A comprehensive evaluation method and system for onboarding authentication test data

By constructing network access interaction relationships and tracing abnormal propagation paths, the problem of insufficient assessment of abnormal chain effects in equipment network access verification was solved, realizing global assessment and accurate quantification of equipment network access verification test data, and improving the comprehensiveness and traceability of assessment results.

CN123145131APending Publication Date: 2026-11-20北京精微致合测试技术有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611655863.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-26
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing equipment network access verification technologies cannot fully cover the chain reaction of anomalies in multi-model collaborative networking, nor can they quantify the extent of the impact of anomalies on related nodes and the overall network impact range, resulting in incomplete comprehensive evaluation results of test data.

Method used

Construct network interaction relationships, map verification issues as abnormal nodes, trace abnormal propagation paths along interaction edges, generate a set of abnormal propagation paths, and generate the calculation results of impact propagation indicators through propagation calculation and result association fusion.

Benefits of technology

It enables a global assessment of equipment network access verification test data, clearly presents the coverage and transmission level of anomalies, improves the comprehensiveness and systematicness of the assessment results, and can accurately quantify the degree of impact on each equipment node while retaining the ability to trace the source of the propagation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123145131A_ABST
    Figure CN123145131A_ABST
Patent Text Reader

Abstract

The application discloses a kind of equipment network access verification test data comprehensive evaluation method and system, belong to verification test data processing technical field.The method first obtains the multiple-source heterogeneous test data in equipment network access verification test, constructs network access interaction relationship according to equipment network access interaction behavior;Verification problem record is mapped as the abnormal node in network access interaction relationship, the propagation path of abnormal node is tracked along interaction edge, and abnormal propagation path set is generated;According to abnormal propagation path set, the evaluation index of each equipment node is propagated along the propagation path to carry out propagation calculation, and impact propagation index calculation result is generated;Finally, the index calculation result is associated and fused with propagation path set, and network access influence evaluation result is generated.The present application can restore abnormal networking conduction context, quantify the degree of influence of node and locate problem root cause, effectively improve the comprehensiveness and accuracy of network access verification test data evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of verification test data processing technology, and in particular to a comprehensive evaluation method and system for equipment network access verification test data. Background Technology

[0002] Equipment network access verification testing is a core step in verifying the networking and interaction capabilities of multiple types of equipment and confirming network access performance indicators. In the current testing phase, multiple types of acquisition terminals are usually deployed to simultaneously acquire heterogeneous data from multiple sources, such as link layer transmit and receive logs, application layer interaction messages, equipment operation status data, and verification problem records. Existing evaluation technologies mainly conduct independent verification of individual network access indicators for each piece of equipment, checking the qualification of indicators such as registration timeliness, interaction success rate, and status stability of individual equipment item by item according to the test specifications, thereby forming a single-point dimension network access verification conclusion.

[0003] In actual test scenarios of multi-model collaborative networking, network access anomalies of a single device will propagate and spread to upstream and downstream related devices through the business interaction links between devices. However, existing assessment technologies are limited to the independent judgment of single-point indicators and cannot reconstruct the propagation path of anomalies in the network interaction relationship, nor can they quantify the impact of anomalies on related nodes and the overall network impact range. Ultimately, the comprehensive assessment results of test data are difficult to fully cover the chain effect of anomalies and cannot provide sufficient data support for root cause investigation and risk classification of network access problems. Summary of the Invention

[0004] This invention provides a comprehensive evaluation method and system for equipment network access verification test data to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, the present invention provides a comprehensive evaluation method for equipment network access verification test data, comprising:

[0006] Acquire multi-source heterogeneous test data in the equipment network access verification test, and construct network access interaction relationships based on the equipment network access interaction behavior. The network access interaction relationships include equipment nodes, interaction edges between equipment nodes, and interaction attributes.

[0007] The verification problem record is mapped to the abnormal node in the network entry interaction relationship. The propagation path of the abnormal node is traced along the interaction edge of the network entry interaction relationship to generate a set of abnormal propagation paths.

[0008] Based on the set of abnormal propagation paths, the evaluation indicators of each equipment node in the network entry interaction relationship are propagated and calculated along the propagation path to generate the calculation results of the propagation indicators.

[0009] The results of the propagation impact indicators are correlated and integrated with the set of abnormal propagation paths to generate the network access impact assessment results.

[0010] Preferably, the step of constructing the network access interaction relationship based on the equipment's network access interaction behavior includes:

[0011] Extract participant records of equipment network access interaction behavior from multi-source heterogeneous test data, and merge participant records corresponding to the same interaction behavior into interaction behavior records according to participant identifier and interaction sequence.

[0012] Based on the chronological order of the participant identifiers in the interaction behavior record, determine the initiator and responder of the interaction edge corresponding to the interaction behavior record;

[0013] Assign interaction edges to the interaction types and participating equipment nodes in the interaction behavior records to generate network entry interaction relationships.

[0014] Preferably, mapping the verification question record to an abnormal node in the network access interaction relationship includes:

[0015] Extract the problem phenomena and the sequence of occurrence from the verification problem records, and determine the equipment identifiers involved in the verification problem records based on the problem phenomena;

[0016] Based on the equipment identifier, locate the equipment node in the network access interaction relationship, and select the interaction edge whose interaction time sequence covers the problem occurrence time sequence from the interaction edges in which the equipment node participates as the abnormal interaction edge according to the problem occurrence time sequence.

[0017] The problem phenomenon is compared with the interaction attributes of the abnormal interaction edge. Based on the comparison results, the abnormal role of the equipment node in the abnormal interaction edge is determined, and the equipment node with the abnormal role is regarded as the abnormal node.

[0018] Preferably, the step of tracing the propagation path of abnormal nodes along the interaction edges of the network entry interaction relationship to generate an abnormal propagation path set includes:

[0019] The propagation direction is determined by taking the abnormal role of the abnormal node in the abnormal interaction edge as the propagation role;

[0020] Along the propagation direction, interaction edges that satisfy the association matching condition between the interaction type and the abnormal interaction edge, have a later interaction sequence, and whose starting node is inside the interaction edge and whose role is consistent with the propagation role are considered as valid propagation edges.

[0021] The abnormal propagation path set is generated by continuously tracing along the abnormal interaction edge and the effective propagation edge and setting the loop termination condition. The abnormal propagation path set consists of abnormal nodes, equipment nodes reached by abnormal interaction edges, and equipment nodes reached by effective propagation edges.

[0022] Preferably, generating the set of abnormal propagation paths, consisting of abnormal nodes, equipment nodes reached by abnormal interaction edges, and equipment nodes reached by effective propagation edges, includes:

[0023] When a propagation edge reaches the same equipment node, the propagation level of the same equipment node is determined according to the interaction sequence of the propagation edges that reach the same equipment node.

[0024] Among them, the level where the abnormal node is located is the first propagation level, the level where the equipment node reached by the abnormal interaction edge is located is the second propagation level, and the propagation edges after the second propagation level are valid propagation edges.

[0025] Equipment nodes with the same propagation level are grouped into the same level set, and the equipment nodes are connected in the order of propagation level to construct an anomaly propagation path tree;

[0026] The propagation range is determined based on the interaction type and propagation level of abnormal interaction edges and effective propagation edges in the abnormal propagation path tree, and the abnormal propagation path tree and its propagation range are combined to form an abnormal propagation path set.

[0027] Preferably, the step of calculating the propagation of evaluation indicators for each equipment node in the network entry interaction relationship along the propagation path based on the abnormal propagation path set, and generating the calculation results of the propagation indicators, includes:

[0028] According to the propagation hierarchy order of the abnormal propagation path tree in the abnormal propagation path set, obtain the propagation edge between the equipment node in the current propagation level and the equipment node in the next propagation level.

[0029] The transmission weight is determined based on the interaction type of the propagation edge, the time decay factor is determined based on the interaction sequence of the propagation edge, and the direction coefficient is determined based on the position of the propagation role in the propagation edge.

