Method and device for abnormality determination and parameter linkage adjustment of seal ring compression molding
By acquiring information about the sealing ring molding process and comparing it with a reference parameter range, a linkage adjustment method was implemented to solve the problems of insufficient venting at the front and insufficient edge compaction at the rear, thereby improving the stability and consistency of the sealing ring molding process.
Patent Information
- Application Number
- CN202611356760.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-03
- Publication Date
- 2026-11-24
AI Technical Summary
In the existing sealing ring molding process, the problems of insufficient venting at the front and insufficient edge compaction at the rear lead to local air entrapment, bubble marks, incomplete molding, and increased flash width. There is a lack of effective linkage adjustment methods.
By acquiring the process information of the current molding stage, and comparing it with the reference parameter ranges of the front and rear stages respectively, targeted first and second linkage adjustments are performed, including parameter linkage adjustments such as extending the venting time, reducing the final speed of mold closing, and increasing the holding pressure.
It improves the stability of the sealing ring molding process and the consistency of the finished product, reduces local air entrapment and flash width fluctuations, and enhances the edge compaction retention capability.
Smart Images

Figure CN123150199A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of compression molding control for rubber products, and in particular, to a method and device for anomaly determination and parameter linkage adjustment during the compression molding process of sealing rings. Background Art
[0002] Sealing rings are widely used in scenarios such as fluid sealing, mechanical connections, and automotive components. For sealing rings formed by compression molding and vulcanization, the molding process typically includes stages such as mold clamping, exhaust, pressurization, and pressure holding. In actual production, whether residual gas in the mold cavity can be released in time, whether the rubber compound can stably build pressure in the early molding stage, and whether the edge region can maintain a stable compacted state in the later molding stage will all directly affect the molding quality.
[0003] In existing production processes, the compression molding process for sealing rings usually operates according to preset process parameters, and after molding, problems such as trapped gas, excessive flash, or dimensional fluctuations are judged through appearance inspection, dimensional measurement, or sampling inspection results. When the product cross-section is thin, there are many mold cavities, the exhaust path is limited, or high edge stability is required, the existing process control methods are prone to the following two types of problems.
[0004] First, in the early molding stage, if the exhaust start timing is too late, the exhaust duration is too short, the mold closing speed in the final stage is too high, or the initial pressure builds up too fast, the release time of residual gas in the mold cavity and the formation speed of the release path may be lower than the initial compaction speed of the rubber compound and the mold cavity closing speed, which may lead to local trapped gas, local rubber shortage, bubble marks, or incomplete molding.
[0005] Second, in the later molding stage, if the exhaust duration is too long, the holding pressure is too low, the holding duration is too short, or the pressure state in the later stage fluctuates greatly, the compaction retention capability of the edge region may be insufficient, and the continuous overflow time of the edge may be too long, which may lead to increased flash width and edge dimensional fluctuations.
[0006] Furthermore, there is a restraining relationship between early-stage trapped gas and later-stage flash in process adjustment. If only extending the exhaust duration is used to improve the early-stage exhaust establishment condition, it may increase the continuous overflow time of the later-stage edge; if only increasing the holding pressure or extending the holding duration is used to suppress flash, it may be unfavorable for the release of residual gas in the early stage. That is, the existing technology lacks a process control method that can combine changes in the molding stage to respectively judge the early-stage process quantities and the later-stage process quantities, and perform corresponding linkage adjustments accordingly.
[0007] Therefore, how to identify insufficient venting at the front and insufficient edge compaction at the rear during the sealing ring molding process by comparing the process information of the current molding stage with the reference parameter range, and then perform corresponding parameter linkage adjustment to balance air trapping control and flash suppression, has become a technical problem that urgently needs to be solved in this field. Summary of the Invention
[0008] To address the aforementioned technical problems, this application provides a method for anomaly detection and parameter linkage adjustment in the sealing ring molding process.
[0009] In one specific embodiment, the method includes: acquiring process information of the current molding stage, the process information including front-stage process quantities and back-stage process quantities, the front-stage process quantities including venting start timing, venting duration, mold closing end speed, and initial pressure establishment change information, the back-stage process quantities including venting duration, back-stage pressure establishment fluctuation information, holding pressure, and holding pressure duration; comparing the front-stage process quantities and back-stage process quantities with reference parameter ranges for the corresponding molding stage; when at least two of the front-stage process quantities exceed the corresponding reference parameter ranges, performing a first linkage adjustment; when at least two of the back-stage process quantities exceed the corresponding reference parameter ranges, performing a second linkage adjustment; wherein, the period from the start of mold closing to the completion of initial pressure establishment is the front-stage molding stage, and the first linkage adjustment is performed preferentially in the front-stage molding stage; the period from the completion of initial pressure establishment to the end of holding pressure is the back-stage molding stage, and the second linkage adjustment is performed preferentially in the back-stage molding stage.
