A trestle for tunnel construction
By adopting a T-shaped structure and a support device that can be adjusted in real time in the tunnel construction trestle, the problems of shared passage for people and vehicles and the tilting and deformation of the outriggers were solved, thus improving safety and stability.
Patent Information
- Application Number
- CN202410694460.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2026-11-24
AI Technical Summary
Existing tunnel construction trestle bridges pose safety hazards such as shared passage for pedestrians and vehicles, easy tilting and deformation of the front lifting outriggers, and sinking due to vehicle vibration.
The main body of the trestle bridge adopts a T-shaped structure, equipped with a front lifting support device and multiple pressure sensors. Combined with the control system, it realizes the separation of people and vehicles, and adjusts the support device in real time through pressure sensors and angle detection modules to prevent sinking and vibration.
This improved the structural strength and safety of the trestle bridge, prevented the outriggers from tilting and deforming, reduced the impact of vehicle vibration, and ensured the stability and safety of the trestle bridge.
Smart Images

Figure CN123153340A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel construction technology, and in particular to a trestle bridge for tunnel construction. Background Technology
[0002] During tunnel construction, the existing trestle bridges are mainly erected on the excavated ground to facilitate the passage of construction workers and the transportation of building materials by construction vehicles.
[0003] Existing trestle bridges generally consist of a bottom section providing passage for construction workers and vehicles, with upward-extending side sections on both sides, forming a U-shaped structure. These side sections function as guardrails and increase overall strength. For example, Chinese Patent Publication No. CN213038175U discloses a trestle bridge. Another type of trestle bridge has a front lifting outrigger at the front, a trestle bridge walking device at the rear, and a central lifting support that can move along the length of the trestle bridge. For instance, Chinese Patent Publication No. CN213574119U discloses a self-propelled tunnel inverted arch steel arch construction trestle bridge, which discloses a front lifting outrigger symmetrically arranged on both sides of the main beam of the trestle bridge. The bottom of the lifting outrigger has an enlarged support, and the lifting mechanism is a hydraulic cylinder. Specifically, the lifting outrigger includes a fixed leg and a movable leg. The fixed leg is fixedly connected to the main beam of the trestle bridge, and the relative position between the fixed leg and the movable leg is adjusted by the hydraulic cylinder. However, existing trestle bridges have the following shortcomings: 1. The existing U-shaped trestle bridge has only one walking passage, which needs to be used not only by construction workers but also by construction vehicles. The sharing of a single walking passage between people and vehicles poses a significant safety hazard. 2. When construction vehicles travel on the existing trestle, especially when fully loaded construction vehicles travel on it, the front lifting outriggers are subjected to a large radial load, which can easily cause tilting or even deformation (the movable leg deviates towards the rear end of the trestle, and the connection between the fixed leg and the trestle becomes loose), posing a significant safety hazard. 3. Since the front lifting outriggers are located on unconstructed or under-construction roadbeds (soft ground), during use, when construction vehicles and personnel walk on the trestle, the main body of the trestle (front lifting outriggers) will vibrate and the load on the front lifting outriggers will increase. The front end of the trestle may sink. If this situation is not detected in time, when a fully loaded construction vehicle moves on the front end of the trestle, the front end of the trestle is prone to rapid sinking, thereby increasing the probability of safety accidents and posing a significant safety hazard.
[0004] Therefore, we designed a trestle bridge with a higher safety factor for tunnel construction. Summary of the Invention
[0005] To overcome the shortcomings of the prior art, the present invention discloses a trestle bridge for tunnel construction.
