Inrush current controller for mining / engineering vehicles

By coordinating the inrush current protection of different electrified mining/engineering vehicles through an inrush current controller, the problem of equipment damage during grid connection is solved, achieving efficient current limiting and system stability, and reducing the demand for power supply transformers.

CN123146502APending Publication Date: 2026-11-20EPIROC ROCK DRILLS AB
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202480091038.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The inrush current generated when electric mining/engineering vehicles are connected to the power grid can cause equipment damage and sudden voltage drops in power supply lines. Existing technologies are difficult to effectively control and coordinate inrush current protection between different vehicles.

Method used

An inrush current controller is adopted, including an input terminal, an output terminal, and an inrush current limiter. The controller receives information elements and controls the inrush current limiter to coordinate the inrush current protection of multiple vehicles. It takes into account the grid operation status and vehicle events to achieve interoperability and segmented current limiting.

Benefits of technology

It improves the protection of electrical equipment, reduces equipment damage, lowers the size requirements of upstream power supply transformers, enables flexible inrush current control and coordination, and improves system stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123146502A_ABST
    Figure CN123146502A_ABST
Patent Text Reader

Abstract

The present disclosure relates to an inrush current controller for mining / engineering vehicles. The inrush current controller (100) comprises: an input (102) configured to be electrically connected or disconnected from a power grid (200); an output (104) configured to be electrically connected or disconnected from a first mining / engineering vehicle (300); an inrush current limiter (110) connected between the input (102) and the output (104) and configured to limit or eliminate an inrush current when activated; and a controller (120) configured to: receive a first information element (IE1) indicative of an inrush current event associated with a second mining / engineering vehicle (300'); and control the inrush current limiter (110) based on the first information element (IE1). Furthermore, the present disclosure also relates to corresponding methods and mining / engineering vehicles comprising such an inrush current controller.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This disclosure relates to an inrush current controller for mining / engineering vehicles. Furthermore, this disclosure also relates to corresponding methods and mining / engineering vehicles incorporating such an inrush current controller. Background Technology

[0002] Electrified mining / engineering vehicles offer opportunities to reduce the environmental footprint in mining / engineering environments and create healthier working conditions. These vehicles are driven by one or more electric motors, which can in turn be powered by a grid system and / or an onboard energy storage system (ESS) including, for example, a battery pack. Compared to diesel vehicles, electrified mining / engineering vehicles emit no emissions and therefore can offer significant savings, particularly in ventilation and cooling within mining / engineering environments.

[0003] However, electric mining / engineering vehicles require electricity to operate. That is, electricity is needed to power the electric motors, batteries, and other components of the vehicles. In this respect, mining / engineering vehicles can be connected to the power grid.

[0004] As is well known, when a motor connected to the power grid starts, a so-called inrush current can be generated in an electrical system. Inrush current is a momentary high input current drawn by a power source or electrical equipment when it is switched on. This is due to the high initial current required to charge capacitors and inductors or transformers. These currents can be up to 20 times the steady-state current. If inrush current is left unchecked, the high current can damage equipment in addition to causing voltage drops in the power supply line and leading to malfunctions in other equipment powered by the same source.

[0005] Therefore, inrush current controllers are installed in electric mining / engineering vehicles to mitigate or eliminate the effects of inrush current. Summary of the Invention

[0006] The purpose of this disclosure is to provide solutions that mitigate or resolve the shortcomings of conventional solutions.

[0007] According to a first aspect of this disclosure, the above-mentioned and other objectives are achieved by a first inrush current controller, the first inrush current controller comprising: An input configured to be electrically connected to or disconnected from the power grid; The output is configured to be electrically connected or disconnected from the first mining / engineering vehicle; An inrush current limiter connected between the input and output terminals and configured to limit or eliminate inrush current when activated; and The controller is configured as follows: Receive a first information element indicating an inrush current event associated with the second mining / engineering vehicle; and The inrush current limiter is controlled based on the first information element.

[0008] The advantage of the first inrush current controller according to the first aspect lies in its improved performance compared to conventional solutions, achieved by using a first information element indicating an inrush current event associated with the second mining / engineering vehicle when controlling the inrush current limiter. In particular, the use of the first information element enables coordination between different inrush current controllers connected to different mining / engineering vehicles, which are in turn connected to the same power grid. This provides effective inrush current protection, minimizing or eliminating damage to the electrical components and installations of the mining / engineering vehicles. Furthermore, the introduction of the first inrush current controller significantly reduces the size selection of the upstream power supply transformer, resulting in substantial savings.

