A paint spraying device for wind power tower production
By introducing a path monitoring module and a painting module into the painting equipment used in the production of wind turbine towers, the distance between the paint spray head and the tower surface is automatically adjusted, solving the problem of uneven paint film thickness during the wind turbine tower painting process, and achieving consistency in coating thickness and improved painting quality.
Patent Information
- Application Number
- CN202611679187.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-28
- Publication Date
- 2026-11-24
AI Technical Summary
During the painting process, the diameter of wind turbine towers varies, resulting in uneven paint film thickness. Existing technologies cannot meet the requirements for consistent thickness of anti-corrosion coatings.
A painting device for wind turbine tower production was designed, including a track and a painting vehicle. The painting vehicle is equipped with a painting module and a path monitoring module. Through a photoelectric transmitter and receiver, in conjunction with a four-stage electric telescopic rod, the distance between the paint spray head and the tower surface is automatically adjusted to ensure a constant spraying distance and reduce film thickness differences.
It achieves consistency in paint mist flight distance and solvent evaporation during the painting process, significantly reduces the film thickness difference between the large-diameter end and the small-diameter end, meets the painting specifications, and ensures consistent coating thickness.
Smart Images

Figure CN123149083A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of spraying device technology, specifically relating to a spraying device for wind turbine tower production. Background Technology
[0002] As the core load-bearing component of wind turbine generators, wind turbine towers are exposed to the outdoor environment for a long time, facing severe corrosive conditions such as salt spray, humidity, temperature difference and sandstorms. In order to ensure the structural safety of the towers within their design life, their surfaces need to be painted. In existing technologies, because wind turbine towers have a gradually changing diameter, the distance between the spray nozzle and the tower changes continuously during painting, resulting in uneven paint film thickness. When the distance is too close, less solvent evaporates before the paint mist reaches the surface, resulting in a thicker paint film and defects such as sagging and orange peel. When the distance is too far, a large amount of solvent evaporates during the flight of the paint mist, and the kinetic energy of the paint droplets decreases, resulting in poor spreading upon reaching the surface and a thin and rough paint film. Since the diameters of different points on the conical surface are different, if the spray nozzle still moves along a fixed trajectory, there will inevitably be a significant difference in film thickness between the large-diameter end and the small-diameter end, making it difficult to meet the strict requirements for thickness consistency of anti-corrosion coatings. Summary of the Invention
[0003] The purpose of this invention is to provide a painting device for the production of wind turbine towers, so as to solve the problems mentioned in the background art.
[0004] To achieve the above objectives, the present invention provides the following technical solution: A painting apparatus for wind turbine tower production, comprising: The track and the paint spraying vehicle are located on top of the track. The paint spraying vehicle has a paint spraying module in the middle of the top of the paint spraying vehicle and a path monitoring module in front of the paint spraying vehicle. The painting module includes a vertical plate, a paint spray pipe, and a paint spray head. The vertical plate is connected to the middle of the front side of the top of the painting vehicle. The paint spray pipe is connected to the front side of the painting vehicle. The paint spray pipe has an L-shaped structure. The paint spray head is symmetrically connected to the end of the paint spray pipe away from the painting vehicle. The path monitoring module includes an assembly frame, which is located on the front side of the paint spraying vehicle.
[0005] Preferably, the painting module further includes a collection box, a box door, a support frame, a pump body, and a primary conduit. The collection box is located above the front side of the vertical plate, the box door is located on the collection box, the support frame is symmetrically connected to the bottom of the collection box, the pump body is connected to one side of the collection box by positioning bolts, and the primary conduit is connected between the pump body and the top of the collection box, and the primary conduit is connected to the inner cavity of the collection box. The box door facilitates personnel to clean the paint collected in the collection box. The inner wall of the end of the primary conduit away from the pump body is connected to a paint-blocking mesh, making it difficult for paint to enter the primary conduit. The paint spraying pipe enters through the bottom of the collection box and exits through the front of the collection box. The part of the paint spraying pipe located below the collection box is a telescopic flexible hose structure to prevent the paint spraying pipe from affecting the lifting and lowering of the collection box.
[0006] Preferably, the painting module further includes a recycling frame, a recycling trough, a circular hole, a primary hollow plate, a secondary hollow plate, a hollow ring, a secondary conduit, and a tertiary conduit. The recycling frame is located outside the two paint spray heads. The recycling trough is located on the front side of the recycling frame. The circular hole is located on the rear side of the recycling frame and is connected to the recycling trough. The primary hollow plate is connected to the rear side of the recycling frame, and its inner cavity is connected to the circular hole. The secondary hollow plates are symmetrically connected to both sides of the interior of the primary hollow plate, and their inner cavities are connected to the inner cavities of the primary hollow plate. The hollow ring is sleeved and connected to the outside of the paint spray pipe. The secondary conduit is symmetrically connected to the upper and lower sides of the hollow ring, and the end of the secondary conduit away from the hollow ring is connected to the secondary hollow plate. The support frame is connected to the secondary hollow plate below and the outer wall of the hollow ring respectively. The tertiary conduit is connected between the hollow ring and the collection box, and the tertiary conduit is connected to the inner cavity of the hollow ring and the inner cavity of the collection box respectively. During painting, the pump body uses the primary conduit to collect the paint mist scattered during painting through the recovery tank, round hole, primary hollow plate, secondary hollow plate, secondary conduit, hollow ring and tertiary conduit into the collection box, which is convenient for the staff to clean up later.
[0007] Preferably, the painting module further includes a top plate, a primary drive motor, a lifting groove, a sliding plate, a screw, a push hole, and a four-stage electric telescopic rod. The top plate is connected to the top of the vertical plate, the primary drive motor is connected to the top of the top plate via positioning bolts, the lifting groove is formed inside the vertical plate and extends through the vertical plate from front to back, the sliding plate is slidably fitted within the lifting groove, the lifting plate is located below the top plate, and the lifting plate is slidably fitted with the vertical plate and connected to the sliding plate. The top end of the screw is connected to the output end of the bottom of the primary drive motor. The bottom end of the screw passes through the top plate and the lifting plate in sequence, and is connected to the bearing of the paint spraying vehicle. The outer wall of the screw is threaded to the lifting plate through an external thread. The push hole is opened on the front side of the lifting plate, and the front end of the push hole passes through the sliding plate. The output end of the four-stage electric telescopic rod is connected to the collection box. The four-stage electric telescopic rod does not contact the screw, ensuring that the four-stage electric telescopic rod and the screw will not interfere with each other. The setting of the lifting groove and the sliding plate not only ensures that the lifting plate drives the collection box to rise and fall, but also ensures that the secondary receiver and the photoelectric transmitter are on the same horizontal plane when the bottom surface of the sliding plate contacts the vertical plate.
