A loquat flower and fruit synchronous regulation and cultivation method based on growth stage zoning management

By dividing the loquat growth cycle into six stages and adopting specific management measures, the problems of long flowering period and simultaneous flowering and fruiting of loquat have been solved, resulting in concentrated flowering and improved uniformity and quality of fruit ripening.

CN123147394APending Publication Date: 2026-11-24INST OF TROPICAL & SUBTROPICAL CASH CROP YUNNAN ACAD OF AGRI SCI
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611352738.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-02
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

The long flowering period of loquat and the simultaneous flowering and fruiting on the same tree make management difficult. The overlapping development of flowers and fruits leads to fierce competition for nutrients. Thinning flowers and fruits is labor-intensive, and existing technologies lack systematic management plans and precise control.

Method used

The annual growth cycle of loquat is divided into six stages: latent period, initiation period, elongation period, opening period, shaping period, and rest period. Through measures such as increasing the application of organic fertilizer, controlling nitrogen and increasing phosphorus and potassium, girdling treatment, twisting treatment, gradient water control, spraying compound inducing agents, and gradient temperature regulation, the flowering and fruiting are simultaneously regulated.

Benefits of technology

It has achieved a loquat flowering period concentration of over 95%, a fruit ripening uniformity of over 91%, a high-quality fruit rate of over 88%, and a fruit cracking rate of less than 3.1%, which is significantly better than existing technologies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_1
    Figure SMS_1
  • Figure SMS_2
    Figure SMS_2
  • Figure SMS_3
    Figure SMS_3
Patent Text Reader

Abstract

This invention discloses a method for synchronously regulating loquat flower and fruit development based on zoning management of growth stages, belonging to the field of loquat cultivation technology. This invention divides the annual growth cycle of loquat into a latent period, an initiation period, an elongation period, an opening period, a shaping period, and a rest period. Through: spraying a combination of nitrogen control and phosphorus / potassium enrichment with paclobutrazol during the latent period; applying triple physical stress of girdling, branch twisting, and gradient water control during the initiation period, combined with 6-BA and methyl jasmonate for induction; using a combination of GA3 and amino acid esters to promote elongation and calcium-containing fertilizer during the elongation period; gradually lowering temperatures and thinning late-blooming flowers during the opening period; applying a combination of 6-BA, brassinolide, and calcium nitrate for fruit expansion and phosphorus, potassium, and calcium fertilizer during the shaping period; and heavy pruning after harvest and staged application of post-harvest fertilizer during the rest period, this method achieves synchronous and coordinated regulation of flower and fruit development. Using the method of this invention, the loquat flowering period concentration reaches over 95%, the fruit ripening uniformity reaches over 91%, the high-quality fruit rate reaches over 88%, and the fruit cracking rate is controlled below 3.1%, demonstrating excellent results.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of loquat cultivation technology, and more specifically to a method for synchronous regulation of loquat flower and fruit cultivation based on zoning management of growth stages. Background Technology

[0002] Loquat (Eriobotrya japonica Lindl.) is an evergreen fruit tree belonging to the genus Eriobotrya in the family Rosaceae. Native to China, it is one of the important economic fruit trees in southern my country. Loquat fruit is rich in nutrients and has effects such as moisturizing the lungs, relieving coughs, clearing heat, and quenching thirst, making it very popular with consumers and leading to a continuous expansion of its planting area.

[0003] However, the core challenge in loquat production and cultivation is the difficulty in management caused by the long flowering period and simultaneous flowering and fruiting on the same tree. Studies show that loquat flower bud physiological differentiation begins in late July or early August, and the process from flower bud differentiation to flowering continues continuously, with the flowering period lasting from October to February of the following year, a development process that takes about six months. This exceptionally long flowering period results in the simultaneous presence of open flowers and developing fruits on the same loquat tree, a phenomenon known as "flowering and fruiting on the same tree." This "flowering and fruiting on the same tree" leads to intense competition for nutrients between flowering and fruiting, resulting in significant differences in the maturity time of fruits from different batches of flowers, posing considerable difficulties for agricultural operations such as flower and fruit thinning, fertilization, and pesticide application. Only 5%-10% of the total number of flowers are needed for loquat yield formation, and traditional flower and fruit thinning methods are labor-intensive.

[0004] Regarding the regulation of loquat flowering period, some existing technologies have been explored. Patent CN113615471B discloses a method for regulating the flowering period of greenhouse loquats. This method involves steps such as pinching early spring shoots, thinning weak summer shoots to control strong shoots, controlling watering from mid-September to mid-October, and increasing fertilizer and water from mid-October to December, thus concentrating the flowering period of greenhouse loquats from mid-November to mid-December. Other literature reports the use of physical methods such as branch pulling, bending, and twisting to regulate flower bud differentiation. Furthermore, some studies involve using plant growth regulators such as 6-BA to treat the physiological differentiation period of loquat flower buds.

[0005] However, existing technologies have significant shortcomings. First, current methods primarily focus on the single aspect of flowering period regulation, lacking a systematic consideration of the entire annual growth cycle of loquat. Although some literature divides the loquat growth management process into six stages, this merely represents a division of management time and does not establish an internal logical connection or dynamic transition mechanism between stages. Second, existing technologies fail to fully consider the unique characteristic of loquat trees where flowers and fruits coexist, and have not established a coordinated management plan for the simultaneous occurrence of flowers and fruits. Third, existing methods are mostly combinations of scattered technical measures, lacking a unified regulatory philosophy, and there is a lack of clear temporal coordination and synergistic effects between different management measures. Fourth, the stage division of existing technologies mainly relies on traditional phenological observations (such as "end of flowering - young fruit stage" and "fruit enlargement - color change stage"), which are highly subjective and have low precision, failing to achieve precise regulation of management measures.

[0006] Therefore, developing a cultivation method that can solve the problems of long flowering period and simultaneous flowering and fruiting of loquat at the system level, and realize synchronous regulation of loquat flowering and fruiting based on zoning management of growth stages, has important theoretical significance and application value. Summary of the Invention

[0007] This invention addresses the problems in existing loquat cultivation techniques, such as long flowering periods, difficulties in management due to simultaneous flowering and fruiting, intense nutrient competition caused by overlapping flower and fruit development sequences, and high labor intensity in flower and fruit thinning. It provides a method for rearranging and synchronizing the flower and fruit development sequence of loquat.

[0008] To achieve the above objectives, this application adopts the following technical solution: The primary objective of this application is to provide a method for the synchronous regulation of loquat flowering and fruiting based on zoning management of growth stages, comprising the following steps: The annual growth cycle of loquat is divided into six stages: latent period, initiation period, elongation period, opening period, shaping period, and rest period. The latent period is the nutrient accumulation stage before the start of flower development; the initiation period is the stage from the start of flower bud differentiation to the completion of inflorescence primordia formation; the elongation period is the stage from the completion of inflorescence primordia formation to the rapid elongation of the inflorescence main axis; the opening period is the stage from the opening of florets to the completion of pollination and fertilization; the shaping period is the stage of cell division and early development of young fruit; and the rest period is the stage from fruit ripening to post-harvest tree recovery.

[0009] During the latent period, strong fruiting branches are cultivated by increasing the application of organic fertilizer and controlling nitrogen and increasing phosphorus and potassium. In addition, a compound solution of paclobutrazol and potassium dihydrogen phosphate is sprayed on the leaves to increase the carbon-nitrogen ratio of the branches and shoots, thus reserving the material basis for the start of flower development.

[0010] During the initiation period, flower bud differentiation was simultaneously initiated by superimposing three physical stresses: girdling treatment, branch twisting treatment, and gradient water control, in conjunction with the application of a compound inducer of 6-BA and methyl jasmonate.

[0011] During the elongation period, the inflorescence axis is accelerated by spraying a compound elongation promoter of GA3 and amino acid ester (DA-6) in stages, so that the inflorescence spikes at different nodes tend to elongate synchronously in time.

[0012] During the opening period, precise gradient heating / cooling and flowering nutrition regulation are used to ensure that the opening of small flowers is completed within 7 to 10 days, and the fruit setting rate is improved by spraying a compound flower and fruit preservation agent.

[0013] During the shaping period, the application of phosphorus, potassium and calcium fertilizers and the spraying of a compound fruit-expanding agent containing cytokinin and brassinolide promote the division of young fruit cells, while controlling the sprouting of new shoots to reduce competition for nutrients between flowers and fruits.

