A method and system for synergistic control of fertilizer application and pre-harvest drainage for promoting bud of rices

By using a collaborative control method through the controller management unit, the moisture and nitrogen status are obtained, and a suitable nitrogen application rate and water replenishment plan are generated. This solves the problem of coordinating the application of fertilizer to promote sprouting in ratooning rice with pre-harvest drainage, ensuring the accuracy and efficiency of the preparation conditions for machine harvesting.

CN123147342APending Publication Date: 2026-11-24Zhaoqing Academy of Agriculture and Forestry Sciences
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611586467.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-14
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies cannot effectively reflect the differences in the recovery of machine harvesting conditions after water replenishment in the coordinated control of fertilizer application for promoting sprouting and pre-harvest drainage in ratooning rice. This results in inapplicable fertilizer prescriptions and conflicts between water replenishment and water retention and pre-harvest drying.

Method used

The controller management unit acquires moisture status, nitrogen status, and target node axillary bud status, generates candidate nitrogen application rates and water replenishment plans, and, combined with the drying response relationship, selects plans that can be completed before the expected machine harvest time, controls fertilization and drainage, and prevents unnecessary water replenishment and water retention.

Benefits of technology

This reduces fertilization conflicts caused by underestimating the burden of drying, ensures that water replenishment and fertilization instructions meet the conditions for mechanized harvesting, prevents duplicate allocation of nitrogen application quotas, and allows for timely adjustment of preparation time after changes in water supply and drainage conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123147342A_ABST
    Figure CN123147342A_ABST
Patent Text Reader

Abstract

This invention discloses a method and system for the coordinated control of bud-promoting fertilizer application and pre-harvest drainage in ratooning rice, relating to the fields of water and fertilizer management and agricultural operation control technology for ratooning rice. The method determines candidate nitrogen application amounts based on the water and nitrogen levels of the management unit and the axillary bud status at the target node, generating candidate schemes that include pre-fertilization water replenishment and post-fertilization water retention methods. The drying time is determined by the predicted water status at the end of water retention and the drying response relationship, and schemes that can be completed before the expected machine harvest time are selected. After water replenishment, the water and nitrogen status is retested, and the additional nitrogen application amount is re-determined. The predicted water status and drying time are updated based on the measured water and remaining water retention arrangements. Fertilization, water retention, and drainage are controlled only when the conditions of water, nitrogen application requirements, and remaining time are met. When a prescription becomes invalid, unexecuted instructions are revoked, and actual nitrogen application records are retained. This invention incorporates the subsequent drying burden caused by water replenishment into the time calculations before and after fertilization, reducing conflicts between bud-promoting fertilizer application and machine harvest preparation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of water and fertilizer management and agricultural operation control technology for ratooning rice, and in particular to a method and system for the coordinated control of the application of fertilizer to promote sprouting and pre-harvest drainage for ratooning rice. Background Technology

[0002] Ratoon rice utilizes the axillary buds retained on the stubble after the first-season rice harvest to germinate and form ratooning plants. The nutritional status of the mother plant before the first-season rice harvest, field water conditions, stubble height, and the developmental status of axillary buds at different nodes are all related to the production management of the ratooning season. Sprouting fertilizer is usually applied before the first-season rice harvest, and its application timing and amount need to be adapted to the variety, growth stage, and field conditions.

[0003] Existing technology discloses a nitrogen fertilizer application method to promote the germination of axillary buds in low-stubble ratooning rice harvested by machine. The method arranges the timing and proportion of nitrogen application before and after harvest according to the developmental characteristics of the axillary buds in low-stubble ratooning rice. Another existing technology discloses a feed-type rice cultivation method that uses plant nutrient diagnosis and field water level to arrange fertilization, and records measures for conducting nutrient diagnosis after drying or re-watering the field.

[0004] The prior art also discloses a dynamic optimization method and system for paddy field irrigation and drainage strategies, which optimizes irrigation and drainage strategies based on paddy field environmental parameters and weather forecasts, and corrects subsequent decision states based on actual environmental parameters.

[0005] In the scenario of applying fertilizer to promote sprouting before the first harvest of rice, if there is insufficient moisture in the field, fertilization may require supplemental irrigation and post-application water retention. Meanwhile, preparation for mechanized harvesting requires the field to be drained at an appropriate time. Supplemental irrigation and water retention will alter the initial state of subsequent drying. Relying solely on water and nitrogen test results at the time of fertilization, or using a fixed number of days of pre-harvest irrigation cessation, may not adequately reflect the differences in the time required for different fields to recover for mechanized harvesting after supplemental irrigation. Furthermore, during the periods of supplemental irrigation, waiting for testing, or fertilization, rainfall, drainage outlet conditions, and the expected harvest time may change, rendering the previously formulated fertilization prescription no longer applicable.

[0006] Therefore, it is necessary to further coordinate the water management and pre-harvest drainage of the bud-promoting fertilizer, so that the fertilization decision can reflect the subsequent drying burden brought about by the water replenishment, and promptly stop the implementation of prescriptions that have become ineffective. Summary of the Invention

[0007] The present invention aims to provide a method and system for the coordinated control of the application of fertilizer to promote sprouting in ratooning rice and the drainage before harvest, so that the fertilizer application before the harvest of the first crop rice is simultaneously constrained by the actual fertilizer application needs and the preparation time for machine harvesting, thereby reducing the conflict between the supplementary watering, post-application water retention and pre-harvest drainage.

[0008] To address the aforementioned technical problems, this invention provides a coordinated control method for the application of fertilizer to promote sprouting and pre-harvest drainage in ratooning rice. This method is executed by a controller over a management unit with independent irrigation and drainage capabilities, and includes the following steps: acquiring moisture status, nitrogen status, the axillary bud status at the target node determined according to the planned stubble height, and the expected machine harvesting time; determining candidate nitrogen application amounts; when the candidate nitrogen application amount is greater than zero, generating candidate water replenishment schemes that include pre-fertilization water replenishment and post-fertilization water retention methods; determining the required drying time to achieve the preset machine harvesting preparation conditions based on the predicted moisture status at the end of water retention for each scheme and the pre-calibrated drying response relationship; and combining water replenishment retesting, fertilization, water retention, and drying time... Based on the length and safety margin, select the plan that can be completed before the expected machine harvest time. If there is no feasible plan, cancel the current round of bud-promoting fertilizer operation. Implement the feasible plan for water replenishment or confirm that no water replenishment is needed. Retest the moisture and nitrogen status, redetermine the allowable additional nitrogen application amount, and update the predicted moisture status at the end of water conservation according to the water conservation arrangements that still need to be implemented, using the aforementioned drying response relationship to redetermine the drying time and calculate the remaining operation time. Control fertilization only when the retested moisture meets the fertilization moisture conditions, the allowable additional nitrogen application amount is greater than zero, and the sum of the remaining operation time and the safety margin is not greater than the remaining time before the expected machine harvest time, and control drainage after water conservation.

[0009] Furthermore, the management unit is determined according to the hydrological connectivity of field ridges, water inlet channels, and drainage channels. Areas where the field surface water is interconnected and irrigation and drainage cannot be independently controlled are considered as the same management unit. The target nodes to be retained after machine harvesting are determined according to the correspondence between the planned stake height and the position of the mother plant stem node. The survival status and development status of the axillary buds at the target nodes are obtained. The nitrogen status includes the soil mineral nitrogen test results converted according to dry soil mass and the nitrogen nutrition diagnosis results of the functional leaves of the mother plant. Only when there are surviving axillary buds at the target nodes and their development status is in the stage applicable to the preset bud-promoting fertilizer, and both nitrogen test results support additional nitrogen application, a candidate nitrogen application amount greater than zero is determined according to the corresponding nitrogen deficiency level.