[0008] Preferably, the path monitoring module further includes a primary mounting frame, a primary electromagnet, a primary electric telescopic rod, a primary push plate, and a primary longitudinal rod. The primary mounting frame is located on the right side of the vertical plate, the primary electromagnet is embedded in the front right end of the paint spraying vehicle, the side of the primary mounting frame near the primary electromagnet is coated with a magnetic coating, the primary electric telescopic rod is connected to the rear side of the primary mounting frame, the primary push plate is located at the top front side of the primary mounting frame, the output end of the primary electric telescopic rod passes through the primary mounting frame and is connected to the primary push plate, the primary longitudinal rod is connected to the front side of the primary push plate, and the assembly frame is connected to the front end of the primary longitudinal rod. The opening of the assembly frame is designed to prevent the assembly frame from affecting the rotation of the moving plate.
[0009] Preferably, the path monitoring module further includes a rotating plate, a photoelectric transmitter, a stabilizing plate, stabilizing holes, and a secondary drive motor. The rotating plate is disposed within the assembly frame, the photoelectric transmitter is embedded on the left side of the rotating plate, the stabilizing plate is connected to the top center of the rotating plate, the stabilizing holes are symmetrically opened on the left side of the stabilizing plate, and the secondary drive motor is connected to the top of the assembly frame by positioning bolts. The bottom end of the output end of the secondary drive motor passes through the top of the assembly frame and is connected to the top center of the stabilizing plate. The rotating plate drives the secondary cylinder to rotate, thereby ensuring that the secondary cylinder is in contact with the wind turbine tower while the photoelectric transmitter is always facing the primary receiver.
[0010] Preferably, the path monitoring module further includes a secondary mounting bracket, a secondary electromagnet, a secondary electric telescopic rod, a secondary push plate, a secondary longitudinal rod, a base plate, an arc frame, a primary cylinder, a secondary cylinder, a primary receiver, a sleeve, a return spring, a tertiary electromagnet, and a sixth-level electromagnet. The secondary mounting bracket is located on the left side of the vertical plate, and the secondary electromagnet is embedded in the left front end of the paint spraying vehicle. The side of the secondary mounting bracket near the secondary electromagnet is coated with a magnetic coating. The secondary electric telescopic rod is connected to the rear side of the secondary mounting bracket. The secondary push plate is located at the top front side of the secondary mounting bracket. The output end of the secondary electric telescopic rod passes through the secondary mounting bracket and is connected to the secondary push plate. The secondary longitudinal rod is connected to the front side of the secondary push plate. The sleeve is slidably fitted onto the outer wall of the secondary longitudinal rod. The return spring is located inside the sleeve, and both ends of the return spring are respectively connected to the secondary longitudinal rod. The rod and sleeve are connected. The third-level electromagnet is embedded in the inner wall of the sleeve. The base plate is connected to the front end of the sleeve. The arc frame is connected to the front side of the base plate. The first-level cylinder is slidably fitted in the arc frame. The second-level cylinder is connected to the top of the first-level cylinder and is coaxial with the first-level cylinder. The first-level receiver is embedded on the right side of the cylinder and is on the same horizontal plane as the photoelectric transmitter. The sixth-level electromagnet is embedded in the top of the arc frame. The outer wall of the second-level longitudinal rod and the bottom surface of the second-level cylinder are coated with a magnetic coating. Under the action of the return spring, the sleeve can be pushed outward towards the wind turbine tower, so that the second-level cylinder always abuts against the wind turbine tower. When the second-level cylinder moves with the paint spraying truck, the oblique line formed between the photoelectric transmitter and the first-level receiver is always parallel to the outer inclined contour line of the wind turbine tower. The bottom end of the first-stage cylinder is connected to a limiting plate, which slides against the bottom of the arc frame to restrict the first-stage cylinder and works with the second-stage cylinder to prevent the first-stage cylinder from easily detaching from the arc frame. A gap is left between the recycling frame and the secondary cylinder.
[0011] Preferably, the path monitoring module further includes an equipment hole, a three-stage electric telescopic rod, a moving plate, and a stabilizing rod. The equipment hole is located on the right side of the secondary cylinder and is positioned above the primary receiver. The three-stage electric telescopic rod is located inside the equipment hole. The moving plate is located on the right side of the secondary cylinder, and the output end of the three-stage electric telescopic rod is connected to the moving plate. The stabilizing rod is symmetrically connected to the right side of the moving plate, and its right end slides into a stabilizing hole. When the end of the stabilizing rod is within the stabilizing hole, the rotation of the rotating plate can drive the secondary cylinder to rotate, thereby adjusting the straight line formed between the photoelectric transmitter and the primary receiver to be parallel to the inclined outline of the outer side of the wind turbine tower.
[0012] Preferably, the path monitoring module further includes a horizontal plate, a three-stage drive motor, an adjustment plate, and a secondary receiver. The horizontal plate is connected to the top of the recycling frame. The three-stage drive motor is connected to the top of the horizontal plate via positioning bolts. The adjustment plate is connected below the horizontal plate, and a gap is left between the adjustment plate and the paint spray head. The bottom end of the output shaft of the three-stage drive motor passes through the horizontal plate and is connected to the middle of the top of the adjustment plate. The secondary receiver is embedded in the middle of the right side of the adjustment plate. The three-stage drive motor causes the adjustment plate to rotate, thereby enabling the secondary receiver to align with the photoelectric transmitter.
[0013] Preferably, the path monitoring module further includes a reinforcing rod, an auxiliary plate, an auxiliary groove, a fourth-level electromagnet, and a fifth-level electromagnet. The reinforcing rod is equidistantly connected to the front side of the track. The auxiliary plate is located above the track, and the reinforcing rod is connected to the auxiliary plate by positioning bolts. The auxiliary plate has a T-shaped structure. The auxiliary groove passes horizontally through the first-level mounting frame and the second-level mounting frame, respectively. The auxiliary plate passes through the auxiliary groove and slides with the first-level mounting frame and the second-level mounting frame, respectively. The fourth-level electromagnet is embedded in the first-level mounting frame, and the fifth-level electromagnet is embedded in the second-level mounting frame. Both the fourth-level and fifth-level electromagnets are located behind the auxiliary groove. Activating the fourth-level and fifth-level electromagnets can magnetically fix the first-level and second-level mounting frames to the auxiliary plate, respectively, ensuring the stability of the recovery frame and the second-level cylinder during painting.