[0030] The transmission impact is obtained by calculating the evaluation indicators of the equipment nodes in the current propagation level based on the transmission weight, time decay factor, and direction coefficient.

[0031] The impact quantity is integrated with the original evaluation index of the equipment node in the next propagation level to obtain the impact propagation index of the equipment node in the next propagation level. This process is then performed layer by layer along the abnormal propagation path tree to generate the impact propagation index calculation results.

[0032] Preferably, the generation of the influence propagation index calculation results includes:

[0033] When the same equipment node receives the transmitted influence from multiple upstream equipment nodes through multiple effective propagation edges, the transmitted influence from each effective propagation edge is summed to obtain the total transmitted influence of the equipment node.

[0034] The contribution weight of each indicator source is determined according to the transmission weight of each effective propagation edge and the time decay factor.

[0035] Based on contribution weights, the total propagation impact is decomposed into source components, and each source component carries the corresponding anomaly propagation path tree, propagation level and contribution weight.

[0036] The original assessment index is integrated with the total transmitted impact to obtain the impact propagation index of the equipment node. The sum of each source component equals the total transmitted impact. The calculation result of the impact propagation index includes the original assessment index and the source components.

[0037] Preferably, the step of incorporating the source component into the calculation result of the influence propagation index includes:

[0038] Based on the abnormal propagation path tree and propagation level carried by each source component, determine the path node sequence corresponding to each source component in the abnormal propagation path set;

[0039] When the path node sequences corresponding to different source components pass through the same equipment node (excluding abnormal nodes and current equipment nodes) in the network entry interaction relationship, the first equipment node that is commonly passed when tracing upstream along the source component path will be taken as the merging node, and the source components that have passed through the merging node will be merged into a merged source component according to the contribution weight.

[0040] The merged source component and the source component that did not go through the merge node are included in the result of the influence propagation index calculation. The merged source component carries the merge node, the contribution weight after merging, the abnormal propagation path tree and the propagation level.

[0041] Preferably, the step of correlating and fusing the calculation results of the impact propagation indicators with the set of abnormal propagation paths to generate the network access impact assessment results includes:

[0042] In the network entry interaction relationship, the interaction edge in which the abnormal node participates and whose interaction sequence is earlier than the abnormal interaction edge is identified as the upstream interaction edge;

[0043] Tracing upstream along the upstream interaction edge to the upstream of the abnormal node, the traced equipment node is identified as the root cause node;

[0044] Based on the propagation range of the root cause node in the extended propagation path and the propagation level carried by the source component, determine the equipment nodes affected by the root cause node and form a set of nodes within the affected range.

[0045] Among them, the extended propagation path is composed of the root cause node, the abnormal node, and the equipment node in the abnormal propagation path set according to the propagation order.

[0046] The network access impact assessment results are generated based on the sum of the contribution weights of each source component traced back to the root cause node and the propagation level of the equipment nodes in the set of nodes within the impact range.

[0047] The network access impact assessment results include root cause nodes, the set of nodes affecting the network scope, and the network access risk determination.

[0048] To address the above problems, the present invention also provides a comprehensive evaluation system for equipment network access verification test data, the system comprising:

[0049] The network entry interaction relationship construction module is used to acquire multi-source heterogeneous test data in the equipment network entry verification test, and construct network entry interaction relationships based on the equipment network entry interaction behavior. The network entry interaction relationships include equipment nodes, interaction edges between equipment nodes, and interaction attributes.

[0050] The anomaly propagation path determination module is used to map verification problem records to anomaly nodes in the network entry interaction relationship, trace the propagation path of the anomaly nodes along the interaction edge of the network entry interaction relationship, and generate anomaly propagation path set.

[0051] The impact index calculation module is used to calculate the propagation of the evaluation index of each equipment node in the network interaction relationship along the propagation path based on the abnormal propagation path set, and generate the impact propagation index calculation results.

[0052] The impact result generation module is used to correlate and integrate the calculated results of impact propagation indicators with the set of abnormal propagation paths to generate network entry impact assessment results.

[0053] Compared with the prior art, the present invention has the following beneficial effects:

[0054] 1. By mapping verification problem records to abnormal nodes in the network access interaction relationship and tracing the abnormal propagation path along the interaction edge, and combining the propagation calculation and result correlation of evaluation indicators along the propagation path, it is possible to restore the transmission context of abnormalities based on the actual interaction link of equipment entering the network. This extends the evaluation of single-point verification problems to the entire network interaction scope, fully covers the chain transmission effect of abnormalities, clearly presents the coverage and transmission level of abnormalities, and enables the comprehensive evaluation of network access verification test data to have a global transmission perspective, effectively enhancing the comprehensiveness and systematicness of the evaluation results.

[0055] 2. By merging the participants in interactive behaviors and defining the roles of initiators and responders, a precise network entry interaction relationship is constructed. Combined with an effective propagation edge screening mechanism that matches interaction types, time constraints, and roles, a hierarchical anomaly propagation path tree is generated, providing a precise link foundation for the layer-by-layer transmission of influencing indicators. At the same time, the transmission weight, time decay factor, and direction coefficient are introduced to complete the quantitative propagation calculation of indicators, and the total indicator is decomposed into source components carrying path information. By merging common nodes, the indicator structure under multiple paths is simplified, and the characteristics of each link support each other. This not only achieves accurate quantification of the degree of impact on each equipment node, but also retains complete propagation traceability capabilities, further improving the precision and traceability of the assessment results. Attached Figure Description

[0056] Figure 1 This is a flowchart of a comprehensive evaluation method for equipment network access verification test data in this invention;

[0057] Figure 2 This is a flowchart of the anomaly propagation path tracing method in this invention;

[0058] Figure 3 This is a flowchart of the method for calculating the influence propagation index in this invention;

[0059] Figure 4 This is a module structure diagram of a comprehensive evaluation system for equipment network access verification test data in this invention. Detailed Implementation

[0060] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0061] Example 1, Reference Figures 1-2 As shown, a comprehensive evaluation method for equipment network access verification test data is applied to various equipment network access verification test scenarios. It is used to comprehensively evaluate various test data generated during the test process to accurately pinpoint the propagation path and coverage of equipment network access anomalies. The method includes:

[0062] S1. Obtain multi-source heterogeneous test data in the equipment network access verification test, and construct network access interaction relationship based on the equipment network access interaction behavior.

[0063] Among them, the network interaction relationship includes equipment nodes, interaction edges between equipment nodes, and interaction attributes.

[0064] In practice, multi-source heterogeneous test data are acquired synchronously through multiple types of acquisition terminals pre-deployed at the test site. Each type of data corresponds to a different network layer and business dimension, jointly covering the entire link information of equipment network access interaction.

[0065] The link layer transmit and receive logs collected by the gateway device are collected through the port mirroring function of the gateway device. The collection process does not affect the forwarding of normal business packets. Each link layer transmit and receive log carries a high-precision timestamp, source device address, destination device address, packet type identifier, packet length, verification result and port number fields. The timestamp accuracy can reach the microsecond level, which is used to restore the actual transmit and receive timing and transmission status of the underlying link.

[0066] The application layer interaction messages stored locally on each device's communication terminal are automatically recorded by the communication terminal's service log module and stored in the communication terminal's non-volatile storage medium. After the test, they are uniformly exported through the ground backhaul link. Each application layer interaction message includes a message serial number, interaction service type, sending end equipment number, receiving end equipment number, message sending time, message receiving time, and payload type fields, which are used to characterize the interaction behavior and content at the service layer.

[0067] The operational status reporting data periodically transmitted by the status monitoring system of each device is generated and transmitted by the monitoring module of the status monitoring system at a fixed period. For example, the period can be set to 2 seconds. Each status report data includes equipment number, collection timestamp, communication module working status, network registration status, channel resource occupancy rate, received signal level and equipment temperature fields, which are used to reflect the equipment's own operating status and network access conditions.

