An EHV switch welding automatic line
The design of the EHV switch welding automatic line solves the problems of low efficiency and unstable quality of traditional manual welding, realizes full-process automated continuous production, improves production efficiency and welding quality, reduces labor costs, and is suitable for mass production of EHV switches.
Patent Information
- Application Number
- CN202611177729.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-05
- Publication Date
- 2026-11-24
AI Technical Summary
The current EHV switch welding mainly adopts traditional manual welding methods, which are inefficient, the welding quality is greatly affected by the operator's skill level, and there are problems such as incomplete welding and missing welding. The labor cost is high and the production is discontinuous, making it difficult to meet the needs of large-scale mass production.
The EHV switch welding automatic line includes a double-row synchronous belt conveyor, tooling distribution device, tooling blocking device, tooling positioning device, automatic welding station, CCD inspection station, and defective product discharge device, forming a fully automated continuous operation, realizing continuous tooling conveying, precise positioning, automatic welding, online inspection, and defective product diversion.
It significantly improves production efficiency and welding quality stability, reduces labor costs, avoids problems such as incomplete welding and missing welding, and realizes fully automated continuous production of EHV switches to meet the needs of mass production.
Smart Images

Figure CN123149508A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the technical field of switch welding equipment, and in particular to an automatic EHV switch welding line. Background Technology
[0002] EHV switches are an important component of automotive electrical systems, and their welding quality directly affects product performance and reliability. Currently, EHV switch welding is mainly carried out using traditional manual welding methods, where workers use hand-held welding torches to weld the switches and wires.
[0003] This traditional manual welding method is inefficient, and the welding quality is greatly affected by the skill level of the workers, which can easily lead to problems such as incomplete welding, missing welding, and uneven solder. At the same time, manual welding requires a large number of welding workers, resulting in high labor costs, and the fumes and high temperatures generated during the welding process have a certain impact on the health of the workers. In addition, in the manual welding mode, the workstations are scattered, requiring manual transfer of workpieces, resulting in a discontinuous production cycle and difficulty in meeting the needs of large-scale mass production. Summary of the Invention
[0004] To improve the production efficiency and welding quality of EHV switch welding, reduce labor costs, and achieve automated continuous production, this application provides an automated EHV switch welding line.
[0005] This application provides an automated EHV switch welding line, which adopts the following technical solution: An automatic welding line for EHV switches includes a double-row synchronous belt conveyor and, arranged sequentially along the conveying direction of the double-row synchronous belt conveyor, a tooling device, a tooling blocking device one, a tooling positioning device, an automatic welding station, a tooling blocking device two, a CCD inspection station, and a defective product discharge device. A defective product storage and conveying device is provided on one side of the double-row synchronous belt conveyor, corresponding to the defective product discharge device. An empty tooling return conveying device is provided on the other side of the double-row synchronous belt conveyor, tilted in the opposite direction of the conveying direction to return empty tools to the front-end loading station.
[0006] By adopting the above technical solution, the double-row synchronous belt conveyor achieves continuous automatic transport of tooling. The tooling device and tooling blocking device 1 work together to ensure that tooling enters the welding station one by one in an orderly manner. The tooling positioning device precisely positions the tooling, and the automatic welding station completes the automatic welding operation. Tooling blocking device 2 temporarily stores the welded tooling for manual weld cleaning. The CCD inspection station performs online inspection of welding quality. The defective product discharge device pushes detected defective products into the defective product storage and conveying device. The empty tooling return conveying device automatically returns empty tooling to the front-end loading station, forming a complete closed-loop production system. The entire automated line achieves fully automated continuous operation from assembly, welding, cleaning, inspection to tooling return, significantly improving production efficiency and welding quality stability, and reducing labor costs.
[0007] Optionally, the tooling distribution device and the tooling blocking device work together to control the tooling to enter the welding station individually and at intervals, preventing tooling from accumulating and causing congestion.
[0008] By adopting the above technical solution, the coordinated operation of the tooling device and the tooling blocking device ensures that the tooling enters the welding station one by one in an orderly manner, avoiding the accumulation and congestion caused by multiple tooling entering at the same time, and ensuring the stability of the production cycle.
