A port cargo breaking device

By using a dual-stage crushing mechanism and a hydraulic telescopic rod to adjust the crushing gap, the problem of poor adaptability of existing equipment has been solved, enabling efficient crushing of diverse port cargoes and reducing the risk of failure and jamming.

CN123149013APending Publication Date: 2026-11-24龙口港集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611446962.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-17
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing port cargo crushing equipment cannot dynamically adjust the crushing gap and speed when dealing with diverse port cargo, resulting in incomplete crushing, jamming, and equipment wear, thus increasing the risk of failure.

Method used

The design employs a dual-stage crushing mechanism and a hydraulic telescopic rod to adjust the crushing gap. The first and second crushing mechanisms progressively refine port cargo, while the drive mechanism and controller adjust the crushing drum gap using the hydraulic telescopic rod, achieving adaptable crushing for different port cargoes.

Benefits of technology

It improves crushing capacity, reduces the jamming of large pieces of goods, lowers the risk of equipment failure, and enhances the applicability and operational stability of the crushing device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123149013A_ABST
    Figure CN123149013A_ABST
Patent Text Reader

Abstract

This application relates to a port cargo crushing device, belonging to the technical field of port crushing equipment. It includes a crushing shell with a feed inlet at the top and a discharge outlet at the bottom; a first crushing mechanism installed within the crushing shell for primary crushing of port cargo; a second crushing mechanism installed within the crushing shell for secondary crushing of port cargo; and a drive mechanism connected to the first and second crushing mechanisms for driving their operation. This application improves the crushing capacity of the port cargo crushing device and reduces the risk of device failure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of port crushing equipment, and in particular to a port cargo crushing device. Background Technology

[0002] In port bulk cargo loading, unloading and transshipment operations, port cargo crushing devices are core supporting equipment at the front end of the conveying system. They are used to break up the compacted port cargo formed by transportation and compaction, or to crush large pieces of bulk cargo into qualified particle sizes, so as to avoid port cargo from getting stuck in the conveying equipment and to ensure loading and unloading efficiency.

[0003] Existing port cargo crushing equipment is mostly of fixed configuration, typically designed for single-category bulk cargo, and can achieve stable crushing under specific operating conditions. However, port operations involve a diverse range of cargoes, including coal, ore, grain, and cement clinker, with significant differences in hardness, moisture content, agglomeration strength, and particle size requirements. Existing crushing equipment has fixed settings for crushing gap, rotation speed, and operating mode, making it impossible to dynamically adjust to port cargo conditions. This results in poor adaptability and a common problem of incomplete crushing: insufficient crushing force when handling high-hardness port cargo, difficulty in effectively crushing large pieces of port cargo, and incompletely crushed cargo is prone to jamming and wear on conveyor equipment, increasing the risk of malfunctions and maintenance costs. Summary of the Invention

[0004] In order to improve the crushing capacity of port cargo crushing equipment and reduce the risk of equipment failure, this application provides a port cargo crushing equipment.

[0005] This application provides a port cargo crushing device, which adopts the following technical solution: A port cargo crushing device, comprising: A crushing shell, wherein a feed inlet is provided at the top of the crushing shell and a discharge outlet is provided at the bottom of the crushing shell; The first crushing mechanism is installed inside the crushing housing and is used to perform initial crushing of port cargo. The second crushing mechanism is installed inside the crushing housing and is used to perform secondary crushing on port cargo. A drive mechanism is provided, in which the first crushing mechanism and the second crushing mechanism are connected, and the drive mechanism is used to drive the first crushing mechanism and the second crushing mechanism to work.

[0006] Optionally, the first crushing mechanism includes: Two first crushing rollers are symmetrically and rotatably installed inside the crushing housing; Two crushing spur gears are rotatably mounted on the side wall of the crushing housing. The two crushing spur gears are coaxial with and fixedly connected to the two first crushing drums respectively. The two crushing spur gears are meshed together, and one of the crushing spur gears is connected to the drive mechanism.

