Speed reducer intelligent coating line and speed reducer intelligent coating method
By combining intelligent coating lines with RFID technology, the problems of high spraying difficulty, large film thickness range, and low space utilization of conveyor lines in the coating process of speed reducers have been solved, realizing efficient and intelligent multi-variety coating production.
Patent Information
- Application Number
- CN202611220677.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-12
- Publication Date
- 2026-11-24
AI Technical Summary
The coating process for speed reducers presents challenges such as high spraying difficulty, large film thickness range, low space utilization of conveyor lines, and low production efficiency. In particular, when multiple types of workpieces are coated on the same line, the switching of conveyor lines is complex, resulting in low energy utilization.
The intelligent coating line is adopted, and the coating operation area is controlled by a central control system. It uses an accumulation-type overhead conveyor, elevator and RFID carrier to realize the automated loading and unloading of workpieces and information management. Combined with spraying robots and multi-station cleaning and drying rooms, it realizes automatic switching and efficient spraying of different specifications and models.
It improves the space utilization rate of the hanging area on the conveyor line, the energy utilization rate and production efficiency of the coating production line, ensures the coating quality of different types of reducers, and realizes efficient coating of multi-variety mixed production line.
Smart Images

Figure CN123149095A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to an intelligent coating line and intelligent coating method for speed reducers, belonging to the field of speed reducer coating technology. Background Technology
[0002] In industrial production, coating is a crucial step in product manufacturing. Coating enhances the rust and corrosion resistance of workpieces, improves their appearance quality, and significantly extends their lifespan. Coating typically involves three basic processes: surface treatment, painting, and drying. Coating production lines usually use accumulator chains to transport workpieces to various workstations, forming a continuous coating operation. However, in gearbox coating, due to the numerous pre-drilled holes, low temperature resistance, and difficulty in heating, coupled with the varying film thicknesses (ranging from 40μm to 320μm) between different gearbox models, machine spraying cannot achieve such wide film thicknesses. Therefore, gearboxes are now mostly coated manually using overhead chains.
[0003] Furthermore, there are many specifications and models of speed reducers. Some have surface oxidation and corrosion that require repainting, while others are new machines being painted for the first time. However, since there are no specific loading specifications on the painting line, when multiple types of workpieces are mixed and painted on the same line, the workpieces have different conveying routes on the conveyor line due to different painting requirements. Manual operation is still required on the painting line to switch the painting routes for different specifications and types of products, resulting in low space utilization in the hanging area on the conveyor line, which also affects the energy utilization and production efficiency of the painting production line. Summary of the Invention
[0004] The intelligent coating line for speed reducers provided by this invention forms a complete process from workpiece loading, coating, and unloading, realizing automatic switching of coating lines for different specifications and types of products, forming intelligent coating operations, and improving the space utilization rate of the hanging area on the conveyor line, the energy utilization rate of the coating production line, and the production efficiency. This invention also provides an intelligent coating method for speed reducers.
[0005] To achieve the above objectives, the technical solution adopted by the present invention is as follows: The intelligent coating line for speed reducers, controlled by a central control system, includes a coating operation area and an accumulating overhead conveyor line erected above the coating operation area via steel supports. An upper-part conveyor line is installed at the upper-part station of the coating operation area to transport workpieces to the coating operation area, and a lower-part conveyor line is installed at the lower-part station to output workpieces from the coating operation area. The load trolley of the accumulating overhead conveyor line is equipped with a coating lifting device capable of lifting the workpieces. Its distinguishing feature is: It also includes an upper part hanger for hoisting workpieces onto the upper part area chain line, and a lower part hanger for hoisting workpieces away from the lower part area chain line; The accumulating overhead conveyor line has an upper part track section located directly above the upper part plate chain line and a lower part track section located directly above the lower part plate chain line. The upper part track section and the lower part track section are respectively mounted on two elevators and are disengaged from or connected to the accumulating overhead conveyor line as the elevators rise and fall. The painting work area includes a sandblasting section, a pretreatment section, a painting section, and a manual repair station; The load trolley is equipped with an RFID carrier for recording information of the workpiece on the current painting hanger. The loading station is equipped with an information input area for storing workpiece information in the RFID carrier. Readers are set up at the loading track section, unloading track section, entrance of the pre-processing section, and entrance of the painting section to read information from the RFID carrier. The workpiece information includes workpiece model, pre-processing program, spraying color, and the workpiece's conveying route in the painting operation area. The load trolley runs along the accumulating overhead conveyor line according to the workpiece information, transporting the workpieces on the painting hanger to each section for corresponding process operations.