[0014] Compared with the prior art, the beneficial effects of the present invention are: This invention utilizes a spray painting module to spray paint from a paint spraying vehicle onto the outer wall of a wind turbine tower, performing a painting operation. In conjunction with a path monitoring module, it automatically adjusts the photoelectric transmitter, primary receiver, and secondary receiver to align their straight lines with the inclined contour line of the wind turbine tower's outer side. This, combined with a four-stage electric telescopic rod, provides real-time correction of the spray head, ensuring the spraying distance between the spray head and the wind turbine tower surface remains essentially constant along the entire spraying trajectory. Consequently, the flight distance of the paint mist upon reaching the surface, the degree of solvent evaporation, and the kinetic energy of the paint droplets are all kept relatively consistent. The difference in film thickness between the large-diameter and small-diameter ends is significantly reduced, and the coating thickness consistency meets painting specifications. This invention can automatically adapt to the inclined contour line of the wind turbine tower's outer side, automatically planning the painting path, ensuring the correction function, and guaranteeing painting quality. Attached Figure Description
[0015] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a front view of the present invention; Figure 3 This is a schematic diagram of the lifting plate of the present invention; Figure 4 This is a schematic diagram of the recycling frame of the present invention; Figure 5 This is a schematic diagram of the screw of the present invention; Figure 6 This is a schematic diagram of the secondary receiver of the present invention; Figure 7 This is a schematic diagram of the collection box of the present invention; Figure 8 This is a schematic diagram of the sliding plate of the present invention; Figure 9 This is a schematic diagram of the auxiliary groove of the present invention; Figure 10 This is a schematic diagram of the five-stage electromagnet of the present invention; Figure 11 This is a schematic diagram of the reset spring of the present invention; Figure 12 This is a schematic diagram of the three-stage electromagnet of the present invention; Figure 13 This is a schematic diagram of the rotating plate of the present invention; Figure 14 This is a schematic cross-sectional view of the collection box of the present invention; In the diagram: 10. Track; 20. Painted car; 30. Spray painting module; 301. Spray painting pipe; 302. Spray painting head; 303. Collection box; 304. Box door; 305. Support frame; 306. Pump body; 307. Primary conduit; 308. Recycling frame; 309. Recycling trough; 310. Round hole; 311. Primary hollow plate; 312. Secondary hollow plate; 313. Hollow ring; 314. Secondary conduit; 315. Tertiary conduit; 316. Top plate; 317. Primary drive motor; 318. Lifting trough; 319. Sliding plate; 320. Lifting plate; 321. Screw; 322. Push hole; 323. Quadruple electric telescopic rod; 324. Vertical plate; 40. Path monitoring module; 401. Assembly frame; 402. Primary mounting bracket; 403. Primary electromagnet; 404. Primary electric telescopic rod; 405. Primary push plate; 406. Primary longitudinal rod; 407. Rotating plate; 408. Photoelectric transmitter; 409. Stabilizing plate; 410. Stabilizing hole; 411. Secondary drive motor; 412. Secondary mounting bracket; 413. Secondary electromagnet; 414. Secondary electric telescopic rod; 415. Secondary push plate; 416. Secondary longitudinal rod; 417. Base plate; 418. Arc frame; 419. Primary cylinder; 420. Secondary cylinder; 421. Primary receiver; 422. Sleeve; 423. Return spring; 424. Tertiary electromagnet; 425. Hexa-level electromagnet; 426. Equipment hole; 427. Tertiary electric telescopic rod; 428. Moving plate; 429. Stabilizing rod; 430. Horizontal plate; 431. Tertiary drive motor; 432. Adjusting plate; 433. Secondary receiver; 434. Reinforcing rod; 435. Auxiliary plate; 436. Auxiliary groove; 437. Quaternary electromagnet; 438. Pentium-level electromagnet. Detailed Implementation
[0016] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0017] Example: Please see Figures 1-14 As shown, a painting device for wind turbine tower production includes: Track 10 and paint spraying vehicle 20, paint spraying vehicle 20 is located on top of track 10, paint spraying module 30 is located in the middle of the top of paint spraying vehicle 20, and path monitoring module 40 is located on the front of paint spraying vehicle 20. The painting module 30 includes a vertical plate 324, a paint spray pipe 301, and a paint spray head 302. The vertical plate 324 is connected to the middle of the front side of the top of the painting vehicle 20. The paint spray pipe 301 is connected to the front side of the painting vehicle 20. The paint spray pipe 301 has an L-shaped structure. The paint spray head 302 is symmetrically connected to the end of the paint spray pipe 301 away from the painting vehicle 20. The path monitoring module 40 includes an assembly frame 401, which is located on the front side of the paint spraying vehicle 20.
[0018] refer to Figures 1-7 and Figure 14As shown, the painting module 30 also includes a collection box 303, a box door 304, a support frame 305, a pump body 306, and a primary conduit 307. The collection box 303 is located above the front side of the vertical plate 324, the box door 304 is located on the collection box 303, the support frame 305 is symmetrically connected to the bottom of the collection box 303, the pump body 306 is connected to one side of the collection box 303 by positioning bolts, and the primary conduit 307 is connected between the pump body 306 and the top of the collection box 303, and the primary conduit 307 is connected to the inner cavity of the collection box 303. The box door 304 facilitates personnel to clean the paint collected in the collection box 303. A paint-blocking mesh is connected to the inner wall of the end of the primary conduit 307 away from the pump body 306, making it difficult for paint to enter the primary conduit 307. The paint spraying pipe 301 enters through the bottom of the collection box 303 and exits through the front of the collection box 303. The part of the paint spraying pipe 301 located below the collection box 303 is a telescopic flexible hose structure to prevent the paint spraying pipe 301 from affecting the raising and lowering of the collection box 303.
[0019] refer to Figures 1-7 and Figure 14 As shown, the painting module 30 also includes a recycling frame 308, a recycling trough 309, a circular hole 310, a primary hollow plate 311, a secondary hollow plate 312, a hollow ring 313, a secondary conduit 314, and a tertiary conduit 315. The recycling frame 308 is located outside the two paint spray heads 302. The recycling trough 309 is located in front of the recycling frame 308. The circular hole 310 is located behind the recycling frame 308 and is connected to the recycling trough 309. The primary hollow plate 311 is connected to the rear of the recycling frame 308, and its inner cavity is connected to the circular hole 310. The secondary hollow plate 312 is symmetrically connected to both sides of the interior of the primary hollow plate 311, and its inner cavity is connected to the inner cavity of the primary hollow plate 311. The hollow ring 313 is sleeved and connected to the outer wall of the paint spray tube 301. The secondary conduit 314 is symmetrically connected to the upper and lower sides of the hollow ring 313, and the end of the secondary conduit 314 away from the hollow ring 313 is connected to the secondary hollow plate 312. The support frame 305 is connected to the secondary hollow plate 312 and the outer wall of the hollow ring 313 located below. The tertiary conduit 315 is connected between the hollow ring 313 and the collection box 303, and the tertiary conduit 315 is connected to the inner cavity of the hollow ring 313 and the inner cavity of the collection box 303. During painting, the pump body 306 collects the paint mist scattered during painting through the primary conduit 307, through the recovery tank 309, the round hole 310, the primary hollow plate 311, the secondary hollow plate 312, the secondary conduit 314, the hollow ring 313, and the tertiary conduit 315, and collects it into the collection box 303 for easy collection and cleaning by staff.