[0014] During the rest period, the tree vigor is restored and nutrients are accumulated for the next growing season through post-harvest pruning and phased application of post-harvest fertilizer.

[0015] When the daily elongation rate of the main axis of the inflorescence is less than 0.5 mm for three consecutive days, it transitions from the elongation period to the opening period; when more than 90% of the florets of the inflorescences of the whole tree have finished flowering and the ovaries have begun to swell and visible young fruits appear, it transitions from the opening period to the shaping period.

[0016] The specific management measures for each stage are explained in detail below.

[0017] I. Incubation period (early June to mid-July each year) The latent period is a key stage redefined in this invention, corresponding to the nutrient accumulation period before flower bud differentiation in traditional classification. The core of management during this stage is to cultivate robust fruiting branches through nutrient regulation, increasing the carbon-nitrogen ratio of the shoots to reserve sufficient material foundation for flower development. In existing technologies, this stage is often neglected or only involves routine summer pruning, lacking targeted nutrient reserve management.

[0018] Specific management measures include: (1) Apply more organic fertilizer: In early June, apply 15-25 kg of well-rotted sheep or cow manure per plant, along with 0.5-1.0 kg of superphosphate, and deeply till it into the soil. The slow-release characteristics of organic fertilizer can provide a continuous supply of nutrients for flower development, which cannot be replaced by fast-acting chemical fertilizers.

[0019] (2) Control nitrogen and increase phosphorus and potassium: Apply 0.3-0.5 kg of compound phosphorus and potassium fertilizer per plant in mid-June, with a mass ratio of N:P2O5:K2O of 5-8:18-22:18-22. Strictly control the amount of nitrogen fertilizer. High nitrogen will promote vegetative growth and inhibit flower bud differentiation, while phosphorus and potassium are beneficial to carbohydrate accumulation and flower bud formation. Although there are records of applying phosphorus and potassium fertilizer during the summer shoot growth period in existing technology, it is not clear that nitrogen fertilizer should be controlled to such a low ratio.

[0020] (3) Foliar spraying: Spray the compound solution once in late June and once in early July, 1.5-2.5L per plant each time; the compound solution is a mixture of 300-500 times dilution of 15% paclobutrazol wettable powder + 0.3% potassium dihydrogen phosphate + 0.1% borax. Paclobutrazol can effectively inhibit the vegetative growth of branches and promote the distribution of photosynthetic products towards reproductive growth. Although there are reports in the prior art on the use of paclobutrazol to control the flowering period, there is no mention of the ternary compound with potassium dihydrogen phosphate and borax and its specific application during the latent period.

[0021] (4) Summer light pruning: In early July, remove overly dense branches, weak branches and diseased branches in the inner canopy, and pinch the tips of vigorous branches that are longer than 50cm to improve ventilation and light conditions.

[0022] II. Start-up period (late July to late August each year) The initiation period corresponds to the flower bud differentiation initiation stage in traditional classification, and is a critical period that determines whether flower buds can differentiate successfully. The core management of this stage is to simultaneously initiate flower bud differentiation through the superposition of triple physical stress and chemical induction. In the existing technology, CN113615471B performs branch twisting and water control in July, but does not combine girdling treatment and gradient water control at the same time, nor does it use a compound inducer of 6-BA and methyl jasmonate.

[0023] Specific management measures include: (1) Girdling treatment: In late July, girdle the main trunk or branches. The width of the girdling should be 0.3-0.5 cm, and the depth should be such that it cuts through the bark without damaging the xylem. After girdling, wrap the trunk with white plastic film to retain moisture. Girdling can block the downward transport of photosynthetic products, causing carbohydrates to accumulate above the girdling opening, thereby promoting flower bud differentiation. Although there are reports of girdling being used to promote flowering in loquat in existing technologies, it is mostly used as a standalone measure and is not combined with branch twisting and gradient water control to form a triple stress.

[0024] (2) Twisting treatment: In early August, twist upright vigorous branches with a length of 40-60cm to an angle of 180-270 degrees, so that the bark of the branch cracks slightly but does not break. Twisting can change the growth direction of the branch, inhibit apical dominance, and promote the germination of lateral buds and the formation of flower buds.

[0025] (3) Gradual water control: Gradual water control was implemented from July 25th. In the first week, the relative soil moisture content was controlled at 55%–60%, in the second week at 45%–50%, in the third week at 40%–45%, and in the fourth week it was restored to 50%–55%. Gradual water control is different from the simple binary model of "water control" or "normal water supply" in existing technologies. Instead, it gradually induces flower bud differentiation through progressive drought stress, avoiding stress damage caused by sudden drought.

[0026] (4) Spraying the compound inducer: Spray the compound inducer once in early and once in mid-August, 1.0-2.0L per plant each time; the compound inducer is a mixture of 50-80mg / L 6-BA + 10-20μM methyl jasmonate + 0.2% potassium dihydrogen phosphate. 6-BA is a known cytokinin that promotes flower bud differentiation, while methyl jasmonate, as a novel plant signaling molecule, can synergistically induce flower bud differentiation with 6-BA.

[0027] III. Elongation Period (early September to mid-October each year) The elongation period is a distinct stage defined for the first time in this invention, corresponding to the rapid elongation of the inflorescence axis after the formation of the inflorescence primordium. Traditionally, this stage is usually categorized as the "inflorescence development period" or the "autumn shoot growth-flowering period," but this invention separates it for targeted elongation regulation. The core management principle of this stage is to accelerate the elongation of the inflorescence axis through exogenous hormones and nutrient regulation, thereby synchronizing the inflorescence spikes at different nodes in time.

[0028] Specific management measures include: (1) Spraying elongation promoter: Spray elongation promoter once each in early September, late September, and early October, at a rate of 1.5–2.5 L per plant each time; the elongation promoter is a mixture of 20–40 mg / L GA3 + 10–20 mg / L aminoethyl ester (DA-6) + 0.1% boric acid. Exogenous spraying of GA3 can significantly promote the development of loquat flower buds and increase the length, width, and pedicel length of inflorescences. Aminoethyl ester (DA-6) can increase the content of chlorophyll, protein, and nucleic acid in plants and the photosynthetic rate, promote carbon and nitrogen metabolism in plants, and enhance the absorption of water and fertilizer and the accumulation of dry matter in plants. The combined use of GA3 and aminoethyl ester can synergistically promote the elongation of the main axis of the inflorescence.

[0029] (2) Apply special fertilizer for the elongation period: In early September, apply 0.4-0.7 kg of special fertilizer per plant, in which the mass ratio of N:P2O5:K2O:CaO is 10-13:12-15:12-15:5-8.

[0030] (3) Water management: Control the relative soil moisture content to 65% to 75%, maintain uniform water supply, and avoid water stress affecting inflorescence elongation.

[0031] (4) The daily elongation rate of the inflorescence main axis is used as a dynamic indicator of the stage management effect. When the daily elongation rate of the inflorescence main axis of more than 90% of the fruiting branches reaches 1.0 to 2.0 mm, the elongation period management measures are confirmed to be effective. The introduction of this quantitative indicator makes the evaluation of management effect shift from qualitative to quantitative.

[0032] The stage transition is achieved by monitoring the elongation rate of the inflorescence main axis. When the daily elongation rate of the inflorescence main axis is less than 0.5 mm for 3 consecutive days, it is confirmed that the stage has transitioned from the elongation stage to the opening stage.

[0033] IV. Opening period (late October to mid-November each year) The flowering period is a crucial stage for loquat to complete pollination and fertilization, and it is also the core element of this invention to achieve concentrated flowering. The optimal temperature for loquat pollen germination is 19.9℃, and the optimal temperature for pollen tube growth is 18.0℃. The core management strategy at this stage is to concentrate the opening of small flowers within 7 to 10 days through temperature control and nutrient management during the flowering period.

[0034] Specific management measures include: Gradual temperature control: Under greenhouse cultivation conditions, a gradual cooling process is implemented starting October 20th. Daytime temperatures are gradually reduced from 25–28℃ to 18–22℃, and nighttime temperatures are gradually reduced from 15–18℃ to 8–12℃, with a cooling rate of 0.5–1.0℃ per day. The ideal temperature range for loquat flowering is 10–22℃. Gradual cooling allows loquat flower organs to develop and open synchronously within a suitable temperature range, avoiding uneven flowering caused by drastic temperature changes.

