A long nozzle docking device
By designing a long nozzle docking device that includes a mounting base and a cantilever, and using hydraulic drive and a moving trolley to achieve precise docking of long water pipes, the problem of difficult long nozzle alignment and installation is solved, efficiency and stability are improved, and the purity of molten steel is ensured.
Patent Information
- Application Number
- CN202611279660.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-21
- Publication Date
- 2026-11-24
AI Technical Summary
In existing technologies, the alignment, immersion, insertion, and removal and transportation of long nozzles after pouring rely on manual hoisting, which has problems such as poor hoisting accuracy, long time consumption, and many safety hazards.
Design a long water inlet docking device, including a mounting base and a cantilever. One end of the cantilever is hinged to the mounting base, and the end away from the mounting base is normally raised. The position of the long water pipe is adjusted by hydraulically driving the cantilever. With the help of a moving trolley and a positioning pin, the long water pipe can be accurately docked and stably inserted.
It improves the docking efficiency of long nozzles, reduces the space occupied by the overall structure, enhances operational stability and safety, reduces the possibility of molten steel being carried into the slag layer, and improves the purity of molten steel.
Smart Images

Figure CN123149398A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the technical field of long water inlet structures, and in particular to a long water inlet docking device. Background Technology
[0002] In the vacuum casting process of special steel smelting, the inside of the vacuum vessel is a closed negative pressure environment, making it impossible to directly inject molten steel into the vacuum vessel. Therefore, the industry commonly sets up a transition ladle as a transfer container at the inlet of the vacuum vessel. In actual casting operations, the high-temperature molten steel in the ladle is first injected into the transition ladle, and then the molten steel is smoothly guided to the vacuum vessel below through the drain outlet at the bottom of the transition ladle to complete the vacuum refining casting.
[0003] The transition ladle is a vacuum vessel used to seal the molten steel. To prevent secondary oxidation of the molten steel and isolate it from air, a protective slag layer is laid above the surface of the molten steel inside the transition ladle. This slag layer blocks contact between the molten steel and the outside atmosphere and reduces heat loss. In practice, if the molten steel from the filling ladle is directly added to the transition ladle, the added molten steel will be directly exposed to the outside environment. Simultaneously, the added molten steel will carry the slag layer into the drain outlet, reducing the purity of the molten steel. Therefore, a long nozzle guide structure must be provided on site, with the lower end of the long nozzle inserted below the surface of the molten steel in the transition ladle, allowing the added molten steel to flow directly into the molten steel body, bypassing the slag layer.
[0004] Currently, in vacuum casting production lines, the alignment, immersion, and transfer of long nozzles, as well as their removal and transport after casting, mainly rely on manual lifting with the assistance of gantry cranes. The gantry cranes suffer from poor alignment accuracy, require repeated lifting and adjustment, are time-consuming, and the overall process is cumbersome, consuming significant crane time and affecting the overall production line's operational rhythm. Furthermore, the high-altitude lifting of long nozzles carries the risk of swaying and displacement, potentially leading to misalignment and molten steel leakage, thus necessitating further improvements. Summary of the Invention
[0005] To improve the docking efficiency of long water inlets, this application provides a long water inlet docking device.
[0006] The long nozzle docking device provided in this application adopts the following technical solution: A long water inlet docking device includes a mounting base and a cantilever. One end of the cantilever is hinged to the mounting base, and a long water conduit is hinged to the end of the cantilever away from the mounting base. The upper end of the long water conduit is used to dock with a filling package. The end of the cantilever away from the mounting base is normally raised to force the lower end of the long water conduit to be raised away from the transition package.
[0007] By adopting the above technical solution, a cantilever equipped with a long water pipe (long nozzle) is mounted on an installation base. Under normal conditions, the end of the cantilever furthest from the installation base is raised to lift the long water pipe out of the transition ladle. As vacuum refining and casting proceed, when the transition ladle needs to be replenished with molten steel, a filling ladle containing molten steel is hoisted above the transition ladle by a gantry crane to connect with the long water pipe. Then, the filling ladle is lowered a certain distance, and the filling ladle presses down on the long water pipe, forcing the long water pipe to extend into the transition ladle. This allows the molten steel discharged from the filling ladle to bypass the slag layer and directly enter the molten steel surface of the transition ladle, improving the docking efficiency of the long nozzle.