[0020] refer to Figures 1-5 and Figure 8As shown, the painting module 30 also includes a top plate 316, a primary drive motor 317, a lifting groove 318, a sliding plate 319, a lifting plate 320, a screw 321, a push hole 322, and a four-stage electric telescopic rod 323. The top plate 316 is connected to the top of the vertical plate 324. The primary drive motor 317 is connected to the top of the top plate 316 via positioning bolts. The lifting groove 318 is opened inside the vertical plate 324 and extends through the vertical plate 324 from front to back. The sliding plate 319 is slidably fitted inside the lifting groove 318. The lifting plate 320 is located below the top plate 316 and is slidably fitted with the vertical plate 324. The lifting plate 320 is connected to the sliding plate 319. The top end of the screw 321 is connected to the output end of the bottom of the primary drive motor 317. The bottom end of 21 passes through the top plate 316 and the lifting plate 320 in sequence, and is connected to the bearing of the paint spraying machine 20. The outer wall of the screw 321 is threaded to the lifting plate 320 through the external thread. The push hole 322 is opened on the front side of the lifting plate 320, and the front end of the push hole 322 passes through the sliding plate 319. The output end of the four-stage electric telescopic rod 323 is connected to the collection box 303. The four-stage electric telescopic rod 323 does not contact the screw 321, ensuring that the four-stage electric telescopic rod 323 and the screw 321 will not interfere with each other. The setting of the lifting groove 318 and the sliding plate 319 not only ensures that the lifting plate 320 drives the collection box 303 to rise and fall, but also ensures that the secondary receiver 433 and the photoelectric transmitter 408 are on the same horizontal plane when the bottom surface of the sliding plate 319 contacts the vertical plate 324.
[0021] refer to Figures 1-5 , Figure 9 and Figure 13 As shown, the path monitoring module 40 also includes a primary mounting frame 402, a primary electromagnet 403, a primary electric telescopic rod 404, a primary push plate 405, and a primary longitudinal rod 406. The primary mounting frame 402 is located on the right side of the vertical plate 324. The primary electromagnet 403 is embedded in the front right end of the paint spraying vehicle 20. The side of the primary mounting frame 402 near the primary electromagnet 403 is coated with a magnetic coating. The primary electric telescopic rod 404 is connected to the rear side of the primary mounting frame 402. The primary push plate 405 is located at the top front side of the primary mounting frame 402. The output end of the primary electric telescopic rod 404 passes through the primary mounting frame 402 and is connected to the primary push plate 405. The primary longitudinal rod 406 is connected to the front side of the primary push plate 405. The assembly frame 401 is connected to the front end of the primary longitudinal rod 406. The opening of the assembly frame 401 can prevent the assembly frame 401 from affecting the rotation of the moving plate 428.
[0022] refer to Figures 1-5 and Figure 9 and Figure 11As shown, the path monitoring module 40 also includes a rotating plate 407, a photoelectric transmitter 408, a stabilizing plate 409, a stabilizing hole 410, and a secondary drive motor 411. The rotating plate 407 is located inside the assembly frame 401. The photoelectric transmitter 408 is embedded on the left side of the rotating plate 407. The stabilizing plate 409 is connected to the top center of the rotating plate 407. The stabilizing holes 410 are symmetrically opened on the left side of the stabilizing plate 409. The secondary drive motor 411 is connected to the top of the assembly frame 401 by positioning bolts. The bottom end of the output end of the secondary drive motor 411 passes through the top of the assembly frame 401 and is connected to the top center of the stabilizing plate 409. The rotating plate 407 drives the secondary cylinder 420 to rotate, thereby ensuring that the secondary cylinder 420 is in contact with the wind turbine tower while the photoelectric transmitter 408 is always facing the primary receiver 421.
[0023] refer to Figures 1-5 and Figures 9-11As shown, the path monitoring module 40 also includes a secondary mounting bracket 412, a secondary electromagnet 413, a secondary electric telescopic rod 414, a secondary push plate 415, a secondary longitudinal rod 416, a base plate 417, an arc frame 418, a primary cylinder 419, a secondary cylinder 420, a primary receiver 421, a sleeve 422, a return spring 423, a tertiary electromagnet 424, and a sixth-level electromagnet 425. The secondary mounting bracket 412 is located on the left side of the vertical plate 324, and the secondary electromagnet 413 is embedded in the front left end of the paint spraying vehicle 20. The side of the bracket 412 closest to the secondary electromagnet 413 is coated with a magnetic coating. The secondary electric telescopic rod 414 is connected to the rear side of the secondary mounting bracket 412. The secondary push plate 415 is located at the top front side of the secondary mounting bracket 412. The output end of the secondary electric telescopic rod 414 passes through the secondary mounting bracket 412 and is connected to the secondary push plate 415. The secondary longitudinal rod 416 is connected to the front side of the secondary push plate 415. The sleeve 422 is slidably sleeved on the outer wall of the secondary longitudinal rod 416. The return spring 423 is located inside the sleeve 422. Both ends are connected to the secondary longitudinal rod 416 and the sleeve 422 respectively. The tertiary electromagnet 424 is embedded in the inner wall of the sleeve 422 and connected to the rear bottom plate 417 at the front end of the sleeve 422. The arc frame 418 is connected to the front side of the bottom plate 417. The primary cylinder 419 is slidably fitted in the arc frame 418. The secondary cylinder 420 is connected to the top of the primary cylinder 419 and is coaxial with the primary cylinder 419. The primary receiver 421 is embedded on the right side of the cylinder and is positioned with the photoelectric transmitter 408. On the same horizontal plane, the sixth-level electromagnet 425 is embedded in the top of the arc frame 418. The outer wall of the second-level longitudinal rod 416 and the bottom surface of the second-level cylinder 420 are coated with a magnetic coating. Under the action of the return spring 423, the sleeve 422 can be pushed outward towards the wind turbine tower, so that the second-level cylinder 420 always abuts against the wind turbine tower. When the second-level cylinder 420 moves with the paint spraying vehicle 20, it ensures that the oblique line formed between the photoelectric transmitter 408 and the first-level receiver 421 is always parallel to the inclined outline of the outer side of the wind turbine tower. A limiting plate is connected to the bottom of the primary cylinder 419. The limiting plate slides and fits on the bottom of the arc frame 418 to restrict the primary cylinder 419. Together with the secondary cylinder 420, it makes it difficult for the primary cylinder 419 to detach from the arc frame 418. A gap is left between the recycling box 308 and the secondary cylinder 420.
[0024] refer to Figures 1-5 , Figure 9 , Figure 10 and Figure 13As shown, the path monitoring module 40 also includes an equipment hole 426, a three-stage electric telescopic rod 427, a moving plate 428, and a stabilizing rod 429. The equipment hole 426 is located on the right side of the secondary cylinder 420 and is above the primary receiver 421. The three-stage electric telescopic rod 427 is located inside the equipment hole 426. The moving plate 428 is located on the right side of the secondary cylinder 420, and the output end of the three-stage electric telescopic rod 427 is connected to the moving plate 428. The stabilizing rod 429 is symmetrically connected to the right side of the moving plate 428. The right end of the stabilizing rod 429 is slidably fitted into the stabilizing hole 410. When the end of the stabilizing rod 429 is inside the stabilizing hole 410, the rotation of the rotating plate 407 can drive the secondary cylinder 420 to rotate, thereby adjusting the straight line formed between the photoelectric transmitter 408 and the primary receiver 421 to a state parallel to the inclined outline of the outer side of the wind turbine tower.