[0068] The verification issue records recorded by the verification test bench are divided into two categories: automatically detected issues and manually entered issues by test personnel. Automatically detected issues are automatically generated by the test bench by comparing the standard interaction process with the actual interaction data. These include transmission-related issues such as message timeouts, message loss, verification errors, and format errors. Manually entered issues are entered by test personnel based on the functional verification results. These include business-related issues such as abnormal functional response, performance indicators not meeting standards, and business process interruptions. Each verification issue record carries an issue number, associated equipment number, issue description, issue occurrence timestamp, issue severity level, and judgment criteria fields to identify various abnormal issues that occur during the test.

[0069] All types of test data are uniformly connected to the clock synchronization device in the test environment for clock synchronization. The clock synchronization device obtains the standard time through an external clock source and distributes the synchronization clock signal to each acquisition terminal. The synchronization accuracy can reach the millisecond level, thereby eliminating the local clock deviation of different acquisition terminals, ensuring that the timing reference of all test data is consistent, and avoiding errors in subsequent interaction behavior reconciliation and anomaly location due to timing misalignment.

[0070] S101. Extract the participant records of equipment network access interaction behavior from multi-source heterogeneous test data, and merge the participant records corresponding to the same interaction behavior into interaction behavior records according to the participant identifier and interaction sequence.

[0071] When extracting participant records, corresponding fields are extracted from the link layer send / receive logs and application layer interaction messages respectively. For the link layer send / receive logs, the source equipment address and destination equipment address are used as participant identifiers, and the send / receive timestamps corresponding to the logs are used as the interaction sequence. For the application layer interaction messages, the sender equipment number and receiver equipment number are used as participant identifiers, and the send time and receive time of the message are used as the interaction sequence.

[0072] The merging process iterates through all extracted participant records. First, all records are initially classified according to the interaction type field. Then, records of the same category are paired up by participant identifier. When the participant identifiers of two records correspond to each other as sender and receiver and the timestamp difference is within the preset interaction matching window, it is determined that the two records correspond to the same interaction behavior and are merged into a complete interaction behavior record.

[0073] For example, for a network registration interaction, if the communication terminal log of the third terminal device contains a record of sending a registration request and the log of the gateway device contains a record of receiving the registration request, and the interaction type of both records is network registration and the timestamp difference is 32 milliseconds, which is within the preset interaction matching window, then the two records will be merged into the same network registration interaction record.

[0074] The interactive matching window is preset through time synchronization calibration and link delay test before the test. During the preset, the maximum transmission delay of the same type of equipment under ideal channel is tested first, and then the clock synchronization error of each terminal is added to finally determine the window width, which can be set to 50 milliseconds for example.

[0075] The advantage of setting this window width is that it can completely cover the time delay and clock deviations during normal transmission, ensuring that two records of the same interaction can be correctly merged, and it will not misjudge two independent interactions as the same one, thus improving the accuracy of the merging results.

[0076] For unmatched one-sided records, such as messages with only a sending record and no corresponding receiving record, they are stored separately as incomplete interaction records and are not included in the subsequent interaction edge construction process to avoid invalid data interfering with the accuracy of the interaction relationship.

[0077] S102. Based on the chronological order of the participant identifiers in the interaction behavior record, determine the initiating end and the responding end of the interaction edge corresponding to the interaction behavior record.

[0078] The specific determination method is to extract the timestamps of the two participant records in the interaction behavior record, take the equipment node corresponding to the participant with the earlier timestamp as the initiating end of the interaction edge, and take the equipment node corresponding to the participant with the later timestamp as the responding end of the interaction edge.

[0079] For example, in the aforementioned network registration interaction record, if the timestamp of the third terminal device's communication terminal sending the registration request is earlier than the timestamp of the gateway device receiving the registration request, then the equipment node corresponding to the third terminal device will be taken as the initiator of the interaction edge, and the equipment node corresponding to the gateway device will be taken as the responder of the interaction edge.

[0080] For broadcast-type interactive behaviors, such as broadcast devices broadcasting status data to the entire network, one interactive behavior record will correspond to multiple receiver participant records. In this case, the broadcast sender is regarded as the initiator, and each receiver is regarded as the responder of an independent interactive edge, generating multiple interactive edges with the same initiator at one time.

[0081] S103. Assign interaction edges to the interaction type and participating equipment nodes in the interaction behavior record to generate network entry interaction relationship.

[0082] The interaction type in the interaction behavior record is assigned to the corresponding interaction edge. At the same time, the interaction sequence, interaction message length and interaction response duration are assigned to the corresponding interaction edge as interaction attributes. The interaction type is specifically divided into five categories: network registration, status synchronization, command forwarding, data sharing and heartbeat detection, which correspond to different business scenarios in the equipment network entry process. The interaction sequence includes two time points: the interaction start sequence and the interaction end sequence. The interaction response duration is the difference between the end sequence and the start sequence.

[0083] Equipment nodes are initialized when the network entry interaction relationship is established. Each equipment node carries basic attributes such as equipment number, equipment type, and initial evaluation indicators, and corresponds one-to-one with the equipment that actually participated in the test.

[0084] S2. Map the verification problem record to the abnormal node in the network entry interaction relationship, trace the propagation path of the abnormal node along the interaction edge of the network entry interaction relationship, and generate a set of abnormal propagation paths.

[0085] S201. Extract the problem phenomenon and the sequence of occurrence of the problem from the verification problem record, and determine the equipment identifier involved in the verification problem record based on the problem phenomenon.

[0086] The extraction process directly reads the corresponding fields in the verification issue record. The issue phenomenon is extracted from the issue phenomenon description field to extract the core category. The issue occurrence sequence is read from the issue occurrence timestamp field. The associated equipment number is directly used as the equipment identifier involved.

[0087] For example, a verification problem recorded by the verification test bench is a network registration timeout. The problem occurred 120 seconds after the test started. The device number in the problem description is DEV-03. Based on this device number, it can be determined that the device involved is a third-party terminal device.

[0088] S202. Locate the equipment node in the network access interaction relationship based on the equipment identifier, and select the interaction edge whose interaction time sequence covers the problem occurrence time sequence from the interaction edges in which the equipment node participates as the abnormal interaction edge.

[0089] The rule for determining the timing of the interaction sequence covering the occurrence of the problem is as follows: if the interaction start timing of a certain interaction edge is earlier than the occurrence timing of the problem and the interaction end timing is later than the occurrence timing of the problem, then the interaction sequence of that interaction edge is determined to cover the occurrence timing of the problem.

[0090] For example, the equipment node corresponding to the third terminal device participates in three interaction edges: the heartbeat detection interaction at 110 seconds after the start of the test, the network registration interaction from 119 seconds to 122 seconds, and the status synchronization interaction at 130 seconds. Among them, only the timing interval of the network registration interaction covers the timing of the problem occurrence at 120 seconds. Therefore, the network registration interaction edge is determined to be an abnormal interaction edge.

[0091] When multiple candidate interaction edges that meet the timing coverage conditions exist near the time sequence of the same equipment node for the same problem, they are filtered according to the matching degree between the interaction type and the problem phenomenon. The one with the highest matching degree is regarded as the abnormal interaction edge. For example, the registration timeout problem is preferentially matched with the interaction edge of the network registration type, so as to ensure the accuracy of anomaly location.

[0092] S203. Compare the problem phenomenon with the interaction attributes of the abnormal interaction edge, determine the abnormal role of the equipment node in the abnormal interaction edge based on the comparison result, and designate the equipment node with the abnormal role as the abnormal node.

[0093] The specific comparison process is as follows: when the problem is that the request sending timeout occurs and there is a significant delay in the sending time of the initiating end in the corresponding interaction attribute, and the message does not reach the other end, the abnormal role of the equipment node is determined to be an initiating end abnormality; when the problem is that the response reply timeout occurs and the reply duration of the responding end in the corresponding interaction attribute exceeds the preset threshold, the abnormal role of the equipment node is determined to be a responding end abnormality; when the problem is that the transmission packet is lost and the sending and receiving records of the two ends do not match, it is determined to be a link abnormality, and at this time both ends of the node have abnormal roles.