[0008] Optionally, it also includes a mobile trolley, which is equipped with a column, and the mounting base is rotatably mounted on the column.
[0009] By adopting the above technical solution, when the transition ladle does not require replenishment of molten steel, the cantilever can be moved above the transition ladle by a moving trolley. Furthermore, depending on the layout of the workshop equipment, the mounting base can be rotated appropriately to adjust the orientation of the cantilever and long water pipe, improving the overall structure's ease of storage and reducing its overall workshop space occupancy.
[0010] Optionally, the bottom of the mobile trolley is provided with a guide rail, which is located on one side of the transition bag; multiple rolling wheels are rotatably mounted on the bottom of the mobile trolley, and the rolling wheels are rotatably mounted on the guide rail; a positioning pin is connected to the side wall of the mobile trolley, and a positioning hole for the positioning pin to be inserted is opened on the side wall of the guide rail.
[0011] By adopting the above technical solution, when the transition ladle needs to be replenished with molten steel, the moving trolley is moved to one side of the transition ladle, and the rotation angle of the mounting base is controlled to transfer the long water pipe to the top of the transition ladle. At this time, the positioning pin is inserted into the positioning hole to fix the position of the moving trolley, thereby reducing the possibility of the moving trolley sliding freely during the molten steel pouring process.
[0012] Optionally, the cantilever includes a swing cylinder and a swing rod, one end of the swing cylinder is hinged to the mounting base, one end of the swing rod is slidably inserted into the swing cylinder, and a long water conduit is hinged to the end of the swing rod away from the swing cylinder.
[0013] By adopting the above technical solution, the specific position of the long water conduit is adjusted by controlling the extension of the swing arm, so that the long water conduit can be smoothly connected to the filling package and the transition package, thereby improving the adaptability of the overall structure.
[0014] Optionally, the swing arm includes a first swing part and a second swing part, one end of the first swing part is slidably inserted into the swing cylinder, one end of the second swing part is slidably inserted into the first swing part, a long water conduit is hinged to the second swing part, and a first spring is provided between the first swing part and the second swing part.
[0015] By adopting the above technical solution, the swing arm is composed of a first swing part and a second swing part. This allows the second swing part to slide downwards during the process of the filling bag pressing down on the long water guide tube, forcing the cantilever to swing downwards. This ensures that the long water guide tube maintains vertical sliding as much as possible during its downward movement, reducing horizontal offset. This design reduces the possibility of the long water guide tube colliding with the inner wall of the top inlet of the transition bag during its insertion into the transition bag, thus improving the overall operational stability of the structure.
[0016] Optionally, the transition package is provided with a mounting frame, on which a lifting ring is slidably mounted, and a punching head is provided on the lifting ring; a second spring is provided between the lifting ring and the mounting frame, and the second spring normally forces the punching head to lift away from the slag layer; when the filling package presses the long water conduit to extend into the transition package, the lower end of the long water conduit punches through the slag layer through the punching head.
[0017] By adopting the above technical solution, the punch head is slidably installed on the mounting frame via the lifting ring. When the long water pipe extends into the transition ladle, the lower end of the long water pipe pushes the punch head downward, using the punch head to squeeze open the slag layer in the transition ladle, reducing the possibility of the slag layer entering the long water pipe and being carried into the molten steel surface of the transition ladle by the replenished molten steel, thus ensuring the purity of the molten steel in the transition ladle.
[0018] Optionally, the punch head includes multiple expansion sections, each of which is slidably mounted on the lifting ring so as to be able to slide radially along the lifting ring; a third spring is provided between the expansion section and the lifting ring, the third spring forcing two adjacent expansion sections to abut against each other, and the multiple expansion sections enclose an isolation space, the top of the isolation space being open for the insertion of a long water conduit.