[0006] Optionally, the painting hoist is mounted on the load-bearing beam of the load trolley. The painting hoist includes a connector connected to the load-bearing beam, an electric turntable capable of 360-degree horizontal rotation and locking function every 90 degrees of rotation, and a lifting chain mounted on the bottom surface of the electric turntable and capable of being connected to the workpiece.
[0007] Optionally, the upper and lower part conveyor belts are horizontally arranged belt-type or roller-type conveyor belts. The upper and lower part hangers have the same structure, including a hanger spanning across the upper or lower part conveyor belt, a linear guide rail mounted horizontally on the hanger, and upper and lower part hangers mounted on the slider of the linear guide rail and capable of connecting with the workpiece. The direction of the linear guide rail is perpendicular to the conveying direction of the upper and lower part conveyor belts.
[0008] Optionally, a loading buffer area is set up between the loading station and the pretreatment section. The conveyor track corresponding to the sandblasting section is connected in parallel to the conveyor track corresponding to the loading buffer area, so that the load trolley moves along the conveyor track from the loading station through the sandblasting section, loading buffer area, pretreatment section, painting section, and manual repair station to the unloading station, or from the loading station through the loading buffer area, pretreatment section, painting section, and manual repair station to the unloading station.
[0009] Optionally, a shielding area is set between the pretreatment section and the painting section, where shielding plugs are installed into the assembly holes of the workpiece. A shielding removal area is set between the painting section and the manual repair station, where the shielding plugs on the workpiece are removed.
[0010] Optionally, the sandblasting section includes an automatic sandblasting chamber and a manual touch-up spraying chamber arranged in sequence; the pretreatment section includes a multi-station combined cleaning chamber, a robot water blowing chamber, and a moisture drying chamber arranged in sequence; the painting section includes a primer area, a primer drying area, a topcoat area, and a topcoat drying area. The primer area and the topcoat area are both composed of a robot painting chamber and a manual touch-up painting chamber. The primer drying area and the topcoat drying area are both composed of a leveling chamber, a paint drying chamber, a strong cooling chamber with an air-cooling system, and a natural cooling chamber. A painting robot is installed in the robot painting chamber. The painting robot is equipped with a paint mixing and supply system. The front and rear doors of each work chamber are interlocked by the controller of the accumulation-type overhead conveyor line. Each work chamber has a manual button box on both the front and rear doors.
[0011] Optionally, the multi-station combined cleaning chamber is a continuous pass-through multi-station combined cleaning machine. The multi-station combined cleaning machine has seven automatically cleaning stations set continuously. The seven automatic cleaning stations are, in order, full cleaning pre-degreasing wash, main degreasing wash, pure water wash, fresh pure water wash, silane treatment, pure water wash and rust prevention wash.
[0012] Optionally, the paint drying chamber consists of a gas-fired catalytic infrared preheating section and a hot air drying section, while the moisture drying chamber consists of a gas-fired catalytic infrared preheating section and a gas-fired hot air convection section with a heat circulation system.
[0013] Optionally, the conveying track is provided with a branch track that sends the workpiece that came out of the topcoat drying area back into the topcoat area.
[0014] The intelligent coating method for speed reducers, using the aforementioned intelligent coating line, includes the following steps: First, the reducer to be painted is taken as the workpiece. The transfer car transports the workpiece to the loading station. The loading crane lifts the workpiece from the transfer car to the loading area chain line. The loading area chain line transports the workpiece to the bottom of the loading track section. At the same time, a load trolley is parked on the loading track section. In the information entry area, the workpiece information is entered into the RFID carrier of the load trolley on the loading track section. Then, the elevator lowers the upper track section to a position where the painting hanger on the load trolley can be connected to the workpiece, and then the painting hanger is connected to the workpiece. Next, the elevator drives the upper track section to rise and connect with the conveyor track. Then, the accumulating overhead conveyor line is started so that the load trolley runs along the accumulating overhead conveyor line according to the workpiece information, and the workpiece on the painting hanger is transported to each section for corresponding process operation. When the load trolley reaches the lower part track section, the accumulating suspension chain stops operating. The elevator drives the upper part track section to descend, placing the workpiece onto the lower part area plate chain line and disconnecting the painting hanger from the workpiece. The lower part area plate chain line transports the workpiece to directly below the lower part hanger, then connects the lower part hanger to the workpiece and lifts the workpiece onto the transfer car.
[0015] The beneficial effects of this invention are: The speed reducer intelligent painting line of the present invention is equipped with a loading hanger at the loading station and a unloading hanger at the unloading station. The loading hanger lifts the workpiece from the transfer car onto the loading area chain line, and the unloading hanger lifts the workpiece on the unloading area chain plate onto the transfer car. A lift drives the loading track section to rise and fall, realizing the automatic loading of workpieces from the loading area chain line to the conveyor track. The lift drives the unloading track section to rise and fall, realizing the automatic unloading of workpieces from the conveyor track to the unloading area chain line, forming a complete process of workpiece loading, painting, and unloading. The loading and unloading of speed reducers is carried out by the loading and unloading hangers, improving the efficiency of loading and unloading.
