Energy saving and consumption reducing process for hot rolling high-pressure water descaling section

By monitoring the pressure changes in the high-pressure water circuit, identifying the residual pressure retention section, and performing segmented pressure replenishment, the problem of insufficient utilization of residual pressure in the hot rolling high-pressure water descaling system was solved, achieving energy conservation and consumption reduction.

CN123149263APending Publication Date: 2026-11-24GUANGDONG GUANGQING METAL ROLLING CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611565967.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-10
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

The existing hot rolling high-pressure water descaling system cannot effectively utilize the residual pressure between two adjacent descaling operations, resulting in repeated pressurization of the high-pressure pump and increased energy consumption.

Method used

By continuously monitoring the pressure changes at the high-pressure pump outlet, accumulator, and descaling box inlet, the residual pressure retention section is determined, and pressure is replenished from upstream of this section during the next descaling cycle to avoid overall pressure increase and achieve segmented pressure replenishment.

Benefits of technology

This reduces the energy consumption of repeated pressurization operation of the high-pressure pump, and improves the adaptability and energy-saving effect of pressure control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123149263A_ABST
    Figure CN123149263A_ABST
Patent Text Reader

Abstract

This invention discloses an energy-saving and consumption-reducing process for hot-rolled high-pressure water descaling, relating to the field of descaling technology. The process includes determining a residual pressure retention section based on the pressure decay and rebound sequence at the high-pressure pump outlet, accumulator, and descaling tank inlet after the jet valve is closed. If the residual pressure in this section can be maintained until the next descaling cycle, pressure is replenished from upstream, and the existing residual pressure is used to establish the working pressure. When the pressure propagation state changes, the pressure holding boundary and pressure replenishment starting point are redefined. This invention determines the residual pressure retention section that still maintains pressure transmission capacity by associating the continuous pressure drop, pressure rebound, and further decay sequence at the high-pressure pump outlet, accumulator, and descaling tank inlet after the jet valve is closed. During the next descaling cycle, the lost pressure is replenished only from upstream of this section, allowing the existing residual pressure to continue participating in pressure establishment. This avoids repressurization for each descaling cycle, reducing the electrical energy consumption caused by repeated high-pressure pump operation, thereby achieving energy saving and consumption reduction in the descaling system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of descaling technology, and in particular to an energy-saving and consumption-reducing process for hot rolling high-pressure water descaling. Background Technology

[0002] During the hot rolling process, the high-pressure water descaling system sprays high-pressure water onto the slab surface through a high-pressure pump, accumulator, and descaling box to remove iron oxide scale from the slab surface. Between two adjacent descaling operations, after the spray valve is closed, the pressure in the high-pressure water circuit does not immediately disappear completely. Different pipe sections between the high-pressure pump outlet, accumulator, and descaling box inlet usually retain a certain residual pressure, which gradually decreases as the pressure is released and the pressure wave propagates.

[0003] Existing descaling control typically reduces pressure according to a predetermined control logic after each spraying cycle and re-establishes the system working pressure before the next descaling cycle. Alternatively, it may determine whether additional pressure is needed based solely on the residual pressure at a certain pressure measurement point. This makes it difficult to determine which section of the high-pressure water circuit the residual pressure is actually stagnating in, or whether that section of the water column still has the ability to transmit pressure to the next descaling process. As a result, even if some high-pressure water circuits still have usable residual pressure, the pressure may still need to be re-established for the entire high-pressure water circuit during the next descaling cycle, causing the high-pressure pump to repeatedly increase pressure and thus increasing the ineffective energy consumption between adjacent descaling cycles. To address this, we propose an energy-saving and consumption-reducing process for hot rolling high-pressure water descaling. Summary of the Invention

[0004] The purpose of this invention is to provide a hot rolling high-pressure water descaling energy-saving and consumption-reducing process to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, the present invention provides the following technical solution: a hot-rolling high-pressure water descaling energy-saving and consumption-reducing process, comprising: Step 1: After each injection valve is closed, continuously obtain the residual pressure decay process of the high-pressure pump outlet, accumulator and descaling tank inlet. According to the order of continuous pressure drop, pressure rebound and decay at each position, determine the residual pressure retention section in the high-pressure water circuit that still maintains pressure transmission capacity. Step 2: Correspond the residual pressure retention section to the pressure establishment process required for the next descaling. When the residual pressure retention section can maintain the water column continuity until the next descaling, replenish the lost pressure from the upstream side of the section so that the retained residual pressure can continue to participate in the pressure establishment for the next descaling. Step 3: When the propagation sequence of pressure rebound changes or the residual pressure retention section disappears prematurely, stop using the previous pressure replenishment position and redetermine the pressure holding boundary and pressure replenishment starting point according to the new residual pressure decay process.

[0006] Preferably, the determination of the residual pressure retention section includes: The moment when the pressure transient begins to drop is recorded sequentially, with the closure of the injection valve as the starting event of the pressure transient. The moments when the descaling tank inlet, accumulator, and high-pressure pump outlet begin to continuously decrease in pressure are recorded. When the downstream position maintains pressure after the upstream position begins to decrease pressure, and then a pressure rebound occurs due to valve closure, the area between the downstream position and the position where the corresponding rebound first is lost is identified as a candidate residual pressure retention section, so that the determination of the residual pressure position is not based on the residual pressure value of a single measuring point.