[0019] By adopting the above technical solution, under normal conditions, all expansion sections slide towards the center of the lifting ring under the action of their respective third springs to form an open isolation space at the top. The filling ladle presses the long water guide tube into the transition ladle, forcing the long water guide tube to insert into the isolation space of the punch head. As the long water guide tube extends, it drives the punch head to move downward and squeezes open the slag layer, allowing the long water guide tube to pass over the slag layer and extend into the molten steel surface of the transition ladle, reducing the possibility of slag layer entering the long water guide tube and ensuring the purity of the molten steel in the transition ladle.
[0020] Optionally, a limiting rod is slidably installed on the lifting ring, with one end of the limiting rod forming a limiting end; a first limiting hole is opened on the side wall of the expansion part, and the limiting end is normally inserted into the first limiting hole, forcing two adjacent expansion parts to remain in abutting state.
[0021] By adopting the above technical solution, under normal conditions, the limiting end of the limiting rod is inserted into the first limiting hole, keeping the multiple expansion parts in a contracted state to form an isolation space for the insertion of the long water guide tube. When the long water guide tube pushes the breaking head downward and uses the breaking head to squeeze open the slag layer, it forces the limiting end to disengage from the limiting hole. As the long water guide tube extends in, it squeezes open all the expansion parts and continues to extend into the molten steel in the transition ladle, so as to introduce the molten steel discharged from the charging ladle into the molten steel surface of the transition ladle.
[0022] Optionally, the end of the limiting rod away from the limiting end forms a pushing end, and the mounting frame has a pushing surface; when the long water conduit drives the breaking head to penetrate the slag layer, the pushing surface pushes the limiting rod through the pushing end and forces the limiting end to disengage from the first limiting hole; each expansion part has a guide slope on its inner side, and the long water conduit forces all expansion parts to expand outward through the guide slope.
[0023] By adopting the above technical solution, the long water guide tube pushes the breaker head downwards, and after the breaker head squeezes open the slag layer, the pushing surface pushes the limiting rod upwards through the pushing end, forcing the limiting end of the limiting rod to disengage from the first limiting hole, thus "unlocking" the expansion section. As the long water guide tube extends, it pushes the expansion section to slide radially along the lifting ring through the guide inclined surface. The effect is that during the process of the long water guide tube extending into the transition ladle, it first drives the breaker head to squeeze open the slag layer (at this time, all expansion sections remain in a contracted state); after squeezing out the slag layer, as the long water guide tube extends, it forces all expansion sections to expand outwards to open the breaker head, allowing the molten steel discharged from the ladle to be introduced into the molten steel surface of the transition ladle, improving the overall operational convenience of the structure.
[0024] Optionally, the sidewall of the expansion section is provided with a second limiting hole. When the long water conduit passes through all the expansion sections, the limiting end is inserted into the second limiting hole, forcing all expansion sections to remain in an expanded state.
[0025] By adopting the above technical solution, after the long water guide tube forces all the expansion sections to expand outward, the limiting end of the limiting rod is inserted into the second limiting hole to restrict the slippage of the expansion sections, thus forcing all expansion sections to remain in an expanded state. This design ensures that when the lifting ring lifts the breaking head away from the slag layer, the breaking head remains in an "expanded state," avoiding the possibility that the molten steel remaining in the isolation space cannot fall downwards due to the breaking head being in a "closed state" after being lifted away, thereby improving the overall operational stability of the structure. Attached Figure Description
[0026] Figure 1 This is a schematic diagram of the overall structure of Example 1; Figure 2 This is a schematic diagram illustrating the structure of the mounting base and cantilever in Example 1; Figure 3 This is a partial cross-sectional view of the rotating rod in Embodiment 1; Figure 4 This is a partial cross-sectional view of the pendulum rod in Embodiment 2; Figure 5 This is a schematic diagram illustrating the structure of the lifting ring and the mounting frame in Example 3; Figure 6 This is a schematic diagram of the structure of the long water conduit with its expansion section shown in Example 3; Figure 7 This is a partial cross-sectional view of the isolated space in Example 3; Figure 8 This is a partial cross-sectional view of Embodiment 3 showing the limiting rod; Figure 9 yes Figure 8 Enlarged view of point A in the middle; Figure 10 This is a schematic diagram illustrating the structure of the lifting ring in Example 4; Figure 11 This is a partial cross-sectional view of Embodiment 4 showing the second limiting hole.
