Blast furnace slag flushing water waste heat all-year round cascade comprehensive utilization system and control method
By introducing a lithium bromide absorption chiller and a cascade heat recovery subsystem into the blast furnace slag flushing water system, the problem of the single method of utilizing waste heat from blast furnace slag flushing water has been solved, enabling comprehensive cascade utilization throughout the year and improving energy efficiency and economic benefits.
Patent Information
- Application Number
- CN202611309061.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-27
- Publication Date
- 2026-11-24
AI Technical Summary
In existing technologies, the utilization of waste heat from blast furnace slag flushing water is limited to a single method, failing to achieve comprehensive utilization throughout the year. This results in problems such as high equipment investment, high energy consumption, and underutilization of waste heat resources.
The system employs a lithium bromide absorption chiller and a cascade heat recovery subsystem. By directly introducing flushing water and cooperating with multi-stage heaters, it achieves year-round cascade comprehensive utilization of the waste heat from the flushing water for both summer cooling and dehumidification and winter heating, thus optimizing the utilization of waste heat resources.
It significantly reduces fuel consumption in hot blast stoves, improves the efficiency of lithium bromide units, saves energy consumption for slag flushing water cooling, achieves comprehensive utilization of waste heat throughout the year, and enhances energy utilization efficiency and economic benefits.
Smart Images

Figure CN123152818A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of waste heat recovery and utilization technology in iron and steel metallurgy, and in particular to a system and control method for the comprehensive utilization of waste heat from blast furnace slag flushing water throughout the year. Background Technology
[0002] During blast furnace ironmaking, molten blast furnace slag is quenched and cooled by water, generating a large amount of slag-flushing water. The temperature of this water is typically 70℃~90℃, containing abundant low-grade waste heat resources. It is estimated that the slag-flushing water produced per ton of molten iron can carry approximately 25kg~30kg of heat equivalent to standard coal, and the total amount of waste heat generated by blast furnaces nationwide each year is considerable. Currently, steel enterprises utilize slag-flushing water waste heat in relatively simple ways, mainly for winter heating and summer cooling. Existing technologies include schemes using lithium bromide absorption chillers to produce chilled water for blast furnace blast dehumidification, and systems that use slag-flushing water waste heat for heating in winter. However, these systems mostly operate on a single seasonal basis, failing to achieve comprehensive year-round utilization, and the waste heat resources are not fully utilized in a tiered manner. Existing technologies have the following shortcomings: 1) Due to the strong corrosiveness and easy scaling of the flushing water, the conventional method is to install an intermediate heat exchanger before the flushing water enters the lithium bromide unit. This causes the temperature of the heat source water entering the lithium bromide unit to decrease, which reduces the performance efficiency of the lithium bromide unit and increases equipment investment and operating costs. 2) Under summer operating conditions, the air temperature used for dehumidification after being cooled by the lithium bromide unit is low. Directly feeding it into the hot air furnace will consume additional fuel to heat it, increasing the fuel consumption of the hot air furnace and failing to make full use of the waste heat resources in the system to preheat the dehumidified air. 3) During the cooling operation of the lithium bromide unit, the temperature of the cooling water directly affects the cooling efficiency of the unit. The higher the cooling water temperature, the lower the unit's coefficient of performance (COP). The existing system does not make full use of the produced low-temperature air to reduce the cooling water temperature of the lithium bromide unit, making it difficult to improve the unit's COP. 4) Under summer cooling conditions, the slag flushing water still needs to be further cooled by cooling towers and other equipment after heat exchange before it can be used for slag flushing. This process consumes electricity. The existing system does not coordinate the utilization of waste heat from slag flushing water with the cooling requirements of slag flushing water, and the fan load of the slag flushing water cooling tower is relatively large. 5) Under winter operating conditions, the existing waste heat heating system for slag flushing water usually uses plate heat exchangers to exchange heat with secondary heating water. The temperature difference between the inlet and outlet of the primary side slag flushing water is small, and the slag flushing water still has a high temperature after leaving the generator. The waste heat is not fully utilized in stages, the secondary hot water heating capacity is insufficient, and the heating water temperature rise is limited. Summary of the Invention
[0003] To address the above problems, this invention provides a system and control method for the year-round cascaded comprehensive utilization of waste heat from blast furnace slag flushing water. By directly introducing the slag flushing water into a lithium bromide absorption chiller and cooperating with a cascaded heat recovery subsystem, the system achieves year-round cascaded comprehensive utilization of waste heat from slag flushing water under summer cooling and dehumidification and winter heating conditions, thereby improving waste heat recovery efficiency and reducing system energy consumption.
