A method for optimizing the rolling process of high dam filling in mountainous gorges

By collecting signals on the compaction wheel in real time to calculate the energy absorption rate and adjust the parameters, the problem of unstable control of compaction quality in the filling of high dams in mountainous canyons was solved, and the uniformity of compaction quality and energy utilization efficiency were improved.

CN123153331APending Publication Date: 2026-11-24POWERCHINA HUADONG ENG CORP LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611603724.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-16
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies cannot adjust compaction parameters in real time according to the actual compaction of dam materials during the construction of high dams in mountainous canyons, making it difficult to control the compaction quality stably. In particular, under-compaction or over-compaction problems are prone to occur in complex terrain and material source differences.

Method used

By installing force and acceleration sensors on the compaction wheel, the excitation force and vertical acceleration signals are collected in real time, the energy absorption rate is calculated, and combined with the spatial gradient and cumulative effective compaction energy, the excitation force and travel speed are adjusted in real time to ensure that the energy absorption rate is within the set range, thereby achieving dynamic optimization of compaction parameters.

Benefits of technology

It enables real-time adjustment of compaction parameters based on the actual condition of the dam material, improving the uniformity of compacted material quality and energy utilization efficiency, avoiding under-compaction or over-compaction, and ensuring dam settlement control and long-term operational safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153331A_ABST
    Figure CN123153331A_ABST
Patent Text Reader

Abstract

This invention discloses an optimization method for the compaction process in the construction of high dams in mountainous canyons, relating to the field of filling construction. The method includes: installing force sensors and acceleration sensors on the compaction wheel of a roller to collect in real time the excitation force signal applied by the roller to the dam material and the vertical acceleration signal of the roller; integrating the vertical acceleration signal to obtain the vertical velocity signal of the roller, and calculating the phase difference between the excitation force signal and the vertical velocity signal; this invention calculates the energy absorption rate by collecting the excitation force and vertical acceleration signals of the roller, and determines the completion of compaction based on the rate of change of this rate with the cumulative effective compaction energy. During the compaction process, the excitation force and travel speed are adjusted in real time to maintain the energy absorption rate within a set range, thereby avoiding under-compaction and over-compaction, and improving compaction uniformity and energy utilization efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of filling construction technology, specifically to an optimized method for the compaction process in the filling of high dams in mountainous canyons. Background Technology

[0002] High dams in mountainous canyons involve large filling volumes, multiple zones, and complex sources of dam materials. The quality of compaction directly affects the control of dam settlement and long-term operational safety.

[0003] Current construction methods mostly rely on indoor tests and pre-set compaction parameters in specifications, and are carried out on site according to fixed number of passes, vehicle speed and layer thickness. Due to the narrow canyon terrain, fluctuating rock properties in the material yard and differences in the gradation of dam materials in different areas, it is difficult to take into account the compaction effect and construction efficiency of each part with uniform parameters, and local under-compaction or over-compaction occurs from time to time.

[0004] Chinese invention patent application No. 201410123677.4 discloses a method for real-time monitoring of the compaction construction quality of dam filling in narrow and deep river valleys. This method collects positioning and vibration force data through an onboard terminal of the compactor. To address the issue of reduced satellite positioning accuracy caused by the canyon terrain, an intelligent total station is introduced for positioning compensation. Real-time monitoring results of the number of compaction passes, trajectory, and thickness are generated for on-site personnel to review. While this method solves the problems of data acquisition and visual monitoring of the compaction process, the compaction parameters remain preset fixed values ​​and are not dynamically adjusted according to the real-time compaction status.

[0005] Based on the above, existing technologies can only monitor the compaction process and cannot adjust the compaction parameters in a timely manner according to the actual compaction of the dam material. Construction parameters still rely on experience-based presets, making it difficult to stably control the compaction quality when dealing with complex working conditions in mountainous canyons. Summary of the Invention

[0006] In view of the above-mentioned shortcomings of the existing technology, the present invention provides an optimization method for the compaction process of high dam filling in mountain canyons, which can effectively solve the problems of the existing technology.

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions; This invention discloses an optimization method for the compaction process in the construction of high dams in mountainous canyons, comprising the following steps: Force and acceleration sensors are installed on the roller of a compactor to collect the excitation force signal and vertical acceleration signal of the roller applied to the dam material in real time. The vertical acceleration signal is integrated to obtain the vertical velocity signal of the roller, and the phase difference between the excitation force signal and the vertical velocity signal is calculated. Based on the amplitude of the excitation force signal, the amplitude of the vertical velocity signal, and the phase difference, the effective compaction power absorbed by the dam material per unit time is calculated. The energy absorption rate is obtained by comparing the effective compaction power with the product of the amplitude of the excitation force signal and the amplitude of the vertical velocity signal. The effective compaction power is integrated over the rolling time to obtain the cumulative effective compaction energy at the current rolling position. The rate of change of energy absorption rate with the cumulative effective compaction energy is calculated. When the rate of change of energy absorption rate with the cumulative effective compaction energy is greater than the preset abrupt change threshold, it is determined that the compaction at the current rolling position is completed. The rolling wheel is controlled to reduce the excitation force and increase the travel speed to pass through the current rolling position. Before the compaction at the current rolling position is completed, the excitation force and travel speed of the rolling wheel are continuously adjusted according to the real-time value of the energy absorption rate to keep the energy absorption rate within the set range.

[0008] Furthermore, two force sensors are configured, respectively installed at the bearing seats at both ends of the eccentric shaft of the rolling mill. The average value of the two force sensor measurements is taken as the force sensor measurement value. The acceleration sensor is installed at the geometric center of the bearing seat cover plate of the rolling mill. An angle encoder is installed on the eccentric shaft of the rolling mill to obtain the real-time rotation angle of the eccentric block. The angular velocity of the eccentric block is obtained by differentiating the real-time rotation angle with respect to time. The vertical component of the centrifugal force generated by the eccentric block is calculated based on the mass, eccentricity, angular velocity, and real-time rotation angle of the eccentric block. The vertical component of the centrifugal force is subtracted from the force sensor measurement value, and the alternating component is extracted as the excitation force signal after high-pass filtering.

[0009] Furthermore, the step of integrating the vertical acceleration signal to obtain the vertical velocity signal of the rolling wheel includes: taking the zero-crossing point of the eccentric block rotation angle output by the angle encoder as the starting time of each vibration cycle, subtracting the average acceleration value within that cycle from the vertical acceleration signal within each cycle, and then performing time-domain integration according to the following formula, with the velocity reset to zero at the starting time of each cycle: ; In the formula: for Vertical velocity at any given moment; For the first The start time of each oscillation cycle; for The vertical acceleration signal at any given moment; For the first The average value of the vertical acceleration signal within each vibration cycle; The calculation of the phase difference between the excitation force signal and the vertical velocity signal includes: using one vibration period as a window, performing Fourier transform on the excitation force signal and the vertical velocity signal respectively, and taking the phase difference value of the fundamental frequency component after the transform as the phase difference.