[0016] An RFID tag is installed on the load trolley to record workpiece information on the painting hanger. An information input area is set up at the loading station. When loading, the workpiece information is entered into the RFID tag on the load trolley on the loading track section. Readers are set up at the entrances of the loading track section, unloading track section, pre-treatment section, and painting section to read the information from the RFID tag. The readers read the workpiece information from the RFID tag to obtain the workpiece cleaning procedure, water blowing procedure, paint color, and conveying route. The central control system controls the conveying route of the load trolley and the operation procedures of each section based on the workpiece information read by the readers, realizing the automatic switching of painting routes for different specifications and types of products, forming an intelligent painting operation, and improving the space utilization rate of the hanging area on the conveyor line, the energy utilization rate of the painting production line, and the production efficiency.
[0017] The central control system controls the trolley's route based on the workpiece information read by the reader on the loading track section using the RFID tag on the trolley. Workpieces requiring sandblasting enter the loading buffer area from the loading station via the sandblasting section, while workpieces not requiring sandblasting enter directly from the loading station into the loading buffer area. This enables mixed-material coating of various workpieces on the same line. The loading buffer area buffers the workpieces, preventing workpieces that have passed through the sandblasting section from queuing and crowding each other in the pre-processing section. This ensures that multiple workpieces are coated in a sequential queue on the accumulating overhead conveyor line, further improving the space utilization of the hanging area on the conveyor line, the energy utilization of the coating production line, and the production efficiency.
[0018] The painting robot is equipped with a paint mixing and supply system. Based on the workpiece information and through communication with the painting robot, the paint mixing and supply system realizes online automatic paint cleaning, color changing, and material supply functions, as well as paint input to the spray gun of the painting robot, paint flow rate stabilization, and spray gun pressure control functions, so as to realize mixed production of multiple varieties and colors.
[0019] After the workpiece is coated with primer or topcoat, it enters the paint drying chamber. In the paint drying chamber, it is first preheated by a gas-fired catalytic infrared preheating section, and then enters the hot air drying section for hot air circulation drying. Through the process of preheating and then circulating drying, the temperature rise process is strictly controlled, and the workpiece is gradually heated in a cyclical manner to prevent the temperature from being too high. This overcomes the problems of low temperature resistance and difficulty in heating the reducer, and achieves rapid heating of the solid reducer surface to accelerate the curing of the paint film and improve the coating surface quality of the workpiece.
[0020] Branch tracks form repeated painting processes on the workpiece topcoat to achieve different film thicknesses of paint layers according to the workpiece model. At the entrance of the painting section, the reader reads the RFID carrier information. The main control system controls the number of topcoat sprays on the workpiece according to the paint film thickness corresponding to the workpiece model. Moreover, the topcoat is dried after each spray to ensure the quality of the topcoat. This solves the technical problem of large film thickness range for different models of reducers, making it difficult to achieve large-span film thickness coating. It ensures that the paint thickness meets the coating requirements of the workpiece, realizes mixed-line coating of different workpieces and product types, and improves the practicality of the coating production line. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the intelligent coating line for the speed reducer of the present invention.
[0022] Figure 2 A schematic diagram of assembling a painting hoist on a loading trolley.
[0023] Figure 3 for Figure 1 A magnified view of a portion of the image.
[0024] Figure 4 This is a diagram of the conveyor route for the intelligent coating line of the speed reducer. Detailed Implementation
[0025] The following is combined with Figures 1-4 The embodiments of the present invention will be described in detail below.
[0026] The intelligent coating line for speed reducers, controlled by a central control system, includes a coating work area 1, an accumulating overhead conveyor 2 erected above the coating work area via steel supports, an upper-part conveyor 3 for conveying workpieces to the coating work area at the upper-part station of the coating work area 1, and a lower-part conveyor 4 for outputting workpieces from the coating work area at the lower-part station. A coating lifting device 6 capable of lifting workpieces is mounted on the load trolley 5 of the accumulating overhead conveyor 2. Its distinguishing feature is: It also includes an upper part hanger 7 that lifts the workpiece 100 onto the upper part plate chain 3, and a lower part hanger 8 that lifts the workpiece 100 away from the lower part plate chain 4; The accumulating overhead conveyor line 2 has an upper part track section 21 located directly above the upper part plate chain line 3 and a lower part track section 22 located directly above the lower part plate chain line 4 on the conveying track 20. The upper part track section 21 and the lower part track section 22 are respectively mounted on two elevators 9 and are disengaged from or connected to the conveying track of the accumulating overhead conveyor line as the elevators 9 rise and fall. Painting work area 2 includes a sandblasting section, a pretreatment section, a painting section, and a manual repair station; The load trolley 5 is equipped with an RFID carrier for recording information of the workpiece on the current painting hanger. The loading station is set up with an information input area to store the workpiece information in the RFID carrier. Readers and writers for reading RFID carrier information are set up at the loading track section, unloading track section, entrance of the pre-processing section, and entrance of the painting section. The workpiece information includes workpiece model, pre-processing program, spraying color, and the conveying route of the workpiece in the painting operation area. The load trolley 2 runs along the accumulating overhead conveyor line according to the workpiece information, and transports the workpieces on the painting hanger to each section for corresponding process operations.