[0004] The technical solution adopted in this invention is: a comprehensive system for the year-round cascade utilization of waste heat from blast furnace slag flushing water, comprising a lithium bromide absorption chiller, a chilled water pump, a dehumidification device, a condensate tank, a condensate pump, a cooling tower, a cooling water pump, a first-stage heater, and a second-stage heater. The lithium bromide absorption chiller includes a generator, an absorber, a condenser, and an evaporator. Slag flushing water enters from the inlet of the generator, and one outlet of the generator is connected to the inlet of the second-stage heater via a third valve. The outlet of the second-stage heater is connected to the slag flushing water cooling tower. Another outlet of the generator is connected to the first valve and... The second valve is connected to the evaporator inlet; the condenser outlet is delivered to the heating user via the fifth valve, and then returned to the absorber via the hot water pump; the condenser outlet is also connected to the cooling tower via the fourth valve; the evaporator outlet is connected to the inlet of the blower dehumidification device, and the outlet of the blower dehumidification device is connected to the evaporator inlet via a chilled water pump; the condensate in the blower dehumidification device flows to the condensate tank, and is then pumped to the cooling tower via the condensate pump; the cooling tower outlet is connected to the inlet of the first-stage heater via a cooling water pump, and the first-stage heater outlet is connected to the absorber.
[0005] Preferably, the air dehumidified by the blower dehumidification device is heated twice, flowing sequentially through a first-stage heater and a second-stage heater. The first-stage heater uses cooling water from the lithium bromide absorption chiller as its heat source, while the second-stage heater uses slag return water leaving the generator as its heat source. This preferred scheme fully utilizes the waste heat resources within the system to preheat the dehumidified air through two-stage heating, reducing the fuel consumed by the hot air furnace to heat the cold air, while simultaneously lowering the cooling water inlet temperature of the lithium bromide chiller and improving the chiller's refrigeration efficiency.
[0006] Preferably, the heat exchange tubes of the generator and evaporator are made of 2507 duplex stainless steel with a spiral flat tube structure. This preferred design is suitable for operating conditions where flushing water is highly corrosive and prone to scaling, allowing the flushing water to directly enter the lithium bromide absorption chiller. This avoids the temperature drop of the heat source water caused by setting up an intermediate heat exchanger, maintaining the performance efficiency of the unit. At the same time, the spiral flat tube structure enhances the heat exchange effect and reduces the tendency to scale.
[0007] Preferably, in summer mode, the cooling water of the lithium bromide absorption chiller undergoes two heat releases for cooling. The cooling water leaving the chiller first releases heat through a cooling tower, transferring heat to the atmosphere, and then enters the first-stage heater for a second heat release, transferring heat to the dehumidified air. This preferred scheme, through these two heat releases, both heats the dehumidified air and lowers the cooling water inlet temperature of the lithium bromide chiller, increasing the chiller's COP by approximately 5 to 8 percentage points.
[0008] Preferably, in winter mode, the flushing water is first sent to the generator as a driving heat source, and then sent to the evaporator as a low-temperature heat source after leaving the generator. The flushing water flows through the generator and evaporator in sequence, and returns to the flushing water tank after releasing heat twice. This preferred scheme realizes the series cascade utilization of flushing water in the absorption heat pump, reducing the temperature of the flushing water from 85℃ to 30℃, and significantly improving the waste heat recovery rate of the flushing water.