[0010] Furthermore, the harvesting preparation conditions are that the surface water depth and predetermined soil moisture content at each representative measuring point within the management unit are not higher than their respective upper limits, and the soil carrying capacity index is not lower than the lower limit corresponding to the harvesting equipment to be used; the drying response relationship is established by recording the drainage process under different initial moisture conditions, and is associated with soil type, drainage outlet conditions, drainage execution method and meteorological conditions; the drying time recorded for each drainage process is the time interval from the start of drainage to when each representative measuring point reaches the harvesting preparation conditions, and when there are multiple applicable records, the longest drying time is taken.

[0011] Furthermore, the candidate water replenishment scheme includes the amount of water replenished before fertilization, the conditions for ending water replenishment, the duration of water retention after fertilization, the water control range during the water retention period, and the upper limit of water replenishment. Based on the water status before water replenishment and the pre-calibrated water replenishment response relationship, a water replenishment amount before fertilization that can meet the water conditions for fertilization is generated, and the predicted water status at the end of water retention is determined based on the candidate water replenishment scheme and meteorological conditions. When the current water status already meets the water conditions for fertilization, the scheme with a water replenishment amount of zero before fertilization is included in the candidate scheme. When updating the predicted water status after water replenishment, the completed water replenishment amount before fertilization is not counted again. When there is a lack of water replenishment response relationship or dry-out response relationship covering the current conditions, the corresponding automatic water replenishment and fertilization instructions are not issued.

[0012] Furthermore, the screening process involves adding the duration of water replenishment and retesting, the duration of fertilization, the duration of post-fertilization water retention, the duration of drying, and the safety margin, retaining candidate schemes whose total duration does not exceed the remaining time before the expected machine harvesting time. After obtaining valid retesting results, the completed water replenishment and testing time is no longer included in the remaining operation time, while the time required for resampling and waiting for testing is included in the remaining operation time. The fertilization execution time is updated according to the newly determined allowable additional nitrogen application amount. The post-fertilization water retention time is calculated from the time of the last actual fertilizer application in this round, and the starting time is updated and the time feasibility is recalculated when fertilizer is applied again.

[0013] Furthermore, water replenishment is stopped when the selected water replenishment conditions are met, the measured water replenishment volume reaches its upper limit, or any representative measuring point reaches its safe water limit. After water replenishment stops and the water change at the representative measuring point meets the preset sampling stability conditions, a retest is conducted. Only when the retested water levels at each representative measuring point are within the fertilization water range are the fertilization water conditions met. Soil mineral nitrogen testing before and after water replenishment uses the same sampling soil layer, analytical method, and dry soil mass conversion caliber. Functional leaf diagnosis uses the same leaf position and corresponding growth stage as a reference. Fertilization is prohibited when data is invalid or the water level does not meet the fertilization water conditions.

[0014] Furthermore, the allowable additional nitrogen application amount is the smaller of the non-negative additional nitrogen application demand determined based on the latest effective diagnosis and the remaining nitrogen application limit; the remaining nitrogen application limit is the larger of the difference between the nitrogen application limit of the same management unit during the pre-application nitrogen statistics period and the cumulative actual nitrogen application amount during that period, and zero; the allowable additional nitrogen application amount is converted into the fertilizer mass to be applied according to the management unit area and the nitrogen mass fraction of the fertilizer, and the cumulative actual nitrogen application amount is updated according to the actual fertilizer application mass; when applying fertilizer in segments, the applied area and the unapplied area are recorded separately, and the limit constraint is applied to each area and the total amount of the management unit respectively; the prescription is canceled or regenerated without resetting the cumulative actual nitrogen application amount.

[0015] Furthermore, the fertilizer prescription is associated with the management unit identifier, sampling time, planned staking height, expected machine harvesting time, drying response relationship, post-application water retention arrangements, and allowed additional nitrogen application. When changes in associated information affect fertilization demand or time feasibility, or when changes in rainfall or drainage outlet conditions render the original predicted moisture status inapplicable, the unexecuted water replenishment or fertilization instructions are revoked, the actual amount of nitrogen applied is retained, and the time feasibility is re-evaluated. For fertilized areas, the remaining water retention and drainage arrangements are re-determined based on the last actual fertilization time and the current moisture status. After entering the pre-harvest drainage stage, the original fertilizer prescription is prohibited from automatically resuming execution.

[0016] Furthermore, if the current round of bud-promoting fertilizer application is cancelled and no actual fertilization has been performed, the water conservation arrangement corresponding to this round of fertilization will be cancelled, and the pre-harvest drainage arrangement will be re-determined based on the current water status. When the water status reaches the preset water stress treatment conditions for mother plants, seedling water supply will be implemented independently of the fertilization prescription. Seedling water supply will not trigger the supplementary application of bud-promoting fertilizer, and the original machine harvest preparation time prediction will be invalidated. If flood prevention drainage and the remaining water conservation requirements of the fertilized area cannot be met simultaneously, flood prevention measures will be implemented and the water conservation interruption will be recorded. The water conservation interruption will not be compensated by automatic supplementary application of nitrogen fertilizer.

[0017] The present invention also provides a coordinated control system for the application of fertilizer to promote sprouting in regenerated rice and pre-harvest drainage, including a data acquisition unit, a controller, a storage unit, an operation execution unit and an execution quantity feedback unit.

[0018] The data acquisition unit includes a moisture detection device and an input interface for receiving soil bearing capacity indicators, nitrogen status, target node axillary bud status, planned staking height, weather information, and expected machine harvesting time; the storage unit stores water replenishment response relationships, dryness response relationships, prescriptions, and actual nitrogen application records; the operation execution unit includes an inlet execution mechanism, a drainage execution mechanism, and a quantitative fertilization mechanism; the execution quantity feedback unit includes a water replenishment flow metering device and a fertilization quality metering device; the controller is connected to each of the above units respectively.

[0019] The controller is configured to: determine candidate nitrogen application amounts based on collected data, generate candidate water replenishment schemes including pre-fertilization water replenishment amounts and post-fertilization water retention methods, use the predicted moisture state at the end of each scheme as a starting point, determine the drying time through the drying response relationship, and screen schemes that can be completed before the expected harvest time by combining water replenishment retesting, fertilization, water retention time and safety margin; after implementing water replenishment for feasible schemes or confirming that no water replenishment is needed, obtain moisture and nitrogen retesting results, re-determine the allowable additional nitrogen application amount, update the predicted moisture state, drying time and remaining operation time with the retested moisture state and remaining water retention arrangement, control the quantitative fertilization mechanism to apply fertilizer only when the retested moisture meets the fertilization moisture conditions, the allowable additional nitrogen application amount is greater than zero and the sum of the remaining operation time and safety margin is not greater than the remaining time before the expected harvest time, and control the drainage execution mechanism to drain water after water retention, and prohibit the current round of fertilization when there is no feasible scheme or the review fails.

[0020] The beneficial effects of this invention are as follows: First, the water retention end state caused by candidate water replenishment schemes is included in the assessment of drying time, so that water replenishment and fertilization instructions are constrained by subsequent harvesting preparation conditions, reducing the underestimation of the drying burden based solely on the current slightly dry state. Second, after water replenishment is completed, the additional nitrogen application requirements and remaining operation time are reviewed simultaneously, so that candidate prescriptions formed before water replenishment are not directly converted into mandatory fertilization instructions. Third, actual nitrogen application records are continuously retained during prescription cancellation, regeneration, and operation interruption, preventing the duplicate allocation of already executed nitrogen application quotas due to prescription updates. Fourth, water replenishment for promoting bud growth is treated separately from necessary seedling protection water supply, so that canceling fertilization operations does not directly lead to the cessation of necessary water supply, and the harvesting preparation time is re-evaluated after changes in water supply or drainage conditions. Attached Figure Description

[0021] To more clearly illustrate the technical solution of the present invention, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0022] Figure 1 This is the overall flowchart of the collaborative control method; Figure 2 Flowchart for screening candidate water replenishment schemes and drying times; Figure 3 Flowchart for review of fertilization permits after water replenishment and handling of prescription invalidation; Figure 4 This is a block diagram of the components of a collaborative control system. Figure 5 This is a schematic diagram showing the time sequence relationship between the two candidate schemes and the expected machine harvesting time.