[0025] refer to Figures 1-7 As shown, the path monitoring module 40 also includes a horizontal plate 430, a three-stage drive motor 431, an adjustment plate 432, and a secondary receiver 433. The horizontal plate 430 is connected to the top of the recycling frame 308. The three-stage drive motor 431 is connected to the top of the horizontal plate 430 by positioning bolts. The adjustment plate 432 is connected below the horizontal plate 430, and there is a gap between the adjustment plate 432 and the paint spray head 302. The bottom end of the output shaft of the three-stage drive motor 431 passes through the horizontal plate 430 and is connected to the top middle of the adjustment plate 432. The secondary receiver 433 is embedded in the middle right side of the adjustment plate 432. The three-stage drive motor 431 causes the adjustment plate 432 to rotate, so that the secondary receiver 433 can be aligned with the photoelectric transmitter 408.
[0026] refer to Figures 1-5 , Figure 9 , Figure 10 and Figure 13 As shown, the path monitoring module 40 also includes a reinforcing rod 434, an auxiliary plate 435, an auxiliary groove 436, a fourth-level electromagnet 437, and a fifth-level electromagnet 438. The reinforcing rod 434 is equidistantly connected to the front side of the track 10. The auxiliary plate 435 is located above the track 10, and the reinforcing rod 434 is connected to the auxiliary plate 435 by positioning bolts. The auxiliary plate 435 has a T-shaped structure. The auxiliary groove 436 transversely penetrates the first-level mounting bracket 402 and the second-level mounting bracket 412, respectively. The auxiliary plate 435 penetrates the auxiliary groove 436, and the auxiliary plate 435 is respectively... The fourth-stage electromagnet 437 is embedded in the first-stage mounting bracket 402 and the fifth-stage electromagnet 438 is embedded in the second-stage mounting bracket 412, and both the fourth-stage electromagnet 437 and the fifth-stage electromagnet 438 are located behind the auxiliary slot 436. When the fourth-stage electromagnet 437 and the fifth-stage electromagnet 438 are opened, the first-stage mounting bracket 402 and the second-stage mounting bracket 412 can be magnetically fixed to the auxiliary plate 435 respectively, so as to ensure the stability of the recycling frame 308 and the second-stage cylinder 420 during painting.
[0027] The working principle of this invention is as follows: Before painting, the device is placed at the large-diameter end of the wind turbine tower to be painted. The first-stage electric telescopic rod 404 is activated. The output end of the first-stage electric telescopic rod 404 drives the first-stage push plate 405 and the assembly frame 401 to move closer to the wind turbine tower. When the assembly frame 401 contacts the wind turbine tower, it cannot move further. The first-stage electric telescopic rod 404 transmits a signal to the external terminal. The external terminal receives the signal and controls the first-stage electric telescopic rod 404 to close. The second-stage electric telescopic rod 414, the photoelectric transmitter 408, and the first-stage receiver 421 are activated. The output end of the second-stage electric telescopic rod 414 drives the second-stage push plate 415 and the cylinder to move closer to the wind turbine tower. When the first-stage receiver 421 receives the light signal emitted by the photoelectric transmitter 408, it transmits the signal to the external terminal. The external terminal receives the signal and controls the second-stage electric telescopic rod 414 to close. The third-stage electric telescopic rod 427 is activated. The output end drives the moving plate 428 and the stabilizing rod 429 to move towards the assembly frame 401. When the end of the stabilizing rod 429 moves into the stabilizing hole 410, the stabilizing plate 409 blocks the stabilizing rod 429 from moving further. The three-stage electric telescopic rod 427 sends a signal to the peripheral terminal. The peripheral terminal receives the signal and controls the three-stage electric telescopic rod 427 and the six-stage electromagnet 425 to close, while the two-stage drive motor 411 opens. The two-stage drive motor 411 drives the output shaft to rotate the rotating plate 407. Under the action of the stabilizer bar 429, the secondary cylinder 420 is driven to rotate. The secondary cylinder 420 is restricted by the primary cylinder 419 and the limiting plate to ensure that the secondary cylinder 420 can only rotate around the output shaft of the secondary drive motor 411. When the secondary cylinder 420 contacts the wind turbine tower, the straight line between the contact point between the assembly frame 401 and the wind turbine tower and the contact point between the secondary cylinder 420 and the wind turbine tower is consistent with the inclined contour line of the outer wall of the wind turbine tower, thus completing the matching of the painting path of the device. When the secondary cylinder 420 contacts the wind turbine tower, it cannot continue to rotate. At this time, the primary receiver 421 still receives the light signal emitted by the photoelectric transmitter 408. The output shaft of the secondary drive motor 411 cannot continue to rotate, the secondary drive motor 411 shuts down, and sends a signal to the peripheral terminal. The peripheral terminal receives the signal and controls the sixth-stage electromagnet 425 to open, magnetically fixing the secondary cylinder 420 and the arc frame 418, and causing the output end of the third-stage electric telescopic rod 427 to retract, causing the stabilizing rod 429 to disengage from the stabilizing hole 410. After the output end of the third-stage electric telescopic rod 427 is fully retracted, the moving plate 428 cannot move further. The third-stage electric telescopic rod 427 sends a signal to the peripheral terminal, which receives the signal and controls the third-stage electric telescopic rod 427, the primary electromagnet 403, the third-stage electromagnet 424, and the fifth-stage electromagnet 438 to close. The power system of the paint spraying vehicle 20 is turned on. Due to the opening of the fourth-stage electromagnet 437... This allows the primary mounting bracket 402 to be magnetically fixed to the auxiliary plate 435, and the closure of the fifth-level electromagnet 438 allows the secondary mounting bracket 412 to slide on the auxiliary plate 435. The closure of the primary electromagnet 403 releases the magnetic fixation between the primary mounting bracket 402 and the paint spraying vehicle 20. The closure of the tertiary electromagnet 424 releases the magnetic fixation between the sleeve 422 and the secondary longitudinal rod 416. Driven by the power system, the paint spraying vehicle 20 moves on the track 10, causing the secondary mounting bracket 412 and the secondary cylinder 420 to move towards the smaller diameter end of the wind turbine tower. Under the action of the return spring 423, the sleeve 422 can be pushed outward towards the wind turbine tower, so that the secondary cylinder 420 always abuts against the wind turbine tower. When the secondary cylinder 420 moves with the paint spraying vehicle 20, the oblique line formed between the photoelectric transmitter 408 and the primary receiver 421 is always parallel to the outer inclined contour line of the wind turbine tower. When the secondary cylinder 420 contacts the flange at the small-diameter end of the wind turbine tower, the secondary cylinder 420 cannot move further, thus preventing the paint truck 20 from moving further. The paint truck 20 sends a signal to the external terminal, which receives the signal and controls the paint truck 20's power system and secondary electromagnet 413 to shut down, while the primary drive motor 317 turns on. The shutdown of the secondary electromagnet 413 releases the magnetic attraction between the secondary mounting bracket 412 and the paint truck 20. The primary drive motor 317 then drives the screw 321 to rotate, thereby causing the lifting plate 32... The sliding plate 319 descends, causing the recovery frame 308 to descend as well. When the