[0027] Explanation of reference numerals in the attached drawings: 1. Mounting base; 11. Operating handle; 12. Hydraulic cylinder; 2. Cantilever; 21. Swing cylinder; 22. Swing rod; 221. First swing part; 222. Second swing part; 223. First spring; 23. Gearbox; 231. Drive handwheel; 3. Long water pipe; 31. Rotating rod; 4. Moving trolley; 41. Column; 42. Rolling wheel; 43. Positioning pin; 5. Operating platform; 51. Guide rail; 511. Positioning hole; 6. Mounting bracket; 61. Lifting ring 611. Lifting ring; 612. Hook ring; 62. Second spring; 63. Limiting rod; 631. Limiting end; 632. Pushing end; 64. Pushing surface; 65. Mounting strip; 66. Guide rod; 7. Punching head; 71. Expansion section; 711. First limiting hole; 712. Guide slope; 713. Second limiting hole; 714. Connecting rod; 715. Sliding block; 716. Pushing slope; 72. Third spring; 73. Isolation space; 8. Filling bag; 9. Transition bag. Detailed Implementation
[0028] The following combination Figures 1-11 This application will be described in further detail.
[0029] Example 1: This application discloses a long water inlet docking device.
[0030] Reference Figure 1 , Figure 2A long nozzle docking device includes a mobile trolley 4, a mounting base 1, and a cantilever 2. The bottom of the mobile trolley 4 has an operating platform 5, and a guide rail 51 is fixedly installed on the operating platform 5. The guide rail 51 is located on one side of the transition package 9 of the vacuum vessel. Multiple rolling wheels 42 are rotatably installed on the bottom of the mobile trolley 4, and the rolling wheels 42 are rotatably installed on the guide rail 51.
[0031] A column 41 is fixedly installed on the mobile trolley 4. A mounting base 1 is rotatably installed on the column 41. An operating handle 11 is fixedly installed on the side wall of the mounting base 1, which drives the mounting base 1 to rotate around the column 41. One end of the cantilever 2 is installed on the mounting base 1. In this embodiment, the cantilever 2 includes a swing cylinder 21 and a swing rod 22. One end of the swing cylinder 21 is hinged to the side wall of the mounting base 1, and one end of the swing rod 22 is slidably inserted into the swing cylinder 21. The swing cylinder 21 and the swing rod 22 are combined to form a telescopic cantilever 2.
[0032] The specific structure of the cantilever 2 telescopic can be as follows: a reduction gearbox 23 is installed at the end of the swing cylinder 21 away from the swing rod 22. The reduction gearbox 23 is equipped with a meshing worm gear. A drive screw is rotatably installed in the swing cylinder 21. The drive screw is threaded through the swing rod 22. One end of the drive screw extends into the reduction gearbox 23 and is fixed coaxially with the worm gear. One end of the worm gear extends out of the reduction gearbox 23 and is fixed coaxially with a drive handwheel 231.
[0033] Reference Figure 2 , Figure 3 A long water conduit 3 (i.e., the long water inlet described in the background art) is installed at the end of the swing rod 22 away from the swing cylinder 21. A rotating rod 31 is fixedly installed on the outer peripheral wall of one end of the long water conduit 3. The rotating rod 31 is rotatably installed at the end of the swing rod 22 away from the swing cylinder 21. Under normal conditions, the long water conduit 3 flips to a vertical state under its own gravity.
