A low-carbon network resource scheduling method and system for a communication unit of an electricity meter based on NB-IoT

By acquiring the base sustaining power and trailing leakage power of the meter communication unit and combining it with the channel quality benchmark, the resource scheduling of the NB-IoT meter communication unit is optimized, solving the problem of excessive energy consumption of the radio frequency communication unit in the existing technology and realizing low-carbon and efficient data transmission.

CN123145697APending Publication Date: 2026-11-20联桥科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611370250.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-04
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In the scenario of transmitting extremely small data packets in smart meters, the existing NB-IoT protocol has failed to effectively reduce the nonlinear long-term static power consumption of the radio frequency communication unit. This results in excessively high total energy consumption due to blind frequency reduction under weak signals. Furthermore, frequent state machine switching and trailing leakage current losses exacerbate the carbon emissions and power overdraft of the meter.

Method used

By acquiring the basic sustaining power, trailing leakage power, and transition time of the meter communication unit, and combining them with the channel quality benchmark, the actual total energy consumption under the two subcarrier spacing modes is calculated. Cross-layer joint optimization is introduced at the MAC layer to select the subcarrier spacing mode with the minimum energy consumption for data transmission, thereby optimizing resource scheduling.

Benefits of technology

Without increasing battery capacity, the lifespan of smart meters has been extended, the energy consumption of individual terminals has been reduced, the lengthy dwell time has been decreased, the network throughput and instantaneous concurrent load capacity have been improved, and low-carbon operation has been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123145697A_ABST
    Figure CN123145697A_ABST
Patent Text Reader

Abstract

The present application relates to the field of meter communication resource scheduling, in particular to a kind of low-carbon network resource scheduling method and system of meter communication unit based on NB-IoT.The method first obtains the energy consumption parameter of communication unit and the change curve of actual power consumption with theoretical transmitting power under two kinds of subcarrier spacing modes;When service data packet meets the condition of micro packet, the channel quality reference value is obtained;Accordingly, the sending duration under each subcarrier spacing mode is determined, and the actual total energy consumption of single sending is calculated by combining the above hardware energy consumption parameter;Based on the decoding success rate, the actual total energy consumption is adjusted, the minimum overall total energy consumption obtained is determined as the preferred subcarrier spacing mode;And request the base station to complete data transmission in this mode.The present application includes nonlinear static power consumption into cross-layer scheduling decision, avoids long standby and leakage penalty caused by frequency reduction and speed reduction of micro packet under weak coverage, significantly prolongs the service life of equipment, and realizes the low-carbon operation target.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of electricity meter communication resource scheduling, and specifically to a low-carbon network resource scheduling method and system for electricity meter communication units based on NB-IoT. Background Technology

[0002] With the development of IoT technology and the advancement of dual-carbon goals, Narrowband IoT (NB-IoT), due to its advantages of wide coverage, massive connectivity, and low power consumption, has become the standard communication method for smart meter communication units in advanced measurement systems within the smart grid field. Smart meters are typically powered by batteries or supercapacitors, and their service life can exceed ten years. Therefore, how to reduce the radio frequency power consumption of meter communication units through optimized scheduling of network resources to achieve low-carbon operation is one of the core challenges in the current design of the IoT underlying protocol stack.

[0003] In the existing NB-IoT uplink transmission mechanism, in order to take into account terminals with different coverage depths, the 3GPP protocol standard defines two subcarrier spacings for the uplink narrowband physical shared channel. One is a 15kHz multi-tone or monotone mode, which has a faster transmission rate and relatively higher instantaneous transmit power requirements; the other is a 3.75kHz monotone mode, which has a higher power spectral density and a very slow transmission rate, and is often used for deep penetration of weak signal terminals in coverage enhancement scenarios.

[0004] For scheduling the two types of subcarrier resources mentioned above, existing base station-side Medium Access Control (MAC) layer scheduling algorithms typically assess channel fading by measuring the Reference Received Power (RSRP) or Reference Received Quality (RSRQ) reported by the meter. When the RSRP is good, the scheduler allocates a 15kHz subcarrier; when the RSRP is below a certain threshold (i.e., in a weak coverage area, such as a basement or meter box), the scheduler assumes that the terminal's transmit power is limited, and thus forces the meter to switch to a 3.75kHz subcarrier spacing mode. Existing technology considers that, under poor channel conditions, reducing the subcarrier spacing (speed reduction) and using lower transmit power is the main way to ensure data delivery and save energy.

[0005] However, in real-world scenarios where smart meters transmit tiny data packets (such as heartbeat packets of a few bytes), existing scheduling methods that rely solely on channel quality (such as RSRP) suffer from severe nonlinear long-term static energy consumption blind spots, specifically manifested as follows:

[0006] First, the vast majority of daily operations of smart meters involve the transmission of extremely small data packets (such as periodic heartbeat packets of only a few bytes or anti-theft status toggling flags). When sending such tiny data packets, forcibly reducing the transmission speed to 3.75kHz using current technology, while lowering the instantaneous transmit power of the RF power amplifier, results in a significantly longer interface transmission time for the same amount of data due to its extremely narrow subcarrier bandwidth (typically more than four times that of 15kHz). More importantly, throughout the entire transmission cycle, the fundamental static power required to maintain system operation, such as the voltage-controlled oscillator (VCO), phase-locked loop (PLL), and baseband digital signal processor (DSP), remains fully and unavoidably active. When the transmission time is significantly extended, the cumulative energy consumption of this fundamental static power over time often increases dramatically, consuming far more energy than would have been saved by reducing the transmit power.

