Nonlinear feedforward control device and control method for heating gas in a single combustion chamber of a coke oven
By installing a two-position flow valve and a layered, tiered coke oven gas management system on the coke oven gas branch pipe, the problem of lagging gas quantity regulation in the coke oven heating control system was solved, achieving precise control of the combustion chamber gas supply and temperature stability, thus improving coking efficiency and energy consumption management.
Patent Information
- Application Number
- CN202611563620.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-10
- Publication Date
- 2026-11-24
AI Technical Summary
The existing coke oven heating control system cannot accurately regulate the amount of gas in each combustion chamber, resulting in a serious lag between the adjustment action and temperature changes, which cannot meet the intelligent and automated requirements of the coke oven coking process.
Two-position flow valves are installed on the gas branch pipes of the coke oven, and independent, nonlinear control of the gas supply to each combustion chamber is achieved through feedforward setting and dynamic correction of the process control layer. Combined with the hierarchical coke oven heating gas management system, the gas supply is optimized and corrected to achieve closed-loop control.
It achieves precise control of gas flow in a single combustion chamber, reduces coking energy consumption, improves coking efficiency, and reduces furnace wall temperature fluctuations by dynamically adjusting the coupling of gas supply and combustion chamber heating intensity.
Smart Images

Figure CN123152484A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to automatic heating technology for coke ovens, and more particularly to a nonlinear, feedforward control device and control method for heating gas in a single combustion chamber of a coke oven. Background Technology
[0002] A coke oven is an industrial kiln that uses coking coal as raw material to produce coke, coal gas, and chemical products through high-temperature dry distillation. Coke ovens are characterized by a multi-chamber kiln structure, with alternating carbonization chambers and combustion chambers. The coal charging car and coke pushing car sequentially push coke and charge coal into the carbonization chambers according to a set sequence. Coal gas and air burn in the combustion chamber, and the heat generated is conducted through the furnace walls to adjacent carbonization chambers, continuously heating and raising the temperature of the coal within the carbonization chambers. This process involves high-temperature dry distillation processes such as drying, melting, and coking. The coking cycle in the carbonization chamber is 19–25 hours. When the center temperature of the coke cake reaches 950–1050℃, the coke pusher pushes the coke cake out of the carbonization chamber, and the coal charging car reloads the coal into the carbonization chamber. Due to the different pushing-and-charging times in each carbonization chamber, the coking process of the coal layer in each chamber varies, causing the temperature of adjacent combustion chambers to fluctuate periodically with the coking process of the carbonization chambers.
[0003] Coke ovens use two types of heating fuel: mixed gas and coke oven gas. Mixed gas is produced by mixing blast furnace gas and coke oven gas in a specific ratio according to calorific value requirements (hereinafter referred to as gas). The gas and air are heated using a regenerative combustion method: the rising airflow (gas and air) and the descending airflow (flue gas) exchange heat in a regenerator, and the rising and descending airflows are periodically switched by a waste gas switch, with each exchange lasting 20-30 minutes. When using coke oven gas for heating, only the air is preheated in the regenerator. For double-flue coke ovens, there are main gas pipes and branch pipes on both the machine side and coke side; for single-flue coke ovens, there are only main gas pipes and branch pipes on one side. Reheat coke ovens have main coke oven gas pipes and branch pipes to supply coke oven gas to the combustion chamber; air is drawn into the coke oven through the damper of the waste gas switch.
[0004] The primary function of a coke oven heating control system is to reduce the consumption of coking gas while maintaining coke quality. However, the coking heating process in a coke oven is characterized by high inertia, strong nonlinearity, and multivariable coupling, and is also affected by periodic coal charging and coke pushing operations, as well as gas preheating and reversing disturbances. Currently, coke oven heating control systems and equipment are based on a control strategy of "equal gas supply to each combustion chamber," using the average temperature of the standard flues on the machine side and coke side as the temperature control target, and achieving control by adjusting the gas supply to the main gas pipes on the machine side and coke side. This type of system and equipment faces the following problems in practical applications: The coke oven heating process is a complex process characterized by high inertia, nonlinearity, multi-parameter coupling, and periodic time-varying behavior. Existing heating control systems adjust the total gas flow rate based on the standard flue temperature deviation, resulting in a significant lag between the adjustment action and temperature changes.
[0005] The existing control system uses the average temperature of the standard flue in the combustion chamber as the heating control target. When the actual temperature of the coke oven deviates from the set value, it only adjusts the total supply of coke oven gas by changing the total supply of coke oven gas. It lacks the means to accurately control the heating gas of each combustion chamber.
[0006] The existing coke oven heating control system regulates the heating gas based on the current thermal regime. When the coke oven thermal coefficients K_average and K_stability decrease, the system cannot meet the functional requirements of automatic optimization.
[0007] With the development of large-scale coke ovens, the coking production process has achieved comprehensive measurement and control capabilities, providing a hardware foundation for the intelligent, automated, and precise heating of coke ovens. Many enterprises have conducted extensive research on specific technologies related to control schemes, control models, and control rules for the coke oven heating process, but the aforementioned problems have not yet been effectively resolved.
[0008] In recent years, studies have established three-dimensional transient CFD models for industrial-scale coke ovens. The computational domain consists of a carbonization chamber sandwiched between two semi-combustion chambers. The carbonization chamber side simultaneously considers moisture evaporation and condensation, volatile matter release, and changes in the porosity of the blended coal. The fuel supply rate is adjusted within a coking cycle to meet the heating demands of the carbonization chamber. The simulation results reflect the variation of heat flux on the partition wall during the coking process (see Wang QW, Shen QL, Li XG, et al. Transient behavior of an industrial-scale coke oven: CFD modeling and simulation with a fully coupled heating and coking model[J]. Journal of Analytical and Applied Pyrolysis, 2023, 169: 105848). However, these models have a large computational scale, rely on offline simulation, and output a continuous variation of the furnace wall heat flux. They cannot be directly used for online, cycle-by-cycle adjustment of the gas supply to each combustion chamber, nor do they address how to implement this variation on a two-position flow valve with only two flow levels. Summary of the Invention
[0009] The purpose of this invention is to address the problems of severe lag and inability to accurately control the gas volume in each combustion chamber in existing technologies. This invention proposes a nonlinear, feedforward control device for heating gas in a single combustion chamber of a coke oven. By installing a two-position flow valve on each gas branch pipe, and based on the coal charging-coke pushing sequence and coking process of each carbonization chamber, the process control layer sets and dynamically corrects the gas supply to each combustion chamber during each exchange period. This achieves independent, nonlinear, and precise closed-loop control of the gas flow in a single combustion chamber, thereby reducing coking energy consumption and improving coking efficiency.
[0010] It should be noted that, in this invention, unless otherwise specified, the specific meaning of "comprising" in relation to composition and description includes both open-ended meanings such as "comprising," "including," etc., and closed-ended meanings such as "composed of," "consisting of," etc., and similar meanings.