[0007] Preferably, the pressure wave reflection formed by the closure of the injection valve is continuously tracked in the candidate residual pressure retention section; When the initial pressure rebound returns along the high-pressure water path, and subsequent pressure changes with a sequential relationship can be obtained on both sides of the candidate residual pressure retention section, it is confirmed that the water column inside the section still has a continuous pressure transmission relationship. When the pressure change disappears on one side again, the residual pressure retention zone is redefined based on the location where the change disappears.

[0008] Preferably, when the accumulator pressure rebound can continue to propagate to the descaling box inlet, and no corresponding pressure change occurs at the high-pressure pump outlet, the section between the accumulator and the descaling box is defined as an independently maintained residual pressure section. When the pressure is built up again, the section is first isolated from the pressure relief passage, and then the high-pressure pump replenishes the pressure lost upstream of the accumulator, so that the high-pressure pump pressure replenishment process is connected with the section that independently maintains residual pressure at the accumulator position.

[0009] Preferably, when the pressure rebound at the descaling box inlet can return to the accumulator position, but there is a significant decrease at the accumulator position and it does not continue to correspond to the high-pressure pump outlet, the area between the high-pressure pump outlet and the accumulator is not included in the next pressure holding range. Before the next descaling, the pressure in the upstream section is rebuilt, and after the pressure change is transmitted back to the accumulator location, it is connected to the residual pressure downstream of the accumulator.

[0010] Preferably, between two adjacent descaling operations, the remaining time that can maintain the continuity of the water column is determined based on the shortening process of the residual pressure retention section after the previous spray. If the next descaling start time falls within the remaining time, segmented pressure replenishment is performed. If the next descaling start time exceeds the remaining time, residual pressure is allowed to continue to be released without maintaining high-pressure pump high-load standby, and the full water circuit pressure is re-established before the next descaling.

[0011] Preferably, when performing segmented pressure replenishment, when the new pressure change formed by the pressure replenishment reaches the pressure holding boundary and is continuously connected with the pressure change of the original residual pressure downstream of the pressure holding boundary, the output of the high-pressure pump is stopped, so that the downstream residual pressure and the upstream new pressure together complete the establishment of descaling pressure.

[0012] Preferably, when the time required for the pressure rebound to return from the descaling box inlet to the same upstream position increases during multiple consecutive descaling cycles, while the timing of valve action remains unchanged, this change is determined to be a change in the propagation state of the high-pressure water circuit pressure wave. In this state, the use of historical residual pressure retention sections for segmented pressurization is suspended, and the pressure holding boundary is re-determined based on the pressure reflection after the injection ends.

[0013] Preferably, when the return time of the pressure rebound remains stable, while the rebound amplitude continuously decreases at the same pipeline position, the decrease is correlated with the static pressure holding process after the injection valve is closed; When the static pressure can be maintained but the rebound amplitude decreases, the original pressure holding boundary is retained but the range of residual pressure that can be used next time is reduced. When the static pressure and rebound amplitude decay synchronously, the reuse of residual pressure in this section is cancelled, so that the pressure wave propagation state and the static residual pressure jointly limit the usable residual pressure.

[0014] Preferably, when a transient pressure surge occurs beyond the normal pressure rebound range after the jet valve is closed, the pressure already located upstream of the pressure holding boundary is released first, while maintaining a continuous water column downstream of the pressure holding boundary; After the pressure rebound propagates upstream and decays, the downstream pressure is either retained or released based on the newly formed residual pressure retention section, so that the transient pressure reduction process and the residual pressure retention process of the next descaling share the same pressure release process.

[0015] The technical effects and advantages of this invention are as follows: (1) This invention determines the residual pressure retention section that still maintains pressure transmission capacity by associating the continuous pressure drop, pressure rebound and re-attenuation sequence of the high-pressure pump outlet, accumulator and descaling box inlet after the jet valve is closed, and replenishes the lost pressure from upstream of this section during the next descaling, so that the original residual pressure continues to participate in pressure building, thereby avoiding the need to repressurize the entire high-pressure water circuit every time descaling, reducing the power consumption generated by the repeated pressurization operation of the high-pressure pump, and thus achieving energy saving and consumption reduction of the descaling system.

[0016] (2) The present invention utilizes the pressure rebound and pressure wave reflection formed after the injection valve is closed to continuously verify the pressure changes on both sides of the candidate residual pressure retention section. This allows for the differentiation between effective residual pressure with continuous pressure transmission capability and apparent residual pressure formed by local sealing. At the same time, it can dynamically adjust the residual pressure retention section according to the position where the pressure reflection disappears, thereby improving the reliability of segmented pressure holding and segmented pressure replenishment judgment, thus avoiding the use of local residual pressure that cannot be actually transmitted to the descaling box for incorrect pressure replenishment.