[0007] Secondly, existing protocols do not account for trailing leakage current losses during state machine transitions. In a real NB-IoT RF module, after data transmission is completed and the module enters power-saving mode, the capacitor discharge and hardware state machine degradation require a transition period of several hundred milliseconds to several seconds. During this transition period, a significant trailing leakage current is generated. When the meter is frequently allocated 3.75kHz for long-term low-speed transmission due to minor environmental disturbances (such as being in a critical weak coverage area), the RF circuit is frequently and prolongedly exposed to inefficient operating ranges and lengthy trailing transition periods, resulting in a hidden overdraft of the battery's total capacity. This not only exacerbates the system's carbon emissions but also causes the meter's communication unit to fail due to premature power depletion. Summary of the Invention

[0008] To address the high overall energy consumption caused by blindly reducing frequency under weak signals in NB-IoT scenarios with extremely small data packet transmission, where existing scheduling algorithms fail to consider the nonlinear long-term static power consumption of the radio frequency communication unit, the present invention aims to provide a low-carbon network resource scheduling method and system for NB-IoT-based meter communication units. The specific technical solution adopted is as follows:

[0009] This invention proposes a low-carbon network resource scheduling method for electricity meter communication units based on NB-IoT, the method comprising:

[0010] The basic sustaining power, trailing leakage power, and trailing transition duration of the meter communication unit are obtained, as well as the curves showing the actual power consumption of the meter communication unit versus the theoretical transmission power under two subcarrier spacing modes are obtained.

[0011] When the payload of the service data packet meets the preset micro-packet condition, the channel quality benchmark value is obtained;

[0012] Based on the payload of the service data packet and the channel quality reference value, the transmission duration of the service data packet in each subcarrier spacing mode is determined; based on the difference between the downlink reference signal transmit power of the base station and the channel quality reference value, as well as the change curve, and in combination with the transmission duration, the basic sustaining power, the tailing leakage power, and the tailing transition duration, the actual total energy consumption of a single transmission of the service data packet in each subcarrier spacing mode is obtained;

[0013] Based on the decoding success rate of the base station in each subcarrier spacing mode, the actual total energy consumption is adjusted to obtain the overall total energy consumption in each subcarrier spacing mode; the overall total energy consumption of the two subcarrier spacing modes is compared, and the subcarrier spacing mode corresponding to the minimum value of the overall total energy consumption is decided as the preferred subcarrier spacing mode.

[0014] Send a connection request message carrying the preferred subcarrier spacing mode request to the base station, and send the service data packet on the approved physical resource block in the preferred subcarrier spacing mode.

[0015] Furthermore, obtaining the curves showing the actual power consumption of the meter communication unit versus the theoretical transmission power under the two subcarrier spacing modes includes:

[0016] The subcarrier spacing mode of the meter communication unit is configured as the first subcarrier spacing mode and the second subcarrier spacing mode, respectively.

[0017] In each subcarrier spacing mode, the meter communication unit is instructed to gradually decrease from the maximum transmission power to the minimum transmission power in a preset step value, and the actual power consumption at each theoretical transmission power is collected.

[0018] Curve fitting was performed using the least squares method to obtain the curve of the actual power consumption versus the theoretical transmit power for each subcarrier spacing mode.

[0019] Furthermore, obtaining the channel quality reference value includes:

[0020] Measure the raw value of the received power of the narrowband reference signal received from the base station;

[0021] An infinite impulse response filtering algorithm is used to smooth the original value of the narrowband reference signal received power, and the smoothed filtered value is used as the channel quality reference value.

[0022] Further, determining the transmission duration of the service data packet in each subcarrier spacing mode includes:

[0023] The channel quality reference value is converted into the expected received signal-to-noise ratio (SNR) and matched in a preset SNR-modulation coding strategy mapping table to obtain the modulation coding strategy index value.

[0024] The payload is converted into the number of bits to be transmitted. The uplink transport block size configuration matrix is ​​called, and the table is looked up and filtered based on the row corresponding to the modulation and coding strategy index value to determine the number of resource units in the column corresponding to the minimum transport block size parameter that satisfies the number of bits to be transmitted in each subcarrier spacing mode.

[0025] The transmission duration of the service data packet in each subcarrier spacing mode is obtained by multiplying the number of resource units in each subcarrier spacing mode by the time domain length of the resource unit in the corresponding mode.

[0026] Furthermore, obtaining the actual total energy consumption for a single transmission of service data packets under each subcarrier spacing mode includes:

[0027] The difference between the downlink reference signal transmit power of the base station and the channel quality reference value is used to calculate the path loss of the signal transmission process from the base station to the meter terminal. Combined with the expected received power of the base station and the path loss compensation factor, the theoretical transmit power of each subcarrier spacing mode is calculated.

[0028] By inputting the theoretical transmit power into the variation curve of the corresponding subcarrier spacing mode, the actual power consumption of each subcarrier spacing mode can be obtained;

[0029] Multiply the sum of the actual power consumption and the basic maintenance power of the meter communication unit in each subcarrier spacing mode by the transmission duration of the corresponding subcarrier spacing mode to obtain the operating energy consumption of the meter communication unit in each subcarrier spacing mode.