[0007] Optionally, the second crushing mechanism includes: Two first connecting rods are symmetrically arranged inside the crushing shell, and one end of each first connecting rod is rotatably mounted on the inner wall of the crushing shell. Two second connecting rods are symmetrically arranged inside the crushing shell. One end of each of the two second connecting rods is rotatably mounted on the inner wall of the crushing shell. The first connecting rod and the second connecting rod located on the same side are symmetrical to each other. Two second crushing rollers, one of which is symmetrically and rotatably mounted on two first connecting rods at both ends, and the other of which is symmetrically and rotatably mounted on two second connecting rods at both ends; A linkage assembly is provided on one of the first and second connecting rods located on the same side, the linkage assembly including: The third link, one end of which is rotatably mounted on the first link; The fourth link has one end rotatably connected to the end of the third link away from the first link, and the other end of the fourth link is rotatably mounted on the second link; A first transmission spur gear is rotatably mounted on the first connecting rod and is connected to the drive mechanism. The second transmission spur gear is rotatably mounted on the first connecting rod and meshes with the first transmission spur gear. The third transmission spur gear is rotatably mounted at the rotatable connection between the first connecting rod and the third connecting rod. The third transmission spur gear is coaxial with and fixedly connected to the second crushing drum rotatably mounted on the first connecting rod. The third transmission spur gear meshes with the second transmission spur gear. The fourth transmission spur gear is rotatably mounted on the third connecting rod and meshes with the third transmission spur gear. The fifth transmission spur gear is rotatably mounted at the rotatable connection between the third link and the fourth link, and the fifth transmission spur gear meshes with the fourth transmission spur gear. The sixth transmission spur gear is rotatably mounted on the second connecting rod. The sixth transmission spur gear meshes with the fifth transmission spur gear and is coaxially and fixedly connected to the second crushing drum mounted on the second connecting rod.

[0008] Optionally, the second crushing mechanism further includes two sets of hydraulic telescopic rods, which are symmetrically arranged inside the crushing housing, and the fixed ends of the two sets of hydraulic telescopic rods are rotatably mounted on the crushing housing; One set of the hydraulic telescopic rods is rotatably connected to the end of the first connecting rod away from the first transmission spur gear; The movable end of the other set of hydraulic telescopic rods is rotatably connected to one end of the second connecting rod; Both sets of hydraulic telescopic rods are electrically connected to a controller, which is capable of controlling the hydraulic telescopic rods.

[0009] Optionally, the drive mechanism includes a first motor, the fixed end of which is fixedly mounted on the crushing housing, and the output end of the first motor is coaxially and fixedly connected to one of the crushing spur gears.

[0010] Optionally, the drive mechanism further includes a second motor, the fixed end of which is fixedly mounted on the crushing shell, and the output end of which is coaxial with and fixedly connected to the first transmission spur gear.

[0011] Optionally, a funnel is fixedly installed inside the crushing shell, and the funnel is disposed between the first crushing drum and the second crushing drum.

[0012] Optionally, the first crushing drum shaft is perpendicular to the second crushing drum shaft.

[0013] Optionally, a screw conveyor is fixedly installed on the crushing shell, and the output port of the screw conveyor is connected to the crushing shell.

[0014] Optionally, a screen is fixedly installed inside the discharge port.

[0015] In summary, this application includes at least one of the following beneficial technical effects: 1. By progressively refining port cargo through the first and second crushing mechanisms, the crushing capacity of the port cargo crushing device is effectively improved, the situation of large oversized port cargo getting stuck in the equipment is reduced, and the risk of equipment malfunction is lowered. 2. After the initial crushing process, the port cargo enters the second crushing mechanism through a funnel. When the second crushing mechanism is working, it drives the first transmission spur gear to rotate through the drive mechanism, which in turn drives the two second crushing drums to rotate, completing the second crushing of the port cargo, improving the crushing capacity of the port cargo crushing device and reducing the risk of device failure. 3. The length of the hydraulic telescopic rod is controlled by the controller. When the hydraulic telescopic rod extends, it drives the first and second connecting rods to rotate closer to each other. This rotation of the first and second connecting rods towards each other causes the two second crushing rollers to move closer to each other, reducing the gap between the two crushing rollers. Conversely, when the controller controls the hydraulic telescopic rod to shorten, it drives the first and second connecting rods to rotate further apart from each other. This rotation of the first and second connecting rods towards each other causes the two second crushing rollers to move further apart, increasing the gap between the two crushing rollers. This allows for adjustment of the particle size of port cargo and improves the adaptability of the port cargo crushing device. Attached Figure Description