[0011] To achieve the above objectives, the technical solution adopted by the present invention is: a nonlinear, feedforward control device for heating gas in a single combustion chamber of a coke oven, comprising: The coke oven machine-side gas main pipe, machine-side gas branch pipe, machine-side exhaust gas switch, and coke-side gas main pipe, coke-side gas branch pipe, and coke-side exhaust gas switch are arranged in the same manner as the machine side; it also includes the coke oven gas main pipe, coke oven gas branch pipe, combustion chamber lower spray pipe, and coke oven heating gas management system. External gas is supplied to the main gas pipe on the machine side, which is connected to the machine side gas branch pipes of each combustion chamber. The machine side gas branch pipes are connected to the machine side exhaust gas switch, which is connected to the coke oven flue. A two-position gas flow valve and a gas exchange cock are sequentially installed on the gas branch pipe on the machine side along the gas flow direction; a two-position gas flow valve on the coke side and a two-position gas exchange cock on the coke side are sequentially installed on the gas branch pipe along the gas flow direction; the two-position gas flow valve includes a valve body, a valve shaft, an adjusting plate, a flow limiting orifice plate, a cylinder, and a solenoid valve; the adjusting plate is fixed on the valve shaft, and the flow limiting orifice plate is installed in the orifice slot of the valve body. The area of the adjusting plate is smaller than the opening area of the flow limiting orifice plate, and the difference between the two areas constitutes the airflow channel area; the cylinder drives the valve shaft to rotate, causing the adjusting plate to switch between a horizontal and a vertical position, thereby changing the airflow channel area of the valve body; the structure and working principle of the coke side two-position flow valve are the same as those of the two-position gas flow valve. The gas two-position flow valve defines two valve positions, with valve position one corresponding to gas flow rate V1 and valve position two corresponding to gas flow rate V2. The flow rates of V1 and V2 are determined by the difference between the opening area of the flow limiting orifice plate 214 and the area of the regulating plate 213 according to the furnace type, gas calorific value and coal characteristics. The flow rate ratio of V1 / V2 is 0.75 to 0.95. The gas exchange cock crank of the odd-numbered gas branch pipe and the gas exchange cock crank of the even-numbered gas branch pipe are respectively connected to the odd-numbered pull rod and the even-numbered pull rod of the hydraulic switch. The hydraulic switch pulls the odd-numbered pull rod and the even-numbered pull rod alternately to control the "open" or "close" of the exchange cock. Here, "odd" and "even" are distinguished by the odd or even number of the combustion chamber (carbonization chamber). When the gas exchange cock of the gas branch pipe is in the "open" position, the solenoid valve controls the cylinder of the two-position flow valve to drive the valve shaft to rotate, so that the valve position switches between valve position one and valve position two. The main coke oven gas pipe is connected to the coke oven gas branch pipes of each combustion chamber. The coke oven gas branch pipes are connected to the lower spray pipes of the combustion chambers, and the coke oven gas enters the coke oven combustion chamber through the lower spray pipes. A coke oven gas two-position flow valve and a coke oven gas exchange cock are installed sequentially on the coke oven gas branch pipes along the gas flow direction. The coke oven gas two-position flow valve has the same structure and working principle as the gas two-position flow valve. The gas main pipe on the machine side is equipped with a main gas flow regulating valve, an auxiliary gas flow regulating valve and an accumulation device. The gas main pipe on the coke side is equipped with a main gas flow regulating valve on the coke side, an auxiliary gas flow regulating valve and an accumulation device. The gas flow ratio of the main and auxiliary passages of the main gas flow regulating valve and the auxiliary gas flow regulating valve is 10:1 to 15:1. The coke oven heating gas management system is connected to the solenoid valve, the main gas flow regulating valve and the auxiliary gas flow regulating valve to independently and dynamically regulate the gas supply to each combustion chamber during each exchange period.
[0012] The coke oven heating gas management system adopts a hierarchical structure, including a field equipment layer and a process control layer, and is configured to independently and dynamically adjust the supply of gas to each combustion chamber during each exchange period in the continuous coke oven production process. The field equipment layer includes cylinder drive mechanisms for distributed two-position flow valves for heating gas in each combustion chamber and a dual-path gas flow regulating valve for the main gas pipe; as well as temperature, pressure, and analysis equipment required for normal coke oven production. The process control layer includes a coking production process database, a nonlinear and dynamic feedforward adjustment module for heating gas in a single coke oven combustion chamber, and a module for statistically analyzing and controlling the flow of heating gas in the main coke oven pipe.
[0013] Furthermore, the single-combustion-chamber heating gas nonlinear, dynamic feedforward adjustment module determines the gas supply setpoint for each combustion chamber in each exchange period in the following manner: The coke oven operates with a 2-1 series coke pushing and coal charging operation. The starting point is the coal charging time t0 in the adjacent carbonization chamber on the left side of the combustion chamber. At this moment, the coal in the carbonization chamber on the right side of the combustion chamber has been in residence for τ / 2. The coking cycle τ in the carbonization chamber is divided into N = 60τ / T according to the exchange cycle T. 交Each time period corresponds to an exchange period sequence number (j=1, 2, ..., N) in the combustion chamber; the coking process coefficient s represents the ratio of the coal residence time in the carbonization chamber to the coking cycle, s = ((t - t0) / τ) mod 1, s takes values from 0 to 1 (0 when coal is being loaded into the carbonization chamber, and 1 when coke is being pushed into the carbonization chamber); the heating intensity coefficient of the carbonization chamber furnace wall decreases monotonically as s increases; it reflects the thermal law that cold coal absorbs heat strongly in the early stage of coal loading and absorbs heat weakly in the later stage of coking; the total heating intensity coefficient Q of the combustion chamber to the carbonization chamber walls on both sides. The time difference τ / 2 between the coking and coal charging of the adjacent carbonization chambers on both sides of the combustion chamber means that when the coal charging operation is underway in the left carbonization chamber, the coal in the right carbonization chamber is in the middle stage of coking, at which time the maximum value of the combustion chamber's heat supply intensity coefficient is Q=1.0. After τ / 2 of coking time, the coal in the right carbonization chamber is in the coke maturation stage, while the coal in the left carbonization chamber is in the middle stage of coking, at which time the minimum value of the combustion chamber's heat supply intensity coefficient is Q=0.75~0.85. The value of the combustion chamber's heat supply intensity coefficient Q exhibits a periodic change from 1.0 to 0.75~0.85, with the τ / 2 coking cycle repeating once. The heat supply intensity coefficient Qj of the combustion chamber for each exchange period (j) is found in the database to be between 1.0 and (0.75~0.85). The selection of V1 and V2 flow rates and the setting of Q value involve the following factors: computational fluid dynamics (CFD) simulation model calculation data of coking process, coke oven thermal calculation theory, coke oven thermal calibration data, coke oven structure, temperature, pressure and flow measurement and accuracy during coke oven production, and the control accuracy of process control layer for production stability and operability.