[0010] In one specific embodiment, the reference parameter range is determined by statistical analysis of the process information of qualified batches of the target sealing ring product under the same mold, the same molding equipment, and the same rubber compound conditions. Furthermore, the reference parameter ranges corresponding to the preceding molding stage and the following molding stage are set separately. Therefore, the process information of the current batch is not compared with abstract empirical values, but rather with the stable process window of the target product under the current manufacturing conditions, thereby improving the specificity of the judgment basis.
[0011] In one specific embodiment, comparing the preceding and following process quantities with reference parameter ranges for the corresponding molding stages includes at least one of interval comparison, parameter change trend comparison, and stage switching state comparison. This allows for not only judgment based on whether parameters are above or below the upper or lower limit, but also identification of whether parameter change trends and stage switching states deviate from the reference state of qualified batches, thereby improving the accuracy of identifying actual molding state changes.
[0012] In a specific embodiment, the first linkage adjustment is executed when at least two of the following conditions are simultaneously satisfied: the exhaust start timing is higher than the upper limit of the corresponding reference parameter range, the exhaust duration is lower than the lower limit of the corresponding reference parameter range, the final mold clamping speed is higher than the upper limit of the corresponding reference parameter range, and the initial pressure establishment change information is higher than the upper limit of the corresponding reference parameter range. Specifically, the first linkage adjustment includes at least one of the following: extending the exhaust duration and reducing the final mold clamping speed, extending the exhaust duration and slowing down the initial pressure establishment speed, advancing the exhaust start timing and slowing down the initial pressure establishment speed. Thereby, the residual gas release time and the front-stage cavity sealing speed can be simultaneously affected in the front-stage molding process, so as to improve the front-stage exhaust establishment conditions.
[0013] In a specific embodiment, the second linkage adjustment is executed when at least two of the following conditions are simultaneously satisfied: the exhaust duration is higher than the upper limit of the corresponding reference parameter range, the holding pressure is lower than the lower limit of the corresponding reference parameter range, the holding duration is lower than the lower limit of the corresponding reference parameter range, and the post-stage pressure establishment fluctuation information is higher than the upper limit of the corresponding reference parameter range. Specifically, the second linkage adjustment includes at least one of the following: increasing the holding pressure and extending the holding duration, shortening the exhaust duration and adjusting the post-stage pressure establishment speed, adjusting the post-stage pressure establishment speed and extending the holding duration. Thereby, the edge compaction retention capability and the edge continuous overflow time can be simultaneously affected in the post-stage molding process, so as to improve the post-stage edge stability.
[0014] In a specific embodiment, when the execution condition of the first linkage adjustment and the execution condition of the second linkage adjustment are simultaneously satisfied in the same molding process, the first linkage adjustment is executed first in the front-stage molding process, and the second linkage adjustment is executed after entering the post-stage molding process. Thereby, the adjustment actions of different stages can correspond to the dominant contradictions of different stages respectively, so as to avoid indiscriminate adjustment of all parameters in the same stage.
[0015] In a specific embodiment, the adjustment direction and adjustment amount of the corresponding process parameter are determined according to the degree to which the process information exceeds the corresponding reference parameter range. Let the current value of the parameter to be adjusted be x0, the median value of the corresponding reference parameter range be m, and the adjustment proportional coefficient be k, where 0<k≤1; when x0 is greater than m and the parameter to be adjusted needs to be reduced, the adjusted parameter x1 is determined by the following formula:
[0016] x1=x0-k×(x0-m)
[0017] When x0 is less than m and the parameter to be adjusted needs to be increased, the adjusted parameter x1 is determined by the following formula:
[0018] x1=x0+k×(m-x0)
[0019] This allows the parameter to be adjusted to be pulled back to the stable range of the corresponding reference parameter range, thereby improving the stability after continuous batch adjustments.
[0020] In one specific embodiment, this application also provides a sealing ring molding control device, including an information acquisition unit, a comparison unit, a first execution unit, a second execution unit, and a stage control unit, each unit being used to execute the corresponding steps in the above method.
[0021] Compared with the prior art, this application has at least the following beneficial effects:
[0022] This application obtains process information of the current molding stage and compares the quantities of the preceding and following processes with the reference parameter ranges of the corresponding molding stages. This enables the identification of process changes corresponding to insufficient venting in the preceding stage and insufficient edge compaction in the following stage during the compression molding process, rather than adjusting the machine based on the defect results after molding. Therefore, it is beneficial to improve the timeliness of process adjustment.
[0023] Furthermore, this application does not make local corrections around a single parameter, but performs a first linkage adjustment when at least two of the quantities in the front process exceed the corresponding reference parameter range, and performs a second linkage adjustment when at least two of the quantities in the back process exceed the corresponding reference parameter range, so that at least two types of parameters among the exhaust parameters, mold closing parameters, pressurization parameters and pressure holding parameters are linked and adjusted, which is beneficial to simultaneously improve the residual gas release conditions and the edge compaction retention state.
