A multi-stage purification device based on industrial waste gas treatment

By setting a central gas distribution pipe and an embedded gas distribution pipe in the activated carbon adsorption-desorption box, combined with the inlet adjustment component and adsorption load detection device, the gas distribution state is dynamically adjusted, which solves the problems of anti-penetration and insufficient treatment capacity in the later stage of the adsorption cycle of the activated carbon adsorption box in the treatment of large volume and medium-low concentration organic waste gas, and improves the system's treatment efficiency and continuity.

CN123148784APending Publication Date: 2026-11-24SHANDONG SHIYI ENVIRONMENTAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611535798.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

When treating large volumes of low to medium concentration organic waste gas, existing activated carbon adsorption boxes cannot simultaneously meet the requirements for anti-penetration in the later stages of the adsorption cycle and the uniform utilization of the adsorption box, resulting in insufficient treatment capacity or concentrated regeneration needs, which affects the continuity and efficiency of the system.

Method used

By setting a central gas distribution pipe and an embedded gas distribution pipe in the activated carbon adsorption-desorption box, combined with the inlet adjustment component and adsorption load detection device, the gas distribution state is dynamically adjusted so that the adsorption box restricts the flow capacity in the later stage of the adsorption cycle, and other boxes bear the waste gas treatment load, forming a differentiated flow state and staggering the adsorption and regeneration cycles.

Benefits of technology

It achieves a balance between anti-penetration and flow capacity in the later stages of the adsorption cycle, reduces the flow resistance of the adsorption box, improves the system's processing capacity adaptability and continuity, and reduces the risk of insufficient remaining adsorption capacity in the adsorption box.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123148784A_ABST
    Figure CN123148784A_ABST
Patent Text Reader

Abstract

This invention relates to the field of industrial waste gas adsorption and purification technology, and discloses a multi-stage purification device for industrial waste gas treatment. The device includes an inlet main pipe, an outlet main pipe, and multiple activated carbon adsorption / desorption boxes arranged in parallel. Each adsorption box is equipped with an activated carbon adsorption bed, a central gas distribution pipe, an embedded gas distribution pipe, a gas distribution chamber, an inlet regulating component, and an adsorption load detection device. The inlet regulating component is affected by the waste gas pressure and switches the gas distribution path of the adsorption box. When the adsorption load reaches a first load threshold, the corresponding adsorption box switches from a second adsorption state to a first adsorption state and continues to participate in adsorption, while other adsorption boxes that have not reached the first load threshold remain in the second adsorption state. After reaching the second load threshold, adsorption ceases and desorption / regeneration occurs. This invention can balance waste gas flow capacity, anti-penetration at the end of adsorption, and staggered regeneration of multiple adsorption boxes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of industrial waste gas adsorption and purification technology, and in particular to a multi-stage purification device based on industrial waste gas treatment. Background Technology

[0002] Volatile organic waste gas generated during industrial production processes typically exhibits characteristics such as large fluctuations in gas volume and variations in pollutant concentrations depending on production conditions. For large volumes of low to medium concentration organic waste gas, a treatment method combining activated carbon adsorption and desorption regeneration is often employed. This involves pre-treating the waste gas through filtration and other processes, then introducing it into an activated carbon adsorption unit where the activated carbon adsorbs the organic components. Once the activated carbon's adsorption capacity reaches a set level, it is desorbed using hot gas, and the resulting high-concentration organic waste gas is then transported to subsequent treatment units such as catalytic combustion. To meet the needs of continuous treatment and varying waste gas volumes, existing systems typically employ multiple activated carbon adsorption boxes that can operate in parallel.

[0003] The internal gas distribution structure of existing activated carbon adsorption boxes is usually relatively fixed. After the waste gas enters the adsorption box, it passes through the activated carbon bed according to a predetermined airflow path. In order to reduce the operating resistance of the equipment and increase the waste gas treatment capacity per unit time, it is usually desirable to shorten the flow path of the gas in the activated carbon bed or increase the gas distribution area. However, as the activated carbon gradually enters the later stage of the adsorption cycle, the remaining adsorption capacity in some areas gradually decreases. If a large amount of waste gas is still allowed to pass through the same short-path flow path, it is easy for the waste gas to penetrate prematurely in areas where the remaining effective adsorption depth is insufficient. If a longer adsorption path is always used in order to ensure the treatment reliability in the later stage of the adsorption cycle, it will increase the flow resistance in the normal adsorption stage, making it difficult to balance the treatment capacity and the anti-penetration requirements in the later stage of the adsorption cycle.

[0004] Furthermore, when multiple activated carbon adsorption boxes are operating in parallel, if each adsorption box shares the waste gas under similar flow conditions for a long period of time, the adsorption load of each adsorption box is likely to gradually become similar. This causes multiple adsorption boxes to enter the later stage of the adsorption cycle at similar times. When the waste gas volume suddenly increases, the system may lack adsorption boxes with sufficient remaining adsorption capacity to handle the increased treatment load. At the same time, multiple adsorption boxes reaching the regeneration conditions at similar times will also cause the desorption and regeneration demand to be concentrated, which is not conducive to the continuous connection between adsorption treatment and desorption and regeneration.

[0005] Current treatment methods typically involve removing an activated carbon adsorption box from the adsorption process and switching to other adsorption boxes once it is detected that the adsorption is approaching or has reached the set adsorption state. Alternatively, the number of adsorption boxes involved in the process can be changed by adjusting the valves of each branch. However, there is still room for improvement in how to continue to utilize the remaining adsorption capacity of an adsorption box after it has entered the later stage of the adsorption cycle, while limiting the large amount of waste gas that can continue to pass through the adsorption box, and allowing adsorption boxes in other adsorption stages to bear the corresponding treatment load, so as to take into account changes in waste gas volume, the risk of end-stage penetration, and the staggered regeneration of multiple adsorption boxes. Summary of the Invention

[0006] The purpose of this invention is to provide a multi-stage purification device for industrial waste gas treatment. By changing the internal gas distribution state of the activated carbon adsorption bed according to the adsorption load stage, the adsorption box in the later stage of the adsorption cycle continues to participate in the adsorption treatment while limiting its flow capacity, and the other adsorption boxes bear the corresponding waste gas treatment load, so as to take into account the waste gas treatment capacity, the end-stage anti-penetration and the peak-shifting regeneration requirements of multiple adsorption boxes.

[0007] To achieve the above objectives, the present invention adopts the following technical solution: a multi-stage purification device based on industrial waste gas treatment, comprising an inlet main pipe, an outlet main pipe, a control component, and multiple activated carbon adsorption-desorption boxes arranged in parallel between the inlet main pipe and the outlet main pipe;

[0008] Each of the activated carbon adsorption-desorption boxes includes an activated carbon adsorption bed, a central gas distribution pipe, several embedded gas distribution pipes, a gas distribution chamber, an inlet adjustment component, and an adsorption load detection device. The central gas distribution pipe and several embedded gas distribution pipes extend into the activated carbon adsorption bed. The several embedded gas distribution pipes are distributed between the central gas distribution pipe and the outer peripheral gas outlet surface of the activated carbon adsorption bed, and the several embedded gas distribution pipes are connected to the gas distribution chamber.