[0094] The preset threshold for response time is calibrated based on the normal response time of different interaction types. The calibration method is to select the response time of 100 interactions of the same type of equipment under normal network access status, calculate its average value and standard deviation, and use the average value plus three times the standard deviation as the response time threshold for the corresponding interaction type.

[0095] For example, the response time threshold for network registration interaction can be set to 3 seconds, and the response time threshold for status synchronization interaction can be set to 1 second. This calibration method is based on the 3σ principle in statistics, which can accurately identify abnormal interactions that exceed the normal range and avoid misjudgments caused by normal network fluctuations.

[0096] For example, if the problem of the aforementioned third terminal device is that the network registration timeout occurs, and the interaction attribute of the corresponding abnormal interaction edge shows that the registration request message sent by the initiating end is delayed and not correctly received by the gateway, which meets the judgment condition of the initiating end being abnormal, then the abnormal role of the equipment node corresponding to the third terminal device is determined to be the initiating end being abnormal, and the equipment node is the abnormal node.

[0097] S204. Determine the propagation direction along the abnormal interaction edge by taking the abnormal role of the abnormal node in the abnormal interaction edge as the propagation role.

[0098] The rules for determining the propagation direction are as follows: when the abnormal role is the initiator, the propagation direction is along the abnormal interaction edge from the initiator to the responder; when the abnormal role is the responder, the propagation direction is along the abnormal interaction edge from the responder to the initiator; when both ends are abnormal roles, the propagation direction extends in both directions simultaneously.

[0099] For example, if the aforementioned third terminal device is the initiator of the anomaly, the propagation direction is along the abnormal interaction edge from the third terminal device node to the gateway device node, and the impact of the anomaly spreads from the third terminal device node to the gateway device node.

[0100] S205. Along the propagation direction, interaction edges that satisfy the association matching condition between the interaction type and the abnormal interaction edge, have a later interaction sequence, and whose starting node is within the interaction edge and whose role is consistent with the propagation role are considered as valid propagation edges.

[0101] In this step, the determination of a valid propagation edge can be achieved using the following formula:

[0102]

[0103] in, Representing candidate interaction edges The result of determining whether an edge is a valid propagation edge is 1, which indicates that the edge is a valid propagation edge, and 0, which indicates that the edge is not a valid propagation edge.

[0104] For candidate interaction edges The interaction type is read directly from the interaction attributes of the interaction edge.

[0105] The interaction type of the abnormal interaction edge is extracted from the interaction attributes of the already determined abnormal interaction edges.

[0106] This is an interaction type association matching function. It takes the value 1 when the interaction type of the candidate interaction edge and the abnormal interaction edge meets the preset association matching condition, and otherwise takes the value 0. The preset association matching condition is determined by a pre-organized interaction type association table. The association table is preset by the testers according to the causal dependency relationship of the network access business process. For example, network access registration and status synchronization meet the association matching condition, while heartbeat detection and instruction forwarding do not meet the association matching condition.

[0107] For candidate interaction edges The interaction sequence is specifically obtained by taking the interaction start sequence of the interaction edge and reading it from the interaction attribute.

[0108] For the interaction sequence of abnormal interaction edges, the interaction start sequence of the abnormal interaction edge is taken and extracted from the interaction attributes of the abnormal interaction edge.

[0109] This is a timing indicator function. It takes the value 1 when the interaction timing of the candidate interaction edge is later than that of the abnormal interaction edge, and takes the value 0 otherwise. It is used to ensure the timing of abnormal propagation, that is, the abnormality will only be passed to subsequent interactions.

[0110] For candidate interaction edges The role of the starting node within the interaction edge, i.e., the initiator or the responder, is determined based on the direction of propagation and the correspondence between the two ends of the interaction edge.

[0111] The propagation role, i.e. the abnormal role of the abnormal node in the abnormal interaction edge, is obtained from the judgment result of S203.

[0112] This is a role indicator function. It takes a value of 1 when the starting node role of the candidate interaction edge is consistent with the propagation role, and a value of 0 otherwise. It is used to ensure the consistency of the propagation role and conforms to the business logic of exception propagation.

[0113] This is the set of tracked interaction edges used to implement the loop termination condition. Each valid propagation edge is added to this set during the tracking process.

[0114] This is a loop termination indicator function. It takes a value of 1 when the candidate interactive edge has not been traced, and a value of 0 otherwise. It is used to avoid repeated tracing and loop paths.

[0115] In this formula, all indicator functions and association matching functions are dimensionless quantities, and their product is 0 or 1. The product is 1 only when all four conditions are met, and the candidate interaction edge is determined to be a valid propagation edge.

[0116] For example, the interaction type of the abnormal interaction edge is network registration, the interaction start time is 119 seconds after the test starts, the propagation role is initiator abnormality, and the current abnormal interaction edge is included in the set of tracked interaction edges; the candidate interaction edge is state synchronization type, the interaction start time is 125 seconds, the starting node role is initiator, and it has not been added to the set of tracked edges; at this time... The value is 1. The value is 1. The value is 1. If the value is 1 and the product of the four terms is 1, then the candidate interaction edge is determined to be a valid propagation edge.

[0117] If the interaction timing of the candidate interaction edge is at second 118, which is earlier than the timing of the abnormal interaction edge, then If the value is 0, the product of the four terms is 0, and the candidate interaction edge is determined to be a valid propagation edge.

[0118] S206. Continuously trace along the abnormal interaction edge and the effective propagation edge, and set the loop termination condition to generate a set of abnormal propagation paths;

[0119] The abnormal propagation path set consists of abnormal nodes, equipment nodes reached by abnormal interaction edges, and equipment nodes reached by effective propagation edges.

[0120] The loop termination condition is set to stop tracing along the path when the tracing process reaches a previously visited equipment node again, thus avoiding an infinite loop and ensuring that the tracing process can converge.

[0121] The maximum propagation level can also be preset as a supplementary termination condition. For example, the maximum propagation level can be set to six levels. When the sixth level node is tracked, the tracking of that branch will stop. This setting not only conforms to the objective law that the depth of anomaly propagation is limited in actual equipment networks, but also improves the efficiency of tracking calculation.

[0122] S207. When a propagation edge reaches the same equipment node, the propagation level of the same equipment node is determined according to the interaction sequence of the propagation edges that reach the same equipment node.

[0123] The specific method for determining the level is as follows: the level where the abnormal node is located is the initial level, i.e., the first propagation level; the level where the next level equipment node is located along the first propagation edge is the second propagation level; the first propagation edge is the abnormal interaction edge; and so on. When the same equipment node is reached by multiple propagation edges with different timings, the level corresponding to the earliest arriving propagation edge is taken as the final propagation level of the equipment node.

[0124] For example, the first terminal device node is reached by two propagation edges with different timings. The third level corresponding to the propagation edge that arrives earlier is taken as the propagation level of the first terminal device node, and subsequent calculations are based on this level.

[0125] S208. Group equipment nodes with the same propagation level into the same level set, and connect each equipment node in the order of propagation level to construct an anomaly propagation path tree.

[0126] The construction process is as follows: First, abnormal nodes are placed into the first-level set as root nodes. Then, all propagation edges originating from the root node are traversed, and any unincluded nodes reached are placed into the second-level set. Next, all propagation edges of nodes in the second level are traversed, and any unincluded nodes reached are placed into the third-level set. This process continues until no new nodes are added, ultimately forming a complete tree structure.

[0127] The root node of the anomaly propagation path tree is the initial anomaly node. Each level of the node corresponds to the equipment node at the same propagation level. The connection between the nodes corresponds to the propagation edge, which includes anomaly interaction edges and effective propagation edges. The whole tree clearly shows the structure of the anomaly spreading outward from the initial node layer by layer.

[0128] S209. Determine the propagation range based on the interaction type and propagation level of the abnormal interaction edges and effective propagation edges in the abnormal propagation path tree, and form an abnormal propagation path set by combining the abnormal propagation path tree and its propagation range.