[0010] Furthermore, the effective compaction power and energy absorption rate are obtained by the following formula: ; ; In the formula: for Effective compaction power at any given moment; for The excitation force signal at time 1 The amplitude of the second harmonic; for Vertical velocity signal at time 1 The amplitude of the second harmonic; for Time of the first Phase difference of subharmonics; The highest harmonic order used in the calculation; The equivalent viscous damping coefficient of the compaction wheel's own structure; for Vertical velocity at any given moment; for Energy absorption rate at any given time.

[0011] Furthermore, the preset mutation threshold and the set interval are determined as follows: Before formal compaction, a test compaction section was selected, and the curve of energy absorption rate as a function of cumulative effective compaction energy was recorded. The maximum value of the rate of change of energy absorption rate as a function of cumulative effective compaction energy on the curve was taken as the preset mutation threshold. Take 80% of the maximum energy absorption rate as the upper limit of the set range, and take 50% of the maximum energy absorption rate as the lower limit of the set range.

[0012] Furthermore, in the stage of continuously adjusting the excitation force and travel speed of the compaction wheel, the spatial gradient of energy absorption rate along the compaction direction is calculated based on the energy absorption rate at the current compaction position and the energy absorption rate at a compacted position at a set distance behind the compaction wheel; the energy absorption rate when the compaction wheel reaches that forward position is predicted based on the spatial gradient and the set distance in front of the compaction wheel. ; In the formula: The predicted energy absorption rate at the forward position; This represents the energy absorption rate at the current compaction location. The spatial gradient of energy absorption rate along the compaction direction; Set the distance in front of the compaction wheel.

[0013] Furthermore, based on the predicted energy absorption rate, adjustment commands for the excitation force and travel speed are issued to the roller compactor actuator in advance. The timing of the issuance of these adjustment commands is as follows: ; The target values ​​for excitation force and travel speed in the adjustment command are: When the predicted energy absorption rate at the forward position is higher than the upper limit of the set range, let , ; When the predicted energy absorption rate at the forward position is lower than the lower limit of the set range, let , ; In the formula: To adjust the timing of instruction issuance; The predicted time when the compaction wheel reaches the forward position; The response time delay of the roller compactor actuator; The adjusted excitation force; The current excitation force; The adjusted travel speed; This is the current speed of travel; The predicted energy absorption rate at the forward position; To set the upper limit of the interval; To set the lower limit of the interval.

[0014] Furthermore, the current compaction position is obtained through a satellite positioning module installed on the compactor; the cumulative effective compaction energy is mapped to the dam surface coordinate grid according to the projected area of ​​the compaction wheel on the dam surface, and each grid cell stores the cumulative effective compaction energy of all compaction wheel positions within the cell; the coefficient of variation of the cumulative effective compaction energy of each grid cell is calculated, which is the ratio of the standard deviation to the mean of the cumulative effective compaction energy of each grid cell; when the cumulative effective compaction energy of all grid cells reaches the target energy threshold and the coefficient of variation is less than the set uniformity threshold, the compaction of the dam surface is determined to be complete.

[0015] Furthermore, the difference between the target energy threshold and the cumulative effective compaction energy of each grid cell is used as the undercompression degree of that grid cell, and a spatial distribution field of the undercompression degree is constructed. Starting from the current position of the compaction wheel, uncompacted grid cells are selected as path nodes in descending order of undercompaction degree. Adjacent path nodes are connected by straight lines to form a compaction path. The turning angle of adjacent path segments is constrained not to exceed a set angle. Path planning is completed when all grid cells with undercompaction degree greater than zero are covered by the compaction path. The spacing between adjacent compaction strips is taken to be no more than an integer multiple of the maximum wavelength of the effective compaction width of the compaction wheel, so that the adjacent compaction strips overlap each other and the vibration wave path difference on the center line is an integer multiple of the wavelength, resulting in constructive interference.

[0016] Furthermore, when multiple rollers are operating on the same surface, the vibration wave velocity in the dam material is determined through on-site drop hammer tests; Each rolling mill obtains its real-time location via a satellite positioning module and uploads it to the central control unit that is connected to each rolling mill in communication. The central control unit calculates the vibration wave propagation time difference of adjacent rollers at a depth of half the thickness of the fill layer based on the real-time position and vibration wave velocity of adjacent rollers. It determines the target phase difference of each roller's eccentric block based on the product of the propagation time difference and the vibration angular frequency of the roller wheel, and issues a phase adjustment command to each roller to adjust the rotation phase of each roller's eccentric block so that the vibration waves generated by adjacent rollers at that depth are superimposed in phase.

[0017] Compared with the known prior art, the technical solution provided by this invention has the following beneficial effects: This invention synchronously collects excitation force and vertical acceleration signals on the compaction roller and calculates the phase difference. It then compares the effective compaction power absorbed by the dam material with the input power to obtain the energy absorption rate. The rate of change of this energy with the cumulative effective compaction energy determines whether compaction is complete. This allows for real-time identification of the dam material's condition during compaction, preventing under- or over-compaction. Before compaction is complete, the excitation force and travel speed are continuously adjusted based on the real-time energy absorption rate to maintain them within a set range. Furthermore, it combines spatial gradient prediction of the energy absorption rate at the forward position and considers the response delay of the actuator to issue commands in advance, ensuring that parameter adjustments match the actual state of the dam material. After compaction, a low-amplitude, high-frequency mode is switched to pass through the compacted area, performing only surface leveling without introducing additional plastic deformation. The compaction path is planned based on the spatial distribution of the cumulative effective compaction energy, and the spacing between adjacent compaction zones is constrained to ensure constructive interference of vibration waves. In multi-machine operations, the phase of the eccentric blocks is adjusted to ensure that the vibration waves from adjacent rollers are superimposed in phase in the middle of the fill layer, thereby improving compaction uniformity and energy utilization efficiency. Attached Figure Description

[0018] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are merely some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without any creative effort.

[0019] Figure 1 This is a flowchart illustrating an optimized compaction process for high dam construction in mountainous canyons. Figure 2 This is a schematic diagram of the installation structure of the rolling wheel sensor in this invention; Figure 3 This is a schematic diagram of the dam surface coordinate grid and compaction path planning in this invention. Detailed Implementation

[0020] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.

[0021] The present invention will be further described below with reference to embodiments.