[0014] Ψ = (Q - Qmin) / (Qmax - Qmin) The feedforward setpoint V for the cumulative gas supply during the exchange period (j) is determined according to formula (1). 交 * Then, according to formula (2), it is converted into the exchange period (j) and the dwell time setting value T1 of the two-position flow valve in valve position one is issued for execution.
[0015] V 交 * = V 交,min +Ψ(V 交,max - V 交,min (1) T1* = (V2·T 交 - V 交 *) / (V2 - V1) (2) In the formula: V 交,min = V1·T 交 V 交,max = V2·T 交 .
[0016] Where V 交,minV represents the lower limit of the available gas volume during the exchange period, i.e., the cumulative gas supply during the entire exchange period when the valve is in position one. 交,max This represents the upper limit of the available gas supply during the exchange period, i.e., the cumulative gas supply when the valve is in position two throughout the entire exchange period; V 交 * represents the cumulative gas supply amount set for the feedforward during this exchange period, T1* is the set value for the residence time of valve position one during this exchange period, and T2* = T 交 - T1*.
[0017] Because the coal loading times of each carbonization chamber are different, the s of each combustion chamber are different at the same time, the heating intensity of each combustion chamber is also different at the same time, and the feedforward set gas supply of each combustion chamber during the exchange period is also different. Therefore, the nonlinear and dynamic feedforward adjustment of the heating gas of the single combustion chamber throughout the process can make the heat supply match the heat flow of the furnace wall and reduce the temperature fluctuation of the furnace wall.
[0018] When coal is reloaded into the carbonization chamber, the deviation is calculated as the difference between the measured value (θ) and the target value (θ*) of the standard flue temperature in each exchange period during the kth coking cycle: Δθ = θ* - θ (Δθ > 0 indicates underheating and the need to increase the heating supply). The deviation is expressed as ΔV. 交 =Kp·Δθ calculates the correction amount, and after dead zone judgment and amplitude limiting processing, it is calculated according to V. 交(k+1) = V 交(k) + ΔV 交(k) Update the feedforward setting (V) for the same exchange period in the next coking cycle. 交(k) V during the kth coking cycle 交 V 交(k+1) V during the (k+1)th coking cycle 交 The corrected setting value must fall within [V] 交,min V 交,max Within the specified interval, the boundary value is used when the value exceeds the specified range; where Kp is the proportional correction coefficient, in meters. 3 The temperature is initially determined by coke oven thermal calculations using Kp = ΔVintersection / Δθ. After commissioning, historical data from at least three coking cycles are used for regression calibration using the least squares method, or the value is determined based on coke oven thermal calculations and calibration. The process control layer optimizes and corrects the nonlinear and feedforward adjustment setpoints for single-combustion chamber heating gas in coking cycle k+1 based on production feedback data from coking cycle k; thus achieving closed-loop control of nonlinear and feedforward adjustment of single-combustion chamber heating gas.
[0019] The above-mentioned trend of the heating intensity coefficient Q decreasing monotonically with the progress of coking can be confirmed by the three-dimensional transient simulation results of industrial-scale coke ovens: within a coking cycle, when the fuel supply rate is changed to meet the heating demand of the carbonization chamber, the heat flow rate of the furnace wall decreases rapidly from a high value to a gradual decrease as the coking process progresses, and further decreases slowly in the later stage of coking (after the fire drop temperature), indicating that the coal in the carbonization chamber absorbs heat strongly in the early stage of coking and absorbs heat weakly in the later stage of coking.
[0020] Furthermore, the drive cylinders of the machine-side dual-position flow valve and the coke-side dual-position flow valve share a single solenoid valve for control; the coke oven gas dual-position flow valve has the same structure and working principle as the machine-side and coke-side dual-position flow valves.
[0021] Furthermore, the opening shape of the flow-limiting orifice plate is circular, rectangular, or polygonal. When production conditions change, the area of the opening of the flow-limiting orifice plate or the adjustment plate is changed according to the set values of V1, V2 and V1 / V2.
[0022] Another objective of this invention discloses a nonlinear, feedforward control method for heating gas in a single combustion chamber of a coke oven, employing the aforementioned equipment and comprising the following steps: a. Based on the coke oven heat transfer theory, coke oven thermal calculations, coal characteristics, and gas calorific value, preset target parameters for each exchange period during the coking process of the coal bed in the adjacent carbonization chamber. The target parameters include at least the gas supply, the dynamic average temperature curve of the standard flue, the coke cake center temperature in the carbonization chamber, the fire drop temperature, and the furnace wall temperature. b. Based on the coke oven charging-pushing sequence, the gas supply of each combustion chamber in each exchange period is set using feedforward. Since the charging time of each carbonization chamber is different, the gas supply of each combustion chamber is also different. As the coking process in the carbonization chamber progresses, it is necessary to adjust the gas supply of each combustion chamber in each exchange period. c. The process control layer input variables should include at least the following: coal charging time for each carbonization chamber, coking cycle, residence time T1 of the two-position flow valve of the gas branch pipe in position one during each exchange period, the difference between the measured value and the target value of the standard flue temperature in each combustion chamber, the difference between the measured value and the target value of the coke cake center temperature in the carbonization chamber, the difference between the measured value and the target value of the fire drop temperature in each carbonization chamber, the difference between the measured value and the target value of the furnace wall temperature in each carbonization chamber, the calorific value of the heating gas and the moisture content of the coal fed into the furnace; d. Based on coke oven heat transfer theory, coke oven thermal calculations, historical database data, and the aforementioned deviation values, the process control layer optimizes and corrects the feedforward settings for gas supply, standard flue dynamic average temperature curve, fire drop temperature, and furnace wall temperature during each exchange period in the combustion chamber when recharging coal in the carbonization chamber; the gas supply is calculated according to V... 交 =V1×T1+V2×T2、T 交 =T1+T2 is converted to the residence time T of the two-position gas flow valve in position one during the exchange period. 1,That is, according to T1 = (V2 × T) 交 - V 交 The conversion is ΔV / (V2 - V1). Specifically, the correction is based on ΔV. 交 = Kp·Δθ calculates the correction amount. After dead zone judgment and amplitude limiting, the gas supply amount in each exchange period of the combustion chamber set by the feedforward is corrected, and then adjusted according to V. 交 = V1×T1 + V2×T2、T 交 = T1 + T2 and T1 = (V2·T) 交 - V 交 (V2 - V1) is converted to the residence time T1 of the gas two-position flow valve in position one during the exchange period; the target parameters such as the standard flue dynamic average temperature curve, the fire drop temperature and the furnace wall temperature are updated according to the measured data of this cycle.
[0023] This solves the problem of long lag between gas flow regulation and temperature changes, and enables closed-loop control of the dynamic feedforward setpoint of the combustion chamber.
[0024] Furthermore, in step b, the control system sets the gas supply amount for each exchange period of adjacent combustion chambers based on the coal loading time of the carbonization chamber; the gas branch pipe of each combustion chamber adjusts the amount of gas supplied to the combustion chamber in each exchange period according to the feedforward setting value.