[0009] Preferably, in winter mode, the lithium bromide absorption chiller operates as a type I absorption heat pump, producing hot water that passes through an absorber and a condenser, undergoing two stages of heating before being delivered to the heating user. Compared to traditional plate heat exchanger heating methods, this preferred scheme achieves a coefficient of performance (COP) of 1.2 to 2.5, significantly improving heating capacity.
[0010] The beneficial effects achieved by this invention are as follows: Compared with the prior art, this invention has the following advantages: 1. Significantly reduces fuel consumption in the hot blast stove. Under summer operating conditions, the dehumidified low-temperature air is heated in two stages by the cooling water and slag flushing return water of the lithium bromide unit before being sent into the hot blast stove. This fully utilizes the waste heat resources in the system to preheat the dehumidified air, reducing the fuel consumed by the hot blast stove to heat the cold air and improving energy efficiency.
[0011] 2. Improve the operating efficiency of lithium bromide units. By utilizing dehumidified, low-temperature air to exchange heat with the cooling water of the lithium bromide absorption chiller, the cooling water cools down by approximately 2°C. Simultaneously, the low-temperature condensate generated during dehumidification is sent to the cooling tower's collection pan to mix with the circulating water. The two work synergistically to lower the cooling water temperature, thereby helping to improve the coefficient of performance (COP) of the lithium bromide absorption chiller, reduce unit energy consumption, and increase the unit's COP by approximately 5 to 8 percentage points.
[0012] 3. Saves energy consumption for slag flushing water cooling. After the slag flushing water has completed the operation of the lithium bromide absorption chiller and the heating of the dehumidified air, its temperature has been significantly reduced, which reduces the workload of subsequent cooling equipment such as cooling towers and saves the power consumption of the slag flushing water cooling fan. The fan load of the slag flushing water cooling tower can be reduced by about 15%.
[0013] 4. Full utilization of waste heat from slag flushing water in winter. Under winter operating conditions, the lithium bromide absorption chiller switches to the first type of absorption heat pump mode. The slag flushing water first enters the generator as a driving heat source, and then enters the evaporator as a low-temperature heat source. This realizes the series-stage utilization of slag flushing water in the absorption heat pump, reducing the temperature of the slag flushing water from 85℃ to 30℃, and significantly improving the waste heat recovery rate of the slag flushing water.
[0014] 5. Achieve comprehensive utilization of waste heat throughout the year. Through system switching control, the waste heat from slag flushing water is comprehensively utilized for multiple purposes throughout the year, including cooling, dehumidification, and air preheating in summer, and efficient heating in winter. This avoids seasonal waste of waste heat resources and improves the overall economic benefits of waste heat recovery in steel enterprises. Attached Figure Description
[0015] Figure 1 This is a schematic diagram of the annual cascaded comprehensive utilization system for waste heat from blast furnace slag flushing water according to the present invention. Figure 2 This is a schematic diagram of the summer operation mode of the blast furnace slag flushing water waste heat comprehensive utilization system throughout the year according to the present invention; Figure 3 This is a schematic diagram of the winter operation mode of the blast furnace slag flushing water waste heat comprehensive utilization system throughout the year according to the present invention; In the diagram: 1-Slag flushing water treatment device, 2-Lithium bromide absorption chiller, 2.1-Generator, 2.2-Condenser, 2.3-Absorber, 2.4-Evaporator, 3-Chiller water pump, 4-Dehumidifier, 5-Condensate tank, 6-Condensate pump, 7-Cooling tower, 8-Cooling water pump, 9-First stage heater, 10-Second stage heater, 11-Heating user, 12-Hot water pump, 13-First valve, 14-Second valve, 15-Third valve, 16-Fourth valve, 17-Fifth valve. Detailed Implementation
