Converter circuit with zero voltage switching and improved dead time optimization
By optimizing the dead time through monitoring lines and control units, the dynamic change problem of ZVS in the converter line was solved, zero-voltage switching of semiconductor switches was achieved, losses and thermal load risks were reduced, and the reliability of the converter line was improved.
Patent Information
- Application Number
- CN202580029818.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-04-29
- Filing Date
- 2025-02-25
- Publication Date
- 2026-11-20
AI Technical Summary
Existing converter circuits may not be able to guarantee zero-voltage switching (ZVS) during dynamic operation due to parameter changes, causing semiconductor switches to switch at high voltage, resulting in thermal load and damage risks. Furthermore, the dead time adjustment depends on the operating state and is difficult to optimize.
By monitoring the circuit and control unit, utilizing the charging signal and time measurement device, the dead time of the semiconductor switch is optimized to ensure switching at near-zero voltage. Logic circuits and delay elements are used to adjust the switching signal to achieve symmetrical operation of the half-bridge circuit.
It achieves zero-voltage switching of semiconductor switches under dynamic conditions, reduces power loss, improves the reliability and durability of converter circuitry, and reduces thermal load risk.
Smart Images

Figure CN123147076A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to converter circuits for power applications configured to reduce power loss during operation using zero-voltage switching (ZVS). ZVS can be implemented in half-bridge circuits in which semiconductor switches include unloaded diodes, which are either intrinsic or constructed as separate components. Background Technology
[0002] When an open-circuit current flows through the open-circuit diode of a low-side or high-side semiconductor switch during the switching process, the voltage of the low-side or high-side semiconductor switch is approximately 0V (at the threshold voltage level of the open-circuit diode), achieving zero-voltage switching (ZVS). Typically, the conditions for ZVS are pre-calculated, and the closing time of one of the semiconductor switches is determined, for example, such that this time falls within a time period after the other semiconductor switch is opened, during which the open-circuit current flows through the relevant semiconductor switch.
[0003] Although possible operating conditions are considered in the design of converter circuitry to ensure ZVS, during dynamic operation, due to tolerances or parameter changes caused by aging, a state in which ZVS can no longer be guaranteed may occur.
[0004] If the operating state of the half-bridge circuit changes, thus ceasing ZVS (Zero-Voltage Switching), this will cause the semiconductor switches to switch under high voltage conditions. The resulting power loss can lead to a significant thermal load on the semiconductor switches and potentially damage them.
[0005] When switching a half-bridge using zero-voltage switching (soft switching), the dead time—the time between the turn-off of one of the half-bridge's semiconductor switches and the subsequent turn-on of the corresponding other semiconductor switch—is particularly critical. Too long a dead time can cause the current flowing through the half-bridge to reverse, resulting in recharging. Too short a dead time may be insufficient for zero-voltage switching, causing the turn-on process of the relevant semiconductor switch to occur before reaching the near-zero voltage at the intermediate node. Therefore, in many applications, the dead time between the turn-off signal for one semiconductor switch and the turn-on signal for the corresponding other semiconductor switch is adjusted or predetermined depending on the operating conditions. Summary of the Invention
[0006] The objective of this invention is to provide an improved converter circuit with a half-bridge circuit, wherein the dead time of semiconductor switch control is optimized in an improved manner.
[0007] This task is accomplished by a converter circuit according to claim 1 and a method for operating the converter circuit according to the parallel claims.
[0008] Other design options are described in the dependent claims.