[0027] The aforementioned reducer intelligent painting line uses a transfer cart to transport the workpiece to the loading station. The loading hanger 7 lifts the workpiece from the transfer cart onto the loading area chain conveyor 3. The loading area chain conveyor 3 then transports the workpiece directly below the loading track section 21. Simultaneously, a load trolley is parked on the loading track section 21. In the information input area, the workpiece information is entered into the RFID carrier of the load trolley 5 on the loading track section. Then, the elevator 9 lowers the loading track section 21 and connects the painting hanger to the workpiece, and then lowers the loading track section 21 again. 21 rises and connects with the conveyor rail 20, and starts the accumulating overhead conveyor line 2 so that the load trolley 5 runs along the accumulating overhead conveyor line according to the workpiece information, and transports the workpiece on the painting hanger 6 to each section for corresponding process operation; when the load trolley reaches the lower part track section 22, the accumulating overhead conveyor stops running, the elevator 9 drives the upper part track section 22 to descend and place the workpiece on the lower part area plate chain line 4. The lower part area plate chain line 4 transports the workpiece to the lower part hanger 8 directly below it, and then the lower part hanger 8 lifts the workpiece onto the transfer car, and the painting operation is completed. An upper-part hanger 7 is installed at the upper-part station, and a lower-part hanger 8 is installed at the lower-part station. The upper-part hanger 7 is used to lift the workpiece from the transfer car onto the upper-part area plate chain 3, and the lower-part hanger 8 is used to lift the workpiece from the lower-part area plate chain 4 onto the transfer car. The elevator 9 drives the upper-part track section 21 to rise and fall, realizing the automatic loading of the workpiece from the upper-part area plate chain 3 to the conveyor track 20. The elevator 9 drives the lower-part track section 22 to rise and fall, realizing the automatic unloading of the workpiece from the conveyor track 20 to the lower-part area plate chain 4, forming a complete process of workpiece loading, painting, and unloading. The upper-part hanger 7 and the lower-part hanger 8 are used to lift the reducer for loading and unloading, improving the efficiency of loading and unloading. An RFID tag is installed on the load trolley 5 to record workpiece information on the painting hanger 6. An information input area is set up at the loading station. When loading, the workpiece information is entered into the RFID tag on the load trolley on the loading track section. Readers are set up at the entrances of the loading track section, unloading track section, pre-processing section, and painting section to read the information from the RFID tag. The readers read the workpiece information from the RFID tag to obtain the workpiece cleaning procedure, water blowing procedure, paint color, and conveying line. The central control system controls the conveying line of the load trolley and the operation procedures of each section based on the workpiece information read by the readers, realizing the automatic switching of painting lines for different specifications and types of products, forming an intelligent painting operation, and improving the space utilization rate of the hanging area on the conveyor line, the energy utilization rate of the painting production line, and the production efficiency.
[0028] The painting hanger 6 is mounted on the load-bearing beam 51 of the load trolley 5. The painting hanger 6 includes a connector 61 connected to the load-bearing beam 51, an electric turntable 62 capable of 360-degree horizontal rotation and locking every 90 degrees, and a lifting chain 63 mounted on the bottom surface of the electric turntable 62 and connected to the workpiece. The lifting chain 63 can mate with the connection hole of the workpiece to form a connection without interfering with other parts on the workpiece. The electric turntable 62 allows for 360-degree horizontal rotation of the workpiece and can lock every 90 degrees, adjusting the angle of the workpiece during painting operations to ensure effective and uniform coating of the workpiece surface.