[0017] (3) The present invention can dynamically redetermine the pressure holding boundary according to the shortening of the residual pressure retention section, the pressure rebound propagation time and the rebound amplitude change, so that when the adjacent descaling interval is short, the residual pressure that can continue to be used is retained and segmented pressure is replenished. When the residual pressure cannot be maintained until the next descaling, it is allowed to be released, avoiding the need to maintain the high-pressure pump at high load to preserve residual pressure that has no utilization value. At the same time, when an abnormal transient pressure rise occurs, the upstream pressure of the pressure holding boundary is released first and the downstream continuous water column is retained, so that the transient pressure reduction is combined with the retention of residual pressure for the next descaling, thereby reducing ineffective energy consumption and improving the adaptability of pressure control under different operating conditions. Attached Figure Description

[0018] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used together with the embodiments of the invention to explain the invention, but do not constitute a limitation thereof. In the drawings: Figure 1 This is the overall control flowchart of the present invention; Figure 2 This is a flowchart of the residual pressure retention section determination process of the present invention; Figure 3 This is a flowchart of the segmented pressure replenishment and pressure connection process of the present invention; Figure 4 This is a flowchart of the boundary correction and anomaly handling process of the present invention. Detailed Implementation

[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0020] This invention provides, for example Figures 1-4 The hot rolling high-pressure water descaling energy-saving and consumption-reducing process shown includes: Step 1: After each injection valve is closed, continuously obtain the residual pressure decay process of the high-pressure pump outlet, accumulator and descaling tank inlet. According to the order of continuous pressure drop, pressure rebound and decay at each position, determine the residual pressure retention section in the high-pressure water circuit that still maintains pressure transmission capacity. Step 2: Correspond the residual pressure retention section to the pressure establishment process required for the next descaling. When the residual pressure retention section can maintain the water column continuity until the next descaling, replenish the lost pressure from the upstream side of the section so that the retained residual pressure can continue to participate in the pressure establishment for the next descaling. Step 3: When the propagation sequence of pressure rebound changes or the residual pressure retention section disappears prematurely, stop using the previous pressure replenishment position and redetermine the pressure holding boundary and pressure replenishment starting point according to the new residual pressure decay process. In practice, pressure signals are obtained at the high-pressure pump outlet, accumulator, and descaling tank inlet, respectively. The moment the jet valve closes is taken as the starting point of a residual pressure judgment process. After the jetting ends, the high-pressure water circuit is not immediately treated as a pressure loss state. Instead, the pressure changes at the three locations are continuously recorded to determine the moment when the pressure begins to drop continuously, when pressure rebounds, and when the pressure decays again after rebounding. If a certain location has been continuously depressurized, while its downstream location still maintains pressure, and the pressure change caused by the jet valve closing can continue to propagate between adjacent pressure measurement locations in sequence, it indicates that the water column in the corresponding pipe section is still continuous and the pipe section can continue to transmit pressure. This pipe section is identified as a residual pressure retention section. If only a certain pressure measurement location has a high residual pressure, but its pressure change cannot continue to be transmitted to the adjacent location, then this local residual pressure is not considered as usable residual pressure. After identifying the residual pressure retention section, continue to observe the pressure decay status of this section based on the start time of the next descaling. If corresponding pressure changes can still be obtained on both sides of the section before the establishment of the next descaling pressure, maintain the existing pressure and use a high-pressure pump to supplement the decayed pressure from the upstream side of the residual pressure retention section. During the pressure replenishment process, when the newly established pressure change is transmitted to the residual pressure retention section and can continue to propagate downstream, it indicates that the new pressure has formed a continuous pressure transmission with the original residual pressure, thus completing the establishment of the next descaling pressure and avoiding the need to pressurize the still usable pipe section from a low-pressure state again. During continuous operation, the pressure rebound propagation sequence of the current cycle is compared with that of the previous effective cycle. When the pressure rebound can no longer reach the original pressure holding boundary, or when the residual pressure retention section has lost the continuous pressure transmission relationship before the next descaling, pressure is no longer replenished according to the original pressure replenishment position. Instead, the pressure holding boundary and pressure replenishment starting point are redefined based on the current residual pressure decay and the actual position reached by the pressure rebound. This allows for segmented pressure holding and segmented pressure replenishment based on the actual residual pressure distribution after each injection, reducing the ineffective operating time caused by the high-pressure pump repeatedly pressurizing the entire high-pressure water circuit. This ensures that the pressure is established normally for the next descaling while reducing the power consumption of the pump group and the equipment load caused by repeated pressure establishment.