[0024] Furthermore, this application defines the period from the start of mold closing to the completion of initial pressure establishment as the pre-forming stage, and the period from the completion of initial pressure establishment to the end of pressure holding as the post-forming stage. In the pre-forming stage, the first linkage adjustment is prioritized, and in the post-forming stage, the second linkage adjustment is prioritized. This allows the adjustment in the pre-forming stage to focus more on improving venting conditions, and the adjustment in the post-forming stage to focus more on improving edge compaction retention, thereby improving the stability of the sealing ring molding process, edge dimensional stability, and finished product consistency. Attached Figure Description
[0025] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0026] Figure 1 This is a flowchart illustrating the overall process for determining anomalies and adjusting parameters in the sealing ring molding process according to an embodiment of this application. Detailed Implementation
[0027] See Figure 1 To enable those skilled in the art to more clearly understand the technical solutions of this application, the application will be further described below with reference to specific embodiments. It should be noted that the following specific embodiments are used to illustrate the technical solutions of this application, and not to limit the scope of protection of this application. Those skilled in the art can make equivalent substitutions or modifications to the following specific embodiments without departing from the concept of this application.
[0028] Example 1:
[0029] In one specific embodiment, this embodiment takes the compression molding and vulcanization process of an eight-cavity thin-section O-ring as an example to illustrate the overall implementation process of the present application. The target product uses nitrile rubber compound, the mold is an eight-cavity planar parting mold, and the molding equipment is a hydraulic molding equipment with functions of mold closing speed control, venting timing control, pressure building control, and pressure holding control.
[0030] Specifically, these products are prone to two types of process problems during mass production. First, in the initial molding stage, if venting is insufficient, residual gas in the mold cavity is difficult to release in time during the initial compaction of the material, easily leading to localized air entrapment, localized missing material, bubble marks, or incomplete molding. Second, in the later molding stage, if the edge area is not sufficiently compacted, the edge overflow time is prolonged, easily causing increased flash and edge size fluctuations. Initial air entrapment and later flash are not two isolated problems, but rather two interconnected and mutually restrictive process problems in the same molding process. Improving the initial venting conditions solely by extending the venting duration may increase the later edge overflow time; conversely, suppressing flash solely by increasing the later holding pressure may accelerate the initial closing speed, hindering residual gas release. Therefore, this application does not address isolated defects, but rather organizes coordinated adjustments around the dominant contradictions of different molding stages.
[0031] In one specific embodiment, the sealing ring molding process is divided into a pre-molding stage and a post-molding stage. Specifically, the pre-molding stage extends from the start of mold closing to the establishment of initial pressure; the post-molding stage extends from the establishment of initial pressure to the end of pressure holding. The primary challenge in the pre-molding stage is balancing the residual gas release conditions with the pre-molding sealing speed, while the primary challenge in the post-molding stage is balancing the edge compaction retention capacity with the duration of continuous edge overflow. In other words, the pre-molding stage focuses on ensuring that "the gas can be discharged in time," while the post-molding stage focuses on ensuring that "the edge can be stably compacted and overflow can be stopped in time."
[0032] In one specific embodiment, the process information includes front-end process quantities and back-end process quantities. Front-end process quantities include the venting initiation time t1, venting duration t2, final mold closing speed v1, and initial pressure build-up change information r1; back-end process quantities include the venting duration t2, back-end pressure build-up fluctuation information r2, holding pressure p1, and holding pressure duration t3. The venting initiation time and venting duration characterize the release time and duration of residual gas in the mold cavity; the final mold closing speed characterizes the speed at which the mold cavity transitions from an incompletely closed state to a compacted closed state; the initial pressure build-up change information characterizes the initial pressure build-up speed; the back-end pressure build-up fluctuation information characterizes the back-end pressure stability; and the holding pressure and holding pressure duration characterize the back-end edge compaction retention capability. The front-end process quantities mainly reflect the relationship between the front-end "venting-closing," while the back-end process quantities mainly reflect the relationship between the back-end "holding-overflow."
[0033] The implementation process of this embodiment can be described as follows:
[0034] S10. Obtain process information for the current molding stage, the process information including the quantities of the preceding process and the quantities of the following process;
[0035] S20. Compare the quantities of the preceding process and the subsequent process with the reference parameter ranges of the corresponding molding stages, respectively.
[0036] S30. When at least two of the preceding process quantities exceed the corresponding reference parameter range, the first linkage adjustment is executed.
[0037] S40. When at least two of the downstream process quantities exceed the corresponding reference parameter range, execute the second linkage adjustment.
[0038] S50, the period from the start of mold closing to the completion of initial pressure establishment is defined as the front molding stage, and the first linkage adjustment is performed preferentially in the front molding stage; the period from the completion of initial pressure establishment to the end of pressure holding is defined as the back molding stage, and the second linkage adjustment is performed preferentially in the back molding stage.