[0023] Explanation of reference numerals in the attached figures: 100. Data Acquisition Unit; 110. Moisture and Bearing Information Acquisition Unit; 120. Nitrogen Information Input Unit; 130. Axillary Bud and Stubble Information Input Unit; 140. Weather and Harvesting Plan Input Unit; 200. Controller; 210. Storage unit; 300. Operation execution unit; 310. Water inlet actuator; 320. Drainage actuator; 330. Quantitative fertilization mechanism; 340. Execution quantity feedback unit. Detailed Implementation

[0024] The embodiments of the present invention are described below with reference to the accompanying drawings. This method treats the application of fertilizer to promote sprouting before the harvest of the first crop of rice, and does not directly incorporate post-harvest fertilizer to promote seedling growth into the same prescription. Each detection value, control threshold, and response record is associated with its applicable soil, variety, machinery, detection method, and irrigation and drainage conditions. The values ​​in Example 6 are hypothetical inputs to the control logic.

[0025] Example 1: This example focuses on the fertilization process to promote sprouting before the expected machine harvest of the first crop of rice.

[0026] The management unit is a field with relatively independent water intake and drainage control, or an area separated by field ridges and irrigation and drainage facilities. Multiple areas that are only divided on the software map but whose surface water is still freely connected and whose irrigation and drainage cannot be independently controlled are treated as a single management unit.

[0027] The information for a management unit includes unit identification, effective planting area, soil type, water inlet channel, drainage outlet, drainage implementation method, variety, growth process, planned staking height, planned harvesting equipment, and expected harvesting time. When there are significant differences in terrain or soil within a management unit, representative measuring points are set up, but irrigation and drainage control is still implemented according to its actual hydrological connectivity.

[0028] Representative measuring points cover the inflow side, drainage side, central area, and relatively high and low-lying areas. Soil moisture sensors detect volumetric water content at fixed soil layers, while surface water depth is obtained from water level gauges or water gauges; when there is no visible water, the surface water depth is recorded as zero, and this cannot be used to directly determine if the soil meets the conditions for machine harvesting. Measuring point locations, soil depths, instrument calibration information, and measurement errors are linked and stored with the management unit identifier.

[0029] Soil mineral nitrogen includes ammonium nitrogen and nitrate nitrogen detected using the same analytical methods. Periodic sampling and analysis with results input to the controller are employed; continuous acquisition of all nitrogen data from online sensors is not required.

[0030] In one implementation, the soil mineral nitrogen sampling layer is 0–20 cm. Each test uses the same sampling area, sampling layer, and sample processing method. The sampling time and corresponding soil moisture content are recorded, and the test results are converted according to dry soil mass. When changing the sampling layer or analytical method, a new judgment threshold should be established; the original threshold should not be directly used.

[0031] The nitrogen status of the mother plant is obtained through the relative chlorophyll values ​​of functional leaves and applicable nutrient diagnostic rules. For example, the same leaf position is consistently used, and measurements are taken at similar times and locations, and compared with valid references of the same variety and similar growth stages. If the selected leaves have entered the senescence stage where the diagnostic rules are no longer applicable, the channel is marked as invalid, and leaf color reduction cannot be directly determined as nitrogen deficiency.

[0032] Based on the correspondence between the planned stubble height and the node positions of the sample stems, the target nodes to be retained after machine harvesting were determined. The survival and development status of the axillary buds at these nodes were observed, including whether they were not obviously swollen, whether the buds were swollen, and whether the young leaves were exposed or emerging.

[0033] Different stages of application for bud-promoting fertilizers are set for different varieties and stubble retention methods, and not all high-position buds or buds that have already elongated are uniformly identified as invalid buds. For samples that require sheathing or dissection for observation, paired samples from the same period are used, and the same axillary bud that has been damaged is not reused as a subsequent comparison object.

[0034] Before operation, establish a parameter set for applicable varieties, soil and testing methods, including at least: (1) the applicable stage of the bud-promoting fertilizer and the conditions for judging additional nitrogen application; (2) the appropriate soil moisture and field surface water layer range for fertilization; (3) the baseline pure nitrogen amount of the bud-promoting fertilizer and the nitrogen application limit for the corresponding statistical period; (4) the water retention method and water retention duration after application; (5) the conditions for machine harvesting preparation; (6) the water replenishment response relationship, the dryness response relationship and their applicable scope; (7) the conditions for the validity of the test data, the upper limit of water safety, the conditions for water stress treatment of the mother plant and the safety margin.

[0035] The applicable stage of the bud-promoting fertilizer, the nitrogen deficiency level and corresponding benchmark pure nitrogen amount, the fertilization water range, and the post-application water retention requirements should all be based on cultivation parameters applicable to the target variety and region and verified on-site. Parameters that need to be calibrated independently should be determined according to the following process. Record the source, testing caliber, growth stage, and applicable range for each parameter. Leaf diagnostic thresholds at the heading stage must not be directly used for bud-promoting fertilizer diagnosis at the first-season maturity stage; data from other fields should only be used in this management unit when applicable to the corresponding soil and irrigation / drainage boundary conditions.

[0036] This implementation method defines the nitrogen application statistics period as the sprouting fertilizer management period for the first crop of rice in the current season, from the start of the management period to the end of the first crop harvest. During this period, the amount of pure nitrogen applied by different prescriptions, manual supplementation, and other application terminals is recorded in the same ledger. Changing the machine harvest time, canceling a prescription, or retesting does not restart the statistics period. When using a total nitrogen limit covering a longer period, this limit is also verified, and the sprouting fertilizer management period limit is not used to replace the total nitrogen limit for the entire season.

[0037] This method uses nitrogen requirement and necessary water retention parameters as agronomic inputs, and the required drying time after watering as an operational constraint. The control logic does not rely on any nationally standardized moisture content, chlorophyll value, or nitrogen application rate; if parameters are missing or do not match the current scenario, automatic fertilization is disabled by default.

[0038] Example 2: This example establishes a response relationship for screening candidate water replenishment schemes.

[0039] First, determine the harvesting preparation conditions suitable for the planned harvesting equipment. Each representative measuring point must simultaneously meet the following conditions: the surface water level is not higher than the corresponding upper limit, the predetermined soil volumetric moisture content is not higher than the corresponding upper limit, and the bearing capacity index is not lower than the corresponding lower limit. The water level, soil moisture content, and bearing capacity index are measured separately; none of these should be used as a substitute for the other two.

[0040] Soil bearing capacity indexes were obtained using a fixed-specification penetrometer, a fixed measurement depth, and the same operating method, representing the penetration resistance index. This index was calibrated against the allowable settlement or allowable slippage conditions of the proposed equipment under the corresponding field conditions. Thresholds obtained from different equipment, measurement depths, and measurement methods were stored separately.

[0041] When using soil moisture content as an auxiliary criterion for bearing capacity, a correspondence between the soil and the corresponding equipment conditions should first be established. For conditions that exceed the applicable range of the correspondence, the ability of the equipment to operate cannot be inferred solely based on the moisture content.

[0042] Subsequently, a calibration area adapted to the soil type, drainage boundary and topographic conditions of the target management unit is selected, or existing process data with complete condition records are used to record the water replenishment, water retention and drainage processes under different initial moisture conditions.

[0043] Each process record should include at least: (1) soil moisture content and field surface water depth at each representative measuring point before water replenishment; (2) actual water replenishment amount, water replenishment duration and water inlet implementation method; (3) water change process after water replenishment stops and the time when sampling conditions are met; (4) control range during water conservation period, actual water replenishment situation and water status at the end of water conservation; (5) time of drainage start, drainage outlet water level or unobstructed status and drainage implementation method; (6) rainfall and meteorological conditions related to the drying process; (7) time when each representative measuring point reaches the conditions for machine harvesting.

[0044] Based on the above records, water replenishment response relationship and dryness response relationship are established respectively.

[0045] The water replenishment response relationship is used to determine the state after water replenishment, the waiting time for retesting, and the water state at the end of water retention, based on the initial water state, the amount of water replenished before fertilization, the water retention method after fertilization, and the meteorological conditions.