[0016] Figure 1 This is a structural schematic diagram of an embodiment of this application; Figure 2 This is a schematic diagram used to show the internal structure of the broken shell; Figure 3 This is a schematic diagram illustrating the structure of the second crushing mechanism; Figure 4 This is a structural diagram used to illustrate the first and second links.

[0017] Explanation of reference numerals in the attached figures: 1. Crushing shell; 11. Feed inlet; 12. Discharge outlet; 13. Funnel; 14. Screen; 2. First crushing mechanism; 21. First crushing drum; 22. Crushing spur gear; 3. Second crushing mechanism; 311. First connecting rod; 312. Second connecting rod; 313. Third connecting rod; 314. Fourth connecting rod; 32. Second crushing drum; 331. First transmission spur gear; 332. Second transmission spur gear; 333. Third transmission spur gear; 334. Fourth transmission spur gear; 335. Fifth transmission spur gear; 336. Sixth transmission spur gear; 34. Hydraulic telescopic rod; 4. Drive mechanism; 41. First motor; 42. Second motor; 5. Screw conveyor. Detailed Implementation

[0018] The following is in conjunction with the appendix Figure 1-4 This application will be described in further detail.

[0019] This application discloses a port cargo crushing device.

[0020] A port cargo crushing device includes a crushing shell 1, a first crushing mechanism 2, a second crushing mechanism 3, and a drive mechanism 4. The crushing shell 1 has a feed inlet 11 at its top and a discharge outlet 12 at its bottom. The first crushing mechanism 2 is installed inside the crushing shell 1 and is used for primary crushing of port cargo. The second crushing mechanism 3 is installed inside the crushing shell 1 and is used for secondary crushing of port cargo. The first and second crushing mechanisms 2 and 3 are connected to the drive mechanism 4, which drives the first and second crushing mechanisms 2 and 3 to operate.

[0021] By progressively refining port cargo through the first crushing mechanism 2 and the second crushing mechanism 3, the crushing capacity of the port cargo crushing device is effectively improved, the situation of large oversized port cargo getting stuck in the equipment is reduced, and the risk of equipment malfunction is lowered.

[0022] Furthermore, the first crushing mechanism 2 includes two first crushing rollers 21 and two crushing spur gears 22. The two first crushing rollers 21 are symmetrically and rotatably installed inside the crushing housing 1, and the two crushing spur gears 22 are rotatably installed on the side wall of the crushing housing 1. The two crushing spur gears 22 are coaxially and fixedly connected to the two first crushing rollers 21 respectively, and the two crushing spur gears 22 are meshed together. One of the crushing spur gears 22 is connected to the drive mechanism 4.

[0023] Port cargo falls through the feed inlet 11 between the two first crushing rollers 21. The drive mechanism 4 works and drives the crushing spur gear 22 to rotate. The rotation of the crushing spur gear 22 in turn drives the two first crushing rollers 21 to rotate. The rotation of the two first crushing rollers 21 crushes the port cargo, thus completing the initial crushing of the port cargo.

[0024] Furthermore, the second crushing mechanism 3 includes two first connecting rods 311, which are symmetrically arranged inside the crushing housing 1. One end of each of the two first connecting rods 311 is rotatably mounted on the inner wall of the crushing housing 1. Two second connecting rods 312 are symmetrically arranged inside the crushing housing 1, with one end of each of the two second connecting rods 312 rotatably mounted on the inner wall of the crushing housing 1. The first connecting rods 311 and the second connecting rods 312 located on the same side are symmetrical to each other.