[0030] The product of the trailing leakage power and the trailing transition time of the meter communication unit is taken as the trailing energy consumption of the meter communication unit.

[0031] The sum of the stated and stated trailing energy consumption is taken as the actual total energy consumption of the meter communication unit for sending a single service data packet in each subcarrier interval mode.

[0032] Furthermore, obtaining the overall total energy consumption for each subcarrier spacing mode includes:

[0033] The total energy consumption of the meter communication unit in each subcarrier interval mode is obtained by dividing the actual total energy consumption of the meter communication unit in each subcarrier interval mode by the decoding success rate of the base station in each subcarrier interval mode.

[0034] Furthermore, sending a connection request message carrying the preferred subcarrier spacing mode request to the base station includes:

[0035] In the connection request message sent to the base station, the preferred subcarrier spacing mode is converted into a single-bit identifier for transmission using the reserved bits in the medium access control layer control element.

[0036] Furthermore, after confirming that the service data packet has been sent and that the base station has confirmed the data, the main control microcontroller pulls down the enable pins of the RF power amplifier and the local oscillator power management chip through the underlying general-purpose input / output interface, so that the meter communication unit skips the trailing transition period and directly jumps to the deep power saving mode.

[0037] Furthermore, the preset micro-packet condition is that the payload of the service data packet is less than the payload threshold.

[0038] This invention also proposes a low-carbon network resource scheduling system for electricity meter communication units based on NB-IoT. The system includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements any of the steps of a low-carbon network resource scheduling method for electricity meter communication units based on NB-IoT.

[0039] The present invention has the following beneficial effects:

[0040] 1. Existing protocols blindly rely on reducing the subcarrier spacing (using 3.75kHz) to lower the transmit power when facing weak signal coverage. This invention introduces the integral of the local oscillator base maintenance power consumption and trailing leakage current on the time axis as constraints into the resource allocation cost function of the MAC layer. Through cross-layer joint optimization, the true minimum energy consumption is calculated, avoiding the long static power consumption period when the meter sends small data packets (such as heartbeat packets and alarm bits). This allows smart meters in critical coverage areas to intelligently and optimally use 15kHz for short-term high-power bursts, avoiding the hundreds of milliseconds of wake-up and leakage of the RF module. Without increasing battery capacity, the lifespan of the communication unit is extended, achieving the goal of low-carbon operation.

[0041] 2. Although the 3.75kHz mode enhances coverage, its time domain resources occupied by a single transmission are several times that of 15kHz. The joint cost calculation logic in this invention, under the premise of ensuring the transmission reliability threshold, tends to guide data packets to conduct rapid burst transmission. This mechanism not only reduces the energy consumption of a single terminal, but also generates a huge positive spillover effect at the global network level. By reducing the lengthy dwell time of the electricity meter on the channel, it releases the time domain resources of the uplink narrowband physical shared channel. In extreme scenarios such as large-scale power outages and a large number of electricity meters issuing concurrent alarms, it can effectively reduce the probability of air interface collisions and improve the network throughput and instantaneous concurrent carrying capacity of a single base station. Attached Figure Description

[0042] To more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0043] Figure 1 A flowchart illustrating a low-carbon network resource scheduling method for an electricity meter communication unit based on NB-IoT, provided as an embodiment of the present invention;

[0044] Figure 2 This is a framework diagram of a low-carbon network resource scheduling system for an electricity meter communication unit based on NB-IoT, provided as an embodiment of the present invention. Detailed Implementation

[0045] To further illustrate the technical means and effects adopted by the present invention to achieve its intended purpose, the following, in conjunction with the accompanying drawings and preferred embodiments, details the specific implementation, structure, features, and effects of a low-carbon network resource scheduling method and system for electricity meter communication units based on NB-IoT proposed by the present invention. In the following description, different "one embodiment" or "another embodiment" do not necessarily refer to the same embodiment. Furthermore, specific features, structures, or characteristics in one or more embodiments can be combined in any suitable form.

[0046] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.

[0047] The following description, in conjunction with the accompanying drawings, details the specific scheme of a low-carbon network resource scheduling method and system for an NB-IoT-based electricity meter communication unit provided by this invention.

[0048] Please see Figure 1The diagram illustrates a flowchart of a low-carbon network resource scheduling method for an NB-IoT-based electricity meter communication unit, according to an embodiment of the present invention. The method includes:

[0049] Step S1: Obtain the energy consumption parameters of the underlying communication unit of the electricity meter and the fitting curve of the transmission power under different subcarrier spacing modes.

[0050] Existing NB-IoT baseband scheduling chips operate solely based on pure communication metrics such as signal-to-noise ratio, typically failing to perceive the actual current consumption of peripheral radio frequency power amplifiers (PAs). Therefore, it is essential to transform the unique, nonlinear electrical parameters of the communication unit hardware into models that can be called by the baseband software in real time before the device leaves the factory or enters the network. This provides a benchmark for subsequent joint energy consumption calculations, eliminating the hardware-independent shortcomings of traditional pure software scheduling and ensuring that each seed carrier scheduling strategy output by the subsequent algorithm is supported by real hardware energy-saving benefits.

