsequent configuration schemes.

[0055] Step S302: The transmission line optimization configuration system initializes the basic global control variables of the genetic algorithm in memory. The system allocates a working segment in computer memory based on the problem size and sets the total number of individuals participating in the optimization calculation in each generation, i.e., the number of immune individuals, denoted as a parameter. This parameter determines the number of candidate device deployment schemes that the algorithm can process in parallel within a single computation cycle. The transmission line optimization configuration system sets the termination threshold for the overall iterative process of the control algorithm, i.e., the maximum number of immune generations, denoted as the parameter. The global variables that have been assigned values ​​as described above. , , as well as It will reside in system memory and be used to standardize and constrain the operational boundaries of all subsequent computational instructions such as population encoding, reproduction, and optimization loops.

[0056] After completing the memory initialization assignments for the number of candidate locations, the upper limit of physical devices, and the basic global variables for population iteration in the aforementioned steps, the system's underlying layer has the environmental boundaries for algorithm execution. (See Appendix) Figure 2 , Figure 2 This is a flowchart of a method for optimizing the configuration of a transmission line monitoring system based on an improved genetic algorithm, according to an embodiment of the present invention. Step S4 is executed by the transmission line optimization configuration system to generate an initial population with binary codes based on physical device quantity constraints.

[0057] Step S401: The transmission line optimization configuration system establishes a gene mapping rule, using a binary encoding array of the same length as the number of candidate locations to represent the installation status of monitoring equipment at each node. The transmission line optimization configuration system constructs a one-dimensional array in memory as the basic data structure for algorithm operation, i.e., a chromosome. The length of this chromosome is strictly equal to the number of candidate locations where monitoring devices need to be installed, as determined in the preceding steps. For any gene position in the chromosome, the transmission line optimization configuration system uses a binary encoding rule for state mapping, restricting the gene value to only 0 or 1. When the gene value is 1, it indicates that a monitoring device is configured and installed at the corresponding indexed candidate node location; when the gene value is 0, it indicates that a monitoring device is not configured and installed at the corresponding indexed candidate node location. Through this mapping rule, the transmission line optimization configuration system converts the actual physical deployment scheme of the equipment into a binary chromosome array that can be processed by the computer.

[0058] Step S402: The transmission line optimization configuration system randomly generates a single chromosome and immediately determines whether the sum of its gene states meets the actual physical upper limit constraint of the monitoring devices. The random number generator of the transmission line optimization configuration system randomly assigns a value of 0 or 1 to each gene position in the array, generating an initial chromosome. After the single chromosome is generated, the transmission line optimization configuration system immediately triggers a screening mechanism, summing the gene values ​​representing the installation status within it, and comparing the sum with the aforementioned physical upper limit of the number of monitoring devices actually installed in the system, in order to eliminate invalid schemes that exceed the total amount of on-site hardware. The formula for the constraint on the number of monitoring devices is as follows: ; In the formula, Represents the number of chromosomes in the binary chromosome array. The installation status value of the monitoring equipment corresponding to each gene locus, which can be 0 or 1; This represents the number of candidate locations for which monitoring devices need to be installed, as the upper limit boundary of the summation operation; This represents the number of monitoring devices actually installed as determined above, i.e., the physical upper limit constraint value; The summation term represents the cumulative total number of monitoring devices planned to be deployed in the currently generated single chromosome scheme.

[0059] In step S403, the transmission line optimization configuration system cyclically constructs an initial population that meets the constraints. When a generated single chromosome satisfies the aforementioned constraint formula for the number of monitoring devices, the transmission line optimization configuration system stores it in the effective population pool in memory; when the constraints are not met, the chromosome data is directly erased from memory and a regeneration instruction is triggered. This random assignment and immediate judgment operation is repeated until the number of chromosomes accumulated in the effective population pool reaches the number of immune entries set in the aforementioned steps. The transmission line optimization configuration system then completes the construction of the initial population and inputs the population data matrix composed of multiple legal chromosomes into subsequent steps for fitness evaluation.

[0060] After completing the aforementioned steps of memory screening and construction of legal chromosomes for the initial population, the system needs to further guide the optimization direction by calculating the operational performance of each configuration scheme. (See Appendix) Figure 2 , Figure 2 This is a flowchart of a transmission line monitoring system optimization configuration method based on an improved genetic algorithm according to an embodiment of the present invention. Step S5, executed by the transmission line optimization configuration system for each chromosome in the population, mainly consists of parallel computation processes in two dimensions: safety fitness evaluation and load fitness evaluation.