[0016] The technical solution of the present invention will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0017] Example 1: As Figures 1 to 2As shown, this embodiment provides a year-round cascaded comprehensive utilization system for waste heat from blast furnace slag flushing water, including a lithium bromide absorption chiller 2, a chilled water pump 3, a dehumidification device 4, a condensate tank 5, a condensate pump 6, a cooling tower 7, a cooling water pump 8, a first-stage heater 9, and a second-stage heater 10. The lithium bromide absorption chiller 2 includes a generator 2.1, a condenser 2.2, an absorber 2.3, and an evaporator 2.4. Slag flushing water enters from the inlet of generator 2.1. One path from the outlet of generator 2.1 connects to the inlet of the second-stage heater 10 via a third valve 15. The outlet of the second-stage heater 10 connects to the slag flushing water cooling tower. Another path from the generator outlet connects to the inlet of the evaporator 2.4 via a first valve 13 and a second valve 14. One path from the outlet of condenser 2.2 is delivered to the heating user 11 via a fifth valve 17, and then returns to absorber 2.3 via a hot water pump 12. The outlet of 2.2 is connected to the cooling tower 7 via the fourth valve 16; the outlet of the evaporator 2.4 is connected to the inlet of the blower dehumidification device 4, and the outlet of the blower dehumidification device 4 is connected to the inlet of the evaporator 2.4 via the chilled water pump 3; the condensate in the blower dehumidification device 4 flows to the condensate tank 5, and is sent to the cooling tower 7 via the condensate pump 6; the outlet of the cooling tower 7 is connected to the inlet of the first stage heater 9 via the cooling water pump 8, and the outlet of the first stage heater 9 is connected to the absorber 2.3.
[0018] The blast furnace slag flushing water temperature in a steel plant is 85℃, and the flow rate is 2000t / h. In summer, the ambient temperature is 35℃, and the relative humidity is 70%. The air inlet to the blast furnace blower needs dehumidification treatment to reduce the coke ratio. Under summer operation mode, the system in this embodiment operates according to the following steps: S1) After the slag flushing water is filtered and suspended solids are removed from the slag flushing water tank by the slag flushing water treatment device 1, it directly enters the generator 2.1 of the lithium bromide absorption chiller unit 2 as a driving heat source to drive the chiller unit. The first valve 13 and the second valve 14 are closed, and the third valve 15 is opened. After the slag flushing water releases heat in the generator 2.1, the temperature drops to 75°C and enters the second stage heater 10. The evaporator 2.4 side of the lithium bromide chiller unit 2 produces 7°C chilled water.
[0019] S2) Chilled water is pumped by chilled water pump 3 to the blast furnace dehumidification device 4 to cool and dehumidify the blast furnace blast inlet air. The high-humidity and high-temperature inlet air exchanges heat with chilled water in the dehumidification device 4, and the temperature drops to 10°C. The absolute moisture content drops from about 26g / kg to about 8g / kg, becoming dry and low-temperature air.
[0020] S3) The condensate produced by dehumidification flows into the condensate tank 5 and is sent to the cooling tower 7 by the condensate pump 6 as cooling water. The fourth valve 16 is opened and the fifth valve 17 is closed. While the lithium bromide chiller produces chilled water, it also produces 37°C cooling return water, which is sent to the cooling tower 7 by the cooling water pump 8 and the temperature drops to 32°C after heat dissipation.
[0021] S4) The dehumidified dry low-temperature air (10°C) first enters the first-stage heater 9 and exchanges heat with the cooling water (32°C) from the cooling tower of the lithium bromide unit. The air temperature rises to about 28°C. After the cooling water temperature drops to 30°C, it returns to the absorber 2.3 and condenser 2.2 of the lithium bromide unit 2, which improves the cooling conditions of the unit and increases the unit's COP by about 5 to 8 percentage points. The air (28°C) after the first stage heating enters the second-stage heater 10 and exchanges heat with the slag flushing return water (72°C). The temperature rises to about 60°C and becomes dry high-temperature air before being sent to the blower.