[0051] In the 3.75kHz slow transmission mode of a smart meter's RF link, data that could be transmitted in tens of milliseconds is stretched to hundreds of milliseconds. During this extended period, the base sustaining power undergoes meaningless time integration; and after transmission, the discharge of the RF capacitor causes a long-tail effect in the trailing leakage power. Therefore, this embodiment of the invention first needs to obtain both the base sustaining power and the trailing leakage power to provide the algorithm with the nonlinear power consumption constant of the hardware's core, enabling the algorithm to perceive the hardware standby penalty that pure software logic cannot detect.

[0052] In this embodiment of the invention, before the meter communication unit leaves the factory, a high-precision DC power analyzer is used to power the NB-IoT communication unit. Radio frequency control commands are used to shield the transmission of the radio frequency power amplifier (PA), enabling only the local oscillator circuits such as the baseband chip, phase-locked loop (PLL), and voltage-controlled oscillator (VCO). The minimum base constant power required to maintain the operation of the local oscillator circuit and the external clock circuit is measured and recorded as the base sustaining power. Subsequently, after the control communication unit completes a virtual transmission, it disconnects the RF power amplifier enable pin. An oscilloscope and current probe are used to capture the current tail waveform during the module's transition from the transmit state to the fully latched power-saving mode. High-frequency sampling is used to record the average power generated during this process due to internal capacitor discharge and the gradual shutdown of the state machine, which is recorded as the trailing leakage power. The time taken from the RF power amplifier being turned off until the current completely drops to the sleep noise floor is recorded and denoted as the trailing transition time. (Typically in the range of tens to hundreds of milliseconds).

[0053] Radio frequency power amplifiers are extremely inefficient in the low-power region. When the base station requires power reduction for transmission, the actual current drawn from the battery does not decrease linearly proportionally. In order to avoid serious scheduling deviations caused by the use of theoretical linear estimation in the baseband algorithm, it is necessary to measure the actual power consumption trajectory at each power level at 15kHz and 3.75kHz.

[0054] Therefore, in this embodiment of the invention, the NB-IoT communication unit is configured with two subcarrier spacing operating modes: 15kHz (multi-tone) and 3.75kHz (mono-tone). The 15kHz subcarrier spacing operating mode is designated as the first subcarrier spacing mode, and the 3.75kHz subcarrier spacing operating mode is designated as the second subcarrier spacing mode. In each subcarrier spacing mode, a comprehensive tester (such as CMW500) instructs the communication unit to gradually decrease the transmission power from the maximum transmission power (typically 23dBm) to the minimum transmission power (e.g., -40dBm) in increments of 1dBm. A high-precision power analyzer is used to collect the actual power consumption of the communication unit under each theoretical transmission power in each subcarrier spacing mode. Curve fitting is then performed to obtain the curve showing the change in actual power consumption of the communication unit with the theoretical transmission power under each subcarrier spacing mode. Specific curve fitting algorithms can include least squares methods, etc.

[0055] Step S2: Filter based on the condition of small packets of service data and obtain the channel quality benchmark value after filtering and smoothing.

[0056] The greatest benefit of the cross-layer optimization in this invention (such as prioritizing the 15kHz high-efficiency mode) lies in sending extremely short-duration microdata packets. If the terminal is sending large files (such as firmware upgrades), long-duration transmission is unavoidable, and the coverage gain brought by 3.75kHz is more important. If it is applied indiscriminately to large file transmission, forcibly using 15kHz will lead to serious packet loss. Therefore, strict boundary conditions must be set before entering the core operation to accurately filter the service type and prevent the abuse of non-target services from wasting computing resources and causing scheduling errors. At the same time, it is also necessary to obtain real-time environmental parameters for subsequent optimization calculations.

[0057] Only when the data volume is extremely small (such as a heartbeat packet of a few bytes) and the actual transmission time is extremely short, the proportion of the hardware's basic maintenance power consumption and trailing power consumption in the total energy consumption becomes a key factor. Therefore, the first step must be to extract the size of the service data packet and compare it with the threshold. If it is confirmed to be a small packet, it is necessary to further evaluate the current environmental quality to trigger environmental data collection. This effectively isolates large packet services and precisely locks the algorithm on the extremely small data concurrent reporting services with the highest energy efficiency ratio, significantly improving the industrial applicability of the power grid in daily operation and extreme alarm scenarios.

[0058] When the smart meter's metering MCU generates a communication request and pushes service data into the MAC layer buffer of the communication unit, the protocol stack main control program of the communication unit first extracts the payload of the service data packet, denoted as S (unit: bytes), and then presets a payload threshold for a small packet. The payload threshold typically ranges from 80 to 150 bytes. In this embodiment, based on the service characteristics of the smart meter, the payload threshold is set to 100 bytes. If the payload of the service data packet is less than the payload threshold, it indicates that the current service belongs to a small packet service such as "Power Outage Last Gasp Alarm," "Periodic Heartbeat Maintenance," or "Anti-Theft Flag Reporting," triggering and allowing entry into the subsequent scheduling algorithm. If the payload of the service data packet is greater than or equal to the payload threshold, the subsequent scheduling algorithm is not triggered, and the existing 3GPP standard linear scheduling protocol is used for conventional transmission.