[0006] To achieve the above-mentioned objectives, the present invention adopts the following technical solution: A tunnel construction trestle, comprising: The main body of the trestle is a T-shaped structure. The top surface of the wing of the main body of the trestle has a vehicle passage for construction vehicles to pass through, and the belly has a personnel passage for construction workers to pass through. A front lifting support device is provided at the front section of the main body of the trestle. The front lifting support device has front fixed legs symmetrically arranged on both sides of the main body of the trestle. The bottom of the front fixed legs is provided with a first front movable leg and a second front movable leg located behind the first front movable leg and inclined vertically, so as to increase the strength of the front lifting support device to resist the load along the front end to the rear end of the main body of the trestle. Multiple pressure sensors are respectively located at the bottom of the first and second front movable outriggers to detect the pressure of the corresponding movable outriggers on the ground. The control system has a signal connection to the front lifting support device and the pressure sensor, and is used to control the operation of the front lifting support device based on the signal transmitted by the pressure sensor. The inner side of the front fixed leg is provided with a U-shaped vibration damping space, and both sides of the U-shaped vibration damping space are connected to the main body of the trestle, which is used to buffer the impact stress of the front fixed leg along the width direction of the trestle body.
[0007] Preferably, the sidewall of the personnel passage is provided with multiple light-transmitting windows at intervals along the length of the main body of the trestle.
[0008] Preferably, the inner wall of the personnel passage is provided with a sound-absorbing layer.
[0009] Preferably, the main body of the trestle is equipped with an angle detection module for detecting its tilt angle. The angle detection module is connected to the control system signal and is used to control the operation of the front lifting support device based on the signals transmitted by the pressure sensor and the angle detection module.
[0010] Preferably, the main body of the trestle bridge is provided with a track beam, and the track beam is movably connected to a central lifting support device along its length. The central lifting support device has a drive component for driving its movement and a position detection module for detecting its position. Both the drive component and the position detection module are connected to the control system signal. The main body of the trestle is marked from its front end to its rear end to facilitate the measurement of the length of the trestle body erected above the excavated ground.
[0011] Preferably, the central lifting support device includes an H-shaped fixed leg, and the upper U-shaped cavity side walls of the H-shaped fixed leg are provided with rolling components; the lower n-shaped cavity side walls of the H-shaped fixed leg are provided with central movable legs.
[0012] Preferably, the rolling assembly includes an upper mounting plate and a lower mounting plate, both of which are hinged at the middle to the U-shaped cavity sidewall of the corresponding H-shaped fixed support leg. The upper mounting plate is provided with upper rollers at both ends that roll against the top surface of the track beam; the lower mounting plate is provided with lower rollers at both ends that roll against the bottom surface of the track beam.
[0013] Preferably, the driving component includes a driving motor, the output shaft of the driving motor is fixedly sleeved with a driving gear, and the main body of the trestle is provided with a rack along its length direction that cooperates with the driving gear; The drive assembly also includes a motor mounting base, with the upper ends of connecting rods hinged to both ends of the motor mounting base. The lower ends of the two connecting rods are slidably connected to the fixed part of the middle lifting support device along the length direction of the motor mounting base. A tension spring is provided between the lower ends of the two connecting rods to facilitate bringing the motor mounting base closer to the main body of the trestle, thereby making the drive gear and rack mesh tightly.
[0014] Preferred options also include: The X-shaped connecting beam has its upper two ends fixedly connected to the corresponding fixed legs, and its lower two ends slidingly connected to the corresponding movable legs.
[0015] Preferably, a pad is provided below the pressure sensor, and a sleeve is provided on the upper surface of the pad that is fitted onto the lower end of the corresponding movable leg. A rubber ring is embedded in the inner cavity of the upper end of the sleeve, and the rubber ring is in a sealing and movable fit with the corresponding movable leg.