[0022] S5) After the slag flushing water is heated in the second-stage heater 10, its temperature drops to about 70°C and it returns to the slag flushing water system. Since the temperature has been greatly reduced, the fan load of the slag flushing water cooling tower can be reduced by about 15%.
[0023] Example 2: Based on Example 1, the material and structure of the heat exchange tubes in generator 2.1 and evaporator 2.4 are optimized. Specifically, the heat exchange tubes in generator 2.1 and evaporator 2.4 adopt a spiral flat tube structure made of 2507 duplex stainless steel. 2507 duplex stainless steel has excellent resistance to chloride ion corrosion and can withstand the highly corrosive medium of flushing water. The spiral flat tube structure creates a spiral flow within the tube, enhancing turbulence, increasing the heat transfer coefficient, and reducing scaling tendency. This structure allows flushing water to directly enter the lithium bromide absorption chiller without the need for an intermediate heat exchanger, avoiding a drop in the temperature of the heat source water and maintaining the unit's performance efficiency.
[0024] In summer operation mode, the system in this embodiment operates according to the following steps: S1) After the slag flushing water is filtered and suspended solids are removed from the slag flushing water tank by the slag flushing water treatment device 1, it directly enters the generator 2.1, which uses 2507 duplex stainless steel spiral flat tube heat exchanger, as the driving heat source to drive the operation of the chiller unit. The first valve 13 and the second valve 14 are closed, and the third valve 15 is opened. After the slag flushing water releases heat in the generator 2.1, the temperature drops to 75°C and enters the second stage heater 10.
[0025] The remaining steps from S2) to S5) are the same as in Example 1, and will not be repeated here.
[0026] Thanks to the use of 2507 duplex stainless steel spiral flat tube heat exchangers, slag flushing water can directly enter generator 2.1 and evaporator 2.4 without the need for intermediate heat exchangers. The temperature of the heat source water entering the unit is not lost due to intermediate heat exchange, thus ensuring the unit's performance and efficiency. At the same time, the spiral flat tube structure enhances the heat exchange effect, reduces the tendency to scale, and lowers maintenance costs.
[0027] Example 3: Based on Example 2, a winter operation mode is added. In winter operation mode, the system switches to heating mode, and lithium bromide absorption chiller unit 2 switches to Type I absorption heat pump mode. For the same steel plant's winter heating needs, the heating return water temperature is 40℃, which needs to be increased to 50℃ to supply heating users.
[0028] In winter operation mode, the system in this embodiment operates according to the following steps: S1) The flushing water (85°C) first enters the generator 2.1 of the lithium bromide absorption chiller 2, which serves as a driving heat source to generate refrigerant steam, and the temperature of the flushing water drops to about 75°C.
[0029] S2) Open the first valve 13 and the second valve 14, close the third valve 15, and the flushing water (72°C) leaving the generator 2.1 then enters the evaporator 2.4 of the heat pump unit, where it provides heat to the evaporator as a low-temperature heat source. The temperature of the flushing water further drops to about 30°C and returns to the flushing water system.
[0030] S3) Close the fourth valve 16 and open the fifth valve 17. The heating return water (40℃) on the heating user 11 side flows through the absorber 2.3 and condenser 2.2 of the lithium bromide absorption unit 2 in sequence through the hot water pump 12. After absorbing heat in the two units, the temperature rises to 50℃ and is sent to the heating user 11.