[0025] Furthermore, the gas supply to the combustion chamber branch pipe is optimized, independently, and dynamically adjusted within each exchange period. Specifically, the gas two-position flow valve cylinder adjusts the dwell time of the valve position in each exchange period according to the control system command, causing the gas flow of the gas two-position flow valve to exhibit a non-linear, step-like change; the cumulative gas supply within the exchange period satisfies the formula: V 交 = V1 × T1+ V2 × T2 T 交 = T1 + T2 Among them, T 交 T1 is the residence time of the gas exchange in the coke oven heating gas state (min), T2 is the residence time of the gas in the two-position flow valve at flow rate V1 (min), and T2 is the residence time of the gas in the two-position flow valve at flow rate V2 (min). 交 This represents the cumulative amount of gas supplied during the exchange period.
[0026] Furthermore, it also includes: the control system accumulates the gas supply set value of each combustion chamber during the current exchange period to obtain the instantaneous flow demand of the gas main pipe; the control system allocates the opening commands of the main flow regulating valve and the auxiliary flow regulating valve of the gas main pipe according to the ratio of their flow capacity (i.e., the ratio of gas flow in the main and auxiliary passages), and uses the measured flow of the gas main pipe accumulation device to provide feedback correction to the allocation result, so that the adjustment range and output flow of the main and auxiliary dual-pass regulating valves are adapted to the instantaneous flow demand of the gas main pipe.
[0027] Furthermore, the hydraulic exchanger alternately controls the "open" or "close" of the gas exchange cock by pulling the odd-numbered pull bar and the even-numbered pull bar, with each exchange lasting 20 to 30 minutes; when the gas branch pipe exchange cock is in the "open" position, the solenoid valve controls the gas two-position flow valve cylinder to operate, thereby adjusting the gas supply.
[0028] Furthermore, in step c, the coke cake center temperature in the carbonization chamber is obtained by periodic measurement, while the dynamic average temperature curve of the standard fire channel, the fire drop temperature, and the furnace wall temperature are obtained by real-time feedback measurement.
[0029] The nonlinear, feedforward control device and method for heating gas in a single combustion chamber of a coke oven, as described in this invention, has the following advantages compared to existing technologies: 1) This invention installs a two-position flow valve on the gas branch pipe of each combustion chamber of the coke oven. By stabilizing the pressure of the main gas pipe, the residence time of the two-position flow valve between the two positions is adjusted, so that the gas flow rate presents a non-linear step-shaped change. This realizes the independent and dynamic adjustment of the gas supply of each combustion chamber in each exchange period, and solves the problem that the existing technology can only adjust the total flow rate of the main gas pipe and cannot accurately control the gas quantity of each combustion chamber.
[0030] 2) Based on the coal charging-coke pushing sequence of the coke oven, the present invention sets the gas supply of each combustion chamber in each exchange period by feedforward, and uses production feedback data to optimize and correct the nonlinear and feedforward-regulated gas supply of the heating gas in a single combustion chamber throughout the coke oven process. This solves the long lag problem between gas flow regulation and temperature change, and realizes closed-loop control of the dynamic feedforward set value of the combustion chamber.
[0031] 3) This invention, through the cooperation of the main and auxiliary dual-path flow regulating valves of the main gas pipe and the dual-position flow valves of each combustion chamber, meets the requirement of slight changes in the main gas flow caused by the independent adjustment of the gas volume of each combustion chamber, thus ensuring the stability of the coke oven heating gas supply.
[0032] 4) The present invention adopts a hierarchical coke oven heating gas management system, which combines the field equipment layer with the process control layer. It realizes independent and dynamic adjustment of the gas in each combustion chamber during the continuous coke oven production process, which is conducive to reducing coking energy consumption and improving coking production efficiency.
[0033] 5) This invention dynamically adjusts the gas supply in a single combustion chamber to couple it with the change in the heating intensity of the combustion chamber, which helps to reduce the heat consumption of coking. Based on the experience data of thermal calibration of coking production and the calculation data of coke oven simulation model, it is estimated that 2-3% of the gas will be saved.
[0034] The nonlinear, feedforward control device and control method for heating gas in a single combustion chamber of a coke oven, as described in this invention, are applicable to coke oven heating systems. Attached Figure Description
[0035] Figure 1 Diagram of a coke oven heating gas system; Figure 2 Installation diagram for gas branch pipes; Figure 3 This is a schematic diagram of a two-position flow valve. Figure 4 A graph showing the relationship between the average temperature of the standard flue in the combustion chamber and the gas supply at different times for feedforward setting; Figure 5 This is a graph showing the change in heat flow rate of a single furnace wall as a function of the coking process.
[0036] The following are the annotations in the attached diagram: 1—Machine-side gas main pipe, 2—Machine-side gas branch pipe, 3—Machine-side exhaust gas switch, 4—Coke-side gas main pipe, 5—Coke-side gas branch pipe, 6—Coke-side exhaust gas switch, 7—Coke oven gas main pipe, 8—Coke oven gas branch pipe, 9—Combustion chamber lower spray pipe, 10—Coke oven heating gas management system, 11—Main flow regulating valve of the main gas pipe, 12—Auxiliary flow regulating valve of the main gas pipe, 21—Two-position gas flow valve, 2 2—Gas exchange cock; 41—Main flow regulating valve for coke oven gas main pipe; 42—Auxiliary flow regulating valve for coke oven gas main pipe; 51—Coke oven two-position flow valve; 52—Coke oven exchange cock; 81—Coke oven gas two-position flow valve; 82—Coke oven gas exchange cock; 211—Two-position flow valve body; 212—Two-position flow valve shaft; 213—Two-position flow valve regulating plate; 214—Flow limiting orifice plate; 215—Cylinder; 216—Solenoid valve. Detailed Implementation
[0037] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application.
[0038] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "connected" and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection, an electrical connection, or a connection that allows for mutual communication; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two elements or the interaction between two elements. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances. In the description of this application, "multiple" means two or more, unless otherwise expressly and specifically limited. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, features defined with "first" and "second" may explicitly or implicitly include one or more features.
[0039] The following disclosure provides many different implementations or examples for carrying out different structures of this application. To simplify the disclosure of this application, the components and arrangements of specific examples are described below. Of course, these are merely examples and are not intended to limit this application. Example 1
[0040] like Figures 1-3 As shown, this embodiment discloses a nonlinear, feedforward control device and method for heating gas in a single combustion chamber of a coke oven. It includes a main coke oven gas pipe 1, a branch coke oven gas pipe 2, a waste gas on / off switch 3, and coke oven gas pipe 4, branch coke oven gas pipe 5, and waste gas on / off switch 6 arranged identically to those on the machine side. It also includes a main coke oven gas pipe 7, branch coke oven gas pipe 8, a lower nozzle of the combustion chamber 9, and a coke oven heating gas management system 10. Specifically, the branch coke oven gas pipe 2 is equipped with a two-position flow valve 21 and a gas exchange cock 22; the main coke oven gas pipe 4 is equipped with a main flow regulating valve 41 and an auxiliary flow regulating valve 42; the branch coke oven gas pipe 5 is equipped with a two-position flow valve 51 and an exchange cock 52; and the branch coke oven gas pipe 8 is equipped with a two-position flow valve 81 and an exchange cock 82.