[0016] By employing the technical solution described above, the present invention has the following beneficial effects: 1. Because the main body of the trestle is a T-shaped structure, compared with the U-shaped structure in the existing technology, the thickness of the trestle body at the position that bears the construction vehicles is increased, thus effectively enhancing the structural strength; and it also provides independent passages for construction vehicles and construction personnel, realizing the function of separating people and vehicles, which is safer than the existing technology where people and vehicles share a single walking passage; 2. Compared with the existing technology, the structure of the front lifting support device adds a second front movable outrigger and a hydraulic cylinder to drive the second front movable outrigger to lift. The horizontal component of the second front movable outrigger supporting the main body of the trestle is opposite to the direction of the horizontal component of the construction vehicle on the trestle when the construction vehicle is fully loaded and traveling (generally from the rear end to the front end of the trestle). Therefore, the setting of the second front movable outrigger can reduce the radial force on the first front movable outrigger, thereby preventing the first front movable outrigger from being damaged due to excessive radial force. 3. The U-shaped vibration damping space, compared to the surface-to-surface connection between the front fixed outrigger and the main body of the trestle in the existing technology, is changed to a two-point connection. The existence of the U-shaped vibration damping space can dampen and buffer the contact stress between the front fixed outrigger and the main body of the trestle, prevent the front fixed outrigger from deforming due to the lateral vibration force generated when construction vehicles move, and increase the stability of the combination of the front fixed outrigger and the main body of the trestle. 4. The roller assembly allows the rollers to rise and fall adaptively at uneven points on the track beam, enabling them to pass over or over uneven points on the track beam. This prevents the central lifting support device from getting stuck at uneven points on the track beam, and even prevents the central lifting support device from tilting when the main body of the trestle is moved. 5. Due to the setting of pressure sensors and control system, when the front end of the trestle body sinks, the control system can control the operation of the drive equipment to lower the front movable leg, which can compensate for the sinking of the front end of the trestle body. This can effectively solve the problem of the front end of the trestle body sinking due to the sinking of the bottom surface at the pressing position of the front movable leg. 6. Due to the setting of the angle detection module, combined with the pressure sensor and the control system, the lowering of the front movable leg can be controlled by the control system according to the feedback signal of the pressure sensor and the feedback signal of the angle detection module. This prevents the movable leg from compensating for insufficient or excessive sinking of the front end of the trestle body, thereby ensuring that the trestle body is always in a horizontal position. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the structure of the present invention; Figure 2 This is a schematic diagram of the main structure of the trestle bridge in this invention; Figure 3 This is a schematic diagram of the central lifting support device in this invention; Figure 4 This is a schematic diagram of the assembly structure of the pressure sensor and the pad in this invention; Figure 5 This is a schematic diagram of the driving component in this invention; Figure 6 This is a control flow diagram of the present invention.
[0018] In the diagram: 1. Main body of the trestle bridge; 11. Vehicle passageway; 12. Pedestrian passageway; 13. Skylight; 14. Soundproof layer; 15. Track beam; 16. Rack; 2. Front lifting support device; 21. Front fixed leg; 211. U-shaped vibration damping space; 22. First front movable leg; 23. Second front movable leg; 3. Pressure sensor; 4. Control system; 5. Angle detection module; 6. Middle lifting support device; 61. Drive assembly; 611. Drive motor; 612. Drive gear; 613. Motor mounting base; 614. Connecting rod; 615. Tension spring; 62. Position detection module; 63. H-shaped fixed leg; 64. Rolling assembly; 641. Upper mounting plate; 642. Lower mounting plate; 643. Upper roller; 644. Lower roller; 65. Middle movable leg; 7. X-shaped connecting beam; 8. Pad; 81. Sleeve; 82. Rubber ring. Detailed Implementation
[0019] The present invention will be explained in detail through the following embodiments. The purpose of disclosing the present invention is to protect all technical improvements within the scope of the present invention. In the description of the present invention, it should be understood that if terms such as "upper", "lower", "front", "rear", "left", "right" indicate orientation or positional relationship, they are only corresponding to the drawings of this application for the purpose of describing the present invention. It should be understood that if terms such as "end", "side", "end portion", "side part", "lateral", "longitudinal", etc. indicate orientation or positional relationship, they are only corresponding to the length and width of the corresponding component. That is, "end" indicates the head and tail area in the length direction of the corresponding component, and "side part" indicates the head and tail area in the width direction of the corresponding component. The present invention is disclosed for the purpose of describing the present invention and does not indicate or imply that the device or element referred to must have a specific orientation.