[0025] Two second crushing rollers 32, one of which is symmetrically and rotatably mounted on two first connecting rods 311 at both ends, and the other is symmetrically and rotatably mounted on two second connecting rods 312 at both ends; A linkage assembly is provided on one of the first connecting rods 311 and 312 located on the same side. The linkage assembly includes: one end of a third connecting rod 313 is rotatably mounted on the first connecting rod 311; one end of a fourth connecting rod 314 is rotatably connected to the end of the third connecting rod 313 away from the first connecting rod 311; the other end of the fourth connecting rod 314 is rotatably mounted on the second connecting rod 312; a first transmission spur gear 331 is rotatably mounted on the first connecting rod 311 and is connected to the drive mechanism 4; a second transmission spur gear 332 is rotatably mounted on the first connecting rod 311 and meshes with the first transmission spur gear 331; and a third transmission spur gear 333 is rotatably mounted at the rotatable connection between the first connecting rod 311 and the third connecting rod 313. 3. The second crushing drum 32, which is rotatably mounted on the first connecting rod 311, is coaxial and fixedly connected. The third transmission spur gear 333 meshes with the second transmission spur gear 332. The fourth transmission spur gear 334 is rotatably mounted on the third connecting rod 313 and meshes with the third transmission spur gear 333. The fifth transmission spur gear 335 is rotatably mounted at the rotatable connection between the third connecting rod 313 and the fourth connecting rod 314 and meshes with the fourth transmission spur gear 334. The sixth transmission spur gear 336 is rotatably mounted on the second connecting rod 312 and meshes with the fifth transmission spur gear 335. The sixth transmission spur gear 336 is coaxial and fixedly connected with the second crushing drum 32 mounted on the second connecting rod 312.

[0026] Furthermore, the second crushing mechanism 3 also includes two sets of hydraulic telescopic rods 34, which are symmetrically arranged inside the crushing housing 1, and the fixed ends of the two sets of hydraulic telescopic rods 34 are rotatably mounted on the crushing housing 1. One set of hydraulic telescopic rods 34 has its movable end rotatably connected to the end of the first connecting rod 311 away from the first transmission spur gear 331; the other set of hydraulic telescopic rods 34 has its movable end rotatably connected to the end of the second connecting rod 312; both sets of hydraulic telescopic rods 34 are electrically connected to a controller, which can control the hydraulic telescopic rods 34.

[0027] After initial crushing, port cargo enters the second crushing mechanism 3 through hopper 13. When the second crushing mechanism 3 is working, the drive mechanism 4 drives the first transmission spur gear 331 to rotate. The rotation of the first transmission spur gear 331 drives the second transmission spur gear 332 to rotate. The rotation of the second transmission spur gear 332 drives the third transmission spur gear 333 to rotate. The rotation of the third transmission spur gear 333 drives the fourth transmission spur gear 334 to rotate. The rotation of the fourth transmission spur gear 334 drives the fifth transmission spur gear 335 to rotate. The rotation of the fifth transmission spur gear 335 drives the sixth transmission spur gear 336 to rotate. The rotation of the third transmission spur gear 333 and the sixth transmission spur gear 336 drives the two second crushing drums 32 to rotate, completing the second crushing of the port cargo, improving the crushing capacity of the port cargo crushing device and reducing the risk of device failure.

[0028] Simultaneously, the controller controls the length of the hydraulic telescopic rod 34. When the hydraulic telescopic rod 34 extends, it drives the first connecting rod 311 and the second connecting rod 312 to rotate closer together. This rotation, in turn, moves the two second crushing rollers 32 closer together, reducing the gap between them. Conversely, when the controller controls the hydraulic telescopic rod 34 to shorten, it drives the first connecting rod 311 and the second connecting rod 312 to rotate further apart. This rotation, in turn, moves the two second crushing rollers 32 further apart, increasing the gap between them. This allows for adjustment of the particle size of port cargo, improving the adaptability of the port cargo crushing device.