[0035] (2) Nutritional regulation during flowering: Spray a flowering promoter solution once before flowering, 1.0-1.5L per plant; the flowering promoter solution is a mixture of 0.3% potassium dihydrogen phosphate + 0.15% boron fertilizer + 0.01% brassinolide. Boron plays an important role in pollen germination and pollen tube elongation, and brassinolide can improve the flower's stress resistance and fertilization ability.

[0036] (3) Assisted pollination: During the peak flowering period, artificial pollination or bee pollination should be carried out on sunny mornings to ensure sufficient pollination and fertilization.

[0037] (4) Thinning of late flowers: 7 to 10 days after the first batch of flowers open, thin out the small flower spikes of late flowers that are still developing, so that nutrients are concentrated on supplying the already opened inflorescences. This measure is different from the traditional thinning of flowers - the traditional thinning of flowers is to remove flower spikes or flower buds before or at the beginning of flowering, while the present invention is to remove late flowers after the first batch of flowers open, in order to further shorten the flowering period and concentrate nutrients.

[0038] (5) Stage transition through phenological observation: When more than 90% of the florets of the whole tree have finished blooming and the ovary begins to swell and visible young fruit appears, it is confirmed that the tree has transitioned from the opening period to the shaping period.

[0039] V. Finalization period (late November to early May of the following year) The shaping period corresponds to the period from the young fruit development stage to the early fruit maturity stage in traditional classification. The core management of this stage is to promote cell division and early development of young fruit, while controlling the sprouting of new shoots to reduce nutrient competition between flowers and fruits. This stage partially overlaps with the opening period in time (i.e., the "flowering and fruiting on the same tree" period), but this invention significantly shortens this overlapping period through the temporal regulation of the preceding stages (latent period, initiation period, elongation period, and opening period).

[0040] Specific management measures include: (1) Spraying fruit-enlarging agent: Spray the fruit-enlarging agent once each in early December, early January, and early February, with 1.5-2.5 L per plant each time; the fruit-enlarging agent is a mixture of 5-10 mg / L cytokinin 6-BA + 0.01-0.05 mg / L brassinolide + 0.2% calcium nitrate. Cytokinin promotes cell division, brassinolide promotes cell elongation and nutrient transport, and calcium strengthens cell walls and reduces fruit cracking.

[0041] (2) Apply phosphorus, potassium, and calcium fertilizer: In early December, apply 0.3-0.6 kg of phosphorus, potassium, and calcium compound fertilizer per plant, with a mass ratio of P2O5:K2O:CaO of 10-14:18-22:8-12. The specific supplementation of calcium is one of the important features that distinguishes this invention from existing technologies.

[0042] (3) Controlling shoot growth and protecting fruit: Remove winter shoots that emerge in a timely manner from late December to early January to reduce nutrient consumption. This measure is especially important during the period of "flowering and fruiting on the same tree" because the growth of winter shoots will compete with young fruit for nutrients.

[0043] (4) Water management: During the cell division period of young fruit, the relative soil moisture content should be controlled at 70% to 80%, and adjusted to 75% to 85% after entering the cell enlargement period.

[0044] (5) Cold and frost protection: Take measures such as canopy covering or watering to prevent frost before the arrival of cold waves. The cold resistance of young loquat fruits is lower than that of flower buds, so frost protection is particularly important.

[0045] VI. Rest and recuperation period (mid-May to early July each year) The rest period corresponds to the period from fruit ripening to summer shoot growth in the traditional classification. The core management focus during this stage is to restore tree vigor and accumulate nutrient reserves for the next growing season.

[0046] Specific management measures include: (1) Post-harvest heavy pruning: After harvesting, heavy pruning should be carried out in a timely manner, shortening the fruiting branches to 2-3 buds at the base, and removing weak branches, overly dense branches, crossing branches and diseased and insect-infested branches. Unlike CN113615471B, which "only light pruning is carried out and heavy pruning of large branches is not carried out", this invention carries out heavy pruning after harvesting, with the aim of renewing the fruiting branch groups and cultivating strong fruiting mother branches.

[0047] (2) Apply post-harvest fertilizer in stages: Apply the first post-harvest fertilizer immediately after harvesting, with 0.3-0.5 kg of compound fertilizer per tree, N:P2O5:K2O=15:10:12; apply the second post-harvest fertilizer 20-25 days after harvesting, with 10-20 kg of well-rotted organic fertilizer + 0.3-0.5 kg of compound fertilizer per tree. Staged fertilization can better match the nutritional needs of tree recovery.

[0048] (3) Summer shoot control: For the emerging summer shoots, retain an appropriate amount as fruiting mother branches for the next year, remove excessive vigorous shoots, and pinch off the tips of summer shoots that are longer than 30cm.

[0049] (4) Water management: Control the relative soil moisture content to 60% to 70%.

[0050] VII. Dynamic Connection Between Each Stage The dynamic connection between each stage is mainly achieved through the following methods: (1) Measurement of inflorescence main axis elongation rate: Starting from early September, every 3 days, 3 outgoing inflorescences were selected in each of the four directions of east, west, south and north of each monitored plant. The length of the inflorescence main axis was measured with vernier calipers, and the daily elongation rate was calculated. This indicator directly reflects the dynamic process of inflorescence development and is an objective basis for judging whether the elongation period has ended and whether the opening period has begun.

[0051] (2) Phenological observation: Between the opening period and the shaping period, observe whether more than 90% of the florets of the whole tree have finished withering and whether the ovary has begun to swell and visible young fruit has appeared, as the basis for judging the stage transition.

[0052] (3) Stage transition judgment: When the daily elongation rate of the main axis of the inflorescence is less than 0.5 mm for 3 consecutive days, it transitions from the elongation period to the opening period; when more than 90% of the florets of the inflorescences of the whole tree have finished withering and the ovaries have begun to swell and visible young fruits appear, it transitions from the opening period to the shaping period.

[0053] Existing technologies mainly rely on traditional phenological observations (such as "end of flowering - young fruit stage" and "fruit enlargement - color change stage") for stage division, which are highly subjective. This invention introduces for the first time the inflorescence main axis elongation rate as a quantitative indicator for stage transition, and establishes an objective phenological judgment standard between the opening period and the shaping period, thereby achieving precise and objective stage management.

[0054] As can be seen from the above technical solution, compared with the prior art, the present invention has the following beneficial effects: (1) Conceptual innovation: This invention proposes for the first time the cultivation concept of "regional management based on growth stage", which systematically divides the annual growth cycle of loquat into six stages with clear physiological connotations. The stages are dynamically connected through morphological and physiological indicators, which solves the fundamental problems of long flowering period and simultaneous flowering and fruiting of loquat from a systemic level.

[0055] (2) Innovative Stage Division: This invention redefines six stages based on the morphophysiological processes of loquat flower and fruit development, which is fundamentally different from the traditional stage division based on phenological observation. The clear definition and independent management of the three stages—latent period, initiation period, and elongation period—have not been reported in existing technologies. In particular, the independent division of the elongation period makes targeted regulation of inflorescence elongation possible.

[0056] (3) Innovative management measures: This invention adopts several specific measures that are different from existing technologies at each stage. The triple physical stress of "girdling + twisting + gradient water control" in the start-up period, the "GA3 + amino acid ester" compound elongation promoter in the elongation period, the gradient temperature control in the opening period, and the "6-BA + brassinolide + calcium nitrate" compound fruit-expanding agent in the shaping period are all proposed for the first time in this invention or systematically applied for the first time in loquat cultivation.

[0057] (4) Dynamic connection innovation: For the first time, this invention uses the elongation rate of the main axis of the inflorescence as a quantitative judgment indicator for the stage transition, and establishes an objective transition standard between the elongation period and the opening period, overcoming the subjectivity and lag of traditional phenological observation.

[0058] (5) Significant technical effects: Through the method of the present invention, the loquat flowering period concentration reaches more than 95%, the fruit ripening uniformity reaches more than 91%, the high-quality fruit rate reaches more than 88%, and the fruit cracking rate is controlled below 3.1%. All indicators are significantly better than the existing technology. Detailed Implementation

[0059] The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0060] Example 1: Verification of the overall effect of the invention under protected cultivation conditions

[0061] This embodiment uses "Ninghai White" loquats from a loquat plantation in Taizhou City, Zhejiang Province as the experimental subject. The cultivation and management methods of this invention were applied. The experimental area was 10 mu (approximately 1.65 acres), with 8-year-old trees and a planting density of 4m × 3m. A control area of ​​10 mu (approximately 1.65 acres) was also set up, managed using method CN113615471B. The soil conditions, tree age, and tree vigor were basically the same in both areas.