[0009] According to a first aspect, a converter circuit is provided, the converter circuit comprising: - At least one half-bridge circuit having a high-side semiconductor switch and a low-side semiconductor switch, the high-side semiconductor switch and the low-side semiconductor switch being connected in series between a high switching potential and a low switching potential, and an intermediate node being arranged between the high-side semiconductor switch and the low-side semiconductor switch. - Each drive line is configured to operate a semiconductor switch of at least one half-bridge circuit with a corresponding control signal. - Bootstrap-Schaltung is a start-up circuit used to provide supply voltage to the drive circuit of the high-side semiconductor switch with respect to the node potential of the intermediate node. - A monitoring line, which is configured to provide a umladungssignal based on the timing of current flow toward the start-up line, the umladungssignal indicating the presence or absence of a near-zero voltage on the low-side semiconductor switch; - Control unit, which provides periodic raw control signals for manipulating semiconductor switches according to a predetermined duty cycle during the switching cycle; - Logic circuitry to delay the initial control signal for turning on the low-side semiconductor switch, thereby obtaining a control signal for the drive circuitry of the low-side semiconductor switch, wherein the delay is performed until not only the charge signal indicates the presence of a quasi-zero voltage on the low-side semiconductor switch but also the initial control signal for the low-side semiconductor switch indicates the turning on of the low-side semiconductor switch.
[0010] The logic circuits and control units can be set up separately or together in an integrated circuit.
[0011] In power applications, converter circuits typically switch high voltages ranging from hundreds to thousands of volts. Such converter circuits usually include one or more half-bridge circuits consisting of two power semiconductor switches connected in series, such as power MOSFETs, between the high and low switching potentials. The half-bridge circuit is constructed with high-side and low-side semiconductor switches for this purpose.
[0012] It can be specified that the semiconductor switch is configured as a power semiconductor switch, particularly as a power MOSFET, and is connected between a high switching potential and a low switching potential.
[0013] Power semiconductor switches are, in principle, switched alternately to apply high or low switching potentials at intermediate nodes. The transmission lines applied at intermediate nodes can be, for example, LLC-, PSFB (Phase Shifted Full Bridge-, or DAB- lines, which provide inductance or resonant circuitry.
[0014] The control terminals of the semiconductor switches are operated by drive lines (gate-drivers) that provide the gate voltage required to turn the relevant semiconductor switch on and off. For example, a gate voltage of approximately 10 to 30V can be set for a power MOSFET capable of switching voltages up to 1,000V.
[0015] The drive lines for the high-side and low-side semiconductor switches are supplied with a supply voltage but operate at different potential levels because the gate-source voltage of the high-side semiconductor switch is significantly lower than the voltage to be switched. The high-side drive lines can here be supplied with a startup line to provide a control voltage to the high-side semiconductor switch related to the node potential of the intermediate node between the high-side and low-side semiconductor switches.
[0016] The startup circuit includes a supply capacitor in a manner known per se, which is always charged when the node potential is pulled low to a switching potential by the low-side semiconductor switch. The startup circuit operates with a supply voltage associated with the low switching potential (reference potential), such that voltages within the range of high switching potentials at the mid-node of the half-bridge circuit cause the startup diode of the startup circuit to block, resulting in power supply to the drive circuit via the supply capacitor during the blocking period. This typically occurs when the high-side semiconductor switch is closed, i.e., when the voltage potential at the mid-node is higher than the high supply voltage.
[0017] To achieve ZVS, the semiconductor switch is equipped with an unloaded diode, either intrinsically or extrinsically. Furthermore, a dead time is set between the non-overlapping turn-on phases of the semiconductor switch during operation. This dead time allows an unloaded current to flow through the unloaded diode of the low-side / high-side semiconductor switch after the high-side / low-side semiconductor switch is turned off due to the inductance of the transmission line (located after the converter line), thereby setting the voltage across the low-side / high-side semiconductor switch to approximately 0V (within the threshold voltage range). Then, after the dead time ends, the low-side / high-side semiconductor switch is closed, thus performing the switching process at approximately 0V.
[0018] Preferably, the corresponding semiconductor switch should be turned on while the unloaded diode is still conducting no-load current, so that it can be turned on with a near-zero voltage. The timing and duration of the no-load current flowing through the corresponding unloaded diode depend significantly on the current currently flowing in the inductor. Therefore, the corresponding optimal dead time between the turn-off of one semiconductor switch in the half-bridge circuit and the turn-on of its corresponding other semiconductor switch is variable.