[0061] Step S501: The transmission line optimization configuration system establishes a safety benchmark calculation process under the constraint of no monitoring. The system starts a Monte Carlo simulation loop in memory for an ideal physical environment without monitoring devices. In a single test loop, the system calls a random number generator to generate interval floating-point numbers and compares them with the construction probabilities for each time period output by the aforementioned evaluation to determine whether external construction has occurred on each line segment in the simulated daily scenario. If construction is determined to have occurred, the system combines preset probability parameters of line faults caused by construction to perform fault trigger comparison calculations for each discrete clock point during the construction period of the day. If the comparison confirms a fault, the fault counter in memory increments. The system controls the above simulation process to loop 1000 times at full load and locks the final fault count value as the baseline reference scale.

[0062] Step S502 involves using time-difference game theory logic introduced by the transmission line optimization configuration system to calculate the actual fault risk under monitoring constraints. The system extracts the corresponding equipment installation status data for the currently evaluated segment and initiates 1000 calculation cycles of the same scale. When construction is determined to occur on a certain line segment, the system reads the monitoring frequency parameters configured for that node and extrapolates the time point at which the equipment captures the construction footage. The system extracts three key time points to construct the true time boundary of the line being in a high-risk state, and calculates the time span of this specific danger window, with the interval expression as follows: ; In the formula, This represents the real danger time window constructed by the system based on time difference game logic; This indicates the start time of construction determined by the system in random simulation calculations; This indicates the response time when the monitoring device first captures a video of the construction site based on the monitoring frequency configured for the corresponding node; This indicates the time interval from when the monitoring device detects an anomaly to when on-site personnel physically arrive to intervene.

[0063] The transmission line optimization configuration system strictly limits itself to the actual danger time window calculated above, and then performs fault triggering calculations again based on the fault probability. Once a fault is confirmed, the monitored fault counter for that chromosome will increment automatically.

[0064] Step S503: The transmission line optimization configuration system performs dimensionality reduction and merging of the above two calculation results to calculate the safety fitness of a single chromosome. The system extracts the cumulative fault occurrence count of the same node under the monitoring scheme and the no-monitoring scheme, and performs a ratio calculation to quantify the power grid safety benefits recovered by the monitoring configuration scheme. The safety fitness calculation formula for installing monitoring devices on each chromosome is as follows: ; In the formula, This represents the fitness value of the configuration scheme mapped to a single chromosome. This indicates the actual number of faults caused by construction on each section of the line, calculated by the system through a game of critical time windows and cumulative calculations under the specific configuration of the monitoring devices. This represents the number of baseline faults caused by construction work on each section of the line, calculated cumulatively by the system under baseline conditions without monitoring devices.

[0065] Step S504: The transmission line optimization configuration system performs a quantitative assessment of load adaptability. The system iterates through the binary one-dimensional array of the currently evaluated chromosomes, extracts the corresponding gene loci carrying equipment installation status identifiers, and establishes a computational mapping between these loci and the required monitoring frequency for that line location. By accumulating the network communication and image processing requirements of all nodes, the total system workload is calculated. The system then performs a normalization operation by dividing this total workload by the physical hardware capabilities of the monitoring center. The calculation formulas for the relevant load parameters are as follows: ; In the formula, This represents the total workload generated by the current single chromosome mapping scheme in the monitoring system; This indicates the number of candidate locations where monitoring devices need to be installed, as preset in advance. Indicates the first Evaluation data on the actual required monitoring frequency for each candidate node location; Indicates the number of chromosomes The binary value of the monitoring equipment installation status corresponding to each gene position; For multiple summation operations, it means accumulating the system's global data processing pressure based on the product of the device deployment status and frequency requirements of each node; This indicates the current chromosome's fitness value; This indicates the pre-configured maximum workload boundary parameter of the monitoring center.

[0066] Step S505: The transmission line optimization configuration system integrates dual-objective evaluation indicators to calculate and output the final individual fitness. The system invokes the set weight allocation mechanism to multiply and weight the safety fitness, which reflects the safety benefits of power grid operation, and the load fitness, which reflects the load pressure on the data center, and outputs the absolute evaluation standard to guide subsequent population evolution. The comprehensive fitness calculation formula is as follows: ; ; In the formula, Indicates the current number The final overall fitness index of each chromosome; This represents the safety fitness weighting factor assigned by the system to balance the evaluation focus; This represents the load fitness weighting factor assigned by the system. This indicates the number of independent calculations. Safety fitness of a single chromosome; This indicates the number of independent calculations. The load fitness of each chromosome.