bottom surface of the sliding plate 319 contacts the vertical plate 324, the sliding plate 319 can no longer descend. At this point, the secondary receiver 433 and the photoelectric transmitter 408 are on the same horizontal plane, the screw 321 can no longer rotate, the primary drive motor 317 shuts down, and sends a signal to the peripheral terminal. The peripheral terminal receives the signal and controls the fourth-stage electric telescopic rod 323 to open. The output end of the fourth-stage electric telescopic rod 323 drives the collection box 303 and the recovery frame 308 towards the wind turbine tower. When the recovery frame 308 contacts the wind turbine tower, it can no longer move. The distance between the photoelectric transmitter 408 and the right side of the assembly is the same as the distance between the secondary receiver 433 and the right side of the recovery frame 308, ensuring that the secondary receiver 433 is on the straight line formed by the photoelectric transmitter 408 and the primary receiver 421. At this point, the output of the fourth-stage electric telescopic rod 323 can no longer drive the recovery frame 308 to move. The fourth-stage electric telescopic rod 323 transmits a signal to the external terminal, which receives the signal and controls the four... When the first-stage electric telescopic rod 323 is closed, the third-stage drive motor 431 and the second-stage receiver 433 are opened. The third-stage drive motor 431 drives the output shaft to rotate the adjustment plate 432. When the second-stage receiver 433 is facing the photoelectric transmitter 408, the second-stage receiver 433 receives the light signal emitted by the photoelectric transmitter 408. The second-stage receiver 433 transmits the signal to the peripheral terminal. The peripheral terminal receives the signal and controls the third-stage drive motor 431 to close and the third-stage electromagnet 424, the fifth-stage electromagnet 438 and the first-stage electric telescopic rod 404 to open. The activation of the third-stage electromagnet 424 magnetically fixes the sleeve 422 to the second-stage longitudinal rod 416. The activation of the fifth-stage electromagnet 438 magnetically fixes the second-stage mounting bracket 412 to the auxiliary plate 435. The output end of the first-stage electric telescopic rod 404 retracts, causing the assembly frame 401 to move away from the wind turbine tower. When the output end of the first-stage electric telescopic rod 404 is fully retracted, the assembly frame 401 can no longer move. The first-stage electric telescopic rod 404 sends a signal to the external terminal. The external terminal receives the signal and controls the first-stage electric telescopic rod 404 to close. The first-stage drive motor 317 activates, and the output end of the first-stage drive motor 317 drives the screw 321 to rotate in the opposite direction, thereby causing the lifting plate 320, the collection frame, and the recovery frame 308 to rise. When the top surface of plate 319 contacts vertical plate 324, sliding plate 319 cannot continue to rise, screw 321 cannot continue to rotate in the opposite direction, primary drive motor 317 shuts down and sends a signal to peripheral terminal. Peripheral terminal receives the signal and controls secondary electric telescopic rod 414 to open. The output end of secondary electric telescopic rod 414 retracts, driving secondary cylinder 420 to move away from wind turbine tower. When primary receiver 421 receives the light signal emitted by photoelectric transmitter 408 again, it indicates that the straight line formed between photoelectric transmitter 408 and primary receiver 421 is parallel to the inclined outline of the outer side of wind turbine tower. Primary receiver 421 sends a signal to peripheral terminal. Peripheral terminal receives the signal and controls secondary electric telescopic rod 414 to close, primary drive motor 317 to open. The primary drive motor 317 drives the screw 321 to rotate, thereby causing the lifting plate 320 and the recovery frame 308 to descend. When the bottom surface of the sliding plate 319 contacts the vertical plate 324, the sliding plate 319 can no longer descend. At this time, the secondary receiver 433 receives the light signal emitted by the photoelectric transmitter 408 again, and the screw 321 can no longer rotate. The primary drive motor 317 shuts down and sends the signal to the peripheral terminal. The peripheral terminal receives the signal and controls the spray... The paint truck 20, along with its power supply, painting system, and pump body 306, is activated. The paint truck 20 moves from the small-diameter end of the wind turbine tower towards the large-diameter end. The painting system of the paint truck 20, through the paint pipe 301 and paint head 302, sprays paint in a mist onto the outer wall of the wind turbine tower. The pump body 306, through the primary conduit 307, collects the scattered paint mist from the painting process via the recovery tank 309, round hole 310, primary hollow plate 311, secondary hollow plate 312, secondary conduit 314, hollow ring 313, and so on. The primary conduit 315 is recycled into the collection box 303 for easy subsequent centralized cleaning by staff. As the paint spraying truck 20 continues to move horizontally, its horizontal movement path intersects with the inclined outline of the outer side of the wind turbine tower. Therefore, during this painting operation, the paint spray head 302 will gradually approach the wind turbine tower. When the secondary receiver 433 is no longer on the straight line formed by the photoelectric transmitter 408 and the primary receiver 421, the secondary receiver 433 will not receive the light signal emitted by the photoelectric transmitter 408. The secondary receiver 433 will transmit the signal to the peripheral terminal. The peripheral terminal will receive the signal and control the fourth-stage electric telescopic rod 323 to open. The output end of the fourth-stage electric telescopic rod 323 will drive the collection frame and the recycling frame 308 to move away from the wind turbine tower. When the secondary receiver 433 receives the light signal emitted by the photoelectric transmitter 408 again, the secondary receiver 433 will transmit the signal to the peripheral terminal. The peripheral terminal will receive the signal and control the fourth-stage electric telescopic rod 323 to close. When the recycling frame 308 contacts the assembly frame 401, the recycling frame 308 cannot move further, thus preventing the paint spraying truck 20 from moving further. The paint spraying truck 20 transmits a signal to the peripheral terminal, which receives the signal and controls the power system of the paint spraying truck 20 to drive it in the opposite direction. Therefore, during this reverse movement, the paint spray head 302 gradually moves away from the wind turbine tower. Thus, when the secondary receiver 433 is no longer on the straight line formed by the photoelectric transmitter 408 and the primary receiver 421, the secondary receiver 433 cannot receive the light signal emitted by the photoelectric transmitter 408. The signal is transmitted to the peripheral terminal, which receives the signal and controls the four-stage electric telescopic rod 323 to open. The output end of the four-stage electric telescopic rod 323 drives the collection frame and the recovery frame 308 to move towards the wind turbine tower. When the secondary receiver 433 receives the light signal emitted by the photoelectric transmitter 408 again, the secondary receiver 433 transmits the signal to the peripheral terminal, which receives the signal and controls the four-stage electric telescopic rod 323 to close, thereby realizing the correction of the paint spray head 302, so that the paint spray head 302 can always maintain its consistent distance with the wind turbine tower and ensure the painting effect. When the painting operation on the wind turbine tower is completed, the operator shuts off the power and painting system of the paint truck 20 and the pump 306, and turns on the primary drive motor 317. The output of the primary