[0009] In an embodiment of the first inrush current controller according to the first aspect, the controller is configured to: The first information element is received when or before the second mining / engineering vehicle is electrically connected to the power grid.

[0010] In an embodiment of the first inrush current controller according to the first aspect, a first mining / engineering vehicle is located at a first position, and a second mining / engineering vehicle is located at a second position different from the first position.

[0011] In an embodiment of the first inrush current controller according to the first aspect, the controller is configured to: The first information element is received from the second inrush current controller.

[0012] The advantage of this implementation is that multiple inrush current controllers can share a first information element for collaborative and improved inrush current protection for mining / engineering vehicles connected to the same power grid.

[0013] In an embodiment of the first inrush current controller according to the first aspect, the inrush current event includes any one of the following: the activation of a power consumption device connected to the power grid, and the connection of a power storage unit to the power grid.

[0014] The advantage of this implementation is that it takes into account relevant inrush current events for improved inrush current protection.

[0015] In an embodiment of the first inrush current controller according to the first aspect, the controller is configured to: Receive a second information element indicating the operational status of the power grid; and The inrush current limiter is further controlled based on the second information element.

[0016] The advantage of this implementation is that it takes into account further relevant information, namely a second information element related to the operating state of the power grid, for improved inrush current protection.

[0017] In an embodiment of the first inrush current controller according to the first aspect, the operating state of the power grid includes any one of the following: transient measurements of the power grid, grid disturbances of the power grid, and black start of the power grid.

[0018] The advantage of this implementation is that it takes into account the relevant operating conditions of the power grid for improved inrush current protection.

[0019] In an embodiment of the first inrush current controller according to the first aspect, the controller is configured to: A first control command is transmitted to the second inrush current controller, which instructs the activation / deactivation of the inrush current limiter of the second inrush current controller.

[0020] The advantage of this implementation is that it provides interoperability and coordination among multiple inrush current controllers. Furthermore, the second inrush current can be controlled by an external signal.

[0021] In an embodiment of the first inrush current controller according to the first aspect, the controller is configured to: Receive a second control command indicating the activation / deactivation of the inrush current limiter; and The inrush current limiter is further controlled based on the second control command.

[0022] The advantage of this implementation is that it provides interoperability and coordination among multiple inrush current controllers. Furthermore, the first inrush current can be controlled by an external signal.

[0023] In an embodiment of the first inrush current controller according to the first aspect, the control of the inrush current limiter includes activating / deactivating the inrush current limiter.

[0024] In an embodiment of the first inrush current controller according to the first aspect, the inrush current controller includes two or more inrush current limiters connected in series with each other, and wherein the controller is configured to: Activate / deactivate two or more inrush current limiters in sequence.

[0025] The advantage of this implementation is that the first inrush current controller can operate the current limiter in stages, thereby performing inrush current limiting in stages and thus improving system stability.

[0026] In an embodiment of the first inrush current controller according to the first aspect, the inrush current controller includes two or more inrush current limiters connected in parallel between an input terminal and two or more output terminals.

[0027] The advantage of this implementation is that the first inrush current controller can be used to protect multiple different mining / engineering vehicles connected to the same power grid.

[0028] In an embodiment of the first inrush current controller according to the first aspect, The input terminal includes an input insertion / removal device for connecting the input terminal to or disconnecting the input terminal from the power grid, and The output terminal includes an output insertion / extraction device for connecting the output terminal to the first mining / engineering vehicle or disconnecting the output terminal from the first mining / engineering vehicle.

[0029] The advantage of this embodiment is that the first inrush current controller is a standalone device that can be moved to the location and application where the inrush current controller is needed. This improves the flexibility of the first inrush current controller.

[0030] In an embodiment of the first inrush current controller according to the first aspect, an inrush current limiter is connected between the input and output terminals via at least one bypass switch configured to connect or disconnect the first inrush current controller to the power grid and the first mining / engineering vehicle.

[0031] The advantage of this implementation is that the inrush current limiter can be bypassed when necessary (e.g., during operation, maintenance, etc.).