[0009] The inlet regulating component is subjected to the exhaust gas pressure in the intake manifold and has a closed state, a first open state, and a second open state, and the opening force condition of the inlet regulating component can be adjusted.

[0010] In the first open state, the activated carbon adsorption-desorption box maintains air intake, the central gas distribution pipe is isolated from the gas distribution chamber, and the waste gas enters the activated carbon adsorption bed through the central gas distribution pipe to form the first adsorption state;

[0011] In the second open state, the activated carbon adsorption-desorption box is kept in air intake, and the central gas distribution pipe is connected to the gas distribution chamber, so that part of the waste gas enters the activated carbon adsorption bed through the gas distribution chamber and the embedded gas distribution pipe to form the second adsorption state.

[0012] The equivalent flow resistance of the activated carbon adsorption-desorption chamber in the first adsorption state is greater than that in the second adsorption state.

[0013] The adsorption load detection element is used to obtain the adsorption load parameters of the corresponding activated carbon adsorption bed, and the control component is connected to the adsorption load detection element and the inlet adjustment component.

[0014] When the adsorption load parameter of the first activated carbon adsorption-desorption box reaches the first load threshold but does not reach the second load threshold, the control component adjusts the opening force condition of the corresponding inlet adjustment component to switch the first activated carbon adsorption-desorption box from the second open state to the first open state and keep it participating in adsorption treatment, wherein the second load threshold is higher than the first load threshold.

[0015] When the first activated carbon adsorption-desorption box and at least one second activated carbon adsorption-desorption box whose adsorption load parameter has not reached the first load threshold jointly participate in the adsorption treatment, the first activated carbon adsorption-desorption box is in the first adsorption state and the second activated carbon adsorption-desorption box is in the second adsorption state.

[0016] When the adsorption load parameter of the first activated carbon adsorption-desorption box reaches the second load threshold, the first activated carbon adsorption-desorption box exits the adsorption process.

[0017] Preferably, the inlet adjustment assembly includes a valve cover, an inlet valve plate, a linkage rod, a return spring, an excitation coil, and a moving magnetic core. The valve cover is disposed at the inlet end of the central air distribution pipe and is provided with a valve-controlled inlet. The inlet valve plate and the moving magnetic core are respectively connected to the linkage rod.

[0018] The reset spring applies a reset action to the linkage rod, causing the intake valve plate to move toward closing the valve-controlled intake port. The excitation coil is installed on the top of the valve cover and arranged on the outer periphery of the moving magnetic core. The opening force of the inlet regulating component is adjusted by changing the electromagnetic action acting on the moving magnetic core.

[0019] Preferably, the inlet adjustment assembly further includes a flow path switching sleeve connected to the linkage rod, the flow path switching sleeve being movably engaged with the central air distribution pipe;

[0020] The central air distribution pipe is provided with a central pipe connection port, and the flow path switching sleeve is provided with a sleeve connection port. The flow path switching sleeve moves with the linkage rod so that the central pipe connection port and the sleeve connection port are misaligned or at least partially overlapped, thereby correspondingly isolating or connecting the central air distribution pipe and the air distribution chamber.

[0021] Preferably, the linkage has a closed position, a first open position, and a second open position in sequence along its moving direction;

[0022] In the closed position, the intake valve plate closes the valve-controlled intake port;

[0023] In the first open position, the intake valve plate opens the valve-controlled intake port, and the central tube connection port and the sleeve connection port are misaligned.

[0024] In the second open position, the intake valve plate opens the valve-controlled intake port, and the central tube connection port and the sleeve connection port at least partially overlap.

[0025] Preferably, the activated carbon adsorption bed has an outer peripheral gas outlet surface, the central gas distribution pipe extends along the central region of the activated carbon adsorption bed, and a plurality of the embedded gas distribution pipes are distributed at intervals around the central gas distribution pipe.

[0026] Both the embedded air distribution pipe and the central air distribution pipe have air distribution holes on their pipe walls. The distance from at least some of the air distribution holes on the embedded air distribution pipe to the outer peripheral air outlet surface is less than the distance from the air distribution holes on the central air distribution pipe to the outer peripheral air outlet surface.

[0027] Preferably, the top and bottom of the activated carbon adsorption bed are provided with gas blocking parts, and a clean gas collection cavity is formed between the outer peripheral gas outlet surface of the activated carbon adsorption bed and the inner wall of the activated carbon adsorption-desorption box, and the clean gas collection cavity is connected to the main gas outlet pipe.

[0028] The lower ends of the central air distribution pipe and the embedded air distribution pipe are both closed ends, so that the waste gas entering the central air distribution pipe or the embedded air distribution pipe enters the activated carbon adsorption bed through the corresponding air distribution holes, and enters the clean gas collection cavity through the outer peripheral air outlet surface.

[0029] Preferably, the intake valve plate has a pressure-bearing surface for bearing the exhaust gas pressure in the intake manifold, the exhaust gas pressure applies an opening action to the intake valve plate in the opening direction, and the return spring and excitation coil provide a counteracting action to the linkage rod.

[0030] The inlet regulating component has a first opening pressure threshold corresponding to the transition from a closed state to a first open state. When the exhaust gas pressure in the intake manifold reaches the first opening pressure threshold, the intake valve plate transitions from a closed state to a first open state.

[0031] Preferably, the control component sets the initial excitation parameters of the excitation coils corresponding to at least two activated carbon adsorption-desorption boxes, so that the at least two activated carbon adsorption-desorption boxes have different first opening pressure thresholds, so that when the exhaust gas pressure in the main intake pipe reaches the corresponding first opening pressure threshold, the corresponding activated carbon adsorption-desorption boxes switch from the closed state to the first open state.

[0032] Preferably, when the adsorption load parameter of the first activated carbon adsorption-desorption box reaches the first load threshold but does not reach the second load threshold, the control component changes the excitation parameter of the corresponding excitation coil, thereby changing the opening force condition of the corresponding inlet adjustment component, and causing the linkage rod to switch from the second opening position to the first opening position under the combined action of the exhaust gas pressure in the main intake pipe and the reset action and electromagnetic action.

[0033] When the linkage rod is in the first open position, the valve-controlled air inlet remains open, and the central air distribution pipe is isolated from the air distribution chamber.

[0034] Preferably, the activated carbon adsorption-desorption box further includes a desorption hot gas supply passage selectively connected to the gas distribution chamber and a desorption exhaust passage connected to the purified gas manifold.

[0035] When the corresponding activated carbon adsorption-desorption box exits the adsorption process, the desorption hot gas supply passage is connected to the gas distribution chamber, so that the desorption hot gas enters a number of the embedded gas distribution pipes through the gas distribution chamber, and enters the activated carbon adsorption bed through the gas distribution holes on the embedded gas distribution pipes. The gas carrying the desorbed organic matter is discharged through the desorption exhaust passage.

[0036] The present invention has the following beneficial effects:

[0037] 1. It balances the flow capacity during the normal adsorption phase with the anti-penetration requirements in the later stages of the adsorption cycle.