[0020] Example 1, in conjunction with Appendix Figure 1-6 A trestle bridge for tunnel construction, comprising: The T-shaped trestle bridge body 1 has a vehicle passage 11 on the top surface of its wings for construction vehicles and a personnel passage 12 on its belly for construction workers; that is, construction vehicles and construction workers each have their own walking passages. If needed, two personnel passages 12 can be spaced apart along the width of the belly of the trestle bridge body 1 to facilitate the separation of construction workers. Because the trestle bridge body is T-shaped, compared to the U-shaped structure in existing technologies, the thickness of the trestle bridge body at the location bearing construction vehicles is increased, thus effectively enhancing the structural strength; furthermore, it provides independent passages for both construction vehicles and construction workers, achieving the function of separating people and vehicles, which is safer than existing technologies where people and vehicles share a single walking passage.
[0021] As needed, multiple skylights 13 are provided at intervals along the length of the main body 1 of the trestle bridge on the side wall of the personnel passage 12. It should be noted that the size of the skylights 13 and the spacing between adjacent skylights 13 are not specifically limited, as long as personnel can clearly see the interior of the personnel passage 12 during the day. As needed, lighting can be installed at the top of the personnel passage 12 to ensure that the personnel passage 12 is well-lit and facilitates the passage of construction personnel.
[0022] As needed, the inner wall of the personnel passage 12 is provided with a sound-absorbing layer 14; as needed, the sound-absorbing layer 14 can be made of sound-absorbing materials such as sound-absorbing cotton and honeycomb panels; as needed, the bottom surface of the sound-absorbing layer 14 can also be provided with a floor; in this way, the noise generated by construction vehicles and vehicle passage 11 needs to pass through the sound-absorbing layer 14 before entering the personnel passage 12, and the noise in the personnel passage 12 can be effectively reduced after passing through the sound-absorbing layer 14.
[0023] The front lifting support device 2 is located at the front section of the main body 1 of the trestle bridge. The front lifting support device 2 has front fixed legs 21 symmetrically arranged on both sides of the main body 1 of the trestle bridge. The bottom of the front fixed legs 21 is provided with a first front movable leg 22 and a second front movable leg 23 located behind the first front movable leg 22 and inclined vertically, so as to increase the strength of the front lifting support device 2 to resist the load along the front end to the rear end of the main body 1 of the trestle bridge. It is conceivable that the front lifting support device 2 should also have a drive device to drive the first front movable leg 22 and the second front movable leg 23 to move. As needed, the drive device adopts a hydraulic drive device.
[0024] As needed, the first front movable support leg 22 can be set vertically or vertically. When the first front movable support leg 22 is set vertically, the direction of the tilt of the first front movable support leg 22 is the same as the direction of the tilt of the second front movable support leg 23.
[0025] It should be noted that the raising and lowering of the movable outriggers is a movement along their axial direction. For example, the raising and lowering of the second front movable outrigger 23 is not a vertical upward movement, but rather the second front movable outrigger 23 can move along its axial direction, causing the vertical position of the second front movable outrigger 23 to change.
[0026] When the first front movable support leg 22 is set vertically, the structure of the front lifting support device 2 is improved by adding a second front movable support leg 23 and a driving device for lifting the second front movable support leg 23 compared with the prior art. The horizontal component of the support force of the second front movable support leg 23 on the main body of the trestle bridge is opposite to the direction of the horizontal component of the support force of the construction vehicle on the trestle bridge when the construction vehicle is fully loaded (generally from the rear end to the front end of the trestle bridge). Therefore, the setting of the second front movable support leg 23 can reduce the radial force on the first front movable support leg 22, thereby preventing the first front movable support leg 22 from being damaged due to excessive radial force.