[0019] In addition, the monitoring line can have a current-to-voltage converter to transform the current flowing into the startup line into a monitoring potential. The monitoring potential is used to generate a charge signal and indicate whether or when current flows into the startup line.
[0020] Furthermore, a control unit provides corresponding control signals for the drive circuitry of the high-side semiconductor switch / low-side semiconductor switch. These control signals are used to pre-determine the times at which the relevant semiconductor switches should be turned on and off. These control signals are conventionally designed to account for variable dead times, thereby achieving zero-voltage switching. The control signals are converted into switching signals with appropriate levels in the drive circuitry.
[0021] According to the converter circuit described above, the charging signal is now explained. This charging signal depends on the timing of current flow into the startup circuit relative to the turn-on time of one of the semiconductor switches (and thus the start time or time period of the quasi-zero voltage on the low-side semiconductor switch) and is generated by an AND operation (verunden) with the turn-on signal (control signal) used to turn on the low-side semiconductor switch. The charging signal occurs, or indicates this situation, when the intermediate node voltage drops to a value lower than the higher supply potential of the drive circuit for the high-side semiconductor switch due to the charging of the capacitor at the intermediate node by the induced current through the converter circuit.
[0022] The AND operation enables the low-side semiconductor switch to be turned on only when both the charge signal indicates the arrival of zero-voltage switching and the control unit signals the relevant semiconductor switch to be turned on. Thus, the dead time, which is the duration from the opening of the high-side semiconductor switch to the closing of the low-side semiconductor switch, is varied or variable and optimally adapted to the operating conditions, depending on the load current flowing through the connected load.
[0023] It can be specified that the logic circuit has a time measuring device configured to measure the duration between the edge of a control signal for turning on a low-side semiconductor switch and the edge of a charge signal indicating the presence of a quasi-zero voltage on the low-side semiconductor switch, and wherein the logic circuit has a delay element to delay the measured duration by delaying the most recent edge of the original control signal for operating or turning on a high-side semiconductor switch.
[0024] Since the start-up circuit for the high-side semiconductor switch is used to detect or generate a charge signal, the optimal switching time (on-time) can be determined solely for the low-side semiconductor switch according to the above processing method. Due to the symmetry of the half-bridge circuit, it can be assumed that the optimal dead time for switching the low-side semiconductor switch is also optimal or usable for the high-side semiconductor switch in the same switching cycle. For this purpose, a time measuring device in the form of a time counter is used, which is turned on by a control signal for the low-side semiconductor switch and stopped by a charge signal indicating zero-voltage switching. After the low-side semiconductor switch is turned off after approximately a half-hour switching cycle, the counter value or the measured duration of the time measuring device can now be used to delay the control signal for turning on the high-side semiconductor switch based on the duration generated from the counter value of the time counter. This counter value indicates the dead time between the edge for turning on the low-side semiconductor switch and the edge of the charge signal (provided there is no dead time between the edges of the control signal for the semiconductor switch), which indicates the situation when the quasi-zero voltage above the low-side semiconductor switch has been reached. Therefore, in each switching cycle, the dead time between the switching off of the high-side semiconductor switch and the switching on of the low-side semiconductor switch is adjusted to an optimal value, and this dead time is used to switch on the high-side semiconductor switch in the next switching cycle. Thus, the two semiconductor switches in the half-bridge circuit operate with optimized dead times.
[0025] In one embodiment, the logic circuit can have additional delay elements to delay the edge of the relevant original control signal for a pre-given maximum duration if the corresponding low-side semiconductor switch or high-side semiconductor switch was not turned on in the relevant switching cycle.
[0026] If the following operating conditions are reached, in which zero-voltage switching is impossible or the operating point requiring hard switching is reached, such as during the initial phase of the converter circuit during startup, the converter circuit must perform the semiconductor switch switching process after a predetermined maximum time, otherwise no switching will occur. This is achieved by providing delay elements for the switching signals of the low-side and high-side semiconductor switches. These delay elements connect the corresponding control signals to the corresponding drive lines through corresponding OR gates, thereby enabling forced switching regardless of the time measurement by a time measuring device, such as the counter value of a time counter.