[0022] Example: This embodiment presents an optimization method for the compaction process in the construction of high dams in mountainous canyons, such as... Figure 1 As shown, it includes the following steps: Force sensors and acceleration sensors are installed on the rollers of the roller to collect the excitation force signal and the vertical acceleration signal of the roller applied to the dam material in real time. Two force sensors are installed at the bearing seats at both ends of the eccentric shaft of the rolling wheel. The average value of the two force sensor measurements is taken as the force sensor measurement value. At the implementation level, two force sensors measure the vertical force at the left and right bearing seats of the eccentric shaft, respectively. The total excitation force of the rolling wheel on the dam material is equal to the sum of the forces on the two bearing seats. After taking the average value of the two sensor measurements, it needs to be multiplied by a coefficient of 2 to obtain the equivalent measured value of the total excitation force. This coefficient of 2 is included in the calibration coefficient when the force sensor is calibrated on site. That is, the output value of the calibrated force sensor directly represents the total excitation force of the rolling wheel without additional conversion. formula The calculation is for the vertical component of the centrifugal force of the entire eccentric block, which is consistent with the total excitation force level. Therefore, the vertical component of the centrifugal force is subtracted from the calibrated total excitation force measurement value, and then the alternating component of the dam material reaction force is obtained by high-pass filtering. If the force sensor has been calibrated at the factory and includes a 2x coefficient, the average value can be used directly. An accelerometer is installed at the geometric center of the bearing housing cover of the rolling mill; an angle encoder is installed on the eccentric shaft of the rolling mill to obtain the real-time rotation angle of the eccentric block, and the angular velocity of the eccentric block is obtained by differentiating the real-time rotation angle with respect to time; the vertical component of the centrifugal force generated by the eccentric block is calculated based on the mass, eccentricity, angular velocity and real-time rotation angle of the eccentric block, the vertical component of the centrifugal force is subtracted from the measured value of the force sensor, and the alternating component is extracted as the excitation force signal after high-pass filtering; The mass and eccentricity of the eccentric block are obtained from the factory parameters of the rolling mill or from on-site calibration. The angular velocity of the eccentric block is obtained as follows: the difference between the real-time rotation angles of two consecutive sampling outputs from the angle encoder is divided by the sampling time interval to obtain the instantaneous angular velocity of the eccentric block. A smoothed angular velocity is obtained by taking a moving average of multiple consecutive instantaneous angular velocities. The vertical component of the centrifugal force... In the formula for The vertical component of the centrifugal force generated by the eccentric block at any given moment. For the mass of the eccentric block, For the eccentricity, for The angular velocity of the eccentric block at any given moment. for The angle of rotation of the center of mass of the eccentric block relative to the vertical axis of the rolling wheel at any given moment; The above formula is based on the mechanical mechanism of centrifugal force generated by the rotation of the eccentric block. Using the eccentric block mass, eccentricity, real-time angular velocity, and rotation angle as input parameters, it specifically separates the vertical component of the centrifugal force. This eliminates the inherent vibration interference from the eccentric mechanism itself in the force sensor's acquired signal, preventing the force from the equipment itself from mixing into the actual excitation force signal of the dam material. This differs from the conventional method of directly using the sensor's raw readings. It can accurately extract the true force component of the compaction wheel acting on the dam material from the raw force measurement data, providing a reliable raw force signal basis for subsequent calculations of compaction-related parameters. The high-pass filter uses a Butterworth high-pass filter with a cutoff frequency set to half the vibration frequency of the rolling wheel. The force sensor measurement value after subtracting the vertical component of centrifugal force is filtered, and the alternating component with a frequency higher than the cutoff frequency is extracted as the excitation force signal. The vertical acceleration signal is integrated to obtain the vertical velocity signal of the rolling wheel, and the phase difference between the excitation force signal and the vertical velocity signal is calculated. The vertical acceleration signal is integrated to obtain the vertical velocity signal of the compaction wheel, including: taking the zero-crossing point of the eccentric block rotation angle output by the angle encoder as the start time of each vibration cycle, subtracting the average acceleration value of the cycle from the vertical acceleration signal in each cycle, and then performing time-domain integration according to the following formula, with the velocity reset to zero at the start time of each cycle: ; In the formula: for Vertical velocity at any given moment; For the first The start time of each oscillation cycle; for The vertical acceleration signal at any given moment; For the first The average value of the vertical acceleration signal within each vibration cycle; The above formula uses the vibration period as the calculation unit. At the beginning of each vibration period, the initial value of the velocity is reset. The DC mean component of the acceleration signal within a single period is deducted first, and then time-domain integration is carried out to eliminate the cumulative integration error caused by the DC drift of the acceleration signal. This changes the processing mode that is prone to velocity drift distortion when directly integrating the acceleration over a complete duration. It matches the working characteristics of the periodic vibration of the rolling wheel, thereby obtaining real and reliable rolling wheel vertical velocity time series data within each vibration period to ensure the accuracy of subsequent force-velocity phase and power calculations. The calculation of the phase difference between the excitation force signal and the vertical velocity signal includes: using one vibration period as a window, performing Fourier transform on the excitation force signal and the vertical velocity signal respectively, and taking the phase difference value of the fundamental frequency component after the transformation as the phase difference; In this process, when performing Fourier transforms on the excitation force signal and the vertical velocity signal respectively, and taking the phase difference of the fundamental frequency components after the transform as the phase difference, the following holds true: A discrete sequence is constructed using sampling points within one vibration cycle. The discrete sequences of the excitation force signal and the vertical velocity signal, obtained synchronously at the same time, are denoted as... and Perform the Discrete Fourier Transform according to the following formulas: ; ; In the formula: The number of sampling points within one vibration cycle: Sampling point number: Let the harmonic order be denoted as ; take . Corresponding fundamental frequency component and The phase difference is calculated using the following formula: ; In the formula: Indicates taking the principal argument of a complex number; This represents the phase difference between the excitation force signal and the vertical velocity signal. The phase difference of each harmonic is obtained from the complex components of the corresponding order in the discrete Fourier transform result. For the Subharmonics, phase difference ; and The discrete Fourier transforms of the excitation force signal and the vertical velocity signal are respectively the first... The complex values ​​of the order components, This indicates taking the principal value of the argument, with a range of values. The fundamental frequency phase difference is... Special cases at that time, amplitude of each harmonic , ; The above formula selects the first-order fundamental frequency complex component representing the main vibration energy in the Fourier transform result. The phase difference between the excitation force and the vertical velocity is obtained by calculating the principal value of the argument through the complex ratio. It focuses on the fundamental frequency vibration component that plays a dominant role in the compaction operation, ignores the disturbance of higher harmonics on the phase result, and does not rely on time-domain phase extraction methods such as zero-crossing detection that are easily triggered by noise. It obtains key phase parameters that can reflect the energy consumption characteristics of the interaction between the vibrating wheel and the dam material, and then serves the subsequent compaction power solution. The effective compaction power absorbed by the dam material per unit time is calculated based on the amplitude of the excitation force signal, the amplitude of the vertical velocity signal, and the phase difference. The energy absorption rate is obtained by comparing the effective compaction power with the product of the amplitude of the excitation force signal and the amplitude of the vertical velocity signal. Effective compaction power and energy absorption rate are obtained by the following formula: ; This formula calculates the total vibration input power by integrating the force amplitude, velocity amplitude, and corresponding harmonic phase difference of each harmonic, and then subtracts the power consumed by the equivalent damping of the roller itself, thus obtaining the effective compaction power actually used for the compaction deformation of the dam material. The formula does not simply use a single fundamental harmonic for power estimation, but takes into account the energy contribution of multiple harmonics, and distinguishes between equipment damping loss and dam material absorption of compaction energy, thus restoring the objective physical process of energy distribution during the rolling process and quantifying the actual amount of compaction work obtained by the dam material. ; This formula establishes a ratio relationship between the effective compaction power obtained by the dam material and the total output power of the vibration system, constructs an energy absorption rate index, and transforms the complex rolling interaction into a dimensionless evaluation index. This directly reflects the degree of absorption and utilization of the rolling vibration energy by the dam material, and can reflect the changes in the compaction state of the dam material in real time. It is different from the limitations of the traditional method of indirectly judging the compaction effect by the number of rolling passes and settlement. It provides a quantitative basis for online judgment of compaction state and closed-loop adjustment of rolling parameters. In the formula: for Effective compaction power at any given moment; for The excitation force signal at time 1 The amplitude of the second harmonic; for Vertical velocity signal at time 1 The amplitude of the second harmonic; for Time of the first Phase difference of subharmonics; The highest harmonic order used in the calculation; The equivalent viscous damping coefficient of the roller's own structure was obtained through offline calibration and is a constant during normal rolling. for Vertical velocity at any given moment; for Energy absorption rate at any given moment; It should be noted that in the above formula , These refer to the effective values ​​of each harmonic, not the peak values. Take the effective value of the vertical velocity within the current vibration period, that is: ; therefore For the first The average effective compaction power within each vibration cycle is considered a constant within that cycle and is updated with each cycle; the denominator The total apparent power input to the excitation system, The ratio of active power absorbed by the dam material to the total apparent power; Among them, the equivalent viscous damping coefficient of the compaction wheel itself. The data was obtained through offline calibration. The calibration method was as follows: the rolling wheel was placed on a rigid test platform and subjected to no-load vibration. The vibration period was divided by the zero-crossing point of the eccentric block rotation angle output by the angle encoder. The energy balance principle was used to calculate the vibration period under no-load vibration conditions according to the following formula: ; In the formula: The vibration period of the compaction wheel; This is the excitation force signal under no-load vibration conditions; This is the vertical velocity signal under open-air vibration conditions; It should be noted that, This coefficient only characterizes the energy dissipation of structural components such as the roller bearings and frame, and does not include dam material damping; this coefficient was obtained through offline calibration. The compaction wheel was placed on a rigid test platform so that the dam material did not participate in deformation, and the excitation force signal under no-vibration conditions was collected. and vertical velocity signal ,according to The calibration value is calculated; At this point, all the input energy is dissipated by the damping of the compaction wheel itself, and the identification result does not contain the damping component of the dam material. During normal compaction operations... This calibration value is taken as a constant and does not change with the compaction state of the dam material; where Therefore, the effective value of the aforementioned period is... This is the periodic average power dissipated by the damping of the roller itself. After deducting it from the total input active power, the remaining part is the effective compaction power absorbed by the dam material. The above formula is used to solve the equivalent damping coefficient of the roller's own structure during the offline calibration stage. After calibration, this value remains constant during normal rolling. The effective compaction power is calculated by tracking the changes in the dam material state through real-time acquisition of excitation force and velocity signals. The cumulative effective compaction energy at the current compaction position is obtained by integrating the effective compaction power over the compaction time, and the rate of change of energy absorption rate with the cumulative effective compaction energy is calculated. The rate of change of energy absorption rate with cumulative effective compaction energy was calculated using a sliding window least squares fitting method; data points from the current moment and the previous three consecutive vibration cycles were used. Using the least squares method about Perform linear fitting The slope of the fitted line That is, the rate of change The sliding window moves forward one vibration cycle at a time; the range of accumulated effective compaction energy within the window... Less than the average cumulative value of this window When it is one percent, that is It is assumed that energy has stabilized, and the rate of change is directly taken as zero; the absolute value of the rate of change is taken. Participate in the determination of compaction completion; When the rate of change of energy absorption rate with cumulative effective compaction energy is greater than the preset mutation threshold, it is determined that the compaction of the current rolling position is completed, and the rolling wheel is controlled to reduce the excitation force and increase the travel speed to pass through the current rolling position. Before compaction is completed at the current rolling position, the excitation force and travel speed of the rolling wheel are continuously adjusted according to the real-time value of the energy absorption rate, so that the energy absorption rate is maintained within the set range. During the stage of continuously adjusting the excitation force and travel speed of the compaction wheel, the spatial gradient of the energy absorption rate along the compaction direction is calculated based on the energy absorption rate of the current compaction position and the energy absorption rate of the already compacted position at a set distance behind the compaction wheel. The spatial gradient is the difference between the energy absorption rate of the current position and the energy absorption rate of the already compacted position behind the compaction wheel divided by the set distance behind. Set distance behind Take the current speed of the compaction wheel With three times the oscillation period The product of, i.e. and constraints The principle for selecting this distance is to ensure that the sampling point behind it has left the significant influence range of the vibration of the current compaction wheel, and that its energy absorption rate is in a stable state. At the same time, the distance should not be too large in order to retain the sensitivity to the spatial non-uniformity of the dam material. On-site calibration can be performed within a range of 0.5m to 2m using test sections. The distance value selected should show stable energy absorption rate readings and good repeatability of gradient calculation results. Spatial gradient... ; The energy absorption rate when the rolling wheel reaches the designated position is predicted based on the spatial gradient and the distance in front of the rolling wheel: ; In the formula: For the predicted energy absorption rate at the forward position, The energy absorption rate at the current compaction location. The spatial gradient of energy absorption rate along the compaction direction. Set a distance in front of the compaction wheel; The above formula uses the spatial gradient of energy absorption rate in the direction of compaction to calculate the estimated energy absorption rate at the position