[0046] The dry-down response relationship is used to determine the time required to reach the conditions for machine harvesting based on the moisture status at the start of drainage, drainage boundaries, drainage execution method, and meteorological conditions.

[0047] The response relationship is implemented using a tiered correspondence table. The record index includes the management unit or equivalent calibration area, soil type, measuring point layout, initial moisture content range, water layer range, water replenishment volume and execution method, water retention duration and control range, drainage outlet conditions, drainage execution method, and meteorological category. Each tier boundary and applicable conditions are saved along with the original process record. During matching, the above categories and control conditions are checked first, and then it is checked whether the current value falls within the corresponding range.

[0048] When creating the table, the same process was divided into two consecutive stages. The first stage used the measured state before water replenishment, the measured amount of water replenishment, and the water replenishment method as inputs, recording the state and time required to meet the valid retest conditions after water replenishment stopped. The second stage used the measured state after water replenishment, the duration of fertilization, the water retention control range, the water retention duration, the upper limit of water retention and replenishment, and meteorological conditions as inputs, recording the state at the end of water retention. The pre-replenishment prediction used both stages sequentially, and the post-replenishment verification only started from the second stage. Therefore, the retest values ​​already included the effect of the actual water replenishment in this round.

[0049] The drainage response form separately stores the moisture range at the drainage starting point, the moisture and load-bearing capacity compliance times at each measuring point, and the weather, outlet, and execution conditions at that time. The moisture range at the end of the water retention period for candidate schemes must fall within the queryable drainage starting point range; if it only partially overlaps with the recorded range but is not covered, the record is not considered sufficient to support permission.

[0050] Calibration and verification were conducted in the corresponding fields or areas with equivalent boundary conditions. During repeated sampling, water level, soil moisture content, actual water inflow and outflow, rainfall, and the bearing capacity of the equipment were continuously recorded. The intervals used for table construction are the applicable range of these measured records, and are not arbitrarily set to be considered valid fitting results.

[0051] When the same set of matching conditions contains multiple applicable records, the water replenishment and water retention responses use the water retention end-of-life intervals covered by these records as the prediction results. If this interval involves multiple drainage periods, the applicable drainage processes for each period are queried, and the longest drainage duration is selected for filtering. If there are no drainage records covering the prediction interval, it is considered that the data is insufficient, and zero drainage duration or unverified extrapolated values ​​are not used as substitutes.

[0052] The drying time for each drainage process is calculated from the start of drainage until all representative monitoring points meet the conditions for machine harvesting. If the compliance times of different monitoring points are inconsistent, the latest compliance time shall be used. If rainfall during the drainage process causes the monitoring points to fail to meet the standards again, the time when all points in the subsequent process meet the standards again shall be used, and the earlier compliance times that were invalid before the rainfall shall not be used.

[0053] The safety margin covers response prediction errors and execution delays. In one implementation, the maximum positive deviation of the actual drying time from the predicted time in the table is calculated from the verification records independent of the table data. This deviation is then added to the upper limit of the execution delay for water inflow, drainage, and fertilization control measured on-site to obtain the safety margin. If no verification records are available, the conservative allowance time verified on-site from the parameter group is used, and its basis is recorded; fertilization permits are not automatically generated if there is no reliable basis. When the weather forecast covers multiple calibrated categories, the longer time among the categories is used; if it exceeds the calibrated range, automatic permitting is suspended.

[0054] After drainage channels are improved, drainage outlet water levels change significantly, soil structure changes significantly, or harvesting equipment is replaced, the affected response relationships or harvesting preparation conditions should be re-checked.

[0055] Example 3, as Figure 1 As shown, this embodiment includes steps S101 to S106.

[0056] S101, Obtain the status of the management unit and crop. Obtain the current soil moisture content, surface water layer, soil mineral nitrogen test results, mother plant functional leaf diagnosis results, target node axillary bud status, expected machine harvesting time, and weather information for the management unit, and obtain the parameter set applicable to the current conditions.

[0057] Check the timing and scope of application for each data point. After significant rainfall, irrigation, or drainage, previously obtained moisture data cannot be directly used as the current moisture status. If the detection method, leaf position, or growth stage does not match the parameter set, the corresponding diagnostic results should be marked as invalid.

[0058] The above-mentioned estimated machine harvesting times are determined based on the ripening progress of the first-season rice and the operational schedule. If these times change, subsequent time constraints should be updated accordingly, and the initially entered dates should not be treated as constant conditions.

[0059] S102, Determine the candidate nitrogen application rate. First, determine whether the target node axillary bud is in the appropriate stage for the set bud-promoting fertilizer based on its condition, and then determine the candidate nitrogen application rate based on the nitrogen status.

[0060] In one implementation, the following branching approach is adopted: When there are no viable axillary buds available for regeneration at the target node, or when the node is no longer in the applicable stage for the bud-promoting fertilizer corresponding to the adopted parameter group, the candidate nitrogen application rate is set to zero. When the axillary bud status at the target node meets the applicable requirements, and both the mother plant's nitrogen nutrition diagnosis and soil mineral nitrogen testing support additional nitrogen application, the candidate nitrogen application rate is obtained according to the corresponding nitrogen deficiency level. When the test results support sufficient nitrogen supply, no additional nitrogen fertilizer is applied. When the mother plant diagnosis and soil test results contradict each other, or the data validity is insufficient, a verification state is entered, and the contradiction is not eliminated by automatically increasing the fertilizer application rate.

[0061] Nitrogen deficiency levels and their pure nitrogen requirements are linked to variety, growth stage, soil sampling layer, and diagnostic method. The controller queries the nitrogen application diagnostic table according to soil mineral nitrogen level, functional leaf diagnostic level, and target node axillary bud applicable status. Both nitrogen diagnoses in the diagnostic table support additional entries corresponding to non-negative pure nitrogen amounts; if any result indicates sufficient supply, the two results contradict each other, or either channel is invalid, the branch of "no additional application" or "pending verification" is executed respectively, and the fertilizer amount is not increased by multiplying with uncalibrated coefficients.

[0062] The candidate nitrogen application rate is used as input for subsequent screening and is not used as an execution instruction for quantitative fertilization agencies before obtaining fertilization permission.

[0063] The diagnostic table provides the amount of pure nitrogen that still needs to be added at the corresponding diagnostic time point. When the same set of diagnostic data is used again, the pure nitrogen actually applied after that diagnostic time point should be deducted first; the same recommended amount should not be considered a new addition each time. If the new diagnosis has not yet met the effective interval for the post-application response of the method used, the complete baseline amount should not be reallocated based on the fact that short-term leaf color or soil concentration has not changed.

[0064] S103, Screening candidate hydration solutions. For example... Figure 2 As shown, when the candidate nitrogen application rate is greater than zero, a candidate water replenishment plan that can meet the fertilization water conditions is generated based on the current water status.

[0065] The candidate water replenishment plan shall include at least the amount of water to be replenished before fertilization, the conditions for ending water replenishment, the duration of water retention after fertilization, the range of water control during the water retention period, and the upper limit of water replenishment allowed.

[0066] When the current water conditions already meet the requirements for fertilization, the candidate program can have zero pre-fertilization water replenishment. Zero water replenishment does not mean that necessary state monitoring and time-based judgments are exempted.

[0067] If the current water level exceeds the suitable range for fertilization and cannot be brought back to the suitable range through the set water replenishment plan, a water replenishment and fertilization permit will not be generated temporarily. The water level will be retested once it is suitable. Flood control and drainage will be handled according to the abnormal situation handling branch.

[0068] For management units requiring water replenishment, the amount of water replenishment sufficient to meet fertilization water requirements is determined based on the water replenishment response relationship. Candidate amounts are generated according to calibrated grading or water replenishment levels that the implementing agency can measure, without using "more water replenishment is more beneficial for fertilization" as a selection criterion.