drive motor 317 drives the screw 321 to rotate in the opposite direction, causing the lifting plate 320 and the recovery frame 308 to rise. When the top surface of the sliding plate 319 contacts the vertical plate 324, the sliding plate 319 can no longer rise, the screw 321 can no longer rotate, the primary drive motor 317 shuts off, and sends a signal to the external terminal. The external terminal receives the signal and controls the power system of the paint truck 20 to start, causing the paint truck 20 to move towards the primary mounting frame 402. When the paint truck 20 contacts the primary mounting frame 402, the paint truck 20 can no longer move. The paint spraying truck 20 transmits a signal to the peripheral terminal, which in turn transmits the signal back to itself. The peripheral terminal receives the signal and sequentially controls the primary electromagnet 403, the paint spraying truck 20's power system to start, and the quaternary electromagnet 437 to stop. The starting of the primary electromagnet 403 magnetically fixes the primary mounting bracket 402 to the paint spraying truck 20. The stopping of the quaternary electromagnet 437 releases the magnetic fixation between the primary mounting bracket 402 and the auxiliary plate 435. The paint spraying truck 20 moves towards the secondary mounting bracket 412. When the paint spraying truck 20 contacts the secondary mounting bracket 412, it cannot move further. The paint spraying truck 20 then transmits a signal to the peripheral terminal, which receives the signal and controls the tertiary electric telescopic rod 427, the secondary electromagnet 413, and the quaternary electromagnet 437 to stop. When magnet 437 is activated, the output end of the three-stage electric telescopic rod 427 drives the moving plate 428 and the stabilizing rod 429 to move, so that the end of the stabilizing rod 429 is once again within the stabilizing hole 410. When the stabilizing rod 429 can no longer move, the three-stage electric telescopic rod 427 sends a signal to the peripheral terminal. The peripheral terminal receives the signal and controls the three-stage electric telescopic rod 427, the six-stage electromagnet 425 to close, and the two-stage drive motor 411 to open. The output end of the two-stage drive motor 411 drives the rotating plate 407 and the two-stage cylinder 420 to rotate in the opposite direction. When the first-stage cylinder 419 rotates and moves to the end of the arc frame 418 near the base plate 417, the first-stage cylinder 419 can no longer rotate and move, the two-stage drive motor 411 closes, and sends a signal to the peripheral terminal. The peripheral terminal receives the signal and controls the sixth-stage electromagnet 425 to open, the third-stage electric telescopic rod 427 to open, and the output end of the third-stage electric telescopic rod 427 to retract, causing the stabilizing rod 429 to disengage from the stabilizing hole 410. When the output end of the third-stage electric telescopic rod 427 is fully retracted, the third-stage electric telescopic rod 427 transmits a signal to the peripheral terminal. The peripheral terminal receives the signal and controls the third-stage electric telescopic rod 427 to close, and the second-stage electric telescopic rod 414 to open. The output end of the second-stage electric telescopic rod 414 drives the second-stage cylinder 420 to move away from the wind turbine tower. When the output end of the second-stage electric telescopic rod 414 is fully retracted, the second-stage cylinder 420 can no longer move, and the second-stage electric telescopic rod 414 transmits a signal to the peripheral terminal, which receives the signal.The system controls the secondary electric telescopic rod 414 to close. Then, the operator closes the tertiary electromagnet 424, releasing the magnetic attraction between the sleeve 422 and the secondary longitudinal rod 416. The sleeve 422 is then pushed, bringing it into contact with the secondary push plate 415. Upon contact, the tertiary electromagnet 424 is activated, magnetically securing the sleeve 422 to the secondary longitudinal rod 416, thus completing the device's reset.
[0028] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A painting device for wind turbine tower production, characterized in that, include: The track (10) and the paint spraying vehicle (20) are located on the top of the track (10). The paint spraying vehicle (20) is provided with a paint spraying module (30) in the middle of the top of the paint spraying vehicle (20) and a path monitoring module (40) is provided on the front side of the paint spraying vehicle (20). The painting module (30) includes a vertical plate (324), a paint pipe (301), and a paint head (302). The vertical plate (324) is connected to the middle of the front side of the top of the painting vehicle (20). The paint pipe (301) is connected to the front side of the painting vehicle (20). The paint pipe (301) has an L-shaped structure. The paint head (302) is symmetrically connected to the end of the paint pipe (301) away from the painting vehicle (20). The path monitoring module (40) includes an assembly frame (401) located on the front side of the paint spraying vehicle (20).
2. The painting device for wind turbine tower production according to claim 1, characterized in that: The painting module (30) also includes a collection box (303), a box door (304), a support frame (305), a pump body (306), and a primary conduit (307). The collection box (303) is located above the front side of the vertical plate (324). The box door (304) is located on the collection box (303). The support frame (305) is symmetrically connected to the bottom of the collection box (303). The pump body (306) is connected to one side of the collection box (303) by positioning bolts. The primary conduit (307) is connected between the pump body (306) and the top of the collection box (303), and the primary conduit (307) is connected to the inner cavity of the collection box (303). A paint-blocking mesh is connected to the inner wall of the end of the primary conduit (307) away from the pump body (306); The paint spraying tube (301) enters through the bottom of the collection box (303) and exits through the front side of the collection box (303). The part of the paint spraying tube (301) located below the collection box (303) is a telescopic flexible hose structure.
3. The painting device for wind turbine tower production according to claim 2, characterized in that: The painting module (30) further includes a recycling frame (308), a recycling trough (309), a circular hole (310), a primary hollow plate (311), a secondary hollow plate (312), a hollow ring (313), a secondary conduit (314), and a tertiary conduit (315). The recycling frame (308) is located outside the two paint spray heads (302). The recycling trough (309) is located in front of the recycling frame (308). The circular hole (310) is located behind the recycling frame (308) and is connected to the recycling trough (309). The primary hollow plate (311) is connected to the rear of the recycling frame (308), and the inner cavity of the primary hollow plate (311) is connected to the circular hole (310). The secondary hollow plate (312) is symmetrically connected to the primary hollow plate (315). The hollow plate (311) is located on both sides inside, and the inner cavity of the secondary hollow plate (312) is connected to the inner cavity of the primary hollow plate (311). The hollow ring (313) is sleeved and connected to the outer wall of the paint spray pipe (301). The secondary conduit (314) is symmetrically connected to the upper and lower sides of the hollow ring (313), and the end of the secondary conduit (314) away from the hollow ring (313) is connected to the secondary hollow plate (312). The support frame (305) is connected to the outer wall of the secondary hollow plate (312) and the hollow ring (313) located below. The tertiary conduit (315) is connected between the hollow ring (313) and the collection box (303), and the tertiary conduit (315) is connected to the inner cavity of the hollow ring (313) and the inner cavity of the collection box (303).