[0032] In an embodiment of the first inrush current controller according to the first aspect, the first inrush current limiter is an electrical storage unit of the first mining / engineering vehicle and / or a grid-connected converter connected between the input and output.

[0033] The advantage of this implementation is that the existing electrical units and electrical devices of the first mining / engineering vehicle can be used as inrush current limiters, making it easier and more cost-effective to implement.

[0034] According to a second aspect of this disclosure, the above and other objectives are achieved by a first mining / engineering vehicle including a first inrush current controller according to any embodiment of this disclosure.

[0035] According to a third aspect of this disclosure, the above and other objectives are achieved by a method for a first inrush current controller, the first inrush current controller comprising: an input terminal configured to be electrically connected to or disconnected from a power grid; an output terminal configured to be electrically connected to or disconnected from a first mining / engineering vehicle; an inrush current limiter connected between the input terminal and the output terminal and configured to limit or eliminate inrush current when activated; and a controller; the method comprising: Receive a first information element indicating an inrush current event associated with the second mining / engineering vehicle; and The inrush current limiter is controlled based on the first information element.

[0036] The method can be adapted according to the above-described embodiment of the first inrush current controller according to the first aspect. The advantages of the method are the same as those of the corresponding embodiment of the first inrush current controller.

[0037] According to a further aspect of this disclosure, the methods described herein are implemented by using a computer program product comprising instructions that, when executed by a computer such as the control unit mentioned herein, cause the computer to perform the steps of the methods according to any of the embodiments described herein.

[0038] Further applications and advantages of the embodiments disclosed herein will become apparent from the following detailed description. Attached Figure Description

[0039] The accompanying drawings are intended to illustrate and explain different embodiments of this disclosure, wherein: Figure 1 A first inrush current controller according to an embodiment of the present disclosure is shown; Figure 2 A first inrush current controller is shown that receives a first information element from a second inrush current controller according to an embodiment of the present disclosure; Figure 3 A first inrush current controller, according to an embodiment of the present disclosure, receives a first information element from a second inrush current controller and a second information element from the power grid. Figure 4 A first inrush current controller, according to an embodiment of the present disclosure, exchanges control commands with a second inrush current controller; Figure 5 A first inrush current controller comprising two or more inrush current limiters connected in series with each other, according to an embodiment of the present disclosure, is shown. Figure 6 A first inrush current controller comprising two or more inrush current limiters connected in parallel with each other, according to an embodiment of the present disclosure, is shown. Figure 7 A first inrush current controller including one or more bypass switches is shown according to an embodiment of the present disclosure; Figure 8 Different implementation examples of a first inrush current controller associated with a mining / engineering vehicle according to embodiments of the present disclosure are illustrated; Figure 9 A flowchart illustrating a method according to an embodiment of the present disclosure; and Figure 10 Examples illustrating mining / engineering vehicles. Detailed Implementation

[0040] Among other things, the objectives of an inrush current controller include high performance in controlling inrush current and flexible interconnectivity. Therefore, an inrush current controller 100 is disclosed herein, also referred to as a first inrush current controller, to distinguish it from other inrush current controllers that may be referred to as a second inrush current controller. The corresponding designation is also applied to a mining / engineering vehicle 300 that may be referred to as a first mining / engineering vehicle, to distinguish it from other mining / engineering vehicles that may be referred to as a second mining / engineering vehicle. Therefore, the use of the labels "first" and "second" is merely labelling for this purpose and does not imply any technical features.

[0041] Figure 1 A first inrush current controller 100 according to an embodiment of the present disclosure is shown. The first inrush current controller 100 includes an input terminal 102 and an output terminal 104. The input terminal 102 is configured to be electrically connected or disconnected from a power grid 200, and the output terminal 104 is configured to be electrically connected or disconnected from a first mining / engineering vehicle 300. The first inrush current controller 100 further includes an inrush current limiter 110 connected between the input terminal 102 and the output terminal 104 and configured to limit or eliminate inrush current when activated. The inrush current limiter 110 can be any suitable type of current limiter, such as a circuit of passive electrical components, a star-delta connection, a semiconductor switch, etc.

[0042] The first inrush current controller 100 further includes a controller 120 configured to receive a first information element (IE1) indicating an inrush current event associated with the second mining / engineering vehicle 300'. The controller 120 is configured to control the inrush current limiter 110 based on the first information element.