[0034] The upper end of the long water guide tube 3 is used to connect to the outlet at the bottom of the filling vessel 8, and the lower end of the long water guide tube 3 is used to extend into the molten steel surface inside the transition vessel 9. Under normal conditions, the end of the cantilever 2 away from the mounting base 1 is raised to force the lower end of the long water guide tube 3 away from the transition vessel 9. The specific method of raising the cantilever 2 is hydraulically driven, that is, a hydraulic cylinder 12 is provided on the mounting base 1, the cylinder body of the hydraulic cylinder 12 is hinged to the mounting base 1, and the piston rod of the hydraulic cylinder 12 is hinged to the outer peripheral wall of the swing cylinder 21 of the cantilever 2, so as to achieve the raising of the end of the cantilever 2 away from the mounting base 1 under normal conditions.
[0035] In this embodiment, a positioning pin 43 is slidably installed on the side wall of the mobile trolley 4, and a positioning hole 511 is opened on the side wall of the guide rail 51. The positioning pin 43 is inserted into the positioning hole 511 from top to bottom. When the positioning pin 43 is inserted into the positioning hole 511, the long water pipe 3 moves to the top of the transition package 9.
[0036] The implementation principle of Embodiment 1 of this application is as follows: A cantilever 2 equipped with a long water pipe 3 (long nozzle) is set on the mounting base 1. Under normal conditions, the end of the cantilever 2 away from the mounting base 1 is raised upward to lift the long water pipe 3 out of the transition ladle 9. As vacuum refining and casting proceeds, when the transition ladle 9 needs to be replenished with molten steel, a filling ladle 8 containing molten steel is hoisted above the transition ladle 9 by a gantry crane to connect with the long water pipe 3; then the filling ladle 8 is lowered a certain distance, and the filling ladle 8 presses the long water pipe 3, forcing the long water pipe 3 to extend into the transition ladle 9, so that the molten steel discharged from the filling ladle 8 can pass over the slag layer and directly enter the molten steel surface of the transition ladle 9, thereby improving the docking efficiency of the long nozzle.
[0037] After the molten steel is poured, the pouring ladle 8 is removed, and the cantilever 2 is raised under hydraulic pressure, causing the long water pipe 3 to be lifted away from the transition ladle 9. The cantilever 2 can then be moved out of the top of the transition ladle 9 by the moving trolley 4. By utilizing the telescopic nature of the cantilever 2 and the rotation of the mounting base 1, the position of the long water pipe 3 can be precisely adjusted, allowing the long water pipe 3 to smoothly connect to the actual position of the transition ladle 9, thus improving the adaptability of the overall structure.
[0038] Example 2: This application discloses a long water inlet docking device.
[0039] The difference between the long nozzle docking device disclosed in this application and Embodiment 1 is that: Reference Figure 4 In this embodiment, the swing arm 22 includes a first swing portion 221 and a second swing portion 222. One end of the first swing portion 221 is slidably inserted into the swing cylinder 21, that is, the drive screw is threaded through the first swing portion 221. The second swing portion 222 is located on the side of the first swing portion 221 away from the swing cylinder 21, and one end of the second swing portion 222 is slidably inserted into the first swing portion 221. The long water conduit 3 is hinged to the end of the second swing portion 222 away from the first swing portion 221. A first spring 223 is installed inside the first swing portion 221, with one end of the first spring 223 fixedly connected to the first swing portion 221 and the other end fixedly connected to the second swing portion 222.
[0040] The implementation principle of Embodiment 2 of this application is as follows: The swing arm 22 is composed of a first swing part 221 and a second swing part 222. During the process of the filling bag 8 pressing down on the long water conduit 3 and forcing the cantilever 2 to swing downwards, the sliding amount of the second swing part 222 compensates for this, ensuring that the long water conduit 3 maintains vertical sliding as much as possible during its downward movement, reducing the horizontal offset during the downward movement of the long water conduit 3. This design reduces the possibility of the long water conduit 3 colliding with the inner wall of the top inlet of the transition bag 9 during its insertion into the transition bag 9, thus improving the overall operational stability of the structure.