[0062] (1) Incubation period management (early June to mid-July) On June 5th, apply 20kg of well-rotted sheep manure and 0.8kg of superphosphate to each plant and deeply till it into the soil.

[0063] On June 15, apply 0.4 kg of phosphorus and potassium compound fertilizer (N:P2O5:K2O=6:20:20) to each plant.

[0064] Spray the compound solution once on June 25 and once on July 5, 2.0L per plant each time; the compound solution is a mixture of 15% paclobutrazol wettable powder 400 times dilution + 0.3% potassium dihydrogen phosphate + 0.1% borax.

[0065] On July 5th, light summer pruning was carried out, removing overly dense branches, weak branches, and diseased and insect-infested branches from the inner canopy, and pinching off vigorous branches longer than 50cm.

[0066] (2) Start-up period management (late July to late August) On July 25, the main trunk was girdled, with a girdling width of 0.4cm and a depth sufficient to cut through the bark without damaging the xylem. After girdling, the trunk was wrapped with white plastic film to retain moisture.

[0067] On August 5th, upright, vigorous branches with a length of 40-60cm were twisted at an angle of 240 degrees, causing the bark of the branches to crack slightly but not break.

[0068] Starting July 25, a tiered water control system will be implemented: the first week (July 25 to July 31) will control the relative soil moisture content to 58%, the second week (August 1 to August 7) ​​to 48%, the third week (August 8 to August 14) to 42%, and the fourth week (August 15 to August 21) will restore it to 52%.

[0069] The compound inducer was sprayed once on August 5th and once on August 15th, with 1.5L per plant each time; the compound inducer was a mixture of 60mg / L 6-BA + 15μM methyl jasmonate + 0.2% potassium dihydrogen phosphate.

[0070] (3) Long-term management (early September to mid-October) Spray the elongation promoter once each on September 5, September 25 and October 5, 2.0L per plant each time; the elongation promoter is a mixture of 30mg / L GA3 + 15mg / L amino acid ester (DA-6) + 0.1% boric acid.

[0071] On September 5th, apply 0.5 kg of fertilizer (N:P2O5:K2O:CaO=12:13:13:6) to each plant for its elongation period.

[0072] Starting September 5th, the relative soil moisture content will be controlled at 70%, and a uniform water supply will be maintained.

[0073] (4) Management during the open period (late October to mid-November) Starting from October 20th, a gradual cooling policy will be implemented, with daytime temperatures gradually decreasing from 26℃ to 20℃ and nighttime temperatures gradually decreasing from 16℃ to 10℃, at a rate of 0.8℃ per day.

[0074] On October 18, spray a flowering promotion solution once, 1.2L per plant; the flowering promotion solution is a mixture of 0.3% potassium dihydrogen phosphate + 0.15% boron fertilizer + 0.01% brassinolide.

[0075] During the peak flowering period from October 25th to November 10th, artificial pollination should be carried out on sunny mornings from 9:00 to 11:00.

[0076] On November 5th (8 days after the first batch of flowers opened), the small late-blooming flower spikes that were still developing were removed, so that nutrients could be concentrated on supplying the already opened inflorescences.

[0077] (5) Finalization period management (late November to early May of the following year) Spray the fruit-enlarging agent once each on December 5th, January 5th, and February 5th, with 2.0L per plant each time; the fruit-enlarging agent is a mixture of 8mg / L 6-BA + 0.03mg / L brassinolide + 0.2% calcium nitrate.

[0078] On December 5th, apply 0.5 kg of phosphorus, potassium and calcium compound fertilizer (P2O5:K2O:CaO=12:20:10) to each plant.

[0079] From late December to early January, promptly remove any emerging winter shoots to reduce nutrient consumption.

[0080] During the cell division stage of young fruit (late November to early February), the relative soil moisture content should be controlled at 75%, and adjusted to 80% during the cell enlargement stage (from mid-February onwards).

[0081] Take measures to protect tree canopies from frost before a cold wave arrives.

[0082] (6) Rest and recuperation period management (mid-May to early July) After harvesting (from late April to early May), perform heavy post-harvest pruning, shortening fruiting branches to 2-3 buds at the base, and removing weak, overly dense, crossing, and diseased branches.

[0083] Apply the first post-harvest fertilizer immediately after harvesting, using 0.4 kg of compound fertilizer (N:P2O5:K2O=15:10:12) per plant; apply the second post-harvest fertilizer 22 days after harvesting, using 15 kg of well-rotted organic fertilizer + 0.4 kg of compound fertilizer per plant.

[0084] Appropriately regulate the emerging summer shoots, retain an appropriate number as fruiting mother branches for the next year, remove excessively vigorous shoots, and pinch off the tips of summer shoots that are longer than 30cm.

[0085] The relative soil moisture content should be controlled at 65%.

[0086] (7) Monitoring of morphological and physiological indicators and stage transition Starting from September 5th, every 3 days, 3 outgoing inflorescences were selected from each of the four cardinal directions of each monitored plant, and the length of the main axis of the inflorescence was measured with calipers to calculate the daily elongation rate.

[0087] When the daily elongation rate of the main axis of the inflorescence is less than 0.5 mm for three consecutive days, it transitions from the elongation period to the opening period.

[0088] When more than 90% of the florets in the inflorescences of the tree have finished blooming and the ovaries have begun to swell and visible young fruits appear, the tree transitions from the opening period to the shaping period.

[0089] Example 2: Verification of the overall effect of the invention under protected cultivation conditions

[0090] This embodiment uses "Ninghai White" loquats from a loquat planting base in Taizhou City, Zhejiang Province as the test object. The method of this invention is used for facility cultivation and management. The test area is 5 mu, the trees are 8 years old, and the planting density is 4m×3m.

[0091] (1) Incubation period management (early June to mid-July) On June 5th, apply 15kg of well-rotted sheep manure and 0.5kg of superphosphate to each plant, and then deeply till it into the soil.

[0092] On June 15th, each plant was treated with 0.3 kg of phosphorus and potassium compound fertilizer, with an N:P2O5:K2O ratio of 5:18:18.

[0093] Spray the compound solution once on June 25 and once on July 5, 1.5L per plant each time; the compound solution is a mixture of 15% paclobutrazol wettable powder at 500 times dilution + 0.3% potassium dihydrogen phosphate + 0.1% borax.

[0094] On July 5th, light summer pruning was carried out, removing overly dense branches, weak branches, and diseased and insect-infested branches from the inner canopy, and pinching off vigorous branches longer than 50cm.

[0095] (2) Start-up period management (late July to late August) On July 25, the main trunk was girdled, with a girdling width of 0.3cm and a depth sufficient to cut through the bark without damaging the wood. After girdling, the trunk was wrapped with white plastic film to retain moisture.

[0096] On August 5th, upright, vigorous branches with a length of 40-60cm were twisted at an angle of 180 degrees.

[0097] Starting July 25, a tiered water control system will be implemented: the first week (July 25 to July 31) will control the relative soil moisture content to 55%, the second week (August 1 to August 7) ​​to 45%, the third week (August 8 to August 14) to 40%, and the fourth week (August 15 to August 21) will restore it to 50%.

[0098] The compound inducer was sprayed once on August 5th and once on August 15th, with 1.0L per plant each time; the compound inducer was a mixture of 50mg / L 6-BA + 10μM methyl jasmonate + 0.2% potassium dihydrogen phosphate.

[0099] (3) Long-term management (early September to mid-October) Spray the elongation promoter once each on September 5, September 25 and October 5, 1.5L per plant each time; the elongation promoter is a mixture of 20mg / L GA3 + 10mg / L aminoethyl ester (DA-6) + 0.1% boric acid.

[0100] On September 5th, apply 0.4 kg of fertilizer specifically for the elongation period to each plant, with a ratio of N:P2O5:K2O:CaO = 10:12:12:5.

[0101] Starting September 5th, the relative soil moisture content will be controlled at 65%.