[0059] After confirming the service and requiring subsequent scheduling, the terminal must know the current signal quality to determine the data transmission parameters. Considering the fixed location of smart meters, their signal fluctuations are mostly caused by brief pulse environmental interference (such as access control opening and closing). If instantaneous values ​​are used directly without filtering, it will trigger frequent resource reconfiguration requests, increasing the power consumption of signaling interaction. Therefore, smoothing filtering must be performed first to remove shortwave pulse interference and extract steady-state indicators that truly reflect the coverage depth of the space where the meter is located, ensuring the stability of subsequent energy estimation and subcarrier optimization calculations.

[0060] Therefore, in this embodiment of the invention, the meter communication unit enables downlink synchronization to measure the received power of the narrowband reference signal transmitted from the NB-IoT base station in real time. To avoid inaccurate evaluation due to transient disturbances in the channel caused by the opening and closing of the basement door and personnel movement, an IIR infinite impulse response filtering algorithm is used to smooth the measured narrowband reference signal received power. The filtering formula is as follows: ,in, This is the filtered value of the currently measured narrowband reference signal received power. This is the original value of the narrowband reference signal received power currently measured. This is the filtered value of the narrowband reference signal received power from the previous measurement. The filter coefficient is set to 0.15 in this embodiment, and then the filtered value of the currently measured narrowband reference signal received power is recorded as the channel quality reference value. .

[0061] Step S3: Calculate and compare the overall total energy consumption based on the channel quality benchmark value and energy consumption parameters, and decide on the optimal subcarrier spacing mode accordingly.

[0062] Existing signal threshold lookup table methods cannot reflect true energy consumption. It is necessary to use the obtained packet size and steady-state channel values ​​to extrapolate the actual battery energy loss when data is delivered to the base station under two subcarrier spacing modes: 15kHz and 3.75kHz. Error retransmission risk should be included as a probability correction term to arrive at a statistically significant optimization conclusion. This conclusion directly determines what resources should be requested from the base station, enabling the accurate identification of the optimal solution that balances communication success rate and capacitor saving even in extremely harsh environments, thus achieving low-carbon operation of the meter equipment throughout its lifecycle.

[0063] For any subcarrier spacing mode (15kHz or 3.75kHz), the MAC scheduler of the meter communication unit performs the following mapping based on the signal-to-noise ratio-MCS mapping table pre-stored in the baseband memory (this table defines the optimal modulation and coding scheme that satisfies the target block error rate (BLER) upper limit under specific channel conditions): First, combining the ambient noise floor parameters of the environment (e.g., a certain cell), the channel quality reference value measured in step S2 is... The signal-to-noise ratio (SNR) is converted to the expected received SNR. Then, the expected SNR is matched against the SNR-MCS mapping table to obtain the index value of the modulation and coding strategy recommended by the system under the current channel conditions, denoted as [index value]. Among them, when the signal-to-noise ratio is low, The mapping is to a lower index using low-order modulation (such as BPSK); when the signal-to-noise ratio is high, The mapping is to a higher index using higher-order modulation (such as QPSK).

[0064] Get the modulation and coding strategy index value Then, the payload S (in bytes) of the service data packet is converted into the number of bits to be transmitted. ,Right now That is, 1 byte equals 8 bits. Subsequently, the baseband processor of the communication unit calls the uplink transport block size (TBS) configuration matrix that conforms to the 3GPP NB-IoT protocol specification. In this two-dimensional matrix, the rows correspond to the modulation and coding strategy index values. The column corresponds to the allocated number of Resource Units (RUs). The communication unit performs a reverse lookup table optimization: locking and modulation coding strategy index value. For each corresponding row, compare each column to filter out the number of bits in the matrix whose value is greater than or equal to the number of bits in the business data packet. The minimum transport block size parameter, and the number of resource units corresponding to the column containing this parameter, represent the number of resource units required to complete the transmission of this service data packet under the corresponding subcarrier spacing mode. These are denoted as follows: 15kHz mode (i.e., the first subcarrier spacing mode). Compared to the 3.75kHz mode (i.e., the second subcarrier spacing mode) .

[0065] Then, based on the number of resource units required for the service data packet in each subcarrier spacing mode, and the time-domain length of the resource unit in each subcarrier spacing mode, the transmission duration of the service data packet in each subcarrier spacing mode is calculated:

[0066]

[0067] in, This indicates the transmission duration of service data packets under each subcarrier spacing mode; This indicates the number of resource units required to allocate for each subcarrier spacing mode of the service data packet; This represents the time-domain length of the resource element for each subcarrier spacing mode, where the time-domain length of the resource element for the first subcarrier spacing mode (i.e., the 15kHz subcarrier spacing mode) is 1ms, and the time-domain length of the resource element for the second subcarrier spacing mode (i.e., the 3.75kHz subcarrier spacing mode) is 32ms.

[0068] Because the 3.75kHz spectrum is extremely narrow, the transmission time required to send the same amount of data is usually several times or even tens of times longer than that required for 15kHz. This difference in transmission time is the root cause of the subsequent amplification of hardware noise.

[0069] Therefore, it is necessary to analyze the actual energy consumption generated by transmitting service data packets under each subcarrier spacing mode. Since the above process has already obtained the transmission duration of service data packets under each subcarrier spacing mode, in order to analyze the transmission energy consumption, it is necessary to first analyze the actual transmission power under each subcarrier spacing mode.