[0067] After completing the absolute standard quantification of the overall fitness of each candidate scheme within the population, the system needs to enter a pre-reproduction screening stage of survival of the fittest. (See attached diagram) Figure 2 , Figure 2 This is a flowchart of a transmission line monitoring system optimization configuration system and method based on an improved genetic algorithm according to an embodiment of the present invention. The transmission line optimization configuration system performs step S6 on the current population, using an improved roulette wheel selection method to ensure that the number of retained individuals meets the scale requirements for subsequent reproduction. Specifically, this includes the following sub-steps: Step S601: An adaptive dynamic factor is introduced by the transmission line optimization configuration system to reconstruct the probability density of each chromosome being selected. The system reads the comprehensive fitness index of a single chromosome and calculates its reciprocal parameter. To overcome the inherent defects of traditional genetic algorithms, such as convergence too quickly in the initial optimization stage leading to getting trapped in local solutions, and convergence too slowly in the final stage, the system synchronously reads the current immune iteration count and the maximum immune generation recorded in memory, and derives the adaptive factor that gradually increases with the iteration process through algebraic derivation. The system uses this adaptive factor as an exponent, performs power operations and ratio calculations on the reciprocal of the fitness, and reconstructs the probability density of each chromosome being selected. The calculation relationship of the relevant parameters is as follows: ; ; ; In the formula, Indicates the first The inverse fitness parameter of each chromosome; The current output of the dual-objective evaluation index of the aforementioned system. A comprehensive fitness index of chromosomes; This represents the adaptive factor introduced by the system through the current iteration state; The maximum number of immune generations for the overall iterative process of the control algorithm initialized in memory for the aforementioned system; This indicates the current number of immune iterations being performed during the system's optimization process; Indicates the first The probability density value of the selected chromosome after adaptive exponential improvement; The number of immune cells initialized in memory for the aforementioned system; This is a summation operation, representing the total value of all individuals in the current generation after adaptive exponentiation.

[0068] Step S602: The transmission line optimization configuration system divides and allocates selection probability intervals in memory. Based on the individual probability density values ​​calculated above, the system continuously calculates the upper and lower thresholds of the allocation interval for each chromosome in the population, maps them to the underlying numerical scale, and thus constructs the improved selection wheel interval boundaries. The derivation expression of the corresponding interval thresholds is as follows: ; ; ; In the formula, Indicates the first in the population The upper limit of the probability interval for selecting an individual chromosome is defined as follows: ; This indicates the first result calculated by the aforementioned system. The probability density value of each chromosome being selected; Indicates when Time The lower limit of the probability interval for a chromosome to be selected; Indicates when Time The upper limit of the probability range for a chromosome to be selected; This indicates the first result calculated by the aforementioned system. The probability density value of each chromosome being selected; For multiple summation operations, it means summing the values ​​of the items ranked in the order of 10. The first to the second The probability density values ​​of each chromosome are summed up. For summation of multiple terms, it means summing the terms of terms ranked in the order of 1 / 2. The first to the second The probability density values ​​of each chromosome are summed up.

[0069] Step S603 involves the transmission line optimization configuration system performing numerical interval comparison and individual selection operations. The system's underlying control program generates a single random floating-point number within a numerical scale range of 0 to 1. The system compares this random floating-point number with the probability interval boundaries corresponding to each chromosome allocated in the previous steps. If the comparison confirms that the random floating-point number falls within the specified range... Within the corresponding numerical range, the system determines the corresponding first... A chromosome was successfully selected. The system copied and extracted the selected chromosome data structure and stored it in a newly created next-generation candidate population pool in memory. The system continuously triggered the above-mentioned execution instructions to generate random floating-point numbers and compare them with interval values ​​until the number of individuals accumulated and stored in the next-generation candidate population pool reached the aforementioned set number of immune individuals, thus completing the evolutionary iteration preparation for selecting high-quality individuals within the current calculation cycle.