[0041] Example 3: This application discloses a long water inlet docking device.
[0042] The difference between the long nozzle docking device disclosed in this application and Embodiment 2 is that: Reference Figure 5 , Figure 6 In this embodiment, a mounting frame 6 is installed on the top of the transition package 9 (the transition package 9 and the filling package 8 are not shown in the figure of this embodiment). The mounting frame 6 is ring-shaped, and a mounting strip 65 is fixedly installed on the outer peripheral wall of the mounting frame 6. The mounting strip 65 is detachably installed on the top wall of the transition package 9 by means of bolt connection. A lifting ring 61 is installed on the mounting frame 6. The lifting ring 61 and the mounting frame 6 are coaxially arranged. Multiple guide rods 66 are fixedly installed on the mounting frame 6. The guide rods 66 are arranged vertically. Each guide rod 66 passes through the lifting ring 61. The lifting ring 61 is slidably installed on the mounting frame 6 through the multiple guide rods 66 so as to be able to be raised and lowered.
[0043] A breaking head 7 is installed at the bottom of the lifting ring 61. The breaking head 7 is used to break open the slag layer inside the transition ladle 9, allowing the long water conduit 3 to penetrate into the molten steel surface of the transition ladle 9. A second spring 62 is sleeved on the outside of each guide rod 66. One end of the second spring 62 is fixedly connected to the guide rod 66, and the other end is fixedly connected to the lifting ring 61. Under normal conditions, the second spring 62 forces the lifting ring 61 to rise, and forces the breaking head 7 to lift away from the slag layer. When the filling ladle 8 presses the long water conduit 3 into the transition ladle 9, the lower end of the long water conduit 3 breaks through the slag layer through the breaking head 7.
[0044] Reference Figure 6 , Figure 7 , Figure 8 In this embodiment, the punch head 7 includes multiple expansion sections 71, which are arranged in a ring around the central axis of the lifting ring 61. A connecting rod 714 is fixedly connected to the top of each expansion section 71, and a sliding block 715 is fixedly connected to the upper end of the connecting rod 714. The sliding block 715 is slidably mounted on the bottom wall of the lifting ring 61, allowing it to slide radially along the lifting ring 61. A third spring 72 is installed between the sliding block 715 of each expansion section 71 and the lifting ring 61. One end of the third spring 72 is fixedly connected to the lifting ring 61, and the other end is fixedly connected to the sliding block 715. Under normal conditions, the third spring 72 forces the sliding block 715 to move towards the center of the lifting ring 61, so that adjacent expansion sections 71 abut against each other.
[0045] Multiple expansion sections 71 enclose each other to form an isolation space 73, with an open top for the insertion of a long water conduit 3. Each expansion section 71 has a pushing slope 716 on its outer side for pushing apart the slag layer, and a guiding slope 712 on its inner side. When the lower end of the long water conduit 3 extends into the isolation space 73, the lower end of the long water conduit 3 abuts against the guiding slope 712, and the guiding slope 712 forces all expansion sections 71 to expand outward.
[0046] Reference Figure 8 , Figure 9 A limiting rod 63 is slidably installed on the lifting ring 61. The number of limiting rods 63 corresponds to the number of expansion parts 71. In this embodiment, the limiting rod 63 is U-shaped. Both ends of the limiting rod 63 pass through the lifting ring 61 downwards. One end of the limiting rod 63 forms a limiting end 631. The sliding block 715 of the expansion part 71 has a first limiting hole 711 on its side wall. Under normal conditions, the limiting end 631 of the limiting rod 63 is inserted into the first limiting hole 711 under the action of gravity. When the limiting end 631 is inserted into the first limiting hole 711, all expansion parts 71 remain in a contracted state, that is, two adjacent expansion parts 71 abut against each other to form an isolation space 73.