[0009] Optionally, the tooling positioning device is set at the automatic welding station to accurately position the EHV switch workpiece and provide a fixed welding reference for the automatic soldering machine.
[0010] By adopting the above technical solution, the tooling positioning device can accurately position the EHV switch workpiece, ensuring that the position is consistent for each welding, providing a stable welding reference for the automatic soldering machine, thereby ensuring the consistency and stability of welding quality.
[0011] Optionally, the tooling blocking device 2 is located downstream of the automatic welding station and is used to temporarily store the tooling after welding is completed, so that manual cleaning of the weld joint can be completed at a fixed point.
[0012] By adopting the above technical solution, the tooling blocking device 2 can temporarily store the welded tooling in a fixed position, making it convenient for workers to perform dry ice cleaning and electronic magnifying glass inspection of the weld points at a fixed work station without the need for workers to walk back and forth, thus improving work efficiency and comfort.
[0013] Optionally, the CCD inspection station is equipped with a vision inspection system for online inspection of the welding status of the finished products.
[0014] By adopting the above technical solutions, the CCD vision inspection system can perform online inspection of welded products, judge the welding quality in real time, and promptly detect defective products such as incomplete welds and missing welds, thus ensuring product quality.
[0015] Optionally, the defective product discharge device is connected to the CCD detection station signal. When a defective product is detected, the defective product discharge device pushes the defective product fixture into the defective product storage and conveying device.
[0016] By adopting the above technical solution, the defective product discharge device is linked with the CCD detection station. When a defective product is detected, it is automatically diverted to the defective product storage and conveying device, thereby realizing automatic sorting of defective products and preventing them from flowing into the next process.
[0017] Optionally, the empty tool return conveyor is constructed from flow rails and is inclined downwards along the conveying direction. The empty tool automatically slides back to the loading station by gravity.
[0018] By adopting the above technical solution, the empty tool return conveyor adopts a flow bar structure and uses gravity to realize the automatic return of the empty tool. It does not require an additional power unit, has a simple structure, reliable operation, and low cost.
[0019] Optionally, the double-row synchronous belt conveyor adopts a double-row synchronous conveyor belt structure to realize continuous automatic flow of tooling.
[0020] By adopting the above technical solutions, the double-row synchronous conveyor belt structure operates smoothly and has high conveying accuracy, enabling continuous automatic flow of tooling and ensuring the continuity and stability of production.
[0021] Optionally, the automatic welding station is equipped with an automatic soldering machine, which is linked with the tooling positioning device. After the tooling is positioned, the welding process starts automatically.
[0022] By adopting the above technical solution, the automatic soldering machine is linked with the tooling positioning device. After the tooling is positioned, the welding is started automatically, realizing the full automation of the welding process without manual operation, thus improving welding efficiency and quality stability.
[0023] Optionally, the starting end of the double-row synchronous belt conveyor is provided with a switch and wire assembly station, and the end corresponds to the high end of the empty tooling return conveyor. The low end of the empty tooling return conveyor corresponds to the switch and wire assembly station, forming a closed-loop tooling circulation system.
[0024] By adopting the above technical solution, the switch and wire assembly station, the double-row synchronous belt conveyor and the empty tool return conveyor together form a closed-loop tooling circulation system. The tooling can be used in a cyclical manner within the system without the need for manual handling of the tooling, thus realizing uninterrupted continuous production.