[0129] The propagation range specifically includes two parts: the spatial range, which is the list of equipment nodes involved in the anomaly and the distribution of equipment types; and the depth range, which is the maximum and average levels of the anomaly propagation. Together, these two parts comprehensively describe the propagation coverage of the anomaly.

[0130] For example, the abnormal propagation path tree caused by the aforementioned third terminal device includes a third terminal device node, a gateway device node, a first terminal device node, a second terminal device node, and a fourth terminal device node, totaling five sets of devices. The propagation level of the farthest node is the fourth level, and the average propagation level is about 2.6 levels. Therefore, the corresponding propagation range covers five sets of devices, and the propagation depth is four levels. This abnormal propagation path tree and its propagation range together constitute an abnormal propagation path set.

[0131] S3. Based on the set of abnormal propagation paths, the evaluation indicators of each equipment node in the network interaction relationship are propagated along the propagation path to generate the calculation results of the propagation indicators.

[0132] In this embodiment, the evaluation index is the equipment network access status score, which is calculated layer by layer along the hierarchical order of the anomaly propagation path tree. The evaluation index of the initial anomaly node is the measured score after the anomaly occurs. Subsequent level nodes are calculated by superimposing the impact of the propagation link, and finally the impact propagation index of each node is obtained.

[0133] S4. The calculation results of the impact propagation indicators are correlated and integrated with the set of abnormal propagation paths to generate the network access impact assessment results.

[0134] In this embodiment, the network access impact assessment results include a list of equipment with abnormal impacts, the impact level classification of each piece of equipment, and the overall network access risk level, which are used to support the output of test conclusions and the location and rectification of abnormal problems.

[0135] In summary, this embodiment constructs network access interaction relationships based on actual test data, and then combines the abnormal nodes to trace the propagation path along the interaction edge and construct a propagation path tree. This clearly and intuitively presents the diffusion context and coverage of abnormal problems in equipment network access verification. It solves the shortcomings of traditional evaluation methods that can only locate single-point problems and cannot reflect the chain effects of abnormalities. It effectively improves the comprehensiveness and accuracy of network access verification test data evaluation and provides reliable data support for the network access performance verification of equipment.

[0136] Example 2, Reference Figure 3 As a preferred embodiment of the present invention, this embodiment further refines the propagation calculation process and correlation fusion mechanism of the evaluation indicators based on embodiment 1. In order to meet the needs of quantitative evaluation and root cause location of abnormal impacts in equipment network access verification tests, this embodiment achieves accurate quantification of the degree of abnormal impact and propagation tracing, and works synergistically with the propagation path construction of embodiment 1.

[0137] S3. Based on the set of abnormal propagation paths, the evaluation indicators of each equipment node in the network interaction relationship are propagated along the propagation path to generate the calculation results of the propagation indicators.

[0138] S301. According to the propagation hierarchy of the abnormal propagation path tree in the abnormal propagation path set, obtain the propagation edge between the equipment node in the current propagation hierarchy and the equipment node in the next propagation hierarchy.

[0139] Among them, the level where the abnormal node is located is the first propagation level, and the level where the equipment node reached by the abnormal interaction edge is located is the second propagation level; the propagation edge between the first propagation level and the second propagation level is the abnormal interaction edge, and the propagation edge after the second propagation level is the effective propagation edge.

[0140] The propagation hierarchy starts from the initial first level, i.e., the level where the abnormal node is located, and proceeds to the subsequent levels one by one. Each round of calculation only processes the propagation edge between two adjacent levels, ensuring that the calculation process proceeds unidirectionally along the propagation direction and avoiding result deviations caused by reverse calculation.

[0141] For example, the anomaly propagation path tree constructed in Example 1 contains four propagation levels. The first level is the anomaly node corresponding to the third terminal device, the second level is the gateway device node, the third level is the first terminal device node and the second terminal device node, and the fourth level is the fourth terminal device node. During the calculation, the propagation edge between the first level and the second level is obtained first, where the propagation edge between the first level and the second level is the anomaly interaction edge. After the index calculation of the second level node is completed, the effective propagation edge between the second level and the third level is obtained, and so on, advancing layer by layer.

[0142] S302. Determine the transmission weight based on the interaction type of the propagation edge, determine the time decay factor based on the interaction timing of the propagation edge, and determine the direction coefficient based on the position of the propagation role in the propagation edge.

[0143] The transmission weight is determined by a pre-calibrated table of interaction type influence coefficients. During calibration, the weight is assigned based on the degree of dependence of different interaction types in the network access service link, combined with the statistical analysis results of historical test data. The higher the degree of dependence, the greater the transmission weight.

[0144] For example, the transmission weight of the network registration interaction, which serves as the basis for all subsequent services, can be set to 0.9; the transmission weight of the status synchronization interaction can be set to 0.7; the transmission weight of the instruction forwarding interaction can be set to 0.8; the transmission weight of the data sharing interaction can be set to 0.6; and the transmission weight of the heartbeat detection interaction can be set to 0.5.

[0145] The advantage of this calibration method is that it can reflect the differences in the abnormal transmission capabilities of different interaction types. The higher the core of the business, the stronger the abnormal transmission capability of the interaction, and the higher the corresponding transmission weight, making the calculation results more consistent with the abnormal propagation patterns of actual network access services.

[0146] The time decay factor is determined based on the time difference between the interaction sequence of the propagation edge and the interaction sequence of the abnormal interaction edge. The larger the time difference, the smaller the time decay factor, reflecting the objective law that the impact of the abnormality gradually weakens over time.

[0147] The specific calculation method is as follows: first, calculate the time difference between the interaction start time of the propagation edge and the interaction start time of the abnormal interaction edge; then compare the difference with the preset decay period. After each complete decay period, the time decay factor decreases by a fixed proportion until it reaches the preset minimum value and remains unchanged.

[0148] The attenuation period is preset through the analysis of business characteristics before the test. When preset, the duration of the impact of the network access anomaly of the same type of equipment is statistically analyzed, and half of the average value is taken as the attenuation period. For example, it can be set to 30 seconds.

[0149] The fixed reduction ratio can be set to 10% per cycle, and the minimum value can be set to 0.2. This parameter setting can reflect the time decay characteristics of the abnormal impact without causing the impact of remote nodes to be underestimated excessively, thus ensuring the rationality of the assessment results.

[0150] For example, if the starting time of an abnormal interaction edge is 120 seconds after the start of the test, and the starting time of a certain propagation edge is 150 seconds after the start of the test, the time difference between the two is 30 seconds, which is exactly one decay cycle. Then the time decay factor is reduced by 10% from the initial value of 1, and the value is 0.9.

[0151] The direction coefficient is determined based on the position of the propagation role in the propagation edge. When the propagation role is consistent with the initiating end of the propagation edge, the direction coefficient takes a positive value. When the propagation role is consistent with the responding end of the propagation edge, the direction coefficient takes a negative value. The absolute value of both is 1.

[0152] The purpose of the directional coefficient is to indicate the direction of the transmission of abnormal influences, ensuring that the calculation of the influence quantity is consistent with the direction of the propagation path, and avoiding calculation errors caused by directional confusion.

[0153] For example, if the propagation role of the aforementioned abnormal node is the initiating abnormality, and the initiating end of its corresponding propagation edge is the abnormal node, then the direction coefficient takes a positive value, and the abnormal impact is transmitted positively from the initiating end to the responding end.

[0154] S303. Calculate the evaluation index of the equipment nodes in the current propagation level according to the transmission weight, time decay factor and direction coefficient to obtain the transmission influence.

[0155] The specific calculation process is as follows: First, the evaluation index value of the current level equipment node is multiplied by the transmission weight to obtain the basic transmission amount. Then, the basic transmission amount is multiplied by the time decay factor to obtain the transmission amount after time decay. Finally, the transmission amount is multiplied by the direction coefficient to obtain the final transmission impact amount. Among them, the original evaluation index is used for the first propagation level, and the impact propagation index obtained from the previous round of calculation is used as the current evaluation index for subsequent propagation levels.