[0038] This invention uses a central gas distribution pipe, a gas distribution chamber, and an embedded gas distribution pipe to create a first adsorption state and a second adsorption state in the activated carbon adsorption-desorption chamber. In the second adsorption state, some waste gas can enter from inside the activated carbon adsorption bed through the embedded gas distribution pipe, thereby shortening the flow path of some waste gas through the activated carbon adsorption bed and reducing the equivalent flow resistance of the corresponding adsorption chamber. When the adsorption load of the activated carbon adsorption bed reaches the first load threshold but has not yet reached the second load threshold, the corresponding adsorption chamber is switched to the first adsorption state, cutting off the gas distribution path corresponding to the embedded gas distribution pipe. This allows the waste gas to mainly enter through the central gas distribution pipe and flow through the activated carbon adsorption bed to the outer peripheral outlet surface, thereby increasing the effective adsorption depth of the waste gas flowing to the outlet surface in the later stage of the adsorption cycle and reducing the risk of local premature penetration due to insufficient remaining adsorption capacity in the short-range adsorption area.

[0039] 2. To create differentiated flow conditions in parallel adsorption boxes at different adsorption stages, reducing the risk of the final adsorption box being impacted by large flow rates.

[0040] In this invention, when the first activated carbon adsorption-desorption box enters the later stage of the adsorption cycle, it does not immediately exit the adsorption treatment, but instead converts it from the second adsorption state to the first adsorption state. At the same time, other activated carbon adsorption-desorption boxes that have not yet reached the first load threshold can maintain or enter the second adsorption state. Since the equivalent flow resistance in the first adsorption state is greater than that in the second adsorption state, under the condition that multiple adsorption boxes are connected in parallel to the same inlet and outlet manifold, more waste gas can flow to the adsorption boxes that are still in the second adsorption state, thereby limiting the flow rate of waste gas entering the adsorption boxes in the later stage of the adsorption cycle. This allows the remaining adsorption capacity to be utilized while reducing the possibility of large flow rates of waste gas passing through the final adsorption area and causing penetration.

[0041] 3. It can simultaneously adjust the number of adsorption boxes and the flow capacity of a single box according to changes in the amount of industrial waste gas treated.

[0042] The inlet regulating component of this invention is affected by the exhaust gas pressure in the main intake pipe and can form different opening states. When the amount of industrial exhaust gas increases, the exhaust gas pressure in the main intake pipe can prompt other activated carbon adsorption-desorption boxes that meet the opening conditions to participate in adsorption treatment. At the same time, for adsorption boxes that have not yet entered the later stage of the adsorption cycle, they can be further converted from the first adsorption state to the second adsorption state, so that the embedded gas distribution pipe participates in gas distribution and reduces the equivalent flow resistance of the corresponding adsorption box. Therefore, the system can improve the exhaust gas flow capacity by increasing the number of adsorption boxes participating in the adsorption treatment and reducing the flow resistance of the adsorption boxes in the normal adsorption stage. Meanwhile, the adsorption boxes in the later stage of the adsorption cycle can still maintain the first adsorption state, thereby taking into account both the expansion of treatment capacity when the amount of exhaust gas changes and the protection of the adsorption boxes in the final stage.

[0043] 4. The adsorption and regeneration cycles of multiple adsorption boxes are staggered to improve the system's available adsorption capacity.

[0044] This invention enables activated carbon adsorption-desorption chambers that have reached the first load threshold to continue adsorption treatment after switching to the first adsorption state, until they reach the second load threshold, at which point they exit adsorption and undergo desorption and regeneration. Other adsorption chambers bear the corresponding treatment load according to the waste gas treatment requirements. This reduces the situation where multiple activated carbon adsorption-desorption chambers consume adsorption capacity simultaneously under similar flow conditions for a long time, allowing each adsorption chamber to form different adsorption load stages. It also allows some adsorption chambers to complete the current adsorption cycle first and enter regeneration, avoiding multiple adsorption chambers being in the later stage of the adsorption cycle at similar times. This reduces the risk of insufficient available adsorption capacity caused by multiple adsorption chambers being in the later stage of the adsorption cycle at the same time, and improves the continuous treatment capacity under sudden large air volume and continuous high load conditions. Attached Figure Description

[0045] Figure 1 This is a schematic diagram of the overall structure of the multi-stage purification device of the present invention;

[0046] Figure 2 This is a schematic diagram of the parallel connection structure of multiple activated carbon adsorption-desorption boxes, the inlet manifold, and the outlet manifold of the present invention.

[0047] Figure 3 This is a schematic diagram of the desorption and regeneration system of the present invention;

[0048] Figure 4 This is a schematic diagram of the decomposed structure of the activated carbon adsorption-desorption box of the present invention;

[0049] Figure 5 This is a schematic diagram of the parallel operation of multiple activated carbon adsorption-desorption chambers in different adsorption states according to the present invention.

[0050] Figure 6 This is a schematic diagram of the airflow path when the activated carbon adsorption-desorption box of the present invention is in the first adsorption state;

[0051] Figure 7 This is a schematic diagram of the airflow path when the activated carbon adsorption-desorption box of the present invention is in the second adsorption state;

[0052] Figure 8 This is a schematic diagram of the structure of the inlet adjustment component of the present invention when it is in the closed state;

[0053] Figure 9 This is a schematic diagram of the structure of the inlet adjustment component of the present invention when it is in the first open state;

[0054] Figure 10 This is a schematic diagram of the structure of the inlet adjustment component of the present invention when it is in the second open state.

[0055] In the diagram: 100, Activated carbon adsorption-desorption box; 101, Activated carbon adsorption bed; 102, Central gas distribution pipe; 103, Embedded gas distribution pipe; 104, Gas distribution chamber; 105, Inlet regulating component; 106, Adsorption load detection component; 111, Gas valve cover; 112, Inlet valve plate; 113, Linkage rod; 114, Return spring; 115, Excitation coil; 116, Moving magnetic core; 117, Valve-controlled inlet; 118, Flow path switching sleeve; 119, Central pipe connection port; 120, Sleeve connection port; 121, Outer peripheral outlet surface; 122, Gas blocking part;

[0056] 201. Main intake pipe; 202. Main exhaust pipe; 203. Pretreatment box; 204. Main exhaust fan; 205. Control components; 206. Exhaust switching valve;

[0057] 301. Desorption hot gas supply passage; 302. Desorption exhaust passage; 303. Catalytic oxidation treatment unit; 304. Heat exchange unit; 305. Desorption fan; 306. Desorption switching valve. Detailed Implementation

[0058] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.

[0059] In the description of this invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0060] Example 1

[0061] Reference Figures 1-5 This embodiment describes the overall structure of a multi-stage purification device based on industrial waste gas treatment and the basic structure of the activated carbon adsorption-desorption box 100.

[0062] The multi-stage purification device in this embodiment includes an inlet main pipe 201, an outlet main pipe 202, a control component 205, and multiple activated carbon adsorption-desorption boxes 100 arranged in parallel between the inlet main pipe 201 and the outlet main pipe 202. The industrial waste gas to be treated enters the inlet main pipe 201 after being pre-treated by the pretreatment box 203. Then, it is transported by the inlet main pipe 201 to the activated carbon adsorption-desorption boxes 100 in the adsorption working state. The gas after being treated by activated carbon adsorption enters the outlet main pipe 202 and is discharged under the action of the airflow formed by the main exhaust fan 204.