[0041] like Figure 1 , Figure 2As shown, external gas is delivered to the machine-side gas main 1, which connects to the machine-side gas branch pipes 2 of each combustion chamber. The machine-side gas branch pipes 2 are connected to the machine-side waste gas valve 3, which is connected to the coke oven small flue. On each machine-side gas branch pipe 2, a gas two-position flow valve 21 and a gas exchange cock 22 are installed in sequence along the direction from the gas main to the waste gas valve. The gas two-position flow valve 21 is driven by a cylinder 215 and controlled by a solenoid valve 216. In this embodiment, "single number" and "double number" are distinguished by the parity of the combustion chamber (carbonization chamber) sequence numbers: the gas branch pipes corresponding to odd-numbered combustion chambers are single-number gas branch pipes, and those corresponding to even-numbered combustion chambers are double-number gas branch pipes.
[0042] The cranks of the gas exchange cocks 22 of the single-number gas branch pipes and the double-number gas branch pipes are respectively connected to the single-number tie rods and double-number tie rods of the hydraulic exchanger. The hydraulic exchanger pulls the single-number and double-number tie rods to alternately control the opening and closing of the exchange cocks, with each exchange cycle being 20 to 30 minutes. When the gas exchange cock of a certain combustion chamber is in the open position, the solenoid valve 216 controls the cylinder 215 of the two-position flow valve of that combustion chamber to drive the valve shaft 212 to rotate, switching the valve position between the first valve position and the second valve position, thereby changing the area of the gas flow channel of the valve body and adjusting the gas supply volume of that combustion chamber.
[0043] The coke oven gas main 7 is connected to the coke oven gas branch pipes 8 of each combustion chamber. The coke oven gas branch pipes 8 are connected to the combustion chamber bottom spray pipes 9, through which the coke oven gas enters the coke oven combustion chamber. On the coke oven gas branch pipes 8, a coke oven gas two-position flow valve 81 and a coke oven gas exchange cock 82 are installed in sequence along the direction from the coke oven gas main to the combustion chamber bottom spray pipes.
[0044] As Figure 3 shown, the gas two-position flow valve 21 includes a valve body 211, a valve shaft 212, a regulating plate 213, a throttling orifice plate 214, a cylinder 215 and a solenoid valve 216. The regulating plate 213 is fixed on the valve shaft 212, and the throttling orifice plate 214 is installed in the orifice plate groove of the valve body 211. The opening shape of the throttling orifice plate 214 is circular, rectangular or polygonal. The area of the regulating plate 213 is smaller than the opening area of the throttling orifice plate 214, and the difference between the two constitutes the gas flow channel area. The cylinder 215 drives the valve shaft 212 to rotate: valve position 1 (first position), where the regulating plate 213 is in the first position, has a smaller gas flow channel area, corresponding to the flow rate V1; valve position 2 (second position), where the regulating plate 213 is in the second position, has a larger gas flow channel area, corresponding to the flow rate V2; and V1 < V2. The driving cylinders of the machine-side and coke-side two-position flow valves are controlled by a common solenoid valve 216. The structure and working principle of the gas two-position flow valve 21 are the same as those of the coke oven gas two-position flow valve 81. The two valve positions satisfy V1 / V2 = 0.75 to 0.95.
[0045] To meet the requirement of independent and dynamic adjustment of gas supply in each combustion chamber to cause slight changes in gas flow in the main gas pipe, a dual-path gas flow regulator is installed on the main gas pipe, including a main gas pipe flow regulator 11, a secondary gas pipe flow regulator 12, and an accumulation device. The flow ratio of the main gas pipe flow regulator 11 to the secondary gas pipe flow regulator 12 is 10:1.
[0046] like Figure 1 As shown, the coke oven heating gas management system 10 adopts a hierarchical structure, including a field equipment layer and a process control layer. The field equipment layer, in addition to the existing temperature, pressure, and automatic adjustment items for large coke ovens, also includes distributed cylinder drive mechanisms for dual-position flow valves for heating gas in each combustion chamber and dual-path gas flow regulating valves for the main gas pipe. The process control layer includes a coking production process database, a nonlinear and dynamic feedforward adjustment module for heating gas in a single coke oven combustion chamber, and a module for statistically analyzing and controlling the flow of heating gas in the main coke oven pipe. The coke oven heating gas management system independently and dynamically adjusts the gas supply to each combustion chamber during each exchange period in the continuous coke oven production process.
[0047] The process control layer implements feedforward setting and feedback correction in the following manner: according to the sequence of coke pushing and coal charging in the carbonization chambers on both sides of the combustion chamber, the process control layer sets the target parameters corresponding to each exchange period. The target parameters include at least the gas supply, the dynamic average temperature curve of the standard flue, the coke cake center temperature in the carbonization chamber, the fire drop temperature, and the furnace wall temperature. The process control layer retrieves the coking progress s of the adjacent carbonization chambers of the combustion chamber and the combustion chamber heat supply intensity coefficient Q in each exchange period from the database, and determines it according to Ψ=(Q-Qmin) / (Qmax-Qmin).
[0048] The cumulative gas supply setting value V for each exchange period is obtained according to formula (1). 交 *, converted to the residence time setpoint T1* according to formula (2), and the two-position flow valve cylinder controlled by the solenoid valve executes according to T1*; when coal is loaded again in the carbonization chamber, according to ΔV 交 = Kp·Δθ corrects the setting value for the next coking cycle. The specific calculation process is shown in Example 3.
[0049] The control method for the device in this embodiment includes the following steps: a. Based on coke oven heat transfer theory, coke oven thermal calculation, coal characteristics, gas calorific value, etc., preset target parameters for each exchange period in the coking process of the coal layer in the adjacent carbonization chamber. The target parameters include at least the gas supply, the dynamic average temperature curve of the standard flue, the coke cake center temperature in the carbonization chamber, the fire drop temperature and the furnace wall temperature. b. Based on the coke oven charging-pushing sequence, the gas supply of each combustion chamber is set in each exchange period using feedforward settings. Since the charging time of each carbonization chamber is different, the gas supply of each combustion chamber is also different. As the coking process in the carbonization chamber progresses, it is necessary to adjust the gas supply of each combustion chamber in each exchange period.