where the compaction wheel has not yet reached, combined with the predicted distance in front of the compaction wheel. This introduces the spatial variation law of the compaction state of the dam material into the prediction process. As a result, it no longer relies solely on the measured parameters at the current position for lagging adjustment, but can perceive the changes in the compaction state of the area to be compacted in advance, compensate for the inherent response lag problem of the compaction machine actuator, and provide predictive input for issuing rolling parameter adjustment instructions in advance. in, It is determined by the product of the current travel speed of the compaction wheel and the response time delay of the actuator, which is calibrated by a step jump on site; Based on the predicted energy absorption rate, adjustment commands for the excitation force and travel speed are issued in advance to the roller compactor actuator. The timing of the adjustment command issuance is as follows: ; The target values ​​for excitation force and travel speed in the adjustment command are: When the predicted energy absorption rate at the forward position is higher than the upper limit of the set range, let , ; When the predicted energy absorption rate at the forward position is lower than the lower limit of the set range, let , ; In the formula: To adjust the timing of instruction issuance; The predicted time when the compaction wheel will reach the position ahead is calculated from the current position and speed of the compaction wheel; The response time delay of the roller compactor actuator; The adjusted excitation force; The current excitation force; The adjusted travel speed; This is the current speed of travel; The predicted energy absorption rate at the forward position; To set the upper limit of the interval; To set the lower limit of the interval; The above formula combines the estimated time when the compaction wheel reaches the target position with the mechanism response time lag to determine the command issuance time, thereby offsetting the action delay of the actuator and ensuring that the parameter adjustment and compaction position timing are matched; based on the energy absorption rate predicted at the forward position, the excitation force and travel speed are adjusted in conjunction with the upper and lower limits of the set range. When the predicted value is too high, the excitation force is reduced and the travel speed is increased to avoid overpressure; when the predicted value is too low, the excitation force is increased and the travel speed is reduced to prevent underpressure. By relying on the coordinated ratio of the two parameters, the mismatch caused by the adjustment of a single parameter is avoided, thereby realizing the advanced closed-loop control of compaction parameters; The preset mutation threshold and the set range are determined as follows: Before formal compaction, a test compaction section was selected, and the curve of energy absorption rate as a function of cumulative effective compaction energy was recorded. The maximum value of the rate of change of energy absorption rate as a function of cumulative effective compaction energy on the curve was taken as the preset mutation threshold. Among them, the rate of change of energy absorption rate with cumulative effective compaction energy The value is negative during the compaction process and in the middle stage of compaction. During rapid descent Reaching the minimum value, i.e., the most negative value, after compaction is complete. tending to stabilize Approaching zero, the algebraic maximum value is reached, and the value is taken from the curve of the test section. The maximum value is used as the preset mutation threshold, which corresponds to the area at the end of the test section where compaction has stabilized. During formal compaction, when the current compaction position... When the value exceeds the preset mutation threshold, it indicates that the energy absorption rate no longer decreases significantly with the increase of cumulative energy, the dam material has entered a stable and dense state, and it is determined that the compaction of the current rolling position is complete. The rate of change is calculated using the difference method: ,in Take one to three vibration cycles; Take 80% of the maximum energy absorption rate as the upper limit of the set range, and take 50% of the maximum energy absorption rate as the lower limit of the set range; It should be noted that: Once it is determined that the current compaction position has been completed, the compaction wheel is switched to a low-amplitude, high-frequency vibration mode to pass through the position. The excitation force amplitude is reduced to less than one-third of that of the normal compaction mode, the vibration frequency is increased to more than 1.5 times that of the normal compaction mode, and the travel speed is increased to more than twice that of the normal compaction speed. This ensures that the compaction wheel only produces a leveling effect on the surface of the dam material when passing through the compacted area without introducing additional plastic deformation. The current compaction position is obtained through a satellite positioning module installed on the compactor; Specifically, the satellite positioning module adopts a real-time dynamic differential positioning method. The base station is deployed on stable bedrock with a wide field of vision around the dam area, and the rover station is installed on the top of the roller compactor cab. The positioning solution states are divided into fixed solution, floating solution, and single-point solution, with corresponding planar accuracies of [missing information]. , and Magnitude; When canyon obstruction causes the differential positioning solution to be a floating solution or a single-point solution, it automatically switches to total station tracking positioning mode. Intelligent total stations are deployed on both sides of the dam abutment to perform real-time tracking measurements of the prisms on the compactor, using the total station coordinates to supplement or replace the satellite positioning results; the positioning accuracy requirement is a plane error of no more than [value missing]. To meet the location resolution requirements of grid mapping and path planning; The cumulative effective compaction energy is mapped to the dam surface coordinate grid according to the projected area of ​​the compaction wheel on the dam surface. Each grid cell stores the cumulative effective compaction energy of all positions passed by the compaction wheel in the cell. Specifically, the projection of the compaction wheel on the dam surface is rectangular, with a width equal to the effective compaction width of the compaction wheel. The contact length along the direction of travel is ;Sampling at fixed intervals along the compaction direction The location and time of each sampling point are collected, with the sampling interval not exceeding the side length of the grid cell. One-half, that is ; Roller wheel When passing through a grid cell, the effective compaction power of the sampling points within that grid cell during that pass is integrated over time to obtain the energy increment for that pass. ; in and These represent the moments when the compaction wheel enters and leaves the grid. This increment is added to the accumulated value already stored in that grid cell. ; When the projected area of ​​the compaction wheel covers multiple grid cells simultaneously, the calculation of each grid cell is based on the residence time of the center of the compaction wheel within that cell. And sum them up, without area-weighted allocation; Among them, the cumulative effective compaction energy is accumulated on a grid cell basis, consistent with the accumulation system in item 10; the compaction wheel... When passing through a grid cell, the effective compaction power of the sampling points within that grid cell during that pass is integrated over time to obtain the increment of effective compaction energy for that pass. ,in and These represent the moments when the compaction wheel enters and leaves the grid; this increment is added to the accumulated effective compaction energy stored in the grid cell, i.e. ; When the same grid cell is passed by multiple rollers or the same roller multiple times, the increments are accumulated sequentially. The value stored in the grid cell is the total cumulative effective compaction energy after accumulation. When it is necessary to evaluate uniformity, the coefficient of variation is calculated directly using the accumulated total value of each grid cell. Specifically, the dam surface coordinate grid uses square cells, with a cell side length of... conform to The specific value is determined by the on-site positioning accuracy. When satellite positioning plane error Time to take ;when Time to take The grid coordinate system has its origin at the lower left corner of the dam surface, with horizontal edges parallel to the dam axis and vertical edges perpendicular to the dam axis. The dam surface is divided into integer grid cells, with edge regions less than one cell being merged into adjacent cells. The total number of grid cells... Based on warehouse dimensions Divide by the element side length to determine, i.e. , ; Calculate the coefficient of variation of the cumulative effective compaction energy of each grid cell. The coefficient of variation is the ratio of the standard deviation to the mean of the cumulative effective compaction energy of each grid cell. Among them, a uniformity threshold is set. The compaction uniformity is determined based on the design documents' requirements, or calibrated through test sections; the cumulative effective compaction energy of all grid cells in the test section reaches [a certain level]. Then, the coefficient of variation of the grid cells across the entire chamber is calculated. ,in The standard deviation of the cumulative effective compaction energy for each grid cell. The mean is taken; the coefficient of variation is taken as 1 / 3. The multiple is used as the set uniformity threshold, that is... This allows for reasonable discrete fluctuations during formal construction; In engineering practice, this threshold is usually controlled between 0.1 and 0.2, with a smaller value used for parts with high uniformity requirements; When the cumulative effective compaction energy of all grid cells reaches the target energy threshold and the coefficient of variation is less than the set uniformity threshold, the compaction of the grid surface is considered complete. Target energy threshold The test section calibration was used to determine the compaction method. Before formal compaction, several monitoring points were selected within the test section, and the cumulative effective compaction energy at each monitoring point was recorded in real time during the compaction process. Simultaneously, after compaction, the compaction degree at each point is measured using the pit-filling sand method or a nuclear density meter. ; To achieve the design requirements in terms of compaction degree The test points are considered qualified points, and the arithmetic mean of the cumulative effective compaction energy of all qualified points is taken as the target energy threshold, i.e. ,in To determine the number of qualified points, when the dam material is zoned or has different gradations, each zone should be marked separately. ; The difference between the target energy threshold and the cumulative effective compaction energy of each grid cell is used as the undercompression degree of that grid cell, and a spatial distribution field of the undercompression degree is constructed. Starting from the current position of the compaction wheel, uncompacted grid cells are selected as path nodes in descending order of undercompaction degree. Adjacent path nodes are connected by straight lines to form a compaction path. The turning angle of adjacent path segments is constrained not to exceed a set angle. Path planning is completed when all grid cells with undercompaction degree greater than zero are covered by the compaction path. The spacing between adjacent compaction strips shall not exceed an integer multiple of the maximum wavelength of the effective compaction width of the compaction wheel, so that the adjacent compaction strips overlap each other and the vibration wave path difference on the center line is an integer multiple of the wavelength, resulting in constructive interference. At the implementation level, the constructive interference between adjacent compaction zones is achieved when multiple compactors operate simultaneously side-by-side. At this time, the phase of the eccentric blocks of adjacent compactors is adjusted to be in phase through a phase synchronization method, i.e., the initial phase difference... , matching spacing The design ensures that the vibration wave path difference generated by the two compaction rollers along the center line of the overlapping area is... And since they have the same initial phase, constructive interference occurs, in which... , The wavelength of the vibration wave in the dam material. The vibration frequency; When a single machine is rolling back and forth, adjacent rolling zones pass through at different times, which does not meet the coherence condition. Therefore, it does not pursue the constructive interference effect and only ensures the continuity of compaction and coverage through overlap. The wavelength of the vibration wave of the compaction wheel in the dam material is obtained by dividing the vibration wave velocity by the vibration frequency of the compaction wheel. The vibration wave velocity is determined by the on-site drop hammer test. Specifically, the drop hammer test used multi-channel surface wave analysis to determine the Rayleigh wave velocity of the dam material. According to the compaction vibration frequency The empirical conversion relationship between Rayleigh wave velocity and shear wave velocity within the corresponding wavelength range is used to multiply the Rayleigh wave velocity by the conversion factor. Obtain the equivalent shear wave velocity ;in The value is between 1.05 and 1.1, determined by comparative calibration of the test section; Wavelength calculation of adjacent compaction zones Calculation of propagation time difference for multi-machine phase synchronization This equivalent shear wave velocity is used in all cases; The setting angle is the maximum steering angle specified by the roller manufacturer, or determined by on-site turning tests; an under-compaction degree greater than zero indicates that the cumulative effective compaction energy of the grid cell has not reached the target energy threshold, an under-compaction degree equal to zero indicates that it just meets the standard, and an under-compaction degree less than zero indicates over-compaction; the effective compaction width of the roller is determined by on-site compaction tests, and the lateral width at which the compaction degree reaches the design requirements after a single pass of the roller in the test section is taken as the effective compaction width; Maximum wavelength multiple ; In the formula: This refers to the effective compaction width of the roller. The wavelength of the vibration wave from the compaction wheel in the dam material; This indicates rounding down; the spacing between adjacent compaction strips is taken as... and The product; When multiple rollers are operating on the same surface, the vibration wave velocity in the dam material is determined by on-site drop hammer test; When multiple compactors operate on the same bin surface, the central control unit performs unified path planning and task allocation; let the set of grid cells with a sub-compression degree greater than zero within the bin surface be denoted as . ,in For the first The central control unit determines the underpressure level of each grid; based on the real-time location of each roller, it will... Based on spatial proximity, it is divided into categories related to the number of rolling mills. Equal subregions Each sub-area is assigned to the nearest compactor; each compactor plans its path within its assigned sub-area according to the degree of undercompaction from high to low; the central control unit monitors the progress of each sub-area in real time; when a compactor completes its task in its sub-area, it is dispatched to the adjacent sub-area with the most remaining undercompaction grids to assist in the operation, thus avoiding repeated compaction and path conflicts. Each rolling mill obtains its real-time location via a satellite positioning module and uploads it to the central control unit that is connected to each rolling mill in communication. The central control unit calculates the vibration wave propagation time difference between adjacent rollers at half the depth of the fill layer based on the real-time position and vibration wave velocity of the adjacent rollers. It then selects the target point at half the depth of the fill layer, within the overlapping area of ​​the two adjacent compaction strips, that needs to be superimposed in phase. This serves as a reference point for calculation, determined in real-time by the central control unit based on the location of the overlapping area. For the thickness of the filling layer; Let the plane coordinates of the centers of two adjacent rollers be respectively and The straight-line distances from the centers of the two rollers to the reference point are as follows: ; ; The transmission times are respectively and ,in Equivalent shear wave velocity of dam material. Propagation time difference. Target phase difference ,in The angular frequency of the compaction wheel vibration. The vibration frequency; for a rolling mill farther from the reference point, the phase of its eccentric block is ahead. This causes the vibration waves generated by the two rolling mills to be at the reference point. When the reference point is exactly the equidistant point of the two compaction rollers, the two rollers are superimposed in the same phase. Simply keep them in phase; The target phase difference of each roller's eccentric block is determined by multiplying the propagation time difference with the vibration angular frequency of the roller. A phase adjustment command is then issued to each roller to adjust the rotation phase of the eccentric blocks of each roller, so that the vibration waves generated by adjacent rollers at that depth are superimposed in phase.