[0070] After the initial screening process completes the weeding out of inferior candidates and a new generation of candidate population pool is built in memory, the system needs to explore better configuration schemes through gene sequence recombination operations. (See attached...) Figure 2 , Figure 2 This is a flowchart of a transmission line monitoring system optimization configuration system and method based on an improved genetic algorithm according to an embodiment of the present invention. The transmission line optimization configuration system performs step S7 on the selected population, carrying out a crossover operation with a hard constraint on the total number of devices as a pre-verification step. Specifically, this includes the following sub-steps: Step S701: The transmission line optimization configuration system introduces a crossover probability determination mechanism and performs pairing selection. The system's underlying control program starts a loop process, traversing each chromosome individual in the previously screened population. For the chromosome currently in the processing queue, the system calls an internal random number generator to generate a judgment benchmark value and compares it with the pre-configured crossover probability parameter. The value of this crossover probability parameter is limited to between 0.6 and 0.9. If the comparison result indicates that crossover is not required, the system directly saves the current chromosome in memory as a new sub-chromosome, terminates the recombination process of that individual, and proceeds to the subsequent mutation operation stage. If the comparison result indicates that crossover is allowed, the system randomly selects another different chromosome from the current population pool as a pairing target, and they jointly enter the substantive gene exchange stage.

[0071] Step S702: The transmission line optimization configuration system calculates the crossover range width and defines the data replacement interval. To ensure the reasonableness of the gene recombination fragment size, the system dynamically calculates the maximum allowed gene replacement length for each crossover operation by calling the floor function in the underlying mathematical operation library, based on the preset candidate node network size. The formula for calculating the crossover range width is as follows: ; In the formula, This represents the width of the crossing range determined by the transmission line optimization configuration system. The function to be executed for rounding up; The number of candidate locations for which monitoring devices need to be installed, as identified in the foregoing, is used here as a basic parameter for measuring network size.

[0072] After completing the width calculation, the transmission line optimization configuration system randomly determines the first crossover starting position within the effective index length of the current chromosome array. Using this starting position as a base point, and combining it with the previously calculated crossover range width, the system synchronously defines the same data replacement interval on the two paired chromosome one-dimensional arrays. The mathematical boundary of this interval is expressed as follows: .

[0073] In step S703, the transmission line optimization configuration system performs gene fragment swapping and real-time verification of physical upper limit constraints. The system swaps the physical memory addresses of the binary gene data of the two paired chromosomes within the aforementioned defined range, thereby generating a new offspring chromosome that has undergone gene recombination. Because the recombination process may lead to abnormal clustering of local installation state variables "1", the system triggers a blocking verification mechanism the instant the swapping operation is completed.

[0074] The system iterates through and sums the binary arrays of the newly generated offspring, and then, referring to the aforementioned formula for constraining the number of monitoring devices, compares whether the planned total number of devices to be installed under this reorganization scheme is less than or equal to the previously determined actual number of monitoring devices to be installed. If the verification result meets the physical upper limit constraint, the system determines that the gene recombination operation is valid and directly stores the new offspring chromosome in the memory pool of the new breeding population. If the verification result indicates that the total number of hardware devices exceeds the upper limit, the system determines that the crossover has produced an illegal solution, discards the new offspring generation result, and retrieves the original chromosome data saved in the current operation cycle as the new offspring. The system continues to execute the above probability determination, interval calculation, fragment replacement, and constraint verification instructions until the traversal cycle of all individuals in the population is completely completed.

[0075] After the crossbreeding operation is completed and a new offspring population is generated, in order to maintain the diversity of population data and prevent the optimization process from getting stuck in local optima, the system needs to simulate gene mutations in individuals within the population at the lowest level. (See Appendix) Figure 2 , Figure 2 This is a flowchart of a transmission line monitoring system optimization configuration system and method based on an improved genetic algorithm according to an embodiment of the present invention. The transmission line optimization configuration system executes step S8 on the newly generated population, performing a single-point gene mutation operation with a hard constraint check on the total number of devices, specifically including the following sub-steps: Step S801: The transmission line optimization configuration system sets a threshold for the number of chromosomes participating in mutation based on the aforementioned defined network scale. The system extracts the previously determined number of candidate locations where monitoring devices need to be installed, and uses the floor function in the mathematical operation library to calculate the number of sub-chromosomes allowed to enter the mutation sequence, thereby controlling the overall mutation scale. The formula for calculating the number of mutation selections is as follows: ; In the formula, This represents the threshold for the number of sub-chromosomes randomly selected to participate in the mutation operation, as determined by the transmission line optimization configuration system. The function to be executed for rounding up; The parameter refers to the number of candidate locations where monitoring devices need to be installed, as mentioned above.