[0025] In summary, this application includes at least one of the following beneficial technical effects: 1. By using a double-row synchronous belt conveyor in conjunction with a tooling device, a two-stage tooling blocking device, a tooling positioning device, an automatic welding station, a CCD inspection station, a defective product discharge device, a defective product storage and conveying device, and an empty tooling return conveying device, the entire process of EHV switch assembly, welding, cleaning, inspection and tooling return is fully automated and continuous, increasing production efficiency by more than 2 times and meeting the needs of mass production. 2. Standardized automatic soldering is achieved by using a tooling positioning device in conjunction with an automatic soldering machine, which completely avoids problems such as cold solder joints, missing solder joints, and uneven solder amount in manual soldering. With the addition of CCD online detection and automatic sorting of defective products, the finished product soldering yield is greatly improved, and rework and repair costs are reduced. 3. By using an empty tool return conveyor, the tooling can be automatically circulated in a closed loop, reducing the number of dedicated welding personnel, lowering labor costs, and avoiding occupational injuries such as burns and fume inhalation caused by long-term high-temperature welding operations. 4. By integrating feeding, automatic welding, cleaning, visual inspection, defective product sorting, and tooling return onto a single conveyor line, the processes are integrated into one unit, resulting in a more organized workshop layout, higher space utilization, and easier standardized management. Attached Figure Description
[0026] Figure 1 This is a three-dimensional structural diagram of this application; Figure 2 This is a top view of the overall structure in this application.
[0027] Reference numerals in the attached drawings: 1. Double-row synchronous belt conveyor; 2. Tooling device; 3. Tooling blocking device one; 4. Tooling positioning device; 5. Automatic welding station; 6. Tooling blocking device two; 7. CCD inspection station; 8. Defective product discharge device; 9. Defective product storage and conveying device; 10. Empty tooling return conveying device; 11. Switch and wire assembly station; 12. Dry ice cleaning and electronic magnifying glass inspection station. Detailed Implementation
[0028] The following is in conjunction with the appendix Figure 1 - Appendix Figure 2 This application will be described in further detail.
[0029] This application discloses an automated EHV switch welding line.
[0030] Example 1
[0031] Reference Figure 1The EHV switch welding automatic line includes a double-row synchronous belt conveyor 1. The double-row synchronous belt conveyor 1 adopts a double-row synchronous conveyor belt structure to realize continuous automatic conveying of tooling. Along the conveying direction of the double-row synchronous belt conveyor 1, a tooling distribution device 2, a tooling blocking device 1 3, a tooling positioning device 4, an automatic welding station 5, a tooling blocking device 2 6, a CCD inspection station 7, and a defective product discharge device 8 are arranged in sequence.
[0032] Reference Figure 1 and Figure 2 A defective product storage and conveying device 9 is provided on one side of the double-row synchronous belt conveyor 1. The defective product storage and conveying device 9 is an independent belt conveyor, corresponding to the position of the defective product discharge device 8, and is used to store and convey the detected defective products. An empty tool return conveying device 10 is provided on the other side of the double-row synchronous belt conveyor 1. The empty tool return conveying device 10 is inclined in the opposite direction along the conveying direction, that is, the high end is located at the end of the double-row synchronous belt conveyor 1, and the low end is located at the beginning of the double-row synchronous belt conveyor 1, and is used to return the empty tools to the front loading station.
[0033] Reference Figure 1 and Figure 2 At the starting end of the double-row synchronous belt conveyor 1, there is a switch and wire assembly station 11, where workers assemble the EHV switches and wires to be welded onto the tooling. Next to the tooling blocking device 2 6, there is a dry ice cleaning and electronic magnifying glass inspection station 12, where workers clean and visually inspect the weld points of the finished products.
[0034] Reference Figure 1 and Figure 2 The tooling distribution device 2 and the tooling blocking device 3 work together in a coordinated manner. The tooling distribution device 2 uses a material distribution conveyor belt structure. The rotating material distribution conveyor belt separates the stacked tooling pieces one by one, thus moving the tooling pieces. The tooling blocking device 3 uses a blocking plate structure. Blocking plates are installed above the material distribution conveyor belt on both sides of the tooling in the horizontal direction to control the passage of the tooling pieces. The two work together to ensure that the tooling pieces enter the welding station one at a time, preventing tooling accumulation and congestion, and ensuring the stability of the production cycle.
[0035] Reference Figure 1 and Figure 2 The tooling positioning device 4 is installed at the automatic welding station 5, and includes an infrared laser position sensor and a controller. When the tooling arrives at the welding station, the infrared laser position sensor detects the tooling and sends a detection signal to the controller. The controller is electrically connected to the drive power source of the material distribution conveyor belt. After the tooling moves to the target position, the controller controls the material distribution conveyor belt to stop, realizing precise positioning of the tooling, providing a fixed welding reference for the automatic soldering machine, and ensuring consistent welding position each time.