[0023] In this embodiment, before the compaction operation, a force sensor is installed on each of the bearing seats at both ends of the eccentric shaft of the compaction wheel, an acceleration sensor is installed in the center of the bearing seat cover plate, and an angle encoder is installed on the eccentric shaft; before the formal compaction, a test section is selected for calibration, the curve of energy absorption rate with cumulative effective compaction energy is recorded, the abrupt change threshold and the set range are determined, and the vibration wave velocity of the dam material is determined by the drop hammer test; During compaction, the values ​​measured by the two force sensors are averaged, and the vertical component of the centrifugal force calculated from the eccentric block parameters and the real-time rotation angle is subtracted. The alternating component is extracted by a Butterworth high-pass filter with a cutoff frequency of half the vibration frequency to obtain the excitation force signal. The acceleration signal is divided into periods based on the zero-crossing point of the rotation angle. After subtracting the mean value in each period, the vertical velocity is obtained by time-domain integration. The velocity is returned to zero at the beginning of the period to eliminate integration drift. Within each vibration cycle, discrete Fourier transforms are performed on the excitation force and vertical velocity, and the phase difference is obtained by taking the ratio of the amplitude angle of the fundamental frequency component. Combining the amplitude and phase difference of each harmonic, the effective compaction power is calculated after deducting the equivalent damping dissipation term, and the energy absorption rate is obtained by multiplying it by the product of the excitation force and velocity amplitude. The equivalent damping coefficient is the damping constant of the roller structure itself, which is calibrated offline. The power calculation is carried out by tracking the dynamic changes of the dam material stiffness through real-time acquisition of excitation force and velocity signals. The effective compaction power is integrated over time to obtain the cumulative effective compaction energy at the current position. At the same time, the rate of change of energy absorption rate with the cumulative energy is calculated. When the rate of change falls below the abrupt change threshold, compaction is determined to be complete. The roller is switched to low amplitude high frequency mode, the excitation force is reduced to less than one-third of the normal mode, the frequency is increased to more than 1.5 times, and the travel speed is doubled. It only plays a leveling role on the surface without producing additional plastic deformation, thus avoiding over-compression that could lead to the breakage of the dam material. Before compaction is completed, the system calculates the spatial gradient based on the energy absorption rate at the current position and the set distance behind, and predicts the energy absorption rate at the front position by combining the travel speed and the response time delay of the actuator. It issues excitation force and speed adjustment commands one response time delay in advance to keep the energy absorption rate within the set range. The real-time position of the compaction wheel is obtained by the satellite positioning module, and the accumulated effective compaction energy is mapped to the dam surface coordinate grid according to the projected area. When all grids reach the target energy threshold and the coefficient of variation is lower than the uniformity threshold, the whole section compaction is judged to be completed. For grids that do not meet the standard, path nodes are selected from high to low under-compaction degree, and the turning angle is constrained to generate the optimal path covering all under-compaction areas. The spacing between adjacent compaction strips is taken as the maximum integer multiple of the vibration wave wavelength within the effective compaction width, so that the vibration waves at the center line of the two strips interfere constructively, thereby enhancing the deep compaction effect. When multiple machines operate in the same compartment, each machine will upload its real-time position to the central control unit. The central control unit calculates the wave propagation time difference at half the depth of the filling layer based on the distance between adjacent machines and the wave velocity. This determines the target phase difference of the eccentric blocks of each machine and issues adjustment commands so that the vibration waves of adjacent rollers at this depth are superimposed in phase, further optimizing the uniformity of deep compaction and energy utilization efficiency.