[0029] Among them, the upper part plate chain 3 and the lower part plate chain 4 are horizontally arranged belt or roller type conveyor belts. The upper part hanger 7 and the lower part hanger 8 have the same structure, both including a hanger 71 spanning across the upper part plate chain 3 or the lower part plate chain 4, a linear guide rail 72 mounted on the hanger 71 in the horizontal direction, and an upper and lower part lifting device 73 mounted on the slider of the linear guide rail 71 and capable of connecting with the workpiece. The setting direction of the linear guide rail 72 is perpendicular to the conveying direction of the upper part plate chain 3 and the lower part plate chain 4. The upper part hanger 7 spans the upper part area plate chain line 3, and the lower part hanger 8 spans the lower part area plate chain line 4. The upper and lower part hangers 73 can lift the workpiece. When loading, the transfer car transports the workpiece to the upper part hanger 7. The linear track 71 drives the upper and lower part hangers 73 to run directly above the workpiece. Then, the upper and lower part hangers 73 are connected to the workpiece. The upper and lower part hangers 73 lift the workpiece and drive it to the upper part area plate chain plate 3 through the linear guide rail 72. Then, the connection between the upper and lower part hangers 73 and the workpiece 100 is disconnected. The workpiece 100 is transferred to the lower part track section 21 directly below the upper part as the upper part area plate chain line 3 runs. When unloading, the load trolley 5 moves to the unloading track section 22, and the elevator drives the unloading track section 22 to descend, placing the workpiece on the painting hanger 6 of the load trolley 5 onto the unloading area plate chain 4. Then, the connection between the painting hanger 6 and the workpiece is disconnected, and the workpiece is transported with the unloading area plate chain 4 to directly below the upper and lower hanger 73. The upper and lower hanger 73 is connected to the workpiece, and the workpiece is hoisted onto the transfer car. Then, the connection between the upper and lower hanger 73 and the workpiece is disconnected, and the transfer car can then transfer the workpiece to the next process, realizing automatic loading and unloading of workpieces.
[0030] A loading buffer area is set up between the loading station and the pre-processing section. The conveyor track corresponding to the sandblasting section is connected in parallel to the conveyor track corresponding to the loading buffer area. This allows the load trolley 5 to travel along the conveyor track 20 from the loading station through the sandblasting section, loading buffer area, pre-processing section, painting section, and manual repair station to the unloading station, or from the loading station through the loading buffer area, pre-processing section, painting section, and manual repair station to the unloading station. Since some reducers are unpainted, indicating a smooth surface without residual paint or oxide scale, the workpiece can skip the sandblasting section and travel directly from the loading buffer area to the pre-processing section. However, some reducers are corroded after painting, with oxide scale, rust, and paint residue on the surface. These workpieces need to pass through the sandblasting section and loading buffer area to enter the pre-processing section. The central control system controls the running route of the load trolley 5 based on the workpiece information read by the reader head on the loading track section using the RFID tag on the load trolley. Sandblasting is required in these cases. Workpieces that do not need to go through the sandblasting section enter the upper workpiece buffer area from the upper workpiece station. Workpieces that do not need to go through the sandblasting section directly enter the upper workpiece buffer area from the upper workpiece station. This enables the mixed coating of multiple types of workpieces on the same line. The upper workpiece buffer area buffers the upper workpieces, avoiding the formation of queues and crowding of workpieces that have gone through the sandblasting section and those that have not. This ensures that multiple workpieces are coated in sequence on the accumulating overhead conveyor line 2, further improving the space utilization rate of the hanging area on the conveyor line, the energy utilization rate of the coating production line, and the production efficiency.
[0031] A shielding area is set up between the pretreatment section and the painting section. Shielding plugs are installed into the assembly holes of the workpiece in this area. A shielding removal area is set up between the painting section and the manual repair station. Shielding plugs are removed from the workpiece in this area. Since the reducer has assembly holes that cannot be painted, after pretreatment, shielding plugs are installed to block these holes. After painting, the plugs are removed in the shielding removal area, ensuring that the painting of the reducer does not affect subsequent assembly.