[0076] After the calculation is completed, the system randomly selects from the new population pool generated by the crossover operation. The chromosome is processed and loaded into the mutation execution memory queue.

[0077] In step S802, the transmission line optimization configuration system determines the mutation triggering conditions for each selected individual based on the mutation probability. The system traverses the extracted sub-chromosome queue in memory. For the currently processed sub-chromosome, it uses a random number generation mechanism to generate a judgment threshold and compares it with the system's pre-configured mutation probability parameter. This mutation probability parameter is strictly limited to a value range of 0.2 to 0.4. If the comparison result determines that mutation is not required, the system maintains the original data structure of the sub-chromosome in memory without updating it and directly jumps the underlying pointer to the judgment process of the next individual. If the comparison result meets the mutation triggering conditions, the sub-chromosome is pushed into the substantive single-point gene inversion and verification stage.

[0078] In step S803, the transmission line optimization configuration system performs a single-point gene inversion and physical upper limit real-time verification operation. Within the one-dimensional array length range of the mutated sub-chromosome, the system locks a specific mutation location index using a random function. After locking the location, the system performs a logical inversion operation on the binary gene value corresponding to the mutation location, changing "0" representing no equipment installed to "1" representing equipment installed, or changing "1" to "0".

[0079] Since changing "0" to "1" can easily increase the total number of devices mapped to the current chromosome, the system immediately triggers a summation instruction for the number of devices on the newly generated sub-chromosome in memory. It then references the previously established constraint rules on the number of monitoring devices to compare whether the planned total number of devices is less than or equal to the previously determined actual number of monitoring devices installed. If the verification confirms that it meets the physical upper limit constraint on the total number of devices, the system uses the inverted newly generated sub-chromosome data structure in the population memory area to overwrite and update the original unmutated sub-chromosome. If the verification finds that the actual number of physical devices is exceeded, the system determines that the inversion operation has produced an illegal solution, refuses to execute the memory overwrite instruction, and directly retains the original sub-chromosome state. The system continuously loops through the above judgment, inversion, and verification process until all individuals in the mutation execution queue have been traversed, and then pushes the processed compliant population into the next round of fitness evaluation and iteration.

[0080] After the aforementioned gene recombination and single-point mutation operations, and the completion of physical upper limit constraint verification, a new generation of compliant population with a completely new data structure has been constructed in the underlying memory. To quantitatively verify the merits of the newly introduced gene features, the system needs to re-quantify and evaluate the data features of this population. (See attached...) Figure 2 , Figure 2 This is a flowchart of a transmission line monitoring system optimization configuration system and method based on an improved genetic algorithm according to an embodiment of the present invention. The transmission line optimization configuration system performs step S9 on the new generation population to conduct a dual-objective fitness re-evaluation operation, specifically including the following sub-steps: In step S901, the transmission line optimization configuration system iterates through and extracts the binary gene sequences of each chromosome in the new generation population. The system's underlying layer reads the one-dimensional array data of the newly generated sub-chromosomes and identifies the configuration variables representing the equipment installation status. For each newly generated sub-chromosome, the system loads it as an independent configuration scheme into the internal evaluation queue, providing basic equipment status data for subsequent simulation and numerical accumulation calculations.

[0081] In step S902, the transmission line optimization configuration system calls the Monte Carlo evaluation engine to re-execute the safety fitness metric calculation. The system references the safety fitness evaluation logic constructed in step S5 above, and for the new sub-chromosome currently in the evaluation queue, combines the updated equipment configuration positions in its gene sequence to restart the cyclic simulation a specified number of times at the underlying level. In each simulation cycle, the system randomly determines the offline construction status of the line corridor based on the construction probability parameters for each time period of the day. If construction occurs, the system, combined with the monitoring frequency parameters of each monitoring device corresponding to the new sub-chromosome, re-determines the time when the construction point is monitored and the time interval for subsequent monitoring personnel to arrive. The system randomly determines whether a line fault occurs at each moment during the construction period and accumulates the number of fault occurrences. After the simulation cycle ends, the system calculates the ratio of the total number of fault occurrences under this configuration scheme to the baseline number of fault occurrences recorded in memory under the state without monitoring devices, and then uses the aforementioned safety fitness calculation formula to obtain the current safety fitness index value of the new sub-chromosome.