[0036] Reference Figure 1 and Figure 2 Automatic welding station 5 is equipped with an automatic soldering machine, which is connected to the tooling positioning device 4 via a signal connection. Once the tooling positioning device 4 completes positioning, the automatic soldering machine starts automatically and performs welding operations according to preset welding parameters, achieving full automation of the welding process.
[0037] Reference Figure 1 and Figure 2 The tooling blocking device 26 is located downstream of the automatic welding station 5 and adopts a combination structure of a blocking plate and a lifting cylinder. When the welded tooling is conveyed to the tooling blocking device 26 by the double-row synchronous belt conveyor 1, it is blocked by the blocking plate and temporarily stored in a fixed position, which facilitates the worker to perform dry ice cleaning and electronic magnification inspection of the weld joints at the dry ice cleaning and electronic magnification inspection station 12. After the worker completes the inspection, he presses the release button, and the lifting cylinder pneumatically drives the blocking plate to descend. After the blocking plate descends, it disengages from the tooling, allowing the tooling to continue to be conveyed downstream.
[0038] Reference Figure 1 and Figure 2 The CCD inspection station 7 is equipped with a vision inspection system, including a CCD camera, a light source, and an image processing unit. When the fixture passes through the CCD inspection station 7, the CCD camera takes a picture of the welding area, and the image processing unit analyzes the image to determine whether the welding quality is up to standard, including whether there are defects such as cold solder joints, missing solder joints, insufficient or excessive solder.
[0039] Reference Figure 1 and Figure 2 The defective product discharge device 8 is located downstream of the CCD inspection station 7 and is signal-connected to the CCD inspection station 7. The defective product discharge device 8 includes a push-out cylinder. When the CCD inspection station 7 detects a defective product, the push-out cylinder of the defective product discharge device 8 actuates, pushing the defective product fixture from the double-row synchronous belt conveyor 1 onto the defective product storage and conveying device 9, thus achieving automatic sorting of defective products. The defective product storage and conveying device 9 transports the defective product fixture to the end for centralized processing by workers.
[0040] Reference Figure 1 and Figure 2 The empty tool return conveyor 10 is constructed from multiple flow bars and is inclined downwards along the conveying direction at an angle of 5°-10°. When the good tool reaches the end of the double-row synchronous belt conveyor 1, the worker takes out the welded product and places the empty tool on the high end of the empty tool return conveyor 10. The empty tool automatically slides down the flow bars by gravity and returns to the switch and wire assembly station 11 at the front end for workers to use repeatedly.
[0041] The working principle of this application embodiment is as follows: S1. Loading and Assembly: At the switch and wire assembly station 11, the worker places the EHV switch and wire to be welded into the corresponding position of the tooling according to the work instructions, and then puts the tooling into the double-row synchronous belt conveyor 1. S2, Tooling distribution: The tooling is conveyed forward by the double-row synchronous belt conveyor 1. When it passes the tooling distribution device 2 and the tooling blocking device 3, the two work together to control the tooling to enter the automatic welding station 5 at intervals to prevent the tooling from accumulating and congesting. S3, Positioning Welding: After the tooling arrives at the automatic welding station 5, the tooling positioning device 4 accurately positions the tooling. After positioning is completed, the automatic soldering machine starts automatically and performs welding operations according to the preset parameters. S4. Cleaning and visual inspection: After welding is completed, the tooling continues to be conveyed forward to the tooling blocking device 2 6 and is temporarily stored. The worker takes out the tooling at the dry ice cleaning and electronic magnifying glass inspection station 12 and performs dry ice cleaning of the weld joint. After cleaning, the tooling is visually inspected with an electronic magnifying glass. After the inspection is OK, the tooling is put back on the double-row synchronous belt conveyor 1. S5. Visual inspection: The tooling flows into the CCD inspection station 7 along the double-row synchronous belt conveyor 1. The visual inspection system performs online inspection of the welding status to determine whether it is a good product. S6. Defective Product Diversion: If the product is determined to be defective, the defective product discharge device 8 pushes the defective product tooling into the defective product storage and conveying device 9, which then transports it to the end for centralized processing. If the product is determined to be good, the tooling continues to flow backward. S7. Tooling return: After the good tooling arrives at the end of the double-row synchronous belt conveyor 1, the worker takes out the welded product and puts the empty tooling into the high end of the empty tooling return conveyor 10. The empty tooling automatically slides back to the switch and wire assembly station 11 by gravity along the flow strip. S8. Circular Production: By repeating the above process, continuous automated welding production of EHV switches can be achieved.