[0043] The second mining / engineering vehicle 300' is a different mining / engineering vehicle compared to the first mining / engineering vehicle 300. Therefore, when the first inrush current controller 100 is connected to the first mining / engineering vehicle 300, which is different from the second mining / engineering vehicle 300', the controller 120 of the first inrush current controller 100 is informed about inrush current events for the second mining / engineering vehicle 300'. By using information about inrush current events for the second mining / engineering vehicle 300', the first inrush current controller 100 can improve inrush current protection for the first mining / engineering vehicle 300.

[0044] Controller 120 can be any suitable controller, control device, or control arrangement for controlling components and devices of the first inrush current controller 100. Therefore, controller 120 may include control logic, a processor, memory, and communication lines, communication devices, and communication interfaces for performing its control functions. Communication devices and interfaces can be standardized communication devices and interfaces known in the art and are shown in dashed lines. Depending on the application, communication can be wired and / or wireless. When communication is performed to / from controller 120, any suitable communication protocol and communication interface can be used. Communication can be performed using wired and / or wireless communication and is based on standardized communication systems.

[0045] The controller 120 can use the first information element IE1 in a control algorithm to control the inrush current limiter 110 via a suitable control line shown in dashed lines. Therefore, the first information element IE1 can be an input parameter or variable in such a control algorithm. Note that other information or data, such as variables and parameters, can also be used to control the inrush current limiter 110.

[0046] In embodiments of this disclosure, control of the inrush current limiter 110 includes activating / deactivating the inrush current limiter 110. For example, if a first information element indicates a critical event, the inrush current limiter 110 is activated to protect the electrical installations of the first mining / engineering vehicle 300.

[0047] It can be recognized that the aforementioned inrush current event may include any of the following: activation of the power consuming device 310 connected to the power grid 200, and activation of the power storage unit 320 (e.g., see...). Figure 8 The first inrush current controller 100 is connected to the same power grid 200 as the power grid 200 to which the second mining / engineering vehicle 300 is connected.

[0048] The activation of the power-consuming device 310 connected to the power grid 200 can cause an inrush current. Furthermore, the connection to the power storage unit 320 can mean, for example, that an inrush current also exists from the power storage unit 320 when the battery has a certain state of charge.

[0049] The power consumption device 310 is any electrical device in a mining / engineering vehicle that requires electricity for its operation, such as an electric motor, compressor, pump, actuator, etc. On the other hand, the power storage unit 320 is an electrical unit, electrical component, or electrical device configured and capable of storing electrical energy, such as a battery or capacitor.

[0050] Figure 2 A first inrush current controller 100 is shown receiving a first information element IE1 from a second inrush current controller 100' according to an embodiment of the present disclosure. For example... Figure 2 As shown, the controller 120 of the first inrush current controller 100 can be configured to receive a first information element IE1 when the second mining / engineering vehicle 300' is electrically connected to the power grid 200 or before it is electrically connected to the power grid 200. The latter case means that the first information element IE1 is sent as a warning signal that a future inrush current event may occur. Therefore, the controller 120 can prepare to protect electrical equipment by activating the inrush current limiter 110.

[0051] from Figure 2 It can also be noted that in embodiments of this disclosure, the first mining / engineering vehicle 300 is located at a first position P1, and the second mining / engineering vehicle 300' is located at a second position P2, different from the first position P1. The second position P2 can be a location adjacent to, remote from, or between an adjacent and a remote position relative to the first position P1. The first position P1 and the second position P2 can be located at a charging station where the mining / engineering vehicles are charged by the power grid 200. However, the first position P1 and the second position P2 can also be a power grid connection point where power is supplied / fed from the power grid 200 to the mining / engineering vehicles via a suitable power interface, power cable, mechanical attachment interface, etc.

[0052] The first information element IE1 can be received from the second mining / engineering vehicle 300' itself or from a grid connection point where the second mining / engineering vehicle 300' connects to the power grid 200. The grid connection point can be integrated with a charging station. However, in embodiments of this disclosure, the controller 120 is configured to receive the first information element IE1 from a second inrush current controller 100', which is different from the first inrush current controller 100. The second inrush current controller 100' can be located in the same location as the second mining / engineering vehicle 300' and, for example, attached to it. For example, the first information element IE1 can be processed and transmitted by the controller 120' of the second inrush current controller 100'.