[0032] The sandblasting section includes an automatic sandblasting chamber and a manual touch-up spraying chamber arranged in sequence; the pretreatment section includes a multi-station combined cleaning chamber, a robot water blowing chamber, and a moisture drying chamber arranged in sequence; the painting section includes a primer area, a primer drying area, a topcoat area, and a topcoat drying area. The primer area and the topcoat area are both composed of a robot painting chamber and a manual touch-up painting chamber. The primer drying area and the topcoat drying area are both composed of a leveling chamber, a paint drying chamber, a strong cooling chamber with an air-cooling system, and a natural cooling chamber. The robot painting chamber is equipped with a painting robot, which is equipped with a paint mixing and supply system. The front and rear doors of each work chamber are interlocked by the controller of the accumulating overhead conveyor line. Each work chamber has a manual button box on both the front and rear doors. In the sandblasting section, the workpiece is first sandblasted in an automatic sandblasting chamber using sandblasting equipment, and then manually sandblasted in a manual touch-up sandblasting chamber. After sandblasting, the surface of the workpiece should be free of residual oil, grease, and dust, and should be free of loose oxide scale, rust, paint, and foreign matter. Any traces of residual dirt should only appear as slight spots or streaks. In the pretreatment section, the workpiece is washed in a multi-station combined cleaning chamber. After washing, the workpiece is blown with water in a robotic blowing chamber to prevent the surface from shrinking into discontinuous water droplets or beads. Then, the workpiece enters a moisture drying chamber to dry. After drying, the surface of the workpiece is free of rust, stains, and residual oil. Both the primer and topcoat areas employ a combination of robotic spraying and manual touch-up painting to complete the overall painting of the workpieces. Workpieces enter the robotic spraying chamber, where a stopper on the accumulating overhead conveyor stops them in the precise position. An electric turntable then starts, allowing the workpiece to rotate 360°. The workpiece stops every 90° of rotation to allow for painting, then rotates another 90°. Once painting is complete, the electric turntable stops, and the accumulating overhead conveyor releases the workpiece to the manual touch-up painting chamber for inspection and touch-up painting. The painting robot is equipped with a paint mixing and supply system. Based on workpiece information and through communication with the painting robot, this system performs online automatic paint mixing functions such as cleaning, color changing, and material supply. It also supplies paint to the robot's spray guns, stabilizes the paint flow rate, and controls the spray gun pressure, enabling mixed-line production of multiple varieties and colors. After painting, the workpieces are sent to a leveling chamber for proper evaporation of the paint thinner, followed by a paint drying chamber to thoroughly dry the surface. The paint drying chamber meets the drying temperature and time curve requirements of the corresponding paint to achieve a high-quality paint film. After drying, the workpieces are forcibly cooled in a forced cooling chamber. The forced cooling system of the chamber mainly consists of fans, nozzles, and ductwork. Air is drawn from the workshop, filtered through a primary filter, exchanges heat with the workpieces, and is then exhausted through the top of the chamber. After forced cooling, the surface temperature of the workpieces must not exceed 60°C. Finally, the workpieces enter a natural cooling chamber to cool naturally to room temperature.Each work compartment has a program switch installed on the front side of its front and rear doors, controlled by the accumulating overhead conveyor system's controller. The load trolley 5 or painting hanger 6 activates the program switch as it travels along the conveyor track 20. The controller of the accumulating overhead conveyor system then controls the opening and closing of the front and rear doors of each work compartment based on the activation signals from the program switches. This interlocking control of the front and rear doors of each work compartment by the accumulating overhead conveyor system's controller is achieved. Each work compartment's front and rear doors are equipped with manual button boxes. In automatic mode, the opening and closing of the front and rear doors are controlled by the accumulating overhead conveyor system's controller. The manual button boxes are used for manual maintenance of the doors during non-production periods. When a door cannot be opened or malfunctions, the accumulating conveyor system immediately stops operating and issues a corresponding audible and visual alarm, indicating a door malfunction. The accumulating conveyor system can only restart normally after the malfunction has been resolved.
[0033] The multi-station combined cleaning chamber is a continuous pass-through multi-station combined cleaning machine. This machine has seven automatically connected cleaning stations: full cleaning pre-degreasing, main degreasing, pure water washing, fresh pure water washing, silane treatment, pure water washing, and rust prevention washing. The continuous pass-through multi-station combined cleaning machine features seven stations—full cleaning pre-degreasing, main degreasing, pure water washing, fresh pure water washing, silane treatment, pure water washing, and rust prevention washing—to achieve continuous automated cleaning operations. This ensures that no residual oil, grease, or dust is visible on the workpiece surface. The workpiece surface is wiped with clean white lint-free paper; if the paper leaves no stains, the cleaning is considered satisfactory.
[0034] The paint drying chamber consists of a gas-fired catalytic infrared preheating section and a hot air drying section, while the moisture drying chamber consists of a gas-fired catalytic infrared preheating section and a gas-fired hot air convection section with a heat circulation system. After being cleaned in a multi-station combined cleaning chamber and blown dry by a robot, the workpiece enters the gas-fired catalytic infrared preheating section for preheating. The power output ratio can be adjusted according to different diameter products to ensure uniform heating during drying. After being coated with primer or topcoat, the workpiece enters the paint drying chamber, where it is first preheated in the gas-fired catalytic infrared preheating section and then circulated and dried in the hot air drying section. This preheating followed by circulating drying process strictly controls the temperature rise, providing gradual and cyclical heating to prevent excessively high temperatures. This overcomes the problems of low temperature resistance and difficulty in heating the reducer, enabling rapid surface heating of the solid reducer to accelerate paint film curing and improve the surface quality of the coating. After the paint is dried, the workpiece enters a forced cooling chamber for air cooling to accelerate the cooling process.