[0082] Step S903 involves the transmission line optimization configuration system performing load fitness calculation and dual-objective comprehensive feature quantification. Simultaneously, the system references the workload calculation rules established in step S5, summing the monitoring frequency parameters of all corresponding nodes based on their installation positions in the new sub-chromosome, to obtain the overall workload value corresponding to the new chromosome. The system then calculates the ratio of this overall workload value to the maximum workload threshold determined in the aforementioned evaluation, using the aforementioned load fitness calculation formula to obtain the load fitness index value of the current new sub-chromosome. After completing the index calculations in both the safety and load dimensions, the system calls the aforementioned constructed dual-objective comprehensive evaluation function, using pre-set safety fitness factors and load fitness factors to weight the two index values, obtaining the final comprehensive fitness quantification parameter of the new sub-chromosome. The system records this comprehensive fitness parameter in the memory data structure of the corresponding chromosome until all individuals in the new generation population have completed feature quantification, using this as the numerical basis for subsequently determining whether the optimization process should terminate or a new round of screening should begin.

[0083] After the bi-objective integrated fitness metric of the new generation population is quantitatively calculated and fully recorded in memory, the system needs to determine and constrain the termination conditions of the entire iterative optimization lifecycle of the genetic algorithm at this node. (See attached...) Figure 2 , Figure 2 This is a flowchart of a transmission line monitoring system optimization configuration system and method based on an improved genetic algorithm according to an embodiment of the present invention. The transmission line optimization configuration system executes step S10 on the algorithm engine to perform a global iterative state comparison and determination operation, specifically including the following sub-steps: Step S1001: The transmission line optimization configuration system extracts global control variables and iterative state parameters. The system's underlying state register reads the cycle count value of the currently executing state from the memory runtime area, which is the current immune iteration number defined above. The system synchronously retrieves the algorithm's initialization phase, with the periodic running upper limit threshold fixed in the system configuration file, which is the maximum number of immune generations set as mentioned above. Both serve as the basis for numerical comparison in subsequent loop exit logic.

[0084] In step S1002, the transmission line optimization configuration system executes the condition comparison and cycle flow control instructions. The system calls its internal logic comparison operator to obtain the current immune iteration count. The maximum number of immune generations set by the system Global variables are compared to determine whether the system should return to the previous step or exit the loop engine's logical control process. If the comparison result indicates the current immune iteration count... Maximum number of immune generations not reached The system determines that the multidimensional optimization process has not yet fully converged, and then increments the current immune iteration count in the underlying counter. Perform an increment operation and control the system's execution pointer to jump back to the aforementioned step S6. The system will use the population that has just completed its fitness assessment as the initial base and restart the improved roulette wheel algorithm for the next round of individual selection and crossover mutation operations. If the comparison result indicates the current number of immune iterations... Maximum number of immune generations has been reached The system determines that the overall genetic algorithm's optimization lifecycle has reached the designed physical boundary conditions, instructs the loop engine to terminate its iterative operation and cut off the loop. The system exits the loop control process and directly transfers all the comprehensive fitness data accumulated in the current population pool to the final solution presentation stage.

[0085] Once the genetic algorithm's iterative engine reaches its preset running limit and terminates the loop, the system will obtain the final population obtained through multiple rounds of crossover and mutation evolution. To transform the underlying mathematical solution obtained from the optimization calculation into a physical configuration scheme that can guide actual engineering deployment, the system needs to parse and map the final population data. (See appendix) Figure 2 , Figure 2 This is a flowchart of a transmission line monitoring system optimization configuration system and method based on an improved genetic algorithm according to an embodiment of the present invention. The transmission line optimization configuration system performs step S11 on the final population, carrying out data parsing output and physical point mapping operations, specifically including the following sub-steps: In step S1101, the transmission line optimization configuration system locates and extracts the globally optimal chromosome with the highest comprehensive fitness value from memory. The system reads the last generation of population data residing in the memory pool after exiting the optimization loop, traverses the internal data structure of all individuals, and extracts the comprehensive fitness quantification parameters calculated and overwritten in the previous steps. By calling numerical comparison instructions, the system selects the single chromosome with the highest comprehensive fitness value from the entire final population and marks it as the globally optimal chromosome. Simultaneously, the system extracts the safety fitness parameter and load fitness parameter associated with the data structure of this optimal chromosome and stores them in the output buffer as quantitative evaluation indicators for the final configuration scheme.