[0039] Through the above steps, specific process quantities are first obtained, then compared with the reference parameter range, and then corresponding linkage adjustments are executed according to the dominant contradictions at different stages, so as to take into account both the front-end gas trapping control and the back-end edge suppression in the process.
[0040] Example 2:
[0041] In a specific embodiment, this embodiment is used to illustrate the process of establishing the reference parameter range of the target product. Specifically, twenty qualified batches under the same mold, same molding equipment and same rubber compound conditions are selected consecutively. After excluding abnormal batches caused by shutdown, rubber compound change and mold change, statistics are performed on the exhaust start timing, exhaust duration, final mold closing speed, initial pressure establishment change information, subsequent pressure establishment fluctuation information, holding pressure and holding duration, to obtain the reference parameter ranges of the front-end molding stage and the rear-end molding stage respectively.
[0042] Establishing the reference parameter range under the same mold, same equipment and same rubber compound conditions can reduce the impact of non-target factors on the parameter statistical results, so that the established reference parameter range can better reflect the stable process window of the target product under the current manufacturing conditions. If batches under different molds, different equipment or different rubber compound conditions are mixed for statistics, the reference parameter range may be broadened by non-process target factors, thereby affecting the pertinence of subsequent judgments.
[0043] In this embodiment, the reference parameter range of the front-end molding stage is: the exhaust start timing t1 is 0.18s to 0.24s, the exhaust duration t2 is 0.30s to 0.36s, the final mold closing speed v1 is 4.0mm / s to 5.0mm / s, and the initial pressure establishment change information r1 is 1.8MPa / s to 2.2MPa / s. The reference parameter range of the rear-end molding stage is: the exhaust duration t2 is 0.30s to 0.36s, the holding pressure p1 is 12MPa to 14MPa, the holding duration t3 is 16s to 20s, and the subsequent pressure establishment fluctuation information r2 is 0.2MPa to 0.6MPa.
[0044] The comparison between the current batch process information and the reference parameter range includes not only interval comparison of whether the current parameter value is higher than the upper limit of the corresponding reference parameter range or lower than the lower limit of the corresponding reference parameter range, but also parameter change trend comparison of whether the parameter change trend is consistent with the reference change trend of qualified batches, and stage switching state comparison of whether the parameter switching time point and switching amplitude between adjacent molding stages are consistent with the reference state. This can avoid making judgments only based on single-time values, thereby improving the recognition accuracy of actual molding state changes.
[0045] The reference parameter range in this embodiment is not only used to judge whether a certain parameter deviates from the stable interval, but also provides a basis for subsequent adjustment amounts. That is, when a certain parameter is higher than the upper limit of the reference parameter range, the adjustment direction and adjustment amount can be determined according to its relative excess degree; when a certain parameter is lower than the lower limit of the reference parameter range, the callback amplitude can also be determined according to its relative low degree. Therefore, the reference parameter range in this application not only undertakes the state discrimination function, but also undertakes the quantitative benchmark function for subsequent linkage adjustment.
[0046] Example 3:
[0047] In one specific embodiment, this embodiment is used to illustrate the triggering and execution process of the first linkage adjustment in the front-end molding stage. After the molding equipment completes the front-end process action of the current batch, the process information of the current front-end molding stage is collected. The specific collection results are as follows: the venting start time t1 is 0.29s, the venting duration t2 is 0.22s, the final speed v1 of the mold closing stage is 5.8mm / s, and the initial pressure establishment change information r1 is 2.6MPa / s.
[0048] Comparing the above process information with the reference parameter ranges of the preceding molding stage reveals the following: t1 is higher than the upper limit of the corresponding reference parameter range, t2 is lower than the lower limit of the corresponding reference parameter range, v1 is higher than the upper limit of the corresponding reference parameter range, and r1 is higher than the upper limit of the corresponding reference parameter range. In other words, in the preceding molding stage of this batch, four conditions occurred simultaneously: late venting initiation, short venting duration, high final mold closing speed, and rapid initial pressure build-up.
[0049] The above comparison results show that, in the current batch, during the initial molding stage, the release time and release path formation rate of residual gas in the mold cavity are lower than the initial compaction and mold cavity closing speeds of the rubber compound. If the original process parameters are continued under these conditions, residual gas is more likely to be trapped in localized areas of the mold cavity, resulting in localized missing rubber, bubble marks, or incomplete molding. Based on this, the first linkage adjustment is implemented in this embodiment.
[0050] This embodiment uses "at least two parameters simultaneously exceeding the corresponding reference parameter range" as the condition for executing the first linkage adjustment. This is not to mechanically raise the trigger threshold, but to avoid erroneous triggering of the adjustment action due to short-term fluctuations in a single process quantity. Only when at least two process quantities directly related to the front-end exhaust establishment conditions and the front-end sealing speed simultaneously exceed the corresponding reference parameter range is it determined that the current batch has experienced a systemic imbalance with practical technological significance in the front-end forming stage.