[0156] In this embodiment, the first hop uses an abnormal interaction edge as the initial propagation segment, and its transmission weight is determined according to the interaction type of the abnormal interaction edge. From the second hop onwards, an effective propagation edge is used. For example, the original evaluation index of the third terminal device node in the first level, namely the network access status score, is 60 points. The interaction type of the abnormal interaction edge is network access registration, and its transmission weight is 0.9. Since the first hop uses the abnormal interaction edge itself, the time difference between it and the abnormal interaction edge is zero. The time decay factor is taken as the initial value of 1, and the direction coefficient is positive. Then, 60 multiplied by 0.9 gives 54 points, and multiplied by the time decay factor 1 again gives 54 points. The final transmission impact is 54 points.

[0157] S304. Integrate the transmitted impact quantity with the original evaluation index of the equipment node in the next propagation level to obtain the impact propagation index of the equipment node in the next propagation level. Execute the process layer by layer along the abnormal propagation path tree to generate the impact propagation index calculation results.

[0158] The fusion method adopts negative impact superposition fusion, which means merging the absolute value of the transmitted impact with the original evaluation index value of the next level node to obtain the impact propagation index of that node.

[0159] Since the impact of anomalies has a negative effect on the network access status score, the fusion rule is as follows: the impact propagation index equals the original evaluation index minus the absolute value of the transmitted impact, and the direction coefficient is used to identify the source direction of the transmitted impact, without changing the negative nature of the impact of anomalies on the downstream node score.

[0160] The original evaluation index is the initial score of the equipment node under normal conditions. The higher the score, the better the network access status. Abnormal effects are negative. Therefore, regardless of whether the impact is generated by forward or backward propagation, it reduces the node's comprehensive score in absolute form to ensure that the final result is consistent with business understanding.

[0161] For example, if the original network access status score of the second-level gateway device node is 90 points, and the amount of transmitted influence received from the first level is 54 points, take the absolute value of the transmitted influence of 54 points, subtract 54 points from the original evaluation index of 90 points to get 36 points, which is the influence propagation index of the node.

[0162] After completing the calculation of a single level, repeat the above steps to continue calculating the next level until all propagation levels of the anomaly propagation path tree have been traversed, and finally obtain the influence propagation index of all nodes, forming the influence propagation index calculation result.

[0163] S305. When the same equipment node receives the transmitted influence from multiple upstream equipment nodes through multiple effective propagation edges, the transmitted influence from each effective propagation edge is summed to obtain the total transmitted influence of the equipment node.

[0164] S306. Determine the contribution weight of each indicator source according to the transmission weight of each effective propagation edge and the time decay factor.

[0165] In this step, the contribution weight can be calculated using the following contribution weight calculation formula:

[0166]

[0167] in, The number of valid propagation edges reaching the same equipment node, i.e. the number of index sources for that equipment node, is obtained by counting the number of all incoming valid propagation edges to that node.

[0168] For the first The propagation weight of a valid propagation edge is determined by the interaction type of that valid propagation edge, and the value is set in the same way as the propagation weight in S302.

[0169] For the first The time decay factor of an effective propagation edge is determined by the interaction timing of that effective propagation edge, and the calculation method is consistent with the calculation method of the time decay factor in S302.

[0170] denominator The normalization factor is the sum of the products of the propagation weights of all effective propagation edges and the time decay factor, used to ensure that the sum of the contribution weights of each indicator source is 1.

[0171] For the first The contribution weight of each indicator source represents the proportion of that source in the total impact of the equipment node, and is a dimensionless quantity.

[0172] For example, the fourth terminal device node at the fourth level simultaneously receives the transmitted influence from the first and second terminal device nodes at the third level. The transmission weight of the first effective propagation edge is 0.7, the time decay factor is 0.8, and the product is 0.56; the transmission weight of the second effective propagation edge is 0.7, the time decay factor is 0.7, and the product is 0.49. The value is 2, and the normalization factor is the sum of 0.56 and 0.49, which is 1.05. Therefore, the contribution weight of the first source is 0.56 divided by 1.05, which is approximately 0.53, and the contribution weight of the second source is 0.49 divided by 1.05, which is approximately 0.47. The sum of the two is 1, which meets the normalization requirements.

[0173] The advantage of this calculation method is that it can reasonably allocate the contribution ratio of different sources according to the transmission capacity and attenuation degree of each propagation path. The source with stronger transmission capacity and lower attenuation degree has a higher contribution weight, making the index decomposition result more consistent with the actual propagation law.

[0174] S307. Based on contribution weight, the total transmission impact of the same equipment node is decomposed into source components, and each source component carries the corresponding anomaly propagation path tree, propagation level and contribution weight.

[0175] In this step, the decomposition of the source components can be achieved using the following source component decomposition formula:

[0176]

[0177] in, For equipment nodes The total transmitted impact is obtained from the summary of S305.

[0178] For the first The contribution weight of each indicator source, For the corresponding number of the total transmitted influence The source component of each indicator has the same dimension as the total transmitted influence.

[0179] The formula satisfies that the sum of all source components equals the total transmitted influence of the equipment node, meaning that the sum of the values ​​of all source components is exactly equal to the total transmitted influence.

[0180] For example, the original evaluation metric for the fourth terminal device node is 80 points. The transmitted influence from the first and second terminal device nodes at the third level is 24 points and 21 points respectively, for a total transmitted influence of 24 plus 21 equaling 45 points. The contribution weights of the two sources are 0.53 and 0.47 respectively. Therefore, the value of the first source component is 45 multiplied by 0.53, which equals 23.85 points, carrying the contribution weight of 0.53 corresponding to the first propagation path tree and the fourth level. The value of the second source component is 45 multiplied by 0.47, which equals 21.15 points, carrying the contribution weight of 0.47 corresponding to the second propagation path tree and the fourth level. The sum of the two components is 45 points, which is equal to the total transmitted influence.

[0181] S308. The source components are included in the calculation results of the influence propagation index. The original assessment index is integrated with the total transmitted influence to obtain the influence propagation index of the equipment node. The sum of each source component is equal to the total transmitted influence. The calculation results of the influence propagation index include the original assessment index and the source components.

[0182] Based on the aforementioned example, the impact propagation index of this node is 80 minus 45, which equals 35 points.

[0183] By decomposing the transmitted impact into source components carrying path information, the propagation path tracing information of abnormal impacts can be preserved, providing a data foundation for subsequent root cause localization and path merging, and solving the problem that traditional overall indicators cannot distinguish the source of impact.

[0184] S309. Based on the abnormal propagation path tree and propagation level carried by each source component, determine the path node sequence corresponding to each source component in the abnormal propagation path set.

[0185] The path node sequence is a sequence formed by arranging all nodes from the root node to the node where the current source component is located in the anomaly propagation path tree in the propagation order, and completely records the propagation path of the source component.

[0186] For example, the path node sequence corresponding to the first source component is the third terminal device node, the gateway device node, the first terminal device node, and the fourth terminal device node, and the path node sequence corresponding to the second source component is the third terminal device node, the gateway device node, the second terminal device node, and the fourth terminal device node.

[0187] S310. When the path node sequences corresponding to different source components pass through the same equipment node (excluding abnormal nodes and current equipment nodes) in the network entry interaction relationship, the first equipment node that is commonly passed when tracing upstream along the source component path is taken as the merging node, and the source components that have passed through the merging node are merged into a merged source component according to the contribution weight.

[0188] The specific merging process is as follows: First, traverse the path node sequence of all source components. Except for abnormal nodes and current equipment nodes, identify all common equipment nodes that appear in multiple sequences. Then, determine the first common equipment node that is passed through from downstream to upstream and identify it as the merging node. Next, add up the contribution weights of all source components that pass through the merging node to obtain the merged contribution weight. At the same time, add up the values ​​of these source components to obtain the value of the merged source component.