[0063] Multiple activated carbon adsorption-desorption boxes 100 are arranged in parallel. Each activated carbon adsorption-desorption box 100 can be in different working states according to the exhaust gas pressure in the main inlet pipe 201 and its own adsorption load. The figure shows an example of setting four activated carbon adsorption-desorption boxes 100. In actual applications, the number of activated carbon adsorption-desorption boxes 100 can be set according to the scale of industrial waste gas treatment and the required treatment capacity, and is not limited to the number shown in the figure.

[0064] Reference Figure 4 Each activated carbon adsorption-desorption chamber 100 includes an activated carbon adsorption bed 101, a central gas distribution pipe 102, several embedded gas distribution pipes 103, a gas distribution chamber 104, an inlet adjustment component 105, and an adsorption load detection component 106.

[0065] An activated carbon adsorption bed 101 is disposed inside an activated carbon adsorption-desorption box 100. The activated carbon adsorption bed 101 has an outer peripheral outlet surface 121 for the purified gas to be discharged. Both the top and bottom of the bed are provided with gas blocking parts 122 to prevent the waste gas from directly bypassing the adsorption medium and being discharged from the bottom of the activated carbon adsorption bed 101. A clean gas collection chamber is formed between the outer peripheral outlet surface 121 of the activated carbon adsorption bed 101 and the inner wall of the activated carbon adsorption-desorption box 100. The clean gas collection chamber is selectively connected to the main outlet pipe 202 through an outlet switching valve 206. Under normal adsorption conditions, the outlet switching valve 206 is open, and the gas purified by the activated carbon adsorption bed 101 enters the clean gas collection chamber from the outer peripheral outlet surface 121 and then gathers into the main outlet pipe 202.

[0066] The central gas distribution pipe 102 extends downward along the central region of the activated carbon adsorption bed 101. Several embedded gas distribution pipes 103 are arranged around the central gas distribution pipe 102 at intervals and are located between the central gas distribution pipe 102 and the outer peripheral gas outlet surface 121. The lower ends of the central gas distribution pipe 102 and the embedded gas distribution pipes 103 are both closed ends, and several gas distribution holes are provided on the pipe walls of both, so that the waste gas entering the corresponding pipe body enters the activated carbon adsorption bed 101 through the gas distribution holes.

[0067] Furthermore, the distance from at least some of the air distribution holes of the embedded air distribution pipe 103 to the outer peripheral air outlet surface 121 is less than the distance from the air distribution holes on the central air distribution pipe 102 to the outer peripheral air outlet surface 121. Therefore, when the waste gas enters the activated carbon adsorption bed 101 only through the central air distribution pipe 102, the waste gas flows from the area near the center of the adsorption bed to the outer peripheral air outlet surface 121. However, when the embedded air distribution pipe 103 participates in air distribution at the same time, at least some of the waste gas can directly enter from the embedded air distribution pipe 103 located inside the activated carbon adsorption bed 101, thereby changing the activated carbon adsorption area that this part of the waste gas needs to pass through to reach the outer peripheral air outlet surface 121.

[0068] The air distribution chamber 104 is located on the air inlet side of the central air distribution pipe 102 and several embedded air distribution pipes 103. Several embedded air distribution pipes 103 are all connected to the air distribution chamber 104, while the central air distribution pipe 102 and the air distribution chamber 104 are selectively connected through the inlet adjustment component 105.

[0069] The adsorption load detection element 106 is used to obtain adsorption load parameters that can characterize the adsorption load state of the corresponding activated carbon adsorption bed 101. The control component 205 receives the adsorption load parameters obtained by each adsorption load detection element 106 and adjusts the opening force condition of the corresponding inlet adjustment component 105 according to the corresponding adsorption load stage.

[0070] Preferably, the adsorption load detection element 106 can be a volatile organic compound (VOC) concentration detection element installed on the outlet side of the activated carbon adsorption-desorption chamber 100. The adsorption load parameter is determined based on the change of VOC concentration on the outlet side during operation. Alternatively, the VOC concentrations on the inlet and outlet sides of the adsorption chamber can be obtained separately, and the adsorption load state of the activated carbon adsorption bed 101 can be determined based on the concentration relationship between the two. When the adsorption load parameter reaches the first load threshold, it indicates that the corresponding activated carbon adsorption bed 101 has entered the later stage of the adsorption cycle. When it further reaches the second load threshold, it indicates that the corresponding activated carbon adsorption-desorption chamber 100 meets the conditions for exiting adsorption and undergoing desorption regeneration. The second load threshold is higher than the first load threshold. The specific values ​​of the first and second load thresholds can be determined based on the type of activated carbon, the type of organic matter to be treated, and the set emission requirements.

[0071] In this embodiment, each activated carbon adsorption-desorption box 100 adopts the same or basically the same structure. The "first activated carbon adsorption-desorption box" and the "second activated carbon adsorption-desorption box" are only used to distinguish adsorption boxes that are in different adsorption load stages or different adsorption states at a certain operating time. They do not mean that different adsorption boxes have fixed different mechanical structures, nor do they limit the fixed working order between multiple activated carbon adsorption-desorption boxes 100.

[0072] Example 2

[0073] Reference Figure 4 as well as Figures 6-10 Based on Example 1, this embodiment describes the specific structure of the inlet adjustment component 105 and the different adsorption states of the activated carbon adsorption-desorption box 100.

[0074] The inlet regulating assembly 105 includes a valve cover 111, an inlet valve plate 112, a linkage rod 113, a return spring 114, an excitation coil 115, a moving magnetic core 116, and a flow path switching sleeve 118. The valve cover 111 is located at the inlet end of the central air distribution pipe 102. The valve cover 111 is provided with a valve-controlled air inlet 117 corresponding to the main air inlet pipe 201. The linkage rod 113 is movably arranged along the axial direction of the central air distribution pipe 102. The inlet valve plate 112 is connected to the linkage rod 113 and is used to close or open the valve-controlled air inlet 117 as the linkage rod 113 moves.

[0075] The moving magnetic core 116 is mounted on the linkage rod 113, and the excitation coil 115 is installed on the top of the valve cover 111 and located on the outer periphery of the moving magnetic core 116. The return spring 114 applies a reset action to the linkage rod 113 to cause the intake valve plate 112 to tend to close the valve-controlled intake port 117. The excitation coil 115 changes the force conditions of the linkage rod 113 by changing the electromagnetic action acting on the moving magnetic core 116, thereby adjusting the opening force conditions of the inlet regulating component 105.