[0102] (4) Management during the open period (late October to mid-November) Starting from October 20th, a gradual cooling policy will be implemented, with daytime temperatures gradually decreasing from 25℃ to 18℃ and nighttime temperatures gradually decreasing from 15℃ to 8℃, at a rate of 0.5℃ per day.

[0103] On October 18, spray a flowering promotion solution once, 1.0L per plant; the flowering promotion solution is a mixture of 0.3% potassium dihydrogen phosphate + 0.15% boron fertilizer + 0.01% brassinolide.

[0104] During the peak flowering period from October 22 to November 10, artificial pollination should be carried out on sunny mornings from 9:00 to 11:00.

[0105] On November 1 (7 days after the first batch of flowers opened), the small late-blooming flower spikes that were still developing were removed.

[0106] (5) Finalization period management (late November to early May of the following year) Spray the fruit-enlarging agent once each on December 5, January 5, and February 5, with 1.5L per plant each time; the fruit-enlarging agent is a mixture of 5mg / L 6-BA + 0.01mg / L brassinolide + 0.2% calcium nitrate.

[0107] On December 5th, each plant was treated with 0.3 kg of phosphorus, potassium, and calcium compound fertilizer, with a P2O5:K2O:CaO ratio of 10:18:8.

[0108] From late December to early January, promptly remove any winter shoots that sprout.

[0109] During the cell division stage of young fruit (late November to early February), the relative soil moisture content should be controlled at 70%, and adjusted to 75% during the cell enlargement stage (from mid-February onwards).

[0110] Take measures to protect tree canopies from frost before a cold wave arrives.

[0111] (6) Rest and recuperation period management (mid-May to early July) After harvesting (early May), perform heavy post-harvest pruning, shortening fruiting branches to 2-3 buds at the base, and removing weak, overly dense, crossing, and diseased branches.

[0112] Apply the first post-harvest fertilizer immediately after harvesting, using 0.3 kg of compound fertilizer (N:P2O5:K2O=15:10:12) per plant; apply the second post-harvest fertilizer 20 days after harvesting, using 10 kg of well-rotted organic fertilizer + 0.3 kg of compound fertilizer per plant.

[0113] Appropriately regulate the emerging summer shoots, retain an appropriate number as fruiting mother branches for the next year, remove excessively vigorous shoots, and pinch off the tips of summer shoots that are longer than 30cm.

[0114] The relative soil moisture content should be controlled at 60%.

[0115] (7) Monitoring of morphological and physiological indicators and stage transition Starting from September 5th, every 3 days, 3 outgoing inflorescences were selected from each of the four cardinal directions of each monitored plant, and the length of the main axis of the inflorescence was measured with vernier calipers to calculate the daily elongation rate.

[0116] When the daily elongation rate of the main axis of the inflorescence is less than 0.5 mm for three consecutive days, it transitions from the elongation period to the opening period.

[0117] When more than 90% of the florets in the inflorescences of the tree have finished blooming and the ovaries have begun to swell and visible young fruits appear, the tree transitions from the opening period to the shaping period.

[0118] Example 3: Verification of the overall effect of the invention under protected cultivation conditions

[0119] This embodiment uses "Ninghai White" loquat (white-fleshed variety) from a loquat planting base in Taizhou City, Zhejiang Province as the test object. The method of this invention is used for facility cultivation and management. The test area is 5 mu, the trees are 8 years old, and the planting density is 4m×3m.

[0120] (1) Incubation period management (early June to mid-July) On June 5th, apply 25kg of well-rotted sheep manure and 1.0kg of superphosphate to each plant and deeply till it into the soil.

[0121] On June 15th, each plant was fertilized with 0.5 kg of phosphorus and potassium compound fertilizer, with an N:P2O5:K2O ratio of 8:22:22.

[0122] Spray the compound solution once on June 25 and once on July 5, 2.5L per plant each time; the compound solution is a mixture of 300 times dilution of 15% paclobutrazol wettable powder + 0.3% potassium dihydrogen phosphate + 0.1% borax.

[0123] On July 5th, light summer pruning was carried out, removing overly dense branches, weak branches, and diseased and insect-infested branches from the inner canopy, and pinching off vigorous branches longer than 50cm.

[0124] (2) Start-up period management (late July to late August) On July 25, the main trunk was girdled, with a girdling width of 0.5cm and a depth sufficient to cut through the bark without damaging the xylem. After girdling, the trunk was wrapped with white plastic film to retain moisture.

[0125] On August 5th, upright, vigorous branches with a length of 40-60cm were twisted at an angle of 270 degrees.

[0126] Starting July 25, a tiered water control system will be implemented: the first week (July 25 to July 31) will control the relative soil moisture content to 60%, the second week (August 1 to August 7) ​​to 50%, the third week (August 8 to August 14) to 45%, and the fourth week (August 15 to August 21) will restore it to 55%.

[0127] The compound inducer was sprayed once on August 5th and once on August 15th, with 2.0L per plant each time; the compound inducer was a mixture of 80mg / L 6-BA + 20μM methyl jasmonate + 0.2% potassium dihydrogen phosphate.

[0128] (3) Long-term management (early September to mid-October) Spray the elongation promoter once each on September 5, September 25 and October 5, 2.5L per plant each time; the elongation promoter is a mixture of 40mg / L GA3 + 20mg / L amino acid ester (DA-6) + 0.1% boric acid.

[0129] On September 5th, apply 0.7 kg of fertilizer specifically for the elongation period to each plant, with an N:P2O5:K2O:CaO ratio of 13:15:15:8.

[0130] Starting September 5th, the relative soil moisture content will be controlled at 75%.

[0131] (4) Management during the open period (late October to mid-November) Under facility cultivation conditions, a gradual cooling process was implemented starting from October 20th, with the daytime temperature gradually decreasing from 28℃ to 22℃ and the nighttime temperature gradually decreasing from 18℃ to 12℃, at a rate of 1.0℃ per day.

[0132] On October 18, spray a flowering promotion solution once, 1.5L per plant; the flowering promotion solution is a mixture of 0.3% potassium dihydrogen phosphate + 0.15% boron fertilizer + 0.01% brassinolide.

[0133] During the peak flowering period from October 25 to November 12, artificial pollination should be carried out on sunny mornings from 9:00 to 11:00.

[0134] On November 4 (10 days after the first batch of flowers opened), the small late-blooming flower spikes that were still developing were removed so that nutrients could be concentrated on the already opened inflorescences.

[0135] (5) Finalization period management (late November to early May of the following year) Spray the fruit-enlarging agent once each on December 5th, January 5th, and February 5th, with 2.5L per plant each time; the fruit-enlarging agent is a mixture of 10mg / L 6-BA + 0.05mg / L brassinolide + 0.2% calcium nitrate.

[0136] On December 5th, each plant was treated with 0.6 kg of phosphorus, potassium, and calcium compound fertilizer, with a P2O5:K2O:CaO ratio of 14:22:12.

[0137] From late December to early January, promptly remove any winter shoots that sprout.

[0138] During the cell division stage of young fruit (late November to early February), the relative soil moisture content should be controlled at 80%, and adjusted to 85% during the cell enlargement stage (from mid-February onwards).

[0139] Take measures to protect tree canopies from frost before a cold wave arrives.

[0140] (6) Rest and recuperation period management (mid-May to early July) After harvesting (early May), perform heavy post-harvest pruning, shortening fruiting branches to 2-3 buds at the base, and removing weak, overly dense, crossing, and diseased branches.

[0141] Apply the first post-harvest fertilizer immediately after harvesting, using 0.5 kg of compound fertilizer (N:P2O5:K2O=15:10:12) per plant; apply the second post-harvest fertilizer 25 days after harvesting, using 20 kg of well-rotted organic fertilizer + 0.5 kg of compound fertilizer per plant.

[0142] Appropriately regulate the emerging summer shoots, retain an appropriate number as fruiting mother branches for the next year, remove excessively vigorous shoots, and pinch off the tips of summer shoots that are longer than 30cm.

[0143] The relative soil moisture content should be controlled at 70%.

[0144] (7) Monitoring of morphological and physiological indicators and stage transition Starting from September 5th, every 3 days, 3 outgoing inflorescences were selected from each of the four cardinal directions of each monitored plant, and the length of the main axis of the inflorescence was measured with vernier calipers to calculate the daily elongation rate.