[0189] Merging nodes are typically common nodes upstream of the propagation path. The closer a merging node is to the root node, the more source components it merges, and the greater its contribution weight after merging. This indicates that the node plays a stronger pivotal role in the propagation of anomalies.

[0190] For example, if the path node sequences of the two aforementioned source components both pass through the third terminal device node and the gateway device node, except for the abnormal node third terminal device node and the current equipment node fourth terminal device node, the first common equipment node that they pass through in the direction from downstream to upstream is the gateway device node. Therefore, the gateway device node is taken as the merging node. The contribution weights of the two source components, 0.53 and 0.47, are added together to get 1.0, which is the contribution weight after merging. The values ​​of the two components are added together to get 45 points, which is the value of the merged source component.

[0191] S311. Merge the source components and the source components that have not passed through the merge node into the result of the influence propagation index calculation. The merged source component carries the merge node, the contribution weight after merging, the abnormal propagation path tree and the propagation level.

[0192] By identifying common nodes and merging components in the path node sequence, the indicator structure under multi-path propagation can be simplified, highlighting the propagation role of key hub nodes, while retaining the independent information of unmerged paths, thus balancing computational efficiency and evaluation precision.

[0193] S4. The calculation results of the impact propagation indicators are correlated and integrated with the set of abnormal propagation paths to generate the network access impact assessment results.

[0194] S401. In the network entry interaction relationship, determine the interaction edge that the abnormal node participates in and whose interaction sequence is earlier than the abnormal interaction edge as the upstream interaction edge.

[0195] The rule for determining upstream interaction edges is that the end time of the interaction edge is earlier than the start time of the abnormal interaction edge, and the abnormal node participates in the interaction edge. This type of interaction edge occurred before the abnormality occurred and may be the cause of the abnormality.

[0196] For example, if a third terminal device node participates in a heartbeat detection interaction before the abnormal interaction, and the end time of this interaction is 118 seconds, which is earlier than the start time of the abnormal interaction at 119 seconds, then this heartbeat detection interaction is identified as the upstream interaction.

[0197] S402. Trace upstream along the upstream interaction edge to the abnormal node and identify the traced equipment node as the root cause node.

[0198] The tracing process starts from the other end of the upstream interaction edge, continues to search for the earlier upstream interaction edge of that node, and continues to trace forward until there is no earlier upstream interaction edge. The topmost node that is finally traced is the root cause node.

[0199] If, during the tracing process, it is found that all upstream interaction edges of a certain node are in a normal state and there are no abnormal records, then the tracing upwards is stopped and the node is identified as the root cause node.

[0200] For example, if the heartbeat detection interaction edge is traced upwards to the gateway device node, which is the equipment node; if all upstream interaction edges of the gateway device node are in a normal state and there is no earlier abnormal association, then the gateway device node is identified as the root cause node.

[0201] The root cause of the network registration timeout for the third terminal device was an anomaly in the heartbeat detection interaction of the gateway device before the anomaly occurred. The impact of the anomaly then spread from the third terminal device to the gateway device and other nodes.

[0202] Root cause tracing proceeds upstream in the causal direction, while abnormal propagation paths proceed downstream in the direction of influence; both take the abnormal node as the center of association.

[0203] The root cause node is the initial node that triggers the anomaly. By tracing upstream, we can overcome the limitations of locating the anomaly node, find the source of the anomaly, and provide precise guidance for the investigation and rectification of experimental problems.

[0204] S403. Based on the propagation range of the root cause node in the extended propagation path and the propagation level carried by the source component, determine the equipment nodes affected by the root cause node and form a set of nodes within the affected range.

[0205] The specific determination method is as follows: starting from the root cause node, traverse its corresponding extended propagation path, and include all equipment nodes contained in the extended propagation path into the set of nodes within the scope of influence, while marking the propagation level and degree of influence of each node. The extended propagation path is composed of the root cause node, the anomalous node, and the equipment nodes in the anomalous propagation path set, arranged in the propagation order.

[0206] For example, if the extended propagation path corresponding to the root cause node contains five sets of device nodes, then all five sets of device nodes are included in the set of nodes within the scope of influence. During the root cause tracing phase, the root cause node is renumbered as level zero, the original abnormal node is at level one, and so on; this numbering is only used for describing the scope of influence and does not change the definition of the abnormal node as level one in the abnormal propagation path tree.

[0207] S404. Based on the sum of the contribution weights of each source component traced back to the root cause node and the propagation level of the equipment nodes in the set of nodes within the affected range, generate the network access impact assessment results.

[0208] It should be noted that the network access impact assessment results include the root cause node, the set of nodes affecting the network scope, and the network access risk determination.

[0209] The specific generation process is as follows: First, calculate the sum of the normalized contribution weights of all source components traced back to the root cause node to obtain the total impact contribution of the root cause node. Then, combine the number of nodes in the set of nodes in the scope of influence, the maximum propagation level and the average propagation level to comprehensively assess the network entry risk level. Finally, the root cause node, the set of nodes in the scope of influence and the network entry risk assessment are combined to form the network entry impact assessment result.

[0210] For example, when the total impact contribution is greater than 0.8 and the maximum propagation level is greater than or equal to level four, it is judged as high risk of network access; when the total impact contribution is between 0.5 and 0.8 and the maximum propagation level is between level two and three, it is judged as medium risk of network access; when the total impact contribution is less than 0.5 and the maximum propagation level is level one, it is judged as low risk of network access.

[0211] For example, if the total impact contribution of the aforementioned root cause node is 1.0 and the maximum propagation level is four, it is judged as a high risk of network access. The corresponding network access impact assessment results include the root cause node, i.e., the gateway device node, the set of nodes in the scope of influence, i.e., the five sets of device nodes, and the network access risk judgment, i.e., high risk.

[0212] In summary, this embodiment refines the quantitative calculation method for impact propagation, introduces transmission weights, time decay factors, and direction coefficients to achieve accurate measurement of the degree of impact, further preserves propagation source tracing information through source component decomposition and path merging, and finally combines upstream tracing to achieve root cause location and risk classification. It works synergistically with the propagation path construction method in Embodiment 1, which can clearly present the abnormal propagation pattern, quantitatively assess the degree of impact of each node and locate the root cause of the problem, comprehensively improve the depth and accuracy of the comprehensive evaluation of equipment network access verification test data, and provide comprehensive data support for equipment network access performance verification and problem rectification.

[0213] Example 3, Reference Figure 4 As shown, a comprehensive evaluation system for equipment network access verification test data includes:

[0214] The network entry interaction relationship construction module 100 is used to acquire multi-source heterogeneous test data in the equipment network entry verification test, and construct network entry interaction relationships based on the equipment network entry interaction behavior. The network entry interaction relationships include equipment nodes, interaction edges between equipment nodes, and interaction attributes.

[0215] The anomaly propagation path determination module 200 is used to map the verification problem record to anomaly nodes in the network entry interaction relationship, trace the propagation path of the anomaly nodes along the interaction edge of the network entry interaction relationship, and generate anomaly propagation path set.

[0216] The impact index calculation module 300 is used to calculate the evaluation index of each equipment node in the network interaction relationship along the propagation path based on the abnormal propagation path set, and generate the impact propagation index calculation results.

[0217] The impact result generation module 400 is used to correlate and integrate the calculation results of impact propagation indicators with the set of abnormal propagation paths to generate network entry impact assessment results.

[0218] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims

1. A comprehensive evaluation method for equipment network access verification test data, characterized in that, The method includes: Acquire multi-source heterogeneous test data in the equipment network access verification test, and construct network access interaction relationships based on the equipment network access interaction behavior. The network access interaction relationships include equipment nodes, interaction edges between equipment nodes, and interaction attributes. The verification problem record is mapped to the abnormal node in the network entry interaction relationship. The propagation path of the abnormal node is traced along the interaction edge of the network entry interaction relationship to generate a set of abnormal propagation paths. Based on the set of abnormal propagation paths, the evaluation indicators of each equipment node in the network entry interaction relationship are propagated and calculated along the propagation path to generate the calculation results of the propagation indicators. The results of the propagation impact index calculation are correlated and integrated with the set of abnormal propagation paths to generate the network access impact assessment results.