[0027] When the first front movable support leg 22 is also tilted up and down, the horizontal component of the force supporting the main body 1 of the trestle bridge is opposite to the direction of the horizontal component of the force exerted by the construction vehicle on the trestle bridge when the construction vehicle is traveling unloaded (generally from the front end to the rear end of the trestle bridge). Therefore, it is preferable that the first front movable support leg 22 is also tilted up and down.
[0028] Multiple pressure sensors 3 are respectively located at the bottom of the first front movable leg 22 and the bottom of the second front movable leg 23, for detecting the pressure of the corresponding movable leg on the ground; The control system 4 is connected to the front lifting support device 2 and the pressure sensor 3, and is used to control the operation of the front lifting support device 2 based on the signal transmitted by the pressure sensor 3. Due to the presence of pressure sensor 3 and control system 4, when the front end of the trestle body 1 sinks, the control system 4 can control the operation of the front lifting support device 2, causing the first front movable support leg 22 and the second front movable support leg 23 to descend, compensating for the sinking of the front end of the trestle body 1. This effectively solves the problem of the front end of the trestle body 1 sinking due to ground subsidence at the position where the first front movable support leg 22 and the second front movable support leg 23 descend and press down. Specifically, when a fully loaded construction vehicle moves from the rear to the front of the main body 1 of the trestle bridge, the center of gravity of the trestle bridge main body 1 and the construction vehicle assembly gradually shifts towards the front of the trestle bridge main body 1. At this time, the pressure value detected by the pressure sensor 3 should theoretically gradually increase (the amount of pressure change is related to the speed of the construction vehicle). When the amount of pressure change detected by the pressure sensor 3 is abnormal (the rate of pressure increase suddenly decreases, the pressure value remains unchanged or even decreases), it indicates that the front of the main body 1 of the trestle bridge is beginning to sink or has a sinking trend. At this time, the control system 4 can control the first front movable support leg 22 and the second front movable support leg 23 to descend again. The descent of the first front movable support leg 22 and the second front movable support leg 23 compensates for the sinking of the main body 1 of the trestle bridge and ensures that the first front movable support leg 22 and the second front movable support leg 23 have a strong ground contact.
[0029] The front fixed support leg 21 has a U-shaped vibration damping space 211 on its inner side, and both sides of the U-shaped vibration damping space 211 are connected to the main body 1 of the trestle bridge. This space is used to buffer the contact stress of the front fixed support leg 21 along the width direction of the main body 1 of the trestle bridge. Compared with the surface-to-surface connection between the front fixed support leg 21 and the main body 1 of the trestle bridge in the prior art, the connection is changed to a two-point connection. The presence of the U-shaped vibration damping space 211 can dampen and buffer the contact stress between the front fixed support leg 21 and the main body 1 of the trestle bridge, preventing the front fixed support leg 21 from deforming due to the lateral vibration force generated when the construction vehicle moves, or the connection between the front fixed support leg 21 and the main body 1 from becoming loose. This increases the stability of the combination of the front fixed support leg 21 and the main body 1 of the trestle bridge.
[0030] Furthermore, the main body 1 of the trestle bridge is equipped with track beams 15, and the track beams 15 are movably connected to the central lifting support device 6 along their length.
[0031] In some possible examples, the central lifting support device 6 has a drive assembly 61 for driving its movement and a position detection module 62 for detecting its position. Both the drive assembly 61 and the position detection module 62 are signal-connected to the control system 4. The trestle body 1 has graduations from its front end to its rear end to facilitate the detection of the length of the trestle body 1 erected above the excavated ground. This allows the length of the trestle body 1 erected above the excavated ground to be determined by observing the graduations, thereby ensuring that the central lifting support device 6 is located in the middle of the area where the trestle body 1 is located above the excavated ground. This allows the front lifting support device 2 and the central lifting support device 6 to support the trestle body 1 under balanced force, reducing the stress on the front lifting support device 2.