[0051] In one specific embodiment, the first linkage adjustment includes at least one of the following: extending the venting duration and reducing the final mold closing speed; extending the venting duration and slowing down the initial pressure build-up speed; and advancing the venting start time and slowing down the initial pressure build-up speed. This embodiment uses the linkage method of "extending the venting duration and reducing the final mold closing speed." Specifically, the venting duration is adjusted from 0.22s to 0.30s, and the final mold closing speed is adjusted from 5.8mm / s to 4.9mm / s. To avoid increasing the chance of subsequent edge overflow simply by extending the venting duration, this embodiment also simultaneously lowers the control value of the initial pressure build-up change information from 2.6MPa / s to around 2.2MPa / s to slow down the initial pressure build-up speed.
[0052] The first linkage adjustment is not an isolated modification of a single parameter, but rather a coordinated correction of venting parameters, mold closing parameters, and pressurization parameters, all centered around the common process objective of "increasing the residual gas release time and slowing down the initial closing speed." Specifically, extending the venting duration mainly affects the gas release time window, while reducing the final mold closing speed and slowing down the initial pressure build-up speed mainly affects the initial closing speed. The combination of these two actions allows the residual gas in the mold cavity to have a more sufficient opportunity to be released in the initial stage.
[0053] Data was collected from consecutive batches after the first linkage adjustment. The results showed that the venting initiation timing stabilized at approximately 0.23s, the venting duration stabilized at approximately 0.31s, the final mold closing speed stabilized at approximately 4.8mm / s, and the initial pressure build-up variation stabilized at approximately 2.1MPa / s. Simultaneous sampling revealed a significant reduction in localized air entrapment defects in the front stage. These results indicate that, in the front molding stage, linkage adjustment based on residual gas release conditions and the front closing speed is more effective in improving air entrapment problems than simply extending the venting duration.
[0054] Example 4:
[0055] In one specific embodiment, this embodiment is used to illustrate the triggering and execution process of the second linkage adjustment in the subsequent forming stage. After several batches of production, when the problem of trapped air in the front stage is alleviated, but the edge flash in the rear stage still fluctuates, the process information of the subsequent forming stage is collected again. The specific collection results are as follows: the exhaust duration t2 is 0.41s, the holding pressure p1 is 11.2MPa, the holding pressure duration t3 is 13s, and the pressure establishment fluctuation information r2 in the rear stage is 0.9MPa.
[0056] Comparing the above process information with the reference parameter ranges for the subsequent molding stage reveals that: t2 is higher than the upper limit of the corresponding reference parameter range, p1 is lower than the lower limit of the corresponding reference parameter range, t3 is lower than the lower limit of the corresponding reference parameter range, and r2 is higher than the upper limit of the corresponding reference parameter range. In other words, in the subsequent molding stage of this batch, four conditions simultaneously occurred: excessively long venting duration, excessively low holding pressure, excessively short holding time, and insufficient pressure stability in the subsequent stage.
[0057] The above comparison results show that in the later forming stage of the current batch, the compaction retention capacity of the edge area is lower than the tendency for continuous overflow and shape springback in the edge area. If the original process parameters are maintained under this condition, the edge area is more likely to maintain a longer continuous overflow time, resulting in increased flash width and edge size fluctuations. Based on this, a second linkage adjustment is performed in this embodiment.
[0058] This embodiment also uses "at least two parameters exceeding the corresponding reference parameter range simultaneously" as the condition for executing the second linkage adjustment. This is because a short-term fluctuation of a single parameter in the later forming stage does not necessarily mean that the edge region is in a significantly unstable state. Only when at least two process quantities directly related to edge compaction retention capacity and edge overflow time simultaneously exceed the corresponding reference parameter range can it be said that the current batch has experienced a process-significant edge retention deficiency in the later forming stage.
[0059] In one specific embodiment, the second linkage adjustment includes at least one of the following: increasing the holding pressure and extending the holding duration, shortening the exhaust duration and adjusting the subsequent pressurization build-up speed, and adjusting the subsequent pressurization build-up speed and extending the holding duration. This embodiment uses the linkage method of "increasing the holding pressure and extending the holding duration." Specifically, the holding pressure is adjusted from 11.2 MPa to 12.6 MPa, and the holding duration is adjusted from 13 seconds to 17 seconds. To prevent edge overflow from continuing due to the excessively long exhaust duration in the subsequent stage, this embodiment reduces the exhaust duration in the subsequent stage from 0.41 seconds to approximately 0.35 seconds.