[0050] c. The input variables of the process control system shall include at least the following: coal charging time of each carbonization chamber, coking cycle, residence time T1 of the two-position flow valve of the gas branch pipe in position one during each exchange period, the difference between the measured value and the target value of the standard flue temperature of each combustion chamber, the difference between the measured value and the target value of the coke cake center temperature of the carbonization chamber, the difference between the measured value and the target value of the fire drop temperature of each carbonization chamber, the difference between the measured value and the target value of the furnace wall temperature of each carbonization chamber, the calorific value of the heating gas and the moisture content of the coal fed into the furnace; d. Based on coke oven heat transfer theory, coke oven thermal calculations, historical database data, and the aforementioned deviation values, the process control layer optimizes and corrects the feedforward settings for target parameters such as gas supply, standard flue dynamic average temperature curve, fire drop temperature, and furnace wall temperature during the recharging of coal in the carbonization chamber. The gas supply is calculated according to V... 交 =V1×T1+V2×T2、T 交 =T1+T2 is converted to the residence time T1 of the two-position flow valve of the gas in position one during the exchange period.
[0051] This solves the problem of long lag between gas flow regulation and temperature changes, and enables closed-loop control of the dynamic feedforward setpoint of the combustion chamber.
[0052] The control system sets the gas supply amount for each exchange period in adjacent combustion chambers based on the coal charging time in the carbonization chamber. Each combustion chamber gas branch adjusts the gas supply to the combustion chamber within each exchange period according to the feedforward set value. Since the heat transfer intensity from the combustion chamber to the carbonization chamber wall changes accordingly with the coking process of the coal bed in the carbonization chamber, it is necessary to optimize, independently, and dynamically adjust the gas supply amount of the combustion chamber gas branch in each exchange period. The gas two-position flow valve cylinder adjusts the residence time T1 in valve position one (flow rate V1) within each exchange period according to the control system command, causing the gas flow rate to change non-linearly in a stepwise manner (flow rate V1 or V2). The gas supply amount of the gas branch changes accordingly within each exchange period, satisfying the formula: V 交 = V1×T1 +V2×T2,T 交 = T1 + T2. Where, T 交 T1 is the gas exchange time (min) for coke oven heating gas, T2 is the residence time (min) of the gas in the two-position flow valve at flow rate V1, and T2 is the residence time (min) in the flow rate V2. 交 The cumulative amount of gas supplied during the exchange period (m³) 3Simultaneously, the control system calculates the instantaneous dynamic flow rate of the main gas pipe, establishes a control model for regulating the gas flow rate through the main and auxiliary dual-path channels of the main gas pipe based on historical data, and predicts the regulation range of the dual-path regulating valve of the main gas pipe.
[0053] In this embodiment, the terms "odd number" and "even number" are determined by the longitudinal arrangement of the coke oven carbonization chambers (combustion chambers) along the coke oven group, based on the parity of their numbers. Specifically, the coke oven carbonization chambers and combustion chambers are arranged alternately, numbered sequentially from one end platform of the coke oven group to the other as 1, 2, 3, ..., n. Carbonization chambers (combustion chambers) with odd numbers are called odd-numbered carbonization chambers (combustion chambers), and those with even numbers are called even-numbered carbonization chambers (combustion chambers). The odd-numbered gas branch pipe is the gas branch pipe connected to the small flue of the odd-numbered combustion chamber and used to supply heating gas to it; the even-numbered gas branch pipe is the gas branch pipe connected to the small flue of the even-numbered combustion chamber and used to supply heating gas to it. Because coke oven heating adopts a regenerative heating method, when gas is supplied to the gas branch pipe of the odd-numbered combustion chamber, the gas enters the small flue through the gas passage of the waste gas switch, and air is drawn into the small air flue through the damper of the waste gas switch. After being preheated in the odd-numbered regenerator, the gas and air enter the combustion chamber vertical flue for combustion through the inclined duct. The flue gas exchanges heat in the even-numbered regenerator and enters the coke oven flue through the small flue via the even-numbered combustion waste gas switch. At this time, the even-numbered gas branch pipe and the air damper are closed. In the same reversing cycle, only the gas main pipe of the odd-numbered combustion chamber (or only the even-numbered combustion chamber) is supplied with gas. Therefore, the parity of the carbonization chamber (combustion chamber) serial number is used as the basis for the division of odd / even numbers, which is consistent with the common convention of coke oven heating reversing in this field. Based on this, those skilled in the art can uniquely and clearly determine whether each gas branch pipe and the combustion chamber it serves are odd or even numbers, and there is no situation of ambiguity.
[0054] It should be noted that the above method of dividing the carbonization chamber serial number into odd / even numbers is only a preferred numbering method. It is also possible to divide the serial number of the combustion chamber itself into odd / even numbers. Example 2
[0055] This embodiment, based on Embodiment 1, provides specific operating parameters to illustrate the detailed process of adjusting and metering the gas supply to the combustion chamber branch pipe using feedforward settings. The main parameters of the coke oven in this embodiment are as follows: The carbonization chamber is 7m high; The coal loading capacity of the carbonization chamber is 41.72 tons. Coking time: 20 hours; The combustion chamber gas consumption for one coking cycle is 29,280 m³. 3 ; Exchange time: 20 minutes; Coal loading-coke pushing sequence 2-1; Two-position flow valve V1 with a flow rate of 22m³ / h 3 / min; Two-position flow valve V2 flow rate 28m 3 / min; The combustion chamber heat supply intensity coefficient Q is 0.8 to 1.0.
[0056] The coke oven heating gas management system starts from the coal charging time in the carbonization chamber and divides the 20-hour coking cycle into 10 time periods, each lasting 2 hours. Each time period contains 6 exchange periods (2 hours = 120 minutes, 120 / 20 = 6). The feedforward setting determines the combustion chamber feedforward heating intensity coefficient Q for each time period and the feedforward setting of the T1 time for each exchange period in the combustion chamber gas branch pipe, thereby determining the gas supply for each exchange period. The feedforward setting values and gas supply for each time period are shown in Table 1.
[0057] Table 1. Feedforward setpoints and gas supply for each time period (h)
[0058] V 交 * = V 交,min + (V 交,max - V 交,min Ψ (1) T1* = (V2·T 交 - V 交 *) / (V2 - V1) (2) In this embodiment, T 交 =20 min, T1=0, 7, 13, 20 min, V1=22m 3 / min, T2 = T 交 -T1, V2=28m 3 / min, V 交 This represents the amount of gas supplied during the exchange period. The cumulative gas supply V for all the aforementioned exchange periods is also included. 交 The dwell time T1 is determined by the formula T1 = (V2·T) 交 -V 交 The conversion is V / (V2 - V1), i.e., V 交 For 560, 518, 482, and 440 m 3 The time intervals T1 were 0, 7, 13, and 20 min, consistent with those listed in Table 1.
[0059] The relationship between the average temperature of the standard flue in the feedforward combustion chamber and the gas supply rate at different times is as follows: Figure 4 As shown.
[0060] In this embodiment, the selection of V1 and V2 flow rates and the setting of Q value involve the following factors: computational fluid dynamics simulation model data of coking process, coke oven thermal calculation theory, coke oven thermal calibration data, coke oven structure, temperature, pressure, and flow measurement and accuracy during coke oven production, as well as process control production stability and operability, etc.