[0021] The determination of the residual pressure retention zone includes: The moment when the pressure transient begins to drop is recorded sequentially, with the closure of the injection valve as the starting event of the pressure transient. The moments when the descaling tank inlet, accumulator, and high-pressure pump outlet begin to continuously decrease in pressure are recorded. When the downstream position maintains pressure after the upstream position begins to decrease pressure, and then a pressure rebound occurs due to valve closure, the area between the downstream position and the position where the corresponding rebound is first lost is identified as a candidate residual pressure retention section, so that the determination of the residual pressure position is not based on the residual pressure value of a single measuring point. In practice, the moment when the injection valve switches from the open state to the closed state is taken as the unified starting point for pressure transient analysis. The pressure signals at the inlet of the descaling box, the accumulator and the outlet of the high-pressure pump are continuously recorded. In order to avoid misjudging the random fluctuations in the injection process as residual pressure decay, the pressure can be used as the criterion for starting continuous pressure reduction if it maintains a downward trend in multiple consecutive sampling cycles. The start time of continuous pressure reduction corresponding to the three pressure measurement positions is recorded respectively. After the jet valve is closed, the inlet side of the descaling tank is first affected by the pressure change caused by the valve closure. Then the pressure change propagates along the high-pressure water path towards the accumulator and the outlet of the high-pressure pump. If the upstream pressure measurement position has entered a continuous pressure drop state, while the downstream position still maintains a relatively stable residual pressure, and then a pressure rebound occurs corresponding to the moment the jet valve is closed, it indicates that the pipe section at the downstream position does not only retain static residual pressure, but can still receive and transmit the pressure change caused by the valve closure. Continue to compare the pressure rebound at each pressure measurement position along the high-pressure water path, and extend the position where the corresponding rebound can still be obtained upstream until the position where the rebound disappears or the rebound cannot form a corresponding relationship before and after is first observed. Use this position as the boundary of the candidate residual pressure retention section. In one embodiment, when pressure rebound can be detected sequentially at both the descaling tank inlet and the accumulator location, but no corresponding rebound occurs at the high-pressure pump outlet, the area between the accumulator and the descaling tank inlet can be considered as a candidate residual pressure retention section. By simultaneously combining the continuous pressure reduction sequence and the pressure rebound propagation situation to determine the residual pressure range, it is possible to avoid mistakenly identifying locally sealed residual pressure as usable residual pressure based solely on the fact that the pressure at a certain measuring point is still high. This ensures that the subsequent pressure holding boundary and pressure replenishment starting point correspond to the pipe section that still has pressure transmission capability, improving the accuracy of segmented pressure replenishment judgment and reducing ineffective repeated pressure increases.

[0022] Among them, the pressure wave reflection formed by the closure of the injection valve is continuously tracked in the candidate residual pressure retention section; When the initial pressure rebound returns along the high-pressure water path, and subsequent pressure changes with a sequential relationship can be obtained on both sides of the candidate residual pressure retention section, it is confirmed that the water column inside the section still has a continuous pressure transmission relationship. When the pressure change disappears on one side again, the residual pressure retention zone is redefined based on the location where the change disappears. In practice, after identifying the candidate residual pressure retention section, the pressure changes after the jet valve is closed are recorded using pressure detection positions set on both sides of the section. The closure of the jet valve will change the original high-speed water flow state and form a pressure rebound in the high-pressure water path. When the rebound propagates to the pipeline connection position, the accumulator action position, or other positions where the impedance changes, it will be reflected and propagate along the high-pressure water path again. Therefore, after the first pressure rebound is detected, the candidate residual pressure retention section is not immediately identified as valid. Instead, it is observed whether a second pressure change with a time-sequential relationship to the first rebound occurs on both sides of the section. In specific judgment, the pressure change can be determined according to the time sequence of the pressure change. The pressure increase or decrease that occurs on one side of the candidate residual pressure retention section can be matched with the pressure change in the same direction that occurs on the other side. When such corresponding pressure changes can be obtained continuously on both sides, it means that the pressure wave can still propagate through the section. That is, the water column inside the section has not lost its ability to transmit pressure due to depressurization, local air intake or pressure decay. Therefore, the candidate section is confirmed as a residual pressure retention section that can continue to be used. If the pressure change can only propagate to one of the pressure measurement locations, and no corresponding change appears on the other side, it indicates that the pressure transmission relationship has been interrupted between the two. In this case, the farthest location from which the pressure change can be obtained is taken as the new effective boundary, the original candidate residual pressure retention section is shrunk towards this location, and the subsequent pressure holding range and pressure replenishment starting point are redefined. By verifying the pressure changes after the initial pressure rebound, we can avoid misjudging the usable range of residual pressure based on only one rebound or local high pressure. This allows the determination of the residual pressure retention section to reflect both the presence of pressure and whether the water column can still continuously transmit pressure, thereby improving the reliability of segmented pressure holding and segmented pressure replenishment, and reducing insufficient pressure replenishment or repeated pressure increases caused by incorrect retention of invalid residual pressure.

[0023] Among them, when the accumulator pressure rebound can continue to propagate to the descaling box inlet, but the high-pressure pump outlet does not show a corresponding pressure change, the section between the accumulator and the descaling box is defined as an independent section that maintains residual pressure. When the pressure is built up again, first keep this section isolated from the pressure relief passage, and then use the high-pressure pump to replenish the pressure lost upstream of the accumulator, so that the high-pressure pump pressure replenishment process is connected with the section that independently maintains residual pressure at the accumulator position. In practice, during the residual pressure decay phase after the jet valve is closed, the pressure changes at the accumulator, the descaling tank inlet, and the high-pressure pump outlet are continuously compared. When the pressure rebound at the accumulator can be transmitted to the descaling tank inlet at a subsequent moment, and the pressure changes at the two locations correspond in time, while the high-pressure pump outlet does not show a change corresponding to the pressure rebound, it indicates that a continuous water column and effective residual pressure are still maintained between the downstream of the accumulator and the descaling tank, while the upstream of the accumulator to the high-pressure pump outlet has basically lost the corresponding pressure transmission capacity. Thus, the section between the accumulator and the descaling tank is defined as an independently maintained residual pressure section. Before the next descaling pressure is established, the section that maintains residual pressure independently is not connected to the pressure relief passage, so that the residual pressure already formed in this section is not released prematurely. At the same time, the high-pressure pump is started to replenish the pressure in the pipeline upstream of the accumulator that has lost pressure. During the pressure replenishment process, the pressure changes at the outlet of the high-pressure pump and at the accumulator are continuously monitored. When the new pressure established by the high-pressure pump is transmitted to the accumulator and forms a continuous pressure change relationship with the original residual pressure downstream of the accumulator, it is considered that the new pressure upstream has been connected with the residual pressure downstream. Thereafter, the two are used together to establish the next working pressure for the descaling box, without having to raise the pressure from the low pressure state between the accumulator and the descaling box. In this way, the accumulator can be used as the connection point between the pressure loss section and the pressure holding section, so that the high-pressure pump only replenishes the pressure that has been actually lost, while retaining the downstream residual pressure that still has utilization value. This reduces the amount of repeated pressure increase and high-load operation time between adjacent descaling cycles, and avoids the loss of usable pressure energy due to premature pressure relief.

[0024] Among them, when the pressure rebound at the descaling box inlet can return to the accumulator position, but there is a significant attenuation at the accumulator position and it does not continue to correspond to the high-pressure pump outlet, the area between the high-pressure pump outlet and the accumulator is not included in the next pressure holding range. Before the next descaling, the pressure in the upstream section is rebuilt, and after the pressure change is transmitted back to the accumulator location, it is connected to the residual pressure downstream of the accumulator. In practice, during the pressure rebound process after the injection valve is closed, the pressure changes at the descaling box inlet, accumulator, and high-pressure pump outlet are continuously recorded. The pressure rebound is then recorded according to the order in which it propagates from downstream to upstream. When the pressure rebound first occurs at the descaling box inlet, followed by a corresponding pressure change at the accumulator location, but the rebound amplitude at the accumulator is significantly smaller than that at the descaling box inlet, and no similar rebound change occurs at the high-pressure pump outlet within the corresponding time range, it indicates that the pressure rebound can no longer be effectively transmitted to the high-pressure pump side after reaching the accumulator location. In this case, the accumulator is taken as the upstream boundary for the effective transmission of residual pressure, and the section between the high-pressure pump outlet and the accumulator is no longer considered a pressure-holding section that can be used. The section between the downstream of the accumulator and the descaling box is still considered a residual pressure retention section. Before the next descaling pressure is established, the residual pressure already retained downstream of the accumulator is maintained. The high-pressure pump repressurizes the upstream section between the high-pressure pump outlet and the accumulator. During the repressurization process, the pressure rise at the high-pressure pump outlet and the accumulator location is monitored sequentially. When the new pressure change formed on the high-pressure pump side propagates to the accumulator location and makes the pressure change at the accumulator location correspond continuously with the original residual pressure change downstream, it is determined that the upstream pressure has been rebuilt. The new pressure is then connected with the retained residual pressure downstream through the accumulator location to jointly establish the pressure required for the descaling box inlet. By dividing the pressure holding range according to the actual location that the pressure rebound can reach, it is possible to avoid continuing to use the high-pressure pump to accumulator pipe section that has lost its effective pressure transmission capability as the pressure holding object. At the same time, the residual pressure downstream of the accumulator can still be used, so that the next descaling only re-establishes pressure on the upstream pipe section that has actually lost pressure. This reduces the energy consumption caused by repeated pressurization of the entire high-pressure water circuit and improves the accuracy of segmented pressure replenishment and residual pressure connection.

[0025] Among them, between two adjacent descaling operations, the remaining time that can maintain the continuity of the water column is determined based on the shortening process of the residual pressure retention section after the previous spray. If the start time of the next descaling operation falls within the remaining time, segmented pressurization will be performed. If the start time of the next descaling operation exceeds the remaining time, residual pressure will be allowed to continue to be released without maintaining high-pressure pumps at high load. The pressure of the entire water circuit will be re-established before the next descaling operation. In practice, after the previous injection valve is closed, the pressure changes at the high-pressure pump outlet, accumulator and descaling box inlet are continuously recorded, and the residual pressure retention section is determined according to the aforementioned method. As the interval between two adjacent descaling operations increases, the residual pressure retention section will gradually shorten towards the side that can still maintain pressure transmission as the pressure decreases. The position changes of the boundary of the residual pressure retention section and whether the pressure changes between adjacent pressure measurement positions can still form a sequential relationship can be continuously recorded. When a certain position no longer shows a pressure change corresponding to the adjacent position, this moment is taken as the time node when the continuous range of the water column shortens to that position. Based on the shortening process formed by multiple consecutive time nodes, the remaining time for the current residual pressure retention section to continue to maintain continuous pressure transmission is determined. After obtaining the estimated start time of the next descaling, it is compared with the remaining time. If the next descaling can start before the residual pressure retention section loses its continuous pressure transmission capacity, the existing pressure in that section is retained, and segmented pressure replenishment is implemented from upstream of the pressure holding boundary before descaling, so that the newly established pressure is connected with the downstream retained residual pressure. If the start time of the next descaling has exceeded the remaining time, it indicates that even if the current residual pressure continues to be maintained, it is difficult to directly participate in the establishment of the next pressure. At this time, the pressure holding time is no longer extended by increasing or maintaining the output of the high-pressure pump, but the residual pressure in the high-pressure water circuit is allowed to continue to be released according to the original decay process. When it is close to the next descaling, the high-pressure pump will re-establish the working pressure of the entire water circuit. By corresponding the time during which residual pressure can maintain continuous pressure transmission to the adjacent descaling interval, it is possible to avoid keeping the high-pressure pump in a high-load standby state for a long time in order to save residual pressure that is about to fail. At the same time, when the descaling interval is short, the effective residual pressure retained in the previous cycle can be fully utilized, thereby forming a dynamic choice between the benefits of residual pressure reuse and the energy consumption of pressure holding, reducing the energy consumption caused by ineffective pressure holding and repeated pressure increase.

[0026] When performing segmented pressure replenishment, when the new pressure change formed by the pressure replenishment reaches the pressure holding boundary and is continuously connected with the pressure change of the original residual pressure downstream of the pressure holding boundary, the output of the high-pressure pump is stopped, so that the downstream residual pressure and the upstream new pressure work together to complete the establishment of descaling pressure. In practice, after determining the pressure holding boundary, the high-pressure pump starts to replenish pressure from the upstream side of the pressure holding boundary, and continuously obtains the pressure changes at the high-pressure pump outlet, the pressure holding boundary position, and the downstream pressure measurement position. In the initial stage of pressure replenishment, the upstream new pressure first forms a continuous rise at the high-pressure pump outlet and propagates along the high-pressure water path to the pressure holding boundary; downstream of the pressure holding boundary, the usable residual pressure formed after the previous descaling is maintained. During the control process, the judgment of whether the descaling box inlet reaches the set pressure is not simply based on whether the high-pressure pump continues to increase its output, but rather focuses on judging whether the new pressure has formed a continuous transmission relationship with the downstream residual pressure. When a pressure change corresponding to the increase in high-pressure pump outlet pressure appears at the pressure holding boundary, continue to compare the pressure change at this location with that at the downstream pressure measuring location. If the original downstream residual pressure is not interrupted after the new pressure arrives and continues to show a pressure response in the same direction as the pressure change at the pressure holding boundary, it indicates that the newly established pressure upstream has crossed the pressure holding boundary and formed a continuous water column pressure transmission state with the downstream residual pressure. At this time, stop increasing the output of the high-pressure pump and maintain the output level that can maintain this continuous pressure transmission state. The pressure establishment at the descaling box inlet is completed by the new upstream pressure and the original downstream residual pressure. If the downstream pressure does not show a corresponding continuous change after the new pressure reaches the pressure holding boundary, it means that the original reserved residual pressure has not been effectively connected with the new pressure. At this time, continue to add pressure until the pressure changes on both sides form a continuous correspondence again. By using the connection between the new pressure and the existing residual pressure as the condition for stopping further pressure increases, it is possible to avoid continuously increasing the output of the high-pressure pump in pursuit of a single pressure setpoint, fully utilize the existing pressure energy downstream, reduce the amount of repeated pressure increases and the high-load operation time of the pump set, and at the same time ensure that the pressure required for the next descaling can be established continuously and stably.

[0027] Among them, when the time required for the pressure rebound to return from the descaling box inlet to the same upstream position increases in multiple consecutive descaling cycles, while the timing of valve action remains unchanged, this change is determined to be a change in the propagation state of the high-pressure water circuit pressure wave. In this state, the use of historical residual pressure retention sections for segmented pressurization is suspended, and the pressure holding boundary is re-determined based on the pressure reflection after the injection ends. In practice, during multiple consecutive descaling cycles, the moment the jet valve closes is taken as the unified starting point for the pressure transient. The moment when the pressure rebound occurs at the descaling box inlet and the moment when the rebound propagates to the same upstream pressure measurement position are recorded. The propagation time corresponding to each cycle is compared. To eliminate the influence caused by the control action itself, the action time of related valves such as the jet valve and the relief valve is also recorded. When the action time of each valve remains unchanged, but the time required for the pressure rebound to propagate from the descaling box inlet to the same upstream position increases continuously, it indicates that the pressure change is not caused by the change in valve control timing, but rather by the change in the pressure wave propagation state inside the high-pressure water circuit. After the above situation occurs, the previously determined residual pressure retention section can no longer be used for the next cycle of segmented pressurization, so as to avoid the inconsistency between the historical pressure holding boundary and the current actual pressure transmission range. At this time, after the current spray ends, the pressure reflection process of the descaling box inlet, accumulator and high pressure pump outlet is continuously collected again. The continuous range of the water column is re-determined according to the position that the pressure rebound can reach in sequence. The farthest upstream position that can continuously obtain the change corresponding to the downstream pressure reflection is determined as the new pressure holding boundary, and the residual pressure retention section and the starting point of the next pressurization are re-determined. By distinguishing the continuous change in pressure wave propagation time from the valve actuation time, the actual changes in the pressure transmission state of the high-pressure water circuit can be identified in a timely manner, avoiding inaccurate judgment of the pressure replenishment position caused by continuing to use the historical residual pressure range. At the same time, by reusing the natural pressure reflection after the injection ends to define the pressure holding boundary, subsequent segmented pressure replenishment always corresponds to the pipe section with the current actual continuous pressure transmission capacity, improving the reliability of residual pressure reuse and reducing energy waste caused by incorrect pressure holding or ineffective pressure replenishment.

[0028] Among them, when the return time of the pressure rebound remains stable, while the rebound amplitude continuously decreases at the same pipeline position, the decrease will correspond to the static pressure holding process after the injection valve is closed. When the static pressure can be maintained but the rebound amplitude decreases, the original pressure holding boundary is retained but the range of residual pressure that can be used next time is reduced. When the static pressure and rebound amplitude decay synchronously, the reuse of residual pressure in this section is cancelled, so that the pressure wave propagation state and the static residual pressure jointly limit the available residual pressure. In practice, the pressure rebound time and rebound amplitude at the same pipeline pressure measurement location are recorded during multiple consecutive descaling cycles. If the time required for the pressure rebound to return from downstream to that location remains relatively stable, it indicates that the propagation path of the pressure wave and the continuity of the water column have not changed significantly. On this basis, if the rebound amplitude decreases continuously, the static residual pressure at that location after the jet valve is closed is further considered to distinguish between two states: the pressure can still be maintained but the dynamic transmission capacity is weakened, and the pressure itself is also continuously being lost. When the static pressure after the injection valve is closed can be maintained in the aforementioned pressure-holding state, and the pressure rebound amplitude decreases cycle by cycle, it indicates that the pipe section still has a certain residual pressure, but the ability of the residual pressure to continue to be transmitted to adjacent sections and participate in the next pressure establishment has been weakened. At this time, instead of immediately canceling the original pressure-holding boundary, the range of residual pressure reuse for the next time is reduced, and the pipe sections near the rebound decay position are excluded from the usable residual pressure section, and only the part that can still form a stable pressure change correspondence is retained to participate in the segmented pressure replenishment. When the static residual pressure and pressure rebound amplitude at the same location decrease continuously at the same time, it indicates that not only is the dynamic pressure transmission capacity of this section weakened, but the actual retained pressure is also disappearing synchronously. At this time, the reuse of residual pressure in this section should be cancelled, and the pressure of the corresponding pipe section should be re-established before the next descaling. By combining the pressure rebound amplitude with the static residual pressure, we can avoid prematurely abandoning usable residual pressure just because the pressure wave weakens, and we can also avoid continuing to incorrectly maintain pressure when the static pressure has already significantly decreased. This makes the usable residual pressure range more closely match the actual pressure state of the pipeline, improves the accuracy of segmented pressure replenishment, and reduces the energy consumption caused by ineffective pressure maintenance and repeated pressure increases.

[0029] In the event of a transient pressure surge exceeding the normal pressure rebound range after the jet valve is closed, the pressure already located upstream of the pressure holding boundary is first released, while maintaining a continuous water column downstream of the pressure holding boundary. After the pressure rebound propagates upstream and decays, the downstream pressure is then determined to be retained or released based on the newly formed residual pressure retention section, so that the transient pressure reduction process and the residual pressure retention process of the next descaling share the same pressure release process. In practice, after the jet valve is closed, the pressure changes at the inlet of the descaling box, the accumulator and the outlet of the high-pressure pump are monitored. The pressure rebound amplitude formed after the jet valve is closed in a continuous normal descaling cycle is taken as the normal pressure rebound range. When a transient pressure rise that significantly exceeds the normal pressure rebound range occurs in the current cycle, the entire high-pressure water circuit is not immediately depressurized synchronously. Instead, the upstream section to be released and the downstream residual pressure retention section are distinguished in combination with the already determined pressure holding boundary. During the control process, the upstream of the pressure holding boundary is first connected to the pressure relief passage to release the excessive pressure formed in this section. At the same time, the downstream of the pressure holding boundary is kept isolated from the pressure relief passage so that the downstream water column does not lose pressure as a whole due to abnormal transient pressure increase. As the upstream pressure is released, the process of pressure rebound propagating to the high-pressure pump side and gradually attenuating is continued to be tracked. When the rebound amplitude returns to the normal range of change, the pressure changes on both sides of the pressure holding boundary are compared again to see if they can still be obtained with a sequential relationship, and the residual pressure retention section is re-determined. If the downstream section remains in a continuous pressure transmission relationship after redetermination, the residual pressure in that section will be retained for segmented pressure replenishment during the next descaling; if the pressure rebound can no longer form a corresponding propagation on both sides of that section, the pressure holding in that section will be released and the remaining pressure will be allowed to continue to be released.

[0030] By using the above method, when reducing abnormal transient pressure rise, the pressure already located upstream of the pressure holding boundary can be released first, avoiding the release of the downstream residual pressure that can still be used in order to eliminate local overpressure. This allows the transient pressure reduction and residual pressure range to be re-screened in one depressurization process, thereby taking into account the pressure safety of the high-pressure water circuit and the subsequent reuse of residual pressure, and reducing the energy consumption generated by re-establishing the pressure of the entire water circuit during the next descaling.

[0031] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A hot-rolled high-pressure water descaling energy-saving and cost-reducing process, characterized in that, include: Step 1: After each injection valve is closed, continuously obtain the residual pressure decay process of the high-pressure pump outlet, accumulator and descaling tank inlet. According to the order of continuous pressure drop, pressure rebound and decay at each position, determine the residual pressure retention section in the high-pressure water circuit that still maintains pressure transmission capacity. Step 2: Correspond the residual pressure retention section to the pressure establishment process required for the next descaling. When the residual pressure retention section can maintain the water column continuity until the next descaling, replenish the lost pressure from the upstream side of the section so that the retained residual pressure can continue to participate in the pressure establishment for the next descaling. Step 3: When the propagation sequence of pressure rebound changes or the residual pressure retention section disappears prematurely, stop using the previous pressure replenishment position and redetermine the pressure holding boundary and pressure replenishment starting point according to the new residual pressure decay process.

2. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 1, characterized in that, The determination of the residual pressure retention zone includes: The moment when the pressure transient begins to drop is recorded sequentially, with the closure of the injection valve as the starting event of the pressure transient. The moments when the descaling tank inlet, accumulator, and high-pressure pump outlet begin to continuously decrease in pressure are recorded. When the downstream position maintains pressure after the upstream position begins to decrease pressure, and then a pressure rebound occurs due to valve closure, the area between the downstream position and the position where the corresponding rebound first is lost is identified as a candidate residual pressure retention section, so that the determination of the residual pressure position is not based on the residual pressure value of a single measuring point.

3. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 2, characterized in that, Continue to track the pressure wave reflection formed by the closure of the injection valve in the candidate residual pressure retention section; When the initial pressure rebound returns along the high-pressure water path, and subsequent pressure changes with a sequential relationship can be obtained on both sides of the candidate residual pressure retention section, it is confirmed that the water column inside the section still has a continuous pressure transmission relationship. When the pressure change disappears on one side again, the residual pressure retention zone is redefined based on the location where the change disappears.

4. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 3, characterized in that, When the accumulator pressure rebound can continue to propagate to the descaling box inlet, but no corresponding pressure change appears at the high-pressure pump outlet, the section between the accumulator and the descaling box is defined as an independent section that maintains residual pressure. When the pressure is built up again, the section is first isolated from the pressure relief passage, and then the high-pressure pump replenishes the pressure lost upstream of the accumulator, so that the high-pressure pump pressure replenishment process is connected with the section that independently maintains residual pressure at the accumulator position.

5. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 4, characterized in that, When the pressure rebound at the descaling box inlet can return to the accumulator position, but there is a significant decrease at the accumulator position and it does not continue to correspond to the high-pressure pump outlet, the area between the high-pressure pump outlet and the accumulator will not be included in the next pressure holding range. Before the next descaling, the pressure in the upstream section is rebuilt, and after the pressure change is transmitted back to the accumulator location, it is connected to the residual pressure downstream of the accumulator.

6. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 5, characterized in that, Between two consecutive descaling operations, the remaining time that can maintain the continuity of the water column is determined based on the shortening process of the residual pressure retention section after the previous spray. If the next descaling start time falls within the remaining time, segmented pressure replenishment is performed. If the next descaling start time exceeds the remaining time, residual pressure is allowed to continue to be released without maintaining high-pressure pump high-load standby, and the full water circuit pressure is re-established before the next descaling.

7. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 6, characterized in that, When performing segmented pressure replenishment, when the new pressure change formed by the pressure replenishment reaches the pressure holding boundary and is continuously connected with the pressure change of the original residual pressure downstream of the pressure holding boundary, the output of the high-pressure pump is stopped, so that the residual pressure downstream and the newly added pressure upstream can work together to complete the establishment of descaling pressure.

8. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 7, characterized in that, When the time required for the pressure rebound to return from the descaling box inlet to the same upstream position increases during multiple consecutive descaling cycles, while the timing of valve action remains unchanged, this change is identified as a change in the propagation state of the high-pressure water circuit pressure wave. In this state, the use of historical residual pressure retention sections for segmented pressurization is suspended, and the pressure holding boundary is re-determined based on the pressure reflection after the injection ends.

9. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 8, characterized in that, When the return time of the pressure rebound remains stable, while the rebound amplitude continuously decreases at the same pipeline position, the decrease is correlated with the static pressure holding process after the injection valve is closed. When the static pressure can be maintained but the rebound amplitude decreases, the original pressure holding boundary is retained but the range of residual pressure that can be used next time is reduced. When the static pressure and rebound amplitude decay synchronously, the reuse of residual pressure in this section is cancelled, so that the pressure wave propagation state and the static residual pressure jointly limit the usable residual pressure.

10. The hot rolling high-pressure water descaling energy-saving and consumption-reducing process according to claim 9, characterized in that, When a transient pressure surge occurs that exceeds the normal pressure rebound range after the jet valve is closed, first release the pressure that is already upstream of the pressure holding boundary, and maintain a continuous water column downstream of the pressure holding boundary; After the pressure rebound propagates upstream and decays, the downstream pressure is either retained or released based on the newly formed residual pressure retention section, so that the transient pressure reduction process and the residual pressure retention process of the next descaling share the same pressure release process.