[0042] Example 2
[0043] The difference between this embodiment and embodiment 1 is that the automatic welding station 5 is equipped with two automatic soldering machines, which correspond to the two conveyor belts of the double-row synchronous belt conveyor 1, respectively, and can perform welding operations on two toolings at the same time, thereby further improving production efficiency.
[0044] The working principle of this embodiment is as follows: two automatic soldering machines work simultaneously to solder the tooling on the two conveyor belts respectively, thereby doubling the production efficiency and making it suitable for scenarios with higher capacity requirements.
[0045] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. An automatic welding line for EHV switches, characterized in that: It includes a double-row synchronous belt conveyor (1), and a tooling device (2), a tooling blocking device (3), a tooling positioning device (4), an automatic welding station (5), a tooling blocking device (6), a CCD inspection station (7), and a defective product discharge device (8) arranged sequentially along the conveying direction of the double-row synchronous belt conveyor (1); a defective product storage and conveying device (9) is provided on one side of the double-row synchronous belt conveyor (1), and the defective product storage and conveying device (9) is correspondingly arranged with the defective product discharge device (8); an empty tooling return conveying device (10) is provided on the other side of the double-row synchronous belt conveyor (1), and the empty tooling return conveying device (10) is inclined in the opposite direction along the conveying direction to return the empty tooling to the front-end loading station.
2. The EHV switch welding automatic line according to claim 1, characterized in that: The tooling device (2) works in conjunction with the tooling blocking device (3) to control the tooling to enter the welding station one at a time to prevent the tooling from accumulating and blocking.
3. The EHV switch welding automatic line according to claim 1, characterized in that: The tooling positioning device (4) is set at the automatic welding station (5) for accurately positioning the EHV switch workpiece.
4. The EHV switch welding automatic line according to claim 1, characterized in that: The tooling blocking device 2 (6) is located downstream of the automatic welding station (5) and is used to temporarily store the tooling after welding, so that manual cleaning of the weld points can be completed at a fixed point.
5. An automatic EHV switch welding line according to claim 1, characterized in that: The CCD inspection station (7) is equipped with a vision inspection system for online inspection of the welding status of the finished products.
6. An automatic EHV switch welding line according to claim 1, characterized in that: The defective product discharge device (8) is connected to the CCD detection station (7) by signal. When a defective product is detected, the defective product discharge device (8) pushes the defective product tooling into the defective product storage and conveying device (9).
7. An automated EHV switch welding line according to claim 1, characterized in that: The empty tool return conveyor (10) is constructed from flow strips and is inclined downward along the conveying direction. The empty tool automatically slides back to the loading station by gravity.
8. An automatic EHV switch welding line according to claim 1, characterized in that: The double-row synchronous belt conveyor (1) adopts a double-row synchronous conveyor belt structure to realize continuous automatic flow of tooling.
9. An automatic EHV switch welding line according to claim 1, characterized in that: The automatic welding station (5) is equipped with an automatic soldering machine. The automatic soldering machine is linked with the tooling positioning device (4). After the tooling is positioned, the welding is started automatically.
10. An automatic EHV switch welding line according to claim 1, characterized in that: The starting end of the double-row synchronous belt conveyor (1) is provided with a switch and wire assembly station, and the end corresponds to the high end of the empty tooling return conveyor (10). The low end of the empty tooling return conveyor (10) corresponds to the switch and wire assembly station, forming a closed-loop tooling circulation system.