[0024] See Figure 2As shown in the figure, the arrangement of the sensors on the compaction wheel is illustrated. An eccentric shaft passes through the inside of the steel wheel, and an eccentric block is mounted on the eccentric shaft. The eccentric block rotates with the shaft, generating centrifugal excitation force. Two force sensors, one on the left and one on the right, are installed at the bearing seats at both ends of the eccentric shaft to measure the vertical force at their respective bearing seats. The average of the two sensor readings is calibrated and converted to obtain the total excitation force of the compaction wheel acting on the dam material. An accelerometer is fixed at the geometric center of the bearing seat cover plate to collect the vertical acceleration signal of the compaction wheel. An angle encoder is installed at the end of the eccentric shaft to output the rotation angle of the eccentric block in real time, which is used for angular velocity calculation and vibration period division. The lower edge of the compaction wheel is in contact with the dam material. The signals collected synchronously by each sensor are conditioned and processed for excitation force extraction, velocity integration, phase difference calculation, and energy absorption rate determination.

[0025] See Figure 3 As shown in the figure, this diagram illustrates the implementation method of grid-based management and path planning for the dam surface. The dam surface is divided into several square grid units, with each unit represented by a gray level indicating the magnitude of the cumulative effective compaction energy. The darker the gray level, the higher the cumulative energy. The units circled by dashed boxes are under-compacted grids, whose cumulative effective compaction energy has not yet reached the target threshold. The broken lines with arrows in the figure represent the planned compaction paths. The path nodes are selected in descending order of undercompactment level, and adjacent nodes are connected by straight lines. At the same time, the turning angle of adjacent path segments is limited to a set value. The black rectangle represents the current position of the compactor, and the gray stripes represent the effective compaction zones. The spacing between adjacent compaction zones is taken as the maximum integer multiple of the wavelength of the vibration wave within the effective compaction width. This ensures that the path difference of the vibration waves generated by the two compaction zones on the center line of the overlapping area is an integer multiple of the wavelength, resulting in constructive interference and improving the deep compaction effect.