[0035] The conveyor track 20 includes a branch track 23 that re-feeds workpieces from the topcoat drying area into the topcoat area. The branch track 23 facilitates repeated topcoat spraying, allowing for different film thicknesses to be applied based on the workpiece model. At the entrance of the painting section, a reader reads the RFID tag information. The main control system controls the number of topcoat spraying cycles based on the corresponding paint film thickness for each workpiece model. Each topcoat spray is followed by a drying cycle to ensure quality. This addresses the technical challenge of achieving large-scale film thickness coating for different types of reducers, ensuring the paint thickness meets the workpiece's coating requirements. It also enables mixed-line coating of different workpieces and product types, improving the practicality of the coating production line.
[0036] This invention also protects an intelligent coating method for speed reducers, which uses the aforementioned intelligent coating line for speed reducers and includes the following steps: First, the reducer to be painted is taken as the workpiece. The transfer car transports the workpiece to the loading station. The loading crane lifts the workpiece from the transfer car to the loading area chain line. The loading area chain line transports the workpiece to the bottom of the loading track section. At the same time, a load trolley is parked on the loading track section. In the information entry area, the workpiece information is entered into the RFID carrier of the load trolley on the loading track section. Then, the elevator lowers the upper track section to a position where the painting hanger on the load trolley can be connected to the workpiece, and then the painting hanger is connected to the workpiece. Next, the elevator drives the upper track section to rise and connect with the conveyor track. Then, the accumulating overhead conveyor line is started so that the load trolley runs along the accumulating overhead conveyor line according to the workpiece information, and the workpiece on the painting hanger is transported to each section for corresponding process operation. When the load trolley reaches the lower part track section, the accumulating suspension chain stops operating. The elevator drives the upper part track section to descend, placing the workpiece onto the lower part area plate chain line and disconnecting the painting hanger from the workpiece. The lower part area plate chain line transports the workpiece to directly below the lower part hanger, then connects the lower part hanger to the workpiece and lifts the workpiece onto the transfer car.
[0037] The intelligent coating method for speed reducers described above realizes the entire process of workpiece loading, coating, and unloading. Loading and unloading are performed using loading and unloading hangers, improving loading and unloading efficiency. An RFID tag is installed on the load trolley to record workpiece information on the coating hanger. An information input area is set up at the loading station. During loading, the workpiece information is entered into the RFID tag on the load trolley on the loading track section. Readers are installed at the entrances of the loading track section, unloading track section, pre-treatment section, and painting section to read the RFID tag information. These readers read the workpiece information from the RFID tag to obtain the workpiece cleaning procedure, water blowing procedure, paint color, and conveyor route. The central control system controls the conveyor route of the load trolley and the operation procedures of each section based on the workpiece information read by the readers, achieving automatic switching of coating routes for different specifications and types of products, forming an intelligent coating operation.
[0038] The technical solutions of the embodiments of the present invention have been fully described above with reference to the accompanying drawings. It should be noted that the described embodiments are only a part of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
Claims
1. A smart coating line with a speed reducer, controlled by a central control system, includes a coating work area, an accumulating overhead conveyor line erected above the coating work area via steel supports, an upper-part conveyor line at the upper workstation of the coating work area to transport workpieces to the coating work area, and a lower-part conveyor line at the lower workstation to output workpieces from the coating work area. The load trolley of the accumulating overhead conveyor line is equipped with a coating lifting device capable of lifting the workpiece. Its features are: It also includes an upper part hanger for hoisting workpieces onto the upper part area chain line, and a lower part hanger for hoisting workpieces away from the lower part area chain line; The accumulating overhead conveyor line has an upper part track section located directly above the upper part plate chain line and a lower part track section located directly above the lower part plate chain line. The upper part track section and the lower part track section are respectively mounted on two elevators and are disengaged from or connected to the accumulating overhead conveyor line as the elevators rise and fall. The painting work area includes a sandblasting section, a pretreatment section, a painting section, and a manual repair station; The load trolley is equipped with an RFID carrier for recording information of the workpiece on the current painting hanger. The loading station is equipped with an information input area for storing workpiece information in the RFID carrier. Readers are set up at the loading track section, unloading track section, entrance of the pre-processing section, and entrance of the painting section to read information from the RFID carrier. The workpiece information includes workpiece model, pre-processing program, spraying color, and the workpiece's conveying route in the painting operation area. The load trolley runs along the accumulating overhead conveyor line according to the workpiece information, transporting the workpieces on the painting hanger to each section for corresponding process operations.