[0076] The intake valve plate 112 has a pressure-bearing surface that withstands exhaust gas pressure. The pressure difference between one side of the intake manifold 201 and the downstream side of the inlet regulating component 105 creates an opening action on the intake valve plate 112 in the opening direction. When the opening action is insufficient to overcome the reset action and the corresponding electromagnetic action, the intake valve plate 112 remains closed. When the opening action reaches the corresponding opening condition, the intake valve plate 112 moves the linkage rod 113 under the action of exhaust gas pressure. For example, if the effective pressure area borne by the intake valve plate 112 is A, and the pressure difference between the upstream and downstream sides of the inlet regulating component 105 is ΔP, then the opening action of the exhaust gas on the intake valve plate 112... The action is related to ΔP·A. The return spring 114 and the excitation coil 115 apply opposite forces to the linkage rod 113 through the moving magnetic core 116. The opening condition required for the linkage rod 113 to move from the closed position to the first open position is lower than the opening condition required to continue moving from the first open position to the second open position. By changing the excitation parameters of the excitation coil 115, the pressure conditions corresponding to the above two state transitions can be changed. When the first load threshold is reached, the excitation parameters are adjusted so that the current pressure condition is still sufficient to keep the intake valve plate 112 open, but insufficient to keep the linkage rod 113 in the second open position, thereby returning it to the first open position.

[0077] The flow path switching sleeve 118 is connected to the linkage rod 113 and is movably engaged with the central air distribution pipe 102. The central air distribution pipe 102 is provided with a central pipe connection port 119, and the flow path switching sleeve 118 is provided with a sleeve connection port 120. When the linkage rod 113 moves, it synchronously drives the flow path switching sleeve 118 to move, so that the central pipe connection port 119 and the sleeve connection port 120 form different relative positions.

[0078] Specifically, when the linkage rod 113 moves in the opening direction, the intake valve plate 112 first opens the valve-controlled intake port 117, while the central tube connection port 119 and the sleeve connection port 120 remain misaligned; when the linkage rod 113 moves further, the central tube connection port 119 and the sleeve connection port 120 at least partially overlap. Thus, the inlet regulating assembly 105 can sequentially form a closed position, a first open position, and a second open position, wherein the pressure required to transition from the closed state to the first open state is lower than the pressure required to further transition from the first open state to the second open state.

[0079] Reference Figure 8 When the linkage rod 113 is in the closed position, the intake valve plate 112 closes the valve-controlled intake port 117, and the corresponding activated carbon adsorption desorption box 100 does not accept the waste gas to be treated delivered by the intake manifold 201.

[0080] Reference Figure 9 as well as Figure 6When the exhaust gas pressure reaches the opening condition corresponding to the first opening state, the intake valve plate 112 moves to the first opening position along with the linkage rod 113, and the valve-controlled intake port 117 is opened; at this time, the central pipe connection port 119 and the sleeve connection port 120 are in a misaligned state, and the central gas distribution pipe 102 and the gas distribution chamber 104 are in a disconnected state. The exhaust gas entering the activated carbon adsorption desorption box 100 enters the activated carbon adsorption bed 101 through the gas distribution hole on the central gas distribution pipe 102, and flows from the central area to the outer peripheral gas outlet surface 121 to form the first adsorption state.

[0081] Since the embedded gas distribution pipe 103 does not participate in the adsorption and distribution in this state, the waste gas needs to pass through the corresponding activated carbon adsorption area during the process of flowing from the central area to the outer peripheral gas outlet surface 121, so that the first adsorption state is suitable for maintaining the corresponding effective adsorption depth in the later part of the adsorption cycle.

[0082] Reference Figure 10 as well as Figure 7 When the exhaust gas pressure further reaches the opening condition corresponding to the second opening state, the linkage rod 113 moves to the second opening position, the intake valve plate 112 still keeps the valve-controlled intake port 117 open, and at the same time the central pipe connection port 119 and the sleeve connection port 120 at least partially overlap, so that the central air distribution pipe 102 is connected to the air distribution chamber 104.

[0083] At this time, in addition to entering the activated carbon adsorption bed 101 through the air distribution holes on the central air distribution pipe 102, at least part of the waste gas entering the central air distribution pipe 102 can also enter the gas distribution chamber 104 through the central pipe connection port 119 and the sleeve connection port 120. Then, the gas distribution chamber 104 distributes it to several embedded air distribution pipes 103, and enters the activated carbon adsorption bed 101 through the air distribution holes on the embedded air distribution pipes 103 to form the second adsorption state.

[0084] Because the embedded gas distribution pipe 103 is located between the central gas distribution pipe 102 and the outer peripheral gas outlet surface 121, and at least some of the gas distribution holes on the embedded gas distribution pipe 103 are closer to the outer peripheral gas outlet surface 121 than the gas distribution holes on the central gas distribution pipe 102, the embedded gas distribution pipe 103, after participating in gas distribution, increases the flow path entering from inside the activated carbon adsorption bed 101. Under the same or equivalent conditions, the equivalent flow resistance of the activated carbon adsorption-desorption box 100 in the second adsorption state is less than that in the first adsorption state. The equivalent flow resistance mentioned in this invention refers to a parameter characterizing the flow capacity of the activated carbon adsorption-desorption box under the same or equivalent conditions of the activated carbon adsorption bed state and the inlet and outlet gas boundary conditions; under the same inlet and outlet pressure difference, the waste gas flow rate in the first adsorption state is less than that in the second adsorption state.

[0085] Thus, the same activated carbon adsorption-desorption box 100 can be in a closed state, a first open state, and a second open state, wherein the first open state corresponds to the first adsorption state, and the second open state corresponds to the second adsorption state.

[0086] Before the activated carbon adsorption bed 101 enters the later stage of the adsorption cycle, the corresponding activated carbon adsorption-desorption box 100 can be allowed to enter the second open state under the action of exhaust gas pressure, so as to use the central gas distribution pipe 102 and the embedded gas distribution pipe 103 to distribute gas together and improve the flow capacity of the corresponding adsorption box.

[0087] When the adsorption load parameter reaches the first load threshold but does not reach the second load threshold, the control component changes the excitation parameter of the corresponding excitation coil 115, thereby changing the opening force condition of the inlet regulating component 105 and ensuring that the current exhaust gas pressure is still sufficient to maintain the inlet regulating component 105 in the first open state, but insufficient to continue maintaining the second open state, thereby causing the linkage rod 113 to switch from the second open position to the first open position.

[0088] At this time, the intake valve plate 112 still keeps the valve-controlled intake port 117 open, while the central tube connection port 119 and the sleeve connection port 120 are re-misaligned, so that the central air distribution pipe 102 is isolated from the air distribution chamber 104, the embedded air distribution pipe 103 stops participating in adsorption and air distribution, and the corresponding activated carbon adsorption and desorption box 100 changes from the second adsorption state to the first adsorption state.

[0089] The aforementioned state transition is based on the adsorption load stage of the activated carbon adsorption bed 101, which actively changes the internal gas distribution path so that the waste gas entering the later stage of the adsorption cycle mainly enters the activated carbon adsorption bed 101 through the central gas distribution pipe 102 and flows to the outer peripheral gas outlet surface 121, thereby increasing the corresponding effective adsorption depth. At the same time, it increases the equivalent flow resistance of the adsorption box and reduces the risk of local premature penetration when the remaining adsorption capacity of the short-range adsorption area is insufficient.