[0031] By switching the system, the lithium bromide absorption chiller operates as a refrigeration unit in summer and as a type I absorption heat pump in winter. In both modes, the internal solution and refrigerant circulation of the lithium bromide chiller follows conventional absorption circulation. In winter, the flushing water first serves as the driving heat source to the generator and then as a low-temperature heat source to the evaporator, achieving series-stage utilization of the flushing water in the absorption heat pump. This reduces the flushing water temperature from 85℃ to 30℃, significantly improving the waste heat recovery rate. Simultaneously, the heating return water is heated from 40℃ to 50℃ through absorber 2.3 and condenser 2.2. Compared to traditional plate heat exchanger heating methods, the coefficient of performance (COP) can reach 1.2 to 2.5, significantly improving heating capacity.
[0032] It should be noted that the above description of the technical solutions is exemplary, and this specification may be embodied in different forms and should not be construed as limiting it to the technical solutions set forth herein. Rather, providing these descriptions will ensure that the disclosure of this invention is thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. Furthermore, the technical solutions of this invention are defined only by the scope of the claims.
[0033] Finally, it should be noted that the above embodiments are merely representative examples of the present invention. Obviously, the present invention is not limited to the above embodiments and many variations are possible. Any simple modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of the present invention should be considered within the protection scope of the present invention.
Claims
1. A system for the year-round cascaded comprehensive utilization of waste heat from blast furnace slag flushing water, characterized in that: The system includes a lithium bromide absorption chiller, chilled water pumps, a dehumidification unit, a condensate tank, a condensate pump, a cooling tower, a cooling water pump, a first-stage heater, and a second-stage heater. The lithium bromide absorption chiller also includes a generator, absorber, condenser, and evaporator. The flushing water enters from the generator inlet, and the generator outlet is connected to the inlet of the second-stage heater via the third valve. The outlet of the second-stage heater is connected to the flushing water cooling tower. The generator outlet is also connected to the evaporator inlet via the first and second valves. One outlet of the condenser delivers water to the heating user via the fifth valve, and then returns it to the absorber via the hot water pump; the other outlet of the condenser is connected to the cooling tower via the fourth valve. The evaporator's outlet is connected to the inlet of the dehumidifier, and the dehumidifier's outlet is connected to the evaporator's inlet via a chilled water pump. The condensate in the blower dehumidification device flows to the condensate tank, and is then pumped to the cooling tower by the condensate pump. The outlet of the cooling tower is connected to the inlet of the first-stage heater via the cooling water pump, and the outlet of the first-stage heater is connected to the condenser.
2. The blast furnace slag flushing water waste heat comprehensive utilization system according to claim 1, characterized in that: The air, after being dehumidified by the blower dehumidification device, is heated twice and flows sequentially through the first-stage heater and the second-stage heater. The first-stage heater uses the cooling water of the lithium bromide absorption chiller as its heat source, while the second-stage heater uses the slag return water leaving the generator as its heat source.
3. The blast furnace slag flushing water waste heat comprehensive utilization system according to claim 1, characterized in that: In summer mode, the cooling water of the lithium bromide absorption chiller undergoes two heat releases for cooling. The cooling water leaving the lithium bromide absorption chiller first releases heat through the cooling tower, transferring the heat to the atmosphere, and then enters the first-stage heater for a second heat release, transferring the heat to the dehumidified air.
4. The blast furnace slag flushing water waste heat comprehensive utilization system according to claim 1, characterized in that: In winter mode, the flushing water is first sent to the generator as a driving heat source, and after leaving the generator, it is sent to the evaporator as a low-temperature heat source. The flushing water flows through the generator and the evaporator in sequence, and after releasing heat twice, it returns to the flushing water tank.
5. The blast furnace slag flushing water waste heat comprehensive utilization system according to claim 4, characterized in that: In winter mode, the lithium bromide absorption chiller operates as an absorption heat pump to produce hot water. The hot water passes through the absorber and condenser in sequence, and is delivered to the heating user after two stages of heating.
6. The blast furnace slag flushing water waste heat comprehensive utilization system according to claim 1, characterized in that: The heat exchange tubes of the generator and evaporator are made of 2507 duplex stainless steel with a spiral flat tube structure.