[0060] The second linkage adjustment is not simply about increasing the compaction strength in the later stage, but rather about simultaneously correcting the holding pressure, pressurization, and venting parameters to achieve the common process objective of "improving the edge compaction retention capacity and shortening the continuous overflow time at the edge." Specifically, increasing the holding pressure and extending the holding pressure duration are mainly used to enhance the edge region's retention capacity, while shortening the venting duration and adjusting the later stage pressurization build-up speed are mainly used to reduce the chance of continued overflow at the edge. The combination of these two effects can more stably compress the space formed by flash.
[0061] Tracking consecutive batches after the second linkage adjustment revealed the following: the subsequent holding pressure stabilized between 12.5 MPa and 13.0 MPa, the holding duration stabilized between 16.8 s and 17.2 s, the subsequent venting duration stabilized between 0.34 s and 0.35 s, and the flash width fluctuation significantly decreased. These results indicate that, in the subsequent forming stage, linkage adjustment focusing on edge compaction retention and edge overflow time is more effective in improving the flash problem than simply increasing the holding pressure.
[0062] Example 5:
[0063] In one specific embodiment, this embodiment illustrates the switching control process when two types of linked adjustments, one in the front stage and one in the rear stage, are executed sequentially during the same molding process. Specifically, in a certain batch, the data collected during the front stage molding phase are: t1 = 0.27s, t2 = 0.24s, v1 = 5.6mm / s, r1 = 2.5MPa / s; the data collected during the rear stage molding phase are: t2 = 0.39s, p1 = 11.5MPa, t3 = 14s, r2 = 0.8MPa. The comparison results show that this batch meets the execution conditions of the first linked adjustment in the front stage and the execution conditions of the second linked adjustment in the rear stage.
[0064] In this batch, instead of simultaneously performing all adjustment actions, the first linkage adjustment is executed during the initial forming stage. After the initial pressure is established and the process moves to the later stage, the second linkage adjustment is then executed. This is because if the residual gas in the initial stage has not been effectively released, even if the edge compaction and retention capacity is improved in the later stage, it cannot compensate for the localized gas trapping defects already formed in the initial stage. Conversely, even after the residual gas in the initial stage has been effectively released, the later stage may still experience flash due to insufficient edge compaction and retention. Therefore, prioritizing the exhaust gas establishment problem in the initial stage, followed by prioritizing edge retention in the later stage, better aligns with the actual process rhythm and the implementation logic of this application.
[0065] By differentiating the dominant contradictions at different stages and sequentially executing corresponding coordinated adjustment actions, we can avoid indiscriminately adjusting all parameters within the same stage, thereby improving the targeting and stability of process control. This phased, sequential execution approach also helps prevent earlier and later adjustment actions from masking or canceling each other out, ensuring that the adjustment actions at each stage are more closely aligned with their corresponding process problems.
[0066] Example 6:
[0067] In one specific embodiment, this embodiment is used to illustrate how to determine the adjustment direction and amount of the corresponding process parameters when the process information exceeds the corresponding reference parameter range. In order to make the judgments such as "above the upper limit of the corresponding reference parameter range" and "below the lower limit of the corresponding reference parameter range" have clear engineering expressions, deviation amounts are established for each key parameter.
[0068] For a given parameter x, its reference range is [a, b], where a is the lower limit and b is the upper limit. When x is higher than b, its upper deviation e_up is determined by the following formula:
[0069] e_up=max((xb) / (ba),0)
[0070] When x is lower than a, its downward deviation e_down is determined by the following formula:
[0071] e_down=max((a-x) / (b-a),0)
[0072] where max denotes taking the larger value. That is, when the parameter is within the reference parameter range, the corresponding deviation amount is 0; when the parameter exceeds the reference parameter range, the corresponding deviation amount is normalized and represented as a ratio relative to the width of the reference parameter range. The reason for adopting this method is that different parameters have different dimensions and numerical ranges. If the original difference is directly used for comparison, it is difficult to uniformly evaluate their influence on the molding process. After normalization, different parameters can be calculated under the same evaluation framework.
[0073] Further, for the parameter to be adjusted, assume its current value is x0, the corresponding median value of the reference parameter range is m, and the adjustment proportionality coefficient is k, where 0<k≤1. When x0 is greater than m and the parameter to be adjusted needs to be decreased, the adjusted parameter x1 is determined by the following formula:
[0074] x1=x0-k×(x0-m)
[0075] When x0 is less than m and the parameter to be adjusted needs to be increased, the adjusted parameter x1 is determined by the following formula:
[0076] x1=x0+k×(m-x0)
[0077] The reason for adopting the above method is that in actual mass production and machine adjustment, parameters are usually not directly pulled to the boundary of the reference parameter range, but are preferentially pulled back to the vicinity of the middle of the stable process window to improve the stability of subsequent continuous batches. In other words, the adjustment amount in this application is not set based on empirical guesswork, but is quantitatively determined based on the current deviation degree and the target stable interval.