[0145] When the daily elongation rate of the main axis of the inflorescence is less than 0.5 mm for three consecutive days, it transitions from the elongation period to the opening period.

[0146] When more than 90% of the florets in the inflorescences of the tree have finished blooming and the ovaries have begun to swell and visible young fruits appear, the tree transitions from the opening period to the shaping period.

[0147] Control group 1 The control area is managed using the method described in Example 1 of CN113615471B, as follows: (1) Pinching the early spring shoots: Before February 10, all early spring shoots should be removed when they are 2-5cm long. Pinching should not be done after February 15.

[0148] (2) Thinning weak branches and controlling strong branches in summer + adjusting fertilizer and water: Summer pruning is carried out from the end of April to the beginning of May to remove weak branches, overly dense branches and crossing branches; from July 1 to 15, the vigorous branches of 35-45cm are twisted; from May to June, phosphorus and potassium fertilizer or high potassium compound fertilizer is applied to vigorous plants; water is controlled in July to control the absolute soil moisture content to 15%; normal water supply is provided from August to early September.

[0149] (3) Water control from mid-September to mid-October: control the absolute soil moisture content to 15% so that the first batch of flowers will be delayed until mid-November.

[0150] (4) Fertilizer and watering from mid-October to December: Apply compound fertilizer (N:P2O5:K2O=15:15:15) once in mid-October and once in mid-November, 0.6 kg per plant; control the absolute soil moisture content to 19%.

[0151] The comparison results between the test area managed by the method of this invention and the control area managed by the method of CN113615471B are shown in Table 1.

[0152] Table 1. Comparison of the effects of the method of this invention and the method of CN113615471B

[0153] Experimental results show that, using the method of this invention, the flowering rate reaches 95.8-97.5% from late October to mid-November, the uniformity of fruit maturity reaches over 91%, the fruit set rate increases to over 73%, the rate of high-quality fruit increases to over 88%, and the fruit cracking rate decreases to below 3.1%. All indicators are significantly better than the method in CN113615471B.

[0154] Example 4: Verification of the Synergistic Effect of Key Measures in the Startup Phase To verify the effectiveness of the key measures of "triple physical stress + compound inducer" during the initiation period of this invention, the following four treatments were set up at the "Ninghai White" loquat planting base in Taizhou City, Zhejiang Province: Treatment (1): Triple physical stress (girdling + twisting + gradient water control) + composite inducer, which is the complete solution of this invention.

[0155] Treatment (2): Ring barking + twisting (without gradient water control and compound inducer), which is the conventional combination of physical flower induction in the existing technology.

[0156] Treatment (3): Gradient water control only + composite inducing agent (no girdling and twisting), i.e. chemical induction scheme without physical stress.

[0157] Treatment (4): Blank control (no girdling, twisting, gradient water control and spraying of compound inducer, only routine water management).

[0158] Each treatment had 3 replicates, for a total of 12 plants, with consistent tree age and vigor. Except for the initial treatment measures, the management measures for each treatment were the same as in Example 1. Flower bud differentiation rate (the proportion of flower primordia appearing in the terminal bud observed under a dissecting microscope) and flowering period concentration (the percentage of flowers opening from late October to mid-November) were observed. The experimental results are shown in Table 2.

[0159] Table 2. Verification Results of Synergistic Effects of Key Measures in the Startup Phase

[0160] Note: Different lowercase letters in the same column indicate significant differences (P<0.05).

[0161] The results showed that the flower bud differentiation rate of the complete scheme of the present invention (treatment 1) reached 92.3%, which was 15.8 percentage points higher than that of treatment (2), 21.1 percentage points higher than that of treatment (3), and 33.6 percentage points higher than that of the blank control. In terms of flowering period concentration, the complete scheme of the present invention reached 97.5%, which was better than that of treatment (2) and treatment (3).

[0162] It is worth noting that the flower bud differentiation rates of treatment (2) and treatment (3) were 76.5% and 71.2%, respectively. The sum of the two (147.7%) minus the blank control (58.7%) was 89.0%, while the actual value of the complete scheme of the present invention was 92.3%, which was higher than the theoretical expected value. This indicates that there is a significant synergistic effect between the triple physical stress and the composite inducer, rather than a simple superposition.

[0163] Example 5: Verification of the effectiveness of key measures during the open period To verify the effectiveness of the key measures of "gradient cooling + thinning of late flowers" during the open period of this invention, the following four treatments were set up at the "Ninghai White" loquat facility cultivation base in Taizhou City, Zhejiang Province: Treatment (1): Gradient cooling + thinning of late-blooming flowers (complete solution of this invention).

[0164] Treatment (2): Gradual cooling only (without thinning late flowers).

[0165] Treatment (3): Only remove late-blooming flowers (without gradient cooling, allowing them to open at natural temperature).

[0166] Treatment (4): Routine management (no gradient cooling, no thinning of late flowers).

[0167] Except for the different measures during the flowering period, the management measures for each treatment were the same as in Example 1. Each treatment was replicated with 5 plants. The total duration of flowering (the number of days from the opening of the first flower to the withering of the last flower), the concentration of peak flowering (the percentage of flowers that opened from late October to mid-November), the fruit set rate, and the uniformity of fruit ripening were observed. The experimental results are shown in Table 3.

[0168] Table 3. Results of Verification of the Effectiveness of Key Measures During the Opening Period

[0169] Note: Different lowercase letters in the same column indicate significant differences (P<0.05).

[0170] The results showed that the total flowering period of the complete scheme of this invention (treatment 1) was only 23.5 days, which was 26.6% shorter than that of gradient cooling only (treatment 2, 32 days), 39.0% shorter than that of thinning late flowers only (treatment 3, 38.5 days), and 47.8% shorter than that of conventional management (treatment 4, 45 days). The concentration of full bloom reached 97.5%, which was significantly higher than that of other treatments. The fruit set rate reached 79.0%, which was 7.5 percentage points higher than that of treatment (2), 10.8 percentage points higher than that of treatment (3), and 16.5 percentage points higher than that of treatment (4).

[0171] Example 6: Effects of different postharvest pruning intensities on flower bud differentiation in the following year This embodiment aims to verify the difference in the effects of the "post-harvest heavy pruning" measure during the fallow period of this invention and the "light pruning" measure in CN113615471B on flower bud differentiation and the number of flowers in the following year. The experiment was conducted at the "Ninghai White" loquat planting base in Taizhou City, Zhejiang Province, and the following three treatments were set up: Treatment (1): The present invention is to heavily prune the fruiting branches after harvesting, and remove weak branches, overly dense branches, crossing branches and diseased and insect-infested branches.

[0172] Treatment (2): Light pruning (CN113615471B method) - only remove weak branches, overly dense branches and diseased and insect-infested branches, without pruning back fruiting branches.

[0173] Treatment (3): No pruning (blank control) - No pruning was performed after harvesting.

[0174] Each treatment had 5 replicates, with trees of similar age and vigor. Except for the pruning intensity, all other management practices were carried out uniformly according to the method described in Example 1 of this invention. The flower bud differentiation rate, the number of flowers per tree, and the number of summer shoots sprouted in the following year were observed. The experimental results are shown in Table 4.

[0175] Table 4. Effects of different postharvest pruning intensities on flower bud differentiation in the following year.

[0176] Note: Different lowercase letters in the same column indicate significant differences (P<0.05).

[0177] The results showed that the flower bud differentiation rate of the heavy pruning treatment of this invention reached 93.2%, and the number of flowers per plant reached 285.5, both significantly higher than those of the light pruning treatment (78.5%, 215.3) and the no pruning treatment (65.8%, 168.2). Although the number of summer shoots sprouting in the heavy pruning treatment (18.5 shoots / plant) was slightly lower than that in the light pruning treatment (25.8 shoots / plant), the quality of the summer shoots was higher (average length 28.5 cm, robust branches), which is more conducive to the formation of high-quality fruiting branches.

[0178] The above results indicate that although the heavy pruning measures adopted by the present invention during the rest period are contrary to the "no heavy pruning" concept explicitly taught in CN113615471B, by pruning back the fruiting branches to 2-3 buds at the base, the buds effectively stimulated the germination of robust summer shoots, which in turn promoted the differentiation of flower buds in the following year, producing a technical effect that is difficult for those skilled in the art to predict.