[0070] For any subcarrier spacing mode, read the downlink reference signal transmit power broadcast by the base station via System Message (SIB). Combined with the channel quality reference value obtained in step S2 Calculate the path loss of the signal during transmission from the base station to the meter terminal:

[0071]

[0072] in, This represents the path loss of the signal during transmission from the base station to the meter terminal, and indicates the amount of signal attenuation during transmission from the base station to the terminal. This indicates the downlink reference signal transmit power of the base station; This represents the channel quality reference value, indicating the received power of the meter terminal; This represents the pre-configured calibration offset for uplink and downlink. If not configured, the value is 0.

[0073] Then the communication unit extracts the System Message (SIB) sent by the network layer to obtain the base station's expected received power. and road loss compensation factor Then, according to the fractional open-loop power control formula in the 3GPP protocol standard, the theoretical transmit power for each subcarrier spacing mode is calculated:

[0074]

[0075] in, This represents the theoretical transmit power for each subcarrier spacing mode; This indicates the maximum allowable transmit power of the communication unit (usually limited to 23dBm). This indicates the base station's expected received power. This represents the road loss compensation factor, both of which are configured by the base station. This indicates the path loss during signal transmission from the base station to the meter terminal; This indicates the number of subcarrier bandwidths for each subcarrier spacing pattern. For 3.75kHz monotone transmission, For 15kHz multi-tone transmission, According to the protocol, the lookup table value is 1, 3, 6, or 12. For the short, bursty, fast-in / fast-out situation addressed in this embodiment of the invention, for 15kHz multi-tone transmission, the goal is usually to maximize instantaneous throughput. In this case, the entire physical resource block is allocated accordingly. ; This represents the function that takes the minimum value.

[0076] Then, the theoretical transmit power of each subcarrier spacing mode is input into the variation curve of the corresponding subcarrier spacing mode fitted in step S1, thereby mapping the actual power consumption of each subcarrier spacing mode. Furthermore, based on the actual power consumption of each subcarrier spacing mode The basic maintaining power of the electricity meter and the transmission duration of service data packets in each subcarrier spacing mode. At the same time, combined with the residual leakage power of the electricity meter and trailing transition duration The actual total energy consumption of the communication unit of the electricity meter in a single transmission of service data packets under each subcarrier spacing mode is obtained:

[0077]

[0078] in, This represents the actual total energy consumption of the meter's communication unit in sending a single service data packet under each subcarrier spacing mode; This indicates the actual power consumption for each subcarrier spacing mode; Indicates the basic sustaining power of the meter; This indicates the transmission duration of service data packets under each subcarrier spacing mode; Indicates the trailing leakage power of the meter; This indicates the duration of the meter's trailing transition.

[0079] in, This represents the operating power consumption of the meter's communication unit in each subcarrier spacing mode. Representing the trailing energy consumption generated by the meter's communication unit during operation, the traditional approach considers the actual total energy consumption of the meter in each subcarrier spacing mode to be... However, in scenarios involving the transmission of small packets, the basic sustaining power... Often greater than the actual power consumed When using the 3.75kHz subcarrier spacing mode, due to its transmission duration The period of rapid extension led to The value spiked, offsetting the benefits of reducing transmit power in the 3.75kHz subcarrier spacing mode. It failed to achieve the goal of saving power by reducing transmit power. In addition, it had to bear the cost of trailing power consumption with each transmission.

[0080] The above analysis only considers the energy consumption of successfully sending a single data packet. However, in weak network conditions, packet loss and retransmission may occur due to poor signal strength. Therefore, the secondary power consumption caused by retransmission needs to be considered. If the channel is extremely poor, using the 15kHz subcarrier spacing mode may save power per transmission, but if the packet loss rate is high, continuous retransmission will consume more power. Therefore, it is necessary to introduce the base station decoding success rate to correct the actual total energy consumption of each subcarrier spacing mode, thus obtaining the overall total energy consumption of the meter's communication unit under each subcarrier spacing mode:

[0081]

[0082] in, This represents the total energy consumption of the meter's communication unit in each subcarrier spacing mode. This represents the actual total energy consumption of the meter's communication unit in sending a single service data packet under each subcarrier spacing mode; This represents the decoding success rate of the base station in each subcarrier spacing mode. This value can be updated in real time by the base station based on successfully received data packets.

[0083] To facilitate subsequent comparative analysis of the overall total energy consumption of the two subcarrier spacing modes, the overall total energy consumption of the meter's communication unit under the first subcarrier spacing mode (15kHz subcarrier spacing mode) is denoted as... The total energy consumption of the meter's communication unit in the second subcarrier spacing mode (3.75kHz subcarrier spacing mode) is denoted as... .

[0084] If the total energy consumption of the meter's communication unit in the first subcarrier spacing mode is less than that in the second subcarrier spacing mode, the first subcarrier spacing mode (15kHz subcarrier spacing mode) will be used as the preferred subcarrier spacing mode for data transmission. Even if the current signal conditions are poor, the total energy consumption cost of using the first subcarrier spacing mode (fast in and fast out, quickly cutting off the RF power supply) is still less than the long-term hardware leakage cost caused by using the second subcarrier spacing mode (3.75kHz subcarrier spacing mode).