[0029] Furthermore, the drive mechanism 4 includes a first motor 41, the fixed end of the first motor 41 is fixedly mounted on the crushing housing 1, and the output end of the first motor 41 is coaxially and fixedly connected to one of the crushing spur gears 22 to drive the first crushing mechanism 2 to work.

[0030] Furthermore, the drive mechanism 4 also includes a second motor 42. The fixed end of the second motor 42 is fixedly installed on the crushing housing 1. The output end of the second motor 42 is coaxial with and fixedly connected to the first transmission spur gear 331 to drive the second crushing mechanism 3 to work.

[0031] Furthermore, a funnel 13 is fixedly installed inside the crushing shell 1. The funnel 13 is located between the first crushing drum 21 and the second crushing drum 32. The funnel 13 is used to receive port cargo after it has been crushed by the first crushing drum 21, and to gather and guide the falling port cargo so that the port cargo enters the crushing area of ​​the second crushing drum 32 evenly.

[0032] Furthermore, the shaft of the first crushing drum 21 is perpendicular to the shaft of the second crushing drum 32. This arrangement causes the directions of the two-stage crushing to intersect, creating a multi-directional crushing and shearing effect on the port cargo after the initial crushing. This avoids the generation of strip-shaped uncrushed material when the port cargo passes through a single roller gap direction, thereby improving the degree of crushing and the uniformity of the output particle size.

[0033] Furthermore, a screw conveyor 5 is fixedly installed on the crushing shell 1, and the output port of the screw conveyor 5 is connected to the crushing shell 1.

[0034] Furthermore, a screen 14 is fixedly installed inside the discharge port 12 to screen the port cargo after crushing. Qualified particle size material passes through the screen 14 and is discharged through the discharge port 12, while insufficiently crushed material with excessive particle size is intercepted by the screen 14 in the crushing shell 1 to wait for further crushing, ensuring that the output particle size is uniform and stable.

[0035] The implementation principle of a port cargo crushing device according to an embodiment of this application is as follows: the first crushing mechanism 2 is used to perform primary crushing of port cargo, and the second crushing mechanism 3 is installed inside the crushing shell 1 and is used to perform secondary crushing of port cargo. By refining port cargo step by step through the first crushing mechanism 2 and the second crushing mechanism 3, the crushing capacity of the port cargo crushing device is effectively improved, the situation of large oversized port cargo getting stuck in the equipment is reduced, and the risk of device malfunction is reduced.

[0036] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.

Claims

1. A port cargo crushing device, characterized in that, include: The crushing shell (1) has a feed inlet (11) at the top and a discharge outlet (12) at the bottom. The first crushing mechanism (2) is installed inside the crushing shell (1) and is used to perform initial crushing of port cargo. The second crushing mechanism (3) is installed inside the crushing housing (1) and is used to perform secondary crushing on port cargo. The drive mechanism (4) is connected to the first crushing mechanism (2) and the second crushing mechanism (3), and the drive mechanism (4) is used to drive the first crushing mechanism (2) and the second crushing mechanism (3) to work.

2. The port cargo crushing device according to claim 1, characterized in that, The first crushing mechanism (2) includes: Two first crushing rollers (21) are symmetrically and rotatably installed inside the crushing housing (1); Two crushing spur gears (22) are rotatably mounted on the side wall of the crushing housing (1). The two crushing spur gears (22) are coaxial with and fixedly connected to the two first crushing rollers (21) respectively. The two crushing spur gears (22) are meshed and connected. One of the crushing spur gears (22) is connected to the drive mechanism (4).