[0032] In some possible instances, combined with appendix Figure 3 The middle lifting support device 6 includes an H-shaped fixed support leg 63, with rolling components 64 on both sides of the upper U-shaped cavity of the H-shaped fixed support leg 63; and middle movable support legs 65 on both sides of the lower n-shaped cavity of the H-shaped fixed support leg 63.
[0033] In some possible instances, combined with appendix Figure 3 The rolling assembly 64 includes an upper mounting plate 641 and a lower mounting plate 642. The upper mounting plate 641 and the lower mounting plate 642 are both hinged to the side wall of the U-shaped cavity on the corresponding H-shaped fixed support leg 63. The upper mounting plate 63 is provided with upper rollers 643 at both ends, which are rolled on the top surface of the track beam 15; the lower mounting plate 642 is provided with lower rollers 644 at both ends, which are rolled on the bottom surface of the track beam 15.
[0034] Since the two upper rollers 643 can swing up and down under the action of the upper mounting plate 641, and the two lower rollers 644 can swing up and down under the action of the lower mounting plate 642, when the track beam 15 is uneven (due to manufacturing tolerances, installation tolerances, etc.), the rollers can swing up or down by rotating the corresponding mounting plate, thus overcoming the uneven position of the track beam 15. This prevents the middle lifting support device 6 from getting stuck with the uneven position of the track beam 15, and even prevents the middle lifting support device 6 from tilting when the main body of the trestle 1 is moved.
[0035] In some possible instances, combined with appendix Figure 3 and 5The drive assembly 61 includes a drive motor 611, with a drive gear 612 fixedly mounted on the output shaft of the drive motor 611. The main body 1 of the trestle has a rack 16 along its length that meshes with the drive gear 612. The drive assembly 61 also includes a motor mounting base 613, with the upper ends of connecting rods 614 hinged to both ends of the motor mounting base 613. The lower ends of the two connecting rods 614 are slidably connected to the fixed part of the middle lifting support device 6 along the length of the motor mounting base 613. A tension spring 615 is provided between the lower ends of the two connecting rods 614 to guide the motor mounting base 613 closer to the trestle body 1, thereby making the drive gear 612 mesh tightly with the rack 16. In this example, the position detection module 62 can be an encoder that is connected to the output shaft of the drive gear 612.
[0036] It should be noted that: the lower end of the connecting rod 614 can be slidably connected to the fixed part of the middle lifting support device 6 above the motor mounting base 613, and can also rotate relative to the fixed part of the middle lifting support device 6; as needed, the lower end of the connecting rod 614 can be hinged with a slider to improve the sliding connection between the slider and the fixed part of the middle lifting support device 6. At this time, the tension spring 615 can be set between the two sliders corresponding to the lower ends of the two connecting rods 614; when the middle lifting support device 6 has an H-shaped fixed leg 63, the H-shaped fixed leg 63 is part of the fixed part of the middle lifting support device 6.
[0037] This configuration allows the tension spring 615 to pull the connecting rod 614, reducing the angle between the two connecting rods 614. This, in turn, brings the motor mounting base 613 closer to the main body of the trestle, ensuring that the drive gear 612 and the rack 16 are always tightly meshed. This means that whether the central lifting support device 6 is moving along the length of the main body of the trestle 1, or the main body of the trestle 1 is moving after the central lifting support device 6 has touched the ground, or when there is wear between the drive gear 612 and the rack 16, the drive gear 612 and the rack 16 can be tightly meshed.
[0038] It should be noted that the rear end of the main body of the trestle bridge 1 also has a trestle bridge walking device.
[0039] Example 2, in conjunction with Appendix Figure 6 A tunnel construction trestle, based on Embodiment 1, has an angle detection module 5 for detecting its tilt angle on the main body 1. The angle detection module 5 is connected to the control system 4 and is used to control the operation of the front lifting support device 2 based on the signals transmitted by the pressure sensor 3 and the angle detection module 5. As needed, the angle detection module 5 can use existing equipment capable of detecting tilt angles, such as gyroscopes and angle detection sensors.