7. A control method for a year-round cascaded comprehensive utilization system of blast furnace slag flushing water waste heat as described in any one of claims 1 to 6, characterized in that: In summer mode, the following steps are included: S1. The slag flushing water enters the generator to produce chilled water; S2. Chilled water is transported to the blast dehumidification unit to cool and dehumidify the air at the blast furnace inlet. S3. The condensate produced during dehumidification is sent to the cooling tower as cooling makeup water; S4. The dehumidified air passes through the first stage heater and the second stage heater in sequence. The first stage heater uses the cooling water of the lithium bromide absorption unit as the heat source, and the second stage heater uses the slag return water leaving generator 2.1 as the heat source for heating, and then sends it to the blower. S5. The cooling water of the lithium bromide absorption chiller is initially cooled by the cooling tower and then cooled again by the first-stage heater. S6. The flushing water is returned to the flushing water cooling tower at a reduced temperature after being heated by the second-stage heater.
8. The control method for the year-round cascaded comprehensive utilization system of blast furnace slag flushing water waste heat according to claim 7, characterized in that: Includes the following steps: S1. The flushing water enters the generator of the lithium bromide absorption chiller unit and serves as a driving heat source to drive the chiller unit to operate. Chilled water is generated on the evaporator side of the lithium bromide absorption chiller unit. The first and second valves are closed, and the third valve is opened. After the flushing water releases heat in the generator and its temperature decreases, it enters the second stage heater. S2, chilled water, is pumped to the blast dehumidification unit to cool and dehumidify the air at the blast furnace inlet; S3. The condensate produced by the dehumidification device flows into the condensate tank and is pumped to the cooling tower as cooling water. When the fourth valve is opened and the fifth valve is closed, the lithium bromide absorption chiller produces cooling return water while producing chilled water. After being pumped to the cooling tower for heat dissipation, the temperature decreases. S4. The dehumidified, dry, low-temperature air first enters the first-stage heater and exchanges heat with the cooling water supply of the cooling tower, raising the air temperature. After being heated by the first-stage heater, the air enters the second-stage heater and exchanges heat with the slag flushing return water, raising the temperature and becoming dry, high-temperature air before being sent to the blower. S5. The cooling water of the lithium bromide absorption chiller is initially cooled by the cooling tower and then cooled again by the first-stage heater. S6. The flushing water is returned to the flushing water cooling tower at a reduced temperature after being heated by the second-stage heater.
9. A control method for a year-round cascaded comprehensive utilization system of blast furnace slag flushing water waste heat as described in any one of claims 1 to 6, characterized in that: In winter mode, the following steps are included: S1. The flushing water first enters the generator of the lithium bromide absorption chiller as a driving heat source. S2. The flushing water leaving the generator then enters the evaporator as a low-temperature heat source; S3. The high-temperature slag flushing water is returned to the slag flushing water cooling tower after being heated by the generator and evaporator in sequence. S4. The heating return water flows through the absorber and condenser in sequence, and is sent to the heating users after the temperature rises.
10. The control method for the year-round cascaded comprehensive utilization system of blast furnace slag flushing water waste heat according to claim 9, characterized in that: In winter mode, the following steps are included: S1. The flushing water first enters the generator of the lithium bromide absorption chiller, which serves as a driving heat source to generate refrigerant steam, thus reducing the temperature of the flushing water. S2. Open the first and second valves, close the third valve, and the flushing water leaving the generator then enters the evaporator, serving as a low-temperature heat source to provide heat to the evaporator, further reducing the temperature of the flushing water. S3. The high-temperature slag flushing water is returned to the slag flushing water cooling tower after being heated by the generator and evaporator in sequence. S4. Close the fourth valve and open the fifth valve. The heating return water on the heating user side flows through the absorber and condenser in sequence through the hot water pump. After absorbing heat and increasing in temperature, it is sent to the heating user.