[0027] There is a zero-voltage handover when switching after the maximum dead time, and the absence of the zero-voltage handover can be notified by signaling accordingly.
[0028] The aforementioned converter circuitry enables simple dead-time optimization for half-bridge circuits with startup-based topologies. The overhead for dead-time optimization is very small and exhibits exceptional resilience against parasitic effects.
[0029] In particular, the current-to-voltage converter can include a bipolar junction transistor, especially a PNP bipolar junction transistor, whose base terminal is connected to a startup line and whose emitter terminal is connected to a supply voltage source, wherein a monitoring potential is applied at the collector terminal.
[0030] Current detection of the startup current flowing into the startup circuit can be implemented, for example, by means of a bipolar junction transistor switched to the emitter circuit, for which the emitter junction has a high supply potential, the base junction is connected to the startup circuit, and the collector junction is connected to the detection circuit.
[0031] If current flows into the startup circuit, then a supply voltage (high supply potential) is applied to the collector terminal of the bipolar junction transistor. Thus, a low supply potential at the collector terminal indicates that the voltage at the intermediate node has not yet reached 0V, and a supply potential at the collector terminal (or a voltage not equal to 0) indicates that approximately 0V has been reached at the intermediate node. Attached Figure Description
[0032] The embodiments are explained in detail below with reference to the accompanying drawings. Wherein: Figure 1 A circuit diagram of a converter line with dead time optimization is shown; Figure 2 A circuit diagram of another implementation of a converter line with dead time optimization is shown; Figure 3 A flowchart is shown to illustrate the method used to operate the converter circuitry. Detailed Implementation
[0033] Figure 1 A circuit diagram of converter line 1 for applications in the medium voltage range, particularly for PSFB-, LLC- and DAB- transmission lines 2, is shown.
[0034] In its core, converter line 1 has one or more half-bridge lines consisting of two power semiconductor switches 3 connected in series, the power semiconductor switches being configured as power MOSFETs. The power semiconductor switches 3a and 3b include a high-side semiconductor switch 3a and a low-side semiconductor switch 3b. The series connection of the semiconductor switches 3a and 3b is connected at a high-to-low switching potential V with a voltage difference typically several hundred volts. SH V SL Between. The power semiconductor switch 3 can be configured as a power MOSFET with an internal unloaded diode that is switched toward blocking during normal operation. Other types of power semiconductor switches can also be configured. The unloaded diode can also be externally located.
[0035] The gate terminals of the power semiconductor switch 3 are correspondingly controlled by switching signals Sa and Sb via drive lines 4a and 4b. The corresponding switching signals Sa and Sb have voltage levels that are generated based on the levels of the corresponding control signals Ta and Tb, and are designed to either block or turn on the corresponding power semiconductor switch 3. For example, the control signals can be 0 and 5 volts, while the switching signals Sa and Sb correspond to, for example, the supply voltage level of 0V and the voltage level between 10V and 30V applied to the drive lines 4a and 4b.
[0036] Control signals Ta and Tb are provided by control unit 10. For this purpose, control unit 10 outputs raw control signals Ta' and Tb'. The raw control signals Ta' and Tb' alternate to achieve periodic operation of semiconductor switches 3a and 3b, for example, in switching cycles with a predetermined duty cycle.
[0037] The corresponding drive lines 4a and 4b rely on control signals Ta and Tb to provide corresponding switching signals Sa and Sb, which are designed to turn on and off the corresponding power semiconductor switch 3 (between low impedance and high impedance states).
[0038] However, the drive circuit 4a used to control the high-side semiconductor switch 3a must ensure that the node voltage V depends on the intermediate node K. k Under these conditions, the gate-source voltage at the high-side semiconductor switch 3a is within the allowable switching signal voltage range, meaning the switching signal voltage must be within the node potential V. k Related.