[0061] The feedforward setpoints for each of the above time periods monotonically decrease within each half-cycle (τ / 2) and then increase sharply at the boundary between the two half-cycles, exhibiting a sawtooth shape. The basis for this is as follows: Figure 5 As shown: the combustion chamber and carbonization chamber are arranged alternately, and each combustion chamber transfers heat to the adjacent carbonization chambers on both sides at the same time. Figure 5 The diagram shows the change in heat flux of a single-sided furnace wall with the coking process. The heat flux is high in the initial stage of coal charging, then decreases rapidly and tends to level off, further decreasing slowly in the later stage of coking. Let G(s) be the heat absorption intensity of the single-sided carbonization chamber at coking progress s. Then G(s) decreases monotonically with increasing s, and... Figure 5 The pattern shown is consistent.
[0062] Coke pushing and coal charging are carried out in sequence, with the charging times of the carbonization chambers on both sides of the combustion chamber differing by approximately τ / 2; Figure 5 The curve shown is shifted along the time axis by τ / 2 and then superimposed on the original curve to obtain the total heat flow rate G = Gleft + Gright of the furnace walls on both sides of the combustion chamber. G is the amount of heat transferred from the combustion chamber to the furnace walls and coal on both sides during one exchange period. This total value shows a sawtooth shape of first decreasing and then increasing during one coking cycle. When the difference in coal charging time between the two carbonization chambers is exactly τ / 2, the set value sequence of the two half-cycles is the same. This is the reason why the set value sequence of the two half-time periods of 0-10 h and 10-20 h in Table 1 of Example 2 is consistent. When the coking sequence causes the difference in coal charging time between the two sides to deviate from τ / 2, it can be recalculated according to the above superposition relationship. The algorithm itself remains unchanged.
[0063] The measured feedback data of each combustion chamber in each exchange period are compared with the target parameters such as the standard fire channel dynamic average temperature curve, the coke cake center temperature in the carbonization chamber (measured periodically), the fire drop temperature, and the furnace wall temperature set by the feedforward. Based on the deviation value, the T1 time in each exchange period of the next coking cycle of the combustion chamber is optimized and corrected. The gas supply of the gas branch pipe changes in the corresponding exchange period. Example 3
[0064] This embodiment uses the parameters from Embodiment 2 to illustrate the conversion and feedback correction process between the feedforward setpoint and the dwell time setpoint. Given T... 交 = 20 min, V1 = 22 m 3 / min, V2 = 28 m 3 / min, then V 交,min= 22 × 20 = 440 m 3 V 交,max = 28 × 20 = 560 m 3 V2 - V1 = 6 m³ / min.
[0065] Conversion of feedforward setpoint: Assume the heating intensity coefficient Ψ = 0.5 for a certain exchange period, and obtain V according to formula (1). 交* =440 + (560 - 440) × 0.5 = 500 m 3 According to equation (2), T1* = (560 - 500) / 6 = 10 min, T2* = 10 min. Back-substitution verification: V 交 = 22 × 10 + 28 × 10 = 500 m 3 It matches the set value.
[0066] Feedback correction conversion: If the measured standard flue temperature θ = 1290 ℃ and the target value θ* = 1300 ℃ during this exchange period, then Δθ = 10 ℃, which is greater than the dead zone threshold. Therefore, Kp = 2.5 m. 3 / ℃ (Kp coke oven thermal calculation + actual production data) yields ΔV 交 = 25 m 3 V 交 (k+1) = 500 + 25 = 525 m 3 It falls within the interval [440, 560]; according to equation (2), T is obtained. 1(k+1) = 5.83 min, rounded to 6.0 min according to cylinder action resolution, substitute back for V 交 = 22 × 6 + 28 × 14 = 524 m 3 The difference from the set value is 1 m 3 The relative deviation is 0.2%, which meets the engineering accuracy requirements.
[0067] Boundary and parameter verification: When Ψ = 0, T1* = 20 min, V 交 = 440 m 3 , which is the lower limit of the available gas volume; when Ψ = 1, T1* = 0, V 交 = 560 m 3The upper limit of the available gas volume is Ψ; both ends of the boundary are consistent with the physical limit of the two-position flow valve, so when Ψ is 0 to 1, T1 must fall within the executable range of 0 to T. In addition, in Example 2, V1 / V2 = 22 / 28 ≈ 0.786, which falls within the range of 0.75 to 0.95 defined in claim 1.
[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A nonlinear, feedforward control device for heating gas in a single combustion chamber of a coke oven, characterized in that, include: The machine-side gas main pipe (1), machine-side gas branch pipe (2), machine-side exhaust gas switch (3), and coke-side gas main pipe (4), coke-side gas branch pipe (5), and coke-side exhaust gas switch (6) are arranged in the same manner as the machine-side gas main pipe; it also includes coke oven gas main pipe (7), coke oven gas branch pipe (8), combustion chamber lower spray pipe (9), and coke oven heating gas management system (10); External gas is delivered to the machine-side gas main pipe (1), the machine-side gas main pipe (1) is connected to the machine-side gas branch pipes (2) of each combustion chamber, the machine-side gas branch pipes (2) are connected to the machine-side exhaust gas switch (3), and the machine-side exhaust gas switch (3) is connected to the coke oven small flue. A two-position gas flow valve (21) and a gas exchange cock (22) are sequentially installed on the gas branch pipe (2) along the gas flow direction; a two-position gas flow valve (51) and a gas exchange cock (52) are sequentially installed on the coke side gas branch pipe (5) along the gas flow direction; the two-position gas flow valve (21) includes a valve body (211), a valve shaft (212), an adjusting plate (213), a flow limiting orifice plate (214), a cylinder (215), and a solenoid valve ( 216); The adjusting plate (213) is fixed on the valve shaft (212), and the flow limiting plate (214) is installed in the orifice slot of the valve body (211). The area of the adjusting plate (213) is smaller than the opening area of the flow limiting plate (214), and the difference between the two areas constitutes the airflow channel area; The cylinder (215) drives the valve shaft (212) to rotate, so that the adjusting plate (213) switches between the horizontal position and the vertical position, thereby changing the airflow channel area of the valve body; The gas two-position flow valve (21) defines two valve positions, with valve position one corresponding to gas flow rate V1 and valve position two corresponding to gas flow rate V2. The flow rate ratio of V1 / V2 is 0.75 to 0.