[0069] Post-application water conservation refers to maintaining suitable field moisture conditions and restricting active drainage during the corresponding period, without requiring all implementation methods to maintain the same field surface water depth. In one implementation method, the drainage outlet is closed during the water conservation period, and when the moisture content reaches a specified lower limit, water is replenished to a specified upper limit, and the total amount of replenished water does not exceed the upper limit of water replenishment included in the candidate scheme.

[0070] Based on the water replenishment amount, water retention method and weather conditions of each candidate scheme, predict the water state at the end of water retention; then use this state as the starting state of the drying process and query the drying response relationship.

[0071] The drying time corresponding to the slightly dry state before rehydration cannot be directly used as the drying time after rehydration and water retention.

[0072] In one implementation, pre-hydration time screening is performed according to the following formula: T p + T a + T h + T d + ΔT ≤ t H - t .

[0073] in, T p The total time required for the remaining water replenishment, waiting for moisture stabilization, sampling, and obtaining valid test results; T a Duration of fertilization application; T h This refers to the required water retention time after the last actual fertilization. T d The drying time required to reach the conditions for machine harvesting from the predicted end of water retention; ΔTFor safety margin; t H For the estimated machine harvesting time; t This represents the current judgment time. All durations use the same unit and are non-negative. The fertilization duration is determined by the effective fertilizer discharge rate of the selected equipment for the candidate fertilizer amount, as well as the time for transfer and mulching operations.

[0074] Retain candidate solutions that meet the above time constraints. When multiple feasible solutions exist, prioritize the solution that meets the fertilization water requirements and has a smaller expected total water replenishment amount; when the total water replenishment amount is the same, choose the solution with a larger time margin.

[0075] If none of the candidate solutions meet the time constraint, cancel this round of bud-promoting fertilizer application, without increasing the fertilizer concentration or shortening the necessary water retention time to barely meet the time limit. Canceling fertilization only cancels the fertilization task; it does not stop the necessary water supply to the mother plant or the pre-harvest drainage that has already been required.

[0076] Figure 5 Option A meets the requirements for complete operation and safety margin, while Option B cannot complete the corresponding calculations before the expected machine harvesting time. In the diagram, "Operation Completed" corresponds to the end of the drying process, and "Calculation End Point" also includes the safety margin; the safety margin is a planned reserve time, not a necessary additional irrigation and drainage operation. The segments in the diagram are not drawn to scale.

[0077] S104, Perform water replenishment and reconfirm fertilizer application permission.

[0078] Perform water replenishment according to the selected plan, while simultaneously monitoring the water replenishment metering value and the moisture content at each representative measuring point. Water replenishment shall be stopped when the planned water replenishment termination conditions are met, the cumulative water replenishment reaches the upper limit specified in the plan, or any measuring point reaches the safe moisture limit; any such situation will result in the cessation of water replenishment. Water replenishment shall not be continued after the moisture content has already met the original plan, simply to reach the planned water volume.

[0079] After water intake stops, fertilization can only proceed if all representative monitoring points are within the fertilization water range and subsequent retests confirm this condition. If the water volume limit is reached but some monitoring points are still too dry or too wet, the original water replenishment plan cannot be directly approved; fertilization must remain prohibited, and a reassessment must be conducted based on valid response records, without unlimited water replenishment.

[0080] After the water inflow stops, check whether the moisture changes at representative measuring points meet the sampling stability conditions. In one implementation, the moisture changes over two or more consecutive sampling cycles should be within the pre-calibrated allowable range, and there should be no new significant water inflow, rainfall, or drainage events during the sampling period.

[0081] The allowable range is determined based on sensor repeatability, measurement error, and the water redistribution process after soil rehydration. Sampling stability does not require absolutely constant soil moisture, but it should ensure that the test results represent the state on which the prescription is based.

[0082] Soil mineral nitrogen was retested using the method specified in Example 1, and the mother plant diagnosis and other outdated data were updated. If the mother plant diagnosis did not yet meet the valid measurement conditions, it remained in a pending retest status; the waiting time continued to consume the remaining operation time.

[0083] The mineral nitrogen results before and after water replenishment are compared using the same soil layer and dry soil mass conversion caliber. The change in solution concentration caused by the increase in water is not directly regarded as an actual change in nitrogen deficiency. Short-term changes in functional leaf indicators are not used as the sole basis for determining whether nitrogen deficiency has been eliminated or aggravated.

[0084] like Figure 3 As shown, after obtaining valid retest results, the recommended additional nitrogen application amount is re-determined and limited based on the remaining nitrogen application quota.

[0085] Using the measured moisture state at the retest moment as the new prediction starting point, only the water conservation control that has not yet been implemented and its allowable water replenishment amount are included. The final moisture state of water conservation is updated, and then the drying response relationship of the same applicable caliber is queried. The water replenishment amount that has already been completed before fertilization should not be added again; the water replenishment, waiting and testing time that has already been completed is no longer added to the time remaining, but they have reduced the available time through the progress of the current moment. The remaining operation time is counted separately for the resampling, testing waiting, fertilization, water conservation and drying that have not yet been completed.

[0086] If the recommended fertilization amount changes after retesting, the fertilization duration will be recalculated based on the quality of the fertilizer to be applied, and the estimated start and end times of the water conservation phase will be updated accordingly. If the meteorological period spanned by the water conservation phase changes, the response table matching conditions will be updated simultaneously. The final water conservation end time will not be locked until the allowable additional nitrogen application amount is determined.

[0087] A valid fertilization prescription is generated only if the retest data is valid, the moisture content at each representative measuring point meets the fertilization moisture requirements, the allowable additional nitrogen application is greater than zero, and the sum of the remaining operating time and the safety margin is not greater than the remaining time until the expected machine harvest time. If the moisture content or other data becomes invalid again during the waiting period for fertilization, the already approved permit cannot be reused.

[0088] If the retest results no longer support additional nitrogen application, the fertilization should be cancelled even if there is still sufficient time.

[0089] If the need for additional nitrogen application still exists, but there is insufficient time remaining, then this fertilization should be cancelled, and the amount of candidate fertilizer prepared before the water replenishment should not be used.

[0090] For management units that have not yet been fertilized in this round, the water retention requirements set for this unfertilized period should be cancelled when fertilization is cancelled. The drainage arrangement should be reassessed based on the current measured water levels to determine if additional water retention is necessary; if there are still effective water retention requirements established by previous fertilization, those requirements should be retained. Cancelling the prescription does not mean immediately draining the field; actual drainage must comply with the lower limit of mother plant water content and flood prevention requirements.

[0091] S105 is used for fertilization, water retention, and drainage.

[0092] The fertilizer prescription includes the management unit identifier, effective planting area, allowable amount of additional pure nitrogen, nitrogen mass fraction of the fertilizer used, quality of fertilizer to be applied, associated testing time, expected machine harvesting time, and water retention and drainage arrangements.

[0093] When the amount of additional pure nitrogen is allowed to be expressed per unit area, the mass of fertilizer to be applied shall be converted according to the following formula: M f = n a × A ÷ w N .

[0094] in, M f The mass of fertilizer to be applied is expressed in kilograms. n a To allow for additional pure nitrogen, the unit is kilograms per hectare; A The area of ​​the management unit actually controlled by this prescription is in hectares; w N This represents the nitrogen content by mass fraction in the fertilizer, expressed as a decimal greater than zero and not greater than 1. The pure nitrogen content is calculated by summing the values ​​of different fertilizers according to their respective mass fractions. Automatic fertilization is not performed if the mass fraction or the actual amount applied is unknown.

[0095] The remaining nitrogen application limit and the allowable additional nitrogen application amount are calculated using the following formula: n r = max (0, n max - n done ), n a = min ( n need , n r ).

[0096] in, n max This refers to the pure nitrogen limit per unit area for the same statistical period.n done This represents the cumulative amount of pure nitrogen actually applied during this period. n need This is the non-negative additional requirement given for the latest effective diagnosis, after deducting the actual amount administered following the diagnosis. n r This is the remaining limit. The above amounts are all in kilograms of pure nitrogen per hectare; the fertilizer mass is not directly subtracted from the pure nitrogen amount.