[0086] In step S1102, the transmission line optimization configuration system parses and maps the globally optimal chromosome sequence to specific physical locations for hardware deployment. The system reads the one-dimensional binary gene sequence of the globally optimal chromosome and scans all array index sites in the sequence sequentially. When a site with a gene value of "1" is identified, the system retrieves the power grid spatial mapping relationship library constructed during the initialization phase and converts the array index of that site into the corresponding specific tower coordinates or channel segment physical coordinates on the overhead transmission line. The system simultaneously extracts the monitoring frequency parameter corresponding to the physical coordinate node determined in the aforementioned model, binds the physical coordinates with the monitoring frequency parameter, and constructs a hardware installation and operation configuration dataset for a single monitoring device. Since the sequence satisfies the aforementioned device quantity constraint, the number of physical locations parsed by the system is equal to the actual number of monitoring devices installed.

[0087] Step S1103: The transmission line optimization configuration system generates configuration instructions and executes output operations. The system aggregates all single-point configuration datasets generated after the above sequence scanning to form an overall spatial layout and frequency configuration scheme for the transmission line monitoring equipment. The system reads the comprehensive fitness, safety fitness, and load fitness indicators from the output buffer and sends them, along with the overall configuration scheme, to the human-machine interface for result display, or encapsulates the spatial layout and frequency parameters into engineering implementation instructions and sends them to the operation and maintenance management terminal. This output data directly guides on-site personnel in setting up monitoring hardware at designated physical locations and setting the monitoring interval parameters, thereby completing the closed-loop optimization configuration of the entire overhead transmission line monitoring system.

[0088] Specific embodiments have been used to illustrate the principles and implementation methods of this invention. The descriptions of the embodiments above are only for the purpose of helping to understand the method and core ideas of this invention. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the ideas of this invention. Therefore, the content of this specification should not be construed as a limitation of this invention.

Claims

1. A transmission line monitoring and optimization configuration system based on an improved genetic algorithm, characterized in that, include: The safety load assessment model for overhead transmission lines includes a safety assessment unit and a load assessment unit. The safety assessment unit determines the overall importance, construction probability, and failure probability based on the voltage level, important load type, fault risk level, offline construction frequency, and geographical features of each section of the overhead transmission line. The load assessment unit determines the monitoring frequency and maximum workload based on the monitoring interval requirements of each candidate node and the hardware performance parameters of the monitoring center. The transmission line optimization configuration system includes a population initialization unit, a fitness evaluation unit, and a genetic operation unit. The population initialization unit sets the number of individuals and the maximum number of iterations and generates an initial population containing chromosomes. The gene loci in the chromosomes correspond to the installation status of the monitoring devices for candidate nodes of the transmission line. The fitness evaluation unit calculates the comprehensive fitness of the chromosomes based on the line fault occurrence count, the total system workload, and the maximum workload under the monitoring device configuration scheme. The genetic operation unit performs selection, crossover, and mutation operations. When the maximum number of iterations is reached, the transmission line optimization configuration system outputs a monitoring configuration scheme containing the physical coordinates of the monitoring device installation location and the corresponding monitoring frequency.

2. The transmission line monitoring and optimization configuration system based on an improved genetic algorithm according to claim 1, characterized in that, The load assessment unit determines the monitoring frequency and the monitoring frequency for the maximum workload, including: The load assessment unit receives evaluation feature values ​​and establishes an initial evaluation data set; The load assessment unit calculates the monitoring frequency by performing an arithmetic average of the evaluation feature values ​​in the initial evaluation data set.

3. The transmission line monitoring and optimization configuration system based on an improved genetic algorithm according to claim 1, characterized in that, The fitness evaluation unit calculates the overall fitness of the chromosome, including: The fitness assessment unit calculates the safety fitness of the chromosome installation monitoring device and the load fitness corresponding to the workload, respectively. The fitness evaluation unit calculates the overall fitness of each chromosome by combining the safety fitness and the load fitness with weighting factors.