[0179] Example 7: Comparison of Gradient Water Control and Conventional Single Water Content Control Effects This embodiment aims to verify the superiority of the "gradient water control" method during the initial stage of this invention compared to the "single moisture content water control" method in the prior art. The experiment was conducted at the "Ninghai White" loquat planting base in Taizhou City, Zhejiang Province, and the following five treatments were set up: Treatment (1): Gradient water control of the present invention - 58% → 48% → 42% → 52% (adjusted every 7 days).

[0180] Treatment (2): Moderate continuous water control - 48% for 4 weeks.

[0181] Treatment (3): Severe and continuous water control - 42% for 4 weeks.

[0182] Treatment (4): Mild continuous water control - 52% for 4 weeks.

[0183] Treatment (5): Routine moisture management - 65% for 4 weeks (no water control control).

[0184] Five plants were replicated for each treatment. Except for the water control method at the start of the treatment, all other management measures were carried out uniformly according to the method in Example 1 of this invention. Flower bud differentiation rate, relative water content (RWC) of leaves, and malondialdehyde (MDA) content in leaves (reflecting the degree of cell membrane lipid peroxidation, i.e., the degree of stress damage) were observed. The experimental results are shown in Table 5.

[0185] Table 5 Comparison of the effects of gradient water control and single water content water control

[0186] Note: Different lowercase letters in the same column indicate significant differences (P<0.05).

[0187] The results showed that the flower bud differentiation rate of the gradient water control treatment of the present invention (91.8%) was significantly higher than that of all single water content continuous water control treatments.

[0188] More importantly, the leaf MDA content of the gradient water control treatment (8.5 μmol / g FW) was significantly lower than that of the moderate continuous water control (12.8 μmol / g FW) and the severe continuous water control (18.5 μmol / g FW), indicating that gradient water control effectively induced flower bud differentiation while avoiding severe cell damage caused by continuous drought stress. Leaf relative water content data also support this conclusion: the gradient water control treatment (72.5%) was significantly higher than that of the moderate (58.2%) and severe (48.5%) continuous water control treatments.

[0189] The above results show that the gradual gradient water control strategy adopted in this invention can effectively induce flower bud differentiation by gradually increasing drought stress, and avoid excessive stress damage by timely water restoration, thus achieving a balance between "promoting flowering" and "protecting trees". Its technical effect is significantly better than the existing technology that uses a single target water content control method.

[0190] Example 8: Comparison of the effects of calcium-containing fertilizer for the elongation period and conventional compound fertilizer This comparative experiment aims to verify the effects of the calcium-containing fertilizer of this invention on inflorescence elongation and fruit quality compared to conventional compound fertilizer during the elongation period. The experiment was conducted at the "Ninghai White" loquat planting base in Taizhou City, Zhejiang Province, and the following four treatments were set up: Treatment (1): The calcium-containing fertilizer of this invention—N:P2O5:K2O:CaO=12:13:13:6, 0.5kg per plant.

[0191] Treatment (2): Conventional compound fertilizer - N:P2O5:K2O=13:13:13 (calcium-free), 0.5kg per plant.

[0192] Treatment (3): High-nitrogen compound fertilizer - N:P2O5:K2O=20:10:10, 0.5kg per plant.

[0193] Treatment (4): No fertilizer applied (blank control).

[0194] Eight plants were replicated for each treatment. Except for the fertilization during the elongation period, all other management practices were carried out uniformly according to the method described in Example 1 of this invention. The daily elongation rate of the inflorescence main axis, the final inflorescence length, the calcium content of the pericarp and pulp at fruit maturity, and the fruit cracking rate were observed. The experimental results are shown in Table 6.

[0195] Table 6. Comparison of the effects of calcium-containing fertilizer for the elongation period and conventional compound fertilizer.

[0196] Note: Different lowercase letters in the same column indicate significant differences (P<0.05).

[0197] The results showed that the daily elongation rate of the main axis of the inflorescence treated with the calcium-containing special fertilizer of the present invention (1.62 mm / day) was significantly higher than that of conventional compound fertilizer (1.28 mm / day) and high-nitrogen compound fertilizer (0.92 mm / day), and the final inflorescence length was also the longest in the calcium-containing special fertilizer treatment (27.8 cm).

[0198] Regarding fruit quality, the calcium content in the peel of fruits treated with calcium-specific fertilizer (285.5 mg / kg) was significantly higher than that of conventional compound fertilizer (215.3 mg / kg) and high-nitrogen compound fertilizer (198.2 mg / kg), while the fruit cracking rate was only 2.5%, significantly lower than that of conventional compound fertilizer (5.8%) and high-nitrogen compound fertilizer (8.2%). This result indicates that calcium supplementation during the elongation period not only promotes inflorescence elongation, but more importantly, calcium is absorbed and accumulated in the peel cell walls in the early stages of young fruit development, enhancing the mechanical strength of the peel and thus significantly reducing the fruit cracking rate in the later stages of fruit enlargement.

[0199] Example 9: Verification of the Necessity of Dynamic Connection Mechanism This embodiment aims to verify the necessity and superiority of the dynamic linkage mechanism of "daily elongation rate of inflorescence main axis" of the present invention. The experiment was conducted at the "Ninghai White" loquat planting base in Taizhou City, Zhejiang Province, and the following two treatments were set: Treatment (1): The present invention dynamically connects the inflorescence main axis when the daily elongation rate is less than 0.5 mm for 3 consecutive days, and then it transitions from the elongation period to the opening period.

[0200] Treatment (2): Experience-based judgment on the timing of the transition to the opening period – technicians with more than 10 years of loquat cultivation experience observe the development of the inflorescence with the naked eye and subjectively judge that the opening period will begin on October 30.

[0201] Except for the different methods for determining the stage transition, all other management measures were carried out uniformly according to the method of this invention. Five plants were replicated for each treatment, and the concentration of full bloom, total flowering duration, and fruit set rate were observed. The experimental results are shown in Table 7.

[0202] Table 7 Comparison of the effects of dynamic connection mechanism with other connection methods

[0203] The results showed that the treatment of dynamic linkage of the daily elongation rate of the inflorescence main axis adopted by the present invention had a significantly higher concentration of full bloom (97.5%) than that of the empirically judged linkage (88.5%); a significantly shorter total flowering period (23.5 days) than that of the empirically judged linkage (30.5 days); and a significantly higher fruit set rate (79.0%) than that of the empirically judged linkage (72.8%).

[0204] The above results show that even if the management measures at each stage are exactly the same, the technical effects differ significantly depending solely on the method of judging the stage transition. This proves that the quantitative dynamic transition index of "the daily elongation rate of the inflorescence main axis being less than 0.5 mm for three consecutive days" proposed in this invention has a substantial technical contribution. This quantitative index eliminates the subjectivity and lag of phenological observation, ensuring that the management measures during the elongation period end at the optimal time and the management measures during the opening period begin at the optimal time, thereby achieving a significant increase in the concentration of flowering and the fruit set rate.

[0205] In summary, this invention, through its six-stage system division, the overall coordination of specific management measures at each stage, and the precise driving force of a quantitative dynamic linkage mechanism, produces a comprehensive effect that is significantly superior to the prior art. Moreover, this effect is something that those skilled in the art could not foresee or achieve through simple reasoning or conventional experiments based on the prior art. It possesses outstanding substantive features and significant progress.

[0206] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.