[0085] If the total energy consumption of the communication unit of the meter in the first subcarrier spacing mode is greater than or equal to the total energy consumption in the second subcarrier spacing mode, the system determines that the current channel degradation has reached its limit (for example, in a very deep underground meter box with the metal door closed). At this time, the retransmission penalty of the first subcarrier spacing mode (15kHz subcarrier spacing mode) is completely out of control and can only compromise on coverage capability. Therefore, the second subcarrier spacing mode is used as the preferred subcarrier spacing mode for data transmission.

[0086] Step S4: Report a preferred subcarrier spacing mode request and send service data packets according to the preferred subcarrier spacing mode.

[0087] The decision of the preferred subcarrier spacing mode by the electricity meter terminal must be implemented within the framework of 3GPP protocol. It is necessary to use low-overhead implicit signaling to inform the base station of the decision, and after the base station allocates resources as needed and the electricity meter completes transmission, the hardware power is cut off to eliminate the final tail leakage, so as to realize the entire scheduling closed loop.

[0088] First, when a smart meter initiates a random access procedure to a base station, it first sends a preamble (Msg1) through the channel and receives a random access response (Msg2) from the base station. In this embodiment of the invention, in the subsequent Msg3 (RRC connection request message) sent to the base station, the meter uses the reserved bits in its MAC layer control element (MAC CE) or reports a simplified service buffer status report (BSR) to encapsulate the preferred subcarrier spacing mode determined in step S3 into 1 bit for implicit transmission. For example, setting the bit to 1 represents requesting the allocation of the first subcarrier spacing mode (15kHz subcarrier spacing mode), and setting it to 0 represents requesting the allocation of the second subcarrier spacing mode (3.75kHz subcarrier spacing mode).

[0089] After receiving the connection request message, the MAC layer scheduler of the base station extracts and parses the reserved bits to determine the preferred subcarrier spacing mode requested by the meter terminal. The base station performs anti-collision verification based on the current frequency domain resource pool occupancy in the sector. Under the premise of resource availability, it follows the preferred subcarrier spacing mode determined by the meter and then generates downlink control information on the channel. In this downlink control information, the physical resource block of the preferred subcarrier spacing mode requested by the meter is allocated through its internal subcarrier indication field.

[0090] Then, the smart meter receives and parses the downlink control information sent by the base station, configures the local radio frequency transceiver link, and transmits the service data packet through the channel in the preferred subcarrier spacing mode and specified time advance. At the same time, at the moment when the last symbol of the meter baseband confirmation data packet physical layer is sent and the base station confirmation is received, the meter's main control MCU does not wait for the RRC release timer specified in the standard protocol to expire, nor does it wait for the conventional software state machine to degrade step by step. Instead, it directly pulls down the enable pin of the radio frequency power amplifier and the local oscillator power management chip through the underlying general input / output interface. Through this hardware-level forced cutoff, the power supply of the radio frequency path is cut off instantly, so that the entire communication unit skips the long tail transition period and forcibly jumps to a deep power saving mode with a power consumption of microamps.

[0091] This invention also provides a low-carbon network resource scheduling system for electricity meter communication units based on NB-IoT. Please refer to [link to relevant documentation]. Figure 2 The diagram illustrates a framework of a low-carbon network resource scheduling system for an NB-IoT-based electricity meter communication unit according to an embodiment of the present invention. The system may include: a memory 201, a processor 202, and a computer program stored in the memory 201 and executable on the processor 202. When the processor 202 executes the program, it implements the low-carbon network resource scheduling method for an NB-IoT-based electricity meter communication unit provided in the above embodiment.

[0092] Furthermore, the system also includes a communication interface 203 for communication between the memory 201 and the processor 202.

[0093] The memory 201 may include high-speed RAM memory, and may also include nonvolatile memory, such as at least one disk storage.

[0094] If the memory 201, processor 202, and communication interface 203 are implemented independently, then the communication interface 203, memory 201, and processor 202 can be interconnected via a bus to complete communication between them. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. The bus can be divided into address bus, data bus, control bus, etc. For ease of representation, Figure 2 A bus is represented by a single line, but this does not mean that there is only one bus or one type of bus.

[0095] Optionally, in a specific implementation, if the memory 201, processor 202, and communication interface 203 are integrated on a single chip, then the memory 201, processor 202, and communication interface 203 can communicate with each other through an internal interface.

[0096] The processor 202 may be a central processing unit (CPU), an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement embodiments of the present invention.

[0097] It should be noted that the order of the above embodiments of the present invention is merely for descriptive purposes and does not represent the superiority or inferiority of the embodiments. The processes depicted in the accompanying drawings do not necessarily require a specific or sequential order to achieve the desired result. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0098] The various embodiments in this specification are described in a progressive manner. The same or similar parts between the various embodiments can be referred to each other. Each embodiment focuses on describing the differences from other embodiments.

Claims

1. A low-carbon network resource scheduling method for electricity meter communication units based on NB-IoT, characterized in that, The method includes: The basic sustaining power, trailing leakage power, and trailing transition duration of the meter communication unit are obtained, as well as the curves showing the actual power consumption of the meter communication unit versus the theoretical transmission power under two subcarrier spacing modes are obtained. When the payload of the service data packet meets the preset micro-packet condition, the channel quality benchmark value is obtained; Based on the payload of the service data packet and the channel quality reference value, the transmission duration of the service data packet in each subcarrier spacing mode is determined; based on the difference between the downlink reference signal transmit power of the base station and the channel quality reference value, as well as the change curve, and in combination with the transmission duration, the basic sustaining power, the tailing leakage power, and the tailing transition duration, the actual total energy consumption of a single transmission of the service data packet in each subcarrier spacing mode is obtained; Based on the decoding success rate of the base station in each subcarrier spacing mode, the actual total energy consumption is adjusted to obtain the overall total energy consumption in each subcarrier spacing mode; the overall total energy consumption of the two subcarrier spacing modes is compared, and the subcarrier spacing mode corresponding to the minimum value of the overall total energy consumption is decided as the preferred subcarrier spacing mode. Send a connection request message carrying the preferred subcarrier spacing mode request to the base station, and send the service data packet on the approved physical resource block in the preferred subcarrier spacing mode.