4. The painting device for wind turbine tower production according to claim 3, characterized in that: The painting module (30) also includes a top plate (316), a primary drive motor (317), a lifting groove (318), a sliding plate (319), a lifting plate (320), a screw (321), a push hole (322), and a four-stage electric telescopic rod (323). The top plate (316) is connected to the top of the vertical plate (324). The primary drive motor (317) is connected to the top of the top plate (316) by positioning bolts. The lifting groove (318) is opened in the vertical plate (324) and extends through the vertical plate (324) from front to back. The sliding plate (319) is slidably fitted in the lifting groove (318). The lifting plate (320) is located below the top plate (316). In this configuration, the lifting plate (320) and the vertical plate (324) are slidably fitted together, and the lifting plate (320) is connected to the sliding plate (319). The top end of the screw (321) is connected to the output end of the bottom of the first-stage drive motor (317). The bottom end of the screw (321) passes through the top plate (316) and the lifting plate (320) in sequence, and is connected to the bearing of the paint spraying machine (20). The outer wall of the screw (321) is threadedly connected to the lifting plate (320) through the external thread. The push hole (322) is opened on the front side of the lifting plate (320), and the front end of the push hole (322) passes through the sliding plate (319). The output end of the fourth-stage electric telescopic rod (323) is connected to the collection box (303).
5. A painting device for wind turbine tower production according to claim 4, characterized in that: The path monitoring module (40) further includes a primary mounting bracket (402), a primary electromagnet (403), a primary electric telescopic rod (404), a primary push plate (405), and a primary longitudinal rod (406). The primary mounting bracket (402) is located on the right side of the vertical plate (324). The primary electromagnet (403) is embedded in the front right end of the paint spraying vehicle (20). The side of the primary mounting bracket (402) near the primary electromagnet (403) is coated with a magnetic coating. The primary electric telescopic rod (404) is connected to the rear side of the primary mounting bracket (402). The primary push plate (405) is located at the top front side of the primary mounting bracket (402). The output end of the primary electric telescopic rod (404) passes through the primary mounting bracket (402) and is connected to the primary push plate (405). The primary longitudinal rod (406) is connected to the front side of the primary push plate (405). The assembly frame (401) is connected to the front end of the primary longitudinal rod (406).
6. A painting device for wind turbine tower production according to claim 5, characterized in that: The path monitoring module (40) also includes a rotating plate (407), a photoelectric emitter (408), a stabilizing plate (409), a stabilizing hole (410), and a secondary drive motor (411). The rotating plate (407) is located inside the assembly frame (401). The photoelectric emitter (408) is embedded on the left side of the rotating plate (407). The stabilizing plate (409) is connected to the top center of the rotating plate (407). The stabilizing hole (410) is symmetrically opened on the left side of the stabilizing plate (409). The secondary drive motor (411) is connected to the top of the assembly frame (401) by positioning bolts. The bottom end of the output end of the secondary drive motor (411) passes through the top of the assembly frame (401) and is connected to the top center of the stabilizing plate (409).
7. A painting device for wind turbine tower production according to claim 6, characterized in that: The path monitoring module (40) also includes a secondary mounting bracket (412), a secondary electromagnet (413), a secondary electric telescopic rod (414), a secondary push plate (415), a secondary longitudinal rod (416), a base plate (417), an arc frame (418), a primary cylinder (419), a secondary cylinder (420), a primary receiver (421), a sleeve (422), a return spring (423), a tertiary electromagnet (424), and a sixth-level electromagnet (425). The secondary mounting bracket (412) is located on the left side of the vertical plate (324). On the side, the secondary electromagnet (413) is embedded in the front left end of the paint spraying vehicle (20). The secondary mounting bracket (412) is coated with a magnetic coating on the side near the secondary electromagnet (413). The secondary electric telescopic rod (414) is connected to the rear side of the secondary mounting bracket (412). The secondary push plate (415) is located at the top front side of the secondary mounting bracket (412). The output end of the secondary electric telescopic rod (414) passes through the secondary mounting bracket (412) and is connected to the secondary push plate (415). The secondary longitudinal rod (416) is connected to the second... On the front side of the push plate (415), the sleeve (422) is slidably sleeved on the outer wall of the secondary longitudinal rod (416), the return spring (423) is disposed inside the sleeve (422), and the two ends of the return spring (423) are respectively connected to the secondary longitudinal rod (416) and the sleeve (422), the tertiary electromagnet (424) is embedded in the rear side of the inner wall of the sleeve (422), the base plate (417) is connected to the front end of the sleeve (422), the arc frame (418) is connected to the front side of the base plate (417), and the primary cylinder (419) The secondary cylinder (420) is connected to the top of the primary cylinder (419) and is coaxial with the primary cylinder (419). The primary receiver (421) is embedded on the right side of the cylinder and is on the same horizontal plane as the photoelectric transmitter (408). The sixth-level electromagnet (425) is embedded on the top of the arc frame (418). The outer wall of the secondary longitudinal rod (416) and the bottom surface of the secondary cylinder (420) are coated with a magnetic coating. The bottom end of the primary cylinder (419) is connected to a limiting plate, which slides against the bottom of the arc frame (418); A gap is left between the recycling box (308) and the secondary cylinder (420).
8. A painting device for wind turbine tower production according to claim 7, characterized in that: The path monitoring module (40) further includes a device hole (426), a three-stage electric telescopic rod (427), a moving plate (428), and a stabilizing rod (429). The device hole (426) is located on the right side of the secondary cylinder (420) and is above the primary receiver (421). The three-stage electric telescopic rod (427) is located inside the device hole (426). The moving plate (428) is located on the right side of the secondary cylinder (420) and the output end of the three-stage electric telescopic rod (427) is connected to the moving plate (428). The stabilizing rod (429) is symmetrically connected to the right side of the moving plate (428), and the right end of the stabilizing rod (429) is slidably fitted into the stabilizing hole (410).
9. A painting device for wind turbine tower production according to claim 4, characterized in that: The path monitoring module (40) also includes a horizontal plate (430), a three-stage drive motor (431), an adjustment plate (432), and a secondary receiver (433). The horizontal plate (430) is connected to the top of the recycling box (308). The three-stage drive motor (431) is connected to the top of the horizontal plate (430) by positioning bolts. The adjustment plate (432) is connected below the horizontal plate (430), and there is a gap between the adjustment plate (432) and the paint spray head (302). The bottom end of the output shaft of the three-stage drive motor (431) passes through the horizontal plate (430) and is connected to the middle of the top of the adjustment plate (432). The secondary receiver (433) is embedded in the middle of the right side of the adjustment plate (432).
10. A painting device for wind turbine tower production according to claim 7, characterized in that: The path monitoring module (40) also includes a reinforcing rod (434), an auxiliary plate (435), an auxiliary groove (436), a fourth-level electromagnet (437), and a fifth-level electromagnet (438). The reinforcing rod (434) is equidistantly connected to the front side of the track (10). The auxiliary plate (435) is located above the track (10), and the reinforcing rod (434) is connected to the auxiliary plate (435) by positioning bolts. The auxiliary plate (435) has a T-shaped structure, and the auxiliary groove (436) passes horizontally through the first-level safety gate. Mounting bracket (402), secondary mounting bracket (412), auxiliary plate (435) penetrates auxiliary groove (436), and auxiliary plate (435) slides with primary mounting bracket (402) and secondary mounting bracket (412) respectively. The fourth-level electromagnet (437) is embedded in primary mounting bracket (402), and the fifth-level electromagnet (438) is embedded in secondary mounting bracket (412). The fourth-level electromagnet (437) and the fifth-level electromagnet (438) are both located behind auxiliary groove (436).