[0097] Implement fertilizer quality m At that time, the cumulative increment of the management unit is m × w N ÷ A Area delineation is only used for fertilizer coverage records and does not change the hydrological boundaries of irrigation and drainage management units. For operations that only cover a portion of the area, a local ledger is established using the actual area and actual nitrogen application rate of that area; fertilization can only continue if the local quota, local demand, and total amount of the management unit are all met.

[0098] The fertilization agency follows the valid prescription. The actual amount of fertilizer applied is obtained by weighing the difference or measuring the mass flow rate, and the actual amount of pure nitrogen applied is calculated by combining the nitrogen mass fraction of the fertilizer.

[0099] For segmented application, record the applied area, the area covered, and the corresponding actual amount of fertilizer applied. After a prescription is interrupted, do not simply average the amount of fertilizer already applied to the local area to the entire field and then reapply it to the previously applied area.

[0100] Once the prescribed amount of fertilizer has been applied, fertilizer dispensing should be stopped. If there are obvious abnormalities in the applied amount, blockages, or if the measurement results cannot be confirmed, fertilization should be stopped and the actual applied amount verified. It is not only based on the number of revolutions of the fertilizer dispensing motor to determine whether all fertilizer has entered the field.

[0101] After fertilization, maintain the appropriate moisture conditions according to the prescription and limit active drainage. The starting time for water retention should be based on the time of the last actual application of fertilizer in this cycle, and cannot be replaced by the start time of water replenishment. When fertilization resumes after an interruption, the water retention time should be recalculated from the time of the last application, and the predicted end state of water retention and the time to dryness should be updated.

[0102] Once the required water retention is met, the drainage system is controlled according to the effective drainage schedule. Moisture levels are continuously monitored during drainage, and load-bearing capacity indicators are rechecked if necessary. If the conditions for mechanized harvesting preparation are not met, the management unit is not marked as ready for harvesting simply because the planned time has elapsed.

[0103] Once the conditions for mechanized harvesting are met, the current round of coordinated control should be terminated. If significant rainfall or water supply for seedling protection occurs subsequently, the mechanized harvesting readiness status should be reassessed.

[0104] S106, handle prescription failures and retain actual execution records. The controller continuously checks the information on which the prescription is based during water replenishment, waiting for retesting, fertilization, and water retention.

[0105] The following changes may trigger a re-evaluation: (1) the expected harvest time is advanced or delayed; (2) the planned stake height changes, causing the target node to change; (3) rainfall or actual water replenishment causes the field moisture to exceed the original forecast range; (4) the drainage outlet is blocked, the outlet water level changes, or the drainage mechanism is abnormal; (5) the latest diagnosis results change the additional nitrogen application requirement; (6) the data on which the prescription is based has expired or has been determined to be invalid; (7) the actual implementation amount is significantly different from the original plan.

[0106] If the aforementioned changes render the original prescription no longer applicable, any unexecuted watering or fertilization instructions shall be revoked. The original prescription record may be retained for retrospective purposes, but cannot continue to be used as the basis for enforcement.

[0107] The amount of nitrogen actually applied to the field is not reset to zero upon prescription cancellation. The new allowable additional nitrogen application is subject to both the latest diagnostic results and the remaining nitrogen application limit.

[0108] If fertilization has already been applied, canceling the prescription does not eliminate the corresponding water retention requirement. If no further fertilization is to be applied, the remaining water retention time is the greater of the required water retention time minus the effective water retention time since the last actual fertilization and zero; if drainage is interrupted, the interruption time cannot be counted as effective water retention. Subsequent arrangements should be recalculated based on the current moisture status, remaining water retention control, and applicable drying records. In case of time conflicts, output a harvester preparation conflict status; necessary water retention cannot be arbitrarily shortened to maintain the original harvester time.

[0109] Once the pre-harvest drainage stage begins, the original bud-promoting fertilizer prescription will not automatically revert. Even if the machine harvesting time is subsequently delayed, a new operational plan can only be formulated after the effective condition is regained and a feasibility assessment is completed.

[0110] After the first rice harvest, any fertilizer applied before harvest to promote sprouting will not automatically be carried over to post-harvest fertilization. Post-harvest fertilization will be determined based on the rice stubble, the number of regenerated seedlings, and the water and nitrogen levels at that time.

[0111] Example 4 illustrates the handling of abnormalities that occur after canceling the bud-promoting fertilizer operation and during the water retention period.

[0112] If the current round of bud-promoting fertilizer application is cancelled due to insufficient remaining time, but the management unit meets the conditions for treating water stress in the mother plant, an independent seedling water supply arrangement will be initiated.

[0113] The seedling protection irrigation is determined based on the water supply needs of the mother plants. Its activation does not reactivate canceled bud-promoting fertilizer prescriptions, nor does it automatically generate instructions to add nitrogen fertilizer. After the seedling protection irrigation changes the field moisture status, the original prediction results for machine harvesting preparation time become invalid, and the expected machine harvesting arrangements should be re-evaluated.

[0114] If heavy rainfall occurs during the water retention period, and continuing to close the drainage outlets may lead to exceeding the permissible flooding conditions, flood prevention and drainage should be implemented. Record the actual duration of water retention, the time of drainage, and the corresponding amount of nitrogen applied, and mark this process as a water retention interruption.

[0115] The controller should not automatically replenish the fertilizer with the same amount of nitrogen fertilizer simply because premature drainage has occurred. Whether to apply additional fertilizer should be reassessed based on effective monitoring and the remaining time.

[0116] If soil moisture continues to decrease beyond the acceptable moisture level for the mother plant, and the planned operating conditions of the machinery still cannot be met, a harvesting preparation conflict status will be issued for adjusting the harvesting time or work arrangements. The original plan will not be forced to be met through excessive drying.

[0117] Automatic fertilization should be suspended if sensors malfunction, detection data is invalid, or drainage response relationships are inapplicable. New data obtained after manual verification should be re-entered into the same permission determination process, without circumventing nitrogen application limits and time constraints.

[0118] Example 5 illustrates the specific structure of a coordinated control system for the application of fertilizer to promote sprouting in regenerated rice and for pre-harvest drainage.

[0119] like Figure 4 As shown, the system in this embodiment includes a data acquisition unit 100, a controller 200, a storage unit 210, a job execution unit 300, and an execution quantity feedback unit 340.

[0120] The data acquisition unit 100 includes a moisture and bearing capacity information acquisition unit 110, a nitrogen information input unit 120, an axillary bud and stub information input unit 130, and a weather and harvesting plan input unit 140. Each input data carries a management unit identifier, sampling or generation time, measurement caliber, and validity identifier.

[0121] The moisture and bearing capacity information acquisition unit 110 includes a soil moisture sensor, a water level detection device, and a bearing capacity index input interface. The bearing capacity index is obtained and input through field penetration measurements, and the controller 200 saves the data according to the measurement point identification and moisture data.

[0122] The nitrogen information input unit 120 receives soil mineral nitrogen analysis results and functional leaf diagnosis results from mother plants. Laboratory results can be imported via the input terminal, while leaf results can be imported via a portable measuring instrument; real-time online nitrogen measurement is not required. Data is correlated with the sampling soil layer, location, time, analysis method, and unit.

[0123] The axillary bud and stub information input unit 130 receives on-site observation, sheathing sampling and height measurement records to obtain the survival and development status of the target node, without requiring the use of an image recognition model.

[0124] The Weather and Harvest Planning Input Unit 140 receives measured rainfall, weather forecasts, and estimated harvest times. The controller saves the forecast release time and applicable time period; if a forecast update causes the original plan to no longer meet the applicable conditions, a new assessment is required.

[0125] Storage unit 210 stores management unit parameters, diagnostic parameter groups, water replenishment response relationship, dry-out response relationship, valid prescriptions, invalid prescriptions, and actual execution records.