[0078] In a specific embodiment, taking the venting duration in the front molding stage as an example, its reference parameter range is [0.30s, 0.36s], and the median value is 0.33s. If the actual venting duration of a certain batch is 0.22s, and k=0.70 is taken, the adjusted venting duration is:
[0079] x1=0.22+0.70×(0.33-0.22)=0.297s
[0080] It can be seen that the adjusted parameter returns to the vicinity of the front-stage reference parameter range.
[0081] For another example, the reference parameter range of the mold closing speed in the final stage is [4.0mm / s, 5.0mm / s], and the median value is 4.5mm / s. If the actual value of a certain batch is 5.8mm / s, and k=0.70 is taken, the adjusted mold closing speed in the final stage is:
[0082] x1=5.8-0.70×(5.8-4.5)=4.89mm / s
[0083] Similarly, it can be seen that the adjusted parameters have returned to a more stable range.
[0084] Example 7:
[0085] In one specific embodiment, this embodiment is used to illustrate the equipment configuration for implementing the above-described method. The sealing ring compression molding control equipment for executing the method of this application includes an information acquisition unit, a comparison unit, a first execution unit, a second execution unit, and a stage control unit. The information acquisition unit is used to acquire process information of the current molding stage; the comparison unit is used to compare the preceding process quantity and the following process quantity with reference parameter ranges for the corresponding molding stages; the first execution unit is used to perform a first linkage adjustment when at least two of the preceding process quantities exceed the corresponding reference parameter ranges; the second execution unit is used to perform a second linkage adjustment when at least two of the following process quantities exceed the corresponding reference parameter ranges; the stage control unit is used to prioritize controlling the operation of the first execution unit from the start of mold closing to the completion of initial pressure establishment in the preceding molding stage, and to prioritize controlling the operation of the second execution unit from the completion of initial pressure establishment to the end of pressure holding in the following molding stage.
[0086] In this embodiment, the stage control unit can automatically switch between the front-end control logic and the back-end control logic based on the molding equipment's process timing signals, or it can switch stages based on the initial pressure establishment completion signal. Specifically, when the stage control unit receives the "initial pressure establishment complete" determination signal, it can switch the control focus from the front-end exhaust establishment control to the back-end edge holding control. The reason for adopting this switching method is that the stage switching is directly based on the current equipment process state, rather than relying on manual re-determination, thus making it more conducive to maintaining the consistency and stability of the front-end and back-end control actions in continuous production.
[0087] The device in this embodiment is not a simple information acquisition device, but a control device capable of organizing and executing actions according to different control logics of the front and rear stages. Therefore, this method can be stably implemented at the device execution level, making it easy to implement in continuous production scenarios.
[0088] Example 8:
[0089] In one specific embodiment, this embodiment is used to illustrate the effect of the solution of this application by comparison. Three production methods are specifically set up. The first method only extends the venting duration without adjusting the final mold closing speed and the initial pressure build-up speed in conjunction with it. The second method only increases the holding pressure and extends the holding duration without adjusting the venting duration and the subsequent pressure build-up speed in conjunction with it. The third method adopts the linkage adjustment method described in this application, that is, the first linkage adjustment is executed when the front stage meets the front stage execution conditions, and the second linkage adjustment is executed when the rear stage meets the rear stage execution conditions.
[0090] Statistics after continuous production of 1000 pieces show that in the first method, the air trapping rate in the front section decreased, but the average width of the flash in the back section increased. In the second method, the flash in the back section decreased, but the proportion of local air trapping in the front section increased. In the third method, the air trapping defect rate and the flash width fluctuation both decreased, and the consistency of the multi-cavity system was more stable.
[0091] In summary, this application does not rely on post-molding defects for delayed machine adjustments. Instead, it identifies insufficient venting in the initial stage and insufficient edge compaction during the compression molding process by comparing specific process quantities with reference parameter ranges, and executes corresponding linked adjustments. This approach allows for more timely and targeted coordination of cavity venting sufficiency and edge molding stability in actual production, thereby improving the stability of the sealing ring compression molding process and the consistency of the finished product.
[0092] The embodiments described above are merely examples of several implementations of this application, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these modifications and improvements all fall within the scope of protection of this application.
Claims
1. A method for anomaly detection and parameter linkage adjustment in the sealing ring molding process, characterized in that, include: S10. Obtain process information for the current molding stage. The process information includes the front-end process quantity and the back-end process quantity. The front-end process quantity includes the venting start time, venting duration, mold closing end speed, and initial pressure establishment change information. The back-end process quantity includes the venting duration, back-end pressure establishment fluctuation information, holding pressure, and holding pressure duration. S20. Compare the quantities of the preceding process and the subsequent process with the reference parameter ranges of the corresponding molding stages, respectively. S30. When at least two of the preceding process quantities exceed the corresponding reference parameter range, the first linkage adjustment is executed. S40. When at least two of the downstream process quantities exceed the corresponding reference parameter range, execute the second linkage adjustment. S50, the period from the start of mold closing to the completion of the initial pressure establishment is defined as the front molding stage, and the period from the completion of the initial pressure establishment to the end of the pressure holding is defined as the back molding stage. The first linkage adjustment is executed first in the front molding stage, and the second linkage adjustment is executed first in the back molding stage. The first linkage adjustment includes the linkage adjustment of the venting parameters, the mold closing parameters and / or the pressurizing parameters, and the second linkage adjustment includes the linkage adjustment of the pressure holding parameters, the pressurizing parameters and / or the venting parameters.