2. The method for low-carbon network resource scheduling of electricity meter communication units based on NB-IoT according to claim 1, characterized in that, The process of obtaining the curves showing the actual power consumption of the meter communication unit versus the theoretical transmission power under two subcarrier spacing modes includes: The subcarrier spacing mode of the meter communication unit is configured as the first subcarrier spacing mode and the second subcarrier spacing mode, respectively. In each subcarrier spacing mode, the meter communication unit is instructed to gradually decrease from the maximum transmission power to the minimum transmission power in a preset step value, and the actual power consumption at each theoretical transmission power is collected. Curve fitting was performed using the least squares method to obtain the curve of the actual power consumption versus the theoretical transmit power for each subcarrier spacing mode.

3. The method for low-carbon network resource scheduling of electricity meter communication units based on NB-IoT according to claim 1, characterized in that, The acquisition of the channel quality reference value includes: Measure the raw value of the received power of the narrowband reference signal received from the base station; An infinite impulse response filtering algorithm is used to smooth the original value of the narrowband reference signal received power, and the smoothed filtered value is used as the channel quality reference value.

4. The method for low-carbon network resource scheduling of electricity meter communication units based on NB-IoT according to claim 1, characterized in that, The determination of the transmission duration of the service data packet in each subcarrier spacing mode includes: The channel quality reference value is converted into the expected received signal-to-noise ratio (SNR) and matched in a preset SNR-modulation coding strategy mapping table to obtain the modulation coding strategy index value. The payload is converted into the number of bits to be transmitted. The uplink transport block size configuration matrix is ​​called, and the table is looked up and filtered based on the row corresponding to the modulation and coding strategy index value to determine the number of resource units in the column corresponding to the minimum transport block size parameter that satisfies the number of bits to be transmitted in each subcarrier spacing mode. The transmission duration of the service data packet in each subcarrier spacing mode is obtained by multiplying the number of resource units in each subcarrier spacing mode by the time domain length of the resource unit in the corresponding mode.

5. A low-carbon network resource scheduling method for electricity meter communication units based on NB-IoT according to claim 1, characterized in that, The method of obtaining the actual total energy consumption of a single transmission of service data packets under each subcarrier spacing mode includes: The difference between the downlink reference signal transmit power of the base station and the channel quality reference value is used to calculate the path loss of the signal transmission process from the base station to the meter terminal. Combined with the expected received power of the base station and the path loss compensation factor, the theoretical transmit power of each subcarrier spacing mode is calculated. By inputting the theoretical transmit power into the variation curve of the corresponding subcarrier spacing mode, the actual power consumption of each subcarrier spacing mode can be obtained; Multiply the sum of the actual power consumption and the basic maintenance power of the meter communication unit in each subcarrier spacing mode by the transmission duration of the corresponding subcarrier spacing mode to obtain the operating energy consumption of the meter communication unit in each subcarrier spacing mode. The product of the trailing leakage power and the trailing transition time of the meter communication unit is taken as the trailing energy consumption of the meter communication unit. The sum of the stated and stated trailing energy consumption is taken as the actual total energy consumption of the meter communication unit for sending a single service data packet in each subcarrier interval mode.

6. A low-carbon network resource scheduling method for an electricity meter communication unit based on NB-IoT according to claim 1, characterized in that, The process of obtaining the overall total energy consumption for each subcarrier spacing mode includes: The total energy consumption of the meter communication unit in each subcarrier interval mode is obtained by dividing the actual total energy consumption of the meter communication unit in each subcarrier interval mode by the decoding success rate of the base station in each subcarrier interval mode.

7. A low-carbon network resource scheduling method for electricity meter communication units based on NB-IoT according to claim 1, characterized in that, The step of sending a connection request message to the base station carrying the preferred subcarrier spacing mode request includes: In the connection request message sent to the base station, the preferred subcarrier spacing mode is converted into a single-bit identifier for transmission using the reserved bits in the medium access control layer control element.

8. A low-carbon network resource scheduling method for an electricity meter communication unit based on NB-IoT according to claim 1, characterized in that, After confirming that the service data packet has been sent and that the base station has confirmed the data, the main control microcontroller pulls down the enable pins of the RF power amplifier and the local oscillator power management chip through the underlying general-purpose input / output interface, so that the meter communication unit skips the tail transition period and directly jumps to the deep power saving mode.

9. A low-carbon network resource scheduling method for an electricity meter communication unit based on NB-IoT according to claim 1, characterized in that, The preset micro-packet condition is that the payload of the service data packet is less than the payload threshold.

10. A low-carbon network resource scheduling system for electricity meter communication units based on NB-IoT, the system comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the steps of the method as described in any one of claims 1 to 9.