[0053] Figure 3 A first inrush current controller 100 is shown, according to an embodiment of the present disclosure, receiving a first information element IE1 from a second inrush current controller 100' and also receiving a second information element IE2 from the power grid 200. Therefore, in these embodiments of the present disclosure, information / data regarding the power grid 200 is further considered for controlling the inrush current limiter 110 for improved inrush current protection. The operating state of the power grid 200 includes information that may be important for controlling the inrush current. Thus, in this example, the controller 120 is configured to receive a second information element IE2 indicating the operating state of the power grid 200, and further control the inrush current limiter 110 based on the second information element IE2. The aforementioned second information element IE2 can be used in a control algorithm for controlling the inrush current limiter 110.

[0054] The operating state of the power grid 200 can include any of the following: transient measurements of the power grid 200, grid disturbances of the power grid 200, and black start of the power grid 200. More specifically, the operating state mentioned herein can be: Transient measurements of the power grid 200—this may include measurements of grid disturbances, etc.; and / or Grid disturbances to power grid 200—this may include inrush currents used to energize new power lines in power grid 200; and / or Black start of power grid 200 – This can include inrush current during grid formation of power grid 200.

[0055] Figure 4 A first inrush current controller 100 is shown exchanging control commands with a second inrush current controller 100' according to an embodiment of this disclosure. Thus, different inrush current controllers can cooperate and communicate with each other, providing useful control commands between them for effective inrush current control. Therefore, this document provides a novel inrush current controller architecture or system in which external commands / signals can activate and deactivate inrush current limiters.

[0056] Therefore, in an embodiment of the present invention, the controller 120 of the first inrush current controller 100 is configured to transmit a first control command CC1 to the second inrush current controller 100'. The first control command CC1 instructs the activation / deactivation of the inrush current limiter 110' of the second inrush current controller 100'. Upon receiving the first control command CC1, the second inrush current controller 100' may use the first control command CC1 as an activation parameter or signal in its control algorithm to control its inrush current limiter 110.

[0057] Accordingly, the controller 120 of the first inrush current controller 100 can also be configured to receive a second control command CC2 instructing the activation / deactivation of the inrush current limiter 110 of the first inrush current controller 100, and further control the inrush current limiter 110 of the first inrush current controller 100 based on the second control command CC2. Upon receiving the second control command CC2, the first inrush current controller 100 can directly comply with the activation / deactivation indicated by the second control command CC2. The first control command CC1 and the second control command CC2 can be recommended or instructed. For example, if the control command is recommended, the controller 120 can also use other information and data when controlling the inrush current limiter 110. However, if the control command is a direct instruction, the controller 120 directly follows what is indicated by the control command, such as activating or deactivating the inrush current limiter.

[0058] Figure 5 A first inrush current controller 100, comprising two or more inrush current limiters connected in series with each other, is shown according to an embodiment of the present disclosure. However, Figure 5 Only two inrush current limiters are illustrated herein, but the first inrush current controller 100 may include any number of inrush current limiters connected in series. According to an example of this disclosure, controller 120 is configured to sequentially activate / deactivate two or more inrush current limiters 110, 110'. The sequential operation of current limiters 110, 110' limits the current in stages and improves the stability of the first inrush current controller 100.

[0059] Figure 6 A first inrush current controller 100 according to an embodiment of the present disclosure is shown, comprising two or more inrush current limiters 110, 110' connected in parallel with each other. The two or more inrush current limiters 110, 110' are connected in parallel with each other between an input terminal 102 and two or more output terminals 104. However, Figure 6Only two inrush current limiters are illustrated, but the first inrush current controller 100 may include any number of inrush current limiters connected in parallel. Controller 120 is configured to control two or more inrush current limiters 110, 110' connected in parallel. It can be further noted that two or more outputs 104, 104' can be connected to different vehicles, for example, to... Figure 6 The first mining / engineering vehicle 300 and the second mining / engineering vehicle 300' shown in the figure, or connected to vehicles not shown in the figure, are also mentioned. Figure 6 The third mining / engineering vehicle is shown in the image. Thus, flexibility is possible for inrush current protection.