[0026] In summary, the method described in the above embodiments synchronously collects excitation force and vertical acceleration signals on the compaction roller and calculates the phase difference. The energy absorption rate is obtained by comparing the effective compaction power absorbed by the dam material with the input power. The completion of compaction is determined by the rate of change of the energy absorption rate with the cumulative effective compaction energy. This allows for real-time identification of the dam material state during compaction, avoiding under-compaction or over-compaction. Before compaction is completed, the excitation force and travel speed are continuously adjusted based on the real-time value of the energy absorption rate to maintain them within a set range. The energy absorption rate at the forward position is predicted by combining spatial gradient and the response time delay of the actuator is taken into account to issue commands in advance, so that the parameter adjustment matches the actual state of the dam material. After compaction is completed, a low-amplitude, high-frequency mode is switched to pass through the compacted area, only performing surface leveling without introducing additional plastic deformation. The compaction path is planned based on the spatial distribution of the cumulative effective compaction energy, and the spacing between adjacent compaction zones is constrained to make the vibration waves constructively interfere. When multiple machines are operating, the phase of the eccentric block is adjusted so that the vibration waves of adjacent compactors are superimposed in phase in the middle of the fill layer, thereby improving the compaction uniformity and energy utilization efficiency.

[0027] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for optimizing the compaction process in the construction of high dams in mountainous canyons, characterized in that, Includes the following steps: Force sensors and acceleration sensors are installed on the rollers of the roller to collect the excitation force signal and the vertical acceleration signal of the roller applied to the dam material in real time. The vertical acceleration signal is integrated to obtain the vertical velocity signal of the rolling wheel, and the phase difference between the excitation force signal and the vertical velocity signal is calculated. The effective compaction power absorbed by the dam material per unit time is calculated based on the amplitude of the excitation force signal, the amplitude of the vertical velocity signal, and the phase difference. The energy absorption rate is obtained by comparing the effective compaction power with the product of the amplitude of the excitation force signal and the amplitude of the vertical velocity signal. The cumulative effective compaction energy at the current compaction position is obtained by integrating the effective compaction power over the compaction time, and the rate of change of energy absorption rate with the cumulative effective compaction energy is calculated. When the rate of change of energy absorption rate with cumulative effective compaction energy is greater than the preset mutation threshold, it is determined that the compaction of the current rolling position is completed, and the rolling wheel is controlled to reduce the excitation force and increase the travel speed to pass through the current rolling position. Before compaction is completed at the current rolling position, the excitation force and travel speed of the rolling wheel are continuously adjusted according to the real-time value of the energy absorption rate, so that the energy absorption rate is maintained within the set range.