[0047] The end of the limiting rod 63 away from the limiting end 631 forms the pushing end 632. For ease of description, the top wall of the mounting frame 6 is defined as the pushing surface 64 of the mounting frame 6. When the long water pipe 3 drives the breaking head 7 to penetrate the slag layer, the lifting ring 61 abuts against the pushing surface 64 of the mounting frame 6, and the pushing surface 64 pushes the limiting rod 63 through the pushing end 632, forcing the limiting end 631 to disengage from the first limiting hole 711.
[0048] The implementation principle of Embodiment 3 of this application is as follows: the punch head 7 is slidably installed on the mounting frame 6 via the lifting ring 61. When the long water pipe 3 extends into the transition ladle 9, the lower end of the long water pipe 3 pushes the punch head 7 downward. The punch head 7 is used to squeeze open the slag layer in the transition ladle 9, reducing the possibility of the slag layer entering the long water pipe 3 and being carried into the molten steel surface of the transition ladle 9 by the replenished molten steel, thus ensuring the purity of the molten steel in the transition ladle 9.
[0049] The specific operation is as follows: the long water conduit 3 is inserted into the transition ladle 9 by pressing down the ladle 8, so that the lower end of the long water conduit 3 extends into the isolation space 73, thereby driving the lifting ring 61 and the punch head 7 to move downward as a whole. When the punch head 7 moves downward and squeezes open the slag layer in the transition ladle 9, the lifting ring 61 abuts against the pushing surface 64 of the mounting frame 6 and cannot move further downward. The pushing surface 64 forces the limiting end 631 of the limiting rod 63 to disengage from the first limiting hole 711, releasing the sliding restriction on the sliding block 715 of the expansion part 71. As the long water conduit 3 extends downward, the long water conduit 3 forces all the expansion parts 71 to expand outward through the guide slope 712 of the expansion part 71, thereby opening the isolation space 73, so that the molten steel discharged from the ladle 8 can be introduced into the molten steel surface of the transition ladle 9, improving the overall operational convenience of the structure.
[0050] Example 4: This application discloses a long water inlet docking device.
[0051] The difference between the long nozzle docking device disclosed in this application and Embodiment 3 is that: Reference Figure 10 , Figure 11 In this embodiment, a lifting ring 611 is installed on the lifting ring 61, and all limiting rods 63 are fixedly installed on the bottom wall of the lifting ring 611. All limiting rods 63 are connected in series through the lifting ring 611 to form a whole, and a hook ring 612 is fixedly installed on the top wall of the lifting ring 611. A second limiting hole 713 is opened on the side wall of the sliding block 715 of the expansion part 71. The second limiting hole 713 is located on the side of the first limiting hole 711 near the center of the lifting ring 61. When the long water conduit 3 passes through all the expansion parts 71, the limiting end 631 is inserted into the second limiting hole 713, and forces all the expansion parts 71 to remain in an expanded state.
[0052] The implementation principle of Embodiment 4 of this application is as follows: During the process of the long water conduit 3 extending into the transition ladle 9, it first drives the breaking head 7 to squeeze open the slag layer (at this time, all expansion parts 71 remain in a contracted state); after squeezing open the slag layer, as the long water conduit 3 extends, it forces all expansion parts 71 to expand outward to open the breaking head 7. After the long water conduit 3 forces all expansion parts 71 to expand outward, the limiting rod 63 moves down, driving the limiting end 631 to be inserted into the second limiting hole 713 to restrict the slippage of the expansion parts 71, that is, to force all expansion parts 71 to remain in an expanded state. When the lifting ring 61 drives the breaking head 7 to lift away from the slag layer, the breaking head 7 still remains in an "expanded state", avoiding the possibility that the molten steel remaining in the isolation space 73 cannot fall downward because the breaking head 7 is in a "contracted state" after being lifted away, thus improving the operational stability of the overall structure.
[0053] The above are preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made to the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A shroud docking apparatus, characterized by: Includes a mounting base (1) and a cantilever (2). One end of the cantilever (2) is hinged to the mounting base (1). The end of the cantilever (2) away from the mounting base (1) is hinged to a long water conduit (3). The upper end of the long water conduit (3) is used to connect to the filling package (8). The end of the cantilever (2) away from the mounting base (1) is normally raised to force the lower end of the long water conduit (3) to be raised away from the transition package (9).