[0060] Figure 7 A first inrush current controller 100, including one or more bypass switches, is shown according to an embodiment of the present disclosure. A bypass mechanism for the inrush current limiter 110 can be useful, and even necessary, during operation, maintenance, etc. Thus, the inrush current limiter 110 is connected between input 102 and output 104 via at least one bypass switch 130, which is configured to connect or disconnect the first inrush current controller 100 from the power grid 200 and the first mining / engineering vehicle 300. Figure 7 The first inrush current controller 100 includes a bypass switch 130 connected between input terminal 102 and output terminal 104 and in parallel with the inrush current limiter 110. Furthermore, two circuit breakers or disconnectors 132a and 132b are connected in series with the inrush current limiter 110, wherein the first circuit breaker or disconnector 132a is connected between input terminal 102 and the inrush current limiter 110, and the second circuit breaker or disconnector 132b is connected between the inrush current limiter 110 and output terminal 104. When the bypass switch 130 is closed, power from the power grid 200 can pass directly through the bypass switch 130a. However, when the first circuit breaker or disconnector 132a and the second circuit breaker or disconnector 132b are activated, the current limiter 110 does not carry any current.

[0061] Figure 8 Different implementation architectures of a first inrush current controller 100 associated with a mining / engineering vehicle according to embodiments of the present disclosure are illustrated. Generally, the first inrush current controller 100 may be a separate device that can be connected to or disconnected from the power grid 200 and the first mining / engineering vehicle 300, respectively. Thus, the input terminal 102 may include an input insertion / removal device 106 for connecting the input terminal 102 to or disconnecting the input terminal 102 from the power grid 200, and the output terminal 104 includes an output insertion / removal device 108 for connecting the output terminal 104 to or disconnecting the first mining / engineering vehicle 300.

[0062] However, in other embodiments of this disclosure, one or more components or devices of the first inrush current controller 100 may be partially integrated with the first mining / engineering vehicle 300. In such an example, the first inrush current limiter 110 may be an electrical storage unit 320 of the first mining / engineering vehicle 300 and / or a grid-connected converter 210 connected between input 102 and output 104. For example, the electrical storage unit 320 may control the inrush current, for example, under the start-up control voltage of the DC bus. Furthermore, the grid-connected converter 210 may be controlled to control the inrush current. The grid-connected converter 210 may be connected between the input and output of the first inrush current controller 100 and function as an inrush current limiter.

[0063] Figure 9 A flowchart illustrating a method according to an embodiment of the present disclosure is shown. Method 400 relates to an inrush current controller such as the first inrush current controller 100 previously described. Therefore, the inrush current controller 100 includes: an input terminal 102 configured to be electrically connected or disconnected from a power grid 200; an output terminal 104 configured to be electrically connected or disconnected from a first mining / engineering vehicle 300; an inrush current limiter 110 connected between the input terminal 102 and the output terminal 104 and configured to limit or eliminate inrush current when activated; and a controller 120.

[0064] Method 400 includes the following steps: receiving 402 a first information element IE1 indicating an inrush current event associated with the second mining / engineering vehicle 300'; and controlling 404 an inrush current limiter 110 based on the first information element IE1.

[0065] According to embodiments of the present disclosure, controller 120 may include one or more control devices / units arranged / configured / programmed with instructions to perform one or more steps of method 400.

[0066] Figure 10 This section illustrates examples of mining / engineering vehicles that can be used with or include the first inrush current controller 100. The mining / engineering vehicle 300 can be any type of electric vehicle used in mining and / or engineering environments / sites, such as drilling rigs, trucks, loaders, excavators, etc. References Figure 10 The mining / engineering vehicle 300 may be, for example, a drilling rig, loading, towing and dumping (LHD) machine or a mining truck, but is not limited thereto.

[0067] Finally, it should be understood that the present invention is not limited to the embodiments described above, but also relates to all embodiments that are incorporated within the scope of the appended independent claims.

Claims

1. A first inrush current controller (100), comprising: An input terminal (102) is configured to be electrically connected to or disconnected from the power grid (200). Output terminal (104) configured to be electrically connected or disconnected from the first mining / engineering vehicle (300); An inrush current limiter (110) connected between the input terminal (102) and the output terminal (104) and configured to limit or eliminate inrush current when activated; and The controller (120) is configured as follows: Receive a first information element (IE1) indicating an inrush current event associated with the second mining / engineering vehicle (300'); and The inrush current limiter (110) is controlled based on the first information element (IE1).