[0040] In this way, by cooperating with the angle detection module 5 and the pressure sensor 3, the control system 4 can control the descent of the first front movable leg 22 and the second front movable leg 23 according to the feedback signals of the pressure sensor 3 and the angle detection module 5, so as to ensure that the main body of the trestle 1 is always in a horizontal position.
[0041] Example 3, in conjunction with Appendix Figure 4 A tunnel construction trestle, based on embodiment one or two, has a pad 8 below the pressure sensor 4, and a sleeve 81 on the upper surface of the pad 8 that is fitted onto the lower end of the corresponding movable leg. The inner cavity of the upper end of the sleeve 81 is embedded with a rubber ring 82, and the rubber ring 82 is in a sealing and movable fit with the corresponding movable leg.
[0042] This design, through the sleeve 81 and rubber ring 82, prevents soil, sand, and gravel from entering the space where the pressure sensor 4 is located after the lower end of the movable outrigger sinks into the ground, thus preventing the pressure sensor 4 from being corroded by soil, sand, and gravel and affecting its normal use.
[0043] Example 4, in conjunction with Appendix Figure 2-3 A tunnel construction trestle, based on Embodiment 1, further includes an X-shaped connecting beam 7, with the upper two ends of the X-shaped connecting beam 7 being fixedly connected to corresponding fixed legs, and the lower two ends being slidably connected to corresponding movable legs. In other words, when the X-shaped connecting beam 7 is located between the front lifting support devices 2, the upper two ends of the X-shaped connecting beam 7 are fixedly connected to the two front fixed legs 21 respectively; the lower two ends of the X-shaped connecting beam 7 are slidably connected to the corresponding first front movable leg 22 or second front movable leg 23 respectively. It should be noted that the sliding here is along the axial direction of the corresponding front movable leg; that is, when the front movable leg is raised or lowered, the lower two ends of the X-shaped connecting beam 7 are slidably engaged with the corresponding front movable leg. When the X-shaped connecting beam 7 is located between the middle lifting support devices 6, the upper two ends of the X-shaped connecting beam 7 are fixedly connected to the two side walls of the lower n-shaped cavity of the H-shaped fixed leg 63 respectively; the lower two ends of the X-shaped connecting beam 7 are slidably connected to the two middle movable legs 65 respectively.
[0044] The parts of this invention not described in detail are prior art. It will be apparent to those skilled in the art that this invention is not limited to the details of the above exemplary embodiments, and that the invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments should be regarded as exemplary and non-limiting in all respects, and are intended to encompass all changes falling within the meaning and scope of equivalents within this invention.
Claims
1. A trestle bridge for tunnel construction, characterized in that: include: The main body of the trestle (1) is a T-shaped structure. The top surface of the wing of the main body of the trestle (1) has a vehicle passage (11) for construction vehicles to pass through, and the belly has a personnel passage (12) for construction personnel to pass through. A front lifting support device (2) is provided at the front section of the main body (1) of the trestle. The front lifting support device (2) has front fixed legs (21) symmetrically arranged on both sides of the main body (1). The bottom of the front fixed legs (21) is provided with a first front movable leg (22) and a second front movable leg (23) located behind the first front movable leg (22) and inclined up and down, so as to increase the strength of the front lifting support device (2) to resist the load along the front end to the rear end of the main body (1). Multiple pressure sensors (3) are respectively located at the bottom of the first front movable outrigger (22) and the bottom of the second front movable outrigger (23) to detect the pressure of the corresponding movable outrigger on the ground; The control system (4) is connected to the front lifting support device (2) and the pressure sensor (3) to control the operation of the front lifting support device (2) based on the signal transmitted by the pressure sensor (3); The inner side of the front fixed leg (21) is provided with a U-shaped vibration damping space (211), and both sides of the U-shaped vibration damping space (211) are connected to the main body of the trestle (1) to buffer the impact stress of the front fixed leg (21) along the width direction of the main body of the trestle (1).