[0207] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for synchronously regulating the flowering and fruiting of loquat based on zoning management of growth stages, characterized in that, Includes the following steps: The annual growth cycle of loquat is divided into six stages: latent period, initiation period, elongation period, opening period, shaping period, and rest period. The latent period is the nutrient accumulation stage before the start of flower development; the initiation period is the stage from the start of flower bud differentiation to the completion of inflorescence primordium formation; the elongation period is the stage from the completion of inflorescence primordium formation to the rapid elongation of the inflorescence main axis; the opening period is the stage from floret opening to the completion of pollination and fertilization; the shaping period is the stage of young fruit cell division and early development; and the rest period is the stage from fruit ripening to post-harvest tree recovery. During the latent period, strong fruiting branches are cultivated by increasing the application of organic fertilizer and controlling nitrogen and increasing phosphorus and potassium. In addition, a compound solution of paclobutrazol and potassium dihydrogen phosphate is sprayed on the leaves to increase the carbon-nitrogen ratio of the branches and shoots, thus reserving the material basis for the start of flower development. During the initiation period, flower bud differentiation was simultaneously initiated by superimposing three physical stresses: girdling treatment, branch twisting treatment, and gradient water control, in conjunction with the application of a compound inducer of 6-BA and methyl jasmonate. During the elongation period, the inflorescence main axis was accelerated by spraying a compound elongation promoter of GA3 and amino acid ester in stages, so that the inflorescence spikes at different nodes tended to elongate synchronously in time. During the opening period, precise gradient heating / cooling and flowering period nutrition regulation are used to ensure that the opening of small flowers is completed within 7-10 days, and the fruit setting rate is improved by spraying compound flower and fruit preservation agents. During the shaping period, the application of phosphorus, potassium and calcium fertilizers and the spraying of a compound fruit-expanding agent of cytokinin and brassinolide promote the division of young fruit cells, while controlling the sprouting of new shoots to reduce competition for nutrients between flowers and fruits. During the rest period, the tree vigor is restored and nutrients are accumulated for the next growing season through post-harvest heavy pruning and phased application of post-harvest fertilizer; When the daily elongation rate of the main axis of the inflorescence is less than 0.5 mm for three consecutive days, it transitions from the elongation period to the opening period; when more than 90% of the florets of the inflorescences of the whole tree have finished flowering and the ovaries have begun to swell and visible young fruits appear, it transitions from the opening period to the shaping period.

2. The cultivation method according to claim 1, characterized in that, The incubation period is from early June to mid-July each year, and the management measures include: (1) Apply more organic fertilizer: In early June, apply 15-25 kg of well-rotted sheep or cow manure per plant, along with 0.5-1.0 kg of superphosphate, and deeply plow it into the soil; (2) Control nitrogen and increase phosphorus and potassium: Apply 0.3-0.5 kg of phosphorus and potassium compound fertilizer per plant in mid-June, with the mass ratio of N:P2O5:K2O being 5-8:18-22:18-22, and control the amount of nitrogen fertilizer used; (3) Foliar spraying: Spray the compound solution once in late June and once in early July, 1.5-2.5L per plant each time; the compound solution is a mixture of 300-500 times dilution of 15% paclobutrazol wettable powder + 0.3% potassium dihydrogen phosphate + 0.1% borax. (4) Summer light pruning: In early July, remove overly dense branches, weak branches and diseased branches in the inner canopy, and pinch off vigorous branches that are longer than 50cm.

3. The cultivation method according to claim 1, characterized in that, The launch period is from late July to late August each year, and the management measures include: (1) Ring barking treatment: In late July, ring bark is applied to the main trunk or main branches. The width of the ring bark is 0.3-0.5 cm, and the depth is such that the bark is cut through without damaging the xylem. After ring barking, the trunk or main branches are wrapped with white plastic film to keep them moist. (2) Twisting treatment: In early August, twist the upright vigorous branches with a length of 40-60cm at an angle of 180-270 degrees so that the bark of the branches cracks slightly but does not break. (3) Gradual water control: Gradual water control will be implemented from July 25th. In the first week, the relative soil moisture content will be controlled at 55-60%, in the second week at 45-50%, in the third week at 40-45%, and in the fourth week it will be restored to 50-55%. (4) Spraying compound inducer: Spray the compound inducer once in early and mid-August, 1.0-2.0L per plant each time; the compound inducer is a mixture of 50-80mg / L 6-BA + 10-20μM methyl jasmonate + 0.2% potassium dihydrogen phosphate.

4. The cultivation method according to claim 1, characterized in that, The elongation period is from early September to mid-October each year, and the management measures include: (1) Spray elongation promoter: Spray elongation promoter once each in early September, late September and early October, 1.5-2.5L per plant each time; the elongation promoter is a mixture of 20-40mg / L GA3 + 10-20mg / L amino acid ester + 0.1% boric acid; (2) Apply special fertilizer for the elongation period: Apply 0.4-0.7 kg of special fertilizer per plant in early September, in which the mass ratio of N:P2O5:K2O:CaO is 10-13:12-15:12-15:5-8; (3) Water management: Control the relative soil moisture content to 65-75% and maintain a uniform water supply; (4) The daily elongation rate of the inflorescence main axis is used as a dynamic indicator of the stage management effect. When the daily elongation rate of the inflorescence main axis of more than 90% of the fruiting mother branches reaches 1.0-2.0 mm, the elongation period management measures are confirmed to be effective. The stage transition is achieved by monitoring the elongation rate of the inflorescence main axis. When the daily elongation rate of the inflorescence main axis is less than 0.5 mm for 3 consecutive days, it is confirmed that the stage has transitioned from the elongation stage to the opening stage.

5. The cultivation method according to claim 1, characterized in that, The opening period is from late October to mid-November each year, and the management measures include: (1) Gradual temperature increase / decrease control: Under the facility cultivation conditions, a gradual temperature decrease was implemented from October 20th, with the daytime temperature gradually decreasing from 25-28℃ to 18-22℃ and the nighttime temperature gradually decreasing from 15-18℃ to 8-12℃, with a cooling rate of 0.5-1.0℃ per day; (2) Nutritional regulation during flowering: spray flowering promotion solution once before flowering, 1.0-1.5L per plant; the flowering promotion solution is a mixture of 0.3% potassium dihydrogen phosphate + 0.15% boron fertilizer + 0.01% brassinolide; (3) Assisted pollination: During the peak flowering period, artificial pollination or bee pollination should be carried out on sunny mornings; (4) Thinning out late-blooming flowers: 7-10 days after the first batch of flowers open, thin out the small late-blooming flower spikes that are still developing, so that nutrients can be concentrated on supplying the already opened inflorescences; (5) Stage transition through phenological observation: When more than 90% of the florets of the whole tree have finished blooming and the ovary begins to swell and visible young fruit appears, it is confirmed that the tree has transitioned from the opening period to the shaping period.

6. The cultivation method according to claim 1, characterized in that, The standardization period is from late November to early May of the following year, and the management measures include: (1) Spraying fruit enlargement agent: Spray the fruit enlargement agent once each in early December, early January and early February, 1.5-2.5L per plant each time; the fruit enlargement agent is a mixture of 5-10mg / L cytokinin 6-BA + 0.01-0.05mg / L brassinolide + 0.2% calcium nitrate. (2) Apply phosphorus, potassium and calcium fertilizer: In early December, apply 0.3-0.6 kg of phosphorus, potassium and calcium compound fertilizer per plant, in which the mass ratio of P2O5:K2O:CaO is 10-14:18-22:8-12; (3) Controlling shoot growth and protecting fruit: Remove winter shoots that emerge in a timely manner from late December to early January to reduce nutrient consumption; (4) Water management: During the cell division stage of young fruit, the relative soil moisture content should be controlled at 70-80%, and adjusted to 75-85% after entering the cell enlargement stage; (5) Cold protection and frost prevention: Before the arrival of cold waves, take measures such as covering the tree canopy or watering to prevent frost.

7. The cultivation method according to claim 1, characterized in that, The aforementioned rest period is from mid-May to early July each year, and the management measures include: (1) Post-harvest heavy pruning: After harvesting, heavy pruning should be carried out in time, shortening the fruiting branches to 2-3 buds at the base, and removing weak branches, overly dense branches, crossing branches and diseased and insect-infested branches; (2) Apply post-harvest fertilizer in stages: Apply the first post-harvest fertilizer immediately after harvesting, with 0.3-0.5 kg of compound fertilizer per plant, N:P2O5:K2O=15:10:12; apply the second post-harvest fertilizer 20-25 days after harvesting, with 10-20 kg of decomposed organic fertilizer + 0.3-0.5 kg of compound fertilizer per plant; (3) Summer shoot control: For the emerging summer shoots, retain an appropriate amount as fruiting mother branches for the next year, remove excessive vigorous shoots, and pinch off the tips of summer shoots that are longer than 30cm. (4) Water management: Control the relative soil moisture content to 60-70%.

8. The cultivation method according to claim 1, characterized in that, The method for measuring the elongation rate of the inflorescence main axis is as follows: starting from early September, every 3 days, 3 inflorescences that have emerged in each of the four directions of east, west, south, and north of each monitored plant are selected, and the length of the inflorescence main axis is measured with vernier calipers to calculate the daily elongation rate.

Citation Information

Patent Citations

  • A method for regulating the flowering period of loquat in greenhouses

    CN113615471B