4. A transmission line monitoring and optimization configuration method based on an improved genetic algorithm, applied to the transmission line monitoring and optimization configuration system based on an improved genetic algorithm as described in any one of claims 1 to 3, characterized in that, Includes the following steps: Determine the overall importance, construction probability, and failure probability, and determine the monitoring frequency and maximum workload; Receive the overall importance, the construction probability, the failure probability, the monitoring frequency, and the maximum workload; set the population size and the maximum number of iterations; and generate an initial population containing chromosomes. A fitness assessment is performed to calculate the safety fitness and load fitness of the chromosome, and the overall fitness of the chromosome is calculated by combining weighting factors. A new population is generated by performing selection, crossover, and mutation operations, and the safety fitness and load fitness are recalculated for the new population. Determine whether the maximum number of iterations has been reached. If the maximum number of iterations has not been reached, proceed to the step of performing selection, crossover, and mutation operations to generate a new population. When the maximum number of iterations is reached, output the monitoring configuration scheme.

5. The transmission line monitoring and optimization configuration method based on an improved genetic algorithm according to claim 4, characterized in that, The determination of overall importance, construction probability, and failure probability includes: Calculate the average score of each line segment under a single evaluation influencing factor; The average score is multiplied by the corresponding weighting factor, and then summed to output the overall importance. Statistical analysis of the frequency of external construction activities occurring at various time intervals within a day; The construction probability for each different time period is calculated and generated based on the frequency distribution. The fault probability is output by matching data with geographical features and assigning corresponding fault probability parameters.

6. The transmission line monitoring and optimization configuration method based on an improved genetic algorithm according to claim 4, characterized in that, The generation of the initial population containing chromosomes includes: The total number of physical surveillance cameras is defined as the actual number of surveillance cameras installed. The gene values ​​representing the installation state within a single chromosome are summed. Compare the sum of the gene values ​​with the actual number of monitoring devices installed; When a single chromosome meets the quantity constraint of the monitoring device, it is stored in the effective population pool. The construction of the initial population is completed when the number of chromosomes accumulated in the effective population pool reaches the number of individuals in the population.

7. The transmission line monitoring and optimization configuration method based on an improved genetic algorithm according to claim 4, characterized in that, The fitness assessment calculation of the chromosome's safety fitness and load fitness includes: Extract the cumulative fault count of the same node under both the configured monitoring scheme and the no-monitoring scheme; Perform a ratio calculation to quantify the security fitness. The total system workload is calculated by summing the network communication and image processing requirements of all nodes. The load fitness is evaluated by dividing the total system workload by the maximum workload and normalizing the total workload.

8. The transmission line monitoring and optimization configuration method based on an improved genetic algorithm according to claim 4, characterized in that, The selection operations performed in generating a new population by executing selection, crossover, and mutation operations include: Read the comprehensive fitness index of a single chromosome and calculate its reciprocal parameter; Calculate the adaptive factor by reading the current number of immune iterations and the maximum number of iterations; The probability density of each chromosome being selected is calculated by exponentiation of the reciprocal parameter with the adaptive factor as the exponent. Based on the probability density of each chromosome being selected, the upper and lower thresholds of the allocation interval are continuously calculated to construct the selection wheel interval boundary; A single random floating-point number is generated and compared with the value of the selected chromosome by the boundary of the selection wheel interval.

9. The transmission line monitoring and optimization configuration method based on an improved genetic algorithm according to claim 4, characterized in that, The crossover and mutation operations performed in generating a new population during the selection, crossover, and mutation operations include: Calculate the crossover range width and define the data replacement interval based on the preset candidate node network size; The binary gene data of the paired chromosomes that are within the data replacement interval are exchanged to generate new offspring chromosomes; Locate the specific mutation location index within the new offspring chromosome that has undergone the mutation; Perform a logical inversion operation on the binary gene data corresponding to the mutation location index; The number of monitoring devices is checked in real time for both the new offspring chromosome and the new offspring chromosome after the logical inversion operation.

10. The transmission line monitoring and optimization configuration method based on an improved genetic algorithm according to claim 4, characterized in that, When the maximum number of iterations is reached, the monitoring configuration scheme is output, including: The chromosome with the highest overall fitness is selected from the final generated population and marked as the globally optimal chromosome. Read the one-dimensional binary gene sequence of the globally optimal chromosome and convert it into specific physical coordinates; The specific physical coordinates are data-bound with the monitoring frequency to construct a single-point configuration dataset; All the single-point configuration datasets are aggregated to form the execution output of the monitoring configuration scheme.