2. The comprehensive evaluation method for equipment network access verification test data as described in claim 1, characterized in that, The construction of network access interaction relationships based on equipment network access interaction behavior includes: Extract participant records of equipment network access interaction behavior from multi-source heterogeneous test data, and merge participant records corresponding to the same interaction behavior into interaction behavior records according to participant identifier and interaction sequence. Based on the chronological order of the participant identifiers in the interaction behavior record, determine the initiator and responder of the interaction edge corresponding to the interaction behavior record; Assign interaction edges to the interaction types and participating equipment nodes in the interaction behavior records to generate network entry interaction relationships.

3. The comprehensive evaluation method for equipment network access verification test data as described in claim 1, characterized in that, The process of mapping verification problem records to abnormal nodes in the network access interaction relationship includes: Extract the problem phenomena and the sequence of occurrence from the verification problem records, and determine the equipment identifiers involved in the verification problem records based on the problem phenomena; Based on the equipment identifier, locate the equipment node in the network access interaction relationship, and select the interaction edge whose interaction time sequence covers the problem occurrence time sequence from the interaction edges in which the equipment node participates as the abnormal interaction edge according to the problem occurrence time sequence. The problem phenomenon is compared with the interaction attributes of the abnormal interaction edge. Based on the comparison results, the abnormal role of the equipment node in the abnormal interaction edge is determined, and the equipment node with the abnormal role is regarded as the abnormal node.

4. The comprehensive evaluation method for equipment network access verification test data as described in claim 3, characterized in that, The method of tracing the propagation path of abnormal nodes along the interaction edges of the network entry interaction relationship and generating an abnormal propagation path set includes: The propagation direction is determined by taking the abnormal role of the abnormal node in the abnormal interaction edge as the propagation role; Along the propagation direction, interaction edges that satisfy the association matching condition between the interaction type and the abnormal interaction edge, have a later interaction sequence, and whose starting node is inside the interaction edge and whose role is consistent with the propagation role are considered as valid propagation edges. The abnormal propagation path set is generated by continuously tracing along the abnormal interaction edge and the effective propagation edge and setting the loop termination condition. The abnormal propagation path set consists of abnormal nodes, equipment nodes reached by abnormal interaction edges, and equipment nodes reached by effective propagation edges.

5. The comprehensive evaluation method for equipment network access verification test data as described in claim 4, characterized in that, The generation of the abnormal propagation path set, consisting of abnormal nodes, equipment nodes reached by abnormal interaction edges, and equipment nodes reached by effective propagation edges, includes: When a propagation edge reaches the same equipment node, the propagation level of the same equipment node is determined according to the interaction sequence of the propagation edges that reach the same equipment node. Among them, the level where the abnormal node is located is the first propagation level, the level where the equipment node reached by the abnormal interaction edge is located is the second propagation level, and the propagation edges after the second propagation level are valid propagation edges. Equipment nodes with the same propagation level are grouped into the same level set, and the equipment nodes are connected in order of propagation level to construct an anomaly propagation path tree; The propagation range is determined based on the interaction type and propagation level of the abnormal interaction edges and effective propagation edges in the abnormal propagation path tree, and the abnormal propagation path tree and its propagation range are combined to form an abnormal propagation path set.

6. The comprehensive evaluation method for equipment network access verification test data as described in claim 5, characterized in that, The step involves calculating the propagation of evaluation indicators for each equipment node in the network entry interaction relationship along the propagation path based on the set of abnormal propagation paths, generating calculation results affecting the propagation indicators, including: According to the propagation hierarchy order of the abnormal propagation path tree in the abnormal propagation path set, obtain the propagation edge between the equipment node in the current propagation level and the equipment node in the next propagation level. The transmission weight is determined based on the interaction type of the propagation edge, the time decay factor is determined based on the interaction sequence of the propagation edge, and the direction coefficient is determined based on the position of the propagation role in the propagation edge. The transmission impact is obtained by calculating the evaluation indicators of the equipment nodes in the current propagation level based on the transmission weight, time decay factor, and direction coefficient. The impact quantity is integrated with the original evaluation index of the equipment node in the next propagation level to obtain the impact propagation index of the equipment node in the next propagation level. This process is then performed layer by layer along the abnormal propagation path tree to generate the impact propagation index calculation results.

7. The comprehensive evaluation method for equipment network access verification test data as described in claim 6, characterized in that, The calculation results of the generation of the influence propagation index include: When the same equipment node receives the transmitted influence from multiple upstream equipment nodes through multiple effective propagation edges, the transmitted influence from each effective propagation edge is summed to obtain the total transmitted influence of the equipment node. The contribution weight of each indicator source is determined according to the transmission weight of each effective propagation edge and the time decay factor. Based on contribution weights, the total propagation impact is decomposed into source components, and each source component carries the corresponding anomaly propagation path tree, propagation level and contribution weight. The original assessment index is integrated with the total transmitted impact to obtain the impact propagation index of the equipment node. The sum of each source component equals the total transmitted impact. The calculation result of the impact propagation index includes the original assessment index and the source components.

8. The comprehensive evaluation method for equipment network access verification test data as described in claim 7, characterized in that, The inclusion of the source component in the calculation results of the influence propagation index includes: Based on the abnormal propagation path tree and propagation level carried by each source component, determine the path node sequence corresponding to each source component in the abnormal propagation path set; When the path node sequences corresponding to different source components pass through the same equipment node (excluding abnormal nodes and current equipment nodes) in the network entry interaction relationship, the first equipment node that is commonly passed when tracing upstream along the source component path will be taken as the merging node, and the source components that have passed through the merging node will be merged into a merged source component according to the contribution weight. The merged source component and the source component that did not go through the merge node are included in the result of the influence propagation index calculation. The merged source component carries the merge node, the contribution weight after merging, the abnormal propagation path tree and the propagation level.

9. The comprehensive evaluation method for equipment network access verification test data as described in claim 8, characterized in that, The process of correlating and fusing the calculation results of the impact propagation indicators with the set of abnormal propagation paths to generate network entry impact assessment results includes: In the network entry interaction relationship, the interaction edge in which the abnormal node participates and whose interaction sequence is earlier than the abnormal interaction edge is identified as the upstream interaction edge; Tracing upstream along the upstream interaction edge to the upstream of the abnormal node, the traced equipment node is identified as the root cause node; Based on the propagation range of the root cause node in the extended propagation path and the propagation level carried by the source component, determine the equipment nodes affected by the root cause node and form a set of nodes within the affected range. Among them, the extended propagation path is composed of the root cause node, the abnormal node, and the equipment node in the abnormal propagation path set according to the propagation order. The network access impact assessment results are generated based on the sum of the contribution weights of each source component traced back to the root cause node and the propagation level of the equipment nodes in the set of nodes within the impact range. The network access impact assessment results include root cause nodes, the set of nodes affecting the network scope, and the network access risk determination.

10. A comprehensive evaluation system for equipment network access verification test data, used to implement the comprehensive evaluation method for equipment network access verification test data as described in any one of claims 1-9, characterized in that, The system includes: The network entry interaction relationship construction module is used to acquire multi-source heterogeneous test data in the equipment network entry verification test, and construct network entry interaction relationships based on the equipment network entry interaction behavior. The network entry interaction relationships include equipment nodes, interaction edges between equipment nodes, and interaction attributes. The anomaly propagation path determination module is used to map verification problem records to anomaly nodes in the network entry interaction relationship, trace the propagation path of the anomaly nodes along the interaction edge of the network entry interaction relationship, and generate anomaly propagation path set. The impact index calculation module is used to calculate the propagation of the evaluation index of each equipment node in the network interaction relationship along the propagation path based on the abnormal propagation path set, and generate the impact propagation index calculation results. The impact result generation module is used to correlate and integrate the calculated results of impact propagation indicators with the set of abnormal propagation paths to generate network entry impact assessment results.