2. The first inrush current controller (100) according to claim 1, wherein, The controller (120) is configured to: The first information element (IE1) is received when or before the second mining / engineering vehicle (300') is electrically connected to the power grid (200).

3. The first inrush current controller (100) according to claim 1 or 2, wherein, The first mining / engineering vehicle (300) is located at a first position (P1), and the second mining / engineering vehicle (300') is located at a second position (P2) different from the first position (P1).

4. The first inrush current controller (100) according to any one of the preceding claims, wherein, The controller (120) is configured to: The first information element (IE1) is received from the second inrush current controller (100').

5. The first inrush current controller (100) according to any one of the preceding claims, wherein, The inrush current event includes any one of the following: the activation of a power consumption device (310) connected to the power grid (200), and the connection of a power storage unit (320) to the power grid (200).

6. The first inrush current controller (100) according to any one of the preceding claims, wherein, The controller (120) is configured to: Receive a second information element (IE2) indicating the operating state of the power grid (200); and The inrush current limiter (110) is further controlled based on the second information element (IE2).

7. The first inrush current controller (100) according to claim 6, wherein, The operating state of the power grid (200) includes any of the following: transient measurement values ​​of the power grid (200), grid disturbances of the power grid (200), and black start of the power grid (200).

8. The first inrush current controller (100) according to any one of the preceding claims, wherein, The controller (120) is configured to: A first control command (CC1) is transmitted to the second inrush current controller (100'), the first control command (CC1) instructing the activation / deactivation of the inrush current limiter (110') of the second inrush current controller (100').

9. The first inrush current controller (100) according to any one of the preceding claims, wherein, The controller (120) is configured to: Receive a second control command (CC2) instructing the activation / deactivation of the inrush current limiter (110); and The inrush current limiter (110) is further controlled based on the second control command (CC2).

10. The first inrush current controller (100) according to any one of the preceding claims, wherein, The control of the inrush current limiter (110) includes activating / deactivating the inrush current limiter (110).

11. The first inrush current controller (100) according to any one of the preceding claims, comprising two or more inrush current limiters (110) connected in series with each other, and wherein, The controller (120) is configured to: Activate / deactivate the two or more inrush current limiters (110) in sequence.

12. The first inrush current controller (100) according to any one of the preceding claims includes two or more inrush current limiters (110) connected in parallel between the input terminal (102) and two or more output terminals (104).

13. The first inrush current controller (100) according to any one of the preceding claims, wherein: The input terminal (102) includes an input insertion / removal device (106) for connecting the input terminal (102) to the power grid (200) or disconnecting the input terminal (102) from the power grid (200), and The output terminal (104) includes an output insertion / removal device (108) for connecting the output terminal (104) to the first mining / engineering vehicle (300) or disconnecting the output terminal (104) from the first mining / engineering vehicle (300).

14. The first inrush current controller (100) according to any one of the preceding claims, wherein, The inrush current limiter (110) is connected between the input terminal (102) and the output terminal (104) via at least one bypass switch (130), the at least one bypass switch (130) being configured to connect or disconnect the first inrush current controller (100) from the power grid (200) and the first mining / engineering vehicle (300).

15. The first inrush current controller (100) according to any one of the preceding claims, wherein, The first inrush current limiter (110) is the electrical storage unit (320) of the first mining / engineering vehicle (300) and / or the grid-connected converter (210) connected between the input (102) and the output (104).

16. A first mining / engineering vehicle (300) comprising a first inrush current controller (100) according to any one of the preceding claims.

17. A method (400) for a first inrush current controller (100), the first inrush current controller (100) comprising: An input terminal (102) is configured to be electrically connected to or disconnected from the power grid (200). An output terminal (104) configured to be electrically connected or disconnected from the first mining / engineering vehicle (300); an inrush current limiter (110) connected between the input terminal (102) and the output terminal (104) and configured to limit or eliminate inrush current when activated. and controller (120); the method (400) includes: Receive (402) a first information element (IE1) indicating an inrush current event associated with the second mining / engineering vehicle (300'); and Based on the first information element (IE1), control (404) the inrush current limiter (110).

18. A computer program having program code for performing the method of claim 17 when the computer program is run on a computer.