2. The method for anomaly judgment and parameter linkage adjustment in the sealing ring molding process according to claim 1, characterized in that, The reference parameter range is determined by statistical analysis of the qualified batch process information of the target sealing ring product under the same mold, the same molding equipment and the same rubber material conditions, and the reference parameter ranges corresponding to the front molding stage and the back molding stage are set separately.
3. The method for anomaly judgment and parameter linkage adjustment in the sealing ring molding process according to claim 1, characterized in that, The process information also includes at least one of mold opening / closing state switching information, pressure applied, and mold temperature; The comparison of the preceding and following process quantities with the reference parameter ranges of the corresponding forming stages includes at least one of interval comparison, parameter change trend comparison, and stage switching state comparison.
4. The method for anomaly judgment and parameter linkage adjustment in the sealing ring molding process according to claim 1, characterized in that, The first linkage adjustment is executed when at least two of the following conditions are met simultaneously: the venting start time is higher than the upper limit of the corresponding reference parameter range, the venting duration is lower than the lower limit of the corresponding reference parameter range, the mold closing speed is higher than the upper limit of the corresponding reference parameter range, and the initial pressure establishment change information is higher than the upper limit of the corresponding reference parameter range.
5. The method for anomaly judgment and parameter linkage adjustment in the sealing ring molding process according to claim 4 or 1, characterized in that, The first linkage adjustment includes at least one of the following: Extend the venting duration and reduce the final speed of mold closing; Extend the exhaust duration and slow down the initial pressure build-up rate; Advance the start of exhaust and slow down the initial pressure build-up rate.
6. The method for anomaly judgment and parameter linkage adjustment in the sealing ring molding process according to claim 1, characterized in that, The second linkage adjustment is executed when at least two of the following conditions are met simultaneously: the exhaust duration is higher than the upper limit of the corresponding reference parameter range, the holding pressure is lower than the lower limit of the corresponding reference parameter range, the holding pressure duration is lower than the lower limit of the corresponding reference parameter range, and the downstream pressure establishment fluctuation information is higher than the upper limit of the corresponding reference parameter range.
7. The method for anomaly judgment and parameter linkage adjustment in the sealing ring molding process according to claim 6 or 1, characterized in that, The second linkage adjustment includes at least one of the following: Increase the holding pressure and extend the holding time; Shorten the exhaust duration and adjust the post-pressurization build-up rate; Adjust the pressurization rate in the later stage and extend the pressure holding time.
8. The method for anomaly judgment and parameter linkage adjustment in the sealing ring molding process according to claim 1, characterized in that, When the execution conditions of the first linkage adjustment and the second linkage adjustment are simultaneously met during the same molding process, the first linkage adjustment is executed first in the first molding stage, and the second linkage adjustment is executed after entering the second molding stage.
9. The method for anomaly judgment and parameter linkage adjustment in the sealing ring molding process according to claim 1, characterized in that, Based on the extent to which the process information exceeds the range of the corresponding reference parameters, determine the adjustment direction and amount of the corresponding process parameters; Let the current value of the parameter to be adjusted be x0, the corresponding value in the reference parameter range be m, and the adjustment ratio be k, and 0. <k≤1; When x0 is greater than m and the parameter to be adjusted needs to be reduced, the adjusted parameter x1 is determined by the following formula: x1 = x0 - k × (x0 - m); When x0 is less than m and the parameter to be adjusted needs to be increased, the adjusted parameter x1 is determined by the following formula: x1 = x0 + k × (m - x0).
10. A sealing ring molding control device, characterized in that, include: The information acquisition unit is used to acquire process information of the current molding stage. The process information includes the front process quantity and the back process quantity. The front process quantity includes the venting start time, venting duration, mold closing end speed and initial pressure establishment change information. The back process quantity includes the venting duration, back pressure establishment fluctuation information, holding pressure and holding duration. The comparison unit is used to compare the front-end process quantity and the back-end process quantity with the reference parameter range of the corresponding molding stage, respectively. The first execution unit is used to perform the first linkage adjustment when at least two of the preceding process quantities exceed the corresponding reference parameter range; The second execution unit is used to perform a second linkage adjustment when at least two of the downstream process quantities exceed the corresponding reference parameter range; The stage control unit is used to prioritize controlling the operation of the first execution unit from the start of mold closing to the completion of the initial stage of molding, and to prioritize controlling the operation of the second execution unit from the completion of the initial stage of molding to the end of the pressure holding stage.