[0090] Example 3

[0091] Reference Figures 5-7 as well as Figures 9-10 Based on the above embodiments, this embodiment describes the coordinated operation mode of multiple activated carbon adsorption-desorption boxes 100 under different waste gas treatment loads and different adsorption load stages.

[0092] For ease of explanation, using Figure 5Taking the four activated carbon adsorption-desorption chambers 100 shown as examples, they are respectively labeled #1, #2, #3 and #4. #1 to #4 are only used as physical location markers in the attached diagram and do not indicate that the corresponding activated carbon adsorption-desorption chambers 100 have a fixed adsorption priority. Any activated carbon adsorption-desorption chamber 100 can switch between the closed state, the first adsorption state, the second adsorption state and the desorption-regeneration state according to its adsorption load state and the change of the exhaust gas pressure in the main inlet pipe 201.

[0093] In the initial stage of device operation, the control component 205 can form different opening force conditions through the inlet regulating component 105, so that multiple activated carbon adsorption-desorption boxes 100 with the same or basically the same structure have different gas pressure response conditions. Whether each adsorption box actually participates in adsorption is not determined by the control component 205 directly issuing an opening command, but by whether the exhaust gas pressure in the main intake pipe 201 reaches the opening condition of the corresponding inlet regulating component 105.

[0094] When the amount of waste gas generated by industrial production is small, the waste gas pressure in the main inlet pipe 201 only reaches the opening condition of some activated carbon adsorption-desorption boxes 100. Therefore, one or a few activated carbon adsorption-desorption boxes 100 can participate in adsorption, while the remaining adsorption boxes remain closed. As the amount of waste gas increases, the waste gas pressure in the main inlet pipe 201 rises, and the other activated carbon adsorption-desorption boxes 100 that reach the corresponding opening conditions gradually participate in adsorption treatment.

[0095] For activated carbon adsorption-desorption box 100 whose adsorption load has not yet reached the first load threshold, when the exhaust gas pressure increases further, its inlet regulating component 105 can switch from the first open state to the second open state, so that the embedded gas distribution pipe 103 can participate in adsorption gas distribution. Therefore, when the industrial exhaust gas treatment volume increases, the system can not only expand the overall treatment capacity by increasing the number of adsorption boxes participating in the adsorption treatment, but also reduce the equivalent flow resistance of a single box by allowing the adsorption box in the normal adsorption stage to enter the second adsorption state, thereby achieving a joint adjustment of the number of participating boxes and the flow capacity of a single box.

[0096] To illustrate the working relationship between adsorption chambers at different adsorption loading stages, the following table can be used to understand the state at a typical operating moment:

[0097] Adsorption box Adsorption loading stage Inlet adjustment component status Corresponding adsorption state Operational function #1 The first load threshold has been reached, but the second load threshold has not been reached. First Opening State First adsorption state Adsorption continues in the latter part of the cycle #2 The first load threshold was not reached. Second Opening State Second adsorption state It undertakes the main waste gas treatment load #3 The first load threshold was not reached. First or second open state First or second adsorption state Based on the current waste gas volume and supplementary treatment capacity #4 Shutdown, standby, or regeneration complete. Closed Not involved in the current adsorption Retain subsequent callable processing capabilities

[0098] Taking the #1 adsorption box as an example, when its adsorption load parameter reaches the first load threshold but has not yet reached the second load threshold, it indicates that #1 has entered the later stage of the current adsorption cycle. At this time, #1 is not immediately closed, but the control component 205 changes the opening force condition of the corresponding inlet adjustment component 105, so that #1 changes from the second opening state to the first opening state under the action of the exhaust gas pressure in the intake manifold 201.

[0099] After the conversion, the valve-controlled air inlet 117 of #1 remains open, so #1 continues to participate in the waste gas adsorption treatment. However, its central air distribution pipe 102 and air distribution chamber 104 are isolated, and the embedded air distribution pipe 103 stops participating in normal adsorption and air distribution. #1 is converted from the second adsorption state to the first adsorption state.

[0100] In contrast, #2 has not yet reached the first load threshold and can remain in the second open state if the exhaust gas treatment demand allows, so that the central air distribution pipe 102 and the embedded air distribution pipe 103 participate in the air distribution at the same time. Since #1 is in the first adsorption state and #2 is in the second adsorption state, the equivalent flow resistance of #1 is greater than that of #2.

[0101] With #1 and #2 connected in parallel to the same intake manifold 201 and exhaust manifold 202, the two branches share common inlet and outlet pressure conditions. The difference in branch resistance causes the flow rate of exhaust gas flowing through #2 to be greater than that flowing through #1. Therefore, #1, which has already entered the later stage of the adsorption cycle, can still continue to utilize its remaining adsorption capacity with a limited flow rate, while the newly added or main exhaust gas is mostly handled by #2, which is still in the normal adsorption stage. This reduces the risk of premature penetration caused by a large amount of exhaust gas continuing to impact the late adsorption area of ​​#1.

[0102] When the volume of industrial waste gas increases further, the waste gas pressure in the intake manifold 201 can also cause #3 to reach the corresponding opening conditions and participate in adsorption; if #3 has not yet reached the first load threshold, it can also enter the second adsorption state when the waste gas pressure continues to increase. Thus, under high flow conditions, the system can form an operating combination such as "#1 first adsorption state + #2 second adsorption state + #3 second adsorption state", instead of making all adsorption boxes participating in adsorption enter the same flow state indiscriminately.

[0103] As operation continues, when the adsorption load parameter of #1 further reaches the second load threshold, #1 exits adsorption treatment and enters desorption regeneration; #2 and #3 continue to bear the corresponding waste gas treatment load. After the desorption regeneration of #1 is completed, it can re-form the capacity to participate in adsorption treatment and be put back into operation according to the subsequent operating conditions.

[0104] The states of multiple adsorption boxes can change over time as follows:

[0105] Operational phase #1 #2 #3 #4 Phase A Second adsorption state First / Second Adsorption State spare spare Phase B The first adsorption state continues adsorption in the latter part of the cycle. Second adsorption state Participate as needed spare Phase C Upon reaching the second load threshold, exit and de-adhere. Second adsorption state Second adsorption state or participation as needed spare Phase D Once regeneration is complete, it can be reused. When entering the later stage of the cycle, it transitions to the first adsorption state. Second adsorption state Participate as needed

[0106] The above states are only used to illustrate the cooperative operation relationship of multiple adsorption boxes, and do not limit #1 to #4 to adsorption or regeneration in a fixed order as shown in the table.

[0107] Through the above operating mode, the activated carbon adsorption-desorption chambers 100 at different adsorption load stages can have different flow states, reducing the situation where multiple adsorption chambers consume adsorption capacity synchronously under similar flow states for a long time. The adsorption chambers that enter the later stage of the adsorption cycle first switch to the first adsorption state to complete the current cycle. After reaching the second load threshold, they enter desorption and regeneration in sequence. This helps to stagger the adsorption, final utilization and regeneration processes of multiple adsorption chambers and continuously form treatment units with different remaining adsorption capacities during system operation.