2. The trestle bridge for tunnel construction according to claim 1, characterized in that: The personnel passage (12) has multiple light-transmitting windows (13) spaced at intervals along the length of the main body of the trestle (1).
3. A trestle bridge for tunnel construction according to claim 1, characterized in that: The inner wall of the personnel passage (12) is provided with a sound-absorbing layer (14).
4. A trestle bridge for tunnel construction according to claim 1, characterized in that: The main body (1) of the trestle is provided with an angle detection module (5) for detecting its tilt angle. The angle detection module (5) is connected to the control system (4) and is used to control the operation of the front lifting support device (2) based on the signals transmitted by the pressure sensor (3) and the angle detection module (5).
5. A trestle bridge for tunnel construction according to claim 1, characterized in that: The main body (1) of the trestle bridge is provided with a track beam (15) on its belly, and the track beam (15) is movably connected to a central lifting support device (6) along its length. The central lifting support device (6) has a drive component (61) for driving its movement and a position detection module (62) for detecting its position. Both the drive component (61) and the position detection module (62) are signal connected to the control system (4). The main body of the trestle (1) is marked from its front end to its rear end to facilitate the detection of the length of the main body of the trestle (1) erected above the excavated ground.
6. A trestle bridge for tunnel construction according to claim 5, characterized in that: The middle lifting support device (6) includes an H-shaped fixed support leg (63), and the upper U-shaped cavity side walls of the H-shaped fixed support leg (63) are provided with rolling components (64); the lower n-shaped cavity side walls of the H-shaped fixed support leg (63) are provided with middle movable support legs (65).
7. A trestle bridge for tunnel construction according to claim 6, characterized in that: The rolling assembly (64) includes an upper mounting plate (641) and a lower mounting plate (642). The upper mounting plate (641) and the lower mounting plate (642) are both hinged to the U-shaped cavity sidewall of the corresponding H-shaped fixed support leg (63). The upper mounting plate (63) is provided with upper rollers (643) rolling on the top surface of the track beam (15) at both ends. The lower mounting plate (642) is provided with lower rollers (644) rolling on the bottom surface of the track beam (15) at both ends.
8. A trestle bridge for tunnel construction according to claim 5, characterized in that: The drive assembly (61) includes a drive motor (611), the output shaft of the drive motor (611) is fixedly fitted with a drive gear (612), and the main body of the trestle (1) is provided with a rack (16) along its length direction that cooperates with the drive gear (612). The drive assembly (61) also includes a motor mounting base (613), with the upper ends of connecting rods (614) hinged to both ends of the motor mounting base (613), and the lower ends of the two connecting rods (614) slidingly connected to the fixed part of the middle lifting support device (6) along the length direction of the motor mounting base (613). A tension spring (615) is provided between the lower ends of the two connecting rods (614) to facilitate the motor mounting base (613) to approach the main body of the trestle (1), thereby making the drive gear (612) mesh tightly with the rack (16).
9. A tunnel construction trestle according to claim 1 or 6, characterized in that: Also includes: The X-shaped connecting beam (7) has its upper two ends fixedly connected to the corresponding fixed legs, and its lower two ends slidingly connected to the corresponding movable legs.
10. A trestle bridge for tunnel construction according to claim 1, characterized in that: The pressure sensor (4) is provided with a pad (8) below it. The upper surface of the pad (8) is provided with a sleeve (81) fitted onto the lower end of the corresponding movable leg. The inner cavity of the upper end of the sleeve (81) is embedded with a rubber ring (82), and the rubber ring (82) is sealed and movablely fitted with the corresponding movable leg.
Citation Information
Patent Citations
Trestle bridge
CN213038175U
Self-propelled tunnel inverted arch steel arch construction trestle
CN213574119U