3. The port cargo crushing device according to claim 2, characterized in that, The second crushing mechanism (3) includes: Two first connecting rods (311) are symmetrically arranged inside the crushing shell (1), and one end of each first connecting rod (311) is rotatably mounted on the inner wall of the crushing shell (1). Two second connecting rods (312) are symmetrically arranged inside the crushing shell (1). One end of each of the two second connecting rods (312) is rotatably mounted on the inner wall of the crushing shell (1). The first connecting rod (311) and the second connecting rod (312) located on the same side are symmetrical to each other. Two second crushing rollers (32), one of which is symmetrically and rotatably mounted on two first connecting rods (311) at both ends, and the other of which is symmetrically and rotatably mounted on two second connecting rods (312) at both ends; A linkage assembly is provided on one of the first connecting rods (311) and the second connecting rod (312) located on the same side, the linkage assembly including: The third link (313) is rotatably mounted on the first link (311) at one end; The fourth link (314) has one end rotatably connected to the end of the third link (313) away from the first link (311), and the other end of the fourth link (314) is rotatably mounted on the second link (312); The first transmission spur gear (331) is rotatably mounted on the first connecting rod (311) and is connected to the drive mechanism (4). The second transmission spur gear (332) is rotatably mounted on the first connecting rod (311), and the second transmission spur gear (332) meshes with the first transmission spur gear (331). The third transmission spur gear (333) is rotatably mounted at the rotatable connection between the first connecting rod (311) and the third connecting rod (313). The third transmission spur gear (333) is coaxial with and fixedly connected to the second crushing drum (32) rotatably mounted on the first connecting rod (311). The third transmission spur gear (333) meshes with the second transmission spur gear (332). The fourth transmission spur gear (334) is rotatably mounted on the third connecting rod (313), and the fourth transmission spur gear (334) meshes with the third transmission spur gear (333). The fifth transmission spur gear (335) is rotatably mounted at the rotatable connection between the third connecting rod (313) and the fourth connecting rod (314), and the fifth transmission spur gear (335) meshes with the fourth transmission spur gear (334). The sixth transmission spur gear (336) is rotatably mounted on the second connecting rod (312). The sixth transmission spur gear (336) meshes with the fifth transmission spur gear (335). The sixth transmission spur gear (336) is coaxial with and fixedly connected to the second crushing drum (32) mounted on the second connecting rod (312).

4. The port cargo crushing device according to claim 3, characterized in that, The second crushing mechanism (3) also includes two sets of hydraulic telescopic rods (34). The two sets of hydraulic telescopic rods (34) are symmetrically arranged inside the crushing shell (1). The fixed ends of the two sets of hydraulic telescopic rods (34) are rotatably installed on the crushing shell (1). One of the hydraulic telescopic rods (34) has its movable end rotatably connected to the end of the first connecting rod (311) away from the first transmission spur gear (331); The movable end of the other set of hydraulic telescopic rods (34) is rotatably connected to one end of the second connecting rod (312); Both sets of the hydraulic telescopic rods (34) are electrically connected to a controller, which is capable of controlling the hydraulic telescopic rods (34).

5. The port cargo crushing device according to claim 2, characterized in that, The drive mechanism (4) includes a first motor (41), the fixed end of the first motor (41) is fixedly installed on the crushing shell (1), and the output end of the first motor (41) is coaxial with and fixedly connected to one of the crushing spur gears (22).

6. The port cargo crushing device according to claim 3, characterized in that, The drive mechanism (4) also includes a second motor (42), the fixed end of which is fixedly installed on the crushing shell (1), and the output end of the second motor (42) is coaxial with and fixedly connected to the first transmission spur gear (331).

7. The port cargo crushing device according to claim 4, characterized in that, A funnel (13) is fixedly installed inside the crushing shell (1), and the funnel (13) is located between the first crushing drum (21) and the second crushing drum (32).

8. The port cargo crushing device according to claim 4, characterized in that, The shaft of the first crushing drum (21) is perpendicular to the shaft of the second crushing drum (32).

9. The port cargo crushing device according to claim 1, characterized in that, A screw conveyor (5) is fixedly installed on the crushing shell (1), and the output port of the screw conveyor (5) is connected to the crushing shell (1).

10. The port cargo crushing device according to claim 1, characterized in that, A screen (14) is fixedly installed inside the discharge port (12).