[0108] Example 4

[0109] Reference Figures 1-5 This embodiment describes the desorption and regeneration process after the activated carbon adsorption-desorption box 100 exits the adsorption treatment, based on the above embodiments.

[0110] When the adsorption load parameter of a certain activated carbon adsorption-desorption chamber 100 reaches the second load threshold, the activated carbon adsorption-desorption chamber 100 exits the normal adsorption process between the inlet manifold 201 and the outlet manifold 202 and enters the desorption-regeneration state.

[0111] The desorption and regeneration system includes a desorption hot gas supply passage 301, a desorption exhaust passage 302, a catalytic oxidation treatment unit 303, a heat exchange unit 304, a desorption fan 305, and a desorption switching valve 306 installed on the corresponding desorption hot gas supply passage 301 and desorption exhaust passage 302.

[0112] During normal adsorption, the desorption switching valve 306 is closed, and the desorption hot gas supply passage 301 and the desorption exhaust passage 302 are isolated from the activated carbon adsorption desorption box 100 that needs to be adsorbed. When an activated carbon adsorption desorption box 100 enters the desorption regeneration state, the connection relationship of the desorption gas passage is changed by the corresponding desorption switching valve 306, and the exhaust switching valve 206 between the activated carbon adsorption desorption box 100 and the exhaust manifold 202 is closed. At this time, the desorption hot gas supply passage 301 is connected to the gas distribution chamber 104 of the activated carbon adsorption desorption box 100, and the desorption exhaust passage 302 is connected to the clean gas manifold of the activated carbon adsorption desorption box 100.

[0113] The desorption hot gas enters the gas distribution chamber 104 through the desorption hot gas supply passage 301, and then enters several embedded gas distribution pipes 103 from the gas distribution chamber 104. The gas is then distributed from the inside of the activated carbon adsorption bed 101 to the adsorption medium through the gas distribution holes on the pipe wall of the embedded gas distribution pipes 103. Since several embedded gas distribution pipes 103 are distributed inside the activated carbon adsorption bed 101, the desorption hot gas can enter the activated carbon adsorption bed 101 from multiple positions to desorb the organic components adsorbed in the activated carbon.

[0114] After the gas carrying the desorbed organic matter is discharged through the activated carbon adsorption bed 101, it enters the desorption exhaust passage 302 and is transported to the catalytic oxidation treatment unit 303 for further treatment. The heat exchange unit 304 is used for heat exchange between the desorption regeneration gas flow and the system heat. The desorption fan 305 is used to form the airflow circulation or transport power required in the desorption regeneration process. The above-mentioned catalytic oxidation and heat exchange processes can be implemented using existing technologies in the field, and will not be described in detail here.

[0115] In this embodiment, the gas distribution chamber 104 and the embedded gas distribution pipe 103 are not only used to reduce the equivalent flow resistance of the adsorption box in the second adsorption state, but also can be used as the internal gas distribution structure for desorption hot gas after the corresponding adsorption box exits normal adsorption, so that the same set of internal gas distribution structures serves the normal adsorption and desorption regeneration processes respectively.

[0116] After desorption and regeneration, the activated carbon adsorption desorption box 100 is restored to a state where it can participate in adsorption treatment, and its inlet regulating component 105 can regain the corresponding opening force conditions; when the exhaust gas pressure in the subsequent intake manifold 201 reaches the opening conditions of the inlet regulating component 105, the activated carbon adsorption desorption box 100 can re-enter the adsorption treatment process.

[0117] By sequentially removing the adsorption chambers that have reached the second load threshold from adsorption and performing desorption and regeneration, while other activated carbon adsorption and desorption chambers 100 maintain their respective adsorption working states, multiple adsorption chambers can form a rolling adsorption-final adsorption-desorption and regeneration-re-injection process, reducing the possibility of multiple adsorption chambers generating regeneration needs at similar times.

[0118] Working principle: After pretreatment, industrial waste gas enters the main inlet pipe 201. The waste gas pressure in the main inlet pipe 201 acts on the inlet regulating component 105 of each activated carbon adsorption-desorption box 100, so that the adsorption box that meets the corresponding opening conditions participates in adsorption treatment. As the waste gas volume increases, more adsorption boxes can be put into operation. At the same time, the adsorption boxes that have not yet entered the later stage of the adsorption cycle can enter the second adsorption state from the first adsorption state. In order to improve the system flow capacity by increasing the number of adsorption boxes and reducing the equivalent flow resistance of the corresponding adsorption boxes.

[0119] When the adsorption load parameter of a certain activated carbon adsorption-desorption box 100 reaches the first load threshold but not the second load threshold, the adsorption box does not immediately exit, but switches from the second adsorption state to the first adsorption state, so that the embedded gas distribution pipe 103 stops participating in normal adsorption and gas distribution, thereby increasing the effective adsorption depth when the waste gas flows from the central area to the outer peripheral outlet surface 121, and making it have a greater equivalent flow resistance relative to other parallel adsorption boxes that are still in the second adsorption state. This limits the waste gas flow rate undertaken by the adsorption box in the later part of the cycle, so that more waste gas is treated by the adsorption box with more sufficient remaining adsorption capacity. After the adsorption box reaches the second load threshold, it exits adsorption and performs desorption and regeneration.

[0120] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.

Claims

1. A multi-stage purification device for industrial waste gas treatment, characterized in that, It includes an intake manifold (201), an exhaust manifold (202), a control assembly (205), and multiple activated carbon adsorption-desorption boxes (100) arranged in parallel between the intake manifold (201) and the exhaust manifold (202). Each of the activated carbon adsorption-desorption boxes (100) includes an activated carbon adsorption bed (101), a central gas distribution pipe (102), several embedded gas distribution pipes (103), a gas distribution chamber (104), an inlet adjustment component (105), and an adsorption load detection component (106). The central gas distribution pipe (102) and several embedded gas distribution pipes (103) extend into the activated carbon adsorption bed (101). Several embedded gas distribution pipes (103) are distributed between the central gas distribution pipe (102) and the outer peripheral gas outlet surface (121) of the activated carbon adsorption bed (101), and several embedded gas distribution pipes (103) are connected to the gas distribution chamber (104). The inlet regulating component (105) is subjected to the exhaust gas pressure in the intake manifold (201) and has a closed state, a first open state and a second open state, and the opening force condition of the inlet regulating component (105) can be adjusted. In the first open state, the activated carbon adsorption-desorption box (100) is kept in the air intake, the central air distribution pipe (102) is isolated from the air distribution chamber (104), and the waste gas enters the activated carbon adsorption bed (101) through the central air distribution pipe (102) to form the first adsorption state; In the second open state, the activated carbon adsorption-desorption box (100) is kept in the air intake, and the central gas distribution pipe (102) is connected to the gas distribution chamber (104), so that part of the waste gas enters the activated carbon adsorption bed (101) through the gas distribution chamber (104) and the embedded gas distribution pipe (103) to form the second adsorption state; The equivalent flow resistance of the activated carbon adsorption-desorption box (100) under the first adsorption state is greater than that under the second adsorption state. The adsorption load detection element (106) is used to obtain the adsorption load parameters of the corresponding activated carbon adsorption bed (101), and the control component (205) is connected to the adsorption load detection element (106) and the inlet adjustment component (105). When the adsorption load parameter of the first activated carbon adsorption-desorption box (100) reaches the first load threshold but does not reach the second load threshold, the control component (205) adjusts the opening force condition of the corresponding inlet adjustment component (105) so that the first activated carbon adsorption-desorption box (100) is switched from the second open state to the first open state and continues to participate in adsorption treatment, wherein the second load threshold is higher than the first load threshold. When the first activated carbon adsorption-desorption box (100) and at least one second activated carbon adsorption-desorption box (100) whose adsorption load parameters have not reached the first load threshold participate in the adsorption treatment together, the first activated carbon adsorption-desorption box (100) is in the first adsorption state, and the second activated carbon adsorption-desorption box (100) is in the second adsorption state. When the adsorption load parameter of the first activated carbon adsorption-desorption box (100) reaches the second load threshold, the first activated carbon adsorption-desorption box (100) exits the adsorption process.