2. The method for optimizing the compaction process for high dam construction in mountainous canyons according to claim 1, characterized in that, Two force sensors are installed at the bearing seats at both ends of the eccentric shaft of the rolling mill. The average value of the two force sensor measurements is taken as the force sensor measurement value. The acceleration sensor is installed at the geometric center of the bearing seat cover plate of the rolling mill. An angle encoder is installed on the eccentric shaft of the rolling mill to obtain the real-time rotation angle of the eccentric block. The angular velocity of the eccentric block is obtained by differentiating the real-time rotation angle with respect to time. The vertical component of the centrifugal force generated by the eccentric block is calculated based on the mass, eccentricity, angular velocity, and real-time rotation angle of the eccentric block. The vertical component of the centrifugal force is subtracted from the force sensor measurement value, and the alternating component is extracted as the excitation force signal after high-pass filtering.

3. The method for optimizing the compaction process for high dam construction in mountainous canyons according to claim 2, characterized in that, The process of integrating the vertical acceleration signal to obtain the vertical velocity signal of the rolling wheel includes: taking the zero-crossing point of the eccentric block rotation angle output by the angle encoder as the start time of each vibration cycle, subtracting the average acceleration value within each cycle from the vertical acceleration signal, and then performing time-domain integration according to the following formula, with the velocity reset to zero at the start time of each cycle: ; In the formula: for Vertical velocity at any given moment; For the first The start time of each oscillation cycle; for The vertical acceleration signal at any given moment; For the first The average value of the vertical acceleration signal within each vibration cycle; The calculation of the phase difference between the excitation force signal and the vertical velocity signal includes: using one vibration period as a window, performing Fourier transform on the excitation force signal and the vertical velocity signal respectively, and taking the phase difference value of the fundamental frequency component after the transform as the phase difference.

4. The method for optimizing the compaction process for high dam construction in mountainous canyons according to claim 3, characterized in that, The effective compaction power and energy absorption rate are obtained by the following formula: ; ; In the formula: for Effective compaction power at any given moment; for The excitation force signal at time 1 The amplitude of the second harmonic; for Vertical velocity signal at time 1 The amplitude of the second harmonic; for Time of the first Phase difference of subharmonics; The highest harmonic order used in the calculation; The equivalent viscous damping coefficient of the compaction wheel's own structure; for Vertical velocity at any given moment; for Energy absorption rate at any given time.

5. The method for optimizing the compaction process for high dam construction in mountainous canyons according to claim 1, characterized in that, The preset mutation threshold and the set interval are determined as follows: Before formal compaction, a test compaction section was selected, and the curve of energy absorption rate as a function of cumulative effective compaction energy was recorded. The maximum value of the rate of change of energy absorption rate as a function of cumulative effective compaction energy on the curve was taken as the preset mutation threshold. Take 80% of the maximum energy absorption rate as the upper limit of the set range, and take 50% of the maximum energy absorption rate as the lower limit of the set range.

6. The method for optimizing the compaction process for high dam construction in mountainous canyons according to claim 1, characterized in that, In the stage of continuously adjusting the excitation force and travel speed of the compaction wheel, the spatial gradient of energy absorption rate along the compaction direction is calculated based on the energy absorption rate at the current compaction position and the energy absorption rate at a compacted position at a set distance behind the compaction wheel. The energy absorption rate when the compaction wheel reaches that forward position is predicted based on the spatial gradient and a set distance in front of the compaction wheel. ; In the formula: The predicted energy absorption rate at the forward position; This represents the energy absorption rate at the current compaction location. The spatial gradient of energy absorption rate along the compaction direction; Set the distance in front of the compaction wheel.

7. The method for optimizing the compaction process for filling high dams in mountainous canyons according to claim 6, characterized in that, Based on the predicted energy absorption rate, adjustment commands for the excitation force and travel speed are issued in advance to the roller compactor actuator. The timing of the issuance of these adjustment commands is as follows: ; The target values ​​for excitation force and travel speed in the adjustment command are: When the predicted energy absorption rate at the forward position is higher than the upper limit of the set range, let , ; When the predicted energy absorption rate at the forward position is lower than the lower limit of the set range, let , ; In the formula: To adjust the timing of instruction issuance; The predicted time when the compaction wheel reaches the forward position; The response time delay of the roller compactor actuator; The adjusted excitation force; The current excitation force; The adjusted travel speed; This is the current speed of travel; The predicted energy absorption rate at the forward position; To set the upper limit of the interval; To set the lower limit of the interval.

8. The method for optimizing the compaction process for high dam construction in mountainous canyons according to claim 1, characterized in that, The current compaction position is obtained by a satellite positioning module installed on the compactor; the cumulative effective compaction energy is mapped to the dam surface coordinate grid according to the projected area of ​​the compaction wheel on the dam surface, and each grid cell stores the cumulative effective compaction energy of all compaction wheel positions within the cell. Calculate the coefficient of variation of the cumulative effective compaction energy of each grid cell. The coefficient of variation is the ratio of the standard deviation to the mean of the cumulative effective compaction energy of each grid cell. When the cumulative effective compaction energy of all grid cells reaches the target energy threshold and the coefficient of variation is less than the set uniformity threshold, the compaction of the grid surface is considered complete.

9. The method for optimizing the compaction process for filling high dams in mountainous canyons according to claim 8, characterized in that, The difference between the target energy threshold and the cumulative effective compaction energy of each grid cell is used as the undercompression degree of that grid cell, and a spatial distribution field of the undercompression degree is constructed. Starting from the current position of the compaction wheel, uncompacted grid cells are selected as path nodes in descending order of undercompaction degree. Adjacent path nodes are connected by straight lines to form a compaction path. The turning angle of adjacent path segments is constrained not to exceed a set angle. Path planning is completed when all grid cells with undercompaction degree greater than zero are covered by the compaction path. The spacing between adjacent compaction strips is taken to be no more than an integer multiple of the maximum wavelength of the effective compaction width of the compaction wheel, so that the adjacent compaction strips overlap each other and the vibration wave path difference on the center line is an integer multiple of the wavelength, resulting in constructive interference.

10. The method for optimizing the compaction process for high dam construction in mountainous canyons according to claim 1, characterized in that, When multiple rollers are operating on the same surface, the vibration wave velocity in the dam material is determined by on-site drop hammer test; Each rolling mill obtains its real-time location via a satellite positioning module and uploads it to the central control unit that is connected to each rolling mill in communication. The central control unit calculates the vibration wave propagation time difference of adjacent rollers at a depth of half the thickness of the fill layer based on the real-time position and vibration wave velocity of adjacent rollers. It determines the target phase difference of each roller's eccentric block based on the product of the propagation time difference and the vibration angular frequency of the roller wheel, and issues a phase adjustment command to each roller to adjust the rotation phase of each roller's eccentric block so that the vibration waves generated by adjacent rollers at that depth are superimposed in phase.