[0039] For this purpose, a startup circuit 5 is provided, which has a supply capacitor 51 connected to a supply voltage source 6 and an intermediate node K via a standard diode or Schottky diode 52 polarized along the forward direction. If the low-side semiconductor switch 3b conducts, the voltage at the intermediate node K is pulled to a low switching potential, and the diode 52 conducts, thus charging the supply capacitor 51. If the node potential V at the intermediate node K is... k Pull to a higher switching potential V SH The direction and method are as follows: closing the high-side semiconductor switch 3a causes a change in the sign of the voltage across diode 52 in the start-up line 5, blocking the diode. Thus, a supply voltage VDD-GND is continuously supplied to the drive line 4a of the high-side semiconductor switch 3a, the supply voltage corresponding to the switching voltage range and related to the source terminal of the high-side semiconductor switch 3a.
[0040] Control unit 10 provides raw control signals Ta' and Tb', from which control signals Ta' and Tb are generated for manipulating power semiconductor switches 3a and 3b via corresponding drive lines 4a and 4b. The manipulation of the power semiconductor switches 3 is performed alternately using a periodic frequency, typically selected to be higher than the resonant frequency of the downstream transmission line 2 connected to intermediate node K.
[0041] To achieve ZVS, a dead time must be set after turning off (disconnecting) one power semiconductor switch 3 and then turning on (closing) the corresponding other power semiconductor switch 3. The dead time allows the voltage on the low-side semiconductor switch to drop to approximately 0V after turning off the high-side semiconductor switch 3a, so that the low-side semiconductor switch 3b can then be closed by the rising edge of the switching signal Sb.
[0042] When the high-side semiconductor switch 3a is disconnected, the inductance of the downstream transmission line 2 connected to the intermediate node K also maintains the following current flow after the high-side semiconductor switch is disconnected. This current flow causes an open-circuit current to flow through the internal open-circuit diode of the low-side semiconductor switch. Therefore, the voltage on the low-side semiconductor switch 3b drops to zero, and the low-side semiconductor switch can be sequentially turned on by the control signal Tb / switching signal Sb for the low-side semiconductor switch 3b.
[0043] To generate the charge signal D, a monitoring line 7 is now configured, which has a current-to-voltage converter to monitor the current from the control voltage source 6 to the starting line 5. Once the current flows into the starting line 5 and thus indicates that the voltage at the intermediate node K has dropped to near-zero volts (near-zero voltage), the supply voltage V is essentially used. vers The level of (potential) is used to provide the corresponding monitoring voltage V. u .
[0044] This current-to-voltage converter can be constructed using a PNP bipolar junction transistor 71, whose base terminal is connected to the startup circuit 5 and whose emitter terminal is connected to the high supply voltage potential V of the supply voltage source 6. vers Connection. If current flows into startup line 5, the collector connector provides a monitoring voltage potential V. u .
[0045] The collector terminal is connected to the reference potential, which is either a low switching potential or a low supply voltage potential, via a pull-down resistor 73. Thus, when no current flows into the startup circuit 5, the reference potential voltage, i.e., 0 volts, is applied to the collector terminal.
[0046] Monitoring voltage V at the collector terminal u The monitoring voltage corresponds to a high supply voltage potential V. vers The time represents the high level of the digital signal and is monitored at voltage V. u The potential corresponding to the reference potential represents a low level for the digital signal. This signal corresponds to the charge signal D, which indicates the presence of a near-zero voltage across the low-side semiconductor switch 3b. The charge signal D is generated either directly at the collector terminal or via a suitable voltage converter 73 connected to the collector terminal and also providing a pull-down resistor.
[0047] The optimal dead time between the cutting off of the high-side semiconductor switch 3a and the turning on of the low-side semiconductor switch 3b depends on the load current flowing into the loaded load and should preferably be selected in this way to achieve zero-voltage switching. If the dead time is too short, it may not be sufficient for zero-voltage switching. If the dead time is too long, it causes the current to reverse and thus leads to recharging.