2. The multi-stage purification device for industrial waste gas treatment according to claim 1, characterized in that: The inlet adjustment assembly (105) includes a valve cover (111), an inlet valve plate (112), a linkage rod (113), a return spring (114), an excitation coil (115), and a moving magnetic core (116). The valve cover (111) is located at the inlet end of the central air distribution pipe (102) and is provided with a valve-controlled inlet (117). The inlet valve plate (112) and the moving magnetic core (116) are respectively connected to the linkage rod (113). The reset spring (114) applies a reset action to the linkage rod (113) to move the intake valve plate (112) toward closing the valve-controlled intake port (117). The excitation coil (115) is installed on the top of the valve cover (111) and arranged on the outer periphery of the moving magnetic core (116). The opening force condition of the inlet regulating component (105) is adjusted by changing the electromagnetic action acting on the moving magnetic core (116).

3. The multi-stage purification device for industrial waste gas treatment according to claim 2, characterized in that: The inlet adjustment assembly (105) also includes a flow path switching sleeve (118) connected to the linkage rod (113), and the flow path switching sleeve (118) is movably engaged with the central air distribution pipe (102); The central air distribution pipe (102) is provided with a central pipe connection port (119), and the flow path switching sleeve (118) is provided with a sleeve connection port (120). The flow path switching sleeve (118) moves with the linkage rod (113) so that the central pipe connection port (119) and the sleeve connection port (120) are misaligned or at least partially overlapped, thereby correspondingly isolating or connecting the central air distribution pipe (102) and the air distribution chamber (104).

4. The multi-stage purification device for industrial waste gas treatment according to claim 3, characterized in that: The linkage rod (113) has a closed position, a first open position and a second open position in sequence along its moving direction; In the closed position, the intake valve plate (112) closes the valve-controlled intake port (117). In the first open position, the intake valve plate (112) opens the valve-controlled intake port (117), and the central tube connection port (119) and the sleeve connection port (120) are misaligned. In the second open position, the intake valve plate (112) opens the valve-controlled intake port (117), and the central tube connection port (119) and the sleeve connection port (120) at least partially overlap.

5. A multi-stage purification device for industrial waste gas treatment according to any one of claims 1-4, characterized in that: The activated carbon adsorption bed (101) has an outer peripheral gas outlet surface (121), the central gas distribution pipe (102) extends along the central region of the activated carbon adsorption bed (101), and a plurality of the embedded gas distribution pipes (103) are distributed at intervals around the central gas distribution pipe (102). Both the inner air distribution pipe (103) and the central air distribution pipe (102) have air distribution holes on their pipe walls. The distance from at least some of the air distribution holes on the inner air distribution pipe (103) to the outer peripheral air outlet surface (121) is less than the distance from the air distribution holes on the central air distribution pipe (102) to the outer peripheral air outlet surface (121).

6. A multi-stage purification device for industrial waste gas treatment according to claim 5, characterized in that: The activated carbon adsorption bed (101) is provided with gas blocking parts (122) at the top and bottom. A clean gas collection cavity is formed between the outer peripheral gas outlet surface (121) of the activated carbon adsorption bed (101) and the inner wall of the activated carbon adsorption and desorption box (100). The clean gas collection cavity is connected to the main gas outlet pipe (202). The lower ends of the central air distribution pipe (102) and the embedded air distribution pipe (103) are both closed ends, so that the waste gas entering the central air distribution pipe (102) or the embedded air distribution pipe (103) enters the activated carbon adsorption bed (101) through the corresponding air distribution hole, and enters the clean gas collection cavity through the outer peripheral air outlet surface (121).

7. A multi-stage purification device for industrial waste gas treatment according to claim 2, characterized in that: The intake valve plate (112) has a pressure-bearing surface for bearing the exhaust gas pressure in the intake manifold (201). The exhaust gas pressure applies an opening action to the intake valve plate (112) in the opening direction. The return spring (114) and the excitation coil (115) provide a counteracting action to the linkage rod (113). The inlet regulating component (105) has a first opening pressure threshold corresponding to the transition from the closed state to the first open state. When the exhaust gas pressure in the intake manifold (201) reaches the first opening pressure threshold, the intake valve plate (112) transitions from the closed state to the first open state.

8. A multi-stage purification device for industrial waste gas treatment according to claim 7, characterized in that: The control component (205) sets the initial excitation parameters of the excitation coils (115) corresponding to at least two activated carbon adsorption-desorption boxes (100) respectively, so that the at least two activated carbon adsorption-desorption boxes (100) have different first opening pressure thresholds, so that when the exhaust gas pressure in the main intake pipe (201) reaches the corresponding first opening pressure threshold, the corresponding activated carbon adsorption-desorption box (100) is switched from the closed state to the first open state respectively.

9. A multi-stage purification device for industrial waste gas treatment according to claim 4, characterized in that: When the adsorption load parameter of the first activated carbon adsorption-desorption box (100) reaches the first load threshold but does not reach the second load threshold, the control component (205) changes the excitation parameter of the corresponding excitation coil (115), so that the opening force condition of the corresponding inlet adjustment component (105) changes, and the linkage rod (113) is switched from the second opening position to the first opening position under the combined action of the exhaust gas pressure in the intake manifold (201) and the reset action and electromagnetic action. When the linkage rod (113) is in the first open position, the valve-controlled air inlet (117) remains open, and the central air distribution pipe (102) is isolated from the air distribution chamber (104).

10. A multi-stage purification device for industrial waste gas treatment according to claim 6, characterized in that: The activated carbon adsorption-desorption box (100) also includes a desorption hot gas supply passage (301) selectively connected to the gas distribution chamber (104) and a desorption exhaust passage (302) connected to the clean gas manifold. When the corresponding activated carbon adsorption-desorption box (100) exits the adsorption process, the desorption hot gas supply passage (301) is connected to the gas distribution chamber (104), so that the desorption hot gas enters a plurality of the embedded gas distribution pipes (103) through the gas distribution chamber (104), and enters the activated carbon adsorption bed (101) through the gas distribution holes on the embedded gas distribution pipes (103), and the gas carrying the desorbed organic matter is discharged through the desorption exhaust passage (302).