2. The intelligent coating line for speed reducers according to claim 1, characterized in that: The painting hoist is mounted on the load-bearing beam of the load trolley. The painting hoist includes a connector connected to the load-bearing beam, an electric turntable that can rotate 360 degrees horizontally and lock every 90 degrees, and a lifting chain mounted on the bottom of the electric turntable that can be connected to the workpiece.
3. The intelligent coating line for speed reducers according to claim 2, characterized in that: The upper and lower part conveyor belts are horizontally arranged belt or roller conveyor belts. The upper and lower part hangers have the same structure, including a hanger that spans across the upper or lower part conveyor belt, a linear guide rail mounted on the hanger in the horizontal direction, and upper and lower part hangers mounted on the slider of the linear guide rail that can be connected to the workpiece. The direction of the linear guide rail is perpendicular to the conveying direction of the upper and lower part conveyor belts.
4. The intelligent coating line for speed reducers according to claim 1, characterized in that: An upper part buffer area is set up between the upper part station and the pretreatment section. The conveyor track corresponding to the sandblasting section is connected in parallel to the conveyor track corresponding to the upper part buffer area. The load trolley moves along the conveyor track from the upper part station through the sandblasting section, upper part buffer area, pretreatment section, painting section, and manual repair station to the lower part station, or from the upper part station through the upper part buffer area, pretreatment section, painting section, and manual repair station to the lower part station.
5. The intelligent coating line for speed reducers according to claim 1, characterized in that: A shielding area is set up between the pretreatment section and the painting section. Shielding plugs are installed into the assembly holes of the workpiece in the shielding area. A shielding removal area is set up between the painting section and the manual repair station. Shielding plugs are removed from the workpiece in the shielding removal area.
6. The intelligent coating line for speed reducers according to claim 1, characterized in that: The sandblasting section includes an automatic sandblasting chamber and a manual touch-up sandblasting chamber arranged in sequence; the pretreatment section includes a multi-station combined cleaning chamber, a robot water blowing chamber, and a moisture drying chamber arranged in sequence; the painting section includes a primer area, a primer drying area, a topcoat area, and a topcoat drying area. The primer area and the topcoat area are both composed of a robot painting chamber and a manual touch-up painting chamber. The primer drying area and the topcoat drying area are both composed of a leveling chamber, a paint drying chamber, a strong cooling chamber with an air-cooling system, and a natural cooling chamber. The robot painting chamber is equipped with a painting robot, which is equipped with a paint mixing and supply system. The front and rear doors of each work chamber are interlocked by the controller of the accumulating overhead conveyor line. Each work chamber has a manual button box at both the front and rear doors.
7. The intelligent coating line for speed reducers according to claim 6, characterized in that: The multi-station combined cleaning chamber is a continuous pass-through multi-station combined cleaning machine. The multi-station combined cleaning machine has seven automatically set cleaning stations in succession. The seven automatic cleaning stations are, in order, full cleaning pre-degreasing wash, main degreasing wash, pure water wash, fresh pure water wash, silane treatment, pure water wash and rust prevention wash.
8. The intelligent coating line for speed reducers according to claim 6, characterized in that: The paint drying chamber consists of a gas-fired catalytic infrared preheating section and a hot air drying section, while the moisture drying chamber consists of a gas-fired catalytic infrared preheating section and a gas-fired hot air convection section with a heat circulation system.
9. The intelligent coating line for speed reducers according to claim 6, characterized in that: The conveying track is equipped with a branch track that sends the workpieces that come out of the topcoat drying area back into the topcoat area.
10. A method for intelligent coating of speed reducers, using the intelligent coating line for speed reducers as described in any one of claims 1 to 9, comprising the following steps: First, the reducer to be painted is taken as the workpiece. The transfer car transports the workpiece to the loading station. The loading crane lifts the workpiece from the transfer car to the loading area chain line. The loading area chain line transports the workpiece to the bottom of the loading track section. At the same time, a load trolley is parked on the loading track section. In the information entry area, the workpiece information is entered into the RFID carrier of the load trolley on the loading track section. Then, the elevator lowers the upper track section to a position where the painting hanger on the load trolley can be connected to the workpiece, and then the painting hanger is connected to the workpiece. Next, the elevator drives the upper track section to rise and connect with the conveyor track. Then, the accumulating overhead conveyor line is started so that the load trolley runs along the accumulating overhead conveyor line according to the workpiece information, and the workpiece on the painting hanger is transported to each section for corresponding process operation. When the load trolley reaches the lower part track section, the accumulating suspension chain stops operating. The elevator drives the upper part track section to descend, placing the workpiece onto the lower part area plate chain line and disconnecting the painting hanger from the workpiece. The lower part area plate chain line transports the workpiece to directly below the lower part hanger, then connects the lower part hanger to the workpiece and lifts the workpiece onto the transfer car.