[0126] The operation execution unit 300 includes an inlet actuator 310, a drainage actuator 320, and a quantitative fertilizer application mechanism 330.

[0127] The water inlet actuator 310 includes an inlet valve, a water pump, and corresponding piping that can control the start, stop, or opening degree. The drainage actuator 320 includes a drainage gate, a drainage valve, or a drainage pump. The quantitative fertilizer application mechanism 330 employs fertilizer application equipment capable of controlling fertilizer application according to a given fertilizer quality.

[0128] The execution feedback unit 340 includes a water replenishment flow metering device and a fertilizer application quality metering device. The actual water replenishment amount is obtained by integrating the flow rate or accumulating the flow rate difference; the fertilizer application quality is obtained by the calibrated weighing difference or the cumulative mass flow rate value, deducting the amount recovered or residual that did not actually enter the field. The feedback result updates the actual execution record; automatic fertilization stops when the meter fails.

[0129] The controller 200 operates according to the steps described in Embodiment 3. After generating a valid prescription, it controls the corresponding actuator; if a prescription is found to be invalid or an execution abnormality is detected, it stops the corresponding instructions that have not yet been executed and retains the actual execution records that have been completed.

[0130] For steps requiring manual sampling or input of test results, the controller remains in a waiting state. The time consumed during this waiting period is included in the remaining operation time, and prescriptions that have exceeded the allowed execution time cannot be used after the test results are delayed.

[0131] The system sets water replenishment, waiting for retesting, fertilization, water retention, and drainage as distinguishable execution states. When waiting for retesting, the quantitative fertilization mechanism remains stopped; when retaining water, the drainage mechanism remains closed or restricts discharge according to the water retention method, and flood prevention events are handled as abnormal branches with priority; after the prescription expires, the controller clears the unexecuted instructions but does not clear the actual fertilization log.

[0132] The water inlet, drainage, and quantitative fertilization mechanisms can serve as the controlled actuators of existing agricultural equipment. The controller issues start / stop or setpoint commands via electrical connection or communication interface, and receives completion and anomaly feedback; on-site manual inspection results participate in the same judgment process through the data interface.

[0133] Example 6: This example uses hypothetical inputs to illustrate the control relationship.

[0134] Assuming that a management unit has 144 hours until the expected machine harvest time, the selected candidate water replenishment scheme has a water replenishment and retesting time of 12 hours, a fertilization execution time of 2 hours, a post-fertilization water retention time of 48 hours, and a safety margin of 8 hours.

[0135] If the drying time at the end of the water retention period, as determined by this plan, is 48 hours, the total time required for the complete operation is: 12 + 2 + 48 + 48 + 8 = 118 hours. Since 118 hours is less than 144 hours, this candidate plan is feasible in terms of time. However, a post-watering diagnosis and verification is still necessary; fertilization cannot be automatically applied simply because the plan is feasible in terms of time.

[0136] If another management unit requires 84 hours of drying time under the same candidate watering arrangement, then the total time required for the entire operation is: 12 + 2 + 48 + 84 + 8 = 154 hours. Since 154 hours is greater than 144 hours, this plan is eliminated. If there are no other candidate plans that simultaneously meet the fertilization water conditions and time constraints, then this round of bud-promoting fertilizer operation is cancelled.

[0137] Let's assume that after the first management unit completes 12 hours of water replenishment and retesting, it re-evaluates the actual moisture state and updates the drying time from the originally predicted 48 hours to 84 hours. At this point, there are still 132 hours until the expected machine harvest. The time required to complete the operation is: 2 + 48 + 84 + 8 = 142 hours. 142 hours is greater than 132 hours, therefore the original candidate fertilization amount will not be implemented. This process shows that the feasibility before water replenishment does not mean that fertilization is still permissible after water replenishment.

[0138] In another hypothetical branch, if the drying time after watering remains 48 hours, and the retested moisture content meets the fertilization requirements while the additional demand is still greater than zero, then the remaining work and safety margin total 2 + 48 + 48 + 8 = 106 hours, which is no more than 132 hours, and a fertilization permit can be generated. If the time conditions are also met, but the retested moisture content exceeds the fertilization range, or the additional demand is zero, then fertilization will not be carried out.

[0139] Regarding the nitrogen application quota, assuming the management unit area is 0.1 hectares, the corresponding nitrogen application quota for the statistical period is 80 kg of pure nitrogen per hectare, the cumulative actual nitrogen application is 30 kg of pure nitrogen per hectare, and the latest diagnosis recommends an additional 46 kg of pure nitrogen per hectare.

[0140] The remaining nitrogen application limit is 50 kg of pure nitrogen per hectare, and the allowable additional amount is the smaller of 46 and 50, i.e., 46 kg of pure nitrogen per hectare. Assuming that a fertilizer with a nitrogen content of 46% is used, the corresponding fertilizer mass to be applied to this management unit is: 46 × 0.1 ÷ 0.46 = 10 kg.

[0141] If the prescription becomes invalid after 6 kg of the fertilizer has already been applied, then the amount of pure nitrogen applied this time is 2.76 kg, which is equivalent to 27.6 kg of pure nitrogen per hectare.

[0142] The cumulative actual nitrogen application amount for the corresponding statistical period is updated to 57.6 kg of pure nitrogen per hectare, and the remaining nitrogen application limit is 22.4 kg of pure nitrogen per hectare. After the prescription is cancelled, the cumulative actual nitrogen application amount cannot be restored to 30 kg of pure nitrogen per hectare, nor can the 4 kg of fertilizer that has not yet been applied be directly used as the amount that must be applied next time.

[0143] This example illustrates the total constraints of management units. When actual operations only cover a portion of the area, calculations should be performed separately based on the records of the areas already covered; the average across the entire field cannot be used to replace the regional execution records.

[0144] To illustrate the table lookup process, three additional simulated drainage records that have passed the applicability check are provided. The times from the drainage start point to all measuring points meeting the standards are 42 hours, 48 ​​hours, and 84 hours, respectively. If the predicted interval at the end of the water conservation period for a candidate scheme is only covered by the first two records, then 48 hours is used for selection; if the updated predicted interval after retesting requires a third record for complete coverage, then 84 hours is used. If some predicted intervals are still not covered by records, no permission is generated. These records are merely hypothetical inputs used to reproduce the query and maximum value calculations; they do not indicate that the corresponding field calibration has been completed.

[0145] The above control process takes the moisture state after water replenishment and water retention as the starting point for drying prediction, and recalculates the remaining time after obtaining the retest status, so that the candidate nitrogen application amount formed before water replenishment is jointly constrained by the actual water replenishment effect and subsequent drying conditions.

[0146] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described.

Claims

1. A method for synergistic control of fertilizer application for promoting sprouting in regenerated rice and pre-harvest drainage, characterized in that, The controller performs the following actions on management units with independent irrigation and drainage capabilities: Acquire moisture status, nitrogen status, the status of axillary buds at the target nodes determined according to the planned stubble height, and the expected machine harvest time to determine the candidate nitrogen application rate; When the candidate nitrogen application rate is greater than zero, a candidate water replenishment plan is generated, which includes the water replenishment amount before fertilization and the water retention method after fertilization. Based on the predicted water status at the end of water retention of each plan and the pre-calibrated drying response relationship, the drying time required to reach the preset machine harvesting preparation conditions is determined. Based on the water replenishment and retesting, fertilization, water retention, drying time and safety margin, select a plan that can be completed before the expected machine harvest time. If there is no feasible plan, cancel this round of bud-promoting fertilizer operation. If a feasible water replenishment plan is implemented or it is confirmed that no water replenishment is needed, the moisture and nitrogen status are retested, the allowable additional nitrogen application amount is re-determined, and the predicted moisture status at the end of the water conservation period is updated based on the water conservation arrangements that still need to be implemented, using the aforementioned drying response relationship to re-determine the drying time and calculate the remaining operation time. Fertilization should only be controlled when the retested moisture content meets the fertilization moisture requirements, the allowable additional nitrogen application is greater than zero, and the sum of the remaining operating time and the safety margin is not greater than the remaining time until the expected machine harvest time. Drainage should be controlled after water retention.