[0048] To automatically adjust the dead time to the optimal value, the charging signal D from monitoring line 7 can be utilized. For this purpose, an AND line 8 is provided, which performs an AND operation on the charging signal D and the original control signal Tb' from control unit 10 for the low-side semiconductor switch 3b. That is, if charging occurs after the high-side semiconductor switch 3a is closed, and if the low-side semiconductor switch 3b is requested to be turned on via control unit 10 using the original control signal Tb', then the control signal Tb for the low-side semiconductor switch 3b is transmitted to the corresponding drive line 4b. In this way, the low-side semiconductor switch 3b is switched precisely when the near-zero voltage on the low-side semiconductor switch 3b is determined.
[0049] Due to the design of the converter circuit with startup line 5, this dead-time optimization is only possible for the switching of the low-side semiconductor switch 3b.
[0050] In order to optimize the dead time for the high-side semiconductor switch 3a, a time counter 9 is provided for time measurement. The time counter measures the duration between the original control signal Tb' for turning on the low-side semiconductor switch 3b and the charge signal D indicating the quasi-zero voltage on the low-side semiconductor switch 3b, and sets the measured optimal dead time for turning on the high-side semiconductor switch 3a next.
[0051] To this end, a variable delay element 11 is provided, and the measured duration is communicated with the delay element, thereby delaying the original control signal Ta' for turning on the high-side semiconductor switch 3a by the pre-measured duration. This enables symmetrical operation of the semiconductor switches 3a and 3b in the half-bridge circuit, thereby enabling zero-voltage switching for the two semiconductor switches 3a and 3b.
[0052] In addition, such as in Figure 2 As shown in the implementation, the variable dead time can also be limited to a maximum value. For example, the original control signals Ta' and Tb' can be delayed by the maximum dead time so that the corresponding control signals Ta and Tb are generated without prior activation of the corresponding switching elements 3a and 3b.
[0053] To this end, additional delay elements 12a, 12b and OR elements 13a, 13b can be provided for each drive line 4a, 4b. Delay elements 12a, 12b are used to delay the corresponding original control signals Ta', Tb' by a predetermined maximum dead time. The resulting delayed original control signals Ta', Tb' are ORed in the corresponding OR elements 13a, 13b using either the output of the AND gate 8 or the output of the delay element 11. This ensures hard switching of the half-bridge, especially at specific operating points—where quasi-zero voltage is not reached on the low-side semiconductor switching elements—as is possible during, for example, the initial phase of the half-bridge, during which zero-voltage switching is not possible.
[0054] The AND element 8, OR elements 13a, 13b, time counter 9, and delay elements 12a, 12b, 11 can be fully or partially implemented in the control unit 10.
[0055] exist Figure 3 A flowchart illustrating a method that can be performed via converter line 1 is shown. This method can be implemented in part in control unit 10, either in software or based on hardware.
[0056] In step S1, the control unit 10 predefines the initial control signals Ta' and Tb' for manipulating the semiconductor switches 3a and 3b, using these initial control signals to manipulate the semiconductor switches 3a and 3b so that they alternately conduct or deconduct. This can be done according to a switching cycle with a pre-given duty cycle.
[0057] Therefore, it can be specified in step S1 by the control unit 10 that the low-side semiconductor switch 3b should be turned on. This is indicated by the high level of the original control signal Tb'.
[0058] In step S2, the time counter 9 is turned on by the rising edge of the original control signal Tb'.
[0059] In step S3, check whether the charge signal D has a high level. If it is (either / or: yes), proceed to step S4 to continue the method; otherwise (either / or: no), jump back to step S3.
[0060] In step S4, the time counter 9 is stopped, providing the duration as the counter value, and simultaneously, the on-level of the control signal Tb for the low-side semiconductor switch 3b is applied to the drive line 4b. This turns on the low-side semiconductor switch 3b.
[0061] In step S5, the next rising edge of the original control signal Ta' for the high-side semiconductor switch 3a is delayed by a duration corresponding to the counter value. The delayed original control signal Ta' for the high-side semiconductor switch 3a is then applied to the drive line 4a for the high-side semiconductor switch 3a.
[0062] The method is implemented periodically.