95. The crank of the gas exchange cock (22) of the odd-numbered gas branch pipe and the crank of the gas exchange cock (22) of the even-numbered gas branch pipe are respectively connected to the odd-numbered pull bar and the even-numbered pull bar of the hydraulic switch. The hydraulic switch pulls the odd-numbered pull bar and the even-numbered pull bar to alternately control the "open" or "close" of the exchange cock. When the gas exchange cock (22) of the machine-side gas branch pipe is in the "open" position, the solenoid valve (216) controls the cylinder (215) of the gas two-position flow valve to drive the valve shaft (212) to rotate, so that the valve position switches between valve position one and valve position two. The main coke oven gas pipe (7) is connected to the coke oven gas branch pipes (8) of each combustion chamber. The coke oven gas branch pipes (8) are connected to the lower spray pipes (9) of the combustion chamber. The coke oven gas enters the coke oven combustion chamber through the lower spray pipes (9). A coke oven gas two-position flow valve (81) and a coke oven gas exchange valve (82) are installed sequentially on the coke oven gas branch pipes (8) along the gas flow direction. The gas main pipe (1) on the machine side is equipped with a main gas flow regulating valve (11), a secondary gas flow regulating valve (12) and an accumulation device. The gas main pipe (4) on the coke side is equipped with a main gas flow regulating valve (41), a secondary gas flow regulating valve (42) and an accumulation device. The gas flow ratio of the main and secondary passages of the main gas flow regulating valve (11) and the secondary gas flow regulating valve (12) is 10:1 to 15:
1.
2. The nonlinear, feedforward control device for heating coal gas in a single combustion chamber of a coke oven according to claim 1, characterized in that, The coke oven heating gas management system (10) adopts a hierarchical structure, including a field equipment layer and a process control layer; the field equipment layer includes a cylinder drive mechanism for the distributed dual-position flow valves of heating gas in each combustion chamber and a dual-passage gas flow regulating valve for the main gas pipe; the process control layer includes a coking production process database, a nonlinear and dynamic feedforward adjustment module for heating gas in a single combustion chamber of the coke oven, and a statistical and control module for the flow of heating gas in the main gas pipe of the coke oven.
3. The nonlinear, feedforward control device for heating coal gas in a single combustion chamber of a coke oven according to claim 1, characterized in that, The machine-side dual-position flow valve and the coke-side dual-position flow valve share a solenoid valve (216) for control of their driving cylinders; the coke oven gas dual-position flow valve (81) has the same structure and working principle as the machine-side and coke-side dual-position flow valves.
4. The nonlinear, feedforward control device for heating gas in a single combustion chamber of a coke oven according to claim 1, characterized in that, The opening shape of the flow-limiting orifice plate (214) is circular, rectangular or polygonal.
5. A nonlinear, feedforward control method for heating gas in a single combustion chamber of a coke oven, characterized in that, The nonlinear, feedforward control device for heating coal gas in a single combustion chamber of a coke oven, as described in any one of claims 1 to 4, comprises the following steps: a. Based on the coke oven heat transfer theory, coke oven thermal calculations, coal characteristics, and gas calorific value, preset target parameters for each exchange period during the coking process of the coal bed in the adjacent carbonization chamber. The target parameters include at least the gas supply, the dynamic average temperature curve of the standard flue, the coke cake center temperature in the carbonization chamber, the fire drop temperature, and the furnace wall temperature. b. Based on the coke oven charging-pushing sequence, the gas supply of each combustion chamber in each exchange period is set using feedforward. Since the charging time of each carbonization chamber is different, the gas supply of each combustion chamber is also different. As the coking process in the carbonization chamber progresses, it is necessary to adjust the gas supply of each combustion chamber in each exchange period. c. The process control layer input variables should include at least the following: coal charging time for each carbonization chamber, coking cycle, residence time T1 of the two-position flow valve of the gas branch pipe in position one during each exchange period, the difference between the measured value and the target value of the standard flue temperature in each combustion chamber, the difference between the measured value and the target value of the coke cake center temperature in the carbonization chamber, the difference between the measured value and the target value of the fire drop temperature in each carbonization chamber, the difference between the measured value and the target value of the furnace wall temperature in each carbonization chamber, the calorific value of the heating gas and the moisture content of the coal fed into the furnace; d. Based on coke oven heat transfer theory, coke oven thermal calculations, historical database data, and the aforementioned deviation values, the process control layer optimizes and corrects the feedforward settings for gas supply, standard flue dynamic average temperature curve, fire drop temperature, and furnace wall temperature during each exchange period in the combustion chamber when recharging coal in the carbonization chamber; the gas supply is calculated according to V... 交 =V1×T1+V2×T2、T 交 =T1+T2 is converted to the residence time T1 of the two-position flow valve of the gas in position one during the exchange period.
6. The nonlinear, feedforward control method for heating gas in a single combustion chamber of a coke oven according to claim 5, characterized in that, In step b, the control system feeds forward to set the gas supply in each exchange period of the adjacent combustion chamber based on the coal loading time of the carbonization chamber. Each combustion chamber gas branch pipe adjusts the amount of gas supplied to the combustion chamber during each exchange period according to the feedforward set value.
7. The nonlinear, feedforward control method for heating gas in a single combustion chamber of a coke oven according to claim 5, characterized in that, The gas supply to the combustion chamber branch pipe is optimized, independently, and dynamically adjusted during each exchange period. Specifically, the cylinder of the two-position gas flow valve adjusts the dwell time of the valve position in each exchange period according to the control system command, so that the gas flow of the two-position gas flow valve exhibits a non-linear step-shaped change; the cumulative gas supply during the exchange period satisfies the formula: In 交 = V1×T1 + V2×T2 T 交 = T1 + T2 Among them, T 交 T1 is the residence time of the gas exchange in the coke oven heating gas state (min), T2 is the residence time of the gas in the two-position flow valve at flow rate V1 (min), and T2 is the residence time of the gas in the two-position flow valve at flow rate V2 (min). 交 This represents the cumulative amount of gas supplied during the exchange period.
8. The nonlinear, feedforward control method for heating gas in a single combustion chamber of a coke oven according to claim 5, characterized in that, Also includes: The control system accumulates the gas supply setpoints for each combustion chamber during the current exchange period to obtain the instantaneous flow demand of the gas main pipe. It allocates the opening commands of the main flow regulating valve and the auxiliary flow regulating valve of the gas main pipe according to the ratio of their flow capacities, and uses the measured flow of the gas main pipe accumulator to correct the allocation results, so that the adjustment range and output flow of the main and auxiliary dual-path regulating valves are adapted to the instantaneous flow demand of the gas main pipe.
9. The nonlinear, feedforward control method for heating gas in a single combustion chamber of a coke oven according to claim 5, characterized in that, The hydraulic exchanger alternately controls the "open" or "close" of the gas exchange cock by pulling the odd-numbered and even-numbered pull bars, with each exchange lasting 20 to 30 minutes. When the gas branch pipe exchange cock is in the "open" position, the solenoid valve controls the gas two-position flow valve cylinder to adjust the gas supply.
10. The nonlinear, feedforward control method for heating gas in a single combustion chamber of a coke oven according to claim 5, characterized in that, In step c, the coke cake center temperature in the carbonization chamber is obtained by periodic measurement, while the dynamic average temperature curve of the standard fire channel, the fire drop temperature, and the furnace wall temperature are obtained by real-time feedback measurement.