2. The collaborative control method according to claim 1, characterized in that, The management unit is determined according to the hydrological connectivity of field ridges, water inlet channels, and drainage channels. Areas where the surface water is interconnected and irrigation and drainage cannot be independently controlled are considered as the same management unit. The target nodes to be retained after machine harvesting are determined based on the correspondence between the planned stake height and the position of the mother plant stem node. The survival status and development status of the axillary buds at the target nodes are obtained. The nitrogen status includes the soil mineral nitrogen test results converted according to dry soil mass and the nitrogen nutrition diagnosis results of the functional leaves of the mother plant. Only when there are surviving axillary buds at the target nodes and their development status is in the stage where the preset bud-promoting fertilizer is applicable, and both nitrogen test results support additional nitrogen application, is a candidate nitrogen application amount greater than zero determined according to the corresponding nitrogen deficiency level.

3. The collaborative control method according to claim 1, characterized in that, The harvesting preparation conditions are that the surface water depth and predetermined soil moisture content at each representative measuring point within the management unit are not higher than their respective upper limits, and the soil carrying capacity index is not lower than the lower limit corresponding to the harvesting equipment to be used. The drying response relationship is established by recording the drainage process under different initial moisture conditions and is associated with soil type, drainage outlet conditions, drainage execution method and meteorological conditions. The drying time recorded for each drainage process is the time interval from the start of drainage to when each representative measuring point reaches the harvesting preparation conditions. When there are multiple applicable records, the longest drying time is taken.

4. The collaborative control method according to claim 3, characterized in that, The candidate water replenishment scheme includes the amount of water replenished before fertilization, the conditions for ending water replenishment, the duration of water retention after fertilization, the water control range during the water retention period, and the upper limit of water replenishment. Based on the water status before water replenishment and the pre-calibrated water replenishment response relationship, the amount of water replenished before fertilization that can meet the water conditions for fertilization is generated, and the predicted water status at the end of water retention is determined based on the candidate water replenishment scheme and meteorological conditions. When the current water status meets the fertilization water conditions, the scheme with zero water replenishment before fertilization will be included in the candidate schemes; when updating the predicted water status after water replenishment, the water replenishment before fertilization that has been completed will not be counted again; when there is a lack of water replenishment response relationship or dry-out response relationship covering the current conditions, the corresponding automatic water replenishment and fertilization instructions will not be issued.

5. The collaborative control method according to claim 1, characterized in that, The screening process involves adding the duration of water replenishment and retesting, the duration of fertilization, the duration of post-fertilization water retention, the duration of drying, and the safety margin. Candidate schemes whose total duration does not exceed the remaining time until the expected machine harvest time are retained. After obtaining valid retesting results, the completed water replenishment and testing time will no longer be included in the remaining working time. The time required for resampling and waiting for testing will be included in the remaining working time. The fertilization execution time will be updated according to the newly determined allowable additional nitrogen application amount. The post-fertilization water retention time will be calculated from the time of the last actual fertilizer application in this round. When fertilizer is applied again, the starting time will be updated and the time feasibility will be recalculated.

6. The cooperative control method according to claim 1, characterized in that, When replenishing water, the water replenishment should be stopped when the selected water replenishment conditions are met, the measured water replenishment volume reaches the upper limit, or any representative measuring point reaches the upper limit of water safety. After water replenishment stops and the water change at the representative measuring point meets the preset sampling stability conditions, a retest should be conducted. Only when the retest water at each representative measuring point is within the fertilization water range is the fertilization water condition met. Soil mineral nitrogen testing before and after water replenishment should use the same sampling soil layer, analysis method, and dry soil mass conversion caliber. Functional leaf diagnosis should use the same leaf position and corresponding growth stage as a reference. If the data is invalid or the water does not meet the fertilization water condition, fertilization should be prohibited.

7. The cooperative control method according to claim 1, characterized in that, The allowed additional nitrogen application amount is the smaller of the non-negative additional nitrogen application demand determined based on the latest effective diagnosis and the remaining nitrogen application limit; the remaining nitrogen application limit is the larger of the difference between the nitrogen application limit of the same management unit during the pre-application nitrogen statistics period and the cumulative actual nitrogen application amount during that period and zero; the allowed additional nitrogen application amount is converted into the fertilizer mass to be applied according to the management unit area and the nitrogen content of the fertilizer, and the cumulative actual nitrogen application amount is updated according to the actual fertilizer application mass; when applying fertilizer in segments, the applied area and the unapplied area are recorded separately, and the limit constraint is applied to the total amount of each area and management unit respectively. The cumulative actual nitrogen application amount is not reset when the prescription is canceled or regenerated.

8. The cooperative control method according to claim 7, characterized in that, Fertilizer prescriptions are associated with and stored in the management unit, including the unit identifier, sampling time, planned staking height, expected machine harvesting time, drying response relationship, post-application water retention arrangements, and allowable additional nitrogen application. When changes in associated information affect fertilization demand or time feasibility, or when changes in rainfall or drainage outlet conditions render the original predicted water conditions inapplicable, unexecuted water replenishment or fertilization instructions are revoked, the actual amount of nitrogen applied is retained, and the time feasibility is reassessed. For fertilized areas, the remaining water retention and drainage arrangements are re-determined based on the last actual fertilization time and the current water conditions. Once the pre-harvest drainage stage begins, the original fertilization prescription must not be automatically reinstated.

9. The cooperative control method according to claim 8, characterized in that, If the current round of bud-promoting fertilizer application is cancelled and no actual fertilization has been performed, the water conservation arrangement corresponding to this round of fertilization will be cancelled, and the pre-harvest drainage arrangement will be re-determined based on the current water status. When the water status reaches the preset water stress treatment conditions for mother plants, seedling water supply will be implemented independently of the fertilization prescription. Seedling water supply will not trigger the supplementary application of bud-promoting fertilizer, and the original machine harvest preparation time prediction will be invalidated. If flood prevention drainage and the remaining water conservation requirements of the fertilized area cannot be met simultaneously, flood prevention measures will be implemented and the water conservation interruption will be recorded. The water conservation interruption will not be compensated by automatic supplementary application of nitrogen fertilizer.

10. A coordinated control system for the application of fertilizer to promote sprouting in regenerated rice and pre-harvest drainage, characterized in that, It includes a data acquisition unit, a controller, a storage unit, a job execution unit, and an execution quantity feedback unit; The data acquisition unit includes a moisture detection device and an input interface for receiving soil bearing capacity indicators, nitrogen status, target node axillary bud status, planned staking height, weather information, and estimated machine harvesting time; the storage unit stores water replenishment response relationships, desiccation response relationships, prescriptions, and actual nitrogen application records; the operation execution unit includes an inlet execution mechanism, a drainage execution mechanism, and a quantitative fertilization mechanism; the execution quantity feedback unit includes a water replenishment flow metering device and a fertilization quality metering device; the controller is connected to each of the above units respectively; The controller is configured to: determine candidate nitrogen application amounts based on collected data, generate candidate water replenishment schemes including pre-fertilization water replenishment amounts and post-fertilization water retention methods, use the predicted moisture state at the end of each scheme as a starting point, determine the drying time through the drying response relationship, and screen schemes that can be completed before the expected harvest time by combining water replenishment retesting, fertilization, water retention time and safety margin; after implementing water replenishment for feasible schemes or confirming that no water replenishment is needed, obtain moisture and nitrogen retesting results, re-determine the allowable additional nitrogen application amount, update the predicted moisture state, drying time and remaining operation time with the retested moisture state and remaining water retention arrangement, control the quantitative fertilization mechanism to apply fertilizer only when the retested moisture meets the fertilization moisture conditions, the allowable additional nitrogen application amount is greater than zero and the sum of the remaining operation time and safety margin is not greater than the remaining time before the expected harvest time, and control the drainage execution mechanism to drain water after water retention, and prohibit the current round of fertilization when there is no feasible scheme or the review fails.