Claims
1. A converter line (1), comprising: - At least one half-bridge circuit having a high-side semiconductor switch (3a) and a low-side semiconductor switch (3b), wherein the high-side semiconductor switch and the low-side semiconductor switch are connected in series at a high switching potential (V). SH ) and low switching potential (V SL An intermediate node (K) is arranged between the high-side semiconductor switch and the low-side semiconductor switch. - Each of the following drive lines (4a, 4b) is configured to control the semiconductor switches (3a, 3b) of at least one half-bridge circuit according to the corresponding control signals (Ta, Tb). - Used for the node potential (V) with respect to the intermediate node (K) k The starting circuit (5) provides the supply voltage to the drive circuit (4a) of the high-side semiconductor switch (3a). - Monitoring line (7), which is configured to provide a charge signal (D) depending on the timing of current flow toward the start-up line (5), the charge signal indicating the presence or absence of a near-zero voltage on the low-side semiconductor switch (3b); - Control unit (10), the control unit is used to provide periodic raw control signals (Ta', Tb') for manipulating semiconductor switches (3a, 3b) in a predetermined duty cycle during the switching cycle. - A logic circuit is used to delay the original control signals (Ta', Tb') for turning on the low-side semiconductor switch (3b), thereby obtaining a control signal (Tb) for the drive line (4b) of the low-side semiconductor switch (3b), wherein the delay is performed until not only the charge signal (D) indicates the presence of a quasi-zero voltage on the low-side semiconductor switch (3b) but also the original control signals (Ta', Tb') for the low-side semiconductor switch (3b) indicate that the low-side semiconductor switch (3b) is turned on.
2. The converter line (1) according to claim 1, wherein the monitoring line (7) has a current-voltage converter to convert the current flowing into the startup line (5) into a monitoring potential (V). u A charge signal (D) is generated from the monitoring potential, which indicates whether current flows into the start-up line (5).
3. The converter circuit (1) according to claim 2, wherein the current-voltage converter (71) comprises a bipolar junction transistor, particularly a PNP bipolar junction transistor, whose base terminal is connected to the startup circuit (5) and whose emitter terminal is connected to the supply voltage source (6), wherein the monitoring potential (V) is applied at the collector terminal. u ).
4. The converter circuit (1) according to any one of claims 1 to 3, wherein the logic circuit and the control unit (10) are arranged in an integrated circuit.
5. The converter circuit (1) according to any one of claims 1 to 4, wherein the semiconductor switches (3a, 3b) are configured as power semiconductor switches, particularly as power MOSFETs, and are connected to a high switching potential (V). SH ) and low switching potential (V SL )between.
6. The converter circuit (1) according to any one of claims 1 to 5, wherein the logic circuit has a time measuring device (9) configured to measure the duration between the edge of the original control signal (Tb') for turning on the low-side semiconductor switch (3b) and the edge of the charge signal (D) indicating the presence of a quasi-zero voltage on the low-side semiconductor switch (3b), and wherein the logic circuit has a delay element (11) to delay the measured duration by delaying the particularly recent edge of the original control signal (Ta') for operating or turning on the high-side semiconductor switch (3a).
7. The converter circuit (1) according to any one of claims 1 to 6, wherein the logic circuit has additional delay elements (12a, 12b) to delay the edges of the relevant original control signals (Ta', Tb') for a pre-given maximum duration when the corresponding low-side semiconductor switch (3b) or high-side semiconductor switch (3a) has not been turned on in the relevant switching cycle.
8. The converter line (1) according to any of the preceding claims, wherein a transmission line (2) providing inductance, particularly LLC-, PSFB- or DAB-, is connected at the intermediate node (K).
9. The converter circuit (1) according to any one of the preceding claims, wherein the startup circuit (5) includes a supply capacitor (51), the supply capacitor always having a node potential (V) at the intermediate node (K). k It is charged when pulled to a low switching potential by the low-side semiconductor switch (3b).
10. The converter circuit (1) according to any one of the preceding claims, wherein the semiconductor switch (3) is provided with an internal or external unloaded diode.