2. A shroud docking device according to claim 1, wherein: It also includes a mobile trolley (4), on which a column (41) is provided, and a mounting base (1) is rotatably mounted on the column (41).
3. A shroud docking device according to claim 2, wherein: The bottom of the mobile trolley (4) is provided with a guide rail (51), which is located on one side of the transition bag (9); multiple rolling wheels (42) are rotatably installed on the bottom of the mobile trolley (4), and the rolling wheels (42) are rotatably installed on the guide rail (51); the side wall of the mobile trolley (4) is connected with a positioning pin (43), and the side wall of the guide rail (51) is provided with a positioning hole (511) for the positioning pin (43) to be inserted.
4. A shroud docking device according to claim 1 wherein: The cantilever (2) includes a swing cylinder (21) and a swing rod (22). One end of the swing cylinder (21) is hinged to the mounting base (1), and one end of the swing rod (22) is slidably inserted into the swing cylinder (21). A long water conduit (3) is hinged to the end of the swing rod (22) away from the swing cylinder (21).
5. A shroud docking apparatus as claimed in claim 4, wherein: The swing arm (22) includes a first swing part (221) and a second swing part (222). One end of the first swing part (221) is slidably inserted into the swing cylinder (21), and one end of the second swing part (222) is slidably inserted into the first swing part (221). The long water pipe (3) is hinged to the second swing part (222). A first spring (223) is provided between the first swing part (221) and the second swing part (222).
6. A shroud docking apparatus as claimed in claim 1, wherein: The transition package (9) is provided with a mounting frame (6), and a lifting ring (61) is slidably mounted on the mounting frame (6). The lifting ring (61) is provided with a punching head (7). A second spring (62) is provided between the lifting ring (61) and the mounting frame (6). The second spring (62) normally forces the punching head (7) to lift away from the slag layer. When the filling package (8) presses the long water conduit (3) into the transition package (9), the lower end of the long water conduit (3) punches through the slag layer through the punching head (7).
7. A shroud docking apparatus as claimed in claim 6, wherein: The punch head (7) includes multiple expansion sections (71), each expansion section (71) is slidably mounted on the lifting ring (61) so as to be able to slide along the radial direction of the lifting ring (61); a third spring (72) is provided between the expansion section (71) and the lifting ring (61), the third spring (72) forces two adjacent expansion sections (71) to abut against each other, and the multiple expansion sections (71) enclose an isolation space (73), the top of the isolation space (73) is open for the insertion of a long water conduit (3).
8. A shroud docking apparatus as claimed in claim 7, wherein: A limiting rod (63) is slidably installed on the lifting ring (61), and one end of the limiting rod (63) forms a limiting end (631); a first limiting hole (711) is opened on the side wall of the expansion part (71), and the limiting end (631) is normally inserted into the first limiting hole (711), forcing two adjacent expansion parts (71) to remain in abutting state.
9. A shroud docking apparatus as claimed in claim 8, wherein: The end of the limiting rod (63) away from the limiting end (631) forms a pushing end (632), and the mounting bracket (6) has a pushing surface (64). When the long water conduit (3) drives the breaking head (7) to penetrate the slag layer, the pushing surface (64) pushes the limiting rod (63) through the pushing end (632) and forces the limiting end (631) to disengage from the first limiting hole (711). Each expansion part (71) has a guide slope (712) on its inner side, and the long water conduit (3) forces all expansion parts (71) to expand outward through the guide slope (712).
10. A shroud docking apparatus as claimed in claim 8, wherein: The side wall of the expansion section (71) is provided with a second limiting hole (713). When the long water conduit (3) passes through all the expansion sections (71), the limiting end (631) is inserted into the second limiting hole (713) and forces